CÁLCULO DEL TRANSPORTE DE MATERIAL PARA AFIRMADO

05 TRANSPORTE05.01 Transporte de material para Afirmado hasta 1 Km 25,227.91

05.02 Transporte de material para Afirmado > 1 Km 31,341.00

CALZADA

D<=1 Km D >1 Km

00+000 00+106 3.65 0.00 3.60 106.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

00+106 01+000 3.65 0.00 3.10 894.00 3.75 3,352.50 45.00 146.04 0.15 531.53 1,646.15 531.53 1,114.62

01+000 02+000 3.65 0.00 2.15 1,000.00 3.75 3,750.00 90.00 107.99 0.15 592.20 1,273.23 592.20 681.03

02+000 03+000 3.65 0.00 0.12 1.03 1,000.00 3.75 3,750.00 45.00 98.37 0.15 584.01 601.53 584.01 17.52

03+000 04+000 3.65 0.00 0.12 0.03 1,000.00 3.75 3,750.00 90.00 163.57 0.15 600.54 18.02 18.02 0.00

04+000 05+000 3.65 0.00 0.85 1,000.00 3.75 3,750.00 45.00 154.59 0.15 592.44 503.57 503.57 0.00

05+000 06+000 3.65 0.00 1.85 1,000.00 3.75 3,750.00 45.00 134.89 0.15 589.48 1,090.54 589.48 501.06

06+000 06+460 3.65 0.00 2.58 460.00 3.75 1,725.00 45.00 99.71 0.15 280.46 723.58 280.46 443.12

06+460 07+000 9.27 0.00 2.54 540.00 3.75 2,025.00 45.00 38.37 0.15 316.26 803.29 316.26 487.03

07+000 08+000 9.27 0.00 1.77 1,000.00 3.75 3,750.00 45.00 149.11 0.15 591.62 1,047.16 591.62 455.54

08+000 09+000 9.27 0.00 0.12 0.65 1,000.00 3.75 3,750.00 45.00 168.59 0.15 594.54 386.45 386.45 0.00

09+000 10+000 9.27 0.00 0.12 0.11 1,000.00 3.75 3,750.00 45.00 180.88 0.15 596.38 65.60 65.60 0.00

10+000 11+000 9.27 0.00 1.23 1,000.00 3.75 3,750.00 45.00 146.86 0.15 591.28 727.27 591.28 135.99

11+000 12+000 9.27 0.00 2.23 1,000.00 3.75 3,750.00 45.00 142.21 0.15 590.58 1,317.00 590.58 726.42

12+000 13+000 9.27 0.00 3.23 1,000.00 3.75 3,750.00 45.00 135.39 0.15 589.56 1,904.27 589.56 1,314.72

13+000 13+650 9.27 0.00 4.06 650.00 3.75 2,437.50 136.30 0.15 386.07 1,565.51 386.07 1,179.44

13+650 14+000 18.02 0.00 4.20 350.00 3.75 1,312.50 45.00 55.10 0.15 211.89 888.88 211.89 676.99

14+000 15+000 18.02 0.00 3.52 1,000.00 3.75 3,750.00 45.00 149.21 0.15 591.63 2,082.54 591.63 1,490.91

15+000 16+000 18.02 0.00 2.52 1,000.00 3.75 3,750.00 45.00 221.52 0.15 602.48 1,518.24 602.48 915.77

16+000 17+000 18.02 0.00 1.52 1,000.00 3.75 3,750.00 215.84 0.15 594.88 904.21 594.88 309.34

17+000 18+000 18.02 0.00 0.12 0.40 1,000.00 3.75 3,750.00 90.00 117.87 0.15 593.68 237.47 237.47 0.00

18+000 19+000 18.02 0.00 0.12 0.36 1,000.00 3.75 3,750.00 45.00 142.69 0.15 590.65 212.64 212.64 0.00

19+000 20+000 18.02 0.00 1.48 1,000.00 3.75 3,750.00 45.00 245.51 0.15 606.08 896.99 606.08 290.92

20+000 21+000 18.02 0.00 2.48 1,000.00 3.75 3,750.00 45.00 158.77 0.15 593.07 1,470.80 593.07 877.74

21+000 22+000 18.02 0.00 3.48 1,000.00 3.75 3,750.00 45.00 210.89 0.15 600.88 2,091.07 600.88 1,490.19

22+000 22+020 18.02 0.00 3.99 20.00 3.75 75.00 3.02 0.15 11.70 46.69 11.70 34.99

22+020 23+000 26.02 0.00 3.51 980.00 3.75 3,675.00 45.00 163.08 0.15 582.46 2,044.44 582.46 1,461.98

m3-Km

m3-Km

INICIO (Prog)

FIN (Prog)

UBICACIÓN DE CANTERAS

ACCESO (Km)

D.L.P. -120.00 m

(Km)

DISTANCIA (Km)

LONGITUD (m)

ANCHO (m)

AREA (m2)

Plazoletas (m2)

Sobre ancho

(m2)

ESPESOR (m)

VOLUMEN (m3)MOMENTO

(m3-Km)

C - 06 Km

26+020Acceso: Directo

C - 02 Km

03+650Acceso: Directo

C - 03Km

09+270Acceso: Directo

C - 04Km

18+020Acceso: Directo

C - 07 Km

34+220Acceso: Directo

C - 08 Km

41+820Acceso: Directo

Km 00+000 Km 44+932

CÁLCULO DEL TRANSPORTE DE MATERIAL PARA AFIRMADO

05 TRANSPORTE05.01 Transporte de material para Afirmado hasta 1 Km 25,227.91

05.02 Transporte de material para Afirmado > 1 Km 31,341.00

CALZADA

D<=1 Km D >1 Km

m3-Km

m3-Km

INICIO (Prog)

FIN (Prog)

UBICACIÓN DE CANTERAS

ACCESO (Km)

D.L.P. -120.00 m

(Km)

DISTANCIA (Km)

LONGITUD (m)

ANCHO (m)

AREA (m2)

Plazoletas (m2)

Sobre ancho

(m2)

ESPESOR (m)

VOLUMEN (m3)MOMENTO

(m3-Km)

C - 06 Km

26+020Acceso: Directo

C - 02 Km

03+650Acceso: Directo

C - 03Km

09+270Acceso: Directo

C - 04Km

18+020Acceso: Directo

C - 07 Km

34+220Acceso: Directo

C - 08 Km

41+820Acceso: Directo

Km 00+000 Km 44+932

23+000 24+000 26.02 0.00 2.52 1,000.00 3.75 3,750.00 230.72 0.15 597.11 1,504.71 597.11 907.60

24+000 25+000 26.02 0.00 1.52 1,000.00 3.75 3,750.00 90.00 196.82 0.15 605.52 920.39 605.52 314.87

25+000 25+520 26.02 0.00 0.76 520.00 3.75 1,950.00 122.62 0.15 310.89 236.28 236.28 0.00

25+520 26+000 26.02 0.00 0.12 0.14 480.00 3.90 1,872.00 45.00 156.69 0.20 414.74 58.06 58.06 0.00

26+000 27+000 26.02 0.00 0.12 0.36 1,000.00 3.90 3,900.00 45.00 431.92 0.20 875.38 315.14 315.14 0.00

27+000 28+000 26.02 0.00 1.48 1,000.00 3.90 3,900.00 45.00 274.75 0.20 843.95 1,249.05 843.95 405.10

28+000 29+000 26.02 0.00 2.48 1,000.00 3.90 3,900.00 45.00 298.35 0.20 848.67 2,104.70 848.67 1,256.03

29+000 30+000 26.02 0.00 3.48 1,000.00 3.90 3,900.00 45.00 239.94 0.20 836.99 2,912.72 836.99 2,075.73

30+000 30+120 26.02 0.00 4.04 120.00 3.90 468.00 31.26 0.20 99.85 403.40 99.85 303.55

30+120 31+000 34.22 0.00 3.66 880.00 3.90 3,432.00 45.00 292.33 0.20 753.87 2,759.15 753.87 2,005.28

31+000 32+000 34.22 0.00 2.72 1,000.00 3.90 3,900.00 45.00 335.72 0.20 856.14 2,328.71 856.14 1,472.57

32+000 33+000 34.22 0.00 1.72 1,000.00 3.90 3,900.00 45.00 194.77 0.20 827.95 1,424.08 827.95 596.13

33+000 34+000 34.22 0.00 0.72 1,000.00 3.90 3,900.00 45.00 205.90 0.20 830.18 597.73 597.73 0.00

34+000 35+000 34.22 0.00 0.12 0.16 1,000.00 3.90 3,900.00 45.00 240.75 0.20 837.15 133.94 133.94 0.00

35+000 36+000 34.22 0.00 0.12 1.16 1,000.00 3.90 3,900.00 143.06 0.20 808.61 937.99 808.61 129.38

36+000 37+000 34.22 0.00 2.28 1,000.00 3.90 3,900.00 45.00 132.27 0.20 815.45 1,859.24 815.45 1,043.78

37+000 38+000 34.22 0.00 3.28 1,000.00 3.90 3,900.00 145.61 0.20 809.12 2,653.92 809.12 1,844.80

38+000 38+020 34.22 0.00 3.79 20.00 3.90 78.00 8.70 0.20 17.34 65.72 17.34 48.38

38+020 39+000 41.82 0.00 3.31 980.00 3.90 3,822.00 45.00 177.90 0.20 808.98 2,677.72 808.98 1,868.74

39+000 39+390 41.82 0.00 2.63 390.00 3.90 1,521.00 45.00 63.82 0.20 325.96 855.66 325.96 529.69

39+390 40+000 41.82 0.00 2.13 610.00 3.75 2,287.50 138.15 0.15 363.85 773.18 363.85 409.33

40+000 41+000 41.82 0.00 1.32 1,000.00 3.75 3,750.00 45.00 146.21 0.15 591.18 780.36 591.18 189.18

41+000 42+000 41.82 0.00 0.12 0.20 1,000.00 3.75 3,750.00 45.00 198.23 0.15 598.98 119.80 119.80 0.00

42+000 43+000 41.82 0.00 0.12 0.56 1,000.00 3.75 3,750.00 45.00 185.97 0.15 597.15 334.40 334.40 0.00

43+000 44+000 41.82 0.00 1.68 1,000.00 3.75 3,750.00 45.00 166.85 0.15 594.28 998.39 594.28 404.11

44+000 44+932 41.82 0.00 2.65 932.00 3.75 3,495.00 90.00 187.52 0.15 565.88 1,497.31 565.88 931.44

180,926.20 30,041.52 56,568.91 25,227.91 31,341.00

CÁLCULO DEL TRANSPORTE DE MATERIAL PARA AFIRMADO

05 TRANSPORTE05.01 Transporte de material para Afirmado hasta 1 Km 25,227.91

05.02 Transporte de material para Afirmado > 1 Km 31,341.00

CALZADA

D<=1 Km D >1 Km

m3-Km

m3-Km

INICIO (Prog)

FIN (Prog)

UBICACIÓN DE CANTERAS

ACCESO (Km)

D.L.P. -120.00 m

(Km)

DISTANCIA (Km)

LONGITUD (m)

ANCHO (m)

AREA (m2)

Plazoletas (m2)

Sobre ancho

(m2)

ESPESOR (m)

VOLUMEN (m3)MOMENTO

(m3-Km)

C - 06 Km

26+020Acceso: Directo

C - 02 Km

03+650Acceso: Directo

C - 03Km

09+270Acceso: Directo

C - 04Km

18+020Acceso: Directo

C - 07 Km

34+220Acceso: Directo

C - 08 Km

41+820Acceso: Directo

Km 00+000 Km 44+932

Dist.Media (Km): 1.88

PLANILLA DE METRADOS

ESTUDIO : ESTUDIO DEFINITIVO PARA LAREHABILITACION DE LA CARRETERA SAJINOS-PAIMAS-AYABACA-

SOCCHABAMBA, TRAMO: PAIMAS-AYABACA

TRAMO : Paimas (Km 27+027) - Dv. Lagunas (Km 39+140)

DEPARTAMENTO : PIURA

CONSULTOR : CONSORCIO VICTOR CHAVEZ INGENIEROS

FECHA: Febrero 2011

RESUMEN TRANSPORTE

ITEM DESCRIPCIÓN UNIDAD METRADO

4.00 TRANSPORTE

4.08 TRANSPORTE DE PIEDRA PARA MEJORAMIENTO HASTA 1 KM. M3K 11,638.27

4.09 TRANSPORTE DE PIEDRA PARA MEJORAMIENTO > 1 KM. M3K 425,925.52

ESTUDIO : ESTUDIO DEFINITIVO PARA LAREHABILITACION DE LA CARRETERA SAJINOS-PAIMAS-AYABACA- SOCCHABAMBA, TRAMO: PAIMAS-AYABACATRAMO : Paimas (Km 27+027) - Dv. Lagunas (Km 39+140)DEPARTAMENTO : PIURACONSULTOR : CONSORCIO VICTOR CHAVEZ INGENIEROS FECHA: Febrero 2011

CÁLCULO DEL TRANSPORTE DE PIEDRA PARA MEJORAMIENTO DE SUBRASANTE

TRANSPORTE DE MATERIALES EN OBRATransporte de piedra para mejoramiento hasta 1 Km 11,638.27Transporte de piedra para Mejoramiento > 1 Km 425,925.52

CANTERA ESPESOR (m) D<=1 Km D >1 Km

56+300 57+000 ZAMBA 31+200 0.50 0.12 25.830 3,220.00 576.47 14.00 0.08 304.84 100.00% 304.84 7,873.96 304.84 7,569.12

57+000 58+000 ZAMBA 31+200 0.50 0.12 26.680 4,600.00 825.50 28.00 0.08 436.28 100.00% 436.28 11,639.95 436.28 11,203.67

58+000 59+000 ZAMBA 31+200 0.50 0.12 27.680 4,730.00 673.77 14.00 0.08 433.42 100.00% 433.42 11,997.11 433.42 11,563.69

59+000 60+000 ZAMBA 31+200 0.50 0.12 28.680 5,330.00 580.75 28.00 0.08 475.10 100.00% 475.10 13,625.87 475.10 13,150.77

60+000 61+000 ZAMBA 31+200 0.50 0.12 29.680 4,600.00 732.12 14.00 0.08 427.69 100.00% 427.69 12,693.83 427.69 12,266.14

61+000 62+000 ZAMBA 31+200 0.50 0.12 30.680 4,810.00 740.25 42.00 0.08 447.38 100.00% 447.38 13,725.62 447.38 13,278.24

62+000 63+000 ZAMBA 31+200 0.50 0.12 31.680 5,600.00 780.52 14.00 0.08 511.56 100.00% 511.56 16,206.27 511.56 15,694.71

63+000 64+000 ZAMBA 31+200 0.50 0.12 32.680 5,600.00 436.23 42.00 0.08 486.26 100.00% 486.26 15,890.92 486.26 15,404.67

64+000 65+000 ZAMBA 31+200 0.50 0.12 33.680 5,600.00 738.78 14.00 0.08 508.22 100.00% 508.22 17,116.93 508.22 16,608.71

65+000 66+000 ZAMBA 31+200 0.50 0.12 34.680 5,600.00 957.49 14.00 0.08 525.72 100.00% 525.72 18,231.94 525.72 17,706.22

66+000 67+000 ZAMBA 31+200 0.50 0.12 35.680 5,600.00 1,121.33 14.00 0.08 538.83 100.00% 538.83 19,225.33 538.83 18,686.50

67+000 68+000 ZAMBA 31+200 0.50 0.12 36.680 5,600.00 751.18 0.00 0.08 508.09 100.00% 508.09 18,636.90 508.09 18,128.81

68+000 69+000 ZAMBA 31+200 0.50 0.12 37.680 5,600.00 770.19 0.00 0.08 509.62 100.00% 509.62 19,202.30 509.62 18,692.69

69+000 70+000 ZAMBA 31+200 0.50 0.12 38.680 5,600.00 773.41 0.00 0.08 509.87 100.00% 509.87 19,721.88 509.87 19,212.01

70+000 71+000 ZAMBA 31+200 0.50 0.12 39.680 5,390.00 437.94 14.00 0.08 467.36 100.00% 467.36 18,544.65 467.36 18,077.30

71+000 72+000 ZAMBA 31+200 0.50 0.12 40.680 5,600.00 573.65 28.00 0.08 496.13 100.00% 496.13 20,182.65 496.13 19,686.52

72+000 73+000 ZAMBA 31+200 0.50 0.12 41.680 5,600.00 741.13 42.00 0.08 510.65 100.00% 510.65 21,283.91 510.65 20,773.26

INICIO (Prog)

FIN (Prog)

UBICACIÓN DE CANTERA

ACCESO (Km)

D.L.P. -120.00 m

(Km)

DISTANCIA (Km)

AREA (m2)Plazoletas

(m2)Sobre ancho

(m2)VOLUMEN

PARCIAL (m3)% DE USO

VOLUMEN A UTILIZAR (m3)

MOMENTO (m3-Km)

Km 27+027 Km 80+096.12Km 39+140

C - 03 (Tondopa)Km 38+200

Acceso: Directo

C - 01 (Paimas)

Km 30+100Acceso: 1

Km

C - 02(Zambai) Km 31+200

Acceso: Directo

ESTUDIO : ESTUDIO DEFINITIVO PARA LAREHABILITACION DE LA CARRETERA SAJINOS-PAIMAS-AYABACA- SOCCHABAMBA, TRAMO: PAIMAS-AYABACATRAMO : Paimas (Km 27+027) - Dv. Lagunas (Km 39+140)DEPARTAMENTO : PIURACONSULTOR : CONSORCIO VICTOR CHAVEZ INGENIEROS FECHA: Febrero 2011

CÁLCULO DEL TRANSPORTE DE PIEDRA PARA MEJORAMIENTO DE SUBRASANTE

TRANSPORTE DE MATERIALES EN OBRATransporte de piedra para mejoramiento hasta 1 Km 11,638.27Transporte de piedra para Mejoramiento > 1 Km 425,925.52

CANTERA ESPESOR (m) D<=1 Km D >1 KmINICIO (Prog)

FIN (Prog)

UBICACIÓN DE CANTERA

ACCESO (Km)

D.L.P. -120.00 m

(Km)

DISTANCIA (Km)

AREA (m2)Plazoletas

(m2)Sobre ancho

(m2)VOLUMEN

PARCIAL (m3)% DE USO

VOLUMEN A UTILIZAR (m3)

MOMENTO (m3-Km)

Km 27+027 Km 80+096.12Km 39+140

C - 03 (Tondopa)Km 38+200

Acceso: Directo

C - 01 (Paimas)

Km 30+100Acceso: 1

Km

C - 02(Zambai) Km 31+200

Acceso: Directo

73+000 74+000 ZAMBA 31+200 0.50 0.12 42.680 5,600.00 871.25 28.00 0.08 519.94 100.00% 519.94 22,191.04 519.94 21,671.10

74+000 75+000 ZAMBA 31+200 0.50 0.12 43.680 5,600.00 737.54 14.00 0.08 508.12 100.00% 508.12 22,194.82 508.12 21,686.70

75+000 76+000 ZAMBA 31+200 0.50 0.12 44.680 5,600.00 522.50 28.00 0.08 492.04 100.00% 492.04 21,984.35 492.04 21,492.31

76+000 77+000 ZAMBA 31+200 0.50 0.12 45.680 5,550.00 740.76 42.00 0.08 506.62 100.00% 506.62 23,142.44 506.62 22,635.82

77+000 78+000 ZAMBA 31+200 0.50 0.12 46.680 5,600.00 608.29 14.00 0.08 497.78 100.00% 497.78 23,236.52 497.78 22,738.74

78+000 79+000 ZAMBA 31+200 0.50 0.12 47.680 5,600.00 662.61 42.00 0.08 504.37 100.00% 504.37 24,048.30 504.37 23,543.94

79+000 80+000 ZAMBA 31+200 0.50 0.12 48.680 5,600.00 253.17 14.00 0.08 469.37 100.00% 469.37 22,849.11 469.37 22,379.73

80+000 80+096 ZAMBA 31+200 0.50 0.12 49.228 537.60 0.00 0.00 0.08 43.01 100.00% 43.01 2,117.20 43.01 2,074.19

128,367.60 16,606.83 504.00 11,638.27 11,638.27 437,563.79 11,638.27 425,925.52

Dist.Media (Km): 37.60

CÁLCULO DEL TRANSPORTE DE MATERIAL PARA AFIRMADO

05 TRANSPORTE05.01 Transporte de material para Afirmado hasta 1 Km 22,175.60

05.02 Transporte de material para Afirmado > 1 Km 61,918.98

CALZADA

SECTOR MEZCLA D<=1 Km D >1 Km

20+120 C-01 (90%)20+120 25+500

C-01 19+140 0.00 0.12 3.555,380.00 3.825 20,578.50 0.25 5,144.63

90.00% 4,630.16 16,437.08 4,630.16 11,806.91

25+500 C-04 (10%) C-04 40+010 2.72 0.12 19.80 10.00% 514.46 10,186.36 514.46 9,671.89

25+500 C-01 (90%)25+500 27+500

C-01 19+140 0.00 0.12 7.242,000.00 3.825 7,650.00 0.20 1,530.00

90.00% 1,377.00 9,969.48 1,377.00 8,592.48

27+500 C-04 (10%) C-04 40+010 2.72 0.12 16.11 10.00% 153.00 2,464.83 153.00 2,311.83

27+500 C-02 (90%)27+500 29+300

C-02 29+300 0.00 0.12 0.781,800.00 3.825 6,885.00 0.20 1,377.00

90.00% 1,239.30 966.65 966.65 0.00

29+300 C-04 (10%) C-04 40+010 2.72 0.12 14.21 10.00% 137.70 1,956.72 137.70 1,819.02

29+300 C-02 (90%)29+300 29+500

C-02 29+300 0.00 0.12 -0.02200.00 3.825 765.00 0.20 153.00

90.00% 137.70 -2.75 -2.75 0.00

29+500 C-04 (10%) C-04 40+010 2.72 0.12 13.21 10.00% 15.30 202.11 15.30 186.81

29+500 C-02 (90%)29+500 31+100

C-02 29+300 0.00 0.12 0.881,600.00 3.825 6,120.00 0.25 1,530.00

90.00% 1,377.00 1,211.76 1,211.76 0.00

31+100 C-04 (10%) C-04 40+010 2.72 0.12 12.31 10.00% 153.00 1,883.43 153.00 1,730.43

31+100 C-03 (90%)31+100 35+600

C-03 36+730 0.00 0.12 3.264,500.00 3.825 17,212.50 0.25 4,303.13

90.00% 3,872.81 12,625.37 3,872.81 8,752.56

35+600 C-04 (10%) C-04 40+010 2.72 0.12 9.26 10.00% 430.31 3,984.69 430.31 3,554.38

35+600 C-03 (90%)35+600 36+730

C-03 36+730 0.00 0.12 0.441,130.00 3.825 4,322.25 0.20 864.45

90.00% 778.01 346.21 346.21 0.00

36+730 C-04 (10%) C-04 40+010 2.72 0.12 6.44 10.00% 86.45 557.14 86.45 470.69

36+730 C-03 (90%)36+730 38+000

C-03 36+730 0.00 0.12 0.521,270.00 3.825 4,857.75 0.20 971.55

90.00% 874.40 450.31 450.31 0.00

38+000 C-04 (10%) C-04 40+010 2.72 0.12 5.25 10.00% 97.16 509.58 97.16 412.42

38+000 C-03 (90%)38+000 39+900

C-03 36+730 0.00 0.12 2.101,900.00 3.825 7,267.50 0.25 1,816.88

90.00% 1,635.19 3,433.89 1,635.19 1,798.71

39+900 C-04 (10%) C-04 40+010 2.72 0.12 3.66 10.00% 181.69 664.98 181.69 483.29

39+900 C-05 (90%)39+900 40+010

C-05 43+090 1.00 0.12 4.02110.00 3.825 420.75 0.25 105.19

90.00% 94.67 380.10 94.67 285.43

40+010 C-04 (10%) C-04 40+010 2.72 0.12 2.66 10.00% 10.52 27.93 10.52 17.41

40+010 C-05 (90%)40+010 43+090

C-05 43+090 1.00 0.12 2.423,080.00 3.825 11,781.00 0.25 2,945.25

90.00% 2,650.73 6,414.75 2,650.73 3,764.03

43+090 C-04 (10%) C-04 40+010 2.72 0.12 4.14 10.00% 294.53 1,219.33 294.53 924.81

43+090 C-05 (90%)43+090 46+090

C-05 43+090 1.00 0.12 2.383,000.00 3.825 11,475.00 0.25 2,868.75

90.00% 2,581.88 6,144.86 2,581.88 3,562.99

46+090 C-04 (10%) C-04 40+010 2.72 0.12 7.18 10.00% 286.88 2,059.76 286.88 1,772.89

99,335.25 23,609.81 84,094.57 22,175.60 61,918.98

Dist.Media (Km): 3.56

m3-Km

m3-Km

INICIO (Prog)

FIN (Prog)

CANTERA

UBICACIÓN DE CANTERAS

ACCESO (Km)

D.L.P. -120.00 m

(Km)

DISTANCIA (Km)

LONGITUD (m)

ANCHO (m)

AREA (m2)

Plazoletas (m2)

Sobre ancho

(m2)

ESPESOR (m)

VOLUMEN PARCIAL (m3)

% DE USO

VOLUMEN A UTILIZAR (m3)

MOMENTO (m3-Km)

C - 03 Km 36+730

Acceso: Directo

C - 01 Km 19+140

Acceso: Directo

C - 02Km 29+300

Acceso: Directo

C - 04 Km 40+010

Acceso: 2.72 Km

C - 05 Km 43+090

Acceso: 1.00 Km

Km 20+120 Km 46+090

CÁLCULO DEL TRANSPORTE DE MATERIAL LIGANTE

05 TRANSPORTE05.03 Transporte de Material Ligante D <= 1 km #REF!

05.04 Transporte de Material Ligante D > 1 km #REF!

CANTERA D<=1km D>1km

C - 02 3.65 4.62 0.00 0.12 0.85 23,322.94 15.00% 3,498.44 2,973.67 2,973.67 0.00C - 03 9.270 7.93 0.00 0.12 1.22 #REF! 10.00% #REF! #REF! #REF! #REF!C - 04 18.02 11.70 0.00 0.12 6.20 #REF! 10.00% #REF! #REF! #REF! #REF!C - 06 26.02 31.20 0.00 0.12 5.06 #REF! 10.00% #REF! #REF! #REF! #REF!C - 07 34.22 31.42 0.00 0.12 2.68 #REF! 15.00% #REF! #REF! #REF! #REF!C - 08 41.82 42.38 0.00 0.12 0.44 286.88 20.00% 57.38 25.25 25.25 0.00

#REF! #REF! #REF! #REF! #REF!Dist.Media (km): #REF!

m3-km

m3-km

UBICACIÓN CANTERA Ci

(Km)

UBICACIÓN DE MATERIAL LIGANTE (Km)

ACCESO (km)

D.L.P. -120.00 m

(Km)

DISTANCIA (km)

VOLUMEN DE AFIRMADO (m3)

(%) DE MATERIAL

LIGANTE EN AFIRMADO

VOLUMEN DE LIGANTE (m3)

MOMENTO (m3-km)

L4 Km

31+200Acceso: Directo

L1 Km

04+620Acces

o: Directo

L2Km

07+930Acceso: Directo

L3Km

11+700Acceso: Directo

L5 Km

31+420Acceso

: Directo

L6 Km

42+380Acceso: Directo

Km 00+000 Km 44+932