Agenda
Project status (15 min) achieving the goals of the iteration project metrics
Work results (15 min) presenting the iteration’s results demo
Used work practices (5 min) Discussion (5 min)
3
T-76.4115 T-76.4115 IterationIteration demo demo
Introduction to the project
Customer: Nokia Networks / Service Business Unit Customer representatives:
Jari Jyrävä – business issues Antti Ahonen – technical issues
Project team: Management team: Jukka Kurkinen (PM), Tapio Janasik (QaM), Sami Saariaho
(LD) Development team: Janne Ruskeeniemi, Semi Arajuuri, Sun Jian, Pu Fan
Project’s purpose To produce a database upgrade tool which enables automatic database
upgrades from unknown database structure.
4
T-76.4115 T-76.4115 IterationIteration demo demo
Stakeholders and staffing
Mgmt Team
Jukka Kurkinen PM
Sami Saariaho LD Tapio Janasik QA
Janne Ruskeeniemi Dev
• RE, DataBase, Java
Semi Arajuuri Dev
• DataBase, SQL
Sun Jian Dev
• Java, testing
Pu Fan Dev
• Java, XML, testing
Customer
Jari Jyrävä (business)
Antti Ahonen (technical)
MentorMarkus Rautopuro
5
T-76.4115 T-76.4115 IterationIteration demo demo
Status of the iteration’s goals
Goal 1: Design core architecture OK
Goal 2: Implement selected use cases (UC2 and UC4) OK
Goal 3: Deliver the first limited version of the system for trialing OK
6
T-76.4115 T-76.4115 IterationIteration demo demo
Status of the iteration’s deliverables
Project plan OK
QA plan OK
Requirements document OK
Technical specification OK
Test cases, test report and test log OK
SEPA diaries OK
Progress report OK
7
T-76.4115 T-76.4115 IterationIteration demo demo
Realization of the tasks
TaskId Task Responsible Hours (Est) Hours (Act) Left
I1_1 Iteration planning meeting All 18.5 15.5 0I1_2 Project management JKu 30 28.5 0I1_2.1 Meetings All 55 76.5 0I1_3 Requirements engineering JRu 10 0 0I1_4 QA planning TJa 10 16.5 0I1_5 Oracle installation JRu 8 8 0I1_6 Studying Twiki, Bugzilla,
SubversionAll 21 40 0
I1_7 SEPA All 60 45 0
I1_8 PL/SQL script development for removal part
SAr 30 26 0
I1_9 XML schema design FPu 15 12.5 0I1_10 Core SSa 45 57.5 0I1_11 Error handling SSa 10 7.5 0I1_12 Log Services SSa 10 2.5 0I1_13 User interface design (GUI
design and non-interactive command line implementation)
SJi 15 44.5 0
I1_14 GUI -implementation FPu
I1_15 Data Access Services- connect to db- disconnect to db- read metadata from db- get schema list from db
JRu 30 16 0
I1_16 File I/O Services- save to file
JRu 8 0.5 0
I1_17 SQL Services- generate SQL
SAr 15 32 0
I1_18 XML Services- generate XML
FPu 15 21.5 0
TestingI1_19 Test case design TJa 20 15.5 0I1_20 Integration tests SSa 20 16.5 0
JRu 15 1 0TJa 10 12 0
I1_21 System tests SJi 20 15 0FPu 10 0.5 0TJa 30 24 0
I1_22 Acceptance tests CustomerJRu 10
I1_23 Peer testing planning TJa 3.5 0 3.5544 535
Design and Implementation
Project management & other tasks
8
T-76.4115 T-76.4115 IterationIteration demo demo
Working hours by person
Major discrepancies in realizations: Effort estimation inaccuracies
Real Plan DiffJKu 50,5 56,5 -6TJa 88,5 96,5 -8SSa 109 108 1JRu 41 94 -53SAr 91,5 68 23,5SJi 82,5 58 24,5PFu 72 63 9Total 535 544
Realized hours in this iteration
9
T-76.4115 T-76.4115 IterationIteration demo demo
Working hours by person
Real Plan DiffJKu 50,5 56,5 -6TJa 88,5 96,5 -8SSa 109 108 1JRu 41 94 -53SAr 91,5 68 23,5SJi 82,5 58 24,5PFu 72 63 9Total 535 544
Realized hours in I1 iteration Plan in the beginning of this iteration
PP Σ I1 I2 TotalJKu 55 55 40 75 170TJa 23,5 23,5 73,5 73 170SSa 14 14 70 86 170JRu 22,5 22,5 60 67,5 150SAr 3 3 60 107 170SJi 1 1 60 109 170PFu 1 1 60 109 170Total 120 120 423,5 626,5 1170
Latest plan (inc. realized hours and other updates)
PP I1 Σ I2 TotalJKu 55 50,5 105,5 64,5 170TJa 23,5 88,5 102,5 67,5 170SSa 14 109 123 47 170JRu 22,5 41 63,5 86,5 150SAr 3 91,5 94,5 75,5 170SJi 1 82,5 83,5 86,5 170PFu 1 72 73 97 170Total 120 535 655 515 1170
10
T-76.4115 T-76.4115 IterationIteration demo demo
Quality metrics I
I1 I2 TotalReported 24 - 24Closed 23 - 23Open 1 - 1
Bug metrics
Block Crash Major Minor Tweak TotalTotal open 0 0 0 1 0 1This iteration reported
2 0 6 11 4 23
Block Crash Major Minor Tweak TotalConf.Services 1 1DataAccess 1 1Error Handling 2 3 5File I/O 1 1Log Services 1 1SQL Services 2 2UI 4 2 6XML Services 2 3 2 7
11
T-76.4115 T-76.4115 IterationIteration demo demo
Quality metrics II
Other QA metrics unit test coverage: 41% (Coverlipse)
calculated using integration test suite Not all trivial exceptions covered help methods (for testing for examle) not covered Data Access Service not included since there is a problem with
Coverlipse and reading db over network UI not JUnit tested (tested during system tests) not included in
coverage report code reviews
Static analysis: https://baseb.nbl.fi/staticanalysis/ Some refactoring needed ( I2)
source code metrics See page 12
Blocking bugs found: Bug11: NullPointerException from XmlGenerator (null objects) Bug17: NumberFormatException from XmlParser (“null” input string)
12
T-76.4115 T-76.4115 IterationIteration demo demo
Quality assessment by components
Functional component
Coverage Quality Comments
UI 3 Fault tolerance a lot better, errors are logged.
Data Access 2 Looks good, but bug 26 about portability needs to be investigated.
Error handling 2 Looks good.
File I/O 2 Looks good.
Logging 3 Logging is informative (a lot is logged though).
SQL service 2 Bug fixing done, looks good.
XML service 2 Lots of bug fixing done, looks good.
Core 2 We are doing alright, but issues about version id's need to be investigated.
Conf. services 2 We are doing alright.
Legend
Coverage: Quality:
0 = nothing = quality is good
1 = we looked at it = not sure
2 = we checked all functions = quality is bad
3 = it’s tested
13
T-76.4115 T-76.4115 IterationIteration demo demo
Software size in Lines of Code (LOC)
PP I1 I2
UI / Command line 0 425/- -
UI / GUI 446/- -
Core 842/80% -
Data Access 0 296/- -
File I/O 0 64/45% -
Logging 0 58/60% -
SQL service 0 256/76% -
XML service 0 552/69% -
Conf. services 0 42/39% -
Total LOC, DbUpgrader 2981 -
Unit tests LOC 437 -
Total LOC 0 3418 -
Total Unit Test Coverage (unit test code not included)
41% -
Comments (COM) 0 ? -
14
T-76.4115 T-76.4115 IterationIteration demo demo
Changes to the project
No major changes during the I1.
15
T-76.4115 T-76.4115 IterationIteration demo demo
Risks
Risk status:
Root causes of risk event
1
Technical contact person changing job or continuously loaded with higher priority tasks
Customer cannot provide enough technical support.
Development slows down. Agreed functionalities cannot be delivered in time.
3 1 LOW
2
Accident in Nebula's premises (fire, water damage)
Nebula server destroys files stored on it
All deliverables done so far are lost
5 1 MEDIUM
3
Changing customer contact persons, unclear and insufficient requirement document, not controlled change management
Changing customer requests Delays in project schedule. Effort used to not relevant tasks
3 2 MEDIUM
4
Contact person changing job or company.
Frequent changes in customer interface (contact persons)
Communication becomes more difficult. Priorities in requirements changing.
1 1 LOW
5
Accident, long lasting sickness, suspending studies
Loss of critical project resources Major schedule impact to the project. More effort required to compensate the loss
4 1 LOW
6
Customer requirement for NDA
NDAs required from course personnel
Confilct situation if mentor won't sign. Course cannot be passed until the situation is clarified
5 0 N/A
7
Delay in customer's development work
SQL script not available according to agreed schedule
Project cannot start in time corcerning SQL part
4 0 N/A
8
Customer cannot put enough priority to this project
SQL script for upgrade part not available according to agreed schedule
Use cases 1 and 7 cannot be tested.
3 2 MEDIUM
Risk ID
RISK EVENT Consequences Estimated impactscale (1-5)
Estimated probability scale (1-3)
Risk magnitude
16
T-76.4115 T-76.4115 IterationIteration demo demo
Results of the iteration
Technical specification PL/SQL script User interface UC2 and UC4
17
T-76.4115 T-76.4115 IterationIteration demo demo
System overview
The system consists of the following high level features:
It handles upgrade from unknown database structure to given target structure.
It supports both Oracle and MySQL.
It has a graphical user interface, a command line interface and it can be used from another Java application.
It has a PL/SQL based upgrade solution for Oracle databases.
It can create an XML description file of existing database. This file can be then used to specify the target structure for upgrade.
Use case diagram:
18
T-76.4115 T-76.4115 IterationIteration demo demo
Technical specification – components and services
Components and services of the system:
19
T-76.4115 T-76.4115 IterationIteration demo demo
Technical specification – core architecture
Core architecture of the system:
20
T-76.4115 T-76.4115 IterationIteration demo demo
User interface and UC 2 and UC4
Demo…
21
T-76.4115 T-76.4115 IterationIteration demo demo
Used work practices
Time reporting Time reporting done according to iteration task list (little variation to task list)
Iterative development Tasks identified and planned at the beginning of the iteration Implementation status reviewed in the middle of the iteration Not possible tasks transferred to I2
Risk management Risks identified in the risk workshop and documented Risk status gone trough in project team meetings
Communication Face2face communication in meetings Emails IRC discussions Phone calls and conference calls Wiki used for meeting memo delivery and discussions Subversion used for document store and delivery
Effort estimation Effort estimation done by LD and developers
Work practices to be changed in I2: Time reporting could be still made more accurate to match exactly task list Effort estimation could be made more accurate