INTRODUCTION TO RES

2

RES GROUP PORTFOLIORES GROUP PORTFOLIO

Wind:• 5,000 MW developed and built• 750 MW ownership in operating projects

170 MW developed in Turkey• 170 MW developed in Turkey

3

[insert Puits Caston image]F 5 MW[insert Puits Caston image]France, 5 MW

4

SOLAR LICENSING PROCESSSOLAR LICENSING PROCESS

5

Solar radiation > 1650 kwh/m2Solar radiation 1650 kwh/m2

6

600 MW of identified grid capacity600 MW of identified grid capacity

7

1-year of measurement 1 year of solary 1 year of solarmeasurement

8

Energy law: key features

• Land owners have priority on their land

• Financial requirements for 10 MW: q– Bonds: TL 2.5 million – Share capital: TL 8.4 million– Application bond: ?Application bond: ?– Bid bond: ?

• Feed in Tariff• Feed in Tariff

9

Timeline to first commercial solar plant

Solar Measurement

2012 2013 2014

Licensing

Land, Grid, Permits

Design

Lead time

Permits

Construction

10

Lessons from wind grid Lessons from wind grid tender process

11

Wind farm grid tender gresults so far (krs/kWh)

12

Turkey Solar tariffs (€ cent/kWh)Turkey Solar tariffs (€ cent/kWh)

Local Manufacture premium:

Modules

Cells

Panel AssemblyInverter

Market priceBase

13

Turkey Solar tariffs (€ cent/kWh)Turkey Solar tariffs (€ cent/kWh)

14

Solar tariffs: Turkey vs Italy (€ cent/kWh)Solar tariffs: Turkey vs. Italy (€ cent/kWh)

Italy

Turkey

15

Conclusions:Conclusions:

• Licensing process is becoming well structured

• Investor interest in renewables in Turkey is strong

• .... but is it strong enough to make solar work?