andover c.1

11
 Flight photogr aph ANDOVER C.1 Multi-purpose rear-loader now in service T HE AIR STAFF S PLANNERS  decided in 1961 that they needed a replacement for the RAF s ageing Valetta and Hastings short-range transports which even then had another in- tensive campaign to serve. In that, the Malaysian-Indonesian confrontation, the veterans were called upon to mount a cease- less paradrop logistic-support operation, supplying troops in virtually impenetrable jungle. They did it, and they did it well, as  light  saw at first-hand, but the disadvantages of the old side-loaders, with a strict limit in the size and weight of para- drop loads, and the slow delivery rate consequent upon loads being manhandled down the fusel age and rou nd through the door, were really driven home. The immense operational advantages of rear-end loading were obviously to be required in any replacement but the same aircraft had not only to serve as a tactical freighter and p aratroop transport, while possessing good STOL qualities, but be usable across the whole spectrum of RAF short-range transport operations. This meant, among other things, hauling dependant families from time to time, and use on casualty evacuation flights. Pressurisation, a long ferry range and quick convertibility of the interior were also pre- requisites therefore. For economic reasons it was decided that the transport must be a derivation of an existing aircraft, rath er than evolving from a clean sheet of paper. Britain was in the fairly unusual Position of having two directly competitive commercial trans- ports, the twin-Dart HS.748 and Handley Page Herald, at that time, both of which qualified for consideration as the base aircraft for the project. In one of the most hotly contested contract battles waged between two British airframe companies for many years, and after a lot of politicking and front-page col umn inches, the contract was awarded to Hawker Siddeley s Avro Whitworth Division to go ahead with its 748MF (Military Freighter) project, otherwise known around the group s Man- chester area factories as the Type 780, which became the Andover. The civil 748 had made its first flight in June 1960 and the first production aircraft was delivered in Jan uary 1962. After the Andover go-ahead, work on the definitive programme began on October 26, with delivery of the first aircraft required exactly two years later, on October 26, 1964. Due to extensive changes which were subsequently specified, this date was put back and the aircraft received its CA release in February 1965. An in- terim contract had-been awarded in 1962 which ran until April 23 and the main contract was signed on April 22, 1963. On December 21 that year the maiden flight was made of the rebuilt prototype 748 with the new, upswept ramp-equipped rear-end, and the more powerful D art 12 engines of the Andover, but lacking other features of the definitive military transport. Flight development of this aircraft was followed on July 9, 1965, by the first flight of the first production aircraft. Since then delivery has reached the rate of H aircraft a month (on an assembly line at Woodford separate from that of the commercial 748 airliners) and the last of 31 ordered for RAF Air Support Command is about to be delivered. The Andover is already hard at work adding a new dimension to RAF short-range transport capabilities in the United Kingdom and the Far East and within a few months a Middle East squadron will be formed. The Rolls-Royce Dart R.Da7-powered 748 Series 2 was taken as the base aircraft from which the Andover was evolved. This aircraft was fully described, with a cutaway drawing, in  light for June 3, 1960, and the changes made will be described in this article, rather than a full description, including the common parts, being given. Extensive wind tunnel testing was run to evolve the Andover rear fuselage. The conventional beaver-tail shape adopted for such rear-loaders as the C-130 and the Belfast gave high drag characteristics which threatened the long unrefuelled ferry range requirement of 2,700 n.m. with the relatively high s.f.c. Dart R.Dal2 engine, which was preferable on every other score. Five basic designs of rear fuselage, with sub-variants, were evolved before the final choice was made. Low rear-end drag is achieved by retaining the rounded fuse- lage cross-section right through to the tail, with gently tapering contours in both plan and side elevations. Relatively little up- Continued on page 334 after cutaway drawing of the Andover

Upload: petrusoptimus

Post on 06-Jan-2016

244 views

Category:

Documents


2 download

DESCRIPTION

Andover C.1 for RAF

TRANSCRIPT

Page 1: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 1/10

  Flight photograph

ANDOVER C.1

Multi-purpose rear-loader now in service

HE AIR ST AFF S PLANNERS

  decided in 1961 that they needed

a replacement for the RA F s ageing Valetta and Hastings

short-range transports which even then had another in-

tensive campaign to serve. In that, the Malaysian-Indonesian

confrontation, the veterans were called upon to mount a cease-

less par adro p logistic-support opera tion, supplying troops in

virtually impenetrable jungle. They did it, and they did it well,

as

  light

  saw at first-hand, bu t the disadvantages of the old

side-loaders, with a strict limit in the size and weight of para -

drop loads, and the slow delivery rate consequent upon loads

being man hand led down the fuselage and rou nd throug h the

door, were really driven home. The immense operational

advantages of rear-end loading were obviously to be required

in any replacement but the same aircraft had not only to serve

as a tactical freighter and p ara troo p transp ort, while possessing

good STOL qualities, but be usable across the whole spectrum

of RAF short-range transport operations. This meant, among

other things, hauling dependant families from time to time, and

use on casualty evacuation flights. Pressurisation, a long ferry

range and quick convertibility of the interior were also pre-

requisites therefore.

For economic reasons it was decided that the transport must

be a derivation of an existing aircraft, rath er th an evolving

from a clean sheet of paper. Britain was in the fairly unusual

Position of having two directly competitive commercial trans-

ports, the twin-Dart HS.748 and Handley Page Herald, at that

time, both of which qualified for consideration as the base

ircraft for the project. In one of the most hotly contested

contract battles waged between two British airframe companies

or many years, and after a lot of politicking and front-page

olumn inches, the contra ct was awarde d to Haw ker Siddeley s

Avro Whitworth Division to go ahead with its 748MF (Military

ghter) project, otherwise known around the group s M an-

ndover.

The civil 748 had made its first flight in June 1960 and the

irst production aircraft was delivered in Jan uary 1962. After the

October 26, with delivery of the first aircraft required exactly

two years later, on October 26, 1964. Due to extensive changes

which were subsequently specified, this date was put back and

the aircraft received its CA release in Februa ry 1965. An in-

terim contract ha d-b ee n awarded in 1962 which ran until

April 23 and the main contract was signed on April 22, 1963.

On December 21 that year the maiden flight was made of the

rebuilt prototype 748 with the new, upswept ramp-equipped

rear-end, and the more powerful D art 12 engines of the

Andover, but lacking other features of the definitive military

transport. Flight development of this aircraft was followed on

July 9, 1965, by the first flight of the first production aircraft.

Since then delivery has reached the rate of H aircraft a

month (on an assembly line at Woodford separate from that

of the commercial 748 airliners) and the last of 31 ordered

for RAF Air Support Command is about to be delivered. The

Andover is already hard at work adding a new dimension to

RAF short-range transport capabilities in the United Kingdom

and the Far East and within a few months a Middle East

squadron will be formed.

The Rolls-Royce Dart R.Da7-powered 748 Series 2 was taken

as the base aircraft from which the Andover was evolved. This

aircraft was fully described, with a cutaway drawing, in

  light

for June 3, 1960, and the changes made will be described in

this article, rather than a full description, including the common

parts, being given.

Extensive wind tunnel testing was run to evolve the Andover

rear fuselage. The conventional beaver-tail shape adopted for

such rear-loaders as the C-130 and the Belfast gave high drag

characteristics which threatened the long unrefuelled ferry range

requirement of 2,700 n.m. with the relatively high s.f.c. Dart

R.Dal2 engine, which was preferable on every other score.

Five basic designs of rear fuselage, with sub-variants, were

evolved before the final choice was made.

Low rear-end drag is achieved by retaining the rounded fuse-

lage cross-section right through to the tail, with gently tapering

contours in both plan and side elevations. Relatively little up-

Continued on page 334 after cutaway drawing of the Andover

Page 2: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 2/10

  t

 

p

 

f

«

e

I l i f fe/Transport Publications  Ltd

The

  salient features of the Andover C.I  tactical transport, which shares some common structure with  the HS.748 comm ercial short-hauler but

is nevertheless much modified, are  shown in  this Frank Munger drawing.  The fuselage has been extended b oth fore  and aft, the tail  surf ces

redesigned, the wing centre-section extended

 to

  accommodate the  larger propellers of the  more powerful Dart  12 engines, and the  wingtips

cropped

 to

  leave  the  overall span unchanged. A  radically  new  kneeling and long-stroke un dercarriage  see far  right)  has been fitted

ANDOVER

 C.1\ . .

1 Front pressure bulkhead

2 Electrically heated windscreen

3 Forged windscreen frame

4  DV panel

5 Pull- in slide window

6 Heavy frames, terminate  at pressure

f loor

7 Pressure floor

8 Flight deck f loor

9 Heavy structure supporting pressure

floor and nose gear

10 Continuous Z-section str ingers

11 Uncut frames

12 Frame/skin segment plates

13 Single-pressing door frames

14 Freight/crew door 48in x 54in

15 Spring balance link

16 Doubler plates

17 Stringers doubled up in  this area

18 Window retaining clamps (windows

I9in x  I3in)

19 Fabricated fuselage/wing m ain frames

2 Wing/fuselage joint ( forging  and

plate, multi-bolt fixing

21 Frames bolted to  main ribs

22   Str inger carry-through f it t ing

23   Fuselage inter-spar skin support at

ribs

24 Spars form pressure boundary

25 Top skin forms pressure boun dary

26 Floor support structure

27 Diagonals brace seat rails  for  axial

loads

28 6,7001b lashing point

29 Paratroop door  69m x  30in (pull- in

and slide)

3 Two-stage ramp jack

31 Ramp latch

32 Ramp latch cylinder

33   Door l inkage

34 Door l inkage torque tube

35 Emergency jettison handle

36 Door release lock handle

37 Ramp in  pressurised area

38 Clamshell doors  in  unpressurised

tail cone

39 Troop static- l ine

40 Load drop static- l ine

41 External door-release

42 Hinged rear pressure bulkhead

43 Interchangeable tailplanes (15°

dihedral)

44 Built-up fail-safe braces

45 Crack-I imit join t

 at 67 per

 cent depth

46 Double-L-section bottom boom

47 Boom stabilising brackets

48 Web stiffeners

49 Single-L-section boom

50 Tank

 end

 ribs

51 Tank baffle ribs

52 Str inger carry-through

53  Rib safe w ith  any tie broken

54 Str inger / r ib tie

55 Extruded Z-section

56 Extruded T-section

57 Skin in crack-limit ing panels

58 Skin butt joint

59 Tip  N A C A  4412;  I8SWG bot tom

sk in ,

  I6SWG top

60 Main root r ib  NACA 23018: I4SW G

bottom   skin,  I0SWG

 top

61 Stringer joint plates

62 Str inger carry-through

63 Inspection-hole doubler plate

64 Doublers

 at

  flap tracks

65 Fail-safe hinge brackets

66 Detachable leading edge

67 Hinged leading edge

68 Wing-to-centre-section butt-strap

69 Flap track

70 Flap/rib bridge-piece

71 Ribs take load oh  track failure

72 Back-to-back channel section over

skin

73 Back-to-back L-section

74 Built-up fail-safe bracing

75 Hatch for flap-gear access

76 Hinged radome

77 Hinged fair ing

78 Removable top nd side panels

Outboard cowling panels only

shown

nterchangeable port and stbd

81 Cowling stays

82 Inspection, cabin-air

83 Inspection, electr ics

 bay

84 Inspection, tank and w ing

85 Emergency door 48in

 x

 30in

86 Tail prop strut socket

87 Folding trooping seats

88 Static point

89 Ai r mileage reco rder

90 Stall warning

91 Compass detecto r u nit

92 Galley

93 Toi le t

#o isemtn

79

  I Ou

V she

8 J Int,

A

Al

A2

A3

A4

A5

A6

A7

A8

A9

AI0

Al l

AI2

AI3

Cabin Air System

Cooling-air intake

To cabin via non-return valve

Heat exchang er (no rmal system)

Heat exchanger (cold  air system)

Cold-air unit

Water separator  on  deliver,  to

r iser

Cooling-air outlet

Pressure dump-valve (manual

Temperature control valve

Ground condi t ion ing

Flight deck riser, radio eoolmr

Compressor

 to

 heat exchange"

 a

temperature contro l

Heat exchanger

  to

  temperature

contro l

Page 3: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 3/10

FLIGHT  International 31  ugust

  967

  334 -335

 

I

t Godfrey cabin-air blowe r

 and

 ou t le t

o

  ^

e n s l n

8

  an<

* con t ro l un i t

  Compressor intake

Discharge valve 4 .4lb/sq

 in

 and

  inward

A n t i n g

- A n t i n g

Duct relief valve

Contro l

Aileron controls

Elevator controls

Thro t t le

C4

  HP cock and feathering

C5

  Control rods under f loor

C6 Cable tensioners

C7 Cont ro l lock

C8 Mass balance

C9

  Trim screw-jack

CIO

  Duplicated control rods

C l I

  Torsion bars

C I2  Tab

 torsion

 bar

C I3

  Main torsion bar

C M Cont ro l input

CIS

  Ou tp u t  to tab

C l

Tr im

 tab

C I7

  Spring

 tab

C I8

  Duplicated torque tubes

C I9

  Interconnecting chain

 and

sprockets

C2 0

  Flap-operating cable

C2I

  Tab-operating linkage

C22

  Electric flap mo tor manual

emergency)

E Emergency Syitemi

E l

  Compressor bleed

  to

  pneumatic

de-icing

E2

  De-icing

 air

 f i l te r

E3

  De-icing suction

E4   De-icing pressure

E5

  Discharge from venturi

E4

  Solenoid distributor

  valve

fULLY KNELT

HORM L  ST TIC

E7 Connectors to  boot

E8 Fire  wal l , zone  I

E9 Fire wal l , zone

 2

EIO

  Double-headed  121b  f ire bott le

 each nacelle)

E l l

  Fire suppression  to  zones  I and 2

E I2

  Electric de-icing

EI3

  Pressure-locked outw ard-o pening

emergency hatch

E I4

  External handle

EI5

  Fire access panels

EH

  De-icing boot chardwise tubes)

EI7

  De-icing boot spanwise tubes)

E18

  Door-jettison hinge shear

 pin

Key

 continued

  overleaf

Page 4: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 4/10

336

FLIGHT International

3

August

KEY

 TO

 CUTAW AY DRAWING

  Continued from previous page)

F Fuel System

Fl  Integral tanks (1,440 Imp gal,

addit ional  860 Imp gal opt ional ,

see

 F5)

F2   Pressure refuelling point

F3   Vent

F4   Contents unit

F5   Alterna tive tank-end  rib for ex-

tended tankage

F6   Collector tank

F7   Booster pumps

F8 Ground service cock

F» Water-methanol feed

FIO   LP f i l ter

F l l  Wa ter-m eth ano l tank s (291-gal

port, 32gal stbd)

F I2   Fuel heater

F I3   Cross feed

F14   Fuel heater

 air

 exhaust

H Hydraulic and Electric power

H I  Electr ical contro l panel

H 2  Circuit breakers

H 3  Hydraulics duct

H 4  Al ternator (30kVA)

HS  Generator  9kW)

H 6  Generator cooling air

H 7  Batter ies (4x28V 23Ah)

H S  Retractable landing lamps

H9 Hydraul ic pump

H IO   Header tank

H I I  Hydraulic equipment bay

H I 2  Hydraulic accumulator

H I S  Pressure gauges

 and

 charging

points

H I 4  Hydraulic service

 bay

H I S  Ramp  and  undercarr iage g round

control panel

P Power Plant

P I  Rolls-Royce Dart (R.Dal2) Mk 201C

P2  Rotol  14ft 6in propellers

P3   Rotol  120 h.p. accessory gearbox

P4   Jetpipe shroud (B rit ish Refrasil

blankets)

P5   Jetpipe-shroud cooling

 air

P6   Stainless-steel accessory drip tray

PT Oil- tank f i l ler

P8 Fil ler drain

P9 Oil-cooler air f low

PIO   Oil f i l ler and dips tick access

PI

 I

  Cowl ing dra in

P I2   Turbine drain

P I3   Pressure relief doors

P I4   Engine breather

P I5   Combustion chamber drain

PI6

  Bay

 venting

 air

R Rad io

R l  Radio control panel

R2   Radio racks

R3   Static discharge wicks

R4

  HF

 wire aerial

R5

  IFF

 aerial

R6   Glide slope aerial

R7   Marker aerial

R8  ADF loop, VHF, VHF2 VOR/LO C,

UHF,  Violet Picture, on fuselage

to p

R9  ADF sense ae rial

RIO   Doppler

R l

 

Decca

R I2   UHF aerial

R I3   Ekco M22I0 search radar

R I4  Rebecca transmitt ing

R I5   Rebecca homing

U Undercarriage

U I  Nose  leg p ivot

U 2  Nose

 leg ram

 pickup

U 3  Up- lock

U 4  Up- lock

 pin

US  Down lock

U 6  Steering linkage

U 7  Externally stowed drag strut

U8 Liquid Spring unit

U9 Door operating linkage

U IO   Pre-closing-door opera ting cam-

track (f ixed)

U11 Main ram

U I 2  Leg-operated door mechanism

I I 1 3  Dunlop ceramic mult i-disc

  an t i -

skid brakes

U I 4  Dunlop tyres 34 x  11.75-14 71/77

Ib/sq  in (tubeless)

U I S  Dunlop tyre  8.5x IO.5Slb/sq  in

( tubed)

U I 4  N i t r ogen

U I 7  Hydraulic kneeling facil ity

Paratroop seats

  and

  restrainer nets which replace s eat belts

  for

fully equipped troops)

  and at

  rear

the

  upward-hingeing sectional

rear pressure bulkhead.

  In the

  casing

  by the

  starboard emergency

door  is a  wheel-packed 26-man dinghy

ANDOVER

  C 1

sweep

 of the

 fuselage cen tre line

  was

 necessary

  if

  drag

  was to

be kept  low but this in  turn made  the design  of the rear door

and ramp more complicated.

The solution

  to the

 difficult design p rob lem

  was to

 have

 the

fuselage rear opening closed  by  three sections,  an  upward-

hingeing ramp door forward  of two outward -hingeing clamshell

doors which ' themselves  are  divided, each into  two  longitudinal

sections,  the  inner sections folding inward  to  reduce  the

excrescence  in the airstream when  in the  open position. These

doors continue virtually

 to the

  tail extremity,

  to

 give maximum

loading headroom.  To  overcome problems  of  complexity and

weight  in  pressure sealing  the  clamshell doors,  an  ingenious

rear pressure bulkhead, hingeing down from   the roof  to join the

rear end of the ramp, was designed. To fit the roun d fuselage

contours  in the  raised position,  it was necessary  to  make this

component sectional,  too with  two  side wings which droo p

close

  to the

  fuselage roof

  in the

  retracted position

  and

 which

ar e

 in

  plane with

  the

  middle section

 in the

  lowered, pressurised

position.

  The

  central section

  has a

  vertical slot

  to

  accommo-

date

  the

  para-dropping static line which,

  at its

  rear

  end is

anchored beyond

  the

  limits

  of the

  pressure cabin. Th is slot,

an d

  the

 periphery

 of the

 rear pressure bulkhead,

  are

 sealed

 by

self-inflating servo seals

  of

  silicon* rubber with teryknc

  net

reinforcement. These

 are

 tubular with

 an

 attachment strip inside

and holes are simply  cut in the  outer tubing for the attachment

screws.

The lightweight two-section clamshell doors thus need   no

pressure seals, neither  do  they have aerodynamic seals. They

are geometrically locked  in  both open  and  closed positions; if

there  is a  loss of  hydraulic pressure when  the doors  are  open

they are not closed  by air loads in the path  of  departing loads.

Knowing that rear-loaders,

  and

  particularly ramps, come

 in

for plenty

  of

  physical abuse

  in

  hard service,

  the

 design team

aimed  to  make  the back  end  very robust. Very  big  extrusions

  F l igh t copyr ight drawing

Page 5: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 5/10

International, 31 August 1967

337

  to descend as the shoot bolts slide into place. Bulkhead

  roof aft of the pressure bulkhead, is stowed the

ractor parac hute for mass daisy-chaining drops of pallets.

Although the basic 748 empennage was dictated by the

limits inside which the A ndover was conceived, con-

the case with the civil aircraft, but bolted to heavy frames

  \°

  to star-

e inboard ends of the eleva tors ineffective. The ta ilplan e and

Substantial reinforcement of the wing rear spar was necessary

take the STOL landing loads—vertical speeds are 13ft/sec

e installation of the R .D al2 an uncom plicated affair, despite

2,970 s.h.p. we t take-off pow er against the 2,030 s.h.p.

ke-off we t power of the R.Da7 in the 748 Series 2.

n com plication came from the larger, 14ft 6in-dia pro-

to give the necessary prop/fuselage clearance. The tips were

cropped by 18in each side, to leave the total span unchanged

at 98ft 3in. Despite the beefing of the wing which was neces-

sary, opportunities were taken in the light of experience on

the civil aircraft to save weight on the wing structure. The

outboard tank end rib was moved farther out, to increase fuel

capacity each side from 550gal to 720gal. Spring-tab ailerons

were substituted for the servo-tab controls on the civil 748

and the Fowler flaps were modified. Maximum leading-section

extension angle is 30° (instead of 27^°) and that of the trailing

section another 80°, to produce a re-entrant effect and the 6°

approach angle necessary for STOL landings.

Low-pressure tyres of 34in-dia (instead of the original 32in)

demanded minor nacelle changes while the greater gross-weight,

STOL landing loads and the need for greater ground clearance

for the bigger props all demanded a new undercarriage, de-

signed by Dow ty-Rotol. The main feature of this, the kneel-

ing facility to permit adjustment of ramp-end height to suit

various lorry-bed heights, is already well known. To prevent

accidents in kneeling on to ground obstructions the kneeling

undercarriage, together with the ramp, can be controlled only

from outside the aircraft, at an external panel on the port side

near the ramp, once the pilot has selected a master switch.

Kneeling can. however, be cancelled from the cockpit, the

pilots being able to unkneel, clean up the aircraft by closing

all doors, and getting away. There is lateral adjustment of the

kneeling facility, for sloping ground. A safety device prevents

kneeling without sufficient system pressure to unkneel being

available.

Though the aircraft is cleared for two-pilot operation and

the flight deck bears a close resemblance to that of the civil

airliner, the RAF specified a full navigator's position and seat-

ing for a supernumerary crew member. Installation of the side-

mounted navigation console (the nav's seat turns forward for

take-off and landing) was off-set, in terms of volumetric

capacity, by the extension of the forward fuselage by 3ft to

balance the increased length of the rear fuselage.

In keeping with its multi-purpose role—which means trans-

porting passengers in reasonable airliner-like comfort on

  radar and pro-

for a D ecca flight log

iately in front of the powe r

propeller p itch levers are

  this flight-deck   view

  rear door and ramp control,

switches for the paratroop

  of the co-pilot s

  T

  R F  Andovers have this well

navigator s station on

  opposite the

  door

Details:—

' folding supernum erary seat

  *

s t r o

  navigation window

supply and mask stowage

  Electrics

oppler

a s t e r  c o

m p i s s

Decca

Rebecca

 

bo x

eri

«ope sextant

t-up Periscope  sextant platform

Page 6: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 6/10

Left:  This 3,500lb-pull freight winch, w eighing 1801b, which anch ors

 to

  freight lashing points,

  is

  part

  of the

  role equipment

 and is

  driven

from  the  aircraft electrics. Pull  is  adequate  to  draw  a  disabled Ferret scout car up the  ramp. Right:  the  general-arrangement  dr wing

shows

 a

  normal side elevation

 and

 another with

  the

 undercarriage knelt

and the

 ramp

  and

 clamshell doors open

ANDOVER  C.1 . . .

scheduled military services as well as  fuly equipp ed p aratro ops

on urgent operational occasions, the Andover  has a  fully hard-

trimmed cabin interior,  and two  carry-on toilet units  can be

installed,  one forward  by the  navigato r s station   and one aft

by  the  starboard emergency doo r. Inside  the  forward door

is

 an

 emergency equ ipmen t cabin, which houses parachutes

 and

a 26-man wheel-packed dinghy—which  can easily be rolled aft,

or forward

  to the

 forward door.

 A

  galley unit

 can be

  installed

in  the  forward area. There   are  folding hat-racks  and  four

aeromedical station boxes  in the  cabin walls. The cabin floor

has seat/lashing fittings on a  standard 20in grid and HSA Mk 2

roller conveyors, with side guidance,  can be  swiftly installed.

A light-weight winch, which plugs into a  heavy power socket in

the cabin  roof, has been developed   as  part of the comprehen-

sive range

  of

  role equipment,

  to

  haul heavy goods into

 the

aircraft—the hauling cable passing beneath loads already

embarked. This

  is

  sufficiently powerful

  to

  pull

  an

  inert Ferret

scout  car into  the aircraft. Lightweight r am p extensions—only

1051b  the  pair—are carried   as  standard  and  these,  too, are

stressed  for  weights up to  that  of the  Ferre t  Up to

  1,2001b

can  be carried on the ramp  in  flight. For the  important long-

range ferry case  two  850gal cabin tanks   are  carried, these

gravity feeding  the ordinary fuel system thro ugh   two connector

panels

 in the

 cabin walls.

The aircraft  is  considered  too  narrow   for  double stick

dropping  of  paratroopers  the  And over s cabin cross section,

dictated  by 748 d imensions,  is  certainly  on the  slim side  for

the military transport role); thus, only  the por t rear side door

is used

  for

  paratrooping, this being

  a

  plug-type door moving

on parallel link hinges, with

  the

  com plete ly smooth sill

which

  was an

  operational requirement. Twenty-six paratroops

an d  two dispatchers  can be  carried  in  this role   on  sideways-

facing seats which fold  up against  the  cabin sides. Other items

in  the range  of  role equipment designed   by  Hawker Siddeley

are stretchers  and associated fittings, w hich  can be stowed near

floor level beneath  the  seats when  the  aircraft  is  used  in the

trooping role. As an  aeromedical transport  the  Andover can

carry

  up to 18

  stretcher cases

  and a

  further eight sitting

 pas-

sengers,  who  might include am bulato ry patients  as  well as

nursing personnel.

  In the

  ordinary trooping

  and

  passenger

transport role, standard Shorts-built  Air  Support Command

rearward-facing seats

 are

 installed

  in

  pairs,

 up to a

  maximum

of  44, with  the passengers kitbags   or  other luggage restrained

behind nets on the rear-loading ramp .

HAWKER SIDDELEY ANDOVER

  C.I

  DATA

Powerplant  Two Rolls-Royce  R.Dal2  Mk 20IC turboprops of 2,970 s.h.p.

 mini-

mum we t power take-off rating.

Dimensions  Length 78ft; span 98ft 3i n; height 30ft l in; wing area 83lsq ft; aspect

ratio

  11.61;

 max fuselage dia 8ft 9in; max internal width 8.1ft; gross usable volume

2,200cu ft.

Weights  Manufacturer's empty wt 26,6151b; basic operational wt 27.9141b; APS

wt 28,6421b, max payload (inc role equipment and water/methanol) 'jj i'-jS?'

max zero fuel wt 44,0001b; design gross wt 50,0001b; max landing wt 47,6001b;

STOL landing wt 42,0001b.

Performance ISA conditions)  Take-off to 35ft, 50,0001b, s.l . 2.400ft—balanced

field length 3,420ft; rate-of-climb, 50,0001b, max climb power, s.l. t,l60ft/min:

service ceiling, at max cl imb power 23,8001b; cruising speed (TAS) at max crujs*

power, 45,0001b, 20,000ft 224kt; landing field length from 50ft, 47,6001b, s.l. 3,850ft.

stalling speed (EAS), 50,0001b, no flap IO9kt, 10° flap 99Jkt, 22*° flap 88kt;

46,700 Ib, 10°flap 97kt, 221° flap 86kt; 30° main flap, flap tab 110 77kt. Payload;

Range Performance (ISA, 30min

  hold,

  200 n.m. diversion plus 5 per cent stage tuei

reserves): maximum payload 250 n.m.; I2,000lb payload 700 n.m.; 4,0001b payloao

  5

n m

-

  Andover

  in  Action:

 page

 3»

Left

Rear-end view, showing

 the

 external hydraulic support strut,  with

  an

  8,0001b proof load, which stows

 n the

 clip on

 the

 rear

  of

  the ramp;

the two-section clamshell doo rs

  in the

  fully open position;

  the

  anchorage

 of the

  static line;

  the

  rearward-shining ramp light  one/

  the

external mesh guard  to  prevent flailing parachute lines from whipping upward  and jamming  in the elevator  and  rudder root slots.

a Dart R.Dal2

  Mk

  20IC engine, with

  2,970

  s.h.p.

  wet

take-off

 power,

 goes

 in. It

  drives

 a 14ft bin

 Dow ty-Rotol p rop

 Flight photograph

Page 7: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 7/10

FLIGHT  International,  3 /  August 1967

AN DOVER C.1 . . .

339

Andover in Action

AMPLE COMMENTS FROM ABINGDON,

  where 46 Sqn, the UK-

based Andover squadron, and the Andover OCU are

based : It's in a class of its own— the RA F has never

had a tactical aircraft as good as this before ; A very good

operator—we're all very pleased with it ; Delightful to fly,

and pretty good to look at ; Wond erful little beast—easy to

look after and exceptionally reliable for the early days. On e

does not have to think far back to recollect aircraft which , on

introduction, have not been welcomed with such repeatable

hymns of praise.

No 46 Sqn started operating with three crews on Novem-

ber 28 last year, and has since built up to a full crew

complement, and has eight aircraft. Andover OCU training

began in September last year and 46 Sqn's build-up has run in

parallel with that of 52 Sqn, at RAF Seletar, which is intro-

ducing the new multi-purpose short-hauler to the Far East

theatre. Within the next few mon ths form ation of a third

squadron, for the Middle East, is due to take place. These

three squadrons, and the OCU, will then account for all the

RAF's force of 31 Andovers, one of which was recently

written off in a training accident at Abingdon.

First operational flight with passengers for 46 Sqn took

place on Feb ruary 14 after an intensive work -up period . This

was an aeromedical evacuation flight from W ildenrath in

ermany; the squadron has done several more since and the

intention is that the comfortable pressurised Andover should

eplace the unpressurised Pembrokes which are still operating

the medical run on a scheduled basis. Training had taken

quadron aircraft as far afield as Gibraltar, Norway and

Cyprus when

  light

  visited the unit recently. The squadron's

main commitment is transport support for the Army, and it

is an organic pa rt of the Strategic Reserv e; there is, therefore,

policy to keep it untrammelled by commitments to fly any

regularly scheduled runs, save the aeromedical service.

Most Andover captains are Transport Command men

astings though the CO, Sqn Ldr M. J. Rayson, had been

lying a desk after tou rs on Beverleys and RC AF No rth Stars.

o-pilots are largely first-tour men straight from training; while

he initial navigators on the squadro n ha d previous transport

ours,

  the newest are mainly first-tour men, too.

Very intensive work-up flying is taking place at the present

e squadron's notice board , with 25 planned for the following

ay. The aircraft h as earn ed all its clearances; the crews,

aratroop door—a larger radius aft jamb to prevent static line

s aircraft had b een modified; and m odification of the

Aircrew work-up and role training naturally involves the

dron in operation—they , too, mu st become fully familiar

  light

  flew.

  d took the co-pilot's place; additional to the remaining crew

Tk' °^

  c o u r s e

> there was the Army dispatch team of four.

Three one-ton loads were already lashed in place (the maxi-

m is six—limited by volume rath er than by weight) and

ther than automatically as daisy chain all-in-one dropp ing

  Flight photograph

Above:   a one-ton load goes over  th e  sill of an Abingdon-

based 46 Sqn Andover during training drops at Watch-

field Wilts, from a height of SOOft. The second

operational Andover squadron at the present time is

52 Sqn at RAF

  Seletar

Singapore, one of whose air-

craft below) disgorges a well manned and armed

Land-Rover. Bottom, a one-ton container goes into

an Andover for practice dropping from Abingdon

  Fligh t photograph

Page 8: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 8/10

340-341

FLIGHT lnurn

mm o

  j

• 31 August

  (967

ANDOVER   IN  ACTION  . . .

involves. Take-off weight

  was

  44,8001b. When

  the DZ was

sighted

 and the run in had

 begun,

 for the

 dro p from 500ft,

 the

dispatchers already

  had the

  first load unlash ed,

  but

  chocked

to prevent rearward movement. Action stations—chocks away.

Now

  all

  that restrained

  the

  load

  was a

  small nylon cord

  at

the forward

  end. By it a

  dispatcher stood, knife

  in

  hand.

 The

dispatch commander stood

  on the

  starboard side, hand over

the load, watching  the Go light  and  ready  to  give  the

thumbs-up which would signal the away.

Forward,

  the

  navigator

  was

  standing

  up

  behind

  the

  pilots,

ready with

  the

  correction factors

  to

  apply

  for

  wind drift

 and

the time

 lag

  between giving

  the

  drop order

 and the

 load going

over

 the

 sill. Fo rty yards right, 370yd early,

he

 said.

 Aft, the

check

  AQM was

  ready

  to

  time

  the

  lag— sill time —the

 aim

in training being

  to

  reduce

  it. Ten

  degrees

  of

  flap

 was

 giving

the gentle nose-up floorline which would help

  the

  load

  get

away—a rearward slope  of  about  5°. IAS was  105kt. The red

readiness light  was on;  then came  the  imperative Green on.

The dispatch commander both  saw it and,  through  his  head-

set, heard  it. Up  went  his  thumb, down went  the  knife  and

the suddenly severed nylon tether snaked away from   the

blade. The dispatchers shoved. Load mo ving, load gone, said

the AQM, and there  was both  an  audible  and physical thum p

as  it  went over  the  sill. Then  it  reappeared  as our  distance

from  it  grew, swinging very gently beneath  its red  canopy,  a

bright splash  of  colour against  a  grey-green, overcast country-

side. Five seconds sill time, said the senior A QM .

We flew very wide  and  untypical circuits  for our  second

and third drops,

 to

 clear

  the

  Royal Military College

 of

  Science

at Shrivenham— the College of  Know ledge said the captain—

which gets angry should modern science

 and

 technology actually

manifest itself audibly through

  any

  open window. After

  all

three loads

 had

  gon e, with satisfactory results,

  the

  dispatchers

moved their forward seats

  aft to

  restore trim

  for the

  landing,

made

  at a

  runway target threshold speed,

  Vat, of 91kt,

 with

27°

  of

  flap

  for a

  normal landing. STOL touchdowns require

30°,

  with propeller reverse pitch selected

  in the air a few

seconds before touchdown. Reverse

  is

  used only

  for

  STOL.

Dropping speeds vary between  105 and  120kt  IAS  accord-

ing  to  stores, and are  arou nd 110-115kt  for  troops,  who are

dropped with 22±° flap selected from  a  height of  800ft AGL.

All  46  Squad ron's m aintenance  is  done  in the  open, under

portable floodlights  if  necessary, and the  aircraft only  see the

inside

  of the

  Tech W ing's hangars when they

  go in for

scheduled servicing after 240hr flying. This check takes five

days.  The  squa dron engineering officer rep orts  a  very good

mean time between defects with  the  Ando ver— the aircraft

operated straight away without snags. Even such  a  smooth

and trouble-free introduction into service  has its  drawbacks,

however— the lack  of  troubles  to  rectify gives little technical

feedback  to the  maintenance trades  and  probably slows  up

their familiarity with all parts of the aeroplane, he said. The re

John Marsden s drawing shows an RAF Andover in

typical freighting configuration, with the forward

toilet unit installed, and a Ferret scout car and

Land-Rover quarter-ton truck comprising the load.

Also shown is one of the two 8S0gal cabin-fitted

ferry tanks, which give the Andover a 2,700 n.m.

unrefuelled ferry range  ~-l.

  Pilot

2 Co-pilot

3 Supernumerary folding seat

4 Navigator s position

5 Rebecca aerial

6 Periscopic sextant

7 Astro-navigation window

8 Very pistol

9 Radio racks

10 Freight/crew door, 48in

  X

  54in

  Removable toilet

12  HF aerial

13 VHF aerial

14

 ADF

 oo p

15 VOR aerial

16

 UHF

 aerial

17 Upper formation-keeping lights

 

18 Freight lashing points

19 Freight floor, reinforced uniformly

to carry load

 of 2 1

 b/sq

 ft

20 Ferry-tank connecting panel (two)

21 Protected lights

22 Overw ing emergency exits  one

each side)

23 Emergency door 48in

  x

  30in

24 Paratroop door 69in

  x

  30in

25 Tail ramp

26 Clamshell doors

27 Ramp extensions (stowed both sides)

28 Hinted rear pressure bulkhead

29 Dinghy stowage

30 Vortex generators

31 Auxiliary ferry tanks  (two may be

carried  in fuselage)

32 Main undercarriage unit, fully kneel-

ing (lower wheels shown in normal

static position)

33 Rolls-Royce Dart  12  engines

34 Rotol  14ft  6in-dia reversible-pitch

propeller

35 Aircraft shown  in  freighter  con-

figuration carrying Ferret

 Mk 2/3

scout car and

34 Land-Rover Mk 5 |-ton truck

Page 9: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 9/10

team of Army dispatchers, with RAF air quartermasters, during load -dropping operations.

a dispatcher slashes the one remaining nylon tether after all other restraints have been

Centre, the load begins to move over the roller track, assisted by a downw ard 5°

slope trimmed in for the purpo se and,

  right

it's smack on the DZ. M anually discharged

leave the ramp at an approximate relative speed of 10 m.p.h.; parachute-extracted daisy

loads of up to six one-ton pallets reach 40 m.p.h. over the sill

© Hiffe Transport Publicitions Ltd 967

Page 10: Andover C.1

7/17/2019 Andover C.1

http://slidepdf.com/reader/full/andover-c1 10/10

 4

FLIGHT International 31

  August 1967

ANDOVER IN

AC TION . . .

Sq n  Ldr M. J.  Ray  son CO of 46  Sqn

at Abingdon, noses up close  under

the open ramp of another  squ dron

aircraft for Flight photogr pher

Tom Hamill to get this picture

were the usual crop of radio troubles; any snags we got with

the hydraulics have now disappeared; the electrics are very

good indeed, and we haven't had a snag with the kneeling

undercarriage. Likewise the engines—we went six months

before we got our first engine change. It takes seven hours,

with a team of four men. Prop changes take two.

The Dart 12s are being run to 600hr t.b.o. for the first

sampling, with 800hr targeted for the second sampling. Thing s

are reasonably accessible on this aeroplane and we can

normally turn it round inside the hour. There have been very

few defects at the rear end, save one rather bad snag on a

ramp when the sequencing went wrong and the ramp jammed

down.

Man who's lived longest with the Andover at Abingdon is

Sqn Ldr H. Ogilvie, CO of the OCU and formerly RAF project

officer on the type with HSA. Sqn Ldr Ogilvie, a South

African with 24 years' unbroken RAF flying, is as keen an

Andover enthusiast as one can find and very recently took

great pleasure in demonstrating it to senior US officers during

a series of dem onstratio n flights in W ashington. STO L is a

new concept on aircraft of this type in the R A F and there is

also,  of course, a new c once pt in crewin g, with n o signaller or

flight engineer. The p ilots are k ept very busy, bu t they find

the aircraft delightful.

Course s at the OC U la st 19 weeks, for bo th pilots and navi-

gators, and 90 per cent of the trainee captains are from other

Air Suppo rt Com man d sq uadro ns. The O CU has 18 instruc-

tors—pilots, navigators, AEOs (to supervise pilots' radio

procedures) and A QM s. No m anu factu rers' courses are in-

volved for R A F trainees, all gro und instruction being given

at Abing don by R A F perso nnel. T he first six weeks are

devoted to ground instruction; 13 weeks' flying training

follows. The Andover OCU is also responsible for the train-

ing of crews for the R A F s few Andov er C C.2 VIP transports

— The Shiny Boys —w hose aircraft are geometrically iden-

tical to the civil 748 but installationally identical to the C.I.

Co-pilots for the Q ueen's F light And overs are also trained at

the OCU, but the captains' training is done by the Queen's

Flight itself at Benson.

ROBERT R RODWEIX

THE BACK STAGE PLAN

Four hundred aircraft will take part in Battle of Britain

commemoration displays at nine RAF stations on September 16.

RAF Fighter Command, responsible for overall planning of

the event, has revealed details of the planning.

The calculation of split-second timing, so that aircraft flying

from station to station to give displays arrive exactly on time,

while doing so safely and without disruption of civil traffic, has

resulted in an immense 150-page operation order. In general,

aircraft will fly routes and altitude chosen to avoid controlled

air spaces and prohibited areas. Where faster formations over-

take slower ones, or where there is conflicting traffic, a height

separation is given and each pilot has notes warning him of

proximity of other aircraft. For example, a Shackleton per-

forming at Leuchars, Acklington, Finningley and Coltishall

will fly between stations at 180 m.p.h. and 3,500ft and is

warned that on the first leg he will be overtaken, on the same

route, by a Britannia flying at 280 m.p.h. and 5,500ft; at

different times on the second leg he will be passed by a Sea

Vixen at 340 m.p.h. an d 5,500ft and by four Phantoms and

four Super Sabres at 400 m.p.h. and 5,500ft. The Shackleton

crew will know just where and when the other aircraft wili

come into view, similarly, pilots of the faster aircraft will

know they will pass the Shackleton at a given point and

time.

The time-table cannot be flexible and if, for some reason,

a pilot cannot meet his ETA at a given station, he will inform

the station by radio and be instructed to by-pass outside the

display area, or cleared to do his turn a t an am ended time, he

will go on to his next scheduled station, adjusting his speeti to

arrive at the right ETA. All pilots' watches are synchronised

and meteorological reports will be issued giving significant

weather changes. All weather contingency plans have been pre'

pared. Touring formations will fly between  1 700ft  and 5,500tt.

descending to 500ft and

  1 000ft

  to cross airfield boundaries-

These formations alone will fly some 1,500 miles in three hours

on September 16.