SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
NEAUPG Annual Meeting NEAUPG Annual Meeting WilkesWilkes--Barre, PABarre, PAOctober 23, 2003October 23, 2003
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #1Lesson #1What is What is this Stuff?this Stuff?
LESSON #1
Lesson #1 – What is This Stuff?Lesson #1 – What is This Stuff?
Marshall or Hveem Marshall or Hveem Method for 50 yearsMethod for 50 years
Comfort ZoneComfort ZoneAgencies developed Agencies developed their own mixestheir own mixes
Alphanumeric Code Alphanumeric Code ––AABC, Base 1, Base 2, AABC, Base 1, Base 2, BC, BF, BI, FABC, FBC, BF, BI, FABC, F--1, 1, HDB, HDS, IHDB, HDS, I--1, I1, I--2, I2, I--5, ID5, ID--2, ID2, ID--3, J3, J--1, P1, P--401, SC, 401, SC, SF, ST, Type 1, Type 1B, SF, ST, Type 1, Type 1B, Type 1C, Wearing 1, Type 1C, Wearing 1, Wearing 2Wearing 2Secret Code? Secret Code?
Lesson #1 – What is This Stuff?Lesson #1 – What is This Stuff?
Marshall or Hveem Marshall or Hveem Method for 50 yearsMethod for 50 years
Pendulum went from fine Pendulum went from fine to coarseto coarse
After 50 years of After 50 years of tinkering, these mixes tinkering, these mixes did not always perform did not always perform well, especially in high well, especially in high stress areas stress areas Change Was NecessaryChange Was Necessary
Lesson #1 – What is This Stuff?
Lesson #1 – What is This Stuff?
New Mix Names New Mix Names –– no no more secret codesmore secret codes
Metric SystemMetric SystemNominal Maximum Size Nominal Maximum Size Instead of Maximum Instead of Maximum Aggregate SizeAggregate SizeTypically Coarser than the Typically Coarser than the Mixes of the PastMixes of the Past
Potential for more Potential for more production & laydown production & laydown problemsproblems
19 mm SUPERPAVE Mix19 mm SUPERPAVE Mix
Lesson #1 – What is This Stuff?
Lesson #1 – What is This Stuff?
New Asphalts New Asphalts ––Performance GradePerformance Grade
New Secret Code to New Secret Code to Learn Learn
PG XXPG XX--XXXXNo More ACNo More AC--20?20?
New to Both Suppliers New to Both Suppliers and Contractorsand Contractors
Is it Modified?Is it Modified?HandlingHandlingTemperaturesTemperatures
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #2Lesson #2Training Training ––Leave No Leave No One BehindOne Behind
LESSON #2
Lesson #2 – Leave No One Behind
Lesson #2 – Leave No One Behind
Information Transferred Information Transferred from Researchers to from Researchers to Material Engineers and Material Engineers and TechniciansTechnicians
DOTsDOTsContractorsContractors
Laydown Crews Learned Laydown Crews Learned by Trial & Errorby Trial & ErrorPavement Designers Pavement Designers ––No Training?No Training?
Select MixSelect MixSelect PG BinderSelect PG BinderSelect ThicknessSelect Thickness
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #3Lesson #3SUPERPAVE SUPERPAVE is Not is Not ForgivingForgiving
LESSON #3
Lesson #3 – SUPERPAVE is Not Forgiving
Lesson #3 – SUPERPAVE is Not Forgiving
SUPERPAVE Mix SUPERPAVE Mix Designs are sensitive to Designs are sensitive to material changes caused material changes caused by the HMA plantby the HMA plant
Material BreakdownMaterial BreakdownChange in Aggregate Change in Aggregate Surface TextureSurface Texture
Allow for Material Allow for Material BreakdownBreakdownVerify the Mix Prior to Verify the Mix Prior to Starting the ProjectStarting the Project
Lesson #3 – SUPERPAVE is Not Forgiving
Lesson #3 – SUPERPAVE is Not Forgiving
Consistent, Quality Consistent, Quality Aggregate SupplyAggregate SupplyProper Stockpiling Proper Stockpiling and Material and Material HandlingHandlingGood Plant Good Plant OperationsOperations
CalibrationCalibrationDust Return Dust Return SystemSystemMaintenanceMaintenance
Lesson #3 – SUPERPAVE is Not Forgiving
Lesson #3 – SUPERPAVE is Not Forgiving
Comfort Zone with Comfort Zone with Fine Marshall MixesFine Marshall MixesSloppy Laydown Sloppy Laydown Practices Yield Practices Yield Lousy Results with Lousy Results with Coarse SUPERPAVE Coarse SUPERPAVE MixesMixes
Poor EquipmentPoor EquipmentPoor TechniquesPoor Techniques
Lack of TrainingLack of TrainingPoor AttitudePoor AttitudeLazinessLaziness
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #4Lesson #4How Many How Many Bins, Tanks Bins, Tanks and Silos?and Silos?
LESSON #4
Lesson #4 – How Many Bins, Tanks and Silos?
Lesson #4 – How Many Bins, Tanks and Silos?
SUPERPAVE Mixes are SUPERPAVE Mixes are More Sensitive to More Sensitive to Gradation Changes Gradation Changes --Require Tighter ControlRequire Tighter ControlMore Cold Feed Bins More Cold Feed Bins Required Required
Marshall Marshall -- 3 or 4 bins3 or 4 binsSUPERPAVE SUPERPAVE -- minimum 6minimum 6
Lesson #4 – How Many Bins, Tanks and Silos?
Lesson #4 – How Many Bins, Tanks and Silos?
Not Just ACNot Just AC--20 Anymore 20 Anymore –– Multiple Asphalt Tanks Multiple Asphalt Tanks RequiredRequired
Standard Grade Standard Grade –– PG 64PG 64--2222Bump Grade Bump Grade –– PG 70PG 70--2222PMA PMA –– PG 76PG 76--2222Recycle Mixes Recycle Mixes –– PG 58PG 58--28?28?
Lesson #4 – How Many Bins, Tanks and Silos?
Lesson #4 – How Many Bins, Tanks and Silos?
Storage Silos Storage Silos –– limits limits number of mixesnumber of mixesFour Mixes Four Mixes -- 9.5mm, 9.5mm, 12.5mm, 19mm, 25mm12.5mm, 19mm, 25mmFour ESAL levels Four ESAL levels -- four four asphalt contentsasphalt contentsPG Binders PG Binders -- PG 64PG 64--22, 22, PG 70PG 70--222232 Mix Designs 32 Mix Designs -- 3 Silos3 SilosTry to limit number of Try to limit number of mixes per projectmixes per project
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #5Lesson #5Back to Back to BasicsBasics
LESSON #5
Lesson #5 – Back to BasicsLesson #5 – Back to Basics
Production & Production & Laydown “Best Laydown “Best Practices” Practices”
Developed While Developed While Using Marshall & Using Marshall & Hveem Mixes Hveem Mixes Also Worked With Also Worked With SUPERPAVESUPERPAVEMUSTMUST be used to be used to Place SUPERPAVE Place SUPERPAVE SuccessfullySuccessfully
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #6Lesson #6Don’t Stop!Don’t Stop!
LESSON #6
Lesson #6 – Don’t Stop!Lesson #6 – Don’t Stop!
Consistent, NonConsistent, Non--Stop Stop Movement of HMA Movement of HMA Material and the Paver Material and the Paver is the Goalis the Goal
Mat TextureMat TexturePrevent SegregationPrevent SegregationSmoothnessSmoothness
Lesson #6 – Don’t Stop!Lesson #6 – Don’t Stop!
Match Paver Speed to Match Paver Speed to Delivery Rate of HMA to Delivery Rate of HMA to the Jobthe Job
250 tph delivery 250 tph delivery -- 12’ lane, 12’ lane, 2.00” lift2.00” lift
250 tph x 9 sy/ton = 2250 sy/hr250 tph x 9 sy/ton = 2250 sy/hr2250 sy/hr x 9 sf/sy = 20,250 2250 sy/hr x 9 sf/sy = 20,250 sf/hrsf/hr20,250 sf/hr / 12’ width = 1688 20,250 sf/hr / 12’ width = 1688 ft/hrft/hr1688 ft/hr / 60 min/hr = 28 1688 ft/hr / 60 min/hr = 28 ft/minft/min
400 tph requires 45 ft/min400 tph requires 45 ft/min
Lesson #6 – Don’t Stop!Lesson #6 – Don’t Stop!
Plan for Easy, Quick Entry Plan for Easy, Quick Entry and Exit from Paver for and Exit from Paver for Delivery TrucksDelivery Trucks
Train Truck Drivers in Train Truck Drivers in Proper ProceduresProper Procedures
Trucks Lined Up in Front Trucks Lined Up in Front of Paver With Beds of Paver With Beds RaisedRaisedPaver Bumps TruckPaver Bumps TruckNo Cleanout in Front of No Cleanout in Front of PaverPaver
Designate a location Designate a location on the project siteon the project site
Traffic ControlTraffic Control
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #7Lesson #7No Jail No Jail Breaks!Breaks!
LESSON #7
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Keep HMA Confined Keep HMA Confined in a Mass From the in a Mass From the Plant to the Plant to the PavementPavementLarger Aggregate Larger Aggregate Particles Will Particles Will “Break & Run” At “Break & Run” At Any Time Prior to Any Time Prior to Passing Under The Passing Under The Screed If You Allow Screed If You Allow It It –– SEGREGATIONSEGREGATION
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Segregation in HMA Segregation in HMA PlantPlant
No Obstructions in No Obstructions in DrumDrumDrag Conveyor Drag Conveyor OperationOperationStorage Storage -- Batcher and Batcher and Silo GatesSilo Gates
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Truck Loading Truck Loading ProcedureProcedure
Prevent “Break Prevent “Break & Run” From & Run” From Silo Into Truck Silo Into Truck BedBed3 Drops3 Drops
Use Tailgate, Use Tailgate, Front of Dump Front of Dump Body, and First Body, and First Two Drops as Two Drops as ConfinementConfinement
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Truck Unloading Truck Unloading ProcedureProcedure
Raise Dump Bed & Place Raise Dump Bed & Place Mix Against Tailgate Mix Against Tailgate BeforeBeforeOpening ItOpening ItDump HMA into Paver as Dump HMA into Paver as a Massa Mass
Don’t Dribble Don’t Dribble –– Prevent Prevent “Break & Run” From “Break & Run” From Truck into PaverTruck into Paver
Train Truck Drivers in Train Truck Drivers in Proper ProceduresProper Procedures
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Paver Hopper Paver Hopper OperationOperation
Keep Hopper Deck Keep Hopper Deck Covered With HMA At Covered With HMA At All TimesAll TimesHopper Wings Hopper Wings Dumped Only Into Dumped Only Into HalfHalf--Full Hopper DeckFull Hopper Deck
Prevent EndPrevent End--ofof--Load Load SegregationSegregation
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Paver Feeder Paver Feeder OperationOperation
Prevent “Break & Prevent “Break & Run” of Coarse Run” of Coarse Aggregate Under Aggregate Under Feeder Gear BoxFeeder Gear Box
Diverter PlatesDiverter PlatesReverse AugersReverse Augers
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Paver Feeder Paver Feeder OperationOperation
Flow Gates Set Flow Gates Set for Consistent for Consistent Feeder OperationFeeder OperationMaintain Constant Maintain Constant Head of MaterialHead of Material
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Paver Feeder Paver Feeder OperationOperation
Move Mix as a Move Mix as a Confined Mass to Confined Mass to End GateEnd Gate
Auger ExtensionsAuger ExtensionsAuger Tunnel Auger Tunnel ExtensionsExtensions
Lesson #7 – No Jail Breaks!Lesson #7 – No Jail Breaks!
Material Transfer Material Transfer VehicleVehicle
Reduces TruckReduces Truck--Dumping IssuesDumping IssuesRemixing Reduces Remixing Reduces Silo And TruckSilo And Truck--Loading SegregationLoading SegregationIf Paver Hopper Insert If Paver Hopper Insert Is Kept Full Is Kept Full ––Reduces Segregation Reduces Segregation Caused By Hopper Caused By Hopper OperationOperationDoes Does NOTNOT Correct Correct Poor Practices Poor Practices Behind the HopperBehind the Hopper
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #8Lesson #8It’s Not Easy It’s Not Easy to Be Denseto Be Dense
LESSON #8
Lesson #8 - It’s Not Easy to be Dense
Lesson #8 - It’s Not Easy to be Dense
CoarseCoarse--Graded SUPERPAVE Graded SUPERPAVE Mixes Typically Harder to Mixes Typically Harder to Compact than Marshall MixesCompact than Marshall MixesMajor Adjustment for Major Adjustment for Agencies and Contractors Agencies and Contractors Using Poor Marshall Density Using Poor Marshall Density SpecificationsSpecifications
10% 10% -- 12% in12% in--place air voids place air voids typicaltypicalWorked for fineWorked for fine--graded Marshall graded Marshall mixesmixesPermeability problemsPermeability problems for SP for SP mixesmixes
Lesson #8 - It’s Not Easy to be Dense
Lesson #8 - It’s Not Easy to be Dense
Factors Affecting Factors Affecting CompactionCompaction
Lift Thickness (Design)Lift Thickness (Design)Mix Temperature (Contractor)Mix Temperature (Contractor)Compactive Effort Compactive Effort (Contractor)(Contractor)Strength of Underlying Strength of Underlying Material (Design) Material (Design)
Cannot achieve density Cannot achieve density when paving over when paving over structurally unsound structurally unsound materialmaterialWeak SubgradeWeak SubgradeRoadway ShouldersRoadway Shoulders
Lesson #8 - It’s Not Easy to be Dense
Lesson #8 - It’s Not Easy to be Dense
All SUPERPAVE All SUPERPAVE Coarse Mixes DO NOT Coarse Mixes DO NOT HAVE A Tender HAVE A Tender Zone!!!Zone!!!Tender Mix VS. Tender Mix VS. Tender ZoneTender ZoneOnly 1/3 of Only 1/3 of SUPERPAVE coarse SUPERPAVE coarse mixes have shown a mixes have shown a Tender ZoneTender ZoneBuild a Test StripBuild a Test Strip
Lesson #8 - It’s Not Easy to be Dense
Lesson #8 - It’s Not Easy to be Dense
Use Enough Rollers to Use Enough Rollers to Achieve DensityAchieve Density
Three or Four?Three or Four?WidthWidthHigh FrequencyHigh FrequencyRubber tired?Rubber tired?
Keep Front Roller Close Keep Front Roller Close to Paver to Paver -- If Mix If Mix Temperature is Temperature is AppropriateAppropriateUse an Infrared Use an Infrared Temperature GunTemperature Gun
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #9Lesson #9Good Good Equipment is Equipment is a Must!a Must!
LESSON #9
Lesson #9 – Good Equipment is a Must!
Lesson #9 – Good Equipment is a Must!
HMA Plant Must be in HMA Plant Must be in Good Condition and Good Condition and Calibrated to Produce Calibrated to Produce Quality SUPERPAVE Mixes Quality SUPERPAVE Mixes ConsistentlyConsistentlyCalibrate QuarterlyCalibrate Quarterly
Truck ScalesTruck ScalesBelt ScalesBelt ScalesAsphalt Pump MeterAsphalt Pump MeterThermocouplesThermocouples
Lesson #9 – Good Equipment is a Must!
Lesson #9 – Good Equipment is a Must!
Paver in Poor Condition Cannot Paver in Poor Condition Cannot Place a Quality PavementPlace a Quality PavementA Paver in Perfect Mechanical A Paver in Perfect Mechanical Condition May Still Place a Condition May Still Place a Lousy HMA Pavement Lousy HMA Pavement
Paver AdjustmentsPaver AdjustmentsFeeder GatesFeeder GatesFeeder ControlsFeeder Controls
Head of MaterialHead of MaterialFeeder SpeedFeeder Speed
Screed & ExtensionsScreed & ExtensionsElectronic Grade ControlElectronic Grade Control
Lesson #9 – Good Equipment is a Must!
Lesson #9 – Good Equipment is a Must!
Compaction Equipment Compaction Equipment Must be in Good Must be in Good Condition and WellCondition and Well--MaintainedMaintained
Engine RPMEngine RPMHydrostatic SystemHydrostatic System
Smooth travel movementSmooth travel movementVibratory systemVibratory system
DrumsDrumsSmoothSmoothRoundRound
Water SprayWater Spray
SUPERPAVE Construction –Lessons Learned
SUPERPAVE Construction –Lessons Learned
Lesson #10Lesson #10Quality Starts Quality Starts at The Topat The Top
LESSON #10
Lesson #10 – Quality Starts at the Top
Lesson #10 – Quality Starts at the Top
Commitment to Commitment to Quality Must Start Quality Must Start With Upper Level With Upper Level ManagementManagementManagement Must Management Must ClearlyClearly Communicate Communicate Expectation of Expectation of Quality to All Quality to All EmployeesEmployees
Lesson #10 – Quality Starts at the Top
Lesson #10 – Quality Starts at the Top
Management Must Management Must Provide Necessary Provide Necessary Resources to Resources to Perform Quality WorkPerform Quality Work
PeoplePeopleMotivatedMotivatedCelebrate SuccessCelebrate Success
TrainingTrainingEquipmentEquipmentMaterialsMaterials
SUPERPAVE Construction –Lessons Learned (Summary)SUPERPAVE Construction –Lessons Learned (Summary)
1) What is This Stuff?1) What is This Stuff?2) Training 2) Training –– Leave No One Leave No One BehindBehind3) SUPERPAVE is Not Forgiving3) SUPERPAVE is Not Forgiving4) How Many Bins, Tanks and 4) How Many Bins, Tanks and Silos?Silos?5) Back to Basics5) Back to Basics6) Don’t Stop!6) Don’t Stop!7) No Jail Breaks!7) No Jail Breaks!8) It’s Not Easy to Be Dense8) It’s Not Easy to Be Dense9) Good Equipment is a Must9) Good Equipment is a Must10) Quality Starts at the Top10) Quality Starts at the Top
SUPERPAVE Construction –Lessons Learned (Summary)SUPERPAVE Construction –Lessons Learned (Summary)
Pressures to Meet Pressures to Meet Production Targets Production Targets Should Not Make Us Should Not Make Us Forget or Set Aside Forget or Set Aside the Lessons Learnedthe Lessons Learned