PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 1

STRATEGIC PLANNING

WASHINGTON HARBOUR

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 2

SITE

SITE PLANWASHINGTON HARBOUR

M ST NW

K ST NW

31st

ST

NW

Thom

as J

effe

rson

ST

NW

30

th S

T N

W

Whitehurst Frwy

Presenter
Presentation Notes
Update photo and add your quote

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 3

65%

FLOO

D W

ATER

ELE

VATI

ON

EXISTING CONDITIONS & CONSTRAINTSMITIGATION STRATEGIES

TOTAL FLOOD EVENTSAVG. PER YEAR

CURRENT AVG. GATE RAISINGS PER YEARNUMBER OF GATE RAISINGS HAD 30” WALL BEEN IN PLACE

GATE RAISING PERCENT REDUCTION

158.00 15.4017.56

4.891.71

EXIS

TING

CO

NDIT

IONS

WIT

H 30

”W

ALL

FLOOD EVENTS (LAST NINE YEARS)

FLOOD EVENTS MANAGED WITH ADDITION OF 30” WALL (EL. 6.36’)

CURRENT THRESHOLD FOR GATE RAISING

Presenter
Presentation Notes
Update photo and add your quote
j.abbey
Rectangle

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 5

EXISTING CONDITIONS & CONSTRAINTSGATE IMAGERY

Presenter
Presentation Notes
Update photo and add your quote

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 6

EXISTING CONDITIONS & CONSTRAINTSGATE IMAGERY

Presenter
Presentation Notes
Update photo and add your quote

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 7

EXISTING CONDITIONS & CONSTRAINTSVIEW FROM WATERFRONT

Presenter
Presentation Notes
Update photo and add your quote

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 8

EXISTING CONDITIONS & CONSTRAINTSFLOOD IMAGERY

Presenter
Presentation Notes
Update photo and add your quote

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 9

EXISTING CONDITIONS & CONSTRAINTSCOMBI LIFT PATH

CLEARANCE REQUIRED FOR COMBI LIFT FOR EXISTING GATES

EAST BUILDING

WEST BUILDING

FOUNTAIN

Presenter
Presentation Notes
Update photo and add your quote

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 10

SITE ANALYSISTOPOGRAPHIC DIAGRAM

EL. 7.3’

EL. 4.3’

EL. 4.3’

EL. 7.3’

EL. 5.3’

EL. 5.3’

EL. 4.8’ EL. 4.6’

Presenter
Presentation Notes
Update photo and add your quote

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 11

SITE ANALYSISSECTION VIEW

EL. 4.3’ EL. 0.1’EL. 10.9’

PARKING

PARKING

BOARDWALK PROMENADE ICE RINK GRAND STAIR

EL. 4.8’

Presenter
Presentation Notes
Update photo and add your quote

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 12

CONTEXTUAL MATERIALSWASHINGTON HARBOUR

CAST STONE PLANTER BENCH

TREATED WOOD DECKING MULTI-COLOR BRICK PAVERS

LIMESTONE + PAINTED CONCRETE EXISTING STAIR TO BOARDWALKCONCRETE BOLLARDS

24”

40”

2’-0”

CAST STONE FOUNTAIN EDGE

Presenter
Presentation Notes
Update photo and add your quote

KNEE WALLBASE DESIGN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 14

KNEE WALLBASE DESIGN PLAN & ELEVATION

NEW CONCRETE WALL

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 15

KNEE WALLBASE DESIGN SECTION – KNEE WALL

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 16

KNEE WALLSECTIONS ALONG PROPOSED OPTION

B

A

C

KEY PLAN

A B C B A

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 17

KNEE WALLBASE DESIGN – AERIAL DIAGRAM

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 18

KNEE WALLEND OF WALL – PLAN & SECTION DETAIL

SECTION

PLAN

DOCK STAIR SECTION & DETAIL

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 19

KNEE WALLBASE DESIGN– RIVER VIEW LOOKING EAST (EXISTING)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 20

KNEE WALLBASE DESIGN– RIVER VIEW LOOKING EAST (EXISTING)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 21

KNEE WALLBASE DESIGN– RIVER VIEW LOOKING WEST (PROPOSED)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 22

GATE DOWNBASE DESIGN – RIVER VIEW LOOKING SOUTH FROM GRAND STAIR (EXISTING)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 23

MAIN GATE UPBASE DESIGN – RIVER VIEW LOOKING SOUTH FROM GRAND STAIR (EXISTING)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 24

KNEE WALLBASE DESIGN – RIVER VIEW LOOKING SOUTH FROM GRAND STAIR (PROPOSED)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 25

KNEE WALLBASE DESIGN – RIVER VIEW LOOKING SOUTH FROM GRAND STAIR (PROPOSED)

KEY PLAN

KNEE WALLBASE DESIGN

WITH FLOOD GATE

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 27

KNEE WALL WITH FLOOD GATEBASE DESIGN SECTION – KNEE WALL

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 28

KNEE WALL WITH FLOOD GATESECTIONS ALONG PROPOSED OPTION

B

A

C

KEY PLAN

A B C B AD D

D

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 29

KNEE WALL WITH FLOOD GATEBASE DESIGN PLAN & ELEVATION

NEW CONCRETE WALL 6’-0” FLOOD GATE

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 30

KNEE WALL WITH FLOOD GATEENLARGED PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 31

KNEE WALL WITH FLOOD GATEBASE DESIGN – AERIAL DIAGRAM

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 32

KNEE WALL WITH FLOOD GATEBASE DESIGN– RIVER VIEW LOOKING EAST (EXISTING)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 33

KNEE WALL WITH FLOOD GATEBASE DESIGN– RIVER VIEW LOOKING EAST (EXISTING)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 34

KNEE WALL WITH FLOOD GATEBASE DESIGN– RIVER VIEW LOOKING EAST (PROPOSED)

KEY PLAN

STAIR WALL

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 36

STAIR WALLPLAN & ELEVATION

NEW SLOPED ACCESS + INTEGRATED STAIRNEW CONCRETE WALL

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 37

STAIR WALLENLARGED PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 38

STAIR WALLSECTION – STAIR-SLOPE

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 39

STAIR WALLSECTIONS ALONG PROPOSED OPTION

C

B

A

KEY PLAN

A B C B A

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 40

STAIR WALLAERIAL DIAGRAM

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 41

STAIR WALLRIVER VIEW LOOKING WEST (PROPOSED)

KEY PLAN

SLOPED KEBONY DECKING @ RECREATION PIER. THE WHARF

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 42

STAIR WALLBASE DESIGN– RIVER VIEW LOOKING EAST (EXISTING)

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 43

STAIR WALLBASE DESIGN– RIVER VIEW LOOKING EAST (PROPOSED)

KEY PLAN

APPENDIX

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 45

SITE PHOTOS

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 46

SITE PHOTOS

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 47

SITE PHOTOS

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 48

SITE PHOTOS

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 49

SITE PHOTOS

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 50

SITE PHOTOS

KEY PLAN

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 51

FLOOD STUDYWATER LEVEL STATION

Two water level stations price estimate• $40k (materials) + $15k (Langan design + permitting) +$5k permit fees + ~$55k installation= $115k TOTAL

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 52

FLOOD STUDYWATER LEVEL STATION SENSOR 1

New Rock Creek Flood Mapping• 2 total water level sensors

1 on Potomac and 1 on Rock Creek

`

PERKINS EASTMAN WASHINGTON HARBOUR – GLOBAL HOLDINGS MANAGEMENT GROUP 53

FLOOD STUDYWATER LEVEL STATION

New Rock Creek Flood Mapping• 2 total water level sensors

1 on Potomac and 1 on Rock Creek

`

SENSOR 2

PREVIOUS STUDIES