aniwatta lte final uat document

22
8/10/2019 Aniwatta LTE Final UAT Document http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 1/22  1 OK 2 OK 3 N/A 4 N/A 5 N/A 6 OK 7 OK 8 OK 9 OK Project Manager FTK Vendor Project Manager Dialog Axiata PLC Regional Manager Dialog Axiata PLC Name/Stamp Signature Date Remarks: Acceptance Report - TX Acceptance Report - Power Others Site Images As built Layouts (Civil/EE) Acceptance Report - BSS Acceptance Report - Civil Content  UAT PASSED DATE: Service BOQ Acceptance Report - EE Supply BOQ With Serial Nos. DIALOG AXIATA PLC ACCEPTANCE AND TECHNICAL INSPECTION REPORT FOR LOA5-INDENT-6 2G NEW PROJECT SITE NAME: Aniwaththa Dialog ON AIR DATE: SITE ADDRESS: No. 65/31, Dodanwala Passage Golkandawatta, Aniwatta SITE ID: KA0024 SCOPE OF WORK: LTE Upgrade

Upload: madhushan-silva

Post on 02-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 1/22

 

1 OK

2 OK

3 N/A

4 N/A

5 N/A

6 OK

7 OK

8 OK

9 OK

Project Manager 

FTK Vendor 

Project Manager Dialog Axiata PLC

Regional Manager 

Dialog Axiata PLC

Name/Stamp Signature Date

Remarks:

Acceptance Report - TX

Acceptance Report - Power 

Others Site Images

As built Layouts (Civil/EE)

Acceptance Report - BSS

Acceptance Report - Civil

Content

  UAT PASSED DATE:

Service BOQ

Acceptance Report - EE

Supply BOQ With Serial Nos.

DIALOG AXIATA PLC

ACCEPTANCE AND TECHNICAL INSPECTION

REPORT FOR LOA5-INDENT-6 2G NEW

PROJECT

SITE NAME: Aniwaththa Dialog

ON AIR DATE:

SITE ADDRESS:No. 65/31, Dodanwala Passage

Golkandawatta, Aniwatta

SITE ID: KA0024

SCOPE OF WORK: LTE Upgrade

Page 2: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 2/22

No

1

2

3

4

5

6

7

8

9

10

No Sector IDAzimuth

(deg)Antenna Type

Antennas

per Sector

MechDownti

lt (deg)

ElectDowntilt(deg

)

Installed

Height

1 Sector 1 N/A N/A N/A N/A N/A N/A

2 Sector 2 N/A N/A N/A N/A N/A N/A

3 Sector 3 N/A N/A N/A N/A N/A N/A

No Sector ID Tx / Rx

Tx / Tx - A

Rx / Tx - B

Tx / Tx - A

Rx / Tx - B

Tx / Tx - A

Rx / Tx - B

Tx / Tx - A

Rx / Tx - B

25A

VSWR Reading

3

11

1

General Remarks5

4

General Remarks

2

3

1

2

4N/A

1.19

1.17

1.15

N/A

Existing 6+4+3 , 20W per TRX

Existing RRUS 01

1.21

DUG

N/A

BTS/Node B Configuration

1.15

Comments

1.13

RF Cables lengths (if cables areused)

Receive Diversity verification

Antenna type (should be on

Andrew/Kat codes)

6+4+3 , 20W per TRX

Baseband Card Type

MCB rating to the BTS/RBS

TMA Type

Comments

Dual array DCS/UMTS 65 XX Pol

N/A

N/A

Value

General Site InfoSite Name Aniwaththa Dialog Site ID KA0024

RRUS 12

RBS 6601

FTK Vendor Ericsson Date

RRU/RU type

StatisticsEricssonBTS/Node B Manufacture

BTS/Node B Model

Tech Acceptance - BSS system DCS

Site Type/Mast height 36.5m Rooftop Height (RT sites) GBT

07 17 55.0 N080 37 25.3 E

Access Road Type/Distance N/A

Longitude Latitude

Page 3: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 3/22

No

1

2

3

45

6

7

8

9

10

No1

2

3

4

No

1

2

3

4

5

6

7

8

9

10

No Sector IDAzimuth

(deg)Antenna Type

Antennas

per Sector

Mech

Downti

lt (deg)

Elect

Downtilt(deg

)

Installed

Height

1 Sector 1 20Dual array DCS/UMTS 65

XX Pol /Ant-11 0 4 36.5m

2 Sector 2 N/A N/A N/A N/A N/A N/A

Comments

11

Fuse Faliure

TepmeratureBattery Discharge

Type of Alarm

Rectifier Failure

Ok

OK

Value

Ok

Ok

Ok

Mains Failure

Ok

5

Overol instalation condition

Grounding(Indoor/ outdoor)

Labeling(Indoor/ outdoor)

Generator On Load

General Remarks

RF Earth done( 30 m interval) OK

Comments

OK

ValueOK

Ok

Low Fuel

Item description

General Remarks

Door Open

Theft Alarm

Visitor Present

Tech Acceptance - BSS system 4GStatistics Value Comments

BTS/Node B Manufacture Ericsson

BTS/Node B Model RBS 6601

Baseband Card Type 

100*3

Receive Diversity verification N/A

BTS/Node B Configuration 1+1+1 with 20W per PA

RRU/RU type RRUS 12 B3

Antenna type (should be on

Andrew/Kat codes)

Dual array DCS/UMTS 65 XX Pol /

Ant-1Use DCS antenna for LTE

DUS 31 01

MCB rating to the BTS/RBS

TMA Type N/A

11 General Remarks

Page 4: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 4/22

3 Sector 3 N/A N/A N/A N/A N/A N/A

No Sector ID Tx / Rx

Tx / Tx - A

Rx / Tx - B

Tx / Tx - A

Rx / Tx - BTx / Tx - A

Rx / Tx - B

Tx / Tx - A

Rx / Tx - B

No

1

2

3

4

5

6

7

8

9

10

No

1

2

3

4

No Item description Date Signature

1 Installed By

2 Supervised By

3 Accepted By Dialog

NMI Communication

Ericsson

Name Company

VSWR Reading Comments

1 11.12

1.15

2 21.15

1.23

3 31.16

1.18

4 4N/A

N/A

5 General Remarks

Type of Alarm Value Comments

Mains Failure N/A

Rectifier Failure N/A

Fuse Faliure N/A

Tepmerature N/A

Battery Discharge N/A

Generator On Load

Door Open N/A

Theft Alarm N/A

N/A

Low Fuel N/A

Visitor Present N/A

11 General Remarks

Item description Value Comments

Overol instalation condition OK

Grounding(Indoor/ outdoor) OK

Labeling(Indoor/ outdoor) OK

RF Earth done( 30 m interval) OK

5 General Remarks

Page 5: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 5/22

Page 6: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 6/22

Page 7: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 7/22

Page 8: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 8/22

Page 9: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 9/22

Page 10: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 10/22

Page 11: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 11/22

Page 12: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 12/22

No

1.1.1

1.1.2

1.1.3

1.1.4

1.1.5

1.1.61.1.7

1.1.8

1.1.9

1.1.10

1.1.11

1.1.12

1.1.13

1.1.141.1.15

No

1.2.1

1.2.2

1.2.3

1.2.4

1 2 3 4 5

1 2 3 4 5

1 2 3 4 5

1.2.5

Cell voltages string-1

6

Cell voltages string-2

6

Cell voltages string-3

6

Total capacity 800Ah

Number of Strings N/A

Battery Brand Fiamm

Battery Model N/A

1.1.17 General Remarks Rectifier item's return to dialog

1.2 Battery Banks

Item description Status/Details Remarks

Proper cable sizes used OKLVD operation OK

Proper MCB ratings used to connect

loadsOK

Temp. sensor extended towards BB OK

Controller settings for battery

management and other rectifierOK

Critical Non critical load separation OK

Output voltage

Output current

Positive Bus bar is grounded

through rectifier body YESInput voltage

Installed capacity/ (A) or number of

modules5

Rectifier Body connected to MGB YES

Model FP2 HE 16KW 3PH 48VDC

Rectifier module type N/A

General Site InfoSite Name Aniwaththa Dialog Site ID KA0024

FTK Vendor Ericsson Date

Site Type/Mast height 36.5m Rooftop Height (RT sites) GBT

Longitude 080 37 25.3 E Latitude 07 17 55.0 N

Item description Value Comments

Brand N/A

Access Road Type/Distance N/A

1. Tech Acceptance - Power system1.1 Rectifier

Page 13: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 13/22

7 8 9 10 11

1 2 3 4 5

7 8 9 10 11

1 2 3 4 57 8 9 10 11

1 2 3 4 5

7 8 9 10 11

No

1.3.1

1.3.3

1.3.4

1.3.5

1.3.6

No

1.4.2

1.4.3

1.4.4

1.4.5

No

1.5.1

1.5.2

1.5.3

No Item description Date SignatureName Company

Labelling of all equipments Ok

1.5.4 General Remarks

overal Installation condition Ok

Grounding of all equipments Ok

1.4.6 General Remarks

1.5 General

Item description Value Comments

Operation of Controller(if hybrid)

Properly grounded

Insof insallation condition

Labeling

1.4.1 IntakeExhaust

1.3.7 General Remarks

 1.4 Free Cooling, Hybrid System

Item description Value Comments

Remote controller

ODU properly grounded

Settings of Dual Timer

Auto start function

1.3.2

Air Conditioner Model

Indoor Unit

Outdoor Unit

Item description Value Comments

Air Conditioner Brand

12

Cell voltages string-4

6

12

1.3 Air conditioner

Cell voltages string-5

612

Cell voltages string-6

6

12

Page 14: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 14/22

1 Installed By

2 Supervised By

3 Accepted By

ItemName/

No

Status

Minor / MajorDate

Name of Staff Vendor Name/DAP Date Signature

Ercsson

Dialog

Issue List

Issue Description Final Regional Comment

NMI Communication

Page 15: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 15/22

LocationID KA0024

TIMS Site Name Aniwaththa Dialog

SAP Code NU/LTE/14/505

FTK Vendor Ericsson

Item Indented Qty Actual Qty Serial Number

eNodeBDigital Unit DUS 31 Basic HW Module (excl. HWAC, SFP) 1 1 CD3A489471Output Power HWAC 20W->40W (per RU) 3 3

LTE-FDD DL Throughput HWAC (Mbps) 132 132

LTE-FDD UL Throughput HWAC (Mbps) 48 48

LTE-FDD Connected User HWAC 20 20

LTE-FDD DU Optional IP Optical Interface HWAC 1 1

LTE-FDD Cell Carrier 10MHz Bandwidth HWAC 3 3

Dual-TX RRUS-12B3 (1800MHz) -48VDC , 10W+10W HW Activation i 0 0

RBS 6601v2 Main Unit, -48 VDC (no Digital Unit) 1 1 CB4T847415Digital Unit DUS 31 Basic HW Module (excl. HWAC, SFP)

RBS 6601v2 Main Unit, -48 VDC (no Digital Unit)

A-PackSupport kit for Tower/mast 1 1

Marking set, WCDMA 1 1

OVP Alarm Kit, 8 External Alarms 0 0

Sealing Set, Feeder Connectors 12 12

OPTICAL TRANSCEIVER/TRX SM CPRI 614.4-24

6 6

E3M2030841

E3M2031139

E3T2018481E552000508

E552000702

E482003065Earthing cable, 25mm2, 5m G/Y 3 3

2F LC(FullAXS)-LC SM 3 3

EARTH POWER CABLE 1 1

MOUNTING KIT (MK mast brackets short) 6 6

Power Cable, 2x10 mm2, 300m 1 1

2x6mm2 (10AWG) 600V 90C UL 5m coil 1 1

External Alarm Cable, 15m (MU) 0 0

Jumper Cable, 1/2", 3m, 7/16 Male to 7/16 Male, Indoor/Outdoor 6 6

GPS out [DUS<->DUG] Cable 1 1

IDL Connect cable

CONNECTION CABLE/1000 BASE-T, CAT6, STP 1 1

eNodeB SWDefault SW Package L13B 1 1

Default SW Package OSS-RC and ENIQ  1 1

FAJ 121 0906 Mixed Mode in Multistandard RBS 1 1

2G RBSDigital Unit DUG 20 Basic HW Module (excl.Activation Keys) for E1/T1 1 1 CD39951078Output Power HWAC 20W->40W (per RU) 0 0

Output Power HWAC 40W->60W (per RU) 0 0

Output Power HWAC 60W->80W (per RU) 0 0

Output Power HWAC 80W->100W (per RU) 1 1

Output Power HWAC 100W->120W (per RU) 1 1

GSM Cell Carrier (TRX equiv.) HWAC

Dual-TX RRUS-12B3 (1800MHz) -48VDC , 10W+10W HW Activation i 1 1

Dual-TX RRUS-12B3 (1800MHz) -48VDC , 10W+10W HW Activation i

3 4

CB4T051569

CB4T051568

CB4T051564

CB4T051557Dual-TX RRUS-12B8 (900E MHz) -48VDC , 10W+10W HW Activation 0 0

TG-sync support 1 1

RBS 6601v2 Main Unit, -48 VDC (no Digital Unit) 0 0

Page 16: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 16/22

Cable Kit 2m/35mm2 YL/GR 1 1

Sealing Set, Feeder Connectors 4 4

Support kit for Tower/mast 0 0

Marking set, GSM 1 1

OVP Alarm Kit, 8 External Alarms 0 0

POLE MOUNTING FIXTURE CEU 2 2

OPTICAL TRANSCEIVER/TRX SM CPRI 614.4-24

6 6

E4F2036568E4F2039737

E552001043

E552001128

E552001156

E5520002152F LC-LC SM RRUS02, RRUS11 xM 3 3

CONNECTION CABLE/2F LCD-LCD SM (RRUS-01) 0 0

Cross Connect Cable, 2.4m (RRUS-12) 0 0

RRU rx Cross Connect Cable for RRUS-01 0 0

CONNECTION CABLE/2X E1, SIU - DXU-23, RJ 1 1

Power Cable, 2xY mm2, Xm 1 1

2x6mm2 (10AWG) 600V 90C UL Xm coil 0 0

External Alarm Cable, 15m (MU) 0 0

Jumper Cable, 1/2", 3m, 7/16 Male to 7/16 Male, Indoor/Outdoor 2 2

IDL2 Connect cable

2G SWFAJ 121 0816 Mixed Mode in Multistandard 12 12

FAJ 122 081 Synchronized Radio Networks 96 96

Antenna 471.45 471.45

DCS/3G Combiners-2way 0 0

XX Pol Dual Band GSM/DCS/UMTS 90 0 0

XX Pol Dual Array DCS/UMTS 65 1 1 14CN101923761

XX Pol Dual Array DCS/UMTS 90 0 0

Power

Eletek Indoor Rectifier 1 1 141924101223

Eletek Rectifier Modules

5 5

140471193497

140471193773

140471145576

140471143590

140471143351 Rectifier item's return to dialo

Fiamm 12V/100AH Battery 32 32

Eletek Indoor Battery Rack 2 2

Delta Rectifier Modules

Total Price

Page 17: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 17/22

LocationID KA0024

TIMS Site Name Aniwaththa Dialog

SAP Code NU/LTE/14/505

Item Indented Qty Actual Qty

Indoor BTS, Antenna and Cable Installation cost per site

Outdoor BTS, Antenna and Cable Installation cost per site

Indoor Installation cost per site - BTS Only) (for an upgrade) 1 1

BTS Removal and Handover to Dialog Warehouse

1 BTS

2 BTS 1 1

Antenna Installation

1

3

Antenna Removal

3

Antenna Replacement

1 1 1

2

3

4

DCS-UMTS Combiner installation

Power Installation

Rectifier Module Installation

Rectifiers (indoor)-Installation 1 1 Power upgrade pending

Battery Banks- Indoor Installation 1 1

Battery Bank Removal & bring back to Colombo 1 1

Rectifier Removal & bring back to Colombo 1 1

Battery Bank and rectifier Removal & bring back to Colombo

Roof top sites(>3 floors)

Only site equipment (BTS, TXM and Power)e (50m-300m)

Only site equipment (BTS, TXM and Power) (Above 300m)

Page 18: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 18/22

Site ID KA0024

Site Name Aniwaththa Dialog

SAP Code NU/LTE/14/505

Item Indented Qty Actual Qty

 ABC BOX (12 WAY) 1 0

16MMX SIN COR BLU U/A FLEX 15 15

16MMX SIN COR BLAK UA FLEX 15 1516A SP MCB 1 1

25A SP MCB 4 0

4''X2'' CASING (WHITE) 4 4

16MM EARTH CABLE 0 0

1” PVC coated GI flex cond 78 78

ECB, 40X6X300MM 0 0

Feeder Window(3hole Plate) 0 0

19 inch Rack 40U 0 0

50MM DC cable Bat Flex RED 20 0

50MM DC cable Bat Flex RED 20 0

GSM Bracket straight 0 0

Adjustable GSM Dual Brckt 0 0

GSM BRACKET (TMA) 0 0

63A SP MCB 0 0

Installation assesories 1 1

Page 19: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 19/22

Site Name Aniwaththa Dialog Site ID KA0024

FTK Vendor Ericsson Date

Site Type/Mast

height36.5m

Rooftop

Height (RT

sites)

GBT

Longitude 080 37 25.3 E Latitude 07 17 55.0 N

Access Road

Type/DistanceN/A

MW

OK Remark

1 Correct MW bracket installation

2 Correct mounting of MW antennas

3 MW antenna heights and size as per the approval4 Proper sealing of connectors

5 ODU earthing

6 Proper laying of IF cables

7 IF earthing

8 Sufficient usage of cable ties

9 Labeling as per the given guidelines

10 OD surge arrestors

11 Over all neatness

1 Using correct location for IDU installation

2 Correct configuration as per the WO License

Request Send

3 MW link management

4 IDU earthing

5 Correct E1 wiring

6 Using correct rating of MCB in critical side

7 Routing of IF cables inside cabin

8 ID surge arrestors

9 Labeling as per the given guidelines10 Over all neatness

MW

Remark

Tower Equipment installation

Indoor Equipment installation

Tower Equipment installation

Page 20: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 20/22

1 Correct MW bracket installation

2 Correct mounting of MW antennas

3 MW antenna heights and size as per the approval

4 Proper sealing of connectors

5 ODU earthing

6 Proper laying of IF cables

7 IF earthing8 Sufficient usage of cable ties

9 Labeling as per the given guidelines

10 OD surge arrestors

11 Over all neatness

1 Using correct location for IDU installation

2 Correct configuration as per the WO License

Request Send

3 MW link management4 IDU earthing

5 Correct E1 wiring

6 Using correct rating of MCB in critical side

7 Routing of IF cables inside cabin

8 ID surge arrestors

9 Labeling as per the given guidelines

10 Over all neatness

BTS

OK Remark

Tower Equipment installation

1 Correct cellular bracket installation OK

2 Correct mounting of cellular antennas OK

3 Antenna rotatability as per the agreed specification OK

4 Setting correct cellular antenna azimuth and tilts OK

5 Proper sealing of connectors OK

6 Correctly mounting of RRUs. OK

7 RRU earthing OK8 Covering fiber cable with PVC and flexible conduites OK

9 Routing fiber and power cables OK

10 Sufficient usage of cable ties OK

11 Labeling as per the given guidelines OK

12 Over all neatness OK

Indoor Equipment installation

1 Using correct location for BTS installation OK

2 External alarm propergation OK

Indoor Equipment installation

Page 21: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 21/22

3 BTS earthing OK

4 Routiong of fiber and power cables inside cabin OK

5 Usage of cottect MCB to power PDU OK

6 Labeling as per the given guidelines OK

7 Over all neatness OK

Page 22: Aniwatta LTE Final UAT Document

8/10/2019 Aniwatta LTE Final UAT Document

http://slidepdf.com/reader/full/aniwatta-lte-final-uat-document 22/22

Site Images

Site ID KA0024

Site Name Aniwaththa Dialog

Outdoor Installation-Sector_1

Antenna SWAP still not finish

CELLULAR ANTENNA RRU CONNECTIVITY RRU MOUNTING On ANTENNA POLE

Outdoor Installation-Sector_2

N/A N/A N/A

CELLULAR ANTENNA RRU CONNECTIVITY RRU MOUNTING On ANTENNA POLE

Outdoor Installation-Sector_3

N/A N/A N/A

CELLULAR ANTENNA RRU CONNECTIVITY RRU MOUNTING On ANTENNA POLE

DC Power & Fiber Cable Installation

VERTICAL TO RRU CABLE WAY VERTICAL CABLE LADDER JUNCTION BOX INSTALLATION

VERTICAL TO HORIZONTAL CONNECTION HORIZONTAL CABLE LADDER T-SOCKET

HORIZONTAL TO FEEDER WINDOW FEEDER WINDOW(OUT SIDE) FEEDER WINDOW(IN SIDE)

Indoor BTS Installation