Supplement A
Quality Assurance Project Plan
Quality Assurance Project Plan
Failure Analyses of Underground Storage Tank Equipment in Biofuels Service II
Investigation of Corrosion Influencing Factors in Underground Storage Tanks with Ultra LowSulfur Diesel Service
Version 2
Prepared for U.S. EPA Office of Solid Waste and Emergency Response/ Office of Underground Storage Tanks
STREAMS II, Task Order 0016 Battelle Contract EP-C-11-038
Prepared by Battelle Memorial Institute
January 16, 2015
505 King Avenue | Columbus, Ohio 43201-2696 | 800.201.2011 | solutions@battelle.org | www.battelle.org
http:www.battelle.orgmailto:solutions@battelle.org
UST Corrosion Investigation QAPP Date: 1/16/2015
Version: 2 Page 2 of 38
Anne Marie Gregg Date Battelle Task Order Leader
1/16/2015 Elizabeth Cuti Date Battelle Quality Assurance Manager
A1 TITLE AND APPROVAL PAGE
Quality Assurance Project Plan
for
Investigation of Corrosion Influencing Factors in Underground
Storage Tanks
with Ultra Low Sulfur Diesel Service
Version 2
Ryan Haerer Date U.S. EPA OSWER/OUST Task Order Contracting Officers Representative
Date U.S. EPA OSWER/OUST
1/16/2015
Quality Assurance Manager
UST Corrosion Investigation QAPP Date: 1/16/2015
Version: 2 Page 4 of 38
A2 TABLE OF CONTENTS
SECTION A PROJECT MANAGEMENT.....................................................................................1 A1 TITLE AND APPROVAL PAGE......................................................................................2 A2 TABLE OF CONTENTS ...................................................................................................4 A3 LIST OF ABBREVIATIONS/ACRONYMS ....................................................................6 A4 DISTRIBUTION LIST.......................................................................................................7 A5 PROJECT ORGANIZATION............................................................................................8
A5.1 Battelle ..................................................................................................................8 A5.2 Tanknology, Inc. .................................................................................................10 A5.3 U.S. EPA OSWER/OUST ..................................................................................11 A5.4 Subcontracted Analytical Laboratories...............................................................11
A6 PROBLEM DEFINITION/BACKGROUND ..................................................................12 A6.1 Project Backround and Objectives......................................................................12 A6.2 Schedule of Milestones and Deliverables ...........................................................16
A7 PROJECT DESCRIPTION ..............................................................................................16 A8 QUALITY OBJECTIVES AND CRITERIA FOR MEASUREMENT DATA ..............18 A9 SPECIAL TRAINING NEEDS/CERTIFICATION ........................................................18 A10 DOCUMENTS AND RECORDS.................................................................................19
SECTION B: DATA GENERATION AND ACQUISITION....................................................20 B1 EXPERIMENTAL DESIGN............................................................................................20
B1.1 Information Gathering ........................................................................................20 B1.2 UST Database .....................................................................................................21
B2 OBTAINING SAMPLES.................................................................................................21 B2.1 Vapor Sampling Method.....................................................................................24 B2.2 Fuel and Water Sampling Methods.....................................................................24
B3 SAMPLE HANDLING AND CUSTODY.......................................................................25 B4 ANALYSIS METHODS..................................................................................................25 B5 QUALITY CONTROL REQUIREMENTS ....................................................................27 B6 INSTRUMENT/EQUIPMENT TESTING, INSPECTION, AND
MAINTENANCE..........................................................................................................31 B7 INSTRUMENT/EQUIPMENT CALIBRATION AND FREQUENCY .........................31 B8 INSPECTION/ACCEPTANCE OF SUPPLIES AND CONSUMABLES......................31 B9 NON-DIRECT MEASUREMENTS................................................................................31 B10 DATA MANAGEMENT.................................................................................................32 B11 STATISTICAL ANALYSIS APPROACH...................................................................32
SECTION C: ASSESSMENT AND OVERSIGHT...................................................................34 C1 ASSESSMENTS AND RESPONSE ACTIONS .............................................................34
C1.1 Data Quality Audit ..............................................................................................34 C1.2 Technicl Systems Audit ......................................................................................34 C1.3 QA/QC Reporting ...............................................................................................35
UST Corrosion Investigation QAPP Date: 1/16/2015
Version: 2 Page 5 of 38
SECTION D: DATA VALIDATION AND USABILITY .........................................................36 D1 DATA REVIEW, VALIDATION, AND VERIFICATION............................................36 D2 VALIDATION AND VERIFICATION METHODS ......................................................36 D3 RECONCILIATION WITH USER REQUIREMENTS..................................................36
SECTION E: REFERENCES.....................................................................................................37
APPENDICES
Appendix A UST Inspection List Appendix B Owner/Operator Site Questions Appendix C Inspection Checklist and Sample Collection Log Appendix D Tanknology Job Hazard Analysis Appendix E CRC Protocol: Corrosion Coverage Classification
FIGURES
Figure 1. Project Organizational Chart .......................................................................................... 8 Figure 2. Example of Observed Corrosion on an STP................................................................. 14 Figure 3. Closed-Core Sampling Thief (a) and Tanknology Vacuum Sampler (b)..................... 22
TABLES
Table 1. Anticipated Testing Schedule ........................................................................................ 16
Table 5. Data Quality Objectives and Frequency of Instrument Calibration for Fuel Analysis
Table 6. Data Quality Objectives and Frequency of Instrument Calibration for Water Bottom
Table 7. Data Quality Objectives and Frequency of Instrument Calibration for Vapor Analysis
Table 2. Project Records Submitted to TOL................................................................................ 19 Table 3. Sample Summary Information....................................................................................... 23 Table 4. Analytical Methods by Matrix ....................................................................................... 26
Methods......................................................................................................................................... 28
Analysis Methods.......................................................................................................................... 29
Methods......................................................................................................................................... 30
UST Corrosion Investigation QAPP Date: 1/16/2015
Version: 2 Page 6 of 38
A3 LIST OF ABBREVIATIONS/ACRONYMS
ALS-CA ALS Global laboratory in California ALS-OH ALS Global laboratory in Ohio ASTM ASTM International CCV continuing calibration verification CFR Code of Federal Regulations COC chain of custody CRC Coordinating Research Council DQO data quality objective EPA United States Environmental Protection Agency ICFTL Iowa Central Fuel Testing Laboratory lpm liters per minute LRB laboratory record book LSD low sulfur diesel MIC microbial influenced corrosion NACE National Association of Corrosion Engineers International NIST National Institute of Standards and Technology NIOSH National Institute for Occupational Safety and Health % percent ppm part per million QA quality assurance QAPP Quality Assurance Project Plan QC quality control RFS Renewable Fuel Standard RMO Records Management Office SOP standard operating procedure STP submersible turbine pump STREAMS Scientific, Technical, Research, Engineering and Modeling Support SwRI Southwest Research Institute TO task order TOCOR Task Order Contracting Officers Representative TOL Task Order Leader TSA technical systems Audit TVS Tanknology Vacuum Sampler ULSD ultra low sulfur diesel US United States UST underground storage tank
UST Corrosion Investigation QAPP Date: 1/16/2015
Version: 2 Page 7 of 38
A4 DISTRIBUTION LIST
Ryan Haerer U.S. EPA OSWER/OUST 1200 Pennsylvania Avenue, NW Washington, DC 20460
Michael Pomes U.S. EPA Reg