vs m template
Post on 21-Jan-2016
7 Views
Preview:
TRANSCRIPT
Generic Production Value Stream Map - Example Excel Generated VSM
CUSTOMERPLANNING
SUPPLIER TAKT Time (s) 600
PURCHASINGDemand 48
Frequency Daily
C/T (s) 600C/O (s) 0
Uptime (%) 100Yield (%) 99.3
Shifts 4
Frequency DailySTORES KITS GOODS AWAITING TEST AWAITING FINAL INSPECTION FINISHED GOODS
Frequency Daily Quantity Quantity Quantity Quantity Quantity
INSPECTIONTime 6000
KITTINGTime 6000
ASSEMBLYTime 6000
TESTTime 6000
INSPECTIONTime 6000
SHIPPING
GOODS-INQuantity Frequency Daily
Time 6000
C/T (s) 600 C/T (s) 600 C/T (s) 600 C/T (s) 900 C/T (s) 300 C/T (s) 600C/O (s) 0 C/O (s) 0 C/O (s) 0 C/O (s) 60 C/O (s) 0 C/O (s) 0
Uptime (%) 100 Uptime (%) 100 Uptime (%) 100 Uptime (%) 80 Uptime (%) 100 Uptime (%) 100Yield (%) 100 Yield (%) 90 Yield (%) 90 Yield (%) 90 Yield (%) 100 Yield (%) 100
Shifts 1 Shifts 1 Shifts 1 Shifts 1 Shifts 1 Shifts 1
LEAD6000 6000 6000 6000 6000 6000 6000 TIME (s) 42000
VALUE600 600 600 600 900 300 600 TIME (s) 4200
MANUFACTURINGCELL MANAGER
Generic Production Value Stream Map - Example Excel Generated VSM
PLANNING
SUPPLIER
PURCHASING
C/T (s) 600C/O (s) 0
Uptime (%) 100Yield (%) 99.3
Shifts 4
STORES KITS GOODS AWAITING TEST AWAITING FINAL INSPECTION FINISHED GOODS
Frequency Daily Quantity Quantity Quantity Quantity Quantity
TRAZOTime 6000
CORTETime 6000
PERFORADOTime 6000
ARMADOTime 6000
SOLDADURATime 6000
GOODS-INQuantity
Time 6000
C/T (s) 600 C/T (s) 600 C/T (s) 600 C/T (s) 900 C/T (s) 300C/O (s) 0 C/O (s) 0 C/O (s) 0 C/O (s) 60 C/O (s) 0
Uptime (%) 100 Uptime (%) 100 Uptime (%) 100 Uptime (%) 80 Uptime (%) 100Yield (%) 100 Yield (%) 90 Yield (%) 90 Yield (%) 90 Yield (%) 100
Shifts 1 Shifts 1 Shifts 1 Shifts 1 Shifts 1
LEAD6000 6000 6000 6000 6000 6000 6000 TIME (s) 42000
VALUE600 600 600 600 900 300 600 TIME (s) 4200
MANUFACTURINGCELL MANAGER
PROCESS
Pitch Duration
OUTSIDE SOURCE
C/T (s) C/T (s)C/O (s) C/O (s)
Uptime (%) Uptime (%)Yield (%) Yield (%)
Shifts Shifts
Lead Time (s)
Lead Time (s)
MAX PCS
CUSTOMER
TAKT Time (s)Demand
Frequency
C/T (s)C/O (s)
Uptime (%)Yield (%)
STORAGEQuantity
Time
OUTSIDE SOURCE
PLANNINGCONTROL
Frequency
Frequency
Frequency
Frequency
Frequency
LEADTIME (s) 0VALUE
TIME (s) 0
PLANNINGCONTROL
OPERACIÓN 1
2
C/T (s) 266Available 68400
Uptime (%) 0.39%Shifts 2
BODEGA DE MATERIAS PRIMAS
PROVEEDOR
C/T (s)Frequency sobre pedido C/O (s)
Uptime (%)Yield (%)
Shifts
OPERACIÓN 2
2
C/T (s) 36C/O (s) 68400
Uptime (%) 0.05%INVENTARIO Shifts 2 INVENTARIO
Cantidad 0 Cantidad 0Tiempo 0 Tiempo 0
BODEGA DE MATERIAS PRIMAS
sistemas de control
PEDIDO
OPERACIÓN 3 OPERACIÓN 4
3 3
C/T (s) 45 C/T (s) 45C/O (s) 68400 C/O (s) 68400
Uptime (%) 0.07% Uptime (%) 0.07%Shifts 2 INVENTARIO Shifts 2
Cantidad 0Tiempo 0
CONTROL DE PRODUCCIÓN
sistemas de control
CLIENTE
PEDIDO Demanda 186Turnos 2
Takt-Time
Frequency
ENSAMBLE
7
C/T (s) 2514C/O (s) 68400
Uptime (%) 3.68%INVENTARIO Shifts 2 INVENTARIO
Cantidad 0 Cantidad 0Tiempo 0 Tiempo 0
sistemas de control
sobre pedido
bodega de producto terminado
top related