1. CURRICULUM CHANGES2. GROWTH & SHIFTS IN STUDENT ENROLLMENT3. SAFETY (Cultural Change)4. COSTS
5. CURRENT FACILITIES6. AVAILABLE LAND7. CAPITAL (FURNITURE, TECHNOLOGY)8. TECHNOLOGY INFRASTRUCTURE
DRIVERSFACTORS TO CONSIDER
PROPOSAL FOR ADDRESSING CURRICULUM CHANGES,
AND GROWTH Conversion of Cape Fear Elementary and Rocky Point
Primary to K-5&
Assist with Enrollment at RPP, CFE, CFM, BMS, BESBMS, and BES
CURRICULUM CHANGES
Accountability (Instructional Continuity to support 3rd Grade Promotion/Retention Standard) READING AT GRADE LEVEL BY THIRD GRADE FOR ALL STUDENTS
WHY?
ENROLLMENT
Rapid growth at Rocky Point Primary, Cape Fear Middle, and Cape Fear Elementary
Declining enrollment at the Burgaw Middle School and Burgaw Elementary School
WHY?
SAFETY
On-site traffic during arrival and dismissal at Rocky Point Primary and Cape Fear Elementary
WHY?
THESE SOLUTIONSADDRESS THE ISSUESBY….
• Increasing Vertical Teaming, Common Planning, Curriculum Continuity and Stability
• Reducing traffic backup on Hwy 117 and Hwy 133• Decreasing enrollment at CFE, RPP, and CFM• Increasing enrollment at BES and BMS
WHAT?
• Support FamiliesSame bell schedule K-5Less change for students
• Reduce bus routes More single routesMore buses serving only one school
• Reduce mileage of 98,000 miles on an annual basis
Minimum savings of $100,000.00
ADDITIONAL ADVANTAGES
WHAT?
ADDRESSING FUTURE GROWTH
*Under this proposal, students are evenly divided among RPP and CFE.**This proposal will extend the need for capacity in the southern and central
areas for approximately 3 years.***Enrollment figures do not include Pre-K (Total 236)
SCHOOL 2012-2013 ENROLLMENT
ENROLLMENT UNDER PROPOSAL
CAPACITY
RPP 510 447 584CFE 483 440 516CFM 483 444 483BES 449 565 683BMS 245 293 322
Hispanic Afr. Am. Other MINORITY WHITE
RPP 2012-13 39.6%151
12.9%66
7.3%37
49.8%254
50.2%256
Proposal 38.5%172
12.3%55
2.5%11
53.0%238
47.0%209
CFE 2012-13 26.4%137
13.061
2.55%12
43.5%210
56.5%273
Proposal 20.7%91
12%53
3.4%15
36%159
64%281
ROCKY POINT PRIMARY and CAPE FEAR ELEMENTARY
ETHNICITY
Hispanic Afr. Am. Other Minority White
CFM 2012-13 20.4%99
15.1%73
5.0%23
40.5%195
59.7%288
Proposal 21.8%97
12.8%57
4.5%20
39.2%174
60.8%270
BMS 2012-13 12.1%30
38.5%95
4.0%8
54.6%133
45.4%112
Proposal 10.9%32
38.2%112
3.4%10
52.5%154
47.4%139
BES 2012-13 13.0%63
38.8%167
3.1%2
55.0%232
45%217
Proposal 13.8%78
36.1%204
3.5%20
53.4%302
46.6%263
CAPE FEAR MIDDLE, BURGAW ELEMENTARY, BURGAW MIDDLE
ETHNICITY
SUMMARY1. Creates K-5 schools at Rocky Point Primary and Cape Fear Elementary to
address curriculum changes, growth, and safety. Additional advantages include support for families, reducing mileage, and creating cost savings.
2. Increases enrollment at Burgaw Middle School and Burgaw Elementary School
3. Decreases enrollment at Cape Fear Middle and Cape Fear Elementary.
4. Creates capacity at Cape Fear Schools and Burgaw Schools to provide space for anticipated growth
BOARD ACTIONStaff is requesting approval of Board to conduct public hearings AND
meetings with schools staffs regarding the proposal
Rocky Point PrimaryCape Fear ElementaryCape Fear MiddleBurgaw Middle School and Burgaw Elementary School
Both school facilities (CFE and RPP) designed and built for K-5 students.
The K-5 proposal will allow staff to work in vertical teams for planning, identifying common strategies, collaborating, and providing consistency in instruction with the goal of improving student achievement.
Bus Routes are prepared during the summer and are finalized during the month of September. K-8 bus routes are in existence in several schools in the school district; however, the goal will be to limit these to every extent possible.
The district is in the process of reviewing bus stops. We hope that parents / community members will notify us whenever they see an issue with bus stops. The state determines that 1/4 mile must be between stops, however we can request exceptions in extenuating circumstances.
We cannot predict if the number of buses will be reduced in implementing this plan, but we do know the number of miles currently driven will be reduced, based on the current enrollment.
ADDITIONAL INFORMATION
This plan will reduce traffic but we cannot ascertain the exact reduction. The state Dept. Of Transportation (DOT) is currently reviewing this issue.
The current transfer policy allows parents to request a transfer of their child from one school to another school if the parent/guardian provides transportation. Call 259-2187 to request the paperwork. (Information will be posted on the website)
High Schools are not in this redistricting proposal. A small number of Burgaw Middle students are assigned to Trask. Individual cases may be handled through the transfer policy.
Redistricting for all schools will be addressed in the 5/10 year plan. Meanwhile we will address issues at each school as they occur.
ADDITIONAL INFORMATION
The state budget determines the number of teachers and teacher assistants at each school based on student enrollment. The State requires boards of education to make placement based on certification. Teachers will be asked for input regarding their assignments. Administrators will also be involved.
We will compile questions, suggestions, and information gathered from hearings and meetings with staffs from each of the schools. This information will be presented to the Board of Education on Monday, February 4. The board will determine next steps.
ADDITIONAL INFORMATION
top related