The New Growth Management Statute

TransportationProportionate Fair Share

GR

OW

TH

MANAG

EMENT

• Clarified the ties between concurrency and Capital Improvements

What Has Changed In The Growth Management Laws?

Concurrency

Capital Improvement ProgrammingFinancial Feasibility

GR

OW

TH

MANAG

EMENT

Context• Ramification: Meaningful Capital

Improvement

• Program closely coordinated with local Concurrency Management System

If you plan for it, you must demonstrate you can pay for it.

GR

OW

TH

MANAG

EMENT

The Strategic Intermodal System (SIS)

• Mitigation for development impacts to facilities on the Strategic Intermodal System made pursuant to this subsection requires the concurrence of the Department of Transportation.

GR

OW

TH

MANAG

EMENT

The Foundation of the New Growth Management Law (Chapter 163)

• The Comprehensive Plan’s Capital Improvement Elements (CIEs) must be financially feasible

– It must achieve and maintain the adopted Level of Service

– Either you have the capacity… or you can have it in 3 years

• Previously concurrency was managed at the Certificate of Occupancy (CO) Phase

• Now it is earlier, at the Development Order (DO) Phase

• DCA reviews for compliance

GR

OW

TH

MANAG

EMENT

What is Development Order (DO) and Certificate of Occupancy (CO) ?

Development Order – Permission to begin development

GR

OW

TH

MANAG

EMENT

What is Development Order (DO) and Certificate of Occupancy (CO) ?• Certificate of

Occupancy– Permission to use the

building, parking lot, start your business

GR

OW

TH

MANAG

EMENT

Why Doing This At Development Order Time Is More Effective?

• Development Order– Capacity available or

planned

• Certificate of Occupancy– Building ready to open– Financial commitments

made

Proactive/Real Time

Reactive

GR

OW

TH

MANAG

EMENT

What does it mean to you in local government?

• The New Growth Management Law (Chapter 163) changes and strengthens Growth Management

• Concurrency flexibility provided over time– De minimis

– Exceptions (TCEAs, TCMAs & MMTDs)

– “Backlogged” roads were part of the 1985 “legacy”

GR

OW

TH

MANAG

EMENT

Objectives of “New” Concurrency

• Create “hard” concurrency system to Manage but Not Stop growth

• Provides options for developments to move forward

• Create public/private partnerships to produce infrastructure

• Mechanism: Provide proportionate fair share mitigation option

GR

OW

TH

MANAG

EMENT

Objectives of “New” Concurrency• Required local

governments to adopt mechanism for Proportionate Fair Share by December 1, 2006

http://www.dot.state.fl.us/planning/gm/pfso/default.htm

Proportionate Fair Share

Website

GR

OW

TH

MANAG

EMENT

Best Practices

http://www.dot.state.fl.us/planning/gm/pfso/default.htm

GR

OW

TH

MANAG

EMENT

Model Ordinance

http://www.dot.state.fl.us/planning/gm/pfso/default.htm

GR

OW

TH

MANAG

EMENT

When Do You Use Proportionate Share?

• Developer has applied for Development Order (DO) and failed concurrency

• Does not apply to DRIs

GR

OW

TH

MANAG

EMENT

Options For Developer (From The Model Ordinance)

• Chapter 163 provides options for developer to proceed (Sec. E, General Requirements)– Developer has the Right to use Prop Fair Share on any

project in 5-year CIE and long term Concurrency Management System (CMS)

– Developer MAY negotiate project with local government

• Project financially feasible

• Project placed in next CIE update

• Local Governments can say “not at this time”

GR

OW

TH

MANAG

EMENT

Options For Developer

• How does the Proportionate Fair-Share payment interact with existing impact fees?– No double dipping

– Credit should be given to impact fees used for the same project

GR

OW

TH

MANAG

EMENT

Options for Proportionate Fair-Share(From the Model Ordinance)• Section E (1) (b)

The 5-year schedule of capital improvement in the local government CIE or long term schedule of capital improvements for a Long Term Concurrency Management System (LTCMS) , includes a transportation improvement that, upon completion, will satisfy the requirements of the local government’s transportation CMS.

GR

OW

TH

MANAG

EMENT

Options for Proportionate Fair-Share(From the Model Ordinance)

• Options to satisfy the requirements of the transportation CMS (Section E. (1) (b))

• Language provides for viable options by local government– New reliever corridors

– Transit

– Comprehensive capital operational improvements

GR

OW

TH

MANAG

EMENT

Options for transportation CMSReliever Corridors• Blairstone Rd. Extension - Tallahassee

GR

OW

TH

MANAG

EMENT

Options to meet concurrencyReliever Corridors• How can local governments use these

reliever projects in their system?

–It should be in Comprehensive Plan as a reliever

–Should be agreed to by FDOT

–Should be documented on how it will relieve traffic on other overloaded facilities