andhra university b.e. iii/iv civil environmental ... · 2 andhra university b.e. iii/iv mechanical...
TRANSCRIPT
1 ANDHRA UNIVERSITY
B.E. III/IV CIVIL & CIVIL ENVIRONMENTAL ENGINEERING M.S. 5‐YEAR INTEGRATED III/V CIVIL ENGG. DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 REINFORCED CONCRETE STRUCTURES‐I 70 (COMMON WITH CIVIL ENV.)
TUESDAY 01‐11‐2011 STEEL STRUCTURES – I 70 (COMMON WITH CIV ENV.)
WEDNESDAY 02‐11‐2011 FLUID MECHANICS‐II 70 (COMMON WITH CIV ENV.)
THURSDAY 03‐11‐2011 GEOTECHNICAL ENGINEERING‐I 70 (COMMON WITH CIV ENV.)
FRIDAY 04‐11‐2011 ENVIRONMENTAL ENGINEERING‐II 70 (COMMON WITH CIV ENV.)
SATURDAY 05‐11‐2011 BUILDING PLANNING AND DRAWING 70 (COMMON WITH CIV ENV.)
W.E.F. 2006‐07 ADMITTED BATCH (AU AUTONOMOUS)
W.E.F. 2007‐08 ADMITTED BATCH (AU AFFILIATED COLLEGES)
MONDAY 31‐10‐2011 REINFORCED CONCRETE STRUCTURES‐I 70 (COMMON WITH CIVIL ENV.)
TUESDAY 01‐11‐2011 STEEL STRUCTURES – I 70 (COMMON WITH CIV ENV.)
WEDNESDAY 02‐11‐2011 FLUID MECHANICS‐II 70 (COMMON WITH CIV ENV.)
THURSDAY 03‐11‐2011 GEOTECHNICAL ENGINEERING‐I 70 (COMMON WITH CIV ENV.)
FRIDAY 04‐11‐2011 ENVIRONMENTAL ENGINEERING‐II 70 (COMMON WITH CIV ENV.)
SATURDAY 05‐11‐2011 ELECTIVE‐I : A) ESTIMATING & QUANTITY SURVEYING 70
(COMMON WITH CIV ENV.) B) REPAIR & REHABILITATION OF STRUCTURES (2008‐09 AB) 70 C) DISASTER MANAGEMENT (2008‐09 AB) 70
THURSDAY 17‐11‐2011 FREE ELECTIVE: (AU ONLY) TRAFFIC ENGINEERING & MANAGEMENT 70
(COMMON WITH CIV ENV.)(2007‐08 ADMITTED BATCH) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
2
ANDHRA UNIVERSITY B.E. III/IV MECHANICAL ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER
REVISED TIME‐TABLE TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 DESIGN OF MACHINE ELEMENTS‐I 70 (COMMON WITH METT.) TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS 70
(COMMON WITH MPIE, METT, MARINE & NAVAL) (1999‐00 & after admitted batches)
WEDNESDAY 02‐11‐2011 STRENGTH OF MATERIALS‐II 70
(COMMON WITH MPIE, MARINE & NAVAL) (1999‐00 & after admitted batches)
THURSDAY 03‐11‐2011 APPLIED THERMODYNAMICS‐II 70
(COMMON WITH MPIE) FRIDAY 04‐11‐2011 PRODUCTION DRAWING 70
(COMMON WITH MPIE.) (1999‐00 & after admitted batches) SATURDAY 05‐11‐2011 THEORY OF MACHINES‐I 70
(COMMON WITH MPIE & MARINE) (1999‐00 & after admitted batches)
W.E.F. 2004‐05 ADMITTED BATCH
MONDAY 31‐10‐2011 FLUID MECHANICS 70 (COMMON WITH MARINE, NAVAL & METT.)
TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS 70
(COMMON WITH MPIE, METT, MARINE & NAVAL)
WEDNESDAY 02‐11‐2011 STRENGTH OF MATERIALS‐II 70 (COMMON WITH MARINE & NAVAL)
THURSDAY 03‐11‐2011 ENGINEERING THERMODYNAMICS‐II 70 (COMMON WITH MARINE)
FRIDAY 04‐11‐2011 PRODUCTION DRAWING 70
SATURDAY 05‐11‐2011 THEORY OF MACHINES‐I 70
(COMMON WITH MARINE) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011
*Balaji
3 ANDHRA UNIVERSITY
B.E. III/IV MECHANICAL ENGINEERING AND M.S. 5‐YEAR INTEGRATED III/V MECHANICAL ENGG. DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2006‐07 ADMITTED BATCH (AU AUTONOMOUS) W.E.F. 2007‐08 ADMITTED BATCH (AU AFFILIATED COLLEGES)
MONDAY 31‐10‐2011 MECHANICS OF SOLIDS‐II 70 TUESDAY 01‐11‐2011 INDUSTRIAL ELECTRONICS (COMMON WITH MARINE & NAVAL) 70 WEDNESDAY 02‐11‐2011 ELECTIVE‐I l A) REFRIGERATION & AIR CONDITIONING 70
(COMMON WITH MARINE & NAVAL) B) ADVAMCED FOUNDRY & WELDING TECHNOLOGY 70 C) WORK STUDY 70 D) POWER PLANT ENGINEERING 70 E) FINITE ELEMENT ANALYSIS (COMMON WITH MARINE & NAVAL) 70 F) COMPUTER GRAPHICS 70 G) MACTRONICS 70
THURSDAY 03‐11‐2011 ENGINEERING THERMODYNAMICS‐II 70
FRIDAY 04‐11‐2011 PRODUCTION DRAWING 70
SATURDAY 05‐11‐2011 THEORY OF MACHINES‐II 70 THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB ‐ AU ONLY)
STATISTICAL QUALITY CONTROL 70
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ (BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
4 ANDHRA UNIVERSITY
B.E. III/IV MECHANICAL PRODUCTION & INDUSTRIAL ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 PROBABILITY & STATISTICS 70
TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS 70 (COMMON WITH MECH.)
WEDNESDAY 02‐11‐2011 STRENGTH OF MATERIALS‐II 70 (COMMON WITH MECH.)
THURSDAY 03‐11‐2011 APPLIED THERMODYNAMICS‐II 70 (COMMON WITH MECH.)
FRIDAY 04‐11‐2011 PRODUCTION DRAWING 70
(COMMON WITH MECH.) SATURDAY 05‐11‐2011 THEORY OF MACHINES‐I 70
(COMMON WITH MECH.)
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ (BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
5 ANDHRA UNIVERSITY
B.E. III/IV ELECTRONICS & COMMUNICATION ENGINEERING AND M.S. 5‐YEAR INTEGRATED III/V ELECTRONICS & COMMUNICATION ENGG. DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 PULSE AND DIGITAL CIRCUITS 70 (COMMON WITH EEE)
TUESDAY 01‐11‐2011 LINEAR ICs AND APPLICATIONS 70
(COMMON WITH EEE)
WEDNESDAY 02‐11‐2011 ANALOG COMMUNICATIONS (1999‐2000 & AFTER AB) 70
THURSDAY 03‐11‐2011 ELECTRONIC MEASUREMENTS AND INSTRUMENTS 70 (FOR SUPPL. CANDIDATES ONLY)
THURSDAY 03‐11‐2011 COMPUTER ARCHITECTURE & ORGANISATION 70
(COMMON WITH EEE) (2003‐04 & AFTER AB) FRIDAY 04‐11‐2011 SWITCHING AND LOGIC CIRCUITS(1999‐2000 & AFTER AB) 70
SATURDAY 05‐11‐2011 ANTENNA AND PROPAGATION 70
W.E.F. 2006‐07 ADMITTED BATCH (AU AUTONOMOUS)
W.E.F. 2007‐08 ADMITTED BATCH (AU AFFILIATED COLLEGES) MONDAY 31‐10‐2011 PULSE AND DIGITAL CIRCUITS 70 (COMMON WITH EEE) TUESDAY 01‐11‐2011 LINEAR ICs AND APPLICATIONS 70
(COMMON WITH EEE)
WEDNESDAY 02‐11‐2011 ANALOG COMMUNICATIONS (1999‐2000 & AFTER AB) 70
THURSDAY 03‐11‐2011 COMPUTER ARCHITECTURE & ORGANISATION 70 (COMMON WITH EEE & EIE) (2003‐04 & AFTER AB)
FRIDAY 04‐11‐2011 SWITCHING THEORY AND LOGIC CIRCUITS(1999‐2000 & AFTER AB) 70
SATURDAY 05‐11‐2011 ANTENNA AND PROPAGATION 70 THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB – AU ONLY)
ELECTRONIC DEVICES AND APPLICATIONS 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011
*Balaji
6 ANDHRA UNIVERSITY
B.E. III/IV ELECTRICAL & ELECTRONICS ENGINEERING AND M.S. 5‐YEAR INTEGRATED III/V ELECTRICAL & ELECTRONICS ENGG. DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 PULSE AND DIGITAL CIRCUITS 70 (COMMON WITH ECE)
TUESDAY 01‐11‐2011 LINEAR ICs AND APPLICATIONS 70
(COMMON WITH ECE)
WEDNESDAY 02‐11‐2011 LOGIC DESIGN & MICROPROCESSORS 70
THURSDAY 03‐11‐2011 ELECTRICAL POWER – I 70
FRIDAY 04‐11‐2011 PERFORMANCE & DESIGN OF ELECTRICAL MACHINES‐II 70
SATURDAY 05‐11‐2011 FLUID MECHANICS AND HYDRAULIC MACHINERY 70
W.E.F. 2004‐05 & AFTER ADMITTED BATCHES MONDAY 31‐10‐2011 PULSE AND DIGITAL CIRCUITS 70 (COMMON WITH ECE) TUESDAY 01‐11‐2011 LINEAR ICs AND APPLICATIONS 70
(COMMON WITH ECE & EIE)
WEDNESDAY 02‐11‐2011 ELECTIVE – I : A) LOGIC DESIGN & MICROPOROCESSORS 70 B) DIGITAL SIGNAL PROCESSING 70 C) DATA STRUCTURES 70
THURSDAY 03‐11‐2011 COMPUTER ARCHITECTURE & ORGANISATION 70
(COMMON WITH ECE & EIE) FRIDAY 04‐11‐2011 PERFORMANCE & DESIGN OF ELECTRICAL MACHINES‐II 70
SATURDAY 05‐11‐2011 FLUID MECHANICS AND HYDRAULIC MACHINERY 70 THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB – AU ONLY)
NON‐CONVENTIONAL ENERGY SOURCES 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011
*Balaji
7 ANDHRA UNIVERSITY
B.TECH. III/IV COMPUTER SCIENCE ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 MICROPROCESSOR‐II 70 TUESDAY 01‐11‐2011 COMPUTER ARCHITECTURE 70
WEDNESDAY 02‐11‐2011 COMPUTER GRAPHICS (COMMON WITH IT) 70
THURSDAY 03‐11‐2011 FORMAL LANGUAGES AND AUTOMATA THEORY 70
(COMMON WITH IT) FRIDAY 04‐11‐2011 FILE STRUCTURES 70
SATURDAY 05‐11‐2011 OPERATING SYSTEMS (COMMON WITH IT) 70
W.E.F. 2004‐05 ADMITTED BATCH
MONDAY 31‐10‐2011 MICROPROCESSOR‐II (2004‐05 & AFTER ADMITTED BATCHES) 70 TUESDAY 01‐11‐2011 COMPUTER ARCHITECTURE 70
WEDNESDAY 02‐11‐2011 COMPUTER GRAPHICS (COMMON WITH IT) 70
(2004‐05 & AFTER ADMITTED BATCHES) THURSDAY 03‐11‐2011 FORMAL LANGUAGES AND AUTOMATA THEORY 70
(COMMON WITH IT) (2004‐05 & AFTER ADMITTED BATCHES) FRIDAY 04‐11‐2011 FILE STRUCTURES (COMMON WITH IT) 70
(2004‐05 & AFTER ADMITTED BATCHES) SATURDAY 05‐11‐2011 OPERATING SYSTEMS (COMMON WITH IT) 70
(2004‐05 & AFTER ADMITTED BATCHES) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
8 ANDHRA UNIVERSITY
B.TECH. III/IV COMPUTER SCIENCE ENGINEERING AND M.S. 5‐YEAR INTEGRATED III/V SOFTWARE ENGG. & INFORMATION TECHNOLOGY DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2006 ‐ 07 ADMITTED BATCH – AU W.E.F. 2007 ‐ 08 ADMITTED BATCH – AU AFFILIATED COLLEGES
MONDAY 31‐10‐2011 MICROPROCESSOR‐II 70 (2004‐05 & AFTER ADMITTED BATCHES) TUESDAY 01‐11‐2011 SYSTEM PROGRAMMING 70
WEDNESDAY 02‐11‐2011 ELECTIVE – I : (2004‐05 & AFTER ADMITTED BATCHES)
A) COMPUTER GRAPHICS (COMMON WITH IT) 70 B) DIGITAL SIGNAL PROCESSING 70 C) FAULT TOLERANT COMPUTING 70 D) COMBINATORICS & GRAPHIC THEORY 70
THURSDAY 03‐11‐2011 FORMAL LANGUAGES AND AUTOMATA THEORY 70
(COMMON WITH IT) (2004‐05 & AFTER ADMITTED BATCHES)
FRIDAY 04‐11‐2011 FILE STRUCTURES (2004‐05 & AFTER ADMITTED BATCHES) 70
SATURDAY 05‐11‐2011 OPERATING SYSTEMS (COMMON WITH IT) 70 (2004‐05 & AFTER ADMITTED BATCHES)
THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB – AU ONLY)
DATA STRUCTURES 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER) UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
9 ANDHRA UNIVERSITY
B.E. III/IV METALLURGICAL ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 DESIGN OF MACHINE ELEMENTS ‐ I (COMMON WITH MECH) 70 TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS (COMMON WITH MECH) 70
WEDNESDAY 02‐11‐2011 MINERAL BENEFICIATION 70 THURSDAY 03‐11‐2011 TESTING OF MATERIALS 70
FRIDAY 04‐11‐2011 IRON PRODUCTION 70
W.E.F. 2004 ‐ 05 ADMITTED BATCH
MONDAY 31‐10‐2011 FLUID MECHANICS (COMMON WITH MECH, MARINE & NAVAL) 70 TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS (COMMON WITH MECH,MARINE & NAVAL) 70
WEDNESDAY 02‐11‐2011 MINERAL BENEFICIATION 70 THURSDAY 03‐11‐2011 MECHANICAL METALLURGY 70
FRIDAY 04‐11‐2011 PRODUCTION OF IRON AND FERRO ALLOYS 70 SATURDAY 05‐11‐2011 METALLOGRAPHY AND X‐RAY DIFFRACTION 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
10 ANDHRA UNIVERSITY
B.E. III/IV METALLURGICAL ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2006 ‐ 07 ADMITTED BATCH
MONDAY 31‐10‐2011 FLUID MECHANICS 70 TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS 70
WEDNESDAY 02‐11‐2011 MINERAL BENEFICIATION 70 THURSDAY 03‐11‐2011 MECHANICAL METALLURGY 70
FRIDAY 04‐11‐2011 PRODUCTION OF IRON AND FERRO ALLOYS 70 SATURDAY 05‐11‐2011 METALLOGRAPHY AND X‐RAY DIFFRACTION 70
W.E.F. 2007 ‐ 08 ADMITTED BATCH MONDAY 31‐10‐2011 PHYSICAL METALLURGY 70 TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS 70
WEDNESDAY 02‐11‐2011 ELECTIVE :
A) METAL CASTING 70 B) NON‐DESTRUCTIVE TESTING 70 C) POWDER METALLURGY 70
THURSDAY 03‐11‐2011 TESTING OF MATERIALS – I 70
FRIDAY 04‐11‐2011 IRON MAKING 70 SATURDAY 05‐11‐2011 METALLOGRAPHY AND X‐RAY DIFFRACTION 70
THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB – AU ONLY)
METALLURGICAL ENGG. MATERIALS 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER) UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
11 ANDHRA UNIVERSITY
B.E. III/IV MECHANICAL ENGINEERING (WITH MARINE AS ELECTIVE) DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 MECHANICS OF FLUIDS (COMMON WITH NAVAL) 70 TUESDAY 01‐11‐2011 MECHANICS OF MATERIALS & THEORY OF STRUCTURES ‐ II 70
(COMMON WITH NAVAL) WEDNESDAY 02‐11‐2011 MATERIAL SCIENCE & ENGINEERING 70 (COMMON WITH NAVAL) THURSDAY 03‐11‐2011 DYNAMICS OF MACHINERY ‐ I 70
FRIDAY 04‐11‐2011 MARINE MACHINERY ‐ II (COMMON WITH NAVAL) 70
W.E.F. 2004 ‐ 05 ADMITTED BATCH
MONDAY 31‐10‐2011 FLUID MECHANICS 70 (COMMON WITH MECH, METT. & NAVAL) TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS 70
(COMMON WITH MECH, METT. & NAVAL) WEDNESDAY 02‐11‐2011 STRENGTH OF MATERIALS ‐ II 70 (COMMON WITH MECH. & NAVAL) THURSDAY 03‐11‐2011 ENGINEERING THERMODYNAMICS ‐ II 70
(COMMON WITH MECH.) FRIDAY 04‐11‐2011 MARINE MACHINERY – I 70 (COMMON WITH NAVAL) SATURDAY 05‐11‐2011 THEORY OF MACHINES – I 70 (COMMON WITH MECH.) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
12 ANDHRA UNIVERSITY
B.E. III/IV MECHANICAL ENGINEERING (WITH MARINE AS ELECTIVE) DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2006 ‐ 07 ADMITTED BATCH MONDAY 31‐10‐2011 FLUID MECHANICS 70 (COMMON WITH NAVAL) TUESDAY 01‐11‐2011 INDUSTRIAL ELECTRONICS 70
(COMMON WITH MECH. & NAVAL) WEDNESDAY 02‐11‐2011 ELECTIVE – I :
FINITE ELEMENT ANALYSIS (COMMON WITH MECH. & NAVAL) 70 THURSDAY 03‐11‐2011 PRODUCTION TECHNOLOGY 70 FRIDAY 04‐11‐2011 MARINE MACHINERY – I 70 (COMMON WITH NAVAL) SATURDAY 05‐11‐2011 THEORY OF MACHINES – I 70 THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB – AU)
POWER PLANT ENGINEERING 70 FRIDAY 18‐11‐2011 INDUSTRIAL ENGINEERING & MANAGEMENT 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER) UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
13 ANDHRA UNIVERSITY
B.E. III/IV NAVAL ARCHITECTURE ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 MECHANICS OF FLUIDS (COMMON WITH MARINE) 70 TUESDAY 01‐11‐2011 MECHANICS OF MATERIALS & THEORY OF STRUCTURES‐II 70
(COMMON WITH MARINE)
WEDNESDAY 02‐11‐2011 MATERIAL SCIENCE & ENGINEERING (COMMON WITH MARINE) 70 THURSDAY 03‐11‐2011 SHIP DESIGN – I (1999‐2000 & after AB) 70
FRIDAY 04‐11‐2011 MARINE MACHINERY – II (COMMON WITH MARINE) 70
W.E.F. 2004 ‐ 05 ADMITTED BATCH
MONDAY 31‐10‐2011 FLUID MECHANICS (COMMON WITH MECH, MARINE & METT) 70 TUESDAY 01‐11‐2011 ENGINEERING ECONOMICS (COMMON WITH MECH,MARINE & METT) 70
WEDNESDAY 02‐11‐2011 STRENGTH OF MATERIALS‐II (COMMON WITH MECH & MARINE) 70 THURSDAY 03‐11‐2011 SHIP DESIGN (1999‐2000 & after AB) 70
FRIDAY 04‐11‐2011 MARINE MACHINERY – I (COMMON WITH MARINE) 70 SATURDAY 05‐11‐2011 STRENGTH OF SHIPS 70 THURSDAY 17‐11‐2011 SHIP CONSTRUCTION 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER) UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
14 ANDHRA UNIVERSITY
B.E. III/IV NAVAL ARCHITECTURE ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2006 ‐ 07 ADMITTED BATCH
MONDAY 31‐10‐2011 FLUID MECHANICS (COMMON WITH MECH & MARINE) 70 TUESDAY 01‐11‐2011 INDUSTRIAL ELECTRONICS 70
(COMMON WITH MECH & MARINE) WEDNESDAY 02‐11‐2011 FINITE ELEMENT ANALYSIS 70 (COMMON WITH MECH & MARINE) THURSDAY 03‐11‐2011 SHIP DESIGN ‐ I 70
FRIDAY 04‐11‐2011 MARINE MACHINERY – I (COMMON WITH MECH & MARINE) 70 SATURDAY 05‐11‐2011 SHIP BUILDING TECHNOLOGY & MANAGEMENT 70 THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB – AU)
POWER PLANT ENGINEERING 70 FRIDAY 18‐11‐2011 SHIP TECHNOLOGY 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
15 ANDHRA UNIVERSITY
B.TECH. III/IV INSTRUMENTATION ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 ELECTRICAL MEASUREMENTS AND MEASURING INSTRUMENTS 70 TUESDAY 01‐11‐2011 COMPUTER ORGANISATION AND ARCHITECTURE 70
WEDNESDAY 02‐11‐2011 CONTROL ENGINEERING 70 (CONTROL SYSTEM ENGG) THURSDAY 03‐11‐2011 MICRO‐PROCESSORS AND APPLICATIONS 70
FRIDAY 04‐11‐2011 OPTICAL INSTRUMENTS & LASERS (SUPPL. CANDIDATES) 70 SATURDAY 05‐11‐2011 ELECTRONIC INSTRUMENTATION (FOR REGULAR CANDIDATES) 70 THURSDAY 17‐11‐2011 OPTOELECTRONICS AND LASERS (FOR SUPPL. CANDIDATES) 70
W.E.F. 2006 ‐ 07 ADMITTED BATCH MONDAY 31‐10‐2011 ELECTIVE – I : SIGNAL AND SYSTEMS 70 TUESDAY 01‐11‐2011 COMPUTER ORGANISATION AND OPERATING SYSTEMS 70
WEDNESDAY 02‐11‐2011 CONTROL ENGINEERING ‐ I 70 (CONTROL SYSTEM ENGG) THURSDAY 03‐11‐2011 MICRO‐PROCESSORS AND APPLICATIONS 70
FRIDAY 04‐11‐2011 OPTICAL INSTRUMENTS & LASERS 70 SATURDAY 05‐11‐2011 ELECTRONICS & INSTRUMENTATION 70 THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB – AU)
ELECTRONIC INSTRUMENTATION 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER) UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
16 ANDHRA UNIVERSITY
B.TECH. III/IV INFORMATION TECHNOLOGY ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 DATA COMMUNICATIONS 70 TUESDAY 01‐11‐2011 INTERNET CONCEPTS AND JAVA PROGRAMMING 70
WEDNESDAY 02‐11‐2011 COMPUTER GRAPHICS (COMMON WITH CSE) 70
THURSDAY 03‐11‐2011 FORMAL LANGUAGES AND AUTOMATA THEORY 70
(COMMON WITH CSE) FRIDAY 04‐11‐2011 DATABASE MANAGEMENT SYSTEMS 70
SATURDAY 05‐11‐2011 OPERATING SYSTEMS (COMMON WITH CSE) 70
W.E.F. 2004‐05 AB & AFTER ADMITTED BATCHES
MONDAY 31‐10‐2011 DIGITAL COMMUNICATIONS (2004‐05 AB) 70 MONDAY 31‐10‐2011 DATA COMMUNICATIONS (2007‐08 AB) 70 TUESDAY 01‐11‐2011 INTERNET CONCEPTS AND JAVA PROGRAMMING 70
WEDNESDAY 02‐11‐2011 COMPUTER GRAPHICS (COMMON WITH CSE) 70
THURSDAY 03‐11‐2011 FORMAL LANGUAGES AND AUTOMATA THEORY 70
(COMMON WITH CSE)
FRIDAY 04‐11‐2011 FILE STRUCTURES (COMMON WITH CSE) 70
SATURDAY 05‐11‐2011 OPERATING SYSTEMS (COMMON WITH CSE) 70
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ (BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
17 ANDHRA UNIVERSITY
B.TECH. III/IV CHEMICAL ENGG. AND CHEMICAL PETROLEUM ENGG.DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
TUESDAY 01‐11‐2011 CHEMICAL ENGINEERING THERMODYNAMICS‐I 70 (1999‐00 AND AFTER ADMITTED BATCHES)
WEDNESDAY 02‐11‐2011 MASS TRANSFER – I 70 THURSDAY 03‐11‐2011 INORGANIC CHEMICAL TECHNOLOGY 70
FRIDAY 04‐11‐2011 HEAT TRANSFER 70 SATURDAY 05‐11‐2011 ELECTIVE :
A) POLYMER TECHNOLOGY 70 B) FERTILIZER TECHNOLOGY 70 C) PAPER TECHNOLOGY 70 D) CEMENT TECHNOLOGY 70 E) CERAMIC TECHNOLOGY 70 F) PAINT TECHNOLOGY 70 G) SOAPS & DETERGENTS 70 H) EXTRACTIVE METALLURGY 70 I) PETROCHEMICAL TECH. (PETROLEUM ENGG.) 70 J) MICROBIOLOGY (BIO‐TECHNOLOGY) 70
W.E.F. 2006 ‐ 07 ADMITTED BATCH
MONDAY 31‐10‐2011 PROCESS INSTRUMENTATION 70 TUESDAY 01‐11‐2011 CHEMICAL ENGINEERING THERMODYNAMICS‐I 70
(1999‐00 AND AFTER ADMITTED BATCHES)
WEDNESDAY 02‐11‐2011 MASS TRANSFER – I 70
THURSDAY 03‐11‐2011 INORGANIC CHEMICAL TECHNOLOGY 70
FRIDAY 04‐11‐2011 HEAT TRANSFER 70
SATURDAY 05‐11‐2011 ELECTIVE – I : A) METLAB 70 B) PETROLEUM – I (PETRO‐CHEMICALS) 70 C) MICROBIOLOGY 70 D) POLYMER TECHNOLOGY 70 E) PAPER TECHNOLOGY 70 F) FERTILIZER TECHNOLOGY 70 G) NUCLEAR REACTOR MATERIAL TECHNOLOGY 70 H) FUEL CELL TECHNOLOGY 70
THURSDAY 17‐11‐2011 FREE ELECTIVE : (2007‐08 AB)
CORROSION ENGINEERING 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
18 ANDHRA UNIVERSITY
B.E. III/IV ELECTRONICS & INSTRUMENTATION ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011 DIGITAL ELECTRONICS 70
TUESDAY 01‐11‐2011 LINEAR ICs AND APPLICATIONS 70 WEDNESDAY 02‐11‐2011 CONTROL SYSTEMS 70
THURSDAY 03‐11‐2011 COMPUTER ARCHITECTURE & ORGANISATION 70
FRIDAY 04‐11‐2011 INDUSTRIAL INSTRUMENTATION 70
SATURDAY 05‐11‐2011 SIGNALS AND SYSTEMS 70
W.E.F. 2007‐08 ADMITTED BATCH (AU AFFILIATED COLLEGES) MONDAY 31‐10‐2011 ELECTRICAL & ELECTRONIC MEASUREMENTS 70 TUESDAY 01‐11‐2011 LINEAR ICs AND APPLICATIONS 70
(COMMON WITH ECE & EEE)
WEDNESDAY 02‐11‐2011 CONTROL SYSTEMS 70
THURSDAY 03‐11‐2011 COMPUTER ARCHITECTURE & ORGANISATION 70 (COMMON WITH ECE & EEE)
FRIDAY 04‐11‐2011 INDUSTRIAL INSTRUMENTATION 70
SATURDAY 05‐11‐2011 MICROPROCESSOR & INTERFACING 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
19 ANDHRA UNIVERSITY
B.TECH. III/IV BIO‐TECHNOLOGY ENGG. AND CHEMICAL BIO‐TECHNOLOGY ENGG. DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2002‐2003 A.B. MONDAY 31‐10‐2011 MATHEMATICS – V 70 TUESDAY 01‐11‐2011 CELL & MOLECULAR BIOLOGY 70
WEDNESDAY 02‐11‐2011 MASS TRANSFER ‐ I 70
THURSDAY 03‐11‐2011 IMMUNOLOGY 70
FRIDAY 04‐11‐2011 INDUSTRIAL FERMENTATION ‐ I 70
SATURDAY 05‐11‐2011 CHEMICAL ENGG. THERMODYNAMICS 70
W.E.F. 2006 ‐ 07 ADMITTED BATCH MONDAY 31‐10‐2011 MATHEMATICS – IV 70 TUESDAY 01‐11‐2011 CELL & MOLECULAR BIOLOGY 70
WEDNESDAY 02‐11‐2011 MASS TRANSFER 70
THURSDAY 03‐11‐2011 IMMUNOLOGY 70
FRIDAY 04‐11‐2011 HEAT TRANSFER 70
SATURDAY 05‐11‐2011 GENETIC ENGINEERING 70
W.E.F. 2007 – 08 ADMITTED BATCH MONDAY 31‐10‐2011 BIO‐STATISTICS 70 TUESDAY 01‐11‐2011 CELL & MOLECULAR BIOLOGY 70
WEDNESDAY 02‐11‐2011 MASS TRANSFER 70
THURSDAY 03‐11‐2011 IMMUNOLOGY 70
FRIDAY 04‐11‐2011 HEAT TRANSFER 70
SATURDAY 05‐11‐2011 GENETIC ENGINEERING 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
20 ANDHRA UNIVERSITY
B.TECH. III/IV BIO‐TECHNOLOGY ENGG. AND CHEMICAL BIO‐TECHNOLOGY ENGG. DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2009 – 10 ADMITTED BATCH
MONDAY 31‐10‐2011 THERMODYNAMICS 70 TUESDAY 01‐11‐2011 CELL & MOLECULAR BIOLOGY 70
WEDNESDAY 02‐11‐2011 MASS TRANSFER 70
THURSDAY 03‐11‐2011 IMMUNOLOGY 70
FRIDAY 04‐11‐2011 ELECTIVE ‐I:
A) ENERGY ENGINEERING 70 B) FOOD TECHNOLOGY 70 C) PROCESS OPTIMIZATION 70 D) SYSTEMS BIOLOGY 70
THURSDAY 17‐11‐2011 FREE ELECTIVE :
CORROSION ENGINEERING 70
(COMMON WITH CHEMICAL ENGINEERING) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
21 ANDHRA UNIVERSITY
III/V B. ARCH. ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MONDAY 31‐10‐2011] TO TO ] ARCHITECTURE DESIGN STUDIO – V 150 WEDNESDAY 02‐11‐2011]
THURSDAY 03‐11‐2011 BUILDING CONSTRUCTION ‐ IV 100
FRIDAY 04‐11‐2011 DESIGN OF STRUCTURES ‐ III 50
SATURDAY 05‐11‐2011 HISTORY OF ARCHITECTURE – III 50 THURSDAY 17‐11‐2011 BUILDING SERVICES ‐ II 50 FRIDAY 18‐11‐2011 ACOUSTICS 50
W.E.F. 2006 ‐ 07 ADMITTED BATCH MONDAY 31‐10‐2011] TO TO ] ARCHITECTURAL DESIGN – III 100 WEDNESDAY 02‐11‐2011]
THURSDAY 03‐11‐2011 BUILDING CONSTRUCTION ‐ IV 50
FRIDAY 04‐11‐2011 DESIGN OF STEEL STRUCTURES 50
SATURDAY 05‐11‐2011 HISTORY OF ARCHITECTURE – III 50 THURSDAY 17‐11‐2011 FREE ELECTIVE : (2007‐08 AB)
INTERIOR DESIGN ‐‐‐INTERNAL EXAMN.‐‐‐ 70 FRIDAY 18‐11‐2011 LANDSCAPE DESIGN & SITE PLANNING 50 SATURDAY 19‐11‐2011 SPECIFICATIONS, ESTIMATING & COSTING 50
MONDAY 21‐11‐2011 ELECTIVE – I : (2007‐08 AB) A) COMPUTER APPLICATIONS IN ARCHITECTURE 50 B) HOUSING 50
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ (BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
22 ANDHRA UNIVERSITY
B.TECH. III/IV CERAMIC TECHNOLOGY ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2007 ‐ 08 ADMITTED BATCH MONDAY 31‐10‐2011 FLUID MECHANICS 70 TUESDAY 01‐11‐2011 THERMODYNAMICS 70
WEDNESDAY 02‐11‐2011 CHEMICAL PROCESS CALCULATIONS 70
THURSDAY 03‐11‐2011 CERAMIC FABRICATION PROCESS 70
FRIDAY 04‐11‐2011 CERAMIC SCIENCE AND PHASE EQUILIBRIA IN CERAMICS 70
THURSDAY 17‐11‐2011 FREE ELECTIVE : (2007‐08 AB)
CORROSION ENGINEERING (COMMON WITH CHEM.) 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
23 ANDHRA UNIVERSITY
B.E. III/IV GEO‐INFORMATICS ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2007 ‐ 08 ADMITTED BATCH MONDAY 31‐10‐2011 PRINCIPLES OF PHYSICAL OCEANOGRAPHY 70 TUESDAY 01‐11‐2011 DIGITAL IMAGE PROCESSING ‐ I 70
WEDNESDAY 02‐11‐2011 DATABASE MANAGEMENT SYSTEMS 70
THURSDAY 03‐11‐2011 OPERATION RESEARCH 70
FRIDAY 04‐11‐2011 REMOTE SENSING ‐ II 70 SATURDAY 05‐11‐2011 ELECTIVE – I :
A) GEOINFORMATICS FOR ENVIRONMENTAL MONITORING 70 B) GEOINFORMATICS FOR EARTH SCIENCE APPLICATIONS 70
THURSDAY 17‐11‐2011 FREE ELECTIVE : (2007‐08 AB)
SPATIAL INFORMATION TECHNOLOGY 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
24
ANDHRA UNIVERSITY B.E. III/IV NAVAL ARCHITECTURE AND MARINE ENGINEERING DEGREE EXAMNS. ‐ OCTOBER, 2011
I ‐ SEMESTER
REVISED TIME‐TABLE TIME : 9.00 AM TO 12.00 NOON ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 2009 ‐ 10 ADMITTED BATCH
MONDAY 31‐10‐2011 FLUID MECHANICS 70 TUESDAY 01‐11‐2011 INDUSTRIAL ELECTRONICS 70
(COMMON WITH MECH.) WEDNESDAY 02‐11‐2011 ELECTIVE – I :
A) FINITE ELEMENT ANALYSIS 70 B) COMPUTER GRAPHICS 70 C) WORK STUDY 70 D) MARINE REFRIGERATION & AIR CONDITIONING 70
THURSDAY 03‐11‐2011 SHIP DESIGN ‐ I 70
FRIDAY 04‐11‐2011 MARINE MACHINERY – I 70 SATURDAY 05‐11‐2011 STRENGTH OF SHIPS 70 THURSDAY 17‐11‐2011 FREE ELECTIVE: (2007‐08 AB – AU)
POWER PLANT ENGINEERING 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (M.V.S.S. PRAKASH) VISAKHAPATNAM Deputy Registrar (Exams.) DATED : 27‐10‐2011 *Balaji
25 ANDHRA UNIVERSITY
B.E. V/V B.ARCH. ENGINEERING DEGREE EXAMNS. ‐ NOVEMBER, 2011
I ‐ SEMESTER REVISED TIME‐TABLE
TIME : 2.00 PM TO 5.00 PM ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ DAY DATE SUBJECTS MARKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
W.E.F. 1999‐2000 ADMITTED BATCH
TUESDAY 08‐11‐2011 ADVANCED SERVICES 70 WEDNESDAY 09‐11‐2011 ELECTIVE‐II: A) CONSTRUCTION MANAGEMENT 70 B) AUTO CAD 70 C) URBAN DESIGN 70 THURSDAY 10‐11‐2011 PROFESSIONAL PRACTICE AND LEGISLATION 50
W.E.F. 2006‐2007 ADMITTED BATCH
TUESDAY 08‐11‐2011 ADVANCED SERVICES 70 WEDNESDAY 09‐11‐2011 ELECTIVE‐II: A) COMPUTER APPLICATIONS IN ARCHICTURE 70 B) HOUSING 70 C) URBAN DESIGN 70 D) DISASTER RESISTANT BUILDINGS 70 E) PREFABRICATED CONSTRUCTION 70 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
(BY ORDER)
UNIVERSITY OFFICE (N. SATYANARAYANA) VISAKHAPATNAM DEPUTY REGISTRAR (EXAMS.) DATED : 14‐09‐2011
*Balaji