site survey guide

Post on 27-Oct-2014

165 Views

Category:

Documents

7 Downloads

Preview:

Click to see full reader

TRANSCRIPT

无线基站勘察培训无线基站勘察培训

The training of site surveyThe training of site survey

Table of ContentsTable of Contents

The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing

The training of site surveyThe training of site survey

The step of site surveyThe step of site surveyReceiving the site

survey task

Collecting the Information about the sites network planning

Surveying on spot

Recording the survey Information on spot

Making sure the site designing (including the transmission)with NT staff on spot

Applying the site report to NT

Preparing and checking up the tools

Making sure the survey course and setting down the survey order with NT staff

Making out the site survey report and list

Confirming the designing for the second site

Design and Making out the site drawing

Delivering the site drawing to project department ,then begin to construct thesite

equipment.

Feeding back to the project leader or the network planner in

time,then we make sure .

Table of ContentsTable of Contents

The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing

The training of site surveyThe training of site survey

The content of site surveyThe content of site survey

Site survey for the traffic distributingSite survey for the traffic distributingThe covering users types:Residential area 、highway、detached

houses ;The development of the covering users and economy;The altitude of the hot area and its distance to the site.

The description of the site position:Longitude 、Latitude 、Building Altitude, and so on;

The whole description of the site environment :landforms、surface features,such as mountainous area、river、plain;

The description of the barrier:its character、height、distance ;The electromagnetism environment description around the site:

Microwave site、TV station、transformer、high voltage lines and so on.

Site survey for wireless transmission environmentSite survey for wireless transmission environment

The content of site surveyThe content of site survey

Site survey on spot Site survey on spot

Inside the room:size of room、 size of equipments、equipment layout、Cable Ladder 、 Cable Route and so on;

outside the room:tower、 Antenna\Feeder Cable System、outdoor cable tray、Cable Route and so on;

AC importing:position of transformer、 AC power line route ;Grounding System :Earthing Bar;Others :room bearing.

Table of ContentsTable of Contents

The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing

The training of site surveyThe training of site survey

Main tools for Site surveyMain tools for Site survey::

GPS、range finder、tape、steel rule(5m)、camera、compass、board、pen、telescope 、nite writer pen;

Main software for Site surveyMain software for Site survey::

MapInfo、Google Earth、photoshop、autocad、office

Tools and software for Site surveyTools and software for Site survey

GPSGPS::

The main purpose:Save the site ;navigation;Measure the distance between two sites。

The precision of the GPS must be more than5~8meters ,when we note the longitude and the latitude,so we must wait a while after open the GPS.

Tools for Site surveyTools for Site survey

Tools for Site surveyTools for Site survey

Range finder:Range finder:

The main The main purposepurpose::Measure the dimension of the BTS room;Measure the height of the building。

software for Site surveysoftware for Site survey

MapinfoMapinfo and Google Earth and Google Earth ::

PhotoshopPhotoshop

Outocad2006Outocad2006

Table of ContentsTable of Contents

The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing

The training of site surveyThe training of site survey

基站站址选择基站站址选择

as close as possible to the planning site,make for the network optimization later;distance between sites in dense urban area: 200~300m,deviationshould be less than 50 m ;distance between sites in urban area: 400~500m, deviation should be less than 100 m ;distance between sites in suburban or rural area: 800~1000m,deviation should be less than 200 m .

site position choice for early establishment should meet the coverage in hot area, such as highway、market or temple ;

site position choice in dense urban buildings should avoid the tall buildings or the construction of tall buildings near the antenna ;

General PrinciplesGeneral Principles

基站站址选择基站站址选择

Try to avoid large electromagnetic interference, the choice to the electromagnetic environment around the site should avoid radar stations, power stations or high voltage lines (> 30 m);

Leasehold BTS room is the primary choice,building the roof top tower,reducing investment ,attention to the building load-bearing;

With transmission conditions.

General PrinciplesGeneral Principles

Table of ContentsTable of Contents

The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing

The training of site surveyThe training of site survey

Site EquipmentsSite Equipments

BTS Equipment ConfigurationBTS Equipment Configuration

580x400x284 (without base, mm)1O28202

640x555x330 (mm)1S222(outdoor)8206

1S222(indoor)

1S444

1S666

2S444+S444

1600x600x550(H*W*D mm)

2S444+S666

8018 indoor BTS

Rack size per 1 rackRack Qty.Site typemodel

Power Products ConfigurationPower Products Configuration

Site EquipmentsSite Equipments

GSM 900 Antenna, 12 dBi Omni O2

SIZE:φ60×3245mm

GSM900M Dual Polarized Directional Antenna

MB900-65-17DT/MB900-65-17DT3(S444: 3 degree electronical Down Tilt)(S222: 0 degree electronical Down Tilt)

SIZE:1600×280×100mm

Antenna Antenna Products ConfigurationProducts ConfigurationSite EquipmentsSite Equipments

Antenna Products ConfigurationAntenna Products Configuration

GSM 1800M Antenna 18 dBi, 65 degree(S444、S666)

MB1800-65-18DT3SIZE:1820×200×75mm

GSM Dual Band Antenna 16 dBi, 65 degree

ODP-065R17B6/18C66 degree electronical Down Tilt

(fixed)SIZE:2345×320×195mm

Site EquipmentsSite Equipments

Antenna Products ConfigurationAntenna Products Configuration

WCDMA AntennaType:MB3F-65-18DT2electronical Down Tilt= 2 degreeMechanical Down Tilt >12 degree

Site EquipmentsSite Equipments

Cable TransmissionCable Transmission① Optical fiber transmission

SDH(16~63E1、N×63E1)

PDH(4~16E1)

DDF

DDF module

DDB

imitating siemens

Transmission choiceTransmission choice

Transmission choiceTransmission choice

Cable TransmissionCable Transmission② IP transmission G.SHDSL support DSL line distance

of at least 3.3 km(0.4 mm cable) for E1

75 Ohms unbalanced impedance.

-48V DC power

Rear Panel

Front Panel

TC-200GT

Wireless transmissionWireless transmission Microwave

One hop of Microwave Transmission Equipment Unit

Frequency:4-38 GHz

Link Capacity:4E1 16E1 N×1 STM-1Antenna&ODU

Antenna&ODU

If there is no phone line or the distance of the line is more than 3Km,Microwave must be chosen.

?

Microwave transmission condition :view range!

Transmission choiceTransmission choice

Wireless transmissionWireless transmission Microwave

sites

Centrol Room

Transmission choiceTransmission choice

Wireless transmissionWireless transmission

Microwave Equipment

Microwave

Microwave Antenna

Transmission choiceTransmission choice

ShelterShelter

14.14 7502 9703 120

Square(m2)Length(mm)L

Width(mm)W

Height(mm) H

Shelter Dimension

Site EquipmentsSite Equipments

TowerTower

5m rooftop tower5M.pdf8m rooftop tower8m.pdf18m Ground tower18m20m Ground tower20M

Site EquipmentsSite Equipments

Ground SystemGround System

5/8m rooftop tower屋顶塔接地示意图.dwg18m Ground tower18M自立塔接地示意图.dwg20m Ground tower20m三角塔接地示意图.dwg

Ground SystemGround System

The record on spot The record on spot

Existing site (indoor photos)Existing site (indoor photos)

① Site name ② inside whole ③ REC

④ Battery 300AH/Group II ⑤ BTS

⑥ AC BOX andlighting-proof box

Existing site (indoor photos)Existing site (indoor photos)

LCD of the RECTIFIER

The record on spot The record on spot

Existing site (indoor photos)Existing site (indoor photos)

The maximal power of BTS B8206/B8202 is 380W ,and the air switch we should select is 16A.

The maximal power of BTS B8018 is 3400W ,and the air switch we should select is 63A &32A

The information of the air switch!The information of the air switch!

The record on spot The record on spot

Existing site (indoor photos)Existing site (indoor photos)

The information of the feeder and the feeder windowThe information of the feeder and the feeder window

The record on spot The record on spot

Existing site (indoor photos)Existing site (indoor photos)

The information of AirThe information of Air--condition!condition! Manufacturer?Manufacturer?Capacity?Capacity?Working or not?Working or not?

Reused & change?Reused & change?

The record on spot The record on spot

How to draw the BTS room and the equipment??How to draw the BTS room and the equipment??

The record on spot The record on spot

Existing site (outdoor photos)Existing site (outdoor photos)

① the whole tower

② the outdoor ladder and the Router

③ the antenna and the poles

The record on spot The record on spot

Existing site (outdoor photos)Existing site (outdoor photos)The record on spot The record on spot

Existing site (outdoor photos)Existing site (outdoor photos)The record on spot The record on spot

How to draw the plan of outside??How to draw the plan of outside??

The record on spot The record on spot

How to draw the plan of outside??How to draw the plan of outside??

The record on spot The record on spot

New siteNew site

Finding out the information of the new site:site config、the amount of the equiment、the demand about the room area;

Marking down the new site position on the map,then input the longitude and the latitude to the GPS;

Reaching the exact position of the new site with GPS、surveying around environment、finding out the hot area;

Surveying the site and recording all the information。

Confirming the new site ,talking about the leasehold room with its owner ;

Site survey Site survey

New siteNew site

① Site name ② inside whole ③ window

④ rooftop⑤ Ground ⑥ building

The record on spot The record on spot

New siteNew siteThe record on spot The record on spot

How to draw the plan of NEW SITE??How to draw the plan of NEW SITE??

The record on spot The record on spot

How to draw the plan of NEW SITE??How to draw the plan of NEW SITE??

The record on spot The record on spot

How to draw the plan of NEW SITE??How to draw the plan of NEW SITE??

The record on spot The record on spot

How to draw the plan of NEW SITE??How to draw the plan of NEW SITE??

The record on spot The record on spot

Table of ContentsTable of Contents

The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing

The site survey reportThe site survey report

The site survey reportThe site survey report

The site survey reportThe site survey report

Table of ContentsTable of Contents

The step of site surveyThe step of site surveyThe content of site surveyThe content of site surveyThe usage of tools and softwareThe usage of tools and softwareThe choice of siteThe choice of siteThe record on spotThe record on spotThe site survey reportThe site survey reportThe drawing model of site designingThe drawing model of site designing

The training of site surveyThe training of site survey

All kinds of drawing modelsAll kinds of drawing models

The drawing modelThe drawing model

5m/8m rooftop tower(cross-shaped)5m/8m rooftop tower(I-shaped)18m Ground tower20m Ground tower

S222S444S444/S444S444/S666ShelterExisting site (change HUAWEI’S BTS)

top related