SuDS - SUSTAINABLE URBAN DRAINAGE SYSTEMA sustainable urban drainage system (SuDS) is an alternative to the traditional pipes, gullies and culverts approach to a development and its drainage strategy. A SuDS system comprises components and techniques that are deemed to be more sustainable and deal with storm water at source.
Sustainable urban drainage systems (SuDS) mimic natural drainage processes by employing these three key principles: water quality, water quantity and biodiversity/amenity.
The Roadstone Aquaflow system provides the means to not only achieve but excel in the three key SuDS principles. Through considerate design, careful selection of techniques and materials, the Roadstone Aquaflow blocks and the Roadstone Aquaflow system deliver the following benefits:
• Reducing water quantity - Dealing withsurface water at the source reduces the effectsof urbanisation and the impact of localised flooding
• Improving water quality - RoadstoneAquaflow. provides two levels of storm watertreatment: removing harmful pollutants and protecting the environment downstream
• Contributing to the biodiversity -Contributing to the biodiversity of developmentby working in conjunction with other SuDS techniques. Roadstone Aquaflow. allows any hard standings, including roads, to be used as drainage, producing a traditional looking surface with many desirable features.
89
WAT
ER Q
UANTITY WATER QUALITY
BIODIVERSITY / AMENITY
3KEY PRINCIPLES
16
17
Asphaltconstruction
Highway Agency type 1 sub-base
Concrete haunching face on all haunching must be shovel smooth
Forest Edging
Inbitex Geotextile
SC Membrane
Aquaflow blocks
or slabs
Fin drain connected to 110mm PVC-U pipe with Formpave top hat seal
800mm centres 800mm centresSC Intergrid
Dense bitumen macadam
SC Intergrid
Inbitex Geotextile
Aquaflow blocks
Inbitex Geotextile
Road surface standard block paving over 50mm depth of sharp sand bedding course
Concrete haunching face on all haunching must be shovel smooth
Forest Edging
Inbitex Geotextile
SC Membrane
Aquaflow blocks
or slabs
Fin drain connected to 110mm PVC-U pipe with Formpave top hat seal
Inbitex Geotextile and SC Membrane brought up to haunched kerb and cut o� flush with surface of Aquaflow block/slabs
Inbitex Geotextile
SC Intergrid
Aquaflow Permeable Paving Two layer sub-base
Top layer - 5-20mm aggregate Bottom layer - 10-63mm aggregate
Laying course 2-6mm clean stone
Kerb block
Subgrade
Inbitex Geotextile
SC Intergrid
SC Intergrid
AQUAFLOW® PAVING SOLUTION
AQUAFLOW® system
Roadstone Aquaflow has used research and design to evolve the Roadstone Aquaflow permeable paving system into one of the most cost effective and functional SuDS within the marketplace.
The Roadstone Aquaflow system has a unique sub-base design incorporating SC Intergrid which reduces construction costs whilst giving superior structural performance. Water quality improvement is realised through the use of our tried and tested Inbitex Geotextile which removes the requirement
for downstream pollution control. The patented Roadstone Aquaflow system fits neatly within any block paving project, where your paving design becomes your drainage design and vice versa.
Roadstone Aquaflow SuDS can be designed as fully attenuation, fully infiltration or as a partial infiltration system. Attenuation (tanked) systems capture storm water to be collected and released in a controlled manner into sewers and downstream watercourses. Infiltration systems allow rainwater
to be infiltrated into the ground mimicking a green field environment. Storm water leaving the Roadstone Aquaflow system is cleaned and filtered through the Inbitex Geotextile layers that promote microbial action. Water quality improvement allows secondary non-potable uses to be carried out such as flushing toilets and watering the garden. The Roadstone Aquaflow system can be designed for use in both trafficked and pedestrianised areas, allowing the collection and treatment of storm water
from any paved surface.
Advantages of Roadstone Aquaflow
• Dealing with storm water at source
• Reduces water quantity
• Improves water quality
• Lowers construction costs
• Allows collection of storm water from impermeable surfaces
• Improved maintenance programme.
17
18
There are four basic systems designs (see below). Each design can be tailored for infiltration or tanked according to requirements.
TYPICAL INFILTRATION SYSTEMS
Typical In�ltration systemAreas subject to tra�cking by HGV’s
Typical In�ltration system with a sub-grade CBR of between 2-5%Parking areas subject to tra�cking by cars and vans only
Typical In�ltration system with a sub-grade CBR of 5% or greaterParking areas subject to tra�cking by cars and vans only
Typical footpath constructionFor Aqua�ow
Typical In�ltration systemAreas subject to tra�cking by HGV’s
Typical In�ltration system with a sub-grade CBR of between 2-5%Parking areas subject to tra�cking by cars and vans only
Typical In�ltration system with a sub-grade CBR of 5% or greaterParking areas subject to tra�cking by cars and vans only
Typical footpath constructionFor Aqua�ow
InfiltrationThe system is underlaid with a pervious geotextile membrane (Inbitex®) and is suitable for use where it is proposed to infiltrate the water directly into a suitable sub-grade.
TankedThe system is underlaid by an impervious plastic membrane (SC membrane) and is suitable for use where it is proposed to attenuate storm water before releasing it in a controlled manner, harvest the water for re-use or where difficult or contaminated sub-grades are encountered.
The type of membrane used and the method of sealing will depend upon the application. In some circumstances, the membrane will require additional protection from puncturing and specialist advice should be obtained.
The impervious membrane restricts water entering the sub-grade and preserves sub-grade structural integrity. This is very important where clay subgrades are encountered.
18
19
DESIGN SERVICESFROM CONCEPT TO COMPLETION
In conjunction with our permeable paving design consultants Formpave, Roadstone can offer a comprehensive design service to suit individual design requirements.
The team of experienced engineers have designed more than 3,000 permeable paving schemes, both here and in the UK, during the past 20 years.
All designs carried out by the
design team are project specific; each individual design is carefully considered and bespoke to the project in mind.
Design Services
• Validation of permeable paving designs
• Full structural and hydraulic permeable paving designs complete with layout drawings and construction details
• Free technical advice
• Access to a range of typical details
• Value engineering service
Contact us
Tel: 01 4041200
Web: www.roadstone.ie
Email: info@roadstone.ie
19
20
Charcoal Grey Causeway BlendNatural
Aqua Castlestone 60mm
Curragh Blend
Product Sizes & Quantities
AQUACASTLESTONE Permeable Block Paving
Aqua Castlestone Block Paving® consists a variety of sizes and colours ensuring that Aqua Castlestone paving is suitable for any project.
The Aqua Castlestone Block Paving range is designed to ideally suit driveways, patios and footpaths.
Pedestrian Light Vehicle
Aqua Castlestone Curragh Blend
Size Depth Quantity Quantity Bale size(mixed bale) (per m2) (per bale)
240 x 160mm
160 x 160mm
60mm 13.82m2& 43215.6 units of each size
Mixed bales include an equal number of all sizes.
21
VermontCharcoal Grey Harvest BlendNatural
Aqua Thomond 60mm
VermontCharcoal Grey Harvest BlendNatural
Aqua Thomond Single Sized 80mm
Size Depth Quantity Quantity Bale size(per m2) (per bale)
240x160mm 80mm 26 300 11.52m2
Product Sizes & Quantities
Product Sizes & Quantities
AQUA THOMOND Permeable Block Paving
Aqua Thomond Block Paving® offers a 60mm and 80mm thick pavior. The 60mm range comes in a mixed bale consisting of two sizes, 240 x 160mm and 160 x 160mm, while the 80mm range comes as a single size, namely, 240 x 160mm.
The chamfered edge defines sharp clean lines to the paved area.
Pedestrian Light Vehicle
Heavy Goods Vehicle
Size Depth Quantity Quantity Bale size(mixed bale) (per m2) (per bale)
240 x 160mm
160 x 160mm
60mm 13.82m2& 43215.6 units of each size
Natural
Mixed bales include an equal number of all sizes.
22
Natural Midnight White Granite
Aqua Verona colours
Product Sizes & Quantities 60mm mixed size bale
Size Depth Quantity Quantity Bale size(per m2) (per bale)
240x160mm 80mm 26 300 11.52m2
AQUA VERONAAqua Verona Block Paving® range is a shot-blasted pavior designed to give the exposed aggregate granite look.
It is a modern styled pavior in three different colours. The 60mm range comes in a two-size mixed bale of 240 x 160mm and 160 x 160mm, while the 80mm range comes in a single size of 240 x 160mm.
Pedestrian Light Vehicle
Heavy Goods Vehicle
Aqua Verona White Granite & Natural
Size Depth Quantity Quantity Bale size(mixed bale) (per m2) (per bale)
240 x 160mm
160 x 160mm
60mm 13.82m2& 43215.6 units of each size
Mixed bales include an equal number of all sizes.
White Granite Silver Granite
Product Sizes & Quantities 80mm single size bale
23
Limestone Sandstone
Size Depth Quantity Quantity Bale size (per m2) (per bale)
240x160mm 80mm 26 300 11.52m2
Aqua Riven Single Sized 80mm
Product Sizes & Quantities
AQUA RIVENPermeable Block Paving
Aqua Riven block paving has a surface, modelled on natural stone, available in a 240 x 160 x 80mm single size in two colours: Sandstone and Limestone.
Aqua riven block paving will give a unique textured natural stone appearance.
Pedestrian Light Vehicle
Heavy Goods Vehicle
Aqua Riven Sandstone
24
Product Sizes & Quantities
Aqua Cobblesett 80mm
Size Depth Quantity Quantity Bale size (per m2) (per bale)
200mm x 100mm 80mm 50 500 10.00m2
AQUA COBBLESETT®The Aqua Cobblesett range blends practicality and durability together in this functional pavior. Aqua Cobblesett concrete paviors are manufactured with a silica sand top giving the Aqua Cobblesett range its intense colours and durability.
Aqua Cobblesett block paving is rectangular in shape (200mm x 100mm) with a chamfered top edge. Available as 80mm thickness with a range of six different colours, Aqua Cobblesett is an option for all uses: from driveways and patios, to streetscapes and shopping centers.
Pedestrian Light Vehicle
Heavy Goods Vehicle
NaturalCharcoal Grey Tan Terracotta Multi-ColourHeather
25
Aquaflow MLTBAquaflow ML Aquaflow MLE
Aqua�ow ML block®For Roads and heavy duty useSize80mm
Laying patternInclude stretcher course aroundedge in conjunction with MLE and
MLTB
Aqua�ow MLE®EndblockFor use with Aqua�ow ML blocks
Size80mm
Aqua�ow MLTB®Top and bottom blockFor use with Aqua�ow ML blocks
Size80mm
4
4
Aqua�ow 200x100Aqua�ow MLTB
Aqua�ow ML Block Aqua�ow MLE
Forest Edge Kerb Aqua�ow ML block®For Roads and heavy duty useSize80mm
Laying patternInclude stretcher course aroundedge in conjunction with MLE and
MLTB
Aqua�ow MLE®EndblockFor use with Aqua�ow ML blocks
Size80mm
Aqua�ow MLTB®Top and bottom blockFor use with Aqua�ow ML blocks
Size80mm
4
4
Aqua�ow 200x100Aqua�ow MLTB
Aqua�ow ML Block Aqua�ow MLE
Forest Edge Kerb
Natural Charcoal Grey
AQUAFLOW ML Permeable Block Paving
Aquaflow ML permeable blocks can be laid by hand or by machine, allowing rates of over 600m2 per day to be achieved with a three-man crew.
Designed for heavy-duty applications, the Aquaflow ML block system consists of an interlocking block with specialist top, bottom and edge blocks. The Aquaflow ML block can be specified for all sites designed under BS7533-Pt13.
Pedestrian Light Vehicle
Heavy Goods Vehicle
26
STONE SPECIFICATIONS
*Aggregate Testing
Los Angeles Coefficient (LA) - Determination of resistance to fragmentation = 20 BS EN 13242:2002. Note: Lower values than those specified signifies better resistance to fragmentation and abrasion and is therefore acceptable.
Lower sub-base layer 10-63mm clean crushed stone
Sieve sizes % passing
80mm 90-100
63mm 90-100
40mm 60-80
20mm 15-30
10mm 0-5
Reference specification BS EN 13242:2002
Surface Dressing 2-4mm clean crushed stone
Sieve sizes % passing
6.3mm 100
5mm 95-100
3.35mm 66-90
1.18mm 0-20
600 microns 0-8
600 microns 0-1.5
Reference specification BS EN 1097-2:1998
BS EN 1091-8:2000 Annex A
Laying course 2-6mm clean crushed stone
Sieve sizes % passing
10mm 98-100
6.3mm 80-100
2mm 0-100
1mm 0-5
Reference specification BS EN 13242:2002
Upper sub-base layer 5-20mm clean crushed stone
Sieve sizes % passing
40mm 100
20mm 90-100
10mm 25-75*
4mm 0-15
2mm 0-5
Reference specification BS EN 13242:2002
Material specification Material supplied shall be referred to as 5-20mm clean crushed stone and conform to the above sieve analysis and aggregate testing.
26
27
AQUAFLOW® COMPONENTS
SC Intergrid
Exclusive to Roadstone/Formpave and the Aquaflow system this sub-base stabilisation grid improves structural strength, increases design life and reduces construction costs.
SC Findrain
This drainage component allows efficient and high flow removal of storm water from the Roadstone Aquaflow system. Wrapped in Inbitex Geotextile which provides further filtration and cleansing.
Aquaflow Distribution Tanks
Voided crates that are extremely strong structurally and are wrapped in Inbitex Geotextile, which provides filtration and cleansing. Allows the collection of impermeable surface water catchment, such as roofs to the Aquaflow system.
Top Hats, Tape and Fittings
Roadstone Aquaflow system components.
Inbitex Geotextile
Exclusive to Roadstone/Formpave Aquaflow system, this non-woven geotextile is used for separation, filtration and pollution control.
SC Membrane
This impermeable membrane allows the storage of collecting storm water. Used for the Aquaflow attenuation system it can be welded or taped dependent on the application. A higher grade SC Membrane GT can be specified when contamination is present.
27
28
SuDS SPECIFICATIONTypes(s) of PavingRoadstone Aquaflow permeable concrete block paving range.
ReferenceRoadstone Aquaflow paving.
SizeAs per Roadstone Ltd.
ColoursVarious colours and finishes available.
Setting OutSee page 47/48 of brochure.
KerbsSee page 30-32.
Laying course50mm depth of 2-6mm single size clean crushed stone to BS EN 13242: 2002. The crushed stone used for the laying course must have a minimum LA Coefficient of 25.
Inbitex Geotextile As specification.
Depth of Sub-baseIt is recommended that a sub-base depth of 350mm should be used. The depth of sub-base may be varied at the discretion of the engineer.
Sub-base SpecificationAll granular sub-base material shall comprise crushed rock or concrete possessing well defined edges. It must be sound, clean, non-friable and free from clay or other deleterious matter.
The material must be non-plastic when tested in accordance with BS1377 Test No.4.
The crushed stone used for the sub-base must have a minimum LA Coefficient of 25.
The selected test samples shall not be oven dried and should be soaked in water at room temperature for 48 hours before the test. The 100mm deep upper layer of sub-base material should be graded 5mm-20mm to BS EN 13242: 2002.
Intergrid(s)SC Intergrid Geogrid.
DBM Running Course To be 20mm dense base binder course manufactured with 100/150 grade bitumen to BS4987. The DBM shall conform with the Requirements of BS 4987.
SC Membrane GeomembraneGenerally a taped membrane will be suitable for most applications of the tanked system. If a guaranteed watertight system is required a fully welded system should be installed.
Examples of this type of application would be sites with a high water table, methane contamination, areas above basements or retaining walls. Further advice should be sought from the Formpave design team.
Findrain150/300mm Findrain to BBA Number 95/85.
Top hat seal Formpave top hat seal.
28
29
MAINTENANCE
Operation & maintenance requirements
Maintenance schedule Action Frequency
Regular maintenanceSweeping surface to remove debris and contamination
1-2 times a year, typically Spring and after leaf fall in
Occasional maintenance Removal of leaves As required
Remedial actions
Remediate areas of rutting and depressions
As required
Replace broken/damaged blocks
As required
Rehabilitate surface with sweeping and reapplication of 2-4mm clean gritstone
As required
Monitoring
Initial inspection Within 3 months
Inspection for poor performance and silting
Annually
Inspect ancillary drainage components i.e. gullies, outfall pipes etc
Annually