streambank erosion baseline establishment project ... · segment 1 (downslope) 2(upstream) 3...

Post on 16-Jul-2020

7 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Streambank erosion baseline establishment project

Burnett & Kolan Rivers 2015

Appendix D

Site photo plates

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S4 

 

  

  

  

  

S3 

  

  

  

  

S2 

  

  

  

  

S1 Top 

  

Site 1 – Transect 1 – 13 May 2014

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S4 

 

  

  

  

  

S3 

  

  

  

  

S2a 

 

  

  

  

  

S2 

  

  

  

  

Site 1 – Transect 2 – 13 May 2014

  

S1 Top 

 

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S6 

   

S5 

   

S4 

   

S3 

   

Site 2 – Transect 1 – 20 June 2014

S2 

   

S1 Top 

    

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S8 

   

S7 

   

S6 

   

S5 

   

Site 2 – Transect 2 – 14 May 2014

S4 

   

S3a 

   

S3 

   

S2 

   

S1 Top 

    

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S6 

 

  

  

  

  

S5 

  

  

  

  

S4  

  

  

  

  

S3 

  

  

  

  

Site 3 – Transect 1 – 15 May 2014

S2 

  

  

  

  

S1 Top 

  

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S7  

  

  

  

  

S6 

  

  

  

  

S5  

  

  

  

  

S4 

 

Site 3 – Transect 2 – 15 May 2014

S3 

  

  

  

  

S2 

  

  

  

  

S1 Top 

  

Segmt  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S6  

      

 

S5 

  

  

  

  

S4  

  

  

  

  

S3 

  

  

  

  

Site 3 – Transect 2 – 15 May 2014

S2 

  

  

  

  

S1 Top 

    

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S5 

   

S4 

   

S3 

   

S2 

   

Site 4 – Transect 1 – 19 May 2014 

S1 Top 

    

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S6 

   

S5 

   

S4 

   

S3a 

   

Site 4 – Transect 2 – 19 May 2014 

S3 

   

S2 

   

S1 Top 

    

Segment  1 (Downslope)  2 (Upstream) 3 (Upslope) 4 (Downstream) 

S6 

   

S5 

   

S4 

   

S3 

   

Site 4 – Transect 3 – 19 May 2014 

S2 

   

S1 Top 

    

top related