AlpTransit Gotthard Railway Tunnel
08.09.2015, SWISSED15
Peter Müller / MOL PE51© Siemens Schweiz AG 2015
Agenda:1. Siemens Switzerland Ltd.2. Project AlpTransit Gotthard3. Project LP60 Tunnel Control System4. Maintenance Management
Tunnel Control Systemof Gotthard Base Tunnel
September 2015
© Siemens Schweiz AG 2015Seite 2 Peter Müller / MOL PE51
The organizational structure of Siemens Ltd
Electrification, automation and digitalization are Siemens' long-term growth sectors. To fully exploit thesesectors' market potential, we grouped our business into nine Divisions plus Healthcare as an independentlymanaged business.
Pow
erG
ener
atio
nSe
rvic
es
Pow
eran
dG
as
Win
dPo
wer
and
Ren
ewab
les
Ener
gyM
anag
emen
t
Bui
ldin
gTe
chno
logi
es
Mob
ility
Dig
italF
acto
ry
Proc
ess
Indu
strie
san
dD
rives
Hea
lthca
re
Fina
ncia
lSer
vice
s
September 2015
© Siemens Schweiz AG 2015Seite 3 Peter Müller / MOL PE51
Urban Transport Turnkey Projects &Electrification
Mobility Division/MO CC
Organizational structure of the Mobility Division
Jürgen Brandes (CEO)Pierre Bauer (CFO)
Jürgen Wilder (CEO)Veronika Bienert (CFO)
Johannes Emmelheinz (CEO)Marko Feulner (CFO)
Sandra Gott-Karlbauer (CEO)Thomas Karazmann (CFO)
Products, solutions and turnkeysystems for railand road automation andoptimization
Short-distance, regional andlong-distance rolling stock, andproduct and system solutions forpassenger and freight transport
Railbound urban publictransport vehicles, eBuses andpassenger coaches
Complete rail and road solutionsand rail electrification solutions
Services and tools for road andrail infrastructure and rollingstock
Jochen Eickholt(CEO)
Karl Blaim(CFO)
Business Units
Mainline Transport Customer ServicesMobility Management
Ralph Hasselbacher (CEO)Carsten Schladitz (CFO)
September 2015
© Siemens Schweiz AG 2015Seite 5 Peter Müller / MOL PE51
Project AlpTransit GotthardEuropean Railway System
Bild: © ATG
September 2015
© Siemens Schweiz AG 2015Seite 6 Peter Müller / MOL PE51Seite 6
MapAlpTransit Gotthard Railway Tunnel
Bild: swisstopo
September 2015
© Siemens Schweiz AG 2015Seite 7 Peter Müller / MOL PE51
ProfileAlpTransit Gotthard Railway Tunnel
Bild: © ATG
Bild: © ATG
September 2015
© Siemens Schweiz AG 2015Seite 8 Peter Müller / MOL PE51
Tunnel detail viewAlpTransit Gotthard Railway Tunnel
Bild: © ATGBild: © ATG
September 2015
© Siemens Schweiz AG 2015Seite 9 Peter Müller / MOL PE51
OrganizationAlpTransit Gotthard Railway Tunnel
Alptransit Gotthard AG
Siemens Switzerland AGMobility RCM
LP60Tunnel control system
Siemens Switzerland AGMobility PE
LP82Railway control system
SBBInfrastructureOperator
Consortium Transtec Gotthard (TTG)
ALPIQ Alcatel-LucentTHALES
BalfourBeatty
RenaissanceConstruction
September 2015
© Siemens Schweiz AG 2015Seite 10 Peter Müller / MOL PE51
Time scheduleAlpTransit Gotthard Railway Tunnel
On site
Labor
On site
2010 2011 2012 2013 2014 2015 201620092008
startTestinstallation
TestEngineering
TestInstall.
Labor
CompleteSystem
Engineering
Installation Test
Ready for commercial operation
Start
Test
September 2015Seite 11 Peter Müller / MOL PE51
© Siemens Schweiz AG 2015Seite 11
Project LP60 Tunnel Control SystemAlpTransit Gotthard Railway Tunnel
© Siemens Schweiz AG 2014
September 2015
© Siemens Schweiz AG 2015Seite 12 Peter Müller / MOL PE51
Scope of supply LP60 Tunnel Control SystemAlpTransit Gotthard Railway Tunnel
IT - Infrastruktur
SingleSign On Einsatzleit-
System
MaintenanceManagement
Tool
TunnelControl System
Elec
trom
echa
nica
lequ
ipm
ent
Elec
trom
echa
nica
lequ
ipm
ent
Elek
trom
echa
nisc
heA
nlag
en
Eise
nbah
nlei
tsys
tem
Tunnel ControlCystem LP60
WinCC OA
September 2015
© Siemens Schweiz AG 2015Seite 14 Peter Müller / MOL PE51
Integration elektromechanischer Anlagen in die TLTGotthard Basistunnel
© Siemens Schweiz AG 2013
Tunnelleittechnik Eisenbahnleitsystem
Auftraggeber TTG: Auftraggeber ATG RBA:- Expertensystem (BKA, DN, SN, TFK) - Querschlagstüren, Nothaltestellentüren,- Lt 16.7 Hz Bahnstrom - Spurwechseltore, Abschlüsse, Schleusen- Lt 50 Hz Energieversorgung - Querschlagslüftung, Betriebslüftung- TAG/BLT - Hebeeinrichtung Sedrun
- Elektroanlagen NBW, RLT-Anlagen NBWAuftraggeber ATG RB: - Entwässerung inkl. KWKW Sedrun- Bahntechnik-Gebäude Bodio- Bahntechnik-Gebäude Erstfeld
MaintenanceManagement Tool
SAP PM
OPC-UA
OPC-UAXML-Datei
September 2015
© Siemens Schweiz AG 2015Seite 15 Peter Müller / MOL PE51
System architectureAlpTransit Gotthard Railway Tunnel
Betriebsleitzentrale Süd
West
WinCC OA Master
Ost
Oracle RAC 1b
WinCC OA Slave
Ost
WinCC OA Slave
Oracle RAC 2b
West
Ethernet TCP/IP LAN ServerEthernet TCP/IP LAN DB
Redundante KopfrechnerEM – Anlagen
Tunnel OstTunnel West
Betriebsleitzentrale Nord
WinCC OA Master
Oracle RAC 2a
Oracle RAC 1a
KRKRKRKRKRKRKRKR
KRKRKRKRKRKRKRKR
September 2015
© Siemens Schweiz AG 2015Seite 16 Peter Müller / MOL PE51
Display, different levelsAlpTransit Gotthard Railway Tunnel
LP60Tunnel control system
Levels of sub-systems(EMA)
Level 1Overview GBT und CBT
Level 2aOverview GBT
Level 2bSector overview
Level 3Detailview
Level 4aOverview GBT (Web-Browser)
Level 4bSector overview (Web-Browser)
Level 5Detailview (Web-Browser)
September 2015
© Siemens Schweiz AG 2015Seite 17 Peter Müller / MOL PE51
Level 1AlpTransit Gotthard Railway Tunnel
September 2015
© Siemens Schweiz AG 2015Seite 18 Peter Müller / MOL PE51
Level 2aAlpTransit Gotthard Railway Tunnel
September 2015
© Siemens Schweiz AG 2015Seite 20 Peter Müller / MOL PE51
Level 3AlpTransit Gotthard Railway Tunnel
Level 4 & 5:Web-browserInterface
September 2015
© Siemens Schweiz AG 2015Seite 21 Peter Müller / MOL PE51
Level 4 & 5, Web BrowserAlpTransit Gotthard Railway Tunnel
September 2015Seite 22 Peter Müller / MOL PE51
© Siemens Schweiz AG 2015
Control Center Pollegio CEPAlpTransit Gotthard Railway Tunnel
© Siemens Schweiz AG 2014
September 2015
© Siemens Schweiz AG 2015Seite 23 Peter Müller / MOL PE51
Technical OperatorAlpTransit Gotthard Railway Tunnel
LP60
Sub-Systeme
MaintenanceManagement Tool
SAP PM
EmergencyResponse
System
Tunnel ControlSystem
WinCC OA
Error handling / help
info
Railwaycontrol system
September 2015
© Siemens Schweiz AG 2015Seite 24 Peter Müller / MOL PE51
Error handling tool / help / Operator-InstructionsAlpTransit Gotthard Railway Tunnel
September 2015
© Siemens Schweiz AG 2015Seite 25 Peter Müller / MOL PE51
LP60
Emergency Response SystemAlpTransit Gotthard Railway Tunnel
Sub-Systeme
MaintenanceManagement Tool
SAP PM
EmergencyResponse
System
Tunnel ControlSystem
WinCC OA
Error handling / help
Tunnel ReflexRailway
control system
September 2015
© Siemens Schweiz AG 2015Seite 26 Peter Müller / MOL PE51
Emergency Response SystemAlpTransit Gotthard Railway Tunnel
Train:•Train - derailment•Train - crash•Release of dangerous goods•Fire at a train•Stop of train
Infrastructure:• Infrastrucure - fire• Infrastructure - Information from Tunnel Control System
Third party:•Bomb thread•Use of force•Accidence during maintenance•Staff accident•Severe weather, water damage
September 2015
© Siemens Schweiz AG 2015Seite 27 Peter Müller / MOL PE51
Emergency Response SystemAlpTransit Gotthard Railway Tunnel
September 2015
© Siemens Schweiz AG 2015Seite 28 Peter Müller / MOL PE51
LP60
Maintenance Management ToolAlpTransit Gotthard Railway Tunnel
Sub-Systeme
MaintenanceManagement Tool
SAP PM
EmergencyResponse
System
Tunnel ControlSystem
WinCC OA
Error handling / help
Info
Railwaycontrol system
September 2015
© Siemens Schweiz AG 2015Seite 29 Peter Müller / MOL PE51
Maintenance Management ToolAlpTransit Gotthard Railway Tunnel
Failure
Contact failure of door+QSLX.145958.N02=NT01.TA01-A156;AST3
Failure
others
Tunnel control system
Operation instruction
1 2 3..
3 2 1
Operating hours of light+QSLX.145021.N01=EN11.UV01-K32107;K
MaintenanceManagement Tool1 2 3 4 5 6Maintenence orders
1 3
4
2 5
6
Maintenance bundle
Maintenanceshift
31
Message 3324h
> 3000 h
September 2015
© Siemens Schweiz AG 2015Seite 30 Peter Müller / MOL PE51
LinksAlpTransit Gotthard Railway Tunnel
AlpTransit Gotthard AG – ATGwww.alptransit.ch
Transtec Gotthard – TTGwww.transtec-gotthard.ch
Bundesamt für Verkehr – BAVStandberichtewww.bav.admin.ch/alptransit/01386/index.html
September 2015
© Siemens Schweiz AG 2015Seite 31 Peter Müller / MOL PE51
Questions ?
September 2015
© Siemens Schweiz AG 2015Seite 32 Peter Müller / MOL PE51
ThanksPeter MüllerSenior Project Manager, MO MM PE51Hammerweg 1CH-8304 Wallisellen
Peter.pm.mueller@siemens.com
top related