October 1, 2020| 1Financial Project ID Number: 437942-1

From the Halifax River Bridge to State Road (S.R.) A1A in Volusia County

Corridor Improvements Project

Virtual Public Hearing

International Speedway Boulevard (U.S. 92)

Welcome

October 1, 2020| 2

Technical Information - Issues

I am unable to hear the presenter

Entire hearing is being recorded for later viewing

October 1, 2020| 3

Technical Information - Audio

October 1, 2020| 4

Technical Information – Comments & Questions

Typed comment or request to speak via the Questions Pane

During hearing

www.cflroads.com

Online In-person

Fill out a comment form

Fill out a speaker card to request to

speak at the microphone

John Smith, I wish to speak

October 1, 2020| 5

Technical Information – Comments & Questions

Kathleen EnotFDOT Project Manager 719 South Woodland Boulevard MS 542 DeLand, Florida 32720 Phone: 386-943-5149 Email: kathleen.enot@dot.state.fl.us

Project Contact Information

October 1, 2020| 6

• Comments and Questions will not be responded to during the hearing. Written responses will be provided at a later date.

• All comments and questions received by:

Monday Oct. 12, 2020will be included as a part of this hearing record.

Technical Information – Comments & Questions

www.cflroads.com

*PLEASE NOTE*

October 1, 2020| 7

This public hearing is conducted in accordance with:

• Chapter 23, United States Code 128

• Title 40, Code of Federal Regulations, Parts 1500 through 1508

• Section 339.155, Florida Statutes

And pursuant to Florida Statute 355.199, the Florida Department of Transportation is conducting this public hearing concerning access management changes to State Road 600. This hearing is being held to afford persons the opportunity to express their views relative to the proposed improvements.

Public Hearing Compliance

October 1, 2020| 8

Title VI

All inquiries or complaints will be handled according to FDOT procedure in a prompt and courteous manner.

This hearing, project, or study is being conducted without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI may do so by contacting:

Jennifer SmithFDOT District Five Title VI Coordinator 719 South Woodland BoulevardDeLand, Florida 32720 386-943-5367Jennifer.smith2@dot.state.fl.us

Jacqueline ParamoreState Title VI Coordinator 605 Suwannee Street, Mail Station 65Tallahassee, FL 32399-0450850-414-4753Jacqueline.paramore@dot.state.fl.us

October 1, 2020| 9

Project Location

October 1, 2020| 10

Stakeholders

October 1, 2020| 11

• September 2013 - City of Daytona Beach, Conceptual Design Study

• Possible roundabouts at 3 intersections along International Speedway Boulevard, including S.R. A1A

• November 2015 - U.S. 92 Corridor Master Management Plan Final Report

• Summarized recommended improvement for overall U.S. 92 Corridor from I-4 to S.R. A1A

• October 2017 - FDOT U.S. 92 Corridor Management Plan Study Update

• Study completed

• May 2020 - Additional Analysis Requested• The ISB coalition requested further analysis at the intersection of S.R.

A1A for a signal option• Congestion from beach traffic was the main concern• FDOT is analyzing the operations of a signal at S.R. A1A

Project History and Need

October 1, 2020| 12

Proposed Improvements from the Halifax River Bridge to Grandview Ave.

Overall widening to provide wider travel lanes and a raised median

ADA compliant sidewalks and curb ramps throughout the corridor

Signals reconstructed at Halifax Ave., Peninsula Dr. (S.R. 441) and Grandview Ave.

October 1, 2020| 13

Proposed Improvements at the S.R. A1A Intersection

Signal OptionRoundabout

October 1, 2020| 14

Proposed Typical Section - International Speedway Boulevard

October 1, 2020| 15

Existing Access along International Speedway Boulevard

• Non-Restrictive – allows turns at any point along the roadway

October 1, 2020| 16

Proposed Access along International Speedway Boulevard

Signal Option

Roundabout

October 1, 2020| 17

Proposed Access at Halifax Avenue and Peninsula Drive

October 1, 2020| 18

Proposed Access at Grandview Avenue

October 1, 2020| 19

Proposed Access at S.R. A1A - Signal Option

October 1, 2020| 20

Proposed Access at S.R. A1A - Roundabout Option

October 1, 2020| 21

Signal Option for International Speedway Boulevard at S.R. A1A - Proposed Turn Lanes

Proposed Signal at S.R. A1A• Add right turn lane on eastbound

International Speedway Boulevard

• Add right turn lane on southbound S.R. A1A

October 1, 2020| 22

What is Level of Service (LOS)?

• Level of service is a grading system for amount of traffic congestion.

• Reflects average seconds of delay per vehicle at intersections.

Traffic Efficiency Comparison

LOS

Roundabout

Delay

(seconds per vehicle)

Signalized

Intersection Delay

(seconds per vehicle)

A ≤ 10 ≤ 10

B 11-15 11-20

C 16-25 21-35

D 26-35 36-55

E 36-50 56-80

F >50 >80

October 1, 2020| 23

Weekday Peak Hour

Year Roundabout Signal Option

Level-of-Service2025 A C

2045 B C

Average Intersection Delay (Seconds per vehicle)

2025 6.8 26.6

2045 10.4 30.6

Traffic Comparison - Roundabout vs Signal

Saturday Peak Hours

Roundabout Signal Option

B C

C D

12.7 33.6

19.0 38.5

October 1, 2020| 24

Pedestrian Travel Comparison - Roundabout vs Signal

RoundaboutSignal Option

Signalized Crossing

3 Legs All Legs

Crossing Distances

1 to 2

Lanes

(with

Median

Refuge)

4 to 6

Lanes

Crossing Conflicts

Fewer Greater

Travel Distances (between crossings)

Longer Shorter

• Pedestrian Hybrid Beacons

• 2-Stage crossings with median refuge

• Shorter crossing distance (2 lanes max)

Raised Crosswalk

• Signalized Crossings • Longer crossing distance

(4 to 6 lanes)

Signal OptionRoundabout

October 1, 2020| 25

Roundabout Pedestrian Crossings

October 1, 2020| 26

Bicycle Travel Comparison - Roundabout vs Signal

Signal OptionRoundabout

Option 1 – Travel on wide sidewalk

Option 1 – Travel on wide sidewalk

Option 2 – Navigate through as a vehicle

Option 2 – Navigate through as a vehicle

Not all possible bicycle movements are shown on the graphic above

October 1, 2020| 27

Travel Comparison - Roundabout vs Signal

5x Normal Speed

October 1, 2020| 28

Safety Comparison - Roundabout vs Signal

October 1, 2020| 29

Roundabout vs Signal Comparison

Signal OptionRoundabout

October 1, 2020| 30

• Permitting Agency• St. Johns River Water

Management District

• Exempt from Permitting

• Maintain existing treatment areas

• Conveyance System• Existing pipes in

poor condition

• New storm sewer system

Stormwater Management

Permitted

Unpermitted

ExistingFDOT Pond

October 1, 2020| 31

• U.S. 92 PD&E Study Newsletters • Notify the public for public hearings

• Show the project location

• Describe project impacts and need

• Information on future events

• Public Notifications• Elected, appointed, and agency officials

• Property owners/tenants within 300-feet of project corridor

• Other key stakeholders and interested parties

• Florida Administrative Register

• Email

• Project website

Public Involvement

October 1, 2020| 32

• Design phase• Currently underway

• Scheduled for completion in late 2020

• Right of Way Acquisition • Expected to begin in early 2021

• Construction• Expected to begin in early 2023

• This schedule is based on the current roundabout design. Changes to the design may affect the schedule. All efforts will be made to start construction as currently scheduled.

Project Schedule

October 1, 2020| 33

Providing Comments – After this Hearing

Kathleen EnotFDOT Project Manager 719 South Woodland Boulevard MS 542 DeLand, Florida 32720 Phone: 386-943-5149 Email: kathleen.enot@dot.state.fl.us

Project Contact Information

www.cflroads.com

Comments can be submitted via mail

Comments can be submitted via email

Comments can be submitted via telephone

Comments are always accepted throughout the life of the project. To have your comments included as part of the public record please have them submitted or postmarked by:

October 12, 2020

October 1, 2020| 34

• Browse to www.cflroads.com

• Click on the search icon

• Enter 437942-1 into the search box

• Hit “Go”

• Select the “437942-1 US 92 from the Halifax River Bridge to SR A1A” in the resulting list.

Project Website

October 1, 2020| 35

Public Testimony

Type comments or request to speak via the

Questions Pane

Online In-person

Fill out a speaker card to request to

speak at the microphone

John Smith, I wish to speak

Kathleen EnotFDOT Project Manager 719 South Woodland Boulevard MS 542 DeLand, Florida 32720 Phone: 386-943-5149Email: kathleen.enot@dot.state.fl.us

Dial-In Only

Please provide your comments or question directly

to the project manager

October 1, 2020| 36Financial Project ID Number: 437942-1

From the Halifax River Bridge to State Road (S.R.) A1A in Volusia County

Corridor Improvements Project

Virtual Public Hearing

International Speedway Boulevard (U.S. 92)

Thank You for Attending