analysis of open access feasibility & its … singh...analysis of open access feasibility &...

94
i | Page SUMMER INTERNSHIP REPORT ON ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE UNDER THE GUIDANCE OF MR. N V KUMAR, DY. DIRECTOR (NPTI) MR. RAVI DESHMUKH (MD) (PPS ENERGY SOLUTIONS PVT. LTD) Submitted by DHIR SINGH ROLL NO: 27 MBA (POWER MANAGEMENT) Sector-33, Faridabad 121003, Haryana (Under the Ministry of Power, Govt. of India) Affiliated to MAHARSHI DAYANAND UNIVERSITY, ROTHAK AUGUST 2013

Upload: nguyencong

Post on 26-Apr-2018

227 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

i | P a g e

SUMMER INTERNSHIP REPORT ON

ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS

IMPACT IN MAHARASHTRA STATE

UNDER THE GUIDANCE OF

MR. N V KUMAR, DY. DIRECTOR (NPTI)

MR. RAVI DESHMUKH (MD) (PPS ENERGY SOLUTIONS PVT. LTD)

Submitted by

DHIR SINGH

ROLL NO: 27

MBA (POWER MANAGEMENT)

Sector-33,

Faridabad – 121003, Haryana

(Under the Ministry of Power, Govt. of India)

Affiliated to

MAHARSHI DAYANAND UNIVERSITY, ROTHAK

AUGUST 2013

Page 2: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

ii | P a g e

DECLARATION

I, Dhir Singh, Roll No 27, student of MBA-Power Management (2012-14) at National Power

Training Institute, Faridabad hereby declare that the Summer Training Report entitled

“ANALYSIS OF OPEN ACCESS FEASIBILITY AND ITS IMPACT IN

MAHARASHTRA STATE” is an original work and the same has not been submitted to any

other Institute for the award of any other degree. A Seminar presentation of the Training Report

was made on _____________ and the suggestions as approved by the faculty were duly

incorporated.

Presentation In-Charge Signature of the Candidate

Counter signed

Director/Principal of the Institute

Page 3: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

iii | P a g e

ACKNOWLEDGEMENT

Apart from efforts of the person doing the project, the success of any project depends

largely on the encouragements and guidelines of many others. I take this opportunity to

express my gratitude to the people who have been instrumental in the successful completion of

the project.

I thank to Mr. Ravi Deshmukh, Managing Director, PPS ENERGY SOLUTIONS PRIVATE

LIMITED for giving me the opportunity to execute my Summer Internship Project.

I would also like to thank my Project In-charge Mr. N V Kumar, Deputy. Director, NPTI who

always assisted me in every possible manner.

I feel deep sense of gratitude towards Mr. J. S. S. RAO, Principal Director Corporate Planning,

NPTI, Mr. S. K. Chaudhary, Principal Director, Dept. of Management Studies, Mrs. Manju

Mam, Director, NPTI and Mrs. Indu Maheshwari, Dy. Director, NPTI for arranging my

internship at PPS Energy Solutions Ltd. and being a constant source of motivation and

guidance throughout the course of my internship.

I also extend my thanks to all the faculties and my batch mates in Dept. of Management Studies

(NPTI), for their support and guidance throughout the course of internship.

Thank you all for being there for me always.

DHIR SINGH

Page 4: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

iv | P a g e

EXECUTIVE SUMMARY

The Electricity Act, 2003 defines the duty of a distribution licensee to develop and maintain an

efficient, coordinated and economical distribution system in his area to supply. It also provides

that where any person, whose premises are situated within the area of supply of a distribution

licensee, requires a supply of electricity from a generating company or any licensee other that

such distribution licensee, such person may by notice require the distribution licensee for

wheeling such electricity in accordance with the regulations made by the State commission and

the duties of such distribution licensee in respect of such supply shall be those of a common

carrier providing non-discriminatory open access to its distribution system.

Open access may also be allowed on payment of a surcharge in addition to wheeling charges, as

may be specified by the State Commission. Along with this charges it is important that to work

out on the followings:

i) Minimize / remove the losses which distribution licenses are facing due to inadequacy of

Cross Subsidy Surcharge as it is not equivalent to Subsidy,

ii) Need to define who will pay the Cross subsidy of Renewable? if its obligation has

removed from paying Cross Subsidy Surcharge for its promotion,

iii) Need to solve the problem of forecasting which distribution licensees are facing.

The electricity policy underlines the Government’s commitment to power sector reforms. The

Act advocates that open access is a goal and it lays down a plan to achieve open access. The

industry and the consumers have welcomed the new policy, and are upbeat on the policy of

‘Open Access’ and public – private partnerships.

As a student of MBA in Power Management from National Power Training Institute,

Faridabad, I got an opportunity to do my summer internship in PPS Energy Solutions Private

Ltd.

This report will help to understand the problem which are distribution licensee’s facing and also

what exactly the consumers are expecting from distribution licensee so that their loss can be

minimize.

Page 5: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

v | P a g e

Contents

DECLARATION ....................................................................................................................... ii

ACKNOWLEDGEMENT ......................................................................................................... iii

EXECUTIVE SUMMARY ....................................................................................................... iv

LIST OF TABLE ...................................................................................................................... ix

LIST OF ABBREVIATION ...................................................................................................... xi

CHAPTER – 1: PROJECT INFORMATION .......................................................................... 1

1.1 INTRODUCTION .......................................................................................................... 1

1.2 PROBLEM STATEMENT ............................................................................................. 3

1.3 SOPE OF PROJECT ...................................................................................................... 3

1.4 OBJECTIVE OF THE PROJECT .................................................................................. 4

CHAPTER – 2: PROJECT NEED & COMPANY OVERVIEW ......................................... 5

2.1 IMPORTANCE OF PROJECT ...................................................................................... 5

2.2 ORGANIZATION PROFILE ......................................................................................... 6

About the organization ......................................................................................................... 6

2.3 ORGANIZATION SERVICES ...................................................................................... 8

Energy Management ............................................................................................................ 8

Consultancy ......................................................................................................................... 9

Infrastructure Development & Maintenance ......................................................................... 9

Project Management ............................................................................................................. 9

Critical Assessment of PPS Energy Solution Ltd................................................................. 9

2.4 SWOT ANALYSIS ...................................................................................................... 10

Strengths ............................................................................................................................ 10

Weakness ........................................................................................................................... 10

Opportunities ..................................................................................................................... 10

Threats ............................................................................................................................... 10

CHAPTER - 3: LITERATURE & REASEARCH METHOD ............................................... 11

LITERATURE SURVEY .................................................................................................. 11

Research methodology ....................................................................................................... 15

CHAPTER - 4: REGULATION & BACIS OF OPEN ACCESS ........................................... 16

Page 6: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

vi | P a g e

4.1 INTRODUCTION TO OPEN ACCESS ....................................................................... 16

4.2 ELIGIBILITY CRITERIA FOR OPEN ACCESS ........................................................ 17

4.3 SECTIONS OF EA-2003 GOVERNING OPEN ACCESS .......................................... 19

Captive Generation – Section 9 (2)..................................................................................... 19

Functions of CTU – Section 38 (2) (d) ............................................................................... 19

Functions of STU – Section 39 (2) (d) ................................................................................ 19

Wheeling Charges – Section 42 (2) .................................................................................... 20

Additional Surcharge – Section 42 (4) ................................................................................ 20

Functions of State Commission – Section 86 (1) ................................................................ 20

4.4 OPEN ACCESS TO DISTRIBUTION NETWORKS .................................................. 21

4.5 DUTIES OF DISTRIBUTION LICENSEE AND OPEN ACCESS.............................. 22

4.6 CATEGORIZATION OF OPEN ACCESS .................................................................. 23

4.7 PROCEDURE FOR ALLOTMENT OF OPEN ACCESS ............................................ 25

Long Term Open Access .................................................................................................... 25

Short Term Open Access .................................................................................................... 25

4.8 ROLE OF DIFFERENT AGENCIES IN OPEN ACCESS ........................................... 28

NLDC (National Load Dispatch Centre) ............................................................................ 28

RLDC (Regional Load Dispatch Centre) ............................................................................ 28

SLDC (State Load Dispatch Centre) .................................................................................. 29

CTU (Central Transmission Utility) ................................................................................... 29

STU (State Transmission Utility) ....................................................................................... 30

MEDA (Maharashtra Energy Development Association) ................................................... 30

4.9 COMPONENT OF OPEN ACCESS ............................................................................ 30

4.10 CAPACITY ASSESSMENT ...................................................................................... 31

Approach to Network Capacity Assessment ....................................................................... 31

Allocation of Network Capacity ......................................................................................... 33

Allotment Priority: ............................................................................................................. 34

Curtailment Priority ........................................................................................................... 35

Under-Utilization/Non-Utilization of Open Access capacity .............................................. 35

4.11 PRICING FOR OPEN ACCESS ................................................................................... 36

Objective of Pricing Policy as followed by MSEDCL ........................................................ 36

Page 7: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

vii | P a g e

Pricing for Network Usage ................................................................................................. 36

Elements of tariff ............................................................................................................... 36

Cost allocation Criteria: Tariff design ................................................................................ 36

Cost concepts ..................................................................................................................... 38

4.12 CHARGES FOR OPEN ACCESS CUSTOMERS ..................................................... 40

Transmission Charges ........................................................................................................ 40

Costs to be recovered ......................................................................................................... 41

Allocation of Costs ............................................................................................................. 42

Scheduling and System Operation Charges ........................................................................ 43

Wheeling Charges .............................................................................................................. 43

Cross-Subsidy Surcharge ................................................................................................... 44

Policy Provisions................................................................................................................ 44

Various methods of surcharge (as recommended by FOR) ................................................. 45

Additional Surcharge.......................................................................................................... 49

CHAPTER-5 OPEN ACCESS ANALYSIS .......................................................................... 52

5.1 OPEN ACCESS IN MAHARASHTRA ....................................................................... 52

5.2 BILLING PROCEDURE OF OPEN ACCESS IN MAHARASHTRA ......................... 56

5.3 BILLING COMPONENT OF OPEN ACCESS IN MSEDCL ...................................... 57

5.4 LIST OF OPEN ACCESS CONSUMER IN MAHARASHTRA ................................. 58

Open Access Consumers (May 2012)................................................................................. 58

5.5 ANALYSIS OF TARIFF STRUCTURE (LT AND HT CONSUMERS) ..................... 64

Cross subsidy at existing and approved tariff ..................................................................... 64

5.6 ANALYSIS OF DISCOM LOSS ................................................................................. 68

5.7 EXPECTED MIGRATION OF CONSUMER IN OPEN ACCESS.............................. 69

5.8 COMPARATIVE ANALYSIS OF OPEN ACCESS .................................................... 70

5.9 DIFFERENT CONSUMER OPINION ON OPEN ACCESS ....................................... 71

CHAPTER – 6: SUMMARY ................................................................................................ 76

6.1 CONCLUSION ............................................................................................................ 76

6.2 RECOMMONDATIONS ............................................................................................. 78

6.3 LIMITATION OF THE PROJECT .............................................................................. 79

6.4 RESULT & DISCUSSION .......................................................................................... 80

Page 8: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

viii | P a g e

6.5 FUTURE SCOPE OF THE PROJECT ......................................................................... 80

BIBLIOGRAPHY .................................................................................................................... 81

Page 9: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

ix | P a g e

LIST OF TABLE

Table 1- Comparison of Open Access Fees & Regulated Tariff ................................... 2

Table 2- Open Access Consumers (May 2012) ........................................................... 63

Table 3- Cross subsidy at existing and approved tariff ............................................... 65

Table 4- Comparative Chart of Open Access Charges at State Level .......................... 66

Table 5- Tariff Analysis for LT and HT Consumer .................................................... 67

Table 6- Calculation & Comparisons of ARR for consumer of 1 MW & Above ........ 69

Table 7- Comparisons of Interstate & Intrastate Open Access .................................... 70

Table 8- Consumer Opinion for Feasibility of Open Access ....................................... 75

Page 10: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

x | P a g e

LIST OF FIGURES

Figure 1- Organization setup ...................................................................................................... 7

Figure 2- Organization Services ................................................................................................. 8

Figure 3- Categorization of Open Access ................................................................................. 23

Figure 4- Procedure for Scheduling of Short Term Open Access in Bilateral Transaction ........ 26

Figure 5- Procedure for Scheduling of Short Term Open Access in Collective Transaction ..... 27

Figure 6- Allotment Priority ..................................................................................................... 34

Figure 7- Billing Procedure ...................................................................................................... 56

Page 11: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

xi | P a g e

LIST OF ABBREVIATION

MSEDCL Maharashtra State Electricity Distribution Company Limited

MSEB Maharashtra State Electricity Board

MERC Maharashtra State Electricity Regulatory Commission

CSS Cross Subsidy Surcharge

LT Low Tension

HT High Tension

RGGVY Rajiv Gandhi Gramin Vidhutikarn Yojana

R-APDRP Restructured – Accelerated Power Development & Reforms Programme

SCADA Supervisory Control and Data Acquisition

SOP Standard of Performance

HVDC High Voltage Direct Control

MIS Management Information System

GIS Geographical Information System

Page 12: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

xii | P a g e

SLDC State Load Dispatch Centre

WRLDC Western Load Dispatch Centre

MEDA Maharashtra Electricity Development Association

NLDC National Load Dispatch Centre

RLDC Regional Load Dispatch Centre

CTU Central Transmission Unit

STU State Transmission Unit

ANC Available Network Capacity

ATSC Annual Transmission Service Charges

MUC Marginal Unit Cost

BEST Brihanmumbai Electric Supply & Transport

NTP National Tariff Policy

Page 13: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

1 | P a g e

CHAPTER – 1: PROJECT INFORMATION

1.1 INTRODUCTION

The Electricity Act, 2003 aims at bringing about competition with the ultimate objective of ensuring

efficiency gains resulting from competition for the consumers. Competition with regulatory oversight is

the hallmark of the legislation - and it recognizes the important role of the regulatory commissions in

the wake of the challenges that opening of the sector poses for consumers and other stakeholders.

In the context of competition, open access is the corner-stone of the Act. Open Access has been

conceived as an important tool of introducing competition in the electricity industry and ensuring

choice to buyers and suppliers of electricity. The Act envisages Open Access in transmission and

distribution network. Open Access in transmission has been allowed from the very beginning and

without any fetter. However, in so far as Open Access in distribution is concerned, the law envisages

introduction of such Open Access in phases with due consideration of the operational constraints and

existence of cross subsidy between consumer categories. This responsibility of phased introduction of

open access in distribution has been bestowed on State Electricity Regulatory Commissions. Through

an amendment in the Act, it has, however been provided that the State Commissions shall provide by

January, 2009 open access to all consumers with load exceeding 1 MW.

The issue of open access for consumers with load exceeding 1 MW has been under discussion in recent

past in view of the various interpretations floated in the context. The Government of India (Ministry of

Power and Ministry of Law) in its latest interpretation on 30.11.2011 has articulated that Section 42 of

the Act makes it mandatory for all consumers with load exceeding 1 MW to be open access consumers

and that the tariffs for such consumers shall not be regulated by SERCs. Even as the central

government is pushing state for mandatory implementation of Open Access (OA) for bulk power

consumers, an analysis by a regulators body has revealed that contrary to expectations, the consumers

in 12 states have had to pay more for power under the new regime.

Open Access at various levels is the hallmark of electricity reforms and the regime has been effective

in 20 states since January 2009 on an optional basis. Under the Open Access regime, bulk consumers

enter into bilateral deals with discoms and stay outside the ambit of the regulated tariff system.

Page 14: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

2 | P a g e

According to a study by the Forum of Regulators, which compares average cost of power for Open

Access and regulated tariff consumers of 20 states in the financial year 2009-10, the 12 states where

Open Access consumers paid prices tariffs include Tamil Nadu, Bihar, West Bengal, Orissa and

Jharkhand.

Analysts however reckon that higher prices under the Open Access regime are due to factors like steep

rise in input costs primarily coal since 2009 and don’t negate the principle that Open Access promotes

competition. Also, many large consumers must have chosen to pay higher prices for better quality

power from distant discoms.

States Net open access

charges (Rs./unit)

Net cost of power for OA consumers

(Rs./unit)

Regulated tariff

(Rs./unit)

Tamil Nadu 2.35 5.35 3.96

Bihar 2.45 5.45 4.35

west Bengal 2.68 2.68 3.95

Jharkhand 2.51 5.54 4.48

Assam 2.51 5.61 3.25

Orissa 1.69 4.69 2.91

Himachal Pradesh 1.7 4.2 3.04

Table 1- Comparison of Open Access Fees & Regulated Tariff

There are also other reasons for this phenomenon, which on the fact of it seems to belie the concept

that Open Access regime would promote competition and correct market distortions. Analysts feel that

helped by regulators, discoms have burdened Open Access consumers with numerous un-prescribed

charges and surcharges to increase cost of power for them. As per the regulators study net Open Access

were upwards of Rs. 2/- a unit in six states during the period. It worked out to Rs. 1- 2/- a unit in six

other states. But in state of Maharashtra the scenario of Open Access is totally different here consumers

are moving in Open Access for chipper power because in Maharashtra reliable power is already

available for bulk consumer.

Page 15: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

3 | P a g e

1.2 PROBLEM STATEMENT Due to continuous shifting of bulk consumer distribution licensee and losing their paying consumer

and if the process will remain continue then the time will reach when distribution licensee will remain

with only subsidised of non-paying consumer. Under the Electricity Act, Open Access consumers have

to pay Open Access charges including wheeling and standby charges and cross-subsidy surcharge,

besides the cost of electricity. But this charges are not upto the mark and to minimize the loss of

distribution licensee following things should also need to consider :

i) Ideally, the net effect of subsidy and cross subsidy should need to be zero but in reality it is not zero

because the AT & C losses and theft has not considered in cross subsidy surcharge formula.

ii) Need to define who will pay the Cross subsidy of Renewable? if its obligation has removed from

paying Cross Subsidy Surcharge for its promotion,

iii) Need to solve the problem of forecasting which distribution licensees are facing.

1.3 SOPE OF PROJECT

This project will help to highlight the problem, which distribution companies are facing & also help to

minimize their losses by their different initiative. Customer interaction and the analysis of consumer

view help the licensee to understand the ground realities in Open Access and also help to know the

consumer expectation and suggestion to improve the process. The reasons of shifting of bulk consumer

when there is already a reliable power available in the state for bulk consumer.

Based on difficulties in distribution sector and considering present situation of power deficit market in

India, in this report my role is to do detailed study of billing issues/problem of Distribution Company

in Maharashtra and suggestion for its improvement based on consumer analysis and international

experience.

Page 16: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

4 | P a g e

1.4 OBJECTIVE OF THE PROJECT

To know the Open Access scenario in Maharashtra and find out the basic reasons / root cause

for resistance to implementation of Open Access.

To understand the billing procedure of Open Access in Maharashtra.

Understand the role of SLDC, WRLDC and MEDA in Open Access.

Find out that either consumers are really benefited through Open Access or they have more

benefit by retaining with existing licensee.

Study the loss due to improper implementation of Open Access and suggest the

recommendations to minimize the loss.

Page 17: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

5 | P a g e

CHAPTER – 2: PROJECT NEED & COMPANY OVERVIEW

2.1 IMPORTANCE OF PROJECT Enactment of the Electricity Act, 2003 has force for promotion of Open Access to develop

competition in the market but actual competition is possible only when there is perfect market is

available like number of seller and number of buyer and most important is surplus of

commodity. When we are deficit in power and if we talk about competition then it create

number of flause and heart the interest of consumer which is against the law.

Though open access regulations were already in place in Maharashtra since 2005 in three phases

for HT consumers with Contracted Demand of not less than 5 MW, 3MW and 1MW in

respective phases and MERC has also determined transmission charges, wheeling charges and

cross subsidy surcharge through subsequent orders to implement the open access, there are

5pprox.. 1965 open access customers till date.

While implementation of Open Access the loss of Distribution Company has not taken into

consideration though there may be number of surcharge are available like Cross Subsidy

Surcharge to compensate the loss of Distribution Company but it is not upto the mark to recover

the full loss. Due to improper implementation of Open Access under the name of “Promotion to

Competition” now almost all distribution company are in losses so now it is very important look

into this matter and take some revolutionary steps to recover the losses of Distribution

Company.

Due to Open Access, Distribution Company are losing their paying customer (Consuming more

than 1 MW of Industrial Consumer) and only non-paying or subsidised consumer are remain

with MSEDCL and as per Case No. 43 of MSEDCL the present Cross Subsidy Surcharge

Formula not are able to recover the subsidy which is loss to the MSEDCL and MSEDCL has

filed case against this and honourable high court has given judgement in favour of

implementation of Open Access saying the statement that MSEDCL is non-profit organisation

and present regulation for cross subsidy is to promote the competition. But the point is that upto

what extend it is correct because if this is the case then who will bear the loss of distribution

company. Either state government / central government should has to take initiative to bear this

loss because normally it is found that initiative for subsidy has taken for vote bank. In real term

if subsidy has given to prevent the agriculture consumer then there are other way to prevent it

like giving proper value to their crop production.

Also the theft of Power has not taken into consideration into Cross Subsidy Surcharge which

MSEDCL has to bear although MSEDCL has taken number of steps to stop theft of Electricity.

Following point also need to consider for proper implementation of Open Access :

i) Geographical area of agriculture while deciding subsidy because level of water is

different at different place hence required power for water evacuation is different as per

the location.

ii) Billing of Open Access should be slab wise based on consumption because transmission

loss will depend upon the distance or voltage drop.

Page 18: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

6 | P a g e

iii) The billing of Open Access are under the MSEDCL also it is providing assistance to the

Open Access Consumer and Customer hence it should be get some amount of service

charge for it.

2.2 ORGANIZATION PROFILE

About the organization

PPS is an ambitious company, established by enterprising engineering professionals in the year 2004.

The company offers services pertaining to Energy, Engineering and Architecture to clients across the

globe. PPS team is based in Pune, a city known for its Software and Engineering talent in India. PPS is

a rapidly growing company with a team of about 100 people which includes highly trained and

experienced Techno-Managers, Analysts, and Engineers & Detailers. In the PPS philosophy, the client

always comes first.

Understanding every clients‟ needs and requirements & to offer customized solutions is an endeavor

undertaken by each one of their employees. PPS prides itself as a technology driven company.

Company believes that use of cutting edge technology can greatly enhance output & quality, reduce

project life cycle & optimize costs in long run.

Page 19: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

7 | P a g e

Figure 1- Organization setup

PPS values the natural resources and is committed to preserve them. Company promotes all

environment friendly techniques to the maximum extent. As a natural corollary of their commitment to

the environment & energy efficient structures, the company entered the energy sector as a service

provider to the various arms of the power industry under the name of PPS Energy Solutions Pvt. Ltd.

PPS Energy Solutions is primarily formed to serve their clients to meet numerous challenges created by

a rapidly growing energy market. They are focused on pro- viding affordable energy solutions for our

clients in energy & power sector.

Energy Consulting

• Cost reduction /Process

• Reengineering/Organisation Design

Policy & Regulations

• Regulatory Economics/ PPP Model/Governance

Development Consulting

• Project Advisory/Bid Advisory/Financial Restructuring/Capacity Building/Energy Efficient Building Advisory

Page 20: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

8 | P a g e

2.3 ORGANIZATION SERVICES

Figure 2 - Organization Services

Figure 2- Organization Services

Energy Management

Energy Audits PPS Team offer Energy Audits for:

Process Industries Steel, cement, chemical, etc.

Power Distribution Sub stations, switching stations, distribution feeders, etc.

Commercial Buildings Malls, operating plants, offices, hospitals, colleges, etc.

Generation Units Mini / micro generation utilities

Energy Planning & Optimization

PPS Energy

Energy management

Project Management

Consultancy

Infrastructure Development

& Maintenance

Page 21: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

9 | P a g e

PPS do Energy Efficiency studies and provide solutions regarding green building & lighting

simulations.

Consultancy

Power Distribution End to end support in distribution loss reduction, asset management, formulation of

various schemes, DPR & claims for various power utilities Renewable Energy Complete support to

clients for establishing renewable power generation units Rural Electrification Formulation of DPR&

schemes for rural electrification. Also supporting clients for developing rural electrification

infrastructure. Power Regulation Offer regulatory support to power utility companies, transmission

companies, generation units, utility consumers, industries & power market etc for filing petitions &

sorting out the problems thereof. Power Generation Formulation of feasibility report, project report,

tariff proposals, power purchase agreements, fund arrangements for Mini and Micro projects.

Infrastructure Development & Maintenance

We offer Engineering, Procurement, Commissioning & Maintenance services in Power Sector Power

Distribution Provide end to end solutions in erection of distribution substations and allied works. Power

Transmission Provide end to end solutions in erection of EHV lines & allied works. Power Generation

Provide end to end solutions in Micro and Mini power generation units.

Project Management

Schedule and budget evaluations Value engineering Constructability reviews Accuracy checks on cost

estimates Monitoring and coordinating daily construction activities Technical Audits Contract

Negotiation and Administration Project Controls and Scheduling Regulatory Agency Coordination and

Negotiation Risk Management.

Critical Assessment of PPS Energy Solution Ltd.

Through the process of carrying out several assignments over the past many years, PPS Energy

Solution has accumulated considerable analytical and consulting expertise, backed by the following

organisational capabilities:

An extensive and organised database on power sectors.

Knowledge of key factors of success in different projects and program.

An ability to research emerging global trends, both in specific countries as well as in energy

sectors, based on primary and secondary data.

Performance benchmarking & Quantitative and financial modeling

Ability to identify the various types of risks in energy area and suggest appropriate strategies to

mitigate the same.

Ability to work in different geographies on its own and through affiliate partners

Page 22: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

10 | P a g e

2.4 SWOT ANALYSIS

Strengths

Core team of expert professionals & excellent work culture.

Targeting untapped markets with best management skills and corporate strategy

Time bound targeted goals & promotion of all environment friendly techniques to the

maximum extent.

PPS is certified energy auditing firm for carrying all types of energy audit.

Weakness

Company is in the initial stage of growth.

Small team to handle multiple projects.

Opportunities

Vast and growing market for energy conservation and energy audits.

Company can grab lots of government projects.

Create awareness among industries regarding energy efficiency.

Threats

Number of players has started entering this section of power sector.

Growing competition.

Page 23: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

11 | P a g e

CHAPTER - 3: LITERATURE & REASEARCH METHOD

LITERATURE SURVEY

Open access has been introduced progressively in United Kingdom, United States of America, Europe,

Australia, New Zealand and parts of Latin America. It can be noted that in a number of these countries,

open access has been introduced right up to the level of household consumers. For example, household

consumers in London, New York, Texas, Amsterdam, Melbourne and Auckland can choose among

competing suppliers. In the case of London, such open access was introduced in 1999 and household

consumers can presently choose from 12 competing suppliers. Open Access regulations by FERC,

USA FERC Order No. 888, introduced in April 1996, directed all public utilities that own, operate or

Control interstate transmission to provide open access in transmission and file tariffs that offer others

the same transmission services they provide themselves, under comparable terms and conditions. The

second rule, Order No. 889, introduced in March 1997, is now known as the Open Access Same-time

Information System rule or OASIS rule. It also covers Standards of Conduct. It works to ensure that

transmission owners and their affiliates do not have an unfair competitive advantage in using

transmission to sell power. This rule requires public utilities to obtain information about their

transmission system for their own wholesale power transactions, such as available capacity, in the same

way their competitors do -via an OASIS on the Internet; and, completely separate their wholesale

power marketing and transmission operation functions.

Lot of Scientist and Professor continuously worked & presented number of papers for Open Access

development. Out of which the abstract of some important papers are given below :

In Feb 1998, Mr. David, A.K. analyzed that Managing dispatch in an open access environment is a new

challenge facing independent transmission system operators who are mandated to provide a level

playing field for all transmission users. Two issues are especially important viz; use-of-transmission-

system charges and congestion management. He has examines aspects of these issues with emphasis

on the bilateral and multilateral dispatch co-ordination are explored and mathematical models

developed for each case. The practical case when all three modes coexist is discussed with respect to

both forward and real time dispatch.

In Mr. Ilic, M.[ Feb 1999 ] said that in today's integrated electricity supply industry, transmission is

seen as an (economic) complement to generation. The generation of power and the service of moving it

from one node of the grid to another are bundled into a single product called electricity. Transmission

and generation resources are planned and operated by a same entity. As a result, transmission costs,

mainly consisting of investment costs, are considered common costs and are recovered under the

current cost-based regulatory structure through a single bundled price of electricity, which is based on

average costs. Transmission pricing is not used as an active signal to shape the generation and

consumption of electricity. Here, the author describes how, as the industry is moving toward full open

access, the role of transmission has to be redefined and he discusses the objectives of power

transmission pricing under open access.

Page 24: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

12 | P a g e

Mr. Wu, F .F. etal [2000] used graph theory to calculate the contributions of individual generators and

loads to line flows and the real power transfer between individual generators and loads that are

significant to transmission open access. Related lemmas are proved which present necessary conditions

required by themethod. Based on AC load flow solution a novel method is suggested which can decide

downstream and upstream power flow tracing paths very fast and can calculate the contribution factors

of generations and loads to the line flows efficiently. The power transfer between generators and loads

can also be determined. The suggested method is suitable for both active and reactive power tracings of

real power systems.

Mr. Ping Wei, etal [2000] used the graph theory to analyse real power transfer between individual

generators and loads, which is important to transmission open access. Related lemmas are proved first

to present necessary conditions required by the method. Based on an AC load flow solution a novel

method is suggested which can determine downstream and upstream power flow tracing paths and

calculate the contribution factors of generations and loads to the line flows efficiently in the system

without circulating power. When the existence of circulating power in the system is detected, by

revealing the reasons which cause circulating power, the optimal power flow (OPF) approach is

suggested to eliminate it and a new feasible AC load flow solution will be obtained for tracing. The

computer tests yield satisfactory results. The suggested method is suitable for both active and reactive

power flow tracings of real power systems.

Mr. Staschus, K. [2001] has written about an overview on the development of the German power

market since the 1998 liberalization, including some statistics on the switching rates of customers and

the number of wholesale transactions. So far, the pace of increasing competition continues unabated,

even though the California crisis is being watched with great interest. He has also written about power

balance analyses for Germany and especially the entire interconnected European market. Germany and

most parts of Europe are not facing a power balance crisis, but some peripheral regions of Europe do

have capacity shortfalls. With competition increasing in all parts of Europe, the power balance

developments need to be watched carefully.

Mr. DeMarco, C.[ 2002] said that one of the premises underlying the move toward competitive markets

has been the presumption that it requires "open access" to the transmission network, with widespread

availability of data on the capabilities of that network. The electrical circuit characteristics of the

transmission grid play an intimate role in determining the limits on transmission capability. Almost

inevitably, therefore, it would appear that widespread availability of data regarding transmission

capability will carry with it fairly detailed knowledge of the physical characteristics of the transmission

grid, and more notably, its "Achilles heels," in the form of major transmission bottleneck points whose

loss would render the system inoperable.

Page 25: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

13 | P a g e

Mr. Ilic, M. [2003]has suggests that many of Transmission Reliability and Security challenges are

direct result of the institutional dichotomy within the once vertically integrated industry. Namely, while

the generation portion of this industry has made major progress toward becoming for profit, value-

based industry, both the delivery (transmission) and the end user (distribution) remainders are left

without any clear institutional support to adjust and provide their value to the end users in the changing

industry. His work shows that in order to move forward and provide some more natural ways of

valuing generation, transmission, distribution and customers' willingness to respond to the changing

system constraints, several issues must be resolved. Some possible institutional and technological

approaches to solving the system reliability problems in the changing industry were introduced.

Mr. Ilic, [2007] has explained the modelling, monitoring, and control of electric power systems from

the point of view of large-scale dynamic systems. First a summary of current hierarchical operations

has given, together with an assessment of the underlying assumptions. Next, the challenge of operating

electric power systems over very broad ranges of system conditions is explained as an open sensing,

estimation, and control problem. The latter part is motivated by fundamental technological and

organizational changes. These are requiring a shift from hierarchical to multi-layered open access

modelling, monitoring, and control paradigms for large complex electric power systems. A vision of a

novel information-based multi-layered dynamic energy control protocols (DECPs) framework for

facilitating evolution into open access just-in-time (JIT) and just-in-place (JIP) electricity services of

the future is given.

Mr. Cheung, H. [July 2008] etal has said that recently increased use of network-enabled devices in

power systems, rapid development of distributed generations from renewable energy resources, and

government-imposed open access competition have resulted utilities in greater reliance on computer

networks for proper power grid operations. His work proposes a new two-level architecture for power-

grid computer networks and to strength the networks' security. A new network access control strategy

and a new role-based access model are presented for increasing the power-grid network security. The

new model extends general network access controls for a single security domain to multiple domains

in the interconnected microgrids. A security policy managing method using XML is proposed to

simplify the network security administration. His work shows the significance of the proposed two-

level architecture and role-based network access security for the protection, control and monitoring

operations in distribution systems supplied with centralized bulk electricity generations and dispersed

generations under open access environment.

Mr. Raoofat, M.[ 2009] etal has explained a new fast algorithm to calculate the loss quota of any

bilateral transaction in a deregulated environment. The method is based on the well known incremental

transmission loss allocation method. While the base method is very slow to allocate loss into bilateral

contracts, the proposed method uses artificial neural network to overcome this problem. The proposed

method is tested on IEEE RTS 24-bus network with satisfactory results.

Page 26: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

14 | P a g e

Although Open Access is a relatively new concept in India, internationally most countries that have

gone through the process of electricity reforms, initiated and implemented this concept and thereby

facilitated the introduction of competition in the electricity sector with varying degrees of success.

Typically there have been the following common factors across almost all countries that have gone

through the process of Open Access:

i) Twin objectives of promoting competition and open access have been efficiency improvements

and price reductions;

ii) A precursor to introduction of open access has typically been the setting up of independent

regulator;

iii) A phased approach to Open Access has been followed in most of the countries with

competition being introduced first to large users followed by retail competition. While various

parameters have been used to phase the open access, typical factors used have been

consumption, area and voltage connectivity;

iv) Most countries have begun with simple, easy to understand and implementǁ systems and have

gradually moved/ are moving towards more complicated and sophisticated systems;

v) More often than not, except in the state of New York, there has existed a common

methodology for the introduction and phasing of open access within a country;

vi) In most countries, the system operator has been identified as a separate and distinct entity;

even in cases where the transmission utility itself serves as the system operator, this particular

role of the transmission utility has been separately identified and defined as distinct from its

role as a transmission service provider;

vii) Most countries have in some form or the other tried to bring in restrictions on cross-

ownership between generation and transmission/ distribution so as to ensure competition and a

fair open access market;

viii) Transmission pricing has typically been subject to regulation and prices are mostly based

on a mix of marginal pricing and average pricing to ensure complete recovery of costs.

Some key issues for concern typically have been:

Independence of the regulator due to continued government involvement;

Availability of detailed cost and revenue related data from the sector entities;

Confusion on issues relating to funding of new transmission capacity investments and unclear

identification of the beneficiaries;

In some countries, while the aim has been to promote competition, the industry has evolved into

regionalized markets thereby limiting choices to the final consumers;

Shifting of consumers to inefficient producers due to short term inducements being offered;

Reliability of supply has also been an issue of concern due to additional generation not

materializing to the extent expected.

Page 27: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

15 | P a g e

Research methodology

Study of MSEDCL Open Access Cases filled in MERC.

Study of CERC Open Access Regulation

Study of MERC Open Access Regulation

Collection of secondary data and analyzing the open access tariff in different states and

analyzing the open access market in Maharashtra state.

Analyzed the tariff orders of MERC and the prospects of open access in these tariff orders.

Based on the study above determining whether open access is beneficial or not for consumers,

who are opting for it.

Accessed State Load Dispatch Centre (SLDC), for loss and gain due to Open Access and their

role.

Giving recommendations and suggestions based on the above study.

Page 28: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

16 | P a g e

CHAPTER - 4: REGULATION & BACIS OF OPEN ACCESS

4.1 INTRODUCTION TO OPEN ACCESS

The objective of this assignment is to develop a framework for understanding the Open Access

Mechanism in Maharashtra and recommendation to minimize the loss of distribution licensee by

providing non-discriminatory open access to the transmission and distribution system in

Maharashtra. In order to achieve the desired objective, there is a need to take views of consumer

using Open Access, view of consumer those who are eligible but not using Open Access, also

MSEDCL stand on Open Access, views of SLDC, RLDC on the subject, which should

encompass the legal framework, technical, commercial and financial aspects related to the same.

The condition of power sector in Maharashtra would also need to be considered in order to

develop an overall framework for the implementation of open access in the state.

This section reviews the legal framework existing in Maharashtra, along with the various provisions of

the EA 2003 to understand the legal boundaries within which the regulations would need to be developed.

“According to the Act….”

The Electricity Act 2003 brought in significant changes in the power sector by enabling

competition, mandating open access to transmission and distribution networks, recognizing

trading and supply as a licensed activity, and delicensing generation.

Open Access, as per EA 2003, is defined under Section 2 (47) as follows:

“Open Access means the non-discriminatory provision for the use of transmission lines or

distribution system or associated facilities with such lines or system by any licensee or

consumer or a person engaged in generation in accordance with the regulations specified by the

Appropriate Commission”

To interpret it in a more understandable way the above can be put as follows:

Enabling of non-discriminatory sale/ purchase of electric power/energy between two parties

utilizing the system of an in- between (third party), and not blocking it on unreasonable grounds.

Meaning of Non-discriminatory Open Access

Entitlement of the users to use transmission & distribution network of the

licensees.

Licensees maintaining these networks cannot refuse such usage merely because

such system belongs to him.

Universal service obligation.

Page 29: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

17 | P a g e

Differential treatment of unequals is not discrimination if such unequals are

clearly identifiable as a separate class and there are justifiable reasons for

separating them.

Use of the transmission system can be classified and conditions of the open access

can be structured differently.

Thus, classification can be made between the existing and new users and, long

term, medium term and short term users, continuous and seasonal users, peak and

non-peak hour users and distribution licensees.

4.2 ELIGIBILITY CRITERIA FOR OPEN ACCESS

A consumer of a Distribution Licensee shall be eligible for open access to the distribution

system of such Distribution Licensee for obtaining supply of electricity from a Generating

Company or from a Licensee other than such Distribution Licensee, in accordance with the

following eligibility conditions:

Contract demand of consumer Date on which open access will be allowed under sub section (2) Of Section 42 of the Act

Not less than 5 MVA Publication of these regulations in official gazette

Not less than 2 MVA but less than 5 MVA 1-Apr-06

Not less than 1 MVA 1-Apr-07

Provided that such consumer shall be eligible for open access to the distribution system of such

Distribution Licensee from the date his Contract Demand is equal to or greater than the threshold levels

as specified above on or after the date on which open access is allowed under this Regulation.

Provided further that where a person, not being a consumer, whose premises are situated within the

area of supply of a Distribution Licensee requires supply of electricity from a Generating Company or

any Licensee other than such Distribution Licensee, such person shall be eligible for open access to the

distribution system of the Distribution Licensee if the load applied for by such person with such

Generating Company or Licensee exceeds the threshold levels as specified above on or after the date

on which open access is allowed under this Regulation.

Provided also that the Maximum Demand of such consumer or person in each financial year

subsequent to his being granted open access shall be equal to or greater than eighty (80) per cent of the

threshold level at which he has become eligible for open access failing which the Distribution Licensee

shall be entitled to withdraw the facility of open access granted to such consumer or person.

Page 30: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

18 | P a g e

Provided also that where the facility of open access of such consumer or person has been withdrawn

on account of failure to achieve a Maximum Demand equal to or greater than eighty (80) per cent of

the threshold level, then such consumer or person, as the case may be, shall be liable to pay, to the

Distribution Licensee, a penalty equal to two times the wheeling charges for the financial year or part

thereof for which he had failed to achieve such Maximum Demand.

The Commission shall allow open access to the distribution system of a Distribution Licensee to

a Generating Company or a Licensee, other than such Distribution Licensee, to give supply of

electricity to a consumer or person, whose premises are situated within the area of supply of the

Distribution Licensee, from the date on which such consumer or person, to whom such supply is

to be given, becomes eligible for open access in accordance with above Regulation.

Provided that the application for open access under this Regulation 3.2 shall be made by the eligible

consumer or person, whose premises are situated within the area of supply of the Distribution Licensee,

to whom supply is intended to be given by such Generating Company or Licensee.

The Commission may review, amend and modify, with or without conditions, the eligibility

conditions referred to in this Regulation 3 based on the experience gained through the

introduction of open access and/ or upon a consideration of all relevant factors, including

operational constraints, if any, in the implementation of open access.

Page 31: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

19 | P a g e

4.3 SECTIONS OF EA-2003 GOVERNING OPEN ACCESS

Captive Generation – Section 9 (2)

Every person, who has constructed a captive generating plant and maintains and operates such plant,

shall have the right to open access for the purposes of carrying electricity from his captive

generating plant to the destination of his use:

Provided that such open access shall be subject to availability of adequate transmission facility and

such availability of transmission facility shall be determined by the Central Transmission Utility

or the State Transmission Utility, as the case may be:

Provided further that any dispute regarding the availability of transmission facility shall be adjudicated

upon by the Appropriate Commission.

Functions of CTU – Section 38 (2) (d)

The functions of the Central Transmission Utility shall be to provide non-discriminatory open access to

its transmission system for use by-

i) any licensee or generating company on payment of the transmission charges; or

ii) any consumer as and when such open access is provided by the State Commission under sub-

section (2) of section 42, on payment of the transmission charges and a surcharge

thereon,as may be specified by the Central Commission:

Provided that such surcharge shall be utilised for the purpose of meeting the requirement of current

level cross-subsidy:

Provided further that such surcharge and cross subsidies shall be progressively reduced and eliminated

in the manner as may be specified by the Central Commission:

Provided also that such surcharge may be levied till such time the cross subsidies are not eliminated:

Provided also that the manner of payment and utilisation of the surcharge shall be specified by the

Central Commission:

Provided also that such surcharge shall not be leviable in case open access is provided to a person who

has established a captive generating plant for carrying the electricity to the destination of his own

use.

Functions of STU – Section 39 (2) (d)

The functions of the State Transmission Utility shall be to provide non-discriminatory open access to

its transmission system for use by-

i) any licensee or generating company on payment of the transmission charges ; or

ii) any consumer as and when such open access is provided by the State Commission under

sub-section (2) of section 42, on payment of the transmission charges and a surcharge thereon,

as may be specified by the State Commission:

Page 32: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

20 | P a g e

Provided that such surcharge shall be utilised for the purpose of meeting the requirement of current

level cross-subsidy:

Provided further that such surcharge and cross subsidies shall be progressively reduced and eliminated

in the manner as may be specified by the State Commission:

Provided also that the manner of payment and utilization of the surcharge shall be specified by the

State Commission.

Provided also that such surcharge shall not be leviable in case open access is provided to a

person who has established a captive generating plant for carrying the electricity to the destination of

his own use.

Wheeling Charges – Section 42 (2)

The State Commission shall introduce open access in such phases and subject to such conditions,

(including the cross subsidies, and other operational constraints) as may be specified within one year of

the appointed date by it and in specifying the extent of open access in successive phases and in

determining the charges for wheeling, it shall have due regard to all relevant factors including such

cross subsidies, and other operational constraints:

Provided that such open access may be allowed before the cross subsidies are eliminated on payment

of a surcharge in addition to the charges for wheeling as may be determined by the State Commission:

Provided further that such surcharge shall be utilised to meet the requirements of current

level of cross subsidy within the area of supply of the distribution licensee :

Provided also that such surcharge and cross subsidies shall be progressively reduced and

eliminated in the manner as may be specified by the State Commission:

Provided also that such surcharge shall not be leviable in case open access is provided to a person who

has established a captive generating plant for carrying the electricity to the destination of his own use.

Additional Surcharge – Section 42 (4)

Where the State Commission permits a consumer or class of consumers to receive supply of electricity

from a person other than the distribution licensee of his area of supply, such consumer shall be liable to

pay an additional surcharge on the charges of wheeling, as may be specified by the State Commission,

to meet the fixed cost of such distribution licensee arising out of his obligation to supply.

Functions of State Commission – Section 86 (1)

The State Commission shall discharge facilitate intra-state transmission and wheeling of electricity;

Page 33: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

21 | P a g e

4.4 OPEN ACCESS TO DISTRIBUTION NETWORKS

The rights conferred upon consumers of electricity to source their supply from competing producers

and suppliers and the corresponding duties imposed upon transmission entities, distribution licensees

and RLDCs/SLDCs to transport electricity in an efficient and non-discriminatory manner aim at

creating a competitive market that would improve efficiencies and cut costs. Moreover, it would create

a market for supply by competing producers and thus encourage investments in creation of generating

capacities which need not rely on distribution licensees for payment security. Trading licensees have

been introduced, under the provisions of Section 52, to lend greater efficiency and competitiveness in

the sale and purchase of electricity. To ensure the ‘last mile’ access to consumer, Sections 42 (2)

through 42 (4) stipulate the duties of distribution licensees in providing open access to their networks.

Page 34: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

22 | P a g e

4.5 DUTIES OF DISTRIBUTION LICENSEE AND OPEN ACCESS a) The State Commission shall introduce open access in such phases and subject to such

conditions, (including the cross subsidies, and other operational constraints) as may be

specified within one year of the appointed date by it and in specifying the extent of open

access in successive phases and in determining the charges for wheeling, it shall have due

regard to all relevant factors including such cross subsidies, and other operational

constraints: Provided that such open access shall be allowed on payment of a surcharge in

addition to the charges for wheeling as may be determined by the State Commission:

Provided further that such surcharge shall be utilized to meet the requirements of current

level of cross subsidy within the area of supply of the distribution licensee:

Provided also that such surcharge and cross subsidies shall be progressively reduced in the

manner as may be specified by the State Commission:

Provided also that such surcharge shall not be leviable in case open access is provided to a

person who has established a captive generating plant for carrying the electricity to the

destination of his own use:

Provided also that the State Commission shall, not later than five years from the date of

commencement of the Electricity Act, 2003, by regulations, provide such open access to all

consumers who require a supply of electricity where the maximum power to be made available

at any time exceeds one megawatt.

b) Where any person, whose premises are situated within the area of supply of a distribution

licensee, (not being a local authority engaged in the business of distribution of electricity

before the appointed date) requires a supply of electricity from a generating company or any

licensee other than such distribution licensee, such person may, by notice, require the

distribution licensee for wheeling such electricity in accordance with regulations made by the

State Commission and the duties of the distribution licensee with respect to such supply shall

be of a common carrier providing non-discriminatory open access.

c) Where the State Commission permits a consumer or class of consumers to receive supply of

electricity from a person other than the distribution licensee of his area of supply, such

consumer shall be liable to pay an additional surcharge on the charges of wheeling, as may

be specified by the State Commission, to meet the fixed cost of such distribution licensee

arising out of his obligation to supply.

Page 35: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

23 | P a g e

4.6 CATEGORIZATION OF OPEN ACCESS

Figure 3- Categorization of Open Access

Page 36: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

24 | P a g e

Allotment priority of a long-term customer shall be higher than reservation priority of a short-

term customer.

Applications for grant of short-term access shall be processed only if short-term access is

commencing in the first month to the fourth month and is not ending beyond the fourth month,

taking the month in which application is made as the first month.

Application is made or received after the nineteenth day of a month for open access

commencing and terminating in the following month shall be treated on first-come-first served

basis, and short-term access shall be granted subject to availability of the transmission capacity.

Electronic-bids are invite for reservation of transmission capacity of the congested transmission

corridor in accordance with Regulation on the twenty-sixth day of the month.

Every transmission licensee shall declare the existing long-term customers using its

transmission system (including self-use and use by unbundled agencies which were previously

integrated) either on its website or on the website of the Regional Load Despatch Centre or the

State Load Dispatch Centre concerned latest by the thirtieth day of June 2005.”

A composite request for open access and scheduling shall be sent to the nodal Regional Load

Dispatch Centre through the State Load Despatch Centre concerned latest by 3.00 PM.

Page 37: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

25 | P a g e

4.7 PROCEDURE FOR ALLOTMENT OF OPEN ACCESS

Long Term Open Access

i) An application for long-term access shall be submitted to the nodal agency;

ii) The application shall contain the details, such as capacity needed, point(s) of injection, point(s)

of drawl, duration of availing open access, peak load, average load and such other additional

information that may be specified by the nodal agency: Provided that the nodal agency shall

issue necessary guidelines, procedure and application forms within 30 days of commencement

of these regulations.

iii) The application shall be accompanied by a non-refundable application fee of Rs one lakh

payable in the name and in the manner to be decided by the nodal agency;

iv) Based on system studies conducted in consultation with other agencies involved including

other transmission licensees, the nodal agency shall, within 30 days of receipt of the application,

intimate to the applicant whether or not the long-term access can be allowed without further

system strengthening:

Provided that where the long-term access can be allowed without further system strengthening,

this shall be allowed immediately after entering into commercial agreements.

v) If, in the opinion of the nodal agency, further system strengthening is essential before

providing the long-term access, the applicant may request the nodal agency to carry out the

system studies and preliminary investigation for the purpose of cost estimates and completion

schedule for system strengthening;

vi) The nodal agency shall carry out the studies immediately on receipt of request from the

applicant under clause (v) above and intimate results of the studies within 90 days of receipt of

request from the Central / State transmission Unit.

The applicant shall reimburse the actual expenditure incurred by the nodal agency for system

strengthening studies:

Provided that the fee of rupees one lakh paid by the applicant shall be adjusted against the actual

expenditure to be reimbursed by the applicant.

Short Term Open Access i) A short-term customer shall submit an application for transmission access to the nodal Regional

Load Dispatch Centre.

ii) The application shall contain the details, such as capacity needed, point or points of injection,

point or points of drawl, duration for availing of open access, peak load, average load and such

other additional information that may be laid down by the Regional / State Load Dispatch

Centre.

iii) The application shall be accompanied by a non-refundable application fee of Rupees five

thousand only; Provided that in case of application for access on the date of the application or

Page 38: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

26 | P a g e

on the following day, the application fee may be deposited within next three working days of

making of application.

iv) The reserved transmission capacity shall not be transferred by a short-term customer to any

other customer.

Figure 4- Procedure for Scheduling of Short Term Open Access in Bilateral Transaction

Page 39: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

27 | P a g e

Figure 5- Procedure for Scheduling of Short Term Open Access in Collective Transaction

Page 40: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

28 | P a g e

4.8 ROLE OF DIFFERENT AGENCIES IN OPEN ACCESS

NLDC (National Load Dispatch Centre)

Section 26. (National Load Dispatch Centre) of the Act stipulates that:

1) The Central Government may establish a centre at the national level, to be known as the

National Load Dispatch Centre for optimum scheduling and dispatch of electricity among the

Regional Load Dispatch Centres.

2) The constitution and functions of the National Load Dispatch Centre shall be such as may be

prescribed by the Central Government.

Note : Provided that the National Load Dispatch Centre shall not engage in the business of

trading in electricity.

RLDC (Regional Load Dispatch Centre)

Section 27. (Constitution of Regional Load Dispatch Centre) of the Act stipulates that:

1) The Central Government shall establish a centre for each region to be known as the Regional

Load Dispatch Centre having territorial jurisdiction as determined by the Central Government

in accordance with section 25 for the purposes of exercising the powers and discharging the

functions under this Part.

2) The Regional Load Dispatch Centre shall be operated by a Government company or any

authority or corporation established or constituted by or under any Central Act, as may be

notified by the Central Government. Provided that until a Government company or authority

or corporation referred to in this sub-section is notified by the Central Government, the

Central Transmission Utility shall operate the Regional Load Dispatch Centre.

Note : Provided further that no Regional Load Dispatch Centre shall engage in the business of

generation of electricity or trading in electricity.

Page 41: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

29 | P a g e

SLDC (State Load Dispatch Centre)

Section 31. (Constitution of State Load Dispatch Centre) of the Act stipulates that:

1) The State Government shall establish a Centre to be known as the State Load Dispatch Centre

for the purposes of exercising the powers and discharging the functions under this Part.

2) The State Load Dispatch Centre shall be operated by a Government company or any authority

or corporation established or constituted by or under any State Act, as may be notified by the

State Government. Provided that until a Government company or any authority or corporation

is notified by the State Government, the State Transmission Utility shall operate the State Load

Dispatch Centre.

Note : Provided further that no State Load Dispatch Centre shall engage in the business of trading in

electricity.

CTU (Central Transmission Utility)

Section 38. (Central Transmission Utility and functions) of the Act stipulates that:

1) The Central Government may notify any Government company as the Central Transmission

Utility.

Note : Provided that the Central Transmission Utility shall not engage in the business of generation of

electricity or trading in electricity.

One of the functions of Central Transmission Utility is to provide non-discriminatory Open Access to

its transmission system for use by –

i) any licensee or generating company on payment of the transmission charges; or

ii) any consumer as and when such open access is provided by the State Commission under sub-

section (2) of section 42, on payment of the transmission charges and a surcharge thereon, as

may be specified by the Central Commission.

Page 42: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

30 | P a g e

STU (State Transmission Utility)

Section 39. (State Transmission Utility and functions) of the Act stipulates that:

1) The State Government may notify the Board or a Government company as the State

Transmission Utility.

Note : Provided that the State Transmission Utility shall not engage in the business of trading in

electricity.

One of the functions of State Transmission Utility is to provide non-discriminatory open access to its

transmission system for use by-

i) any licensee or generating company on payment of the transmission charges ; or

ii) any consumer as and when such open access is provided by the State Commission under sub-

section (2) of section 42, on payment of the transmission charges and a surcharge thereon, as

may be specified by the State Commission. The Load Dispatch Centres, transmission utilities

are barred from trading n power in order to ensure non-discriminatory open access to all the

generators/ consumers.

MEDA (Maharashtra Energy Development Association)

The role of MEDA in Open Access is only to see that weather the Open Access Consumer are meeting

is RPO (Renewable Purchase Obligation) or not, because criteria for both Open Access consumption

and RPO is same ie. 1 MW.

4.9 COMPONENT OF OPEN ACCESS

While framing the draft regulations a number of issues have been analysed prior to the formulation of

various options available in building up of the Open Access framework. The intent of the analysis is to

understand the various facets of open access and its impact on the various constituents of the power

sector in Maharashtra so as to develop a framework that is consistent with the legislation, state

environment and is implementable.

The key issues identified are:

- Capacity determination

- Allocation of Capacity

- Pricing of Open Access, including determination of charges, namely, transmission charges,

wheeling charges, cross subsidy surcharge and additional surcharge

- Other issues

Page 43: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

31 | P a g e

4.10 CAPACITY ASSESSMENT The aim of capacity assessment is to understand the extent of surplus capacity available on the network

that can be used to provide open access, without impacting the existing users, reserve capacities and

redundancy requirements to meet emergency conditions. In case there is limited network capacity

available, plan for timely augmentation in view of growth in demand and addition in generation

capacity of the network would need to be identified so that open access can be provided to those who

are seeking the same as per the EA 2003.

In this regard, the following aspects need to be addressed:

• Approach to Network Capacity Assessment and network capacity augmentation

• Operational Aspects

- Allocation of network capacity

- Curtailment

- Revocation and Transfer

Approach to Network Capacity Assessment

The existing system in the State has various generators (both public and private) and linked with the

grid to enable the transfer of power from generating plants to the end consumers. Given the complexity

of the open access, there is a clear need to understand what network capacity really reflects to. Does it

reflect

• Point-to-point capacity available in the network

• Capacity of the network as a whole

If capacity were defined as point-to-point, then specific points of injection and drawl would become

important for assessment of capacity available in the system. Internationally, both network service as

well as point-to-point service is provided by transmission service providers. Network service would be

preferred as it would provide more flexibility to the players and would in any case be required as the

systems move towards dynamic markets. Such a service would require the transmission and

distribution system to be robust with adequate reserve margins and systems and processes to provide it.

Based on the current situation of network capacity and constrained investments, in the interim, it would

be preferable that the system be tested based on limited flexibility on the injection and drawl, i.e. a

point-to-point approach. For the long-term, in view of encouraging the trading business, planning

would be required to ensure availability of network service.

For the present, it is felt that the optimum approach would be the assessment of Available Network

Capacity (ANC) based on point-to-point basis specified on point of injection and point of drawl. ANC

would provide the information about the available transfer capacity of the transmission / distribution

line in a certain direction without violating the security constraints. It would essentially measure the

Page 44: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

32 | P a g e

transfer capability remaining in the physical network for further commercial activity, over and above

already committed uses (less the ―existing loadǁ for the applicant if already a consumer). Any new

load of an existing open access customer would be treated at par for allocation of network capacity as a

new open access customer.

Computation of ANC would need to be assessed keeping the following issues in mind:

Existing users and therefore the capacity utilized over seasons, peak and off-peak periods.

Reserved capacity – that has been reserved but is currently unutilized on account of delays in

commissioning of end-user equipment’s, lack of funds, policy directives or otherwise etc.

Growth expected in the load.

Safety margins required for safety of the grid.

As every transaction affects the entire grid as well as interconnected lines, ANC is expected to be a

dynamic value and would be dependent on the status of the rest of the network. Accordingly, an

assessment of the ANC must allow for reasonable uncertainties in system conditions and afford

redundancies to address emergency situations.

The capacity assessment for the transmission and distribution system would need to be conducted

periodically by the Transmission Licensee, in Maharashtra and distribution licensees MSEDCL, TATA

Power, Reliance and BEST respectively with the help of SLDC. However, it is important that to ensure

fair open access, the regulators must be able to assess the situation put forth by the nodal agency and

take corrective measures/directives within limited time period. There may therefore be need for an

independent assessment, wherever required, with the support of external experts.

In the event that network capacity is not available at the time of assessment, STU and the concerned

Distribution Licensee would be required to make an assessment of the capacity addition required and

the timeframe for implementation of the same. As availability and reliability of the network forms the

core of the open access regime, investment planning would need to form a part of the license

requirements and planning process of the State Transmission Utility. As the system strengthening

would benefit other users also, the costs towards the system augmentation and strengthening required

would be borne by all the long-term users of the system. However, any costs towards any dedicated

system required would be borne by the open access customer alone, until the dedicated facility is

offered for use by other participants of the T&D system, in which case then the costs can be shared

between the users of the dedicated facility in proportion to their capacity reserved.

The increased reliability to be provided under Open access would require that integrated system

planning be undertaken by STU, concerned Distribution Licensees and SLDC with intimation to the

Commission so that smooth implementation and cost recovery can take place.

Page 45: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

33 | P a g e

Allocation of Network Capacity

Before providing Open Access it is essential to address the issue of what the capacity allocation is

required for, and whether such a determination should be undertaken after factoring for the

requirements and constraints of existing licensees or should it be based on a perusal treatment of all

open access customers. The reason why this issue is important is that if reservation of network capacity

is unilaterally adopted, this could result in effectively blocking open access till new capacities are

planned for and allocated to the new applicants seeking open access. Such blocking would not make

economic sense in view of unutilized capacity. It is therefore felt that there is need for an appreciation

of the conflicting viewpoints on this issue before a view is taken on the need or otherwise of

reservation. In the new draft regulations by MERC it is decided to give priority

Page 46: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

34 | P a g e

Allotment Priority:

Figure 6- Allotment Priority

The allocation of network capacity would be contingent on the categorization of open access

customers, which in itself can be based on a variety of factors as outlined below:

Nature of customer

Current Status- Existing and New (Open access customers)

Tenure – Long-term, Medium-term and Short-term

Nature of open access – Firm or non-firm;

Periodicity – Full year vs. seasonal;

Quantum reserved

Page 47: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

35 | P a g e

Curtailment Priority

When, because of constraints or otherwise, it becomes necessary to curtail the open access service of

the customers, subject to the requirements of Grid Code, the short term open access customers shall be

curtailed first, followed by the medium term open access customers and long term access customers.

The open access to a distribution licensee shall be the last to be curtailed.

Under-Utilization/Non-Utilization of Open Access capacity

In case, a Long-Term Access customer is unable to utilize the capacity allotted to him, he shall inform

the same to State Transmission Utility along with reasons for his inability to utilize the capacity and

may request for surrender of the capacity allotted to him by serving a notice of 1 year, after which the

relevant capacity would be deemed to have been surrendered. The State Transmission Utility may

reduce or cancel the allotted capacity of an open access customer on account of underutilization after

providing appropriate notice. The penalty payable for such reduction or cancellation or surrendering of

capacity shall be equivalent to 66% of the transmission charges paid by such customer for the period

falling short of notice period of 1 year and 66% of the transmission charges for the period falling short

of 12 years if long term access was not availed for at least 12 years based on average billing of

respective open access charges for the past three months.

In case, medium term open access customer is unable to utilize the reserved capacity allotted to him, he

shall inform the nodal agency along with the reasons for his inability to utilize the capacity and may

request for surrender of the capacity allotted to him by serving a notice of 30 days, after which the

relevant capacity would be deemed to have been surrendered. The Nodal Agency may reduce or cancel

the allotted capacity of an open access customer on account of underutilization after providing

appropriate notice. The medium-term open access customer relinquishing its rights shall pay applicable

transmission charges for the period of relinquishment or 30 days whichever is lesser.

In case, Short-term open access customer is unable to utilize the reserved capacity allotted to him, he

shall inform the Nodal Agency with a copy to distribution licensee along with reasons for his inability

to utilize the capacity and may surrender the reserved capacity. The State Load Despatch Centre may

reduce or cancel the reserved capacity of a short-term open access customer on account of

underutilization after providing appropriate notice under intimation to distribution licensee. A short

term Open Access customer, whose capacity has been reduced or cancelled or surrendered, shall bear

the open access charges and operation charges based on the original reserved capacity for a period of

two days from the date of receipt of request or the period of reservation surrendered or reduced or

cancelled, as the case may be, whichever period is shorter.

Page 48: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

36 | P a g e

4.11 PRICING FOR OPEN ACCESS

Objective of Pricing Policy as followed by MSEDCL The Pricing policy that has been followed by MERC, took following points into consideration:

Be Simple to understand and administer;

Promote efficient use of the system;

Provide adequate compensation to the system owner;

Give economic signals for new investments and for demand side management including

location of new generation capacities and loads;

Avoid misuse through gaming, speculative possibilities & blocking capacity.

Pricing for Network Usage

It is important to ensure that all the costs are recovered through the proposed method of charging the

transmission / wheeling charges and other components, even stranded costs, if any, resulting from open

access. All these costs need to be recovered so that the financial viability of the successor entities is

established in the transition period. The tariff revolves around the following three aspects:

i) Elements of tariff

ii) Cost allocation Criteria: Tariff design

iii) Cost concepts

Elements of tariff

It would be segregated based on the nature of the costs (Fixed / variable), different sources (Network /

Connection) or basis of allocation (Congestion). The various elements of the tariff are discussed in

detail below.

Cost allocation Criteria: Tariff design

The tariff design should encourage efficient usage of assets, optimum investments and location of

generating stations, loads, competition and power trading. The design accordingly aims at optimal use

of system through allocation of costs based on the impact on the system. A number of methods are

available for this purpose ranging from the simple Postage Stamp method to complex MW-mile

method. The principle would be to allocate the costs based on the usage by the user / beneficiary and

the related losses. In view of the nature of electricity, capturing these two aspects needs a large amount

of reliable data capturing infrastructure and complex systems. Some of the key methods used for

transmission systems have been discussed by CERC in formulating the regulations on open access for

Inter-state transactions and are briefly presented below:

Page 49: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

37 | P a g e

POSTAGE STAMP METHOD

Under this method, the total costs to be covered are distributed amongst the total energy or capacity

carried by the system, resulting in a fixed charge per unit of energy transmitted or capacity reserved

regardless of the distance that the energy travels. This charge can be calculated for defined areas or

zones. These rates can also be differentiated based on seasons and time of day. In the event when a

transaction requires energy to be transmitted across a number of zones, the transmission charges are

equal to the summation of such charges for each zones crossed – such a phenomenon is termed as

―Pan caking. Some of the variations on this method are given below:

(A-1) Regional postage stamp method – The annual transmission costs calculated for each identified

region are shared based on capacity handled by the region, which includes the allocated central

generating stations’ capacity to different states, bilateral exchanges as well as capacity brought in

through trading.

(A-2) Incremental postage stamp method – This method envisages reducing the area within a

postage stamp so as to make the charges sensitive to distances exceeding 100 kms. The proposal is to

demarcate the country into squares of 100km x 100 km and the charges payable by the open access

customer are determined by counting the squares vertically and horizontally from the source to sink of

the transaction. However, this method would not reflect the actual usage of the network by a

transaction especially in case of transmission by displacement.

(A-3) Zonal postage stamp matrix Method – This is an improvised version of incremental postage

stamp method being suggested, in which the country is demarcated into 14 zones, each represented by

one or more States. Stamps between various zones are counted not only by the physical distance but

also by taking into consideration the mode of transmission (i.e. actual flow or displacement). Based on

the existing network and flow patterns, a matrix of stamps between various zones based on notional

distances has been suggested. The notional distance aims to capture the existing flow pattern and

impact of incremental flow due to open access transaction. This method, thus, tries to replicate the

results obtainable from the MW-mile method, without going into complexities of the latter. This matrix

would need to be revised based on asset addition as well as energy flows.

Page 50: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

38 | P a g e

CONTRACT PATH METHOD

In this method, the charges payable by the user are related to the transmission path of the transaction.

For this purpose, contracted path is defined as the shortest route formed by a series of transmission

lines (as agreed between the participants) which are capable of carrying the contracted power between

point of drawal and the point of injection. This method however, requires clear identification of the

contracted path. While it is simple and sensitive to distance, it would not reflect the true picture unless

based on path as chosen by load flow studies that would capture aspects like transmission taking place

in displacement mode and probability of using parallel paths. While this method has been widely used

in the USA, it has been felt that it is not really cost reflective and is vulnerable to gaming.

MW-Mile method

In this method the transmission rates explicitly reflect the cost of transmission, based on both the

megawatts of power flow and the distance between the receipt and delivery points. The cost of

transmission per megawatt-mile is the total transmission costs averaged over megawatt miles of usage.

MW-mile is a sophisticated and scientifically analytical method. This method involves load flow

analysis to model power flows on the transmission network to determine charges and hence requires

complete network data to be captured.

The above methods are primarily used for transmission systems for limited players and require

extensive information. Application of the same principles would be difficult to implement across the

congested and concentrated distribution networks, which would need to be addressed through simpler

principle.

Cost concepts

These would be the cost being used for allocating. The two concepts in this regard are

(i) Average Costs and (ii) Marginal Costs.

i) Average Costs

Under this method, the costs incurred are shared amongst the various users on a specified basis (as

discussed above) and do not reflect the current costs. The users are treated equally – E.g., if the

transmission costs are shared based on capacity reserved, two users with a reservation of 100 MW

would be allocated the same costs. Similarly, two users drawing the same energy would be allocated

the same amount of losses;

Page 51: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

39 | P a g e

ii) Marginal costs

Under this method, each user is charged based on the impact that they make on the network, be it the

requirement of assets or the losses incurred. While the losses can be computed based on the

incremental losses on account of a new addition, for costs recovery, the concept used for assets are

determined based on replacement value / current costs of assets required. While marginal pricing

reflects the market based price, internationally, it has been experienced that this mode of pricing has

not been fully able to recover the costs and has forced the regulators to have a mix of marginal pricing

and fixed pricing so as to ensure investments into the sector. Under such an event, the unrecovered

costs (net of amount collected with marginal pricing) are shared between the users on a uniform basis

(Capacity / Energy).

The key charges that need to be determined by the Commission fall in the following categories,

subject to the National Tariff Policy and principles and methodologies used by MERC for Open Access

Customers:

• Transmission Charges

• Wheeling Charges

• System Operating Charges

• Surcharge for cross subsidy

• Additional Surcharge

• T&D Losses

Prior to the formulation of Intra State Open Access Regulations in Maharashtra, the Central

Commission (CERC) has provided its Order and Regulations on ―Open Access in Inter-state

Transmission used the following principles in pricing:

- Elements of Tariff:

The charges have been segregated into Transmission Charges (for long-term, medium-term and Short-

term), SLDC Charges, UI Charges, Bidding for Congestion, Reactive Energy Charges and Losses.

- Cost Allocation and Cost Concepts:

The allocation of costs has been based on an average principle rather than the marginal implying that

all the costs are uniformly shared between a set of users irrespective of the impact that each additional

user / transaction has on the system. Such a method is being proposed, as it is not currently practicable

Page 52: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

40 | P a g e

to measure the marginal impact of each transaction on the costs and the losses of the transmission

system.

Transmission Charges for the long-term and medium-term users are based on recovery of all approved

costs through a variation of Postage Stamp method, wherein the stamp is computed for each Region.

Under this method, the entire costs of the Transmission (after netting off of 75% of fund collected from

short-term users) are shared between the various users in proportion to the capacity reserved by them.

The charges for the short-term users are 25% of the average transmission charge, as computed at the

beginning of a year. These charges shall be payable to each transmission licensee whose system is used

for the transaction.

These charges are calculated for each Region separately. Further these charges would be

calculated for each inter-regional link, other inter-state transmission licensees separately.

In the event of congestion, short-term users are to bid for the capacity based on a Transmission

Charge Price, wherein the average Transmission Charge computed for the year would be the

floor price for such bidding.

SLDC Charges are also based on the same principle as the Transmission Charges, i.e. the long-

term and medium-term users share the total costs, except that they have been allowed to retain

the charges imposed on the short-term users (on a per day basis) over and above the costs as

approved by the Central / State Commission.

UI Charges are to be payable as governed by the UI pricing mechanism applicable to the inter-

state transactions. However, any UI on account of embedded customers shall form a part of the

State Bill, to whose system the embedded customer is connected.

Reactive Energy Charges shall be as applicable to inter-state transactions. However, as with UI

charges, embedded customers shall be governed by the regulations applicable to the State to

which they are connected.

Losses would be averaged across all users and would be paid in kind by additional injection.

4.12 CHARGES FOR OPEN ACCESS CUSTOMERS

Transmission Charges

Under the EA 2003, open access to the transmission shall be provided on payment of transmission

charges and other charges like surcharge etc. depending on the category of customers seeking open

access. There are two kinds of costs that are incurred by the transmission licensees, viz. costs for

creating, operating and maintaining the network and costs on account of losses. The charges have been

designed in a manner so as to allow the recovery of these costs from the various users of the system.

Under the existing regime, the transmission charge is designed so as to recover all the costs of the

CTU, in proportion of the reserved capacity of the long-term users. At the State level, the State

Commission allows for recovery of the costs from the Consumers.

Page 53: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

41 | P a g e

Costs to be recovered

These charges are for the actual usage of the transmission and the distribution system for transferring

the contracted power from the generator to the user. Accordingly all costs associated with the

transmission or sub-transmission and distribution system may be recovered from the

licensees/consumers availing network service. These charges are expected to cover all the costs for

creating and operating the network including O&M, interest expenses, depreciation and equity returns.

The different costs can be segregated into:

• Connection Charges

For recovery of costs for assets used for interconnection to the grid. As these costs are fixed in nature,

the charges are generally fixed, typically allocated based on capacity reserved. However, the quantum

of these charges can differ, depending on the funding of these assets. In case these assets have been

funded by the users themselves through a capital contribution, these charges would cover only the

expenses for operation and maintenance of these assets, else they would cover all the usual fixed

expenses towards O&M, interest expenses, depreciation, return on equity, etc.

• Use of System Charges

For recovery of costs for using the transmission and distribution network for reaching the power to the

recipient unit.

• Congestion Price

Pricing to reflect the overloading of the network and the costs related with it. Congestion pricing /

peak pricing is used to encourage the efficient usage of the assets as well as to foster investment in new

lines. Congestion results in some of the customers not being able to access the contracted power and

therefore forced to purchase more expensive power through a non-congested link. The increased cost

is the cost of congestion and therefore needs to be charged to those who are causing it. Some of the

methods used for congestion pricing include (i) Nodal pricing, wherein the congestion price reflects the

difference between generation price at the two ends of the congestion, thereby pricing the congestion at

the cost of the replacement power requirement and (ii) sharing the additional costs on account of

buying more expensive power that have to be borne (in proportion of energy drawl) by participants on

account of the congestion. Such computation would need to define ―Congestion and segregate costs

associated with the same. Another surrogate to be used could be that the loss incurred by users is priced

at the ―marginal cost of power and divided among the users causing the congestion.

In case of multiple transmission licensees, the costs of each licensee would be taken into account to

compute the various charges applicable for using the licensee’s system.

Page 54: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

42 | P a g e

Allocation of Costs The costs computed above can be allocated to the various users based on the following:

• Connection Costs

As these costs are related only to the specific users connected to this equipment, these are typically

allocated based on the capacity reserved by each user and are fixed in nature

• Use of System Charges

Various methods are available for allocating these costs

• Congestion Price

As these costs are incurred on account of the users of the congested leg, these are allocated to the users

causing the congestion. The allocation is typically not fixed and is charged only for the periods of

congestion and can be based on capacity reserved or energy drawl.

As per MERC regulation, the open access consumer has to pay Transmission charges payable to State

Transmission Utility/ transmission licensee for usage of their system, and shall be as determined as

under:

i) By Long-term and Medium-term Open Access customers:

The long-term and medium-term open access customers shall share the annual transmission service

charge of the STU or transmission licensee on a monthly basis in accordance with the following

formula:

Transmission Charges = ATSC/ (Acs X 12) (in Rs./MW-Month)

Where,

ATSC – Annual Transmission Service Charges determined by the Commission for the State

Transmission System for the year

Acs – Sum of the capacities allocated to all long-term and medium-term open access customers in

MW.

The transmission charges payable by the long-term and medium-term open access customers for the

use of transmission system for a part of the month shall be determined as under:

Transmission Charges = ATSC/ (Acs X 365) (in Rs. /MW-Day)

Page 55: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

43 | P a g e

Where,

ATSC - Annual Transmission Service Charges determined by the Commission for the State

Transmission System for the year

Acs - Sum of the capacities allocated to all long-term and medium-term open access customers in

MW.

ii) By Short-term Open Access Customers:

The short-term open access customers shall pay one-fourth of the transmission charges applicable to

the Long-term / Medium-term Customers. 25% of the charges collected from the Short Term Open

Access customer shall be retained by the Transmission Licensee and the balance 75% shall be adjusted

towards reduction in the transmission service charges payable by the Beneficiaries.

Scheduling and System Operation Charges

Scheduling and Operation charges include fees for scheduling and system operation, fees for

affecting revision in the schedule on bonafide grounds, and collection and disbursement

charges.

Short-term customers shall pay scheduling and system operation charges to be notified by the

commission after determination of ARR. In Maharashtra, a composite operating charge @

Rs.2,000/- per day or part of the day shall be payable by a short-term open access customer for

each transaction to the SLDC or as determined by the Commission from time to time.

Scheduling and system operation charges shall also be payable by a generating company or a

licensee when allowed accesses under these Regulations.

Wheeling Charges

Under the EA 2003, charges for the use of the distribution system are to be recovered through

the wheeling charges. The wheeling charges is sought to cover not just the network cost but

also need to factor for administration charges and operation & maintenance charges as well.

The basic elements remain similar to the transmission charges.

Wheeling means the operation whereby the distribution system and associated facilities of a

transmission licensee or distribution licensee, as the case may be, are used by another person

for the conveyance of electricity on payment of charges to be determined under section 62.

Distribution system means system of wires and associated facilities between the delivery

points on the transmission lines or the generating station connection and the point of connection

to the installation of consumers.

Page 56: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

44 | P a g e

The wheeling charges should reflect the costs incurred by the distribution licensee to supply

electricity to consumers including the cost of infrastructure.

When distribution system is associated, it is wheeling and wheeling charges is applicable

- Distribution system is where the consumer is connected

- Hence, when open access is used by a consumer, he is liable to pay wheeling charges (may

include transmission charges bundled in it.)

Wheeling charges payable by the open access customers for the usage of distribution system

shall be as determined by the Commission in the tariff order of the distribution licensee.

Transmission and wheeling charges as determined shall be payable, on monthly basis, by the

open access customers based on the capacity booked or actually utilized maximum capacity

whichever is higher. The regulation also specifies where a dedicated transmission system

and/or a distribution system used for open access has been constructed for exclusive use of an

open access customer, the transmission charges or wheeling charges for such dedicated system

shall be worked out by transmission and/or distribution licensee for their respective systems

and got approved by the Commission and shall be borne entirely by such open access customer

till such time the surplus capacity is allotted and used for by other persons or purposes.

In case intra-state transmission system and/or distribution system is used by an open access

customer in addition to inter-state transmission system, transmission charges and wheeling

charges as fixed and approved by the Commission shall be payable for use of intra-state system

in addition to payment of transmission charges for inter-state transmission.

Cross-Subsidy Surcharge Surcharge is to be in addition to charges for wheeling. This surcharge is meant to be utilized to meet

the cross-subsidy that is provided by the distribution licensees. At present, most of the state distribution

utilities provide subsidies to rural, agricultural and domestic consumption by imposing higher charges

on industrial consumption of electricity. If open access is provided, the utilities may no longer be able

to afford this cross-subsidy. Therefore, the Act provides for the gradual dismantling of the cross-

subsidy, and meanwhile, for it to be met through the imposition of a surcharge on the wheeling charge

when open access is allowed.

Policy Provisions

a) National Electricity Policy

Cross Subsidy Surcharge should not be so onerous that it eliminates competition which is intended

through Open Access

b) National Tariff Policy

Cross Subsidy Surcharge should adequately compensate the Distribution Licensee

It should not constraint introduction of competition

Page 57: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

45 | P a g e

Should be beneficial to consumers after adding all the charges

Cross Subsidy Surcharge to be computed as difference between the tariff applicable to the

relevant category of consumers and the cost of distribution licensee to supply electricity to the

consumers of the applicable class.

Cross Subsidy Mechanism as per NTP

S = T – [C (1+ L / 100) + D],

Where,

S – Surcharge

T – Tariff payable by the relevant category of consumers;

C – Weighted average cost of power purchase of top 5% at the margin

excluding renewable power and liquid fuel based generation

D – Wheeling charge

L – System loss for the applicable voltage level, expressed as a percentage

Various methods of surcharge (as recommended by FOR)

a) Average cost method

Surcharge = average realization from a consumer category – average cost

The simplest method to calculate surcharge for the base year is by taking the difference between the

average realization from a consumer category and the average cost. The method is simple and

computation is easy to make, but since the method assumes that losses and costs are same for LT and

HT and EHT consumers, it does not capture reality. Also the extent of cross subsidy will be

understated under this methodology. Also this approach does not provide correct economic signals to

the licensee or the consumer likely to move out. The group observed that it would discourage open

access since generation will not be available at such a low price at which it can be implemented.

Advantages:

Simplest method

Easy to understand

Easy to calculate

Page 58: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

46 | P a g e

Does not involve complicated data

Disadvantages:

Assumes that losses and costs are same all categories

Cross subsidy is understated

Discourages open access since generation is not available at such low price at which it can be

implemented. Issues with the Use of the Average Cost of Supply

Surcharge = HT tariff – Cost to Serve HT consumers

If the average cost of supply is used to calculate the surcharge, then Surcharge using average cost of

supply is

Surcharge = HT tariff – Average Cost of Supply

Therefore, the revenue deficit due to the use of average cost of supply is given by the following

equation:

Cross-subsidizing revenue deficit = Average cost of supply – Costs to Serve HT Consumers

b) Embedded cost method

The second method that was discussed was taking the difference between the average realization and

the consumer category-wise/voltage-wise cost of supply (embedded cost). Even though this method is

an improvement over the average cost method, it results in high level of surcharge. This would imply

that competitive rates of generation at which open access can be implemented have to be very low,

which again does not seem to be a reality. The net result would be that the method would not

encourage open access.

Surcharge = average realization from a consumer category – consumer category wise / voltage

wise cost of supply

Advantages:

Improvement over average cost method as it recognizes the fact that losses and costs are

different for L.T, H.T and E.H.T customer

Easy to calculate.

Disadvantages:

High level of surcharge

Page 59: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

47 | P a g e

To make this method feasible, competitive rates of generation at which open access is

implemented have to be very low and this is very difficult.

c) Marginal cost method

An alternative method of computing the quantum of surcharge is by taking the difference between the

average realization for the respective customer and the marginal cost of supply by the discom. The

different assumptions involved and the methodology adopted are:

i) The marginal cost of supply by a discom is equivalent to the sum of-

- Marginal cost of purchase of electricity by the distribution company

- Applicable transmission and wheeling charge

- Applicable system losses

ii) The marginal cost of purchase of electricity is to be equal to the highest power purchase cost of the

utility including fixed and variable cost It was agreed that surcharge calculated by this method is not

revenue neutral and will adversely impact the licensee financials. The group observed that surcharge in

this method could be negative also.

Surcharge = average realization from a consumer category – Marginal cost of supply

Disadvantages

Has an adverse impact on financial health of licensee

Surcharge by this method is very less sometimes it is also negative

Issues with the Use of Marginal Unit Cost (MUC)

i) We have several concerns with the use of MUC to calculate the surcharge. First, MUC do not

represent avoidable costs. Generally, the fixed costs of the marginal unit are not avoidable. If

the licensee’s load is reduced because of the departure of some customers, at best the licensee

will avoid the highest variable cost of either its own plants or the plants from which it

purchases power. In those cases where the marginal unit for a utility may be an unplanned

purchase from a surplus area or the unallocated portion of a Central Generating Station (CGS),

the utility may be able to avoid both the fixed and variable costs of the contract.

ii) The second reason why it is inappropriate to use MUC to calculate the surcharge is that this

assumes that for any utility, there is a single generating unit that is on the margin at all times,

and that is not so. The generating unit on the margin changes with the time of day and season.

During peak periods, peaking units with very high variable costs are on the margin while

Page 60: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

48 | P a g e

during off-peak periods, base load units with very low variable costs may be on the margin,

etc.. Thus generally the most expensive unit would be the one that operates only at the times of

the system peak (and hence would have a low PLF) and applying that cost to all the 8760 hours

3 of the year would lead to a gross overstatement of the avoidable costs.

iii) The third problem with the use of MUC to calculate the surcharge is that the highest cost unit is

not applicable to the entire decrement of load. The use of a single unit (the highest cost unit) to

represent avoidable costs for the entire load that would go out due to open access is likely to be

incorrect. As an example, consider that 1000MW of industrial load is expected to leave the

licensee and get electricity from alternative suppliers. If the capacity of the highest cost

generating resource is only 200 MW, then clearly it would be incorrect to assume that the costs

per kWh of the 200 MW unit would be applicable to the entire 1000 MW load block. The

avoidable costs for the remaining 800 MW would be lower. Therefore, the size of the

decrement of load for calculating the avoidable costs must match the expected decrement in

load due to open access. The avoidable cost would then be the weighted average of the costs of

the generating units that would no longer be required.

d) Avoided cost method

The methodology for computing the avoided cost is as follows:

i) As a first step, the projected capacity that is likely to move away due to open access will be

estimated.

ii) Since, it will avoid purchase of power from marginal source of supply, the weighted marginal

cost of power purchase (variable cost) from such sources would be considered as avoided cost

for variable components of power purchase.

iii) To that avoided cost, other charges viz. applicable fixed charges of power purchase, and

applicable transmission and wheeling charge will be added to arrive at cost of supply.

iv) The difference between the average realization of a category and the avoided cost of supply,

discussed above, shall provide the cross subsidy surcharge amount.

Surcharge = avg. realization from a consumer category – avoided cost of supply

Page 61: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

49 | P a g e

Additional Surcharge

Additional Surcharge – Policy Provisions

a) National Electricity Policy

Additional Surcharge should not be so onerous that it eliminates competition which is

intended through Open Access

b) National Tariff Policy

Additional Surcharge should be applicable if it is conclusively demonstrated that the

obligation of a licensee in terms of existing power purchase agreements has been and

continues to be stranded ; or

There is an unavoidable obligation and incidence to bear fixed costs consequent to a

Contract

Fixed Costs related to network assets would be recovered through Wheeling Charges

Objectives and Principles

a) To compensate the Licensee towards loss of purchasing power in case Licensee is unable to sell

that power

b) It is not intended to recover other fixed cost of Licensee

c) In case of supply shortage situation, there will be no loss to licensee and hence may be

specified as zero

d) The obligation is on the Licensee to prove that its power purchase commitments have become

stranded

In the draft there is a provision that an open access customer, receiving supply of electricity from a

person other than the distribution Licensee of his area of supply, shall pay to the distribution Licensee

an additional surcharge on the charges of wheeling, in addition to wheeling charges and cross-subsidy

surcharge, to meet out the fixed cost of such distribution Licensee arising out of his obligation to

supply. The Commission shall scrutinize the statement of calculation of fixed cost submitted by the

distribution licensee and obtain objections, if any, from the open access customer and determine the

amount of additional surcharge.

Page 62: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

50 | P a g e

Imbalance Charges

The mismatch between the scheduled and the actual drawl/ scheduled and the actual injection at

the interface points may be met from the grid, which shall be governed by UI pricing

mechanism. However the tariff payable by the open access customers to the licensee may

contain a component of incentive to be decided by the Commission.

A composite UI bill for the State as a whole shall be issued by the RLDC, the segregation of

which shall be done at the state level by the SLDC for the UI charges payable by the open

access customers.

Reactive Energy Charges

The payment for the reactive energy charges by open access customers shall be in accordance with

provisions stipulated in the Grid Code. If the voltage at the point of drawl is below 97% of the normal

voltage, the open access customer shall pay reactive energy charges to the concerned utility /licensee

for drawl of reactive energy at the drawal point. If at the injection point the voltage is higher than 103%

of normal voltage, the open access customer shall pay reactive energy charges to the concern utility/

licensee for injection of reactive energy at the point of injection. Both drawl and injection of reactive

energy shall be measured at 15 minutes time block along with voltage in the SEM meters.

Reactive energy rates applicable for intra-State entity shall be based on inter-State reactive energy rates

notified by NRPC after suitably adjusting for intra-State transmission and distribution losses

determined by the Commission in the applicable Tariff Orders and also by the applicable losses in the

inter-State transmission estimated by NRLDC from time to time.

Transmission Losses

The losses payable here relate to the electricity lost in the system on account of transmission across the

network. These losses are computed based on the difference in reading between the generation bus bar /

receiving station and the meter at the Grid Substation for delivery to all open access customers. Ideally

user should bear it not the market as a whole. Losses are function of the distance travelled, voltage

level and loading of the system (included in system use charge).

Appropriate improvements like metering of electricity flows based on time of day (ToD) could also

capture the impact of differential load/grid conditions on losses. In any case, metering of flows at

various interface points and voltage levels would be the critical activity in the efficient allocation of

losses. The existing approach could gradually shift towards allocation of losses at different voltages as

metering and systems get upgraded in the future.

Page 63: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

51 | P a g e

Distribution Losses

The losses in the distribution system would cover the electricity lost in the system on account of

technical losses and non-technical losses such as theft, pilferage, improper metering, wrong meter

reading, etc. in the network. At the aggregate level, these losses are computed based on the difference

between the energy injected into the distribution system and the total billing (metered plus assessed

consumption) to the consumers.

Unlike the transmission losses, the determination and allocation of distribution losses is far more

complex as the network is far more integrated. While the desired objective is to allocate losses, it is

much more difficult to segregate the losses based on usage as a sizeable portion of the consumption is

not being metered. Since it is not known whether the commercial losses are due to a specific class of

customers, it may be necessary to allocate the commercial losses across all consumers. Under the

arrangement relating to open access where an existing customer has sought an open access, given that

the extent of losses cannot be determined towards any specific customer, there is one argument to state

that it may be necessary to allocate these losses to such customers as well.

Page 64: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

52 | P a g e

CHAPTER-5 OPEN ACCESS ANALYSIS

5.1 OPEN ACCESS IN MAHARASHTRA

1.1 Introduction

In Maharashtra Open Access has started in 2005 with the guideline of Maharashtra Electricity

Regulatory Commission’s (MERC) regulation 2005. In Maharashtra there are total four distribution

licensee namely :

a) Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) (Except Mumbai rest of Maharashta)

b) Tata Power (Mumbai Region)

c) Reliance Power (Mumbai Region)

d) Brihanmumbai Electric Supply & Transport (BEST) (Mumbai Region)

1.2 Case No. 43 of 2010 filled by MSEDCL in MERC

a) As per this petition there is error occurred in calculation of cross subsidy with the help of

conventional formula which is given below due to this error the formula evolved in the said Order does

not result in recovery of cross subsidy inbuilt in the current tariff of MSEDCL.

S = T – [C (1+ L / 100) + D]

Where,

S – Surcharge

T – Tariff payable by the relevant category of consumers

C – Weighted average cost of power purchase of top 5% at the margin excluding

liquid fuel based generation and renewable power

D – Wheeling charge

L – System Losses for the applicable voltage level, expressed as a percentage, and inclusive of

transmission loss. For intra-state transactions, transmission loss prescribed by the Commission for the

STU should be considered, while for inter-state transactions, additional loss compensation as provided

by CERC in its Open Access Regulations should be considered.

Page 65: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

53 | P a g e

b) With the help of this formula CSS works out to be zero, primarily because the weighted average

power purchase cost of top 5% at the margin, after adding the intra-state transmission tariff and

voltage-wise losses is less than the average realization from High Tension category.

c) As per MSEDCL in the present demand supply situation, when there is shortage of power and a

consumer opting for Open Access will not result in the reduction of power procurement, to the extent

of the requirement of the said consumer who has opted for Open Access. The formula as stipulated in

the Tariff Policy assumes an ideal situation, where demand of power and availability of power does not

mismatch. Hence determination of CSS will sustain only when such an ideal situation exists, may be in

future.

d) The Commission ruled that component ‘L’ pertaining to system losses in the formula for CSS

specified in Tariff Policy should include transmission losses. For intra-state transactions, transmission

loss prescribed by the Commission for the STU should be considered, while for inter-state

transactions, additional loss compensation as provided by CERC in its Open Access Regulations

should be considered.

e) Consumers availing Open Access will have to pay the above CSS except in the following cases:-

• For the quantum of power which is not being supplied by the Utility as per the Orders issued by the

Commission from time to time. Currently, load restriction of 10% and 20% is applicable to continuous

and non-continuous industry. Therefore, consumers in these categories will be permitted to purchase

this quantum of energy without payment of CSS.

• Open Access consumer’s purchasing power from renewable sources of energy.

• Open Access transactions as on the date of enactment of the EA 2003.

f) New consumers should not be exempted from paying of CSS.

g) Open Access transactions undertaken using liquid fuel based thermal generation will also have to

pay the CSS.

h) Recommendation was made for collection of surcharge, it may be collected either by the

distribution licensee, the transmission licensee, the STU or the CTU, depending on whose facilities are

used by the consumer for availing electricity supplies. In all cases the amounts collected from a

particular consumer should be given to the distribution licensee in whose area the consumer is located.

In case of two licensees supplying in the same area the licensee from whom the consumer was availing

supply shall be paid the amounts collected.

i) The fixed costs related to network assets would be recovered through wheeling charges.

j) Wheeling charges should be determined on the basis of same principles as laid down for intra-state

transmission charges and in addition would include average loss compensation of the relevant voltage

level.

Page 66: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

54 | P a g e

k) The point was made that due to the scenario of Tariffs (ABR) and weighted average Power

Purchase cost of top 5% at the margin for the licensees has changed and the same would have an

impact on the CSS. Therefore there is need to rework the CSS computation.

l) When commission had stated that MSEDCL has make immense delay of more than four years in

filing the review petition for CSS and the time given was 45 days in 2006, hence it is not considerable.

In reply MSEDCL has stated that in 2006 due to power crisis there is huge load shedding in

comparison to the present scenario, at that time along with agriculture and domestic there is load

restrictions of 10% and 20% for continuous and non-continuous process industries respectively in

MSEDCL area.

m) So external power sourcing during that time was encouraged to enable to meet the requirement of

the industries in the State and any impediment through CSS would have led to slow down in the

development of the State economy. Therefore, the Commission considering the need of the hour had

determined and continued with zero CSS for any additional power brought into the State.

n) Presently, there is no load shedding in the State of Maharashtra except few cases were

Transmission bottlenecks are existing and Load Management schemes of agriculture consumers.

Therefore, the changed situation has necessitated the Commission to revisit the issue of CSS.

o) The Commission is of the view that the CSS formula decided in the September 5, 2006 Order

cannot be reviewed with retrospective effect as that it will result in an anomalous situation of past Open

Access consumers paying a surcharge which was not determined at the relevant time.

p) Commission in its Order of 2011 ruled on the issue of applicability of CSS for change over

consumers from Rinfra – D to TPC – D in line with the Judgment of the Honourable Supreme Court of

India in 2008 in Civil Appeal of 2006. The Commission in the referred Order ruled that the CSS would

be applicable for Group of consumers since these consumers continue to be consumers of Rinra – D

for wires and the CSS has to be levied, to meet the requirements of the current level of cross subsidy.

Page 67: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

55 | P a g e

q) Cross Subsidy status in different state:

Page 68: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

56 | P a g e

5.2 BILLING PROCEDURE OF OPEN ACCESS IN MAHARASHTRA

Figure 7- Billing Procedure

Page 69: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

57 | P a g e

5.3 BILLING COMPONENT OF OPEN ACCESS IN MSEDCL a) Energy Charge

b) FAC Charges

c) Demand Charges

d) Additional Energy Charges

e) Additional Charge (Based on Final Tariff & Approval of ARR – Order No. 69/2011)

f) Additional Charge (Based on Final True Up & Performance Review – Order No. 100/2011)

g) Generation Company Charges

h) Electricity Duty

i) Tax on Sale

j) Demand Penalty

k) PF Penalty / Incentive

l) Cross Subsidy Surcharge

m) Wheeling Charge

n) Debit Adjustment

Page 70: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

58 | P a g e

5.4 LIST OF OPEN ACCESS CONSUMER IN MAHARASHTRA

Open Access Consumers (May 2012)

Page 71: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

59 | P a g e

Page 72: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

60 | P a g e

Page 73: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

61 | P a g e

Page 74: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

62 | P a g e

Page 75: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

63 | P a g e

Table 2- Open Access Consumers (May 2012)

Page 76: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

64 | P a g e

5.5 ANALYSIS OF TARIFF STRUCTURE (LT AND HT CONSUMERS)

Cross subsidy at existing and approved tariff

Page 77: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

65 | P a g e

Table 3- Cross subsidy at existing and approved tariff

In the above Tables,

(a) Existing Tariff refers to the Tariff currently payable by consumers including the

present FAC being paid.

(b) Revised Tariff refers to the Tariff approved by the Commission in the present

Tariff Order

Page 78: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

66 | P a g e

(c) Ratio of Average Billing Rate (ABR) to Average Cost of Supply (ACOS)

i) Existing Tariff to current ACOS refers to the ratio of ABR currently being paid including FAC to

the ACOS approved in the present Tariff Order, i.e., Rs. 5.56 per kWh

ii) Revised Tariff to current ACOS refers to the ratio of ABR approved in this Tariff Order for FY

2012-13 to the ACOS approved in the present Tariff Order, i.e., Rs. 5.56 per kWh.

From the above tariff table we can see that the tariff for industrial (HT consumers) and LT consumers

are higher than the Average cost of supply, determined by the MERC. This leads to the high

expenditure on electricity by these consumers. The rate of cross subsidy is higher for these consumers

as compared to the other states.

State Open Access Charges

(Rs./Kwh) Tariff (Discom)

Assam 2.94 3.25

Chhattisgarh 0.98 3.11

Haryana 0.81 4.55

Himachal Pradesh 1.39 3.04

Karnataka 1.9 4.15

Maharashtra 0.7 4.53

Orissa 1.6 2.91

Punjab 0.57 5.2

Rajasthan 0.97 3.98

Uttar Pradesh 0.76 4.29

Madhya Pradesh 1 4.57

Uttarakhand 0.69 3.27

Gujarat 1.34 7.39

West Bengal 3.77 4.68

Tamil Nadu 2.47 3.96

Table 4- Comparative Chart of Open Access Charges at State Level

*OA charges for a consumer of 5MW at 11 KV (33 KV in some cases) seeking OA for a month.

This includes transmission & wheeling losses (Rs/kWh) calculated assuming power purchase cost as

Rs 3/kWh.

**Tariff for an embedded consumer of 5MW at 11 KV (33 KV in some cases).

Page 79: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

67 | P a g e

Sr. No. Assumptions Value

1 Base Energy Consumption (X) 3600000

2 Power Purchase Cost Assumed (Y) (Rs./Kwh) 3

3 Duration (Month) 1

4 Load (MW) 5

Sr. No. Analysis Value

1 Voltage Level (KV) 11

2 Wheeling Loss (%) 9%

3 Energy Injected into system at T>D (Kwh) 3956043.956

4 Transmission Loss (%) 4.24%

5 Energy Injected into system at G>T (Kwh) 4131207.139

6 Loss (Kwh) 531207.1387

7 Loss (in Rs.) 1593621.416

8 Loss (Rs./Kwh) 0.44

9 Effective open access charges (Rs./Kwh) 0.24

10 Net OA Charges (Rs./Kwh) 0.68

11 Net cost of power from Open access (Rs./Kwh) 3.68

12 Tariff (Discom) (Rs./Kwh) 4.53

13 Difference (11-12) -0.85

Table 5- Tariff Analysis for LT and HT Consumer

Page 80: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

68 | P a g e

a) From the above table it is clear that, a consumer (whether HT or LT) it will gain about Rs.

0.84/Kwh (for the analysis done on the assumptions for a month). Therefore it will be advisable

to get the electricity supply through open access rather than from the discom. This will lead to

the reduction in the revenue for the Discom in the state.

b) Although this will be a gain for HT or LT consumer but the cross subsidy charges are higher in

the state compared to the other state, there are various reason for the higher cross subsidy

charges in the state, some of them are:

1) Subsidy given to the Domestic and Agriculture consumers, this leads to the higher cross

subsidy rates which is overburdened on the industrial and commercial (LT) consumers.

2) Higher rates of the fuel, which results in the higher cost of supply of electricity, which

further leads to the switching of these consumers for other options like open access.

All these factors are responsible for these consumers to switch to other cheaper options.

5.6 ANALYSIS OF DISCOM LOSS

Assumptions for expected migration of consumer to Open Access

• It is assumed that only 30 % HT & LT Industrial and 50 % HT & LT Commercial consumption will

migrate because MSEDCL has started giving other incentives like PF benefits, excise duty benefits and

also in Maharashtra MSEDCL power is more reliable as compare to Open Access.

• Agricultural consumers may not be in a beneficial position to avail power supply from other sources

as the subsidized tariff from MSEDCL. Also, it will be difficult to carry out the activities related to

Open Access by agricultural consumers due to lack of such expertise. Though MSEDCL will have a

separate tariff arrangement, it is expected that MSEDCL may have a tariff below cost of supply which

may not be provided by any other consumers. Therefore, it is assumed that 100% agricultural

consumers above 1 MW will be Open Access consumers availing supply from MSEDCL only.

• It is assumed that Railway consumption will migrate 100% to other sources considering their

practices in past whereby they have a tie-up with NTPC under Open Access to get competitive power

which was cheaper than the tariff they were paying to the utilities.

• In cast of HT Commercial and Industrial consumers, it is assumed that around 30% of industrial

consumers and 50% of commercial consumers may opt for sources other than MSEDCL for availing

supply of power.

Page 81: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

69 | P a g e

5.7 EXPECTED MIGRATION OF CONSUMER IN OPEN ACCESS Considering the above assumption, the expected migration of deemed Open Access consumers opting

power supply from source other than MSEDCL are as follows:

Table 6- Calculation & Comparisons of ARR for consumer of 1 MW & Above

Analysis Based On Above Data

As can be analysed from the above table, it is expected that around 10% of the consumption and 14%

of the revenue of MSEDCL will be impacted due to migration of consumers from MSEDCL to other

sources. Also, of the total deemed Open Access consumers of MSEDCL, it is expected that around

34% of consumption and 35% of revenue will be adversely impacted due to such migration.

Page 82: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

70 | P a g e

5.8 COMPARATIVE ANALYSIS OF OPEN ACCESS Considered the case of 5 MW, 11 kV consumer for comparative analysis of Short Term and Long Term

Open Access

Table 7- Comparisons of Interstate & Intrastate Open Access

Page 83: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

71 | P a g e

From the above comparison we can conclude the followings :

• Intra State Open Access in more profitable than Inter State Open Access

• When large amount of power has to purchase in that case Long Term Open Access is more profitable

than Short Term and vise-versa.

5.9 DIFFERENT CONSUMER OPINION ON OPEN ACCESS

Page 84: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

72 | P a g e

Page 85: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

73 | P a g e

Page 86: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

74 | P a g e

Page 87: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

75 | P a g e

Table 8- Consumer Opinion for Feasibility of Open Access

Page 88: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

76 | P a g e

CHAPTER – 6: SUMMARY

6.1 CONCLUSION

Making the distribution segment of the power industry efficient and solvent is the key to

success of power sector reforms. Implementation of open access in distribution with

proper market condition by studying its feasibility is the only solution. Though it has

been widely says that Open access in distribution will create a competitive environment

but its improper introduction may create huge losses to distribution and also to

consumer.

Subsidy to different segment of consumer is the most challenging part of Open Access

hence it needs to tackle in proper manner because this is the only reason because of

which most of the distribution company are resisting for implementation of Open

Access. However, there are some roadblocks in the successful implementation of open

access in distribution in India.

There are some of positive point which encourage for implementation of Open Access

.Some of the benefit of Open Access are :

i) As mentioned above the freedom to buy and sell electricity thereby creating or

tending towards a perfect market in this sector.

ii) It allows the generator with an excess capacity to sell and take part in the trading

of electricity.

As there are some benefit of Open Access, but its improper implementation may lead to

huge hotchpotch so it need to be handle properly. Some of the difficulties in Open Access

are given below:

Difficulties in forecasting :-

a) Licensee are facing difficulties for future forecast of power required, let say that if

licensee has forecast that it will required 20,000 MW of power in next 5 years but it loses

its 5000 MW of consumer in Open Access. But it has invested / sign PPA or agreement

for 20,000 MW then it has to pay for 20,000MW and transfer invested amount to

remaining consumer to compensate the loss which is against the consumer interest and

our Electricity Act 2003 which is consumer oriented. This is quite contradictory that

Act2003 recommend for implementation of Open Access but actually its implementation

is unfair to consumer benefit. So its implementation is in favor only when we are power

surplus country.

b) Another situation is that if licensee has forecasted to 20,000 MW considering that

5,000 MW consumer will move to Open Access, based on application received for Open

Access and arrange / sign PPA or agreement for only 15,000 MW. But only 2,000 MW

consumer has gone to Open Access and balance 3,000 will remain with licensee so now

licensee has to arrange for 18,000 MW of power but it has make provision for 15,000

MW only then for balance 3,000 MW it has to purchase through open market which is

costliest power and again burden will pass onto consumer which is unfair for consumer.

ii) Cross Subsidy Surcharge is not adequate to compensate subsidy:-

Page 89: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

77 | P a g e

Present Cross Subsidy surcharge formula is not compatible to balance the subsidy with

cross subsidy because it will not considered AT & C loss and theft. So finally it has

negative impact but as per the concept of cross subsidy it should neutralize the effect of

subsidy but in actual practice it is not happening. So in present case licensee is bearing all

this loss and state government has given assurance of payment.

iii) Distribution of subsidy is also not proportionate because location has not considered

due to which those who are economically strong are getting same subsidy as that of

economically weak consumer. Consideration of location is important because it

differentiate the power consumption depending on soil fertility (Region like Vidharbh in

Maharashtra where water is available at deeper in soil).

iv) In Open Access there is no surety for all time power availability or backup because if

Open Access seller power plant has gone for shut down then ideally consumer has also

shut down its activity but in actual practice as they are connected with grid they are

consuming power from grid and create power shortage for licensee. In that case either

licensee has to make load shedding or else they have to purchase costlier power if

available. This also one of the major reasons because of which consumer doesn’t want to

move in Open Access.

v) Renewable generator has exempted from cross subsidy and wheeling charge under the

name of renewable promotion but then who will pay on behalf of renewable is not clear.

Also if renewable energy producer sells powers in Open Access and as we already know

that renewable is not firm power so only because of their grid connectivity they start

consuming power from grid and create power shortage for licensee. In that case either

licensee has to make load shedding or else they have to purchase costlier power.

Lot of consumer are also resisting for implementation of Open Access because of

unreliability of generating unit because due to Open Access it has become their headache

for getting continuous power from generating unit.

Charges for the open access levied by different SERCs are variable in nature.

Apart from few states, many states are still incorporating and facing problem of cross

subsidy surcharge which finally increases the net cost of power from open access.

Net cost of power from open access is more as compared to the tariff which discourages

the buyers and sellers.

SERC’s has to use different methodologies for the calculation of surcharge because of

complexity of consumer even though there is common formula for calculation of

surcharge given by National Tariff Policy 2005.

Distribution companies in India are not financially very sound and Distribution network

in India is not strong.

Page 90: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

78 | P a g e

6.2 RECOMMONDATIONS a) In present scenario of Indian Electricity Sector which is power deficit the implementation

of Open Access are creating huge problems which are given below :

Forecasting of Distribution Company for future requirement of power is adversely

affected because of consumer uncertainty in Open Access.

Gaming in Electricity Market which is altogether is not acceptable as per Electricity

Act 2003.

Sudden drawl of power from grid by Open Access consumer when there are

shutdown at seller side those who are selling power to consumer through Open

Access.

So for proper implementation of Open Access electricity market should be power

surplus.

b) Central and State ERCs should be advised by the appropriate governments to comply

with the statutory requirements relating to open access in a time bound manner. There is

challenge for calculation of open access surcharge because of complexity of consumer

even though there is provision in Tariff Policy notified by the Central Government under

Sec. 3 of the Act but states are using their own method to calculate which need to be

standardized.

c) Subsidy are not reaching to right consumer hence it is advisable to have consideration of

location during calculation of subsidy because the needy consumer like consumer from

Vidharbh region of Maharashtra which actually required the subsidy are getting same

subsidy as that of other region which is economically reach. But when load shedding has

to do then first consideration has given to Vidharbh region saying the reason that they are

not paying consumer though this region has less availability of water and has to go more

deep into the soil to get the water hence requirement of electricity is most important.

Interesting part is that most of powers generating units are there in this region only but

still they are not getting enough power for agriculture and industrial sector because of this

there is instability in the state. Cross subsidy is levied equal in all regions hence it is

important for all state holders to consider this issues.

d) Promotion of renewable energy altogether is considerable but it needs to be taken care

that no one should get its undue advantage by using Open Access. Because many

companies have formed their subsidiary and generated renewable power and showed that

company as loss making company. By doing this they are taking all type of benefits like

Tax Exemption for renewable power generation & loss making company, meeting RPO

obligation.

e) The question of “Who will pay the remaining part (comes under AT & C Loss and Theft)

of subsidy?” is still unanswered because present Cross Subsidy pattern is not able to

balance the subsidy with cross subsidy and distribution companies are bearing this loss

and continuously coming in loss making company.

Page 91: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

79 | P a g e

f) The theft loss is still present even though Distribution has taken lot of measure to reduce

it like metering and it is counted in subsidised section and all other paying consumer like

domestic and industrial consumer are bearing it. If paying or reach consume are moved in

Open Access then rest of the consumer which is not economically strong has to bear this

loss because there is no provision for this in Cross subsidy surcharge (Even though State

Government has given assurance to pay it but it is uncertain).

g) State Governments and States’ ERCs should be suitably advised to enable

operationalization of open access to promote a healthy development of the market where

private investment can be attracted. Where the State Governments or the respective

SERCs do not conform to the Act or the Tariff Policy there under, the State Governments

should be advised and the matter be discussed in the appropriate inter- and intra-State

forum of Power Secretaries/Ministers.

h) IPPs, captive and small generators shall be educated for their responsibility and future

condition if they are bringing power into the market.

i) Need to take regular customer feedback to understand their difficulties so that consumer

satisfaction can be achieved.

j) Regulators should meet with the bulk consumers and other stakeholders to address their

concerns with a view to operationalizing the scheme of open access as provided in the

Act.

k) Consumer education and pro-active action by Regulators, both at the Centre and in the

States, is considered vital for encouraging open access to consumers.

6.3 LIMITATION OF THE PROJECT

a) First of all the time duration of 8 weeks was a major constraint in going through the project

completely.

b) The assumption taken to define different scenario in Maharashtra may not be exact so

may lead to calculation error.

c) Owing to geographical constraints and altogether different prevailing climatic, political, social,

economic, legal and cultural scenarios, the comparison of Open access of various

countries on same parameters was not possible.

d) Some of data collected is through direct contact with different official of different organisation

since there is no written document may lead to communication error.

Page 92: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

80 | P a g e

6.4 RESULT & DISCUSSION

In present scenario of Indian Electricity Sector which is power deficit market the improper

implementation of Open Access are creating huge problems which are listed below:

Forecasting of Distribution Company for future requirement of power is adversely affected

because of consumer uncertainty in Open Access.

Sudden drawl of power from grid by Open Access consumer when there are shutdown at seller

side those who are selling power to consumer through Open Access.

SERCs to calculate Cross-Subsidy Surcharge based on the assumptions that the power available

as a result of exit of open access consumer will be sold at the average revenue realization rate.

This is the most practical scenario in a situation of shortage of power supply. The SERCs may

assume certain percentage (say, 10%) of the total consumption by eligible open access

consumers for the purpose of estimation of power available for sale average realization rate. The

wheeling charge (grossed up by the system loss at appropriate level) to be recovered from the

open access consumers should also be factored into computation of surcharge.

For a situation where there is no power cut, SERCs may calculate Cross-Subsidy Surcharge

based on the estimation that the DISCOM will avoid purchase of the quantum of power for

which open access has been sought. This principle of avoided cost method

should be adopted in areas where there are no power shortages.

6.5 FUTURE SCOPE OF THE PROJECT

To bring the competition in the electricity market it very important to implement Open

Access and Indian Power Sector has already taken shining steps towards it. But its proper

implementation is also equally important to avoid gaming and mismatch. This report will help to

take proper step toward implementation of Open Access also help to put the difficulties of

Distribution Companies.

Analysis part of this report helps to understand the consumer expectation. It also bring into

notice the loss of Distribution Company and need of requirement of steps to minimize its loss.

Everyone are expecting retail competition in Electricity Market and this report highlight the

points of its improper implementation which guide during its implementation.

Page 93: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

81 | P a g e

BIBLIOGRAPHY

[1] Maharashtra Electricity Regulatory Commission (Terms and Conditions for Open Access)

Regulations, 2005.

[2] Maharashtra State Electricity Distribution Co. Ltd. Cases (Case No. 43 of 2010) filled for Open

Access in Maharashtra Electricity Regulatory Commission.

[3] Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and

Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009.

[4] Central Electricity Regulatory Commission (Open Access in inter-State Transmission) Regulations,

2008.

[5] Detailed Procedure issued by CTU for Grant of Connectivity, Long-term Access and Medium-term

Open access in inter-State Transmission.

[6] Regulations on Open Access to Inter-state transmission system published by Central Electricity

Regulatory commission, India, February-2005.

[7] Forum of Regulators’ Model Regulations on Terms and Conditions of intra-State Open Access.

[8] R.N.Nayak, Y.K.Sehgal and Manju Gupta, “Change in Approach to Planning and Operation of

Power Systems under Open Access Regime-Indian Experience.” IEEE conference:Power Tech., 2005

Russia, 27-30 June 2005.

[9] Ilic, M.D, “.From Hierarchical to Open Access Electric Power Systems” IEEE conference:Power,

May 2007.

[10] Staschus, K. , “Open access in Germany and power balance analyses in Germany and Europe.”

IEEE conference: Power Engineering Society Summer Meeting, 2001.

[11] Ping Wei , “Power flow tracing for transmission open access.” IEEE conference: 2000.

[12] DeMarco, C. , “Issues in open access vs. infrastructure security [electricity markets].” IEEE

conference: 25-25 July 2002.

[13] David, A.K. , “Dispatch methodologies for open access transmission systems” IEEE conference:

Feb 1998.

[14] Raoofat, M. , “Fast loss allocation in bilateral open access environment using artificial neural

networks” IEEE conference: 10-12 Nov. 2009

[15] Wu, F.F. , “Power transfer allocation for open access using graph theory-fundamentals and

applications in systems without loop flow” IEEE conference: Aug 2000. [86]

[16] http://www.mahadiscom.in

Page 94: ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS … Singh...ANALYSIS OF OPEN ACCESS FEASIBILITY & ITS IMPACT IN MAHARASHTRA STATE ... to execute my Summer Internship Project. ... is a goal

82 | P a g e

[17] http://www.cea.nic.in

[18] http://www.tatapower.com

[19] http://www.rinfra.com

[20] http://www.wrldc.com

[21] http://www.mahasldc.in

[22] http://www.mahaurja.com

[23] http://www.bestundertaking.com

[24] http://www.business-standard.com

[25] http://www.esakal.com

[26] http://www.ieee.org

[27] http://www.mercindia.org.in

[28] http://www.cercind.gov.in

[29] http://www.nldc.in

[30] http://www.thehindubusinessline.com

[31] http://www.businesstoday.intoday.in

[32] http://www.mahatransco.in

[33] http://www.spancopower.com

[34] http://www.mahagenco.in