an introduction to cannon and wendt electric co., inc
TRANSCRIPT
Historical Highlights
1945 – Company established
1948 – Ray Watson becomes partner
1957 – Albert Wendt becomes partner
2012 – David Fagan becomes President
1947 – Albert Wendt joins Cannon & Gross
1964 – Ernie Cannon retiresAlbert Wendt becomes President
2006 – Employee Stock Ownership Plan formed(ESOP)
Construction Services
TYPES OF PROJECTS:
HEALTHCARE FACILITIES
LARGE COMMERCIAL
MISSION CRITICAL
INDUSTRIAL
MUNICIPAL
SPORTS ARENAS
CASINOS & RESORTS
PROJECT ASPECTS:
CRADLE TO THE GRAVE ESTIMATING & PROJECT MANAGEMENT STYLE
BUSINESS DEVELOPMENT
DESIGN BUILD – DESIGN ASSIST
INTEGRATED PROJECT DELIVERY (IPD)
TRIMBLE ROBOTIC TOTAL STATION
VIRTUAL DESIGN SERVICES BIM
- SPATIAL COLLABORATION
- INSTALL DOCUMENTATION
Construction Services
HEALTH SCIENCE & EDUCATION BUILDING
VEE QUIVA HOTEL & CASINO
Successful Projects
UNIVERSITY OF PHOENIX
STADIUM
PHOENIX CONVENTION CENTER
GRAND CANYON UNIVERSITY ARENA
BANNER ESTRELLA MEDICAL CENTER
TechnologiesDESIGN AND INSTALLATION OF INFORMATION TRANSPORT SYSTEMS
Copper | Optical Fiber |Coaxial Cable
DESIGN/INSTALLATION OF DISTRIBUTED ANTENNA SYSTEMS (DAS)
SALES, INSTALLATION AND SERVICE OF MITEL® TELECOMMUNICATIONS PRODUCTS AND SERVICES
CABLING SYSTEM DESIGN AND INSTALLATION TELEPHONE, SOUND AND PAGING SYSTEMS INTRUSION DETECTION AND PREVENTION IP CAMERA INSTALLATION 24 / 7 EMERGENCY SERVICE DIGITAL SIGNAGE OUTSIDE PLANT CONSTRUCTION
Technologies
MAYO PROTON THERAPY
WESTIN HOTEL
Successful Projects
LEWIS PRISON
CANCER TREATMENT CENTERS
TEGG Services & Service Department 24HOUR EMERGENCY SERVICE
TESTING ASSOCIATED WITH ELECTRICAL PREVENTIVE AND PREDICTIVE MAINTENANCE PROGRAMS
INFRARED THERMOGRAPHY
ULTRASONIC TESTING
VOLTAGE AND AMPERE DIAGNOSTICS
POWER FACTOR TESTING & QUALITY ANALYSIS
PROPER TORQUEING
SURGE PROTECTION ANALYSIS
REPAIRS AND UPGRADES OF ELECTRICAL DISTRIBUTION SYSTEMS
SERVICE CUSTOMERSLEVEL 3IO CAPITAL PHOENIXIO CAPITAL SCOTTSDALESQUARE D FIELD SERVICESASU FLEX DISPLAYSPRINTTOTAL SITE SOLUTIONSSPEEDIE & ASSOCIATEEMPIRE MACHINE
Pre-Assemblies with Modular Capabilities Continued~
Ensures a hassle free and complete installation.
DESIGN MODEL
Specialized Fabrication from the Model~
• Utilizing the Model’s Integrity, we can create fully coordinated specialty products fabricated proactively to meet schedule demands.
Used for laying out:• Sleeve Locations• Bang-it Embeds• Overhead Racks• Underground Trench
Locations• Embedded Floor Boxes• Sleeves• Conduit Stubs• Equipment placement
Bringing the Model into the FieldTRIMBLE’S TOTAL STATION – ROBOTIC PRECISION LAYOUT TOOL
Bringing the Model into the FieldContinued~
Pre-Assemblies designed in the BIM stage to be laid out by the Total Station.
Total Station allows for a seamless and precise installation all without walls or strings.
Information Shop Drawings - UNDERGROUND
Central Utility Plant| *Seven Page Underground Instruction Set
UPON COMPLETION OF THE PROJECT, OUR HYBRID COORDINATION DRAWINGS BECOME PART OF THE CLOSEOUT PACKAGE; A TRUE OWNER’S MANUAL OF THE ELECTRICAL INSTALLATION.
Information The Closeout