  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    1/15

    Cost savings through

    innovative approach

    Presented by: Amund Tftum

    8th Annual North Sea Decommissioning Conference

    Aberdeen, November 2011

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    2/15

    Agenda

    Lessons learned

    Piece Medium approach

    Opportunities for cost savings

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    3/15

    Onshore equipmentoffshore

    Decommissioning logistics

    All waste segregated and

    transported in purpose built

    containers

    Piece Small offshoretechnics developed

    Lessons learned 2/4 Ekofisk Tank

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    4/15

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    5/15

    Well P&A and Removal in paralell Piece Small & Preparations for lifts with HLV

    Work from jack up rig

    Lessons learned Indefield

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    6/15

    Lessons learned EPRD Ekofisk

    Make safe on older platforms

    Offloading and site moves

    Even RI requires piece small

    Environmental aspects offshore

    & onshore

    Early involvement of disposalcontractor

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    7/15

    Lessons learned SR of Kittiwake Buoy

    Special projects requirespecial solutions

    Technical feasible to refloat

    and bring GBS and loading

    buoys to shore

    Cleaning requirements and

    final demolition decides if work

    to be should be carried out

    offshore or onshore

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    8/15

    From Piece Small to Piece Medium ?

    Combining Piece Small with

    Reversed Installation

    Where applicable utilise existingfacilities

    Utilising larger support vessels

    Lifts from 5- 800 tons

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    9/15

    Removal of the H7 platform

    EPRD Ekofisk 2/4 TEkofisk Platforms

    Topside weight: 5700 mT

    Jacket weight: 2600 mT

    40% PS removal

    Use Pacific Orca JU rig

    Topside modules liftedonboard for processing

    Jacket cut in sections

    Disposal in Vats

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    10/15

    Cost cutting opportunities

    Utilize living quarters

    Combine work

    Contracting strategy

    Bundling

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    11/15

    Utilize the existing living quarters to

    save time and costs:

    Make safe of platforms

    Front running/prepare for lifts

    Remove X% of topside

    Prepare/erect barriers

    Opportunities Utilize living quarters

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    12/15

    One contractor responsible from A to Z

    Engineering and Cleaning as required for chosen removal method

    Removal starts immediately after cessation of production

    Limited maintenance costs

    No make safe of platform required

    High focus on reuse of equipment

    Platform information / documentation available from production organization

    LQ, cranes and support systems available on platforms

    One contractor engaged from cessation of production to reuse or disposal

    Field

    Developme

    nt

    Production

    Wellplugging

    and

    abandonme

    nt

    (SC)

    Cleaning ?

    Maintenance

    of

    abandoned

    platforms ?

    Reversed

    installation

    Piece Small

    Single lift

    Disposal

    Reuse

    Hook Down

    Lift &

    Transport

    Piece small

    Close down

    of production

    Engineering ?

    Opportunities - Contracting

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    13/15

    Opportunities Bundling of assets

    Potential bundled campaigns: Removal/prep.work of topside while

    using existing living quarters

    Topside removals in parallel with WP&A

    from Support Vessel

    Preparing jackets for dedicated jacketremoval campaign

    Synergies:

    Less engineering

    Economics of scale Optimization of removal methods

    (or development of new?)

    Lower cost on support rigs / vessels

    (or development of new?)

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    14/15

    Cost cutting opportunities

    Utilize living quarters

    Combine work

    Contracting strategy

    Bundling

    THINK DECOMMISSIONING !

  • 7/27/2019 Amund-Toftum-Cost Savings Through Innovative Approach

    15/15

    Thank you for your attention

    AF Decom Offshore