analyst presentation-oct 05(2) (2) - implats distinctly ... · • increase sag mill loading •...
TRANSCRIPT
1
Investor VisitInvestor Visit21 October 200521 October 2005
Greg Sebborn
www.zimplats.co.zw
Zimplats group structureZimplats group structure
Independent Shareholders
Impala Platinum Holdings Limited
Zimplats Holdings Ltd
13.09% 86.91%
Ngezi, Mhondoro & Selous Platinum Tenements
Zimbabwe Platinum Mines (Private) Limited
100% 100%
Hartley Ore Reserves
Selous Metallurgical complex
Ngezi Opencast Mine
Ngezi Underground Mine
100% 100%100%100%
2
Conditions precedent to expansionConditions precedent to expansion
• Phase 1 growth project approved May 2004 subject to the following conditions precedent• Bilateral agreement – outstanding• Zimplats/ Makwiro structure – complete• Ability to operate offshore accounts – complete• Extension of the IRS off-take agreement – complete• Extension of Special Mining Lease – partially complete• Clarity on empowerment provisions – outstanding• Ability to import power – outstanding
Andrew du Toit
www.zimplats.co.zw
Zimplats resources and reserves
3
Platinum in ZimbabwePlatinum in Zimbabwe
HARARE
BULAWAYO
MusengeziComplex
Selukwe Complex
Wedza ComplexUnki (Anglo)
Mimosa (Implats & Aquarius)(Implats & Aquarius)
HartleyComplex
Hartley Platinum MineSelous Metallurgical Complex
(Zimplats)
Ngezi Mining Operations(Zimplats)(Zimplats)
N Great Dyke
0 200
Kilometres
Zimplats TenementsZimplats Tenements
Darwendale
P2
P4
P10
NgeziMining
Lease 27
Zimplats Claims
Hartley Mine
Special Mining Lease 1
(and extension)
MSZ Outcrop
N
10km
New Plant SMC
4
Zimplats Tenements Zimplats Tenements –– dip and depthdip and depth
155m
800m1230m
365m70m
P2
P4
P10
Sections- Max depth
MSZ Outcrop
NgeziNN
10km10km
Less than 9 degree dip
Zimplats Resources and Reserves Zimplats Resources and Reserves StatementStatement
5.423.028.4
2.711.414.1
51.5215.1266.6
Ore Reserves (O/Cast and P1- P7 <9º)ProvedProbableTotal
11.486.8
185.0283.2
5.643.092.0
140.6
96719
1,6902,505
Mineral Resources & ReservesMeasuredIndicatedInferredTotal
4EMoz
PtMoz
Mt
5
Distribution of Zimplats Resources Distribution of Zimplats Resources and Reservesand Reserves
Claims 179 Moz 4E
Hartley 22 Moz 4E
Ngezi Steep 24 Moz 4E
Ngezi Portals 8-10 11 Moz 4E
Ngezi Portals 1-7 30 Moz 4E
Ngezi Pit 2 Moz 4E
Augustine Simbanegavi
www.zimplats.co.zw
Safety, health and environment
6
SafetySafety
• Please wear safety equipment issued to you• Remain with the group all the times• Check your footing• Don’t touch any machinery• Feel free to highlight any unsafe condition/ behaviour• Ask if in doubt
We Care About Your Safety!We Care About Your Safety!
Your safety and that of our employees are the most important aspects of our business
SHE PerformanceSHE Performance
2
0
1.00
14.20
6
1
0.60
15.33
3
0
0.46
32.74
9
2
1.55
47.28
LTIs
Fatals
LTIFR
NLTIFR
FY06FY05FY04FY03
Fatality free shifts 775,300 (as at 21 Oct 05)
7
Zimplats LTIFR (12 Month Rolling)Zimplats LTIFR (12 Month Rolling)
0.00
0.50
1.00
1.50
2.00
O ct-04 No v -04 De c-04 Jan -05 F e b -05 M ar-05 Ap r-05 M ay-05 Ju n -05 Ju l-05 Au g -05 Se p -05
LTIF
R
Zim p la ts LT IFRZim p la ts F IFR
SHE HighlightsSHE Highlights
• 2004 Zimbabwe Chamber of Mines Frequency Severity Competition• SMC first place• Ngezi third
• The Ngezi Underground first Aid Team won the 2005 Zimbabwe Chamber of Mines First Aid Competition
• Ngezi underground mine worked a record 970 accident free days• SMC won the 2005 National Environmental Trophy organised
through the Association of Mine Managers of Zimbabwe• SMC and Ngezi ISO 14001.2004 accreditation achieved
September 2005• Best overall safety performance in Implats Group
8
Augustine Simanegavi
www.zimplats.co.zw
Ngezi operations
Ngezi Portal 1 and Portal 2 OutlineNgezi Portal 1 and Portal 2 Outline
MSZ Outcrop
N
Portal 2
Portal 1
opencast Reserve
28mT
Fussell’s Fault
Gw
azan
a Fa
ult
Stev
e’s
Faul
t
P2 Reserve = 13.3mTMax Depth = 70mRange of Dip = 0 to 4 deg
P1 Reserve = 12.3mTMax Depth = 88mRange of Dip = 0 to 5 deg
9
Mining Production StatisticsMining Production Statistics
2,235,0501,447,250
787,800
421,000
375
30.3721.63
2,137,4681,826,414
311,054
221,400
175
29.5222.81
2,122,0971,927,760
184,337
118,100
187
18.5018.41
1,999,4431,966,876
32,567
0--
15.74-
Ore mined (tonnes)OpencastUnderground
Underground fleetsProductivity t/fleet/month
t/prod emp
Mining costs o/cast(Delivered SMC) u/g
BP06FY 05FY 04FY 03
Opencast Production ProfileOpencast Production Profile
-
200,000
400,000
Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4
BP'06 BP'07 BP'08
TON
NES
MIN
ED
100Ktpm
Full Pit Closure
Dec 2007Western Pit Closure
10
Portal 2 Production ProfilePortal 2 Production Profile
-
100,000
200,000
300,000
400,000
Qtr1
Qtr2
Qtr3
Qtr4
Qtr1
Qtr2
Qtr3
Qtr4
Qtr1
Qtr2
Qtr3
Qtr4
BP'06 BP'07 BP'08
TON
NES
MIN
ED
Steady State Mining 80Ktpm
Infrastructure Construction Completed
Portal 2 Milestones Portal 2 Milestones
● Trial mine started Aug 02 out of the opencast highwall (Portal 2)● 1 fleet comprising 30t truck, LHD, stope drill rig and roof bolter
rented for trial● Room and pillar method at 2.5m stope height successfully trialed
(0.5mt at a grade + 4% to opencast)● Impala Board approval June 05 for full development of P2 to 1mtpa
and infrastructure (USD 46m)● At max production 4 fleets at 20,000tpm (dip length restrict
production to 4 mining districts)● LOM 14 years at 1mtpa
11
Portal 2 Key IndicatorsPortal 2 Key Indicators
● 60Ktpm achieved October 05● Full production of 80Ktpm planned by May 06● Power Supply – 133kVa supply to be commissioned Nov 2005● Crusher and conveyor system – to be commissioned May 2006● Water Supply – Weir complete, pipeline to P2 to be commissioned
Feb 06● Accommodation - Eagles Nest Management village complete (24
houses)- 181 houses for skilled employees are being built
in Turf Township, to be delivered by March 2006 (Including water purification and sewerage plant)
Ore Grade ProfileOre Grade Profile
0 1 2 3 4 5 6 7
1 . 2 51 . 0 00 . 7 50 . 5 00 . 2 50 . 0 0
- 0 . 2 5- 0 . 5 0- 0 . 7 5- 1 . 0 0- 1 . 2 5- 1 . 5 0- 1 . 7 5- 2 . 0 0- 2 . 2 5- 2 . 5 0- 2 . 7 5- 3 . 0 0
DISTANCE ABOVE/BELOW PPV (m)
g / t ( P t + P d + A u + R h )
0 1000
2000
3000
4000
5000
BCDEFGHIJKLMNOPQRS
p p m ( N i + C u )
B a s e O f M a i n S u l p h i d e Z o n e ( B M S Z )
2.5m Mining Width (UG)
P t + P d + A u + R h ( 4 E )
N i + C u
P t
0 1 2 3 4 5 6 7
1 . 2 51 . 0 00 . 7 50 . 5 00 . 2 50 . 0 0
- 0 . 2 5- 0 . 5 0- 0 . 7 5- 1 . 0 0- 1 . 2 5- 1 . 5 0- 1 . 7 5- 2 . 0 0- 2 . 2 5- 2 . 5 0- 2 . 7 5- 3 . 0 0
DISTANCE ABOVE/BELOW PPV (m)
g / t ( P t + P d + A u + R h )
0 1000
2000
3000
4000
5000
BCDEFGHIJKLMNOPQRS
p p m ( N i + C u )
B a s e O f M a i n S u l p h i d e Z o n e ( B M S Z )
2.5m Mining Width (UG)
P t + P d + A u + R h ( 4 E )
N i + C u
P t
12
Wally Channon
www.zimplats.co.zw
SMC operations
Key Production StatisticsKey Production Statistics
2,135,650
3.273
83.2
185,57589,256
1,538
8.20
2,058,210
3.221
82.8
176,53586,755
1,496
7.80
2,006,328
3.222
82.7
175,77586,099
1,643
8.04
1,937,118
3.187
81.8
169,26080,635
1,387
6.07
Ore milled (tpa)
Mill grade (g/t 4E)
4E Recovery (%)
4E production (oz)Pt production (oz)
Ni production (t)
Cost (USD/t processed)
BP06FY 05FY 04FY 03
13
SMC Continuous Improvement SMC Continuous Improvement ProjectsProjects
• Increase plant throughput by 3.8%• Increase SAG mill loading • New liner design
• Improve recovery by a further 1%• Optimise classification circuit• Commission high energy cells• Replace cyclones
• Further reduce mass pull• Optimise smelter efficiency• Reduce furnace power cost
Anton Wheeler
www.zimplats.co.zw
Strategic Plan
14
Strategic PlanningStrategic Planning• The aim of Zimplats is to produce 500,000oz Pt per annum (1.0M oz 4e)• The strategic plan is based on the fact that the pre conditions set by the
Impala Board will be met timeously• Highest risk in strategic plan will be skills acquisition and retention
85,000 oz
90,000 oz
150,000 oz
O/cast 2,1mt@ 3.20g/t 4E
O/cast 1.1mt @ 3.20 g/t 4EP2 u/g 1.0mt @ 3.31 g/t 4ETotal 2.1mt @ 3.25 g/t 4E
P2 u/g 1.0mt @ 3.31 g/t 4EP1 u/g 1.1mt @ 3.33 g/t 4EP4 u/g 1.5mt @ 3.42 g/t 4ETotal 3.6mt @ 3.36 g/t 4E
Pre FY05
1
2
Pt ozOperationsPhase
12 Year Production Profile12 Year Production Profile
P1 and P4 Establishment
12 YEAR PRODUCTION PROFILE
Ngezi O/Cast
Portal 2 Portal 1
Portal 4
Portal 3
Portal 5
Portal 8
Portal 6
Portal 7
-
3,000,000
6,000,000
9,000,000
12,000,000
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12
Tonn
es p
er a
nnum
Tonnes Milled
15
Optimisation of Strategic BPOptimisation of Strategic BP
• Studies complete• Darwendale reserves less profitable than Ngezi operations• Re opening the Hartley Platinum Mine will yield lower returns
than the Ngezi operations• Studies in progress
• Bankable feasibility study for expansion to 3.6mtpa• Optimum stoping width for the room and pillar mining method• Re commissioning the BMR • Funding, timing and ownership of a 35MW smelter at SMC
Investor VisitInvestor Visit
21 October 200521 October 2005
www.zimplats.co.zw