Single Site Verification Checklist - 2G

Site ID 6229 Site Name: AMP_Uhana_01BSC Name BSC16 Site On-Air Date : 2011.04.11Cell ID 62291,62292,62293 Drive Test Date : 2011.04.21

Site Coordinates:LON_81.63057 ALT (m) : 49LON_7.365231667

Planned Actual

Ph

ysic

al V

erif

icat

ion

1 Site Working Configuration 2/2/2 && 0/0/0 2/2/2 && 0/0/02 BTS Type BTS3900A GSM DBS3900 GSM

Cell 1 Cell 2 Cell 3 Cell 1 Cell 2 Cell 33 Dual Band/Single Band Single Band Single Band Single Band Single Band Single Band Single Band4 Co-BCCH/Split-BCCH - - - - - -5 Antenna Height (m) 50 50 50 50 50 506 Antena Azimuth (Degree) 120 250 340 120 250 340

7 Antenna Type

8 Antenna Tilt (Degree)E:N/A E:N/A E:N/A E:N/A E:N/A E:N/AM:3 M:3 M:3 M:3 M:3 M:3

9 Feeder Size (inch) Fiber Optics Fiber Optics Fiber Optics Fiber Optics Fiber Optics Fiber Optics10 Feeder Length (m) / Fibre Length (m) - - - - - -11 BTS Transmit Power (W) 30 30 30 30 30 3012 BTS Transmit Power Adjustment (dBm) 0 0 0 0 0 013 Antenna Swapping Test (sector swap or tx/rx swap) OK OK OK14 Antenna Feeder Lebeling OK OK OK15 TMA Installed N/A N/A N/A

15 No. of SDCCH 1 1 1 1 1 116 No. of PDCH 0 0 0 0 0 017 No. of Dynamic PDCH 0 0 0 0 0 018 BCCH 986 994 984 986 994 98419 BSIC 40 40 40 40 40 4020 HSN 58 58 58 58 58 5821 MAIO 0 2 4 0 2 422 LAC 50002 50002 50002 50002 50002 5000223 RAC 0 0 0 0 0 024 CI 62291 62292 62293 62291 62292 62293

25 No. of SDCCH N/A N/A N/A N/A N/A N/A26 No. of PDCH N/A N/A N/A N/A N/A N/A27 No. of Dynamic PDCH N/A N/A N/A N/A N/A N/A28 BCCH N/A N/A N/A N/A N/A N/A29 BSIC N/A N/A N/A N/A N/A N/A30 HSN N/A N/A N/A N/A N/A N/A31 MAIO N/A N/A N/A N/A N/A N/A32 CRO (dB) N/A N/A N/A N/A N/A N/A33 LAC N/A N/A N/A N/A N/A N/A34 RAC N/A N/A N/A N/A N/A N/A35 CI N/A N/A N/A N/A N/A N/A

Idle

Mo

de

36 RF Hopping Check GSM900 OK OK OK37 RF Hopping Check DCS1800 N/A N/A N/A38 Cell reselection from 3G to 2G is checked NA NA NA39 Cell reselection from 2G to 3G is checked NA NA NA40 Split-BCCH sites Cell reselection from GSM900 to GSM1800 is checked NA NA NA41 Cell reselection from GSM1800 to GSM900 is checked NA NA NA42 MO-SMS and MT-SMS OK OK OK43 Location Update in case of Boundry cells N/A N/A N/A44 CBCH data for GSM900 Uhana Uhana Uhana45 CBCH data for DCS1800 N/A N/A N/A

46 Mobile terminating calls (Mobile to Mobile) OK OK OK47 Mobile originating voice calls (Mobile to Mobile) OK OK OK48 Intra cell HO OK OK OK49 Inter cell HO OK OK OK50 Inter Layer HO OK OK OK51 Inter RAT HO N/A N/A N/A52 Inter BSC/MSC HO N/A N/A N/A

PS

53 PS attach is checked OK OK OK54 PS detach is checked OK OK OK55 PS PDP activation and deactivation is checked OK OK OK56 Configuration: GPRS/EDGE EDGE EDGE EDGE57 RLC Throughput- kbps Min 60 40 10058 RLC Throughput- kbps Avg 175.8 187.8 207.359 RLC Throughput- kbps Max 238 238 238

Agisson(DX-806-960-65-18i-0F)

Agisson(DX-806-960-65-18i-0F)

Agisson(DX-806-960-65-18i-0F)

Agisson(DX-806-960-65-18i-0F)

Agisson(DX-806-960-65-18i-0F)

Agisson(DX-806-960-65-18i-0F)

So

ft C

on

fig

ura

tio

n

-G

SM

90

0S

oft

Co

nfi

gu

rati

on

-

D

CS

18

00

2G/3G co-located sites

De

dic

ate

d M

od

e

a

nd

Ha

nd

ov

er

Neighbour Definition

Cell-1 Cell-2 Cell-31 AMP_Ampara_01_1 1 AMP_Ampara_02_1 1 AMP_Ampara_03_12 AMP_Ampara_01_3 2 AMP_Ampara_02_3 2 AMP_Ampara_03_33 AMP_Ampara_02_1 3 AMP_Ampara_02_DCS_3 3 AMP_Ampara_03_DCS_34 AMP_Ampara_03_1 4 AMP_Ampara_03_1 4 AMP_Central Camp_01_25 AMP_Ampara_03_2 5 AMP_Ampara_03_3 5 AMP_Central Camp_01_DCS_26 AMP_Ampara_03_3 6 AMP_Ampara_03_DCS_1 6 AMP_Gonagalla_01_17 AMP_Ampara_03_DCS_1 7 AMP_Ampara_03_DCS_3 7 AMP_Gonagalla_01_28 AMP_Ampara_03_DCS_3 8 AMP_Central Camp_01_DCS_2 8 AMP_Gonagalla_01_39 AMP_Central Camp_01_2 9 AMP_Gonagalla_01_2 9 AMP_Gonagalla_01_DCS_1

10 AMP_Central Camp_01_DCS_2 10 AMP_Gonagalla_01_3 10 AMP_Gonagalla_01_DCS_211 AMP_Gonagalla_01_2 11 AMP_Gonagalla_01_DCS_2 11 AMP_Gonagalla_01_DCS_312 AMP_Gonagalla_01_3 12 AMP_Gonagalla_01_DCS_3 12 ZQAMP_Uhana_01_113 AMP_Gonagalla_01_DCS_2 13 ZQAMP_Uhana_01_1 13 ZQAMP_Uhana_01_214 AMP_Gonagalla_01_DCS_3 14 ZQAMP_Uhana_01_3 14 ZQZAMP_Chadayantalawa_01_315 ZQAMP_Uhana_01_2 15 ZQZAMP_Chadayantalawa_01_316 ZQAMP_Uhana_01_317 ZQZAMP_Chadayantalawa_01_118 ZQZAMP_Chadayantalawa_01_219 ZQZAMP_Chadayantalawa_01_3

Following methodology is adapted during Single Site Verification (SSV) - 2G

1 BTS Installation, Feeder Installation & Antenna Installation is visually checked.2 Antenna Azimuth is verified using compass.3 Antenna down tilt is verified using inclinometer.4 Antenna feed cable lebeling accuracy is checked.

5 Following setup is used for drive testing.5.1 Drive testing tool : TEMS Investigation 8.1.35.2 No of Mobiles Used: 25.3 Mobile Details:

Make and Model Purpose IMEI NoMobile 1 Sony Ericsson K790 idle Call 352206010555842Mobile 2 Sony Ericsson K790 Long Call 352206010510482

5.4 Mobiles are latched to 2G network5.5 GPS make & Model: GARMIN GPS18x 5.6 Scanner Make & Model:5.7 Average Speed during drive test: 21.23 Kmph5.8 Date of Drive Test: 2011.04.215.9 Time of Drive Test: 11.00Am5.1 Report should based on post-drive data.

6 Data Post Processing6.1 Software tool used: TEMS Route Analyzer6.2 Distance based data binning carriedout. Bin size = 10m

7 Site Coverage Prediction7.1 Prediction Tool: Atoll7.2 Prediction model: Okumura-Hatta Model7.3

Terrain data used: Yes/NoCluter data used: Yes/NoBuilding data used: Yes/No

EventsEvent #[no.of] Relationship #Cell #LogBlocked Call 1 - - 6Call Attempt 4 - - 2 ,3 ,6Call Attempt Retry 8 - - 2 ,6Call Setup 2 - - 3 ,6Cell Change Order From UTRAN Failure 0 - - -Cell Change Order To UTRAN Failure 0 - - -Dropped Call 0 - - -Handover 185 - - 1 ,2 ,3 ,4 ,5 ,6Handover Failure 5 - - 1 ,4 ,5Handover From UTRAN Failure 0 - - -Handover To UTRAN Failure 0 - - -Location Area Update 1 - - 5Location Area Update Failure 0 - - -PS Attach Failure 0 - - -Routing Area Update 2 - - 4 ,5Routing Area Update Failure 0 - - -Inter-frequency Handover Failure 0 - - -Intra-frequency Hard Handover Failure 0 - - -

DTX Rate Downlink

FER

MS Power Control Level

SQI

TA

BCCH ARFCN

RxLev Full dBm

RxLev Sub dBm

RxQual SubdBm

MS Transmit Power

FER

SITE Coverage Prediction

Prediction vs Actual

Events IDLE

Events Dedicated

0

SEC 1

SEC 2 SEC 3

SEC 1

SEC 2

SEC3