sound transit construction contracting 2013 des training conference & trade show tina davis...

Post on 21-Jan-2016

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

Sound Transit Construction Contracting

2013 DES Training Conference & Trade Show

Tina Davis

October 29, 2013

2

Construction Contracting Tools

1. Invitation for Bid (Design-Bid-Build)

2. General Contractor/Construction Manager (GC/CM)

3. Design-Build (DB)

4. Job Order Contracting (JOC)

5. Small Works Roster (SWR)

3

Advertising Contracting Opportunities

Daily Journal of Commerce• www.djc.com

eBid • www.ebidexchange.com/soundtransit

Weekly Snapshot• www.soundtransit.org

4

Construction Contracting Tools

• 1 LR station• Park and Ride GarageE320 DBB• TunnelE330 DBB• 4 LR stationsE335 GCCM• 1 LR station• Park and Ride LotE340 DBB• 2 LR stations• Park and Ride GarageE360 DB

5

Reaching out to Contractors

Design-Build Industry Review • Comment period on General Conditions

East Link and Northgate Link Outreach Event • Contract Packaging strategies

N125 TBM Tunnel Industry Review• Comment period on draft IFB

6

• Tina Davis, Design & Construction Contracts Supervisor

• Sound Transit• Tina.davis@soundtransit.org• Speaker Phone (206) 689-3372

Questions

top related