CSE Senior Design IICSE Senior Design IITest PlanningTest Planning
Mike O’DellMike O’Dell
Based on an earlier presentation by Based on an earlier presentation by Mike O’Dell, UTAMike O’Dell, UTA
1
CSE 4317 2
Test Planning … when?Test Planning … when?Occurs throughout the product life cycle
Requirement completeness Architectural integrity Component design precision Implementation correctness
But all too often we wait until the end to “validate” what we have already done.
1
CSE 4317 3
System VerificationSystem Verification
SRD: System Requirements
ADS: ArchitectureSpecification
DDS: Detailed Design Specification
Implementation
Integration Test
Component Test (a.k.a.
Function Test)Unit Test
System Validation
Test
System Verification
System Definition
MAP:All SpecifiedRequirements
MAP:All ModuleInterfaces &Interactions
MAP:All Modules
MAP:All Subsystem & LayerInterfaces &Interactions
1 System VerificationSystem VerificationUnit Test: verifies that EVERY module
(Hardware & Software) specified in the DDS operates as specified.
Component/Function Test: verifies integrity of ALL inter-module interfaces and interactions.
Integration Test: verifies integrity of ALL inter-subsystem/layer interfaces and interactions.
System Verification Test: verifies ALL requirements are met.
CSE 4317 4
1 System Test Plan ContentsSystem Test Plan Contents IntroductionExecutive Summary (purpose, scope, etc.)References
SRD (requirements drive the system-level tests you do)
ADS (architecture drives the subsystem and integration testing)
Etc. (detailed design, standards, sample plans, etc. that are test drivers)
Test Item(s) – What will be tested
CSE 4317 5
1 System Test Plan ContentsSystem Test Plan ContentsDesign decomposition (relationship of specific
modules to test plan, test cases) Limitations of product under test (restrictions,
assumptions, caveats, etc.)Other product-level restraints on testingRisks (in test phase)
Specific risks that may affect testing/test outcome Impact assessment and management plan as it
relates to these risks
CSE 4317 6
1 System Test Plan ContentsSystem Test Plan ContentsFeatures to be tested
List of specific features (from the USERS’ viewpoint) that you will test
Features NOT to be tested List of those features (USERS’ perspective) that
cannot/will not be tested Describe rationale for not testing each item (not in
current release, insufficient test capability, low risk feature that is hard to test, not a user-visible feature)
CSE 4317 7
1 System Test Plan ContentsSystem Test Plan ContentsApproach (Strategy)
Overall test strategy (what, why, and how of your test plan)
Number of hardware and software configurations tested/not tested
Plan to deal with defects identified (re-integration, regression)
Identify metrics for overall success (number of bugs found/corrected/open, number of critical features passed, etc.)
Identify any special requirements for testing
CSE 4317 8
1 System Test Plan ContentsSystem Test Plan Contents Item Pass/Fail criteria
List specific criteria for each unit/module/feature to be tested (number and severity of defects, any specific tests that indicate system failure, etc.)
Test Deliverables List what is to be delivered by this test plan (plan
document, test cases, error logs, etc.) Incident/Bug/Problem Reports (IRs)
Test Schedule (should be consistent with your published project plan)
CSE 4317 9
1 System Test Plan - ResourcesSystem Test Plan - ResourcesIEEE Std 829-1998, IEEE Standard for
Software Test Documentation
Test Plan Outline for IEEE Format (from Gerrard Consulting)
CSE 4317 10