MECHANICAL NARRATIVE:
THE MECHANICAL SCOPE OF WORK FOR THIS PROJECT LOCATED IN THE LOWER LEVEL OF CONCOURSE C 9100 PENA BLVD DENVER, CO IS TO REMOVE AND REPLACE THE EXISTING SUMP PUMPS AND SEWAGE EJECTOR PUMPS IN THEIR ENTIRETY WHICH WILL INCLUDE NEW CONTROLS AND POWER. IN ADDITION, THE EXISTING SUMPS WILL BE REHABILITATED WHICH WILL INCLUDE REMOVAL OF THE EXISTING LADDER, SUMP LID, REPAIRING CRACKS AT THE SUMP WALLS, BASE AND PIPE INLETS, SEALING THE WALLS AND BASE, AND LINING THE ENTIRE SUMP WITH A SPRAY ON LINER. ALL METALS TO BE RECYCLED PER SPECS. CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
ELECTRICAL NARRATIVE:
THE ELECTRICAL SCOPE OF WORK INCLUDES REMOVING POWER FROM THE EXISTING PUMPS, LOCKING OUT THE BREAKERS AND PROTECTING THE EXISTING BRANCH CIRCUITS IN PLACE. THEN RECONNECTING THE NEW PUMPS TO THAT SAME BRANCH CIRCUITS USED TO POWER THE PREVIOUS PUMPS. THE NEW PUMPS WILL HAVE THE SAME HP RATING AND ELECTRICAL REQUIREMENTS AS THE EXISTING PUMPS. ALL EXISTING ELECTRICAL SYSTEMS SHALL REMAIN INTACT AND BE UTILIZED TO SERVE THE NEW EQUIPMENT. A LOCAL ALARM HORN AND STROBE SHALL ALWAYS BE REQUIRED AT OR NEAR THE SUMP PUMP CONTROL PANEL TO ENSURE TIMELY RESPONSE. A REMOTE ALARM, STROBE ONLY, SHALL BE PROVIDED ABOVE THE DOOR TO THE SUMP PUMP ROOM WHERE IT CAN BE OBSERVED BY BUILDING OCCUPANTS. NEW PIPE, WIRE, BOXES, FITTINGS AND SUPPORTS WILL BE INSTALLED FOR THE ADDITION OF THE ALARM ANNUNCIATOR PANELS. THE LOCATION OF ALL NEW PUMP CONTROL EQUIPMENT WILL REMAIN THE SAME AS EXISTING. ALL PUMP LABELS WILL BE UPDATED WITH NEW IDENTIFICATION TAGS SHOWING THE PUMPS NAME AND ELECTRICAL INFORMATION.
LASE
EV
NE
DF
O
R
D
NA
YT I
C
YTOC NU
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
ARCHITECT MECHANICAL ENGINEER ELECTRICAL ENGINEER
CONTACT: KEVIN STOCKTONEMAIL: kevin.stockton@rsandh.com
name@zzz.com
CONTACT: MARK D'ROSARIOEMAIL: markd@thecegroup.com
name@zzz.com
CONTACT: BRENDA GLAVINEMAIL: bglavin@pkelectrical.com
name@zzz.com
CODE INFORMATION
APPLICABLE CODES:
2015 INTERNATIONAL PLUMBING CODE2015 INTERNATIONAL ELECTRICAL CODE
FIRE RESISTIVE REQUIREMENTS AND ASSEMBLIES:
BUILDING AREA SUMMARY:
OCCUPANT LOAD:
CADD FILE NO.
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
XX OF XX
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PK ELECTRICAL, LLC
5105 DTC PARKWAYSUITE. 420GREENWOOD VILLAGE, CO 80111
THE CE GROUP
700 AUTOMATION DR.SUITE. FWINDSOR, CO 80550
RS&H
7800 E UNION AVE,SUITE 700DENVER, CO 80237
EXISTING CONCOURSE C
SAME AS PREVIOUSNO CHANGE
PDS
201732415-04 / P0-00046097
TBD
12" = 1'-0"
09/18/19
09/18/2019
JRS
01
COVER SHEET
M000
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
9100 PENA BLVDDENVER, CO 80249
DENVER INTERNATIONAL AIRPORTCONCOURSE C SEWER REPAIRS
DESIGN CONTRACT No. 201732415-04 / P0-00046097
CONSTRUCTION CONTRACT No. TBD
Volume No. 01Addendum #1
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
AN
NA
NN
2
1 3
4
4
5
5
3
5
5
W21W21.9
N2
N3
N4
N5
6
N4
N3
W21.4 W21
N5
N2.1
N2
W21.9
(E) 4"(E) 4"
(E) 4" INLET
(E) 4" PERF. PVC INLET
(E) 2" DISCHARGE
(E) 2" DISCHARGE
MECHANICAL
CCC_00_3W_016
(E) 4" PERF. PVC INLET
7
108
9
W21W21.9
N2
N3
N4
N5
N4
N3
W21.4 W21
N5
N2.1
N2
W21.9
(E) 4"(E) 4"
(E) 4" INLET
(E) 4" PERF. PVC INLET
(E) 2" DISCHARGE
(E) 2" DISCHARGE
1112
MECHANICAL
CCC_00_3W_016
STAIR #38
CCC_00_3W_ST38
CORRIDOR
CCC_00_3W_CR01
BASEMENT
CCC_00_3W_012
CCC_00_3W_SP_N_01CCC_00_3W_SP_N_02
S F
14
(E) 4" PERF. PVC INLET
15
FOOTER SUMP ASSEMBLY - CCC_00_3W_SP_N_02 SANITARY SUMP ASSEMBLY - CCC_00_3W_SP_N_01
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M101C
9100 PENA BLVDDENVER, CO 80249
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
1/4" = 1'-0"M100C M101C
MECHANICAL ROOM CCC_00_3W_016 ENLARGEDDEMOLITION PLUMBING PLAN1
1/4" = 1'-0"M100C M101C
MECHANICAL ROOM CCC_00_3W_016 ENLARGED NEWPLUMBING PLAN2
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES
5
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
44
AN
NA
NN
(E) 4" INLET
2 413
5
4
3
5
5 5
W19
S2
S3
S4
S5
6
W19 W18.6 W18.1
S2
S2.1
S3
S4
S5
S5.1
(E) 4" PERF. PVC INLET
(E) 4" PERF. PVC INLETGROUTED CLOSED
(E) 2" DISCHARGE
(E) 2" DISCHARGE
(E) 6"
(E) 4"
(E) 4"
9
10
7
8
W19
S2
S3
S4
S5
W19 W18.6 W18.1
S2
S2.1
S3
S4
S5
S5.1
(E) 4" PERF. PVC INLET
(E) 4" PERF. PVC INLETGROUTED CLOSED
(E) 2" DISCHARGE
(E) 2" DISCHARGE
(E) 6"
(E) 4"
(E) 4"
1211
CCC_00_3W_SP_S_01
FCCC_00_3W_SP_S_02
S
MECHANICAL
CCC_00_3W_030
ELEVATOR MACHINEROOM CE-07
CCC_00_3W_034
ELEVATOR CE-07
CCC_00_3W_EL07
STAIR #35
CCC_00_3W_ST35
FIRE VALVE
CCC_00_3W_024
BASEMENT
CCC_00_3W_012
ELEV HOLD ROOM
CCC_00_3W_032
14
15
FOOTER SUMP ASSEMBLY - CCC_00_3W_SP_S_01 SANITARY SUMP ASSEMBLY - CCC_00_3W_SP_S_02
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M102C
9100 PENA BLVDDENVER, CO 80249
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
1/4" = 1'-0"M102C
MECHANICAL ROOM CCC_00_3W_030 ENLARGEDDEMOLITION PLUMBING PLAN1
1/4" = 1'-0"M102C
MECHANICAL ROOM CCC_00_3W_030 ENLARGED NEWPLUMBING PLAN2
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
5
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
4
AN
N
2 4
5
4
5
W4W5
N4
N5
N6
6
W5 W4
N4
N5
N6
(E) 6"
(E) 2" DISCHARGE
(E) 4" INLET
(E) 4" (E) 4"
PUMP ROOM
CCC_00_1C_010
INDUSTRIAL SUMP ASSEMBLY - CCC_00_1C_SP_N_01
W4W5
N4
N5
N6
W5 W4
N4
N5
N6
PUMP ROOM
CCC_00_1C_010
(E) 6"
(E) 2" DISCHARGE
(E) 4" INLET
(E) 4" (E) 4"
CCC_00_1C_SP_N_01
I
14
8 10 13
12
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M103C
9100 PENA BLVDDENVER, CO 80249
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
1/4" = 1'-0"M100C M103C
PUMP ROOM CCC_00_1C_010 ENLARGED DEMOLITIONPLUMBING PLAN1
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
4
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
1/4" = 1'-0"M100C M103C
PUMP ROOM CCC_00_1C_010 ENLARGED NEW PLUMBINGPLAN2
4
W2W3
S1
N1
NS
N1
NS
S1
W3 W2
WEST BAGGAGETUNNEL
CCC_22_2C_014
(E) 2" DISCHARGE
(E) 4" INLET
W2W3
S1
N1
NS
N1
NS
S1
W3 W2
11
CCC_00_2C_SP_S_01
WEST BAGGAGETUNNEL
CCC_00_2C_014
(E) 2" DISCHARGE
(E) 4" INLET
14
VERIFY LOCATIOIN
977
dsp-10
F
FOOTER SUMP ASSEMBLY - CCC_00_2C_SP_S_01
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M104C
9100 PENA BLVDDENVER, CO 80249
1/4" = 1'-0"M104C
BAGGAGE CROSSOVER ENLARGED DEMOLITION PLUMBINGPLAN1
1/4" = 1'-0"M104C
BAGGAGE CROSSOVER ENLARGED NEW PLUMBING PLAN2
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
0
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
4
AN
N
1 3
5
3
5
W1W2
S8
W2
S8
W1
(E) 2" DISCHARGE
(E) 3" INLET
SP56-C-W1
JANITORCLOSET
CCC_00_2C_020
AGTS STATION
CCC_00_2C_021
7 9
W1W2
S8
W2
S8
W1
(E) 2" DISCHARGE
(E) 3" INLET
CCC_00_2C_SP_S_02J
JANITOR CLOSET
CCC_00_2C_020
AGTS STATION
CCC_00_2C_021
STAIR #02
CCC_00_2C_ST02
11
14
SANITARY SUMP ASSEMBLY - CCC_00_2C_SP_S_01
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M105C
9100 PENA BLVDDENVER, CO 80249
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
1/4" = 1'-0"M100C M105C
JANITOR CLOSET SOUTH CCC_00_2C_020 ENLARGEDDEMOLITION PLUMBING PLAN1
1/4" = 1'-0"M100C M105C
JANITOR CLOSET SOUTH CCC_00_2C_020 ENLARGED NEWPLUMBING PLAN2
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
0
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
4
AN
N
1 3
5
E1
N8
EW
3
5
E1
N8
EW
(E) 3" INLET
(E) 2" DISCHARGE
JANITORCLOSET
CCC_00_3C_008
AGTS STATION
CCC_00_2C_021
97
E1
N8
EW E1
N8
EW
(E) 3" INLET
(E) 2" DISCHARGE
CCC_00_3C_SP_N_01
J 11
JANITOR CLOSET
CCC_00_3C_008
STAIR #05
CCC_00_3C_ST05
AGTS STATION
CCC_00_3C_021
14
PHOTO OF CCC_00_2C_SP_S_01. PUMP THIS LOCATION IS SIMILAR TO THIS PHOTO.
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M106C
9100 PENA BLVDDENVER, CO 80249
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
1/4" = 1'-0"M106C
JANITOR CLOSET NORTH CCC_00_3C_008 ENLARGEDDEMOLITION PLUMBING PLAN1
1/4" = 1'-0"M106C
JANITOR CLOSET NORTH CCC_00_3C_008 ENLARGED NEWPLUMBING PLAN2
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
0
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
4
AN
N
2 4
4
5
5
E6
N5
N6
N5
N6
E5.9 E6
(E) 4" INLET
(E) 2" VENT
MECH ROOM
CCC_00_3C_020
8 10
E6
E6
N5
N6
N5
N6
E5.9 E6
(E) 4" INLET
(E) 2" VENT
CCC_00_3C_SP_N_02
S
12
MECH ROOM
CCC_00_3C_020
STAIR #14
CCC_00_3C_ST14
14
(E) 2" ST OUTLET
SANITARY SUMP ASSEMBLY - CCC_00_3C_SP_N_01
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M107C
9100 PENA BLVDDENVER, CO 80249
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
1/4" = 1'-0"M100C M107C
MECHANICAL ROOM CCC_00_3C_020 ENLARGEDDEMOLITION PLUMBING PLAN1
1/4" = 1'-0"M100C M107C
MECHANICAL ROOM CCC_00_3C_020 ENLARGED NEWPLUMBING PLAN2
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
0
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
4
AN
NA
NN
1 3
2 4
4
5
3
5
5
5
E19
S2
S3
S4
S5
6
S2
S2.1
S3
S4
S5
S5.1
E18.1 E18.6 E19
(E) 4"
(E) 4"
(E) 4" INLET
(E) 2" DISCHARGE
(E) 2" DISCHARGE
(E) 6"
(E) 4" PERF. PVC INLET
(E) 4" PERF. PVC INLET
CONCRETE OVERCOVER
MECHANICAL
CCC_00_3E_004
ELEV HOLDROOM
CCC_00_3E_006
7
8 10
9
E19
S2
S3
S4
S5
S2
S2.1
S3
S4
S5
S5.1
E18.1 E18.6 E19
(E) 4"
(E) 4"
(E) 4" INLET
(E) 2" DISCHARGE
(E) 2" DISCHARGE
(E) 6"
(E) 4" PERF. PVC INLET
(E) 4" PERF. PVC INLET
CONCRETE OVERCOVER
12 11
CCC_00_3E_SP_S_01
S
CCC_00_3E_SP_S_02
F
MECHANICAL
CCC_00_3E_004
ELEVATOR MACHINEROOM CE-06
CCC_00_3E_002
ELEVATOR CE-06
CCC_00_3E_EL06
ELEV HOLD ROOM
CCC_00_3E_006
STAIR #26
CCC_00_3E_ST26
FIRE VALVE
CCC_00_3E_008
BASEMENT
CCC_00_4E_002
14
15
FOOTER SUMP ASSEMBLY - CCC_00_3E_SP_S_02 SANITARY SUMP ASSEMBLY - CCC_00_3E_SP_S_01
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M108C
9100 PENA BLVDDENVER, CO 80249
1/4" = 1'-0"M108C
MECHANICAL ROOM CCC_00_3E_004 ENLARGEDDEMOLITION PLUMBING PLAN1
1/4" = 1'-0"M108C
MECHANICAL ROOM CCC_00_3E_004 ENLARGED NEWPLUMBING PLAN2
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
5
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
4
AN
NA
NN
1 3
24
3
5
4
5
5
5
E21 E22
N2
N3
N4
N5
6
N4
N3
N5
N2.1
N2
E21 E21.4 E22
(E) 4" PERF. PVC INLET
(E) 2" DISCHARGE(E) 2" DISCHARGE
(E) 4" PERF. PVC INLET
3"PVC INLET
(E) 4" INLET
(E) 4" (E) 4"
MECHANICAL
CCC_00_3E_012
BASEMENT
CCC_00_4E_002
(E) 4" PERF. PVC INLET
9
8
7
10
E21 E22
N2
N3
N4
N5
N4
N3
N5
N2.1
N2
E21 E21.4 E22
(E) 4" PERF. PVC INLET
(E) 2" DISCHARGE(E) 2" DISCHARGE
(E) 4" PERF. PVC INLET
3"PVC INLET
(E) 4" INLET
(E) 4" (E) 4"
CCC_00_3E_SP_N_02
F S
CCC_00_3E_SP_N_01
MECHANICAL
CCC_00_3E_012
STAIR #27
CCC_00_3E_ST27
BASEMENT
CCC_00_4E_002
11 12
14
15
FOOTER SUMP ASSEMBLY - CCC_00_3E_SP_N_01 SANITARY SUMP ASSEMBLY - CCC_00_3E_SP_N_02
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
As indicated
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
CONCOURSE CSUMP PITS
M109C
9100 PENA BLVDDENVER, CO 80249
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
3'4' 4'1'2' 0 8'
N
KEY PLAN
CONCOURSE C
1/4" = 1'-0"M100C M109C
MECHANICAL ROOM CCC_00_3E_012 ENLARGEDDEMOLITION PLUMBING PLAN1
1/4" = 1'-0"M100C M109C
MECHANICAL ROOM CCC_00_3E_012 ENLARGED NEWPLUMBING PLAN2
4 JANITOR SUMPS ARE 3' DEEP AND CONSIST OF ONE MANHOLE BARREL
3 FOOTER SUMPS ARE 7' DEEP AND CONSIST OF 2 MANHOLE BARRELS.
2 INDUSTRIAL AND SANITARY SUMPS ARE 12' DEEP AND CONSIST OF 3 MANHOLE BARRELS.
1
SUMP NOMENCLATURE:"F" REFERS TO SIMPLEX FOOTER SUMP."I" REFERS TO DUPLEX INDUSTRIAL SUMP."S" REFERS TO DUPLEX SANITARY SUMP."J" REFERS TO SIMPLEX JANITORS SANITARY SUMP.
GENERAL NOTES
6REMOVE (E) SUMP ACCESS LADDER RUNGS AND SUPPORTS. GRIND/REMOVE LADDERSUPPORTS FROM SUMP WALL PRIOR TO SEALING THE SUMPS. THIS SUMP HAS RUNGS.
5DISCONNECT VENT PIPING TO ALLOW REMOVAL OF SUMP COVER. REINSTALL WHEN NEWPUMPS AND VALVING, ETC. ARE COMPLETE.
4
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 2, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMPS, QUICK DISCONNECT AND PUMP RAILS. EXISTING SUMPCOVER TO ALSO BE REMOVED.
3
DISCONNECT AND REMOVE EXISTING DISCHARGE PIPING ABOVE SUMP TO POINT INDICATEDAS SHOWN ON DETAIL 1, SHEET M501 AND THE PICTURE ON THIS SHEET TO ALLOW FORNEW VALVES. REMOVE SUMP PUMP, QUICK DISCONNECT AND PUMP RAIL. EXISTING SUMPCOVER TO ALSO BE REMOVED.
2ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING DUPLEX SUMP OR PROVIDEMEANS TO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 2, SHEET M501AND DETAIL 3, SHEET M502
1ISOLATE ALL EXISTING WASTE OR STORM DRAINAGE ENTERING SUMP, OR PROVIDE MEANSTO KEEP SUMP IN OPERATION DURING CONSTRUCTION. RE: DETAIL 1, SHEET M501 ANDDETAIL 3, SHEET M502.
DEMOLITION NOTES
5
NOTE: NOT ALL DEMO NOTES ARE USED ON EACH SHEET
15CONTRACTOR TO INSERT DYE OR OTHER TRACING MATERIAL IN ALL FOOTING ANDINDUSTRIAL SUMPS AND DETERMINE LOCATION OF OUTFLOW OF FOOTING PUMPS.
14 REMOTE STROBE FURNISHED WITH PUMP PACKAGE.
13 SUMP IS FIBERGLASS AND REQUIRES NO RESTORATIVE ACTIONS.
12LOCATION ON NEW DUPLEX SUMP CONTROLLER. CONDUIT AND WIRING TO SUMP ANDREMOTE ALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODELNUMBER AND DETAIL 2, SHEET M502.
11LOCATION ON NEW SUMP PUMP CONTROLLER. CONDUIT AND WIRING TO SUMP AND REMOTEALARM. REFER TO PUMP SCHEDULE SHEET M002 FOR CONTROLLER MODEL NUMBER ANDDETAIL 1, SHEET M502.
10PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW DUPLEX PUMPREQUIREMENTS. RE: PUMP SCHEDULE, SHEET M002 AND DETAIL 2, SHEET M502.
9PROVIDE AND INSTALL NEW SUMP ACCESS COVER TO ACCOMMODATE NEW PUMPREQUIREMENTS. RE: PUMP SHCEDULE, SHEET M002 AND DETAIL1, SHEET 502.
8PROVIDE AND INSTALL NEW DUPLEX SUMP PUMPS. RE: PUMP SCHEDULE, SHEET M002 ANDSUMP DETAIL 2, SHEET M502.
7PROVIDE AND INSTALL NEW SUMP PUMP. RE: PUMP SCHEDULE, SHEET M002 AND SUMPDETAIL 1, SHEET M502.
NEW CONSTRUCTION NOTES NOTE: NOT ALL CONSTRUCTION NOTES ARE USED ON EACH SHEET
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
4
(N) SUBMERSIBLE SUMP PUMP
2"
(N) GATE VALVE
(N) 2" DISCHARGE TO STORM SEWER WASTE LINE. RE: PLANS
(N) REMOTE VISUAL ALARM MOUNTED OUTSIDE MECHANICAL ROOM ON WALL WITH PLACARD. (SEE ELECTRICAL PLANS FOR EXACT LOCATION)
(N) 20"X20" PLASTIC PLACARD ON WALL OUTSIDE OF MECHANICAL ROOM. LOCATE ADJACENT TO VISUAL ALARM. PLACARD SHALL READ, "IF HORN OR STROBE ARE ACTIVATED, PLEASE IMMEDIATELY CALL MAINTENANCE CONTROL AT 303-342-2800" PLACARD TO HAVE WHITE BACKGROUND AND RED LETTERING.
(N) CONTROL PANEL MOUNTED ON WALL IN MECH. ROOM WITH AUDIBLE / VISUAL ALARM. (SEE ELECTRICAL PLANS FOR EXACT LOCATION)
(N) CONTROL PANEL WIRING CONDUITPROVIDED BY ELECTRICAL CONTRACTOR
CONNECT NEW TO EXISTING
FINISHED FLOOR
(N) GUIDE RAIL
OFF/STOP
START
HIGH WATER ALARM LEVEL
(E) 4" C.I. INLET FROM STORM AND PERIMETER DRAINS
CAULK PIPE PENETRATION WATERTIGHT ALL AROUND (TYPICAL) USE DAP CONCRETE ACRYLIC
LATEX SILICONE SEALANT OR APPROVED EQUAL. INSTALL PRIOR TO LINING SYSTEM INSTALLATION REFER TO SPECIFICATION 33 01
30
(N) SUMP PIT COVER ANDINSPECTION ACCESS OPENING
(N) CHECK VALVE SWING CHECK.
(N) LIFTING CHAIN ANCHOR INTO SUMP.
(E) SUMP PIT
(N) LEVEL CONTROL MOUNTING RAIL
CONNECT NEW TO EXISTING
(N) PIPE GROMMET(N) PIPE GROMMET
(N) LIFTING CHAIN OR CABLE
(N) WEIGHTED FLOATS TO BE MOUNTED AT DIFFERENTANGLES AROUND THE PEDESTAL TO PREVENT
BECOMING TANGLED (TYPICAL)
PROVIDE 3/16" AIR HOLE IN RISER PIPE
CONTRACTOR TO COORDINATE THIS DIMENSION WITHPUMP IN FIELD. PUMP INLET SHOULD BE LOWER THAN
THE OFF FLOAT . CONTRACTOR TO ENSURE PUMPSUCTION STAYS FLOODED .
(N) MONOLITHIC PATCHING SYSTEM, (N) LINING-SEALING SYSTEM RE: SPECIFICATION SECTION 33 01 30.
3 1/4" TYP
3 11/16" Ø DISCHARGE FLANGE
6 1/4" Ø
(4) 3/8"-16 x 1 LG WELDSTUDS ON
7 1/4" DIA B C
WELDSTUDS ON 7 1/4" DIA B C
(2) 13/16" THRU HOLES
(6) 11/16" SLOTS ON 38 1/2" DIA B C
4∅ VENT PIPE FLANGE(2) 5/8"-11 x 2 1/4" LG
WELDSTUDS
(4) 11/16" MOUNTING SLOTS ON 38 1/2" DIA B C
40"∅
HINGE SIDE
INSPECTION ACCESS OPENINGOPENING TO BE DIRECTLYOVER FLOATS AND PUMPS
MOTOR CABLE PLATE
WET SUMP COVER FOR 36" Ø SUMPS
SANITARY TEE WITH CAP
(N) PROVIDE THREADED SCHEDULE 40 CPVC FROM DISCHARGE OF PUMP TO INLET OF CHECK VALVE. PIPING DOWNSTREAM OF SHUT OFF VALVE TO BE GALVANIZED STEEL OR COPPER PIPING. VALVING TO ALSO BE METALLIC NO PLASTIC VALES.
TY
P
60°
15"
10" 5"
11"
14"
22"
14"
TY
P45°
(N) 3" VENT
NOTE: 1. ALL SEWAGE, FOOTER AND INDUSTRIAL SEWAGE
EJECTOR PITS AND SYSTEMS MUST REMAIN OPERATIONAL DURING REPLACEMENT. RE DETAIL 3 FOR RECOMMENDED TEMPORARY SOLUTION. AT CONTRACTORS OPTION, PROVIDE DEN AND EOR WITH AN EQUAL OR BETTER SOLUTION FOR REVIEW.
2. PUMP INFRASTRUCTURE INCLUDING GUIDE RAILS, LIFTING CHAIN AND TOP RAILS SHALL BE COMPATIBLE AND PROVIDED BY THE SAME MANUFACTURER AS THE PUMP.
3. SET FLOAT LEVEL CONTROL 2" BELOW INVERT OF LOWEST GRAVITY DRAIN INLET PER CODE 712.3.4 REGARDING MAXIMUM EFFLUENT LEVEL.
4. SET ALL FLOAT LEVELS AT SAME HEIGHT AS EXISTING FLOAT LEVELS. DOCUMENT FLOAT LEVELS DURING DEMOLITION PHASE
SIMPLEX ALTERNATING CONTROL PANEL 8197
ALARM PANEL 8301
JANITORS CLOSET SUMP PUMP DETAIL (3'-0" DEEP)
(N) TOP RAIL SUPPORT MOUNTED TO SIDEWALL OF SUMP GROUT ANY HOLES LEFT FROM EXISTING RAIL SUPPORT ANCHOR BOLTS. ALL NEW ANCHORS SHALL BE TYPE 316 STAINLESS STEEL 1/16" ø SMALLER THAN NEW RAIL SUPPORT BOLT HOLES. EMBED 2" MIN. USE HILTI HIT-RE-500-SD EPOXY OR EQUAL.
UNION
SIMPLEX PANEL H8197
POINT LIST
INPUTS
OVERLOAD 1STOP FLTLEAD FLT
HIGH WATER FLTPRESSURE TRANSDUCERCURRENT TRANSDUCER
GROUND0 VDC
+ 24 VDC
OUTPUTS
M1 CONTACTORDOME LIGHT/HORNPROCESSOR RUN
+24 VDCHIGH WATER (CUSTOMER USE)
GEN ALARM CUSTOMER USECUSTOMER SUPPLIED POWER
4
(E) SUMP PIT
(E) 4" C.I. INLET FROM SANITARY WASTE LINE
CONNECT TEMPORARY HOSE FROM SUBMERSIBLE PUMP/BYPASS PUMP ASSEMBLY TO EXISTING REMAINING DISCHARGE LINE
PROVIDE TEMPORARY CONTAINMENTVESSEL THAT CAN BE REMOVED AFTER BYPASS
PUMP IS IN PLACE AND OPERATIONAL.
PROVIDE TEMPORARY 120 VOLT SUBMERSIBLE EJECTOR PUMP ANDDISCHARGE HOSE THAT CAN BE REMOVED AFTER BYPASS PUMP IS IN PLACE AND OPERATIONAL.
NOTE: 1. ALL SEWAGE, STORM AND INDUSTRIAL SEWAGE
EJECTOR PITS AND SYSTEMS MUST REMAIN OPERATIONAL DURING REPLACEMENT. RE DETAIL 3 FOR RECOMMENDED TEMPORARY SOLUTION. AT CONTRACTORS OPTION, PROVIDE DEN AND EOR WITH AN EQUAL OR BETTER SOLUTION FOR REVIEW.
2. PUMP INFRASTRUCTURE INCLUDING GUIDE RAILS, LIFTING CHAIN AND TOP RAILS SHALL BE COMPATIBLE AND PROVIDED BY THE SAME MANUFACTURER AS THE PUMP.
3. SET FLOAT LEVEL CONTROL 2" BELOW INVERT OF LOWEST GRAVITY DRAIN INLET PER CODE 712.3.4 REGARDING MAXIMUM EFFLUENT LEVEL.
DISCHARGE HOSE
SUCTION HOSE
CONTRACTOR PROVIDED BYPASS PUMP ASSEMBLY. COORDINATE TEMPORARY ELECTRICAL HOOKUP TO (E) ELECTRICAL PANELS.
SUCTION HOSE WITH FLEXIBLE/PLIABLE BUSHING TO BE
INSERTED INTO (E) C.I. PIPING.
REMOVE A PORTION OF THE INLET PIPING TO ALLOW FOR A TEMPORARY DISCHARGE HOSE TO BE ATTACHED DURING SETUP OF BYPASS
PUMP ASSEMBLY.
NOTE: TEMPORARY BYPASS PUMP WILL BE REQUIRED TO ALLOW FOR MATERIAL CURING DURING THE SUMP LINING PROCESS. CONTRACTOR TO DETERMINE THE MEANS AND METHODS TO FACILITATE THE BYPASS CONCEPT SHOW.
(N) SUMP PIT COVER ANDINSPECTION ACCESS OPENING
(E) 4" C.I. INLET FROM SANITARY WASTE LINE
HIGH WATER ALARM LEVEL
LEAD/START
OFF/STOP
FINISHED FLOOR
(N) CHECK VALVE SWING CHECK
(N) GATE VALVE
(N) 3" DISCHARGE TO SANITARY OR INDUSTRIAL SEWER WASTELINE RE: PLANS
CONNECT NEW TO EXISTING
(N) SUBMERSIBLE SUMP PUMP TYP. 2
CAULK PIPE PENETRATION WATERTIGHT ALL AROUND (TYPICAL) USE DAP CONCRETE ACRYLIC LATEX SILICONE
SEALANT OR APPROVED EQUAL. INSTALL PRIOR TO LINING SYSTEM INSTALLATION. REFER TO SPECIFICATION 33 01 30
(N) LEVEL CONTROL MOUNTING RAIL
(N) GUIDE RAIL
(E) SUMP PIT
(N) 3" VENT
CONNECT NEW TO EXISTING
(N) PIPE GROMMET(N) PIPE GROMMET
(N) LIFTING CHAIN
(N) WEIGHTED FLOATS TO BE MOUNTED AT DIFFERENT ANGLESAROUND THE PEDESTAL TO PREVENT BECOMING TANGLED
(TYPICAL)
PROVIDE 3/16" AIR HOLE IN RISER PIPE
COORDINATE ALL REQUIRED CONDUIT, CIRCUITS,ELECTRICAL COMPONENTS ETC.WITH THEELECTRICAL DRAWINGS.
CONTRACTOR TO COORDINATE THIS DIMENSION WITHPUMP IN FIELD. PUMP INLET SHOULD BE LOWER THAN
THE OFF FLOAT . CONTRACTOR TO ENSURE PUMPSUCTION STAYS FLOODED .
(N) LIFTING CHAIN ANCHOR INTO SUMP.
(N) MONOLITHIC PATCHING SYSTEM, (N)LINING-SEALING SYSTEM RE: SPECIFICATION SECTION 33 01 30.
21"
20"
45°TYP
36"
3"
12"TYP
22"
3 1/4"TYP.
(8) 3/8"-16 x 1" LGWELDSTUDS ON
7 1/4" DIA B C
3 3/4" TYP.
4"∅ VENT PIPE FLANGE
(2) 5/8"-11 x 2 1/4" LGWELDSTUDS
60°TYP
(6) 11/16" SLOTSON 51 DIA B
3 11/16" DIA. DISCHARGE FLANGE
(4) 13/16" THRU HOLES
(4) 11/16" SLOTS
ON 51" DIA B C
53"∅
11"TYP
"6 1/4" ∅ MOTOR CABLE PLATE
5" TYP
WET SUMP COVER FOR 48" Ø SUMPS
INSPECTION ACCESS OPENINGOPENING TO BE DIRECTLYOVER FLOATS AND PUMPS
SANITARY TEE
(N) PROVIDE SCHEDULE 40 CPVC FROM DISCHARGE OF PUMP TO INLET OF CHECK VALVE. PIPING DOWNSTREAM OF SHUT OFF VALVE TO BE GALVANIZED STEEL OR COPPER PIPING. VALVING TO ALSO BE METALLIC NO PLASTIC VALVES.
3 11/16" DIA. DISCHARGE FLANGE
(N) 20"X20" PLASTIC PLACARD ON WALL OUTSIDE OF MECHANICAL ROOM.LOCATE ADJACENT TO VISUAL ALARM. PLACARD SHALL READ, "IF HORN OR STROBE ARE ACTIVATED, PLEASE IMMEDIATELY CALL MAINTENANCE CONTROL AT 303-342-2800" PLACARD TO HAVE WHITE BACKGROUND AND RED LETTERING.
(N) REMOTE VISUAL ALARM MOUNTED OUTSIDE MECHANICAL ROOM ON WALL WITH PLACARD. (SEE ELECTRICAL PLANS FOR EXACT LOCATION)
(N) CONTROL PANEL MOUNTED ON WALL IN MECH. ROOM WITH AUDIBLE / VISUAL ALARM. (SEE ELECTRICAL PLANS FOR EXACT LOCATION)
(N) CONTROL PANEL WIRING CONDUITPROVIDED BY ELECTRICAL CONTRACTOR
6 1/4" DIA. LEVEL CONTROL PLATE
NOTE: 1. ALL SEWAGE, STORM AND INDUSTRIAL SEWAGE
EJECTOR PITS AND SYSTEMS MUST REMAIN OPERATIONAL DURING REPLACEMENT. RE DETAIL 3 FOR RECOMMENDED TEMPORARY SOLUTION. AT CONTRACTORS OPTION, PROVIDE DEN AND EOR WITH AN EQUAL OR BETTER SOLUTION FOR REVIEW.
2. PUMP INFRASTRUCTURE INCLUDING GUIDE RAILS, LIFTING CHAIN AND TOP RAILS SHALL BE COMPATIBLE AND PROVIDED BY THE SAME MANUFACTURER AS THE PUMP.
3. SET FLOAT LEVEL CONTROL 2" BELOW INVERT OF LOWEST GRAVITY DRAIN INLET PER CODE 712.3.4 REGARDING MAXIMUM EFFLUENT LEVEL.
4. SET ALL FLOAT LEVELS AT SAME HEIGHT AS EXISTING FLOAT LEVELS. DOCUMENT FLOAT LEVELS DURING DEMOLITION PHASE.
PLC DUPLEX ALTERNATING CONTROL PANEL 8162P
ALARM PANEL 8301
(N) TOP RAIL SUPPORT MOUNTED TO SIDEWALL OF SUMPGROUT ANY HOLES LEFT FROM EXISTING RAIL SUPPORT ANCHOR BOLTS. ALL NEW ANCHORS SHALL BE TYPE 316STAINLESS STEEL 1/16" ø SMALLER THAN NEW RAIL SUPPORT BOLT HOLES. EMBED 2" MIN. USE HILTI HIT-RE-500-SD EPOXY OR EQUAL
UNION
DUPLEX PANEL H8162P
POINT LIST
INPUTS
OVERLOAD 1STOP FLTLEAD FLTLAG FLT
HIGH WATER FLTLEVEL TRANSMITTER
CURRENT TRANSDUCEROVERLOAD 2OVER TEMP 1OVER TEMP 2
MOISTURE SENSOR GROUND
0 VDC+ 24 VDC
OUTPUTS
M1 CONTACTORM2 CONTACTOR
DOME LIGHT/HORNPROCESSOR RUN
+24 VDCHIGH WATER (CUSTOMER USE)
GEN ALARM CUSTOMER USECUSTOMER SUPPLIED POWER
4
4
LASE
EVN
ED
FO
R
D
NA
YT IC
YTOC NU
CITY & COUNTYof DENVER
DENVERINTERNATIONAL
AIRPORT
BIM FILE NAME:
SHEET NO.
SHEET TITLE
VOLUME NO.
DESIGN CONTRACT NO.
WORK BREAKDOWN NO.
FAA AIP NO:
CHECKED BY:
DRAWN BY:
DATE:
ISSUE RECORD
CONST. CONTRACT NO.
SCALE:
DESIGNER OF RECORD
PDS
201732415-04 / P0-00046097
TBD
N.T.S.
DE
NV
ER
IN
TE
RN
AT
ION
AL A
IRP
OR
TC
ON
CO
UR
SE
C S
EW
ER
RE
PA
IRS
09/18/2019
JRS
01
MECHANICALDETAILS
M502
9100 PENA BLVDDENVER, CO 80249
NO. BY PURPOSE DATE CKD
1 CEG 100% DESIGN 01/18/19 PDS
2 CEG IFC 4/18/19 PDS
4 CEG Addendum #1 09/18/19 PDS
N.T.S.M502
SIMPLEX FOOTING SUMP PUMP DETAIL (7'-0" DEEP)2
N.T.S.M502
TEMPORARY SIMPLEX AND DUPLEX SANITARY, INDUSTRIALAND STORM SEWER SUMP PUMP DETAIL3
N.T.S.M502
DUPLEX SANITARY SEWER AND INDUSTRIAL SEWER PUMPDETAL (12'-0" DEEP)1
4
top related