an introduction to cannon and wendt electric co., inc

18

Upload: kerry-a-engmark-rcdd

Post on 14-Aug-2015

66 views

Category:

Business


3 download

TRANSCRIPT

Historical Highlights

1945 – Company established

1948 – Ray Watson becomes partner

1957 – Albert Wendt becomes partner

2012 – David Fagan becomes President

1947 – Albert Wendt joins Cannon & Gross

1964 – Ernie Cannon retiresAlbert Wendt becomes President

2006 – Employee Stock Ownership Plan formed(ESOP)

Construction Services

TYPES OF PROJECTS:

HEALTHCARE FACILITIES

LARGE COMMERCIAL

MISSION CRITICAL

INDUSTRIAL

MUNICIPAL

SPORTS ARENAS

CASINOS & RESORTS

PROJECT ASPECTS:

CRADLE TO THE GRAVE ESTIMATING & PROJECT MANAGEMENT STYLE

BUSINESS DEVELOPMENT

DESIGN BUILD – DESIGN ASSIST

INTEGRATED PROJECT DELIVERY (IPD)

TRIMBLE ROBOTIC TOTAL STATION

VIRTUAL DESIGN SERVICES BIM

- SPATIAL COLLABORATION

- INSTALL DOCUMENTATION

Construction Services

HEALTH SCIENCE & EDUCATION BUILDING

VEE QUIVA HOTEL & CASINO

Successful Projects

UNIVERSITY OF PHOENIX

STADIUM

PHOENIX CONVENTION CENTER

GRAND CANYON UNIVERSITY ARENA

BANNER ESTRELLA MEDICAL CENTER

TechnologiesDESIGN AND INSTALLATION OF INFORMATION TRANSPORT SYSTEMS

Copper | Optical Fiber |Coaxial Cable

DESIGN/INSTALLATION OF DISTRIBUTED ANTENNA SYSTEMS (DAS)

SALES, INSTALLATION AND SERVICE OF MITEL® TELECOMMUNICATIONS PRODUCTS AND SERVICES

CABLING SYSTEM DESIGN AND INSTALLATION TELEPHONE, SOUND AND PAGING SYSTEMS INTRUSION DETECTION AND PREVENTION IP CAMERA INSTALLATION 24 / 7 EMERGENCY SERVICE DIGITAL SIGNAGE OUTSIDE PLANT CONSTRUCTION

Technologies

MAYO PROTON THERAPY

WESTIN HOTEL

Successful Projects

LEWIS PRISON

CANCER TREATMENT CENTERS

TEGG Services & Service Department 24HOUR EMERGENCY SERVICE

TESTING ASSOCIATED WITH ELECTRICAL PREVENTIVE AND PREDICTIVE MAINTENANCE PROGRAMS

INFRARED THERMOGRAPHY

ULTRASONIC TESTING

VOLTAGE AND AMPERE DIAGNOSTICS

POWER FACTOR TESTING & QUALITY ANALYSIS

PROPER TORQUEING

SURGE PROTECTION ANALYSIS

REPAIRS AND UPGRADES OF ELECTRICAL DISTRIBUTION SYSTEMS

SERVICE CUSTOMERSLEVEL 3IO CAPITAL PHOENIXIO CAPITAL SCOTTSDALESQUARE D FIELD SERVICESASU FLEX DISPLAYSPRINTTOTAL SITE SOLUTIONSSPEEDIE & ASSOCIATEEMPIRE MACHINE

Pre-Assemblies with Modular Capabilities Continued~

Ensures a hassle free and complete installation.

DESIGN MODEL

Specialized Fabrication from the Model~

• Utilizing the Model’s Integrity, we can create fully coordinated specialty products fabricated proactively to meet schedule demands.

Used for laying out:• Sleeve Locations• Bang-it Embeds• Overhead Racks• Underground Trench

Locations• Embedded Floor Boxes• Sleeves• Conduit Stubs• Equipment placement

Bringing the Model into the FieldTRIMBLE’S TOTAL STATION – ROBOTIC PRECISION LAYOUT TOOL

Bringing the Model into the FieldContinued~

Pre-Assemblies designed in the BIM stage to be laid out by the Total Station.

Total Station allows for a seamless and precise installation all without walls or strings.

Information Shop Drawings - OVERHEAD

Cath-Lab| *Five Page Instruction Set

Cath-Lab| Put the model on the install drawings…

Information Shop Drawings - OVERHEAD

Information Shop Drawings - UNDERGROUND

Central Utility Plant| *Seven Page Underground Instruction Set

Installing with Precision

Overhead rolling offsets and kicks…

UPON COMPLETION OF THE PROJECT, OUR HYBRID COORDINATION DRAWINGS BECOME PART OF THE CLOSEOUT PACKAGE; A TRUE OWNER’S MANUAL OF THE ELECTRICAL INSTALLATION.

Information The Closeout

(602) 279-1681 cannon-wendt.com

Thank you for visiting our

LinkedIn page.