annex 6: procurement and disbursement arrangements€¦  · web view · 2016-07-11ct. direct...

160
Procurement Plan for first 18 months of the project Rural Roads Project 2 (PMGSY) This is an indicative plan prepared by the Project for the initial period of 18 months. The Project shall update the Procurement Plan annually or as needed through out the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. This plan has been reviewed during negotiations I. General 1. Bank’s approval Date of the procurement Plan November 24, 2010 2. Date of General Procurement Notice issued for Consultancies only: September 14, 2010. Updated GPN for the complete project is to be issued. 3. Period covered by this procurement plan: First 18 months of the project. II. Goods and Works 1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. Expenditure Category Procurement Method Prior Review Threshold US$ Comments GOODS, EQUIPMENT & MACHINERY 1. Goods and Equipment estimated to cost ICB All contracts World Bank SBD will be used and the procurement will be 59788

Upload: trankhue

Post on 24-Apr-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

Procurement Plan for first 18 months of the projectRural Roads Project 2 (PMGSY)

This is an indicative plan prepared by the Project for the initial period of 18 months. The Project shall update the Procurement Plan annually or as needed through out the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. This plan has been reviewed during negotiations

I. General

1. Bank’s approval Date of the procurement Plan November 24, 2010 2. Date of General Procurement Notice issued for Consultancies only: September 14, 2010. Updated GPN for the complete project is to be

issued. 3. Period covered by this procurement plan: First 18 months of the project.

II. Goods and Works

1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement.

Expenditure Category Procurement Method Prior Review ThresholdUS$

Comments

GOODS, EQUIPMENT & MACHINERY1. Goods and Equipment

estimated to cost equivalent of US$ 300,000 or more per contract

ICB

All contracts World Bank SBD will be used and the procurement will be as per procedures described in World Bank Guidelines

2. Goods and Equipment estimated to cost less than US$ 300,000 and greater than US$ 50,000 equivalent per

NCB First contract for goods for each state , irrespective of value and all contracts estimated to cost more than

The NCB bidding document agreed with GOI will be used and the procurement will be as per procedures described in the Procurement and Contract Management

59788

contract US$ 200,000 equivalent per contract

Manual.

3. Goods and Equipment estimated to cost less than US$ 50,000 equivalent per contract

Shopping procedure with at least three quotations from qualified bidders in accordance with the provisions of paragraph 3.5 of procurement Guidelines.

Procurement through DGS&D rate contracts will be considered equivalent to shopping procedure.

All post review

4. Goods and Equipment that meet the requirements of paragraph 3.6 and 3.7 of Procurement Guidelines.

ct

Direct Contracting All prior review

CIVIL WORKS5. .

Civil works contracts estimated to cost more than US$ 10,000,000 equivalent per contract

ICB * All contracts World Bank SBD will be used and the procurement will be as per procedures described in World Bank Guidelines.

6.Civil works contracts estimated to cost up to US$ 10,000,000 equivalent per contract

NCB First contract for works for each state, irrespective of value and all contracts estimated to cost more than US$ 5,000,000 equivalent per contract will be subject to prior review by the Bank.All other works contracts

The procurement will be done as per procedures described in the Procurement cum Contract Management Manual and using the « Model Bidding Document » cleared by the Bank

will be subject to post review.

* As per current planning, no ICB contracts are envisaged for civil works.

2. Pre-qualification. Not Applicable

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable

4. Reference to (if any) Project Operational/Procurement Manual: A Procurement cum contract Management Manual is under preparation by NRRDA. The manual will be reviewed with the Bank and after clearance of the Manual by the Bank all procurement in the project will be done as per procedures described in it. .

5. Any Other Special Procurement Arrangements:

The following provisions constitute additional provisions applicable for purposes of National Competitive Bidding (NCB). NCB will be conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions:

Only the model bidding documents for procurement of works through NCB agreed with the Bank (and as amended for time to time), shall be used for bidding;

Invitations to bid shall be advertised in at least one widely circulated national daily newspaper, at least 30 days prior to the deadline for the submission of bids;

No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small scale enterprises or enterprises from any given State;

Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder;

Extension of bid validity shall not be allowed for prior review packages, without the prior concurrence of the World Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for prior approved packages, all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/Employer);

Re-bidding shall not be carried out without the prior concurrence of the Bank. The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project;

Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures. Such contracts will be acceptable however for any procurement under the Shopping procedures;

Two or three envelop system will not be used. However, as an exception in this project, two part bidding for NCB works (as described in the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards(e-procurement system and complaint handling mechanism acceptable to the Bank)

All procurement of works through NCB in the seven participating states will be done through a standardized e-procurement system acceptable to the Bank.

As per paragraph 1.14(e) of the World Bank's Procurement Guidelines, the Association's right to inspect the accounts and records of bidders, suppliers and contractors will be included in the bidding documents.

III. Selection of Consultants

1. Selection Methods and Prior Review Threshold: Selection decisions shall be subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Expenditure Category

xValue threshold per contract

Selection Method Prior Review Threshold

Consultancy contracts to be awarded to Consultant firms including selection of training institutes by NRRDA/SRRDAs

Each contract estimated to cost US$ 200,000 equivalent or more per contract

-Quality and Cost Based (QCBS) method -REOI to be published in UNDB on line

All prior review.

Each contract estimated to cost less than US$ 200,000 equivalent per contract

-Quality and Cost Based (QCBS) method-Quality Based (QBS) method of selection in accordance with the provisions of paragraph 3.1 to 3.4 of Consultant’s Guidelines.-Consultant’s Qualifications (CQS) method.-Least Cost Method (LCS).-Fixed BudgetMethod.-Single Source Selection

All single source selection of consultants with estimated cost of more than US$ 30,000 equivalent per contract will be subject to prior review. All other contracts will be subject to post review but with TORs subject to prior review by the Bank

Individual Consultant estimated to cost less than US$ 30,000 or equivalent per contract

-Through comparison of qualifications of at least three candidates.

-Sole Source Selection

All cases subject to post review but with TORs subject to prior review by the Bank. All contracts for single source d\selection of individual consultant will be subject to prior review.

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

Any Other Special Selection Arrangements: NIL

Rural Roads Project II (P124639)Procurement Packages with Methods and Time Schedule

Procurement Plan with Methods & Time Schedule for 18 Months period- for CIVIL WORKS

Sl. noReference Package

No.Contract (Description) Length

(Km)

Estimated Cost (Rs. In Lakh)

Procurement Method

Review by Bank

(Prior / Post) *

Expected bid opening date Comments

* First contract of each State will be subject to prior review by the BankNRRDA - Civil Works  PCU Office Work              None              1. HIMACHAL PRADESH - CIVIL WORKS

1 HP-08-237 Maloh to Saryun road. 3.00 97.00 NCB Post15th May to 31st May 2011

 

2 HP-08-244 C/o Sainj Ropa road i/c 1 No. 30 mtr span bridge. 4.00 240.00 NCB Post

15th May to 31st May 2011

 

3 HP-08-245 C/o Kandha Badhin road. 3.95 162.61 NCB Post15th May to 31st May 2011

 

4 HP-08-117 Bahi to Mana (Shana) 9.00 164.75 NCB Post15th May to 31st May 2011

 

5 HP-08-167 Bandli to Kamaru. 5.00 150.24 NCB Post15th May to 31st May 2011

 

6 HP-08-169 Jhungi to Matyog. 7.00 245.41 NCB Post 15th May to 31st May

 

2011

7 HP-08-181 Nainj Bhamrala. 8.00 201.48 NCB Post15th May to 31st May 2011

 

8 HP-08-180 Teban to Joi. 3.30 105.15 NCB Post15th May to 31st May 2011

 

9 HP-08-182 DPF Richhni Kumehri. 12.00 163.31 NCB Post15th May to 31st May 2011

 

10 HP-08-179 Rakni to DPF Restadhar. 3.30 123.73 NCB Post15th May to 31st May 2011

 

11 HP-08-184 Baryogi to Lassi. 4.15 93.39 NCB Post15th May to 31st May 2011

 

12 HP-08-246 Bhajoni to Chawag. 4.00 120.00 NCB Post15th May to 31st May 2011

 

13 HP-06-111 Link road to village solang 3.75 166.76 NCB Post

15th May to 31st May 2011

 

14 HP-06-104 Link road to village Dhara to runga 6.40 239.85 NCB Post

15th May to 31st May 2011

 

15 HP-04-01 Sirmani to Mandhu 2.59 144.84 NCB Post15th May to 31st May 2011

 

16 HP-04-02 Rulohar to lameread 3.88 367.15 NCB Post15th May to 31st May 2011

 

17 HP-04-03 Simbal to mehla Road 1.66 132.13 NCB Post 15th May to  

31st May 2011

18 HP-04-04 Link road to village khajoern 1.00 82.14 NCB Post

15th May to 31st May 2011

 

19 HP-08-238 Katola to kundi kha rd 6.75 405.75 NCB Post15th May to 31st May 2011

 

20 HP-08-239 Masar to balaul road 4.50 292.97 NCB Post15th May to 31st May 2011

 

21 HP-08-240 Ralla to Shery road 2.50 173.74 NCB Post15th May to 31st May 2011

 

22 HP-08-241 Nagrota to Holu road 1.96 110.12 NCB Post15th May to 31st May 2011

 

23 HP-08-242 Majharnoo to siguri arthi road 5.78 154.06 NCB Post

15th May to 31st May 2011

 

24 HP-08-243 Bharour to hanogi road 15.00 400.00 NCB Post15th May to 31st May 2011

 

25 HP-09-241 Pajhor to kharal road 7.50 322.00 NCB Post15th May to 31st May 2011

 

26 HP-09-244 Mural sujala Road 7.00 188.49 NCB Post15th May to 31st May 2011

 

27 HP-09-245 Pujarali Thanari road 3.00 150.00 NCB Post15th May to 31st May 2011

 

28 HP-09-246 Link road to village dhansal 4.80 297.00 NCB Post

15th May to 31st May 2011

 

29 HP-09-247 C/o of chorni ser to chauri road 3.90 320.00 NCB Post

15th May to 31st May 2011

 

30 HP-09-248 c/o of pandaranoo sainj road 9.40 250.00 NCB Post

15th May to 31st May 2011

 

31 HP-09-249 C/o Dhadi link road 1.73 32.00 NCB Post15th May to 31st May 2011

 

32 HP-09-250 Mandal jakher pujarali road 2.00 132.00 NCB Post

15th May to 31st May 2011

 

33 HP-11-194 Changer Ghumaran to Nisaal road 4.30 260.00 NCB Post

15th May to 31st May 2011

 

34 HP-11-195 Link road to hatra 2.60 94.00 NCB Post15th May to 31st May 2011

 

35 HP-11-196 Cheod Khad to samlech road 1.41 59.40 NCB Post

15th May to 31st May 2011

 

36 HP-11-197 Kiarag to seili road 7.00 268.27 NCB Post15th May to 31st May 2011

 

37 HP-12-93 Link to village saloori 3.12 292.59 NCB Post15th May to 31st May 2011

 

38 HP-12-94 Link to village bater parali 2.86 348.39 NCB Post 15th May to 31st May

 

2011

39 HP-01-112 Ghajal to Dabar road 11.00 511.43 NCB Post15th May to 31st May 2011

 

 40HP-02-37

1. Thalla to Serkaw (Portion Mando to Serkaw). 5.500 110.00

NCB Post15th May to 31st May 2011

 

41HP-02-04

1. Link road Banoon to Awan. 3.000 60.00

NCB Post15th May to 31st May 2011

42HP-02-08

1. Link road to Rajindoo.(Sahu to Rajindoo). 3.000 60.00

NCB Post15th May to 31st May 2011

43HP-02-34

1. Link road from Rori to Gaila Gatyanu. 5.000 100.00

NCB Post15th May to 31st May 2011

44HP-02-20 1. Link road to village Simni. 2.570 51.40

NCB Post15th May to 31st May 2011

45HP-02-21 3. Link road to village Manjir. 0.825 16.50

NCB Post15th May to 31st May 2011

46HP-02-21

2. Link road to village Chhapa (upto village Dob-Darkund). 1.750 35.00

NCB Post15th May to 31st May 2011

47HP-02-26

1. Link road to village Chhappa (Dob-Darkund to Nera). 2.250 45.00

NCB Post15th May to 31st May 2011

48HP-02-15

1. Link road Nehra to Marour (Gehra to Marour). 3.500 70.00

NCB Post15th May to 31st May 2011

49 HP-02-35 1. Rajera to Dhullara road. 2.500 50.00 NCB Post 15th May to

31st May 2011

50HP-03-08

1. Link road from Daruhi to village Khaggal. 6.500 130.00

NCB Post15th May to 31st May 2011

51HP-05-07 1.Lippa Asrang road. 10.100 202.00

NCB Post15th May to 31st May 2011

52HP-05-08

1.Road from Leo bridge to Hango. 16.000 320.00

NCB Post15th May to 31st May 2011

53HP-05-11

1.Karchham Shong road to Boning Saring. 7.920 158.40

NCB Post15th May to 31st May 2011

54 HP-06-31/26

1.Manseri to Soil road ( Sarsai to Dashal Soil). 2.300 46.00

NCB Post15th May to 31st May 2011

55HP-06-05

1.Link road to village Bharari Bagan upto Peej. 8.000 160.00

NCB Post15th May to 31st May 2011

56 HP-06-16/10

1.Pah Nallah (Dohra Nallah Kaisdhar Khadiyar road). 8.600 172.00

NCB Post15th May to 31st May 2011

57HP-06-18

1.Link road to Bhallan-II (Gadsa to Bhallan-II road). 10.500 210.00

NCB Post15th May to 31st May 2011

58 HP-06-33/23

1.Bakhali Barghtohli to Bastori road. 6.075 121.50

NCB Post15th May to 31st May 2011

59HP-06-20

1.Road from Damothi to Dharthi Dhar. 14.500 290.00

NCB Post15th May to 31st May 2011

60HP-06-21

1.Road from Salwar to Kanon road upto Tandi. 6.000 120.00

NCB Post15th May to 31st May 2011

61HP-06-09 1.Rana Bagh to Karsai Gad. 14.500 290.00

NCB Post15th May to 31st May 2011

62HP-06-13

1.Nainawati Langoti to Karad road. 11.795 235.90

NCB Post15th May to 31st May 2011

63HP-06-27

1.Link road Soi Dhar to Beungal. 8.500 170.00

NCB Post15th May to 31st May 2011

64HP-06-12 1.Bagipul Jaon Chail road. 12.000 240.00

NCB Post15th May to 31st May 2011

65HP-06-14

1.Brow Randal Panasha Poshna Rali via Parantla Randal (Bari) (Brow to Poshna) 13.180 263.60

NCB Post15th May to 31st May 2011

66HP-06-15

1.Link road from Devdhank to Ghatoo. 10.600 212.00

NCB Post15th May to 31st May 2011

67HP-08-07 1.Bhiuli Chhipnu road. 4.000 80.00

NCB Post15th May to 31st May 2011

682.Bagla Barsu road. 5.000 100.00

NCB Post15th May to 31st May 2011

69HP-08-08 1.Ghata Sihan road. 1.900 38.00

NCB Post15th May to 31st May 2011

70 HP-08-09 1.Gagal Khandala road. 3.850 77.00 NCB Post 15th May to

31st May 2011

71HP-08-23 1.Chambi to Kangar road. 4.000 80.00

NCB Post15th May to 31st May 2011

722.Segali to Palotha road. 3.000 60.00

NCB Post15th May to 31st May 2011

733.Pungh to Thalla road. 2.500 50.00

NCB Post15th May to 31st May 2011

74HP-08-24

1.Slapper to Jarol via Kandar road. 5.000 100.00

NCB Post15th May to 31st May 2011

75HP-08-26

1.Ghassi Nallah to Dehavi road. 2.000 40.00

NCB Post15th May to 31st May 2011

762.Dehavi to Gumahu road. 5.000 100.00

NCB Post15th May to 31st May 2011

77HP-08-29

1.Leda Gharwashan Tarwai road. 5.500 110.00

NCB Post15th May to 31st May 2011

78HP-08-61 1.Halyater to Gushali road. 8.000 160.00

NCB Post15th May to 31st May 2011

79HP-08-34 1.Gohar Kanda road. 16.000 320.00

NCB Post15th May to 31st May 2011

80HP-08-35 1.Bagtha Gadhiman road. 6.000 120.00

NCB Post15th May to 31st May 2011

81HP-08-36 1.Link road to Shilhanu. 5.100 102.00

NCB Post15th May to 31st May 2011

82HP-08-36

2.Sainj Bara road ( Portion Sainj to Gowar). 5.000 100.00

NCB Post15th May to 31st May 2011

83HP-08-42

1.Kot to Kandi road ( Portion Bagshiar to Mahunag). 8.000 160.00

NCB Post15th May to 31st May 2011

84HP-08-43

1.Tattapani Kamdheri Lamshar road. 6.660 133.20

NCB Post15th May to 31st May 2011

85HP-08-40

1.Link road to village Tungadhar Chail Janjehali road. 2.000 40.00

NCB Post15th May to 31st May 2011

86 2.Link road to village Dhar from Chail Janjehali road. 2.000 40.00

NCB Post15th May to 31st May 2011

87HP-08-01

1.Link road to village Harijan Basti Sain. 3.500 70.00

NCB Post15th May to 31st May 2011

88HP-08-49

1.Datoli Kalthar (Datoli Khudla Serus Samlon via Kalthar). 5.500 110.00

NCB Post15th May to 31st May 2011

892.Paonta Sulpur (Bag Paonta Bahi via Kharsyal School). 2.250 45.00

NCB Post15th May to 31st May 2011

90HP-08-51

1.Dabrog Badar Ghadyani ( Badhani to Badar). 6.000 120.00

NCB Post15th May to 31st May 2011

91 2.Tihra to Kot road. 5.000 100.00 NCB Post 15th May to 31st May

2011

92HP-08-56 1.Cholthara to Kothi road. 13.500 270.00

NCB Post15th May to 31st May 2011

93HP-08-06

1.Pandoh Shiva road ( Phase-II ). 6.300 126.00

NCB Post15th May to 31st May 2011

94HP-08-10

1.Link road to village Sagnehar. 0.750 15.00

NCB Post15th May to 31st May 2011

95 2.Sukabag Matroo Bhajrala road via Stain. 1.750 35.00

NCB Post15th May to 31st May 2011

963.Raja Bharola Nagan road. 1.000 20.00

NCB Post15th May to 31st May 2011

97HP-09-03

1.Sandhu Lambidhar Majgaon,Chalawag road. 5.700 114.00

NCB Post15th May to 31st May 2011

98HP-09-51 1.Koti to Piran road. 28.020 560.40

NCB Post15th May to 31st May 2011

99HP-09-17

1.Link road to village Dharogra from DGBR road. 8.100 162.00

NCB Post15th May to 31st May 2011

100HP-09-21 1.Railla Khanog road. 3.000 60.00

NCB Post15th May to 31st May 2011

101HP-09-23 1.Ganvi Keo road. 2.500 50.00

NCB Post15th May to 31st May 2011

102 HP-09-40 1.Tutupani Kuthari road. 10.500 210.00 NCB Post 15th May to

31st May 2011

103HP-09-27

1.Badiara Masli Kharot Dhakgaon road. 12.000 240.00

NCB Post15th May to 31st May 2011

104HP-09-37 1.Jatwari to Gawas road. 4.500 90.00

NCB Post15th May to 31st May 2011

105 HP-09-29/22 1.Marathu Tharolla road. 16.000 320.00

NCB Post15th May to 31st May 2011

106HP-09-44 1.Sawara to Thana link road. 7.000 140.00

NCB Post15th May to 31st May 2011

107HP-10-01

1.Link road from Khajurna to Malonwala. 3.000 60.00

NCB Post15th May to 31st May 2011

108HP-10-05

1.Link road from village Shampur Bhood to Manpur Deora. 3.000 60.00

NCB Post15th May to 31st May 2011

109HP-10-25

1.Km.2/500 to Ghutanpur road. 2.200 44.00

NCB Post15th May to 31st May 2011

110HP-10-09

1.Digwa Chimnu Gunali road.(Mila to Bindla Digwa) 8.000 160.00

NCB Post15th May to 31st May 2011

111HP-10-10

1.Link road to village Koti Uttron ( TMB road to Uttron). 6.000 120.00

NCB Post15th May to 31st May 2011

112 2.Link road to village Rast (Ronahat to Rast). 6.000 120.00

NCB Post15th May to 31st May 2011

113HP-10-21

1.Gangtoli to Pab Manal road. 2.600 52.00

NCB Post15th May to 31st May 2011

114HP-10-24

1.Chowki Mirgwal Barwas Kanti Maswa road (Link road to village Chowki Mirgwal) 6.500 130.00

NCB Post15th May to 31st May 2011

115HP-10-12

1.Link road to village Choakar. 3.000 60.00

NCB Post15th May to 31st May 2011

116HP-10-14

1.Jarwa Juneli Kinnu Kalan road from Solan Meenus road. 3.000 60.00

NCB Post15th May to 31st May 2011

1172.Andheri Koti Dhimans road from village Ranphua Jabrog. 5.000 100.00

NCB Post15th May to 31st May 2011

118HP-10-22 1.Kharkoli to Ganog road. 9.170 183.40

NCB Post15th May to 31st May 2011

119HP-11-05 1.Sitalpur to Nanowal road. 18.400 368.00

NCB Post15th May to 31st May 2011

120HP-11-10 1.Link road to village Gahi. 6.675 133.50

NCB Post15th May to 31st May 2011

121HP-11-19 1.Damsite to Bisha road. 8.000 160.00

NCB Post15th May to 31st May 2011

122HP-11-20

1.Link road to village Wakna ( Hatri to Wakna) 2.000 40.00

NCB Post15th May to 31st May 2011

123 HP-12-02 1.Link road from Repoh to Kudet Jandoh Suri.

6.000 120.00 NCB Post 15th May to 31st May

2011

124HP-12-03

1.Link road from Amrah Nagar to Karluhi Kinnu via Babehar. 2.000 40.00

NCB Post15th May to 31st May 2011

125 2.Link road to village Athmah. 2.800 56.00

NCB Post15th May to 31st May 2011

126HP-12-04

1.Link road from Bharwain to Duhal Bangwala. 3.000 60.00

NCB Post15th May to 31st May 2011

127 2.Link road from Bhaira to Hamboli. 4.000 80.00

NCB Post15th May to 31st May 2011

128HP-12-05

1.Link road to village Kharoh. 3.825 76.50

NCB Post15th May to 31st May 2011

129HP-12-06

1.Link road to village Ghangret. 4.000 80.00

NCB Post15th May to 31st May 2011

130HP-12-01

1.Link road to village Kuneran.( N.M.T. road to village Kuneran). 3.000 60.00

NCB Post15th May to 31st May 2011

131HP-12-07

1.Link road to village Marwari ( from Nangal Una Mubarikpur Talwara road) 4.000 80.00

NCB Post15th May to 31st May 2011

1322.Link road to village Oel ( from Gagret Oel Ispur road). 2.840 56.80

NCB Post15th May to 31st May 2011

133HP-12-08

1.Link road to village Saghnai (from Gagret Daulatpur road). 6.570 131.40

NCB Post15th May to 31st May 2011

134 HP-12-10 1.Link road to village Barrian 2.840 56.80 NCB Post 15th May to

from Chowkiminar road.31st May 2011

135HP-12-11

1.Link road to village Makrer from Una Pirnigah road. 6.000 120.00

NCB Post15th May to 31st May 2011

136HP-12-12

1.Link road to village Badwar from T.M.B.D. road. 6.000 120.00

NCB Post15th May to 31st May 2011

137HP-12-14

1.Link road to village Basal from Una Amb Mubarakpur road. 3.330 66.60

NCB Post15th May to 31st May 2011

138HP-12-15

1.Link road to village Lamlehara from Jankour. 4.285 85.70

NCB Post15th May to 31st May 2011

139HP-12-19

1.Link road to village Kungrat via Kalehra.(Kalehra to Kungrat) 1.795 35.90

NCB Post15th May to 31st May 2011

140HP-12-20

1.Link road to village Dharampur from Jaijon road. 2.225 44.50

NCB Post15th May to 31st May 2011

1412.Link road to village Padouri (Bhadouri) road from Jaijon road). 1.600 32.00

NCB Post15th May to 31st May 2011

142HP-12-21

1.Link road to village Nagroli from Gagret road. 5.510 110.20

NCB Post15th May to 31st May 2011

143HP-12-22

1.Link road to village Pandoga from Gagret road. 3.470 69.40

NCB Post15th May to 31st May 2011

1442.Link road to village Kangar from Saloh Bhadauri road (Una Jaijon road to Kangar). 2.000 40.00

NCB Post15th May to 31st May 2011

145HP-12-23

1.Link road to village Badehra from Jaijon road. 5.500 110.00

NCB Post15th May to 31st May 2011

146HP-12-12

1.Link road to village Badwar from T.M.B.D. road. 6.000 120.00

NCB Post15th May to 31st May 2011

Total 822.55 20637.752. PUNJAB

1 PB-0138

Construction and Maintenance of village road from Manj to Bachiwind

7.86 370.02 NCB Post

04th February to 15th February 2011

 

2 PB-0139

Construction and Maintenance of village road from Amritsar Wagha to Amritsar Chabal Road

16.98 951.79 NCB Post

04th February to 15th February 2011

 

3 PB-0140

Construction and Maintenance of village road from Amritsar Ajnala road to Chetanpura

19.92 945.72 NCB Post

04th February to 15th February 2011

 

4 PB-0141

Construction and maintenance of village road from Gaggomahal, Chamiari to Khatrai Kalan

13.55 650.97 NCB Post

04th February to 15th February 2011

 

5 PB-0142 MB

Construction and maintenance of village road from Burj to Lahori Mal Bhakna Road

12.16 583.14 NCB Post

04th February to 15th February 2011

 

6 PB-0144 MB

Construction and maintenance of village 24 1033.25 NCB Post

04th February to 15th  

road from Bandala to G.T. Road (NH-I)

February 2011

7 PB-0145 MB

Construction and Maintenance of village road from APK road to Jandiala

9.72 464.03 NCB Post

04th February to 15th February 2011

 

8 PB-0146 MB

Construction and Maintenance of Village road from Amritsar Ajnala road to APK road

15.72 726.69 NCB Post

04th February to 15th February 2011

 

9 PB-0147

Construction and maintenance of village road from G.T. NH-I (Khilchian) to Amritsar Mehta Road

15.75 671.09 NCB Post

04th February to 15th February 2011

 

10 PB-0151

Construction and maintenance of village road from Kathu Nangal to Bebbowall road (Section Fattu Bhilla to Babbowal)

6.3 268.23 NCB Post

04 th February to 15 th February 2011

 

11 PB-0143 MB Jandiala Verowal to Bath 10.32 410.11 NCB Post

04 th February to 15 th February 2011

 

12 PB-0149 Khadoor Sahib to Verowal Road 8.6 392.92 NCB Post

04 th February to 15 th February 2011

 

13 PB-0150Valtoha to Wan Tara Singh (Section Rajoke to Wan Tara Singh)

12.75 627.47 NCB Post

04 th February to 15 th February 2011

 

14 PB-0533 Mallanwala to Fatehgarh Sabhraon 11.42 576.8 NCB Post

04 th February to 15 th February 2011

 

15 PB-0534 Ferozepur to Maboke 15.69 783.59 NCB Post

04 th February to 15 th February 2011

 

16 PB-0535 Mamdot to Maboke 10.7 537.74 NCB Post

04 th February to 15 th February 2011

 

17 PB-0536 Chak Moban Hardo Dhandi to Tahliwala 20.9 911.26 NCB Post

04 th February to 15 th February 2011

 

18 PB-0537Guruharsahai to MKT- Jallalabad road via Boor Wala Kuti road

22.5 1142.1 NCB Post

04 th February to 15 th February 2011

 

19 PB-0538 MB

NH-15 (Km 168.50) to Fatehgarh Sabraon via 7.91 378.53 NCB Post 04 th

February to  

Nizimudin, Wattu Bhatti Gatta Badshah)

15 th February 2011

20 PB-0539 MB

NH-10 (Km 391.25 Ghallu) to Ghallu, Khippan wali, Azamwala, Kheo wali Dhab

13.13 632.31 NCB Post

04 th February to 15 th February 2011

 

21 PB-0540 MB

NH-10 (Km 393.00) to Kathera, Kamal Wala, Islamwala

15 722.51 NCB Post

04 th February to 15 th February 2011

 

22 PB-0541 MB

NH-15 (KM 170.60) to Sadar wala, Ghuddu wala, Behak Fattu, Islambad, Lohke Kalan, Thatha Kishan Singh

13.58 680.42 NCB Post

04 th February to 15 th February 2011

 

23 PB-0542 Mamdot to SH-20 Ferozepur Fazilka raod 20.13 967.39 NCB Post

04 th February to 15 th February 2011

 

24 PB-0543

Ferozepur City to Pharymal Bhalla to ODR-20 Ferozepur Mallanwala road

24.7 1192.85 NCB Post

04 th February to 15 th February 2011

 

25 PB-0637

Gharota to Dinanagar Gurdaspur Trimmu road Section Chounta to Dinanagar (via Jharoli

14.03 560.89 NCB Post

04 th February to 15 th February

 

Pachowal, Sadana, Bhagwanpur) Km 5.39 to 19.42 = 14.03 Km

2011

26 PB-0638

Dhobra Taragarh to Kathlour Kohlian Fatehpur Kharkhra Road (Km 17.77 to 37.18 )

19.41 956.47 NCB Post

04 th February to 15 th February 2011

 

27 PB-0639

ASR-Mehta-Shri Hargobindpur road to Batala Shri Hargobindpur road

10.35 454.13 NCB Post

04 th February to 15 th February 2011

 

28 PB-0640 Qadian to Udhanwal road 11 357.07 NCB Post

04 th February to 15 th February 2011

 

29 PB-0641Udhanwal to Darawali via Ghuman (Section Udhanwal to Ghoman

12.65 502.41 NCB Post

04 th February to 15 th February 2011

 

30 PB-0642 MB

Aliwal to Ramdass (Km 17.00 to 20.67) 3.67 190.58 NCB Post

04 th February to 15 th February 2011

 

31 PB-0643 MB

FGC-DBN road Dehra Gawar Shikar Machhian (Km 5.90 to 14.60)

8.7 414.15 NCB Post 04 th February to 15 th February

 

2011

32 PB-0644 MB Dhianpur to APK road 25.75 1188.66 NCB Post

04 th February to 15 th February 2011

 

33 PB-0645 MB

PTK-Shahpur Kandi Road to Tharra Jhikla Sukret 6.24 372.8 NCB Post

04 th February to 15 th February 2011

 

34 PB-0646 MB Dunera to Phangota 5.85 309.09 NCB Post

04 th February to 15 th February 2011

 

35 PB-0647 MB

Dhakki to Dhira Dina Nagar 15.33 751.1 NCB Post

04 th February to 15 th February 2011

 

36 PB-0648 MB

Badani-Madhopur to Mamoon Madhopur NH-1

17.1 857.56 NCB Post

04 th February to 15 th February 2011

 

    Total 499.37 23535.84        3. Jharkhand

1 JH-01-HS-18 Machatanr To Nayanband 4.625 114.600 NCB Post 15th to 28th

February 2011  

2 JH-01-HS- Nh-32 To Kolbendi 5.500 143.870 NCB Post 15th to 28th  

23 February 2011

3 JH-01-HS-38

Gomi Karmatanr To Tiskopi 21.650 601.181 NCB Post 15th to 28th

February 2011  

4 JH-01-HS-39 Talaiya To Dakasaram 4.000 98.858 NCB Post 15th to 28th

February 2011  

5 JH-01-HS-47 Bagda To Bhawanipur 2.000 48.785 NCB Post 15th to 28th

February 2011  

6 JH-01-HS-59

Chapri To Kodawadih Via Denga Pani 3.700 104.737 NCB Post 15th to 28th

February 2011  

7 JH-01-HS-61

Cirudih Telo Road Tthm To Khalcho 2.500 67.279 NCB Post 15th to 28th

February 2011  

8 JH-01-HS-69

Mines Board Road To Champi 8.200 212.458 NCB Post 15th to 28th

February 2011  

9 JH-0201 Pachmore To Tapsa 11.100 265.837 NCB Post 15th to 28th February 2011  

10JH-0206

Paroka Kala To Tilra Part Ii 2.800 68.075 NCB Post 15th to 28th

February 2011  

11 Banajang To Malakpur 2.500 59.594 NCB Post 15th to 28th February 2011  

12 JH-0207 Jangi More To Jangi 8.100 184.801 NCB Post 15th to 28th February 2011  

13 JH-0208 Lukoiyo To Jamdih 10.600 270.412 NCB Post 15th to 28th February 2011  

14 JH-0209 Sidki To Chiloy 15.700 430.371 NCB Post 15th to 28th February 2011  

15 JH-0210 Bukru To Padampur 7.100 168.373 NCB Post 15th to 28th February 2011  

16 JH-06-NPCC-60 Kharbanda To Katasmara 2.000 53.847 NCB Post 15th to 28th

February 2011  

17 JH-06-NPCC-62

Rupaskundi Chowk To Sapdhara 1.500 38.019 NCB Post 15th to 28th

February 2011  

18 JH-06- Shyamsundarur Road To 0.850 24.434 NCB Post 15th to 28th  

NPCC-63 Khairbani February 2011

19 JH-06-NPCC-65 Mahlipara To Charkpathar 1.770 48.119 NCB Post 15th to 28th

February 2011  

20 JH-06-NPCC-66 Gobargushi To Sisda 3.200 81.186 NCB Post 15th to 28th

February 2011  

21 JH-06-NPCC-68

Patamda Khas Ghagra Road To Barudih 1.450 34.864 NCB Post 15th to 28th

February 2011  

22 JH-06-NPCC-70

Chirudih Rajdoha Road To Chologora 1.250 35.469 NCB Post 15th to 28th

February 2011  

23 JH-06-NPCC-72 Muslwa To Kankidih 1.550 40.793 NCB Post 15th to 28th

February 2011  

24 JH-06-NPCC-73

Birkham Meghda To Majhidih 2.075 54.404 NCB Post 15th to 28th

February 2011  

25 JH-06-NPCC-74

Amjhare Birkham Road To Pakartola 2.150 58.374 NCB Post 15th to 28th

February 2011  

26 JH-06-NPCC-75 Mohanpur To Bataluka 1.775 51.745 NCB Post 15th to 28th

February 2011  

27 JH-06-NPCC-76 Muchidih To Chingragora 1.000 25.644 NCB Post 15th to 28th

February 2011  

28 JH-06-NPCC-78 Nipania To Dangar 1.450 36.790 NCB Post 15th to 28th

February 2011  

29 JH-06-NPCC-79

Katin Nh33 Jsr To Jharbani 1.325 37.818 NCB Post 15th to 28th

February 2011  

30 JH-06-NPCC-80 Mudidihdih To Goalkatta 1.500 40.382 NCB Post 15th to 28th

February 2011  

31 JH-06-NPCC-81 Kujhurdih To Katagora 2.600 69.135 NCB Post 15th to 28th

February 2011  

32 JH-06-NPCC-83 Bikrampur To Balidungri 1.850 41.970 NCB Post 15th to 28th

February 2011  

33 JH-06-NPCC-91 Pungora To Bangora 3.400 78.220 NCB Post 15th to 28th

February 2011  

34 JH-06- Buatand Via Murakanjia 2.900 62.150 NCB Post 15th to 28th  

NPCC-99 To Bhagasole February 2011

35 JH-06-NPCC-123

Nh-33 Nayagram To Betana 1.800 47.310 NCB Post 15th to 28th

February 2011  

36 JH-06-NPCC-124 Betna More To Kharkasol 1.850 50.780 NCB Post 15th to 28th

February 2011  

37 JH-06-NPCC-125 Pukhuria To Brajbani 2.050 53.810 NCB Post 15th to 28th

February 2011  

38 JH-06-NPCC-126

Bend Road To Jaganathpur 5.800 153.430 NCB Post 15th to 28th

February 2011  

39 JH-06-NPCC-127 Dighi More To Rajabandh 5.100 131.420 NCB Post 15th to 28th

February 2011  

40 JH-06-NPCC-128

Lodhasoli Sardiha To Bagadiha 2.850 74.410 NCB Post 15th to 28th

February 2011  

41 JH-06-NPCC-129

Amardanga To Kanimahuli 1.700 45.010 NCB Post 15th to 28th

February 2011  

42 JH-06-NPCC-130

Chakulia Road To Dhobasol 2.000 52.440 NCB Post 15th to 28th

February 2011  

43 JH-06-NPCC-131

Chakulia Road To Khadandih 7.250 171.550 NCB Post 15th to 28th

February 2011  

44 JH-06-NPCC-132 Sarasbad To Baikunthpur 2.350 61.760 NCB Post 15th to 28th

February 2011  

45 JH-06-NPCC-133 Bariagajar To Kalajhor 0.700 18.520 NCB Post 15th to 28th

February 2011  

46 JH-06-NPCC-134 Salbani To Jirapara 1.700 45.250 NCB Post 15th to 28th

February 2011  

47 JH-06-NPCC-135

Baliyabandh Chowk To Salkagoriya 1.825 47.710 NCB Post 15th to 28th

February 2011  

48 JH-06-NPCC-136

Hutuldungri More To Junbani Tola - 6 1.150 30.480 NCB Post 15th to 28th

February 2011  

49 JH-06-NPCC-137

Roladihmore To Junbanitola 5 1.150 29.970 NCB Post 15th to 28th

February 2011  

50 JH-06- Nekrasoli To Murakati-2 1.275 32.700 NCB Post 15th to 28th  

NPCC-138 February 2011

51 JH-06-NPCC-139

Chengjora Digha To Khairkasole 2.800 71.860 NCB Post 15th to 28th

February 2011  

52 JH-06-NPCC-140

Bada Govindpur To Kukaradih 3.575 92.760 NCB Post 15th to 28th

February 2011  

53 JH-06-NPCC-141 Salbani To Hirachuni 2.950 69.600 NCB Post 15th to 28th

February 2011  

54 JH-06-NPCC-142 Mosjobi To Banamguttu 2.700 71.000 NCB Post 15th to 28th

February 2011  

55 JH-06-NPCC-143

Salboni Hiruchuni To Dhaniya 1.550 40.590 NCB Post 15th to 28th

February 2011  

56 JH-06-NPCC-144 Kowali To Godinda 2.500 65.900 NCB Post 15th to 28th

February 2011  

57 JH-06-NPCC-145 T04 To Bansil 3.150 82.180 NCB Post 15th to 28th

February 2011  

58 JH-06-NPCC-146 Parodiha To Pokharia 2.500 65.290 NCB Post 15th to 28th

February 2011  

59 JH-06-NPCC-147 Nega To Kendmuri 2.025 53.070 NCB Post 15th to 28th

February 2011  

60 JH-06-NPCC-148 Sj Road To Jadughutu 1.050 30.080 NCB Post 15th to 28th

February 2011  

61 JH-06-NPCC-149 T08 To Darusai 1.025 28.040 NCB Post 15th to 28th

February 2011  

62 JH-06-NPCC-150 T08 To Barabandhu 2.250 54.960 NCB Post 15th to 28th

February 2011  

63 JH-06-NPCC-153 Nh-33 To Golkatta 4.000 98.686 NCB Post 15th to 28th

February 2011  

64 JH-06-NPCC-157

State Highway To Bhitardarhi 3.550 86.350 NCB Post 15th to 28th

February 2011  

65 JH-06-NPCC-159 Nh-33 To Ulda Tola 1.000 24.255 NCB Post 15th to 28th

February 2011  

66 JH-06- Mahatam To Paharpur 1.000 24.586 NCB Post 15th to 28th  

NPCC-161 February 2011

67 JH-06-NPCC-162

Burudih Check Post To Hiraganj 0.700 15.045 NCB Post 15th to 28th

February 2011  

68 JH-06-NPCC-165

Hatta Msb Road To Annanagur 0.700 16.692 NCB Post 15th to 28th

February 2011  

69 JH-06-NPCC-166

Dungrudih Via Barka To Dalmakocha 2.700 77.579 NCB Post 15th to 28th

February 2011  

70 JH-06-NPCC-167

Hata Msb Road Via Rupridih To Ghaghra Nala

1.100 25.540 NCB Post 15th to 28th February 2011  

71 JH-06-NPCC-168

Kulamara Road To Dalmabeda 1.000 24.810 NCB Post 15th to 28th

February 2011  

72 JH-06-NPCC-170

Msb Dumaria Road To Bhuiya Bora 0.650 15.128 NCB Post 15th to 28th

February 2011  

73 JH-06-NPCC-171

Msb Dumaria Road To Kathsakra 3.650 98.436 NCB Post 15th to 28th

February 2011  

74 JH-06-NPCC-172

Rajib Chowk To South Surda 0.900 20.497 NCB Post 15th to 28th

February 2011  

75 JH-06-NPCC-173

Tilabani Road To Larandih 0.750 16.444 NCB Post 15th to 28th

February 2011  

76 JH-06-NPCC-174 Chaidiha To Chhota Asti 1.050 26.247 NCB Post 15th to 28th

February 2011  

77 JH-06-NPCC-176 Teghri To Rajbandh 0.700 17.247 NCB Post 15th to 28th

February 2011  

78 JH-06-NPCC-177 Nh-06 To Gohalmara 3.125 78.079 NCB Post 15th to 28th

February 2011  

79 JH-06-NPCC-179 Db Road To Pankhisol 0.600 13.408 NCB Post 15th to 28th

February 2011  

80 JH-06-NPCC-180 Choira To Tilabanikhas 3.650 90.711 NCB Post 15th to 28th

February 2011  

81 JH-06-NPCC-181

Nh-33 Ektal More To Bangarkola Khas 2.400 56.424 NCB Post 15th to 28th

February 2011  

82 JH-06-NPCC-182 Nh-33 To Bharudih 0.750 19.053 NCB Post 15th to 28th

February 2011  

83 JH-06-NPCC-183 Nh-33 To Murkati 1 1.150 27.487 NCB Post 15th to 28th

February 2011  

84 JH-06-NPCC-184 Nh-33 To Choirakhas 1.350 33.814 NCB Post 15th to 28th

February 2011  

85 JH-06-NPCC-185 Rly Gate To Chhabisa 1.700 42.217 NCB Post 15th to 28th

February 2011  

86 JH-06-NPCC-188 T07 To Putlupung 1.000 24.601 NCB Post 15th to 28th

February 2011  

87 JH-06-NPCC-189 Manhara To Sundarpur 2.000 47.596 NCB Post 15th to 28th

February 2011  

88 JH-06-NPCC-190 Raspal To Gamahariya 5.700 145.046 NCB Post 15th to 28th

February 2011  

89 JH-06-NPCC-193 Jharia To Lepo 1.300 33.920 NCB Post 15th to 28th

February 2011  

90 JH-06-NPCC-194 Hj Road To Modhasai 1.325 35.690 NCB Post 15th to 28th

February 2011  

91 JH-06-NPCC-195 Harina To Bagabera 1.150 30.320 NCB Post 15th to 28th

February 2011  

92 JH-06-NPCC-196

Chotapichka To Kharbandh 2.600 66.960 NCB Post 15th to 28th

February 2011  

93 JH-06-NPCC-197 T04 To Badejura 1.825 47.170 NCB Post 15th to 28th

February 2011  

94 JH-06-NPCC-198 Birgha To Karikola 3.775 97.240 NCB Post 15th to 28th

February 2011  

95 JH-06-NPCC-199 Hessalbil To Jahatu 3.875 99.810 NCB Post 15th to 28th

February 2011  

96 JH-06-NPCC-200 Taladhir To Sugnikocha 6.675 171.610 NCB Post 15th to 28th

February 2011  

97 JH-06-NPCC-201

Chotabandhura To Bengdih 3.300 84.730 NCB Post 15th to 28th

February 2011  

98 JH-06-NPCC-202

Benagariya To Khamandih 5.300 129.180 NCB Post 15th to 28th

February 2011  

99 JH-06-NPCC-203 Reo Road To Ghaghra 4.250 94.410 NCB Post 15th to 28th

February 2011  

100 JH-06-NPCC-204

Balijuri Road To Lakrabasa 1.825 51.590 NCB Post 15th to 28th

February 2011  

101 JH-06-NPCC-205 Nh33 To Jarbani 3.600 92.360 NCB Post 15th to 28th

February 2011  

102 JH-06-NPCC-206 Nh33 To Singhpura 2.700 72.950 NCB Post 15th to 28th

February 2011  

103 JH-06-NPCC-207 Nh06 To Gohalmara 3.650 92.580 NCB Post 15th to 28th

February 2011  

104 JH-06-NPCC-208 Jamjurki Road To Bhadua 1.850 47.280 NCB Post 15th to 28th

February 2011  

105 JH-06-NPCC-209 Reo Road To Sonakora 3.010 72.630 NCB Post 15th to 28th

February 2011  

106 JH-06-NPCC-210 Baram To Dhobani 5.200 126.140 NCB Post 15th to 28th

February 2011  

107 JH-06-NPCC-211 Amjhore To Khokhro 5.625 133.420 NCB Post 15th to 28th

February 2011  

108 JH-06-NPCC-212 Chuasol To Taladih 1.000 22.260 NCB Post 15th to 28th

February 2011  

109 JH-06-NPCC-213 Jyotindih To Bangora 1.300 33.370 NCB Post 15th to 28th

February 2011  

110 JH-06-NPCC-214

Hata Msb Road To Low Keshra 1.550 40.990 NCB Post 15th to 28th

February 2011  

111 JH-06-NPCC-215

Hata Msb Road To Sidhedanga 0.600 16.530 NCB Post 15th to 28th

February 2011  

112 JH-06-NPCC-216 Nh06To Kastarua 1.700 41.740 NCB Post 15th to 28th

February 2011  

113 JH-06-NPCC-217 Reo Road To Pachbaria 1.350 34.800 NCB Post 15th to 28th

February 2011  

114 JH-06-NPCC-218

Chitreshwar Road To Kanimaholi 1.050 28.460 NCB Post 15th to 28th

February 2011  

115 JH-06-NPCC-219

Bhadarsole To Kendokotha 1.050 27.650 NCB Post 15th to 28th

February 2011  

116 JH-06-NPCC-220 Mahulchui To Parashiya 2.200 47.370 NCB Post 15th to 28th

February 2011  

117 JH-06-NPCC-221 Db Road To Jankata 0.600 14.820 NCB Post 15th to 28th

February 2011  

118 JH-06-NPCC-222 Reo To Barabera 1.600 41.520 NCB Post 15th to 28th

February 2011  

119 JH-06-NPCC-223

Mangrosol To Swargchhira 1.100 29.070 NCB Post 15th to 28th

February 2011  

120 JH-06-NPCC-224 Reo Road To Kadamdiha 2.050 51.120 NCB Post 15th to 28th

February 2011  

121 JH-06-NPCC-225 Nirudih To Palasboni 1.950 50.970 NCB Post 15th to 28th

February 2011  

122 JH-06-NPCC-226 Reo Road To Bahadurpur 1.350 34.650 NCB Post 15th to 28th

February 2011  

123 JH-06-NPCC-227

Reo Road To Dakshin Sole 1.250 31.540 NCB Post 15th to 28th

February 2011  

124 JH-06-NPCC-228 Bamni To Lakro 4.600 106.170 NCB Post 15th to 28th

February 2011  

125 JH-06-NPCC-229 T04 To Kukru 3.600 92.900 NCB Post 15th to 28th

February 2011  

126 JH-06-NPCC-230 Sagiburu To Hariyakocha 2.100 49.030 NCB Post 15th to 28th

February 2011  

127 JH-06-NPCC-231

Patamda Khas Gagra Road To Bardih 3.700 93.300 NCB Post 15th to 28th

February 2011  

128 JH-06-NPCC-232

Chirudih Cholagora To Chamidih 2.600 61.940 NCB Post 15th to 28th

February 2011  

129 JH-06-NPCC-233 Huchukdih To Mudidih 1.800 42.590 NCB Post 15th to 28th

February 2011  

130 JH-06-NPCC-234

Duyaridih To Ghorabandha 1.500 37.590 NCB Post 15th to 28th

February 2011  

131 JH-06-NPCC-235

Bamni Lakro To Kasidih Gugulbani 2.000 48.740 NCB Post 15th to 28th

February 2011  

132 JH-06-NPCC-236

Bansgarh Mukurdih To Sardar Tola 2.050 51.140 NCB Post 15th to 28th

February 2011  

133 JH-06-NPCC-237

Gengra Bardih Road To Majhidih 4.050 89.720 NCB Post 15th to 28th

February 2011  

134 JH-06-NPCC-238 Mahlipara To Buguda 2.000 46.790 NCB Post 15th to 28th

February 2011  

135 JH-06-NPCC-239 Mahulbasa To Sari 1.000 24.560 NCB Post 15th to 28th

February 2011  

136 JH-06-NPCC-240

Katin Nh33 Jsr Road To Chardungi 3.600 89.180 NCB Post 15th to 28th

February 2011  

137 JH-06-NPCC-241

Barasusani To Rakhdih From Mudidih 1.500 36.500 NCB Post 15th to 28th

February 2011  

138 JH-06-NPCC-242

Sardardih To Batamukhiya Tola 2.500 55.340 NCB Post 15th to 28th

February 2011  

139 JH-06-NPCC-243 Punsa To Jogidih 1.000 26.210 NCB Post 15th to 28th

February 2011  

140 JH-06-NPCC-244

Amjhore Birkham To Kiyabahal 1.500 37.370 NCB Post 15th to 28th

February 2011  

141 JH-06-NPCC-245 Kumarda To Kariguttu 1.500 34.880 NCB Post 15th to 28th

February 2011  

142 JH-06-NPCC-246 Belgora To Beldih 1.150 26.020 NCB Post 15th to 28th

February 2011  

143 JH-06-NPCC-261 Nh33 To Raghunathdih 3.900 85.350 NCB Post 15th to 28th

February 2011  

144 JH-06-NPCC-264 Juri To Samersai 1.100 26.450 NCB Post 15th to 28th

February 2011  

145 JH-06-NPCC-265 Mudasasi To Tataldih 1.000 25.830 NCB Post 15th to 28th

February 2011  

146 JH-06-NPCC-268 L72 To Barasai 4.900 119.020 NCB Post 15th to 28th

February 2011  

147 JH-06-NPCC-269 T07 To Telangkocha 1.675 44.220 NCB Post 15th to 28th

February 2011  

148 JH-06-NPCC-271 Sj Road To Paharkocha 0.900 23.130 NCB Post 15th to 28th

February 2011  

149 JH-0725 Jhurkali To Rapura 17.000 350.526 NCB Post 15th to 28th February 2011  

150

JH-0726

L046 To Jala 5.500 116.477 NCB Post 15th to 28th February 2011  

151 T01 To Nawadih 5.175 110.767 NCB Post 15th to 28th February 2011  

152 L048 To Garnaha 4.400 91.355 NCB Post 15th to 28th February 2011  

153

JH-0728

Khonhar To Ajaniya 1.500 31.238 NCB Post 15th to 28th February 2011  

154 T01 To Singhpur 4.200 88.206 NCB Post 15th to 28th February 2011  

155 Parti Kushwani To Paniakhar 2.400 51.440 NCB Post 15th to 28th

February 2011  

156 Adhaura To Dubey Toal 4.000 83.124 NCB Post 15th to 28th February 2011  

157JH-0729

Ambakoreya To Sakti 3.450 70.506 NCB Post 15th to 28th February 2011  

158 Haliwanta Khurd To Pataria Khurd 4.100 86.504 NCB Post 15th to 28th

February 2011  

159JH-0730

T04 To Bhadaitola 5.300 111.062 NCB Post 15th to 28th February 2011  

160 T02 To Samda Tola 9.000 206.116 NCB Post 15th to 28th February 2011  

161 JH-0731 L031 To Barahiya 9.400 199.094 NCB Post 15th to 28th February 2011

 

162 T02 To Garahi 2.550 56.859 NCB Post 15th to 28th February 2011  

163

JH-0732

L031 To Barwahitola 1.200 26.771 NCB Post 15th to 28th February 2011  

164 T03 To Kumbhi 3.000 63.271 NCB Post 15th to 28th February 2011  

165 T02 To Tisartetuka Harijantola 3.000 62.275 NCB Post 15th to 28th

February 2011  

166 L047 To Kewartola 2.400 48.443 NCB Post 15th to 28th February 2011  

167 Sao Tola To Rajbandha 3.800 78.570 NCB Post 15th to 28th February 2011  

168JH-0733

Pipardih To Suguadamar 4.200 85.923 NCB Post 15th to 28th February 2011  

169 Paraswar To Lohbandha 6.300 129.535 NCB Post 15th to 28th February 2011  

170

JH-0734

L021 To Manjori 3.000 63.739 NCB Post 15th to 28th February 2011  

171 Kalakhajuri To Kumbhiyakona 2.500 54.444 NCB Post 15th to 28th

February 2011  

172 JH-0734 Janewa To Bangalidera 2.435 54.423 NCB Post 15th to 28th February 2011

173 JH-07-NBCC-11 Morbey To Jhina 1.000 25.183 NCB Post 15th to 28th

February 2011  

174 JH-07-NBCC-12 L031 To Atiyari 5.000 127.558 NCB Post 15th to 28th

February 2011  

175 JH-07-NBCC-13 Bhuiyan Tola To Siswa 3.050 93.875 NCB Post 15th to 28th

February 2011  

176 JH-07-NBCC-14 T03 To Chopania Tola 0.550 15.710 NCB Post 15th to 28th

February 2011  

177 JH-07- T01 To Tarke 5.500 138.483 NCB Post 15th to 28th  

NBCC-15 February 2011

178 JH-07-NBCC-16 Sirfaliya To Buthhat Tola 1.100 25.233 NCB Post 15th to 28th

February 2011  

179 JH-07-NBCC-17 Belwadamar To Mangrahi 2.650 71.587 NCB Post 15th to 28th

February 2011  

180

JH-1004

Akasi To Karamdoni Part - A 1.000 23.100 NCB Post 15th to 28th

February 2011  

181 Akasi To Aramdoni Part - B 4.000 86.456 NCB Post 15th to 28th

February 2011  

182 Monghaon To Kothi 2.200 48.091 NCB Post 15th to 28th February 2011  

183 Natawal To Tati 4.000 92.736 NCB Post 15th to 28th February 2011  

184 Reo Road Jairagi To Dahkul 2.500 56.971 NCB Post 15th to 28th

February 2011  

185

JH-1010

Sisai Bargaon Road To Zindatoli 6.000 127.591 NCB Post 15th to 28th

February 2011  

186 Sisai Bargaon Road To Pahartoli 4.150 91.053 NCB Post 15th to 28th

February 2011  

187 T08 To Patratoli 2.450 54.395 NCB Post 15th to 28th February 2011  

188

JH-1017

Kasir Road To Uchadih 2.300 45.830 NCB Post 15th to 28th February 2011  

189 Kundra To Katasaru 3.000 65.545 NCB Post 15th to 28th February 2011  

190 Kasir Road To Nicha Dumri 7.000 164.180 NCB Post 15th to 28th

February 2011  

191

JH-1018

T01 To Singrauli 2.550 54.847 NCB Post 15th to 28th February 2011  

192 T01 To Khasitoli 2.700 56.711 NCB Post 15th to 28th February 2011  

193 Atkora More To Saibatoli 2.100 46.794 NCB Post 15th to 28th  

Part - A February 2011

194 Atkora More To Saibatoli Part - B 1.400 31.461 NCB Post 15th to 28th

February 2011  

195JH-1027

Sh Trundu To Amtoli Part A 3.200 67.282 NCB Post 15th to 28th

February 2011  

196 Sh Trundu To Amtoli Part B 3.250 72.487 NCB Post 15th to 28th

February 2011  

197 JH-1028 Bamhani To Kuli 2.600 58.071 NCB Post 15th to 28th February 2011  

198 JH-1028 Bamhani To Kurmul 4.200 91.729 NCB Post 15th to 28th February 2011

199JH-1029

Kurkura To Betarkera 5.450 117.301 NCB Post 15th to 28th February 2011  

200 Jamdih To Panduloya 3.000 64.502 NCB Post 15th to 28th February 2011  

201JH-1034

Bamidih To Tangarsikwar 2.100 47.695 NCB Post 15th to 28th February 2011  

202 Bansari To Kotari 5.600 120.237 NCB Post 15th to 28th February 2011  

203JH-1036

Pwd Road Hapamuni To Chama Part - C 2.250 44.432 NCB Post 15th to 28th

February 2011  

204 Ganharda To Balakhatang 2.100 45.152 NCB Post 15th to 28th February 2011  

205JH-1037

Pwd Road To Mile 3.400 73.401 NCB Post 15th to 28th February 2011  

206 Sh Adra To Ghuti Part - B 1.050 22.955 NCB Post 15th to 28th February 2011  

207

JH-1039

Pwd Road To Kasporiya 3.100 68.963 NCB Post 15th to 28th February 2011  

208 Bartoli To Katchapara 3.000 64.265 NCB Post 15th to 28th February 2011  

209 Dhidhadi To Makra 2.450 50.068 NCB Post 15th to 28th  

February 2011

210

JH-1040

Bakaspur Chandatola To Bikuma Bikma Via Morha Toli

4.500 90.680 NCB Post 15th to 28th February 2011  

211 Sh School Loenga More To Akra Via Garra 1.500 33.191 NCB Post 15th to 28th

February 2011  

212 Gara To Karichuan 5.000 107.053 NCB Post 15th to 28th February 2011  

213JH-1041

T02 Monjbira To Semra Pakertoli 4.300 92.100 NCB Post 15th to 28th

February 2011  

214 Nirmaha To Dobitoli Via Merangbira 7.300 152.892 NCB Post 15th to 28th

February 2011  

215

JH-1042

Mahuagaon To Birju Part B 6.500 137.632 NCB Post 15th to 28th

February 2011  

216 Mahuagaon To Birju Part C 0.650 13.794 NCB Post 15th to 28th

February 2011  

217 Mahuagaon To Birju Via Icha 3.500 74.059 NCB Post 15th to 28th

February 2011  

218

JH-1043

T02 To Jogiya 3.600 73.948 NCB Post 15th to 28th February 2011  

219 T02 To Lakyabanstoli Part - B 1.500 32.591 NCB Post 15th to 28th

February 2011  

220 T02 To Sakrolikhas 4.700 104.069 NCB Post 15th to 28th February 2011  

221 T02 Amlatoli To Karanjtoli Via Bagaitoli 2.700 58.803 NCB Post 15th to 28th

February 2011  

222JH-1045

Sisai Bargaon Road To Kulamkery 3.250 69.138 NCB Post 15th to 28th

February 2011  

223 T03 To Lohaiyra Naditoli Via Lada 2.550 56.169 NCB Post 15th to 28th

February 2011  

224 JH-1049 Kapri Bpdp Road To Farsma

3.000 64.257 NCB Post 15th to 28th February 2011

 

225 Karamtoli To Dakia 5.450 117.682 NCB Post 15th to 28th February 2011  

226

JH-1051

Banari Ghaghra Road To Bethod Part B 2.000 45.090 NCB Post 15th to 28th

February 2011  

227 Banari Ghaghra To Labga 3.200 73.419 NCB Post 15th to 28th February 2011  

228 Banari Ghaghra To Barang 5.400 117.476 NCB Post 15th to 28th

February 2011  

229 Banari Ghaghra To Barang Part - B 3.000 61.430 NCB Post 15th to 28th

February 2011  

230JH-1054

Oriya To Tithi 3.500 76.746 NCB Post 15th to 28th February 2011  

231 Pwd Road Kokotoli 2.000 47.267 NCB Post 15th to 28th February 2011  

232

JH-1065

Kotengsera To Kutwa Road 4.000 88.275 NCB Post 15th to 28th

February 2011  

233 L024 To Karamtoli 2.700 56.409 NCB Post 15th to 28th February 2011  

234 Mahili Soso To Katasaru Part B 1.500 31.745 NCB Post 15th to 28th

February 2011  

235 Nh-23 Lamge To Chauli 2.500 53.728 NCB Post 15th to 28th February 2011  

236

JH-1066

Reo Road Mahuatoli To Bela Part B 3.000 65.679 NCB Post 15th to 28th

February 2011  

237 T09 To Behira Toli Via Kulhi Part B 2.500 56.819 NCB Post 15th to 28th

February 2011  

238 Aerodram To Tangratoli Part B 2.500 56.184 NCB Post 15th to 28th

February 2011  

239JH-1069

Sh Basia To Kulusera Part A 6.350 141.489 NCB Post 15th to 28th

February 2011  

240 Karamtoli To Majhkera 2.250 53.090 NCB Post 15th to 28th  

February 2011

241JH-1070

Mamarla To Bangoloya 3.400 73.758 NCB Post 15th to 28th February 2011  

242 Maharajganj To Nawatoli 7.350 176.194 NCB Post 15th to 28th February 2011  

243JH-1074

Tiral To Bombiyari 4.000 84.624 NCB Post 15th to 28th February 2011  

244 Konbir To Kadamdih Part A 8.000 175.074 NCB Post 15th to 28th

February 2011  

245

JH-1078

Tangratoli To Madanpur Part A 5.000 107.595 NCB Post 15th to 28th

February 2011  

246 Tangratoli To Madanpur Part B 1.500 33.087 NCB Post 15th to 28th

February 2011  

247 T01 Palmadeepa To Turiyamba Part-C 1.000 22.601 NCB Post 15th to 28th

February 2011  

248

JH-1079

Banohatoli To Kathikura 2.600 59.024 NCB Post 15th to 28th February 2011  

249 Jouli To Omsera 1.300 30.389 NCB Post 15th to 28th February 2011  

250 Pwd To Nawatoli Via Baghiya 2.250 51.440 NCB Post 15th to 28th

February 2011  

251 Chapartoli To Tirradih 3.250 72.544 NCB Post 15th to 28th February 2011  

252 JH-1080 Bpdp Road To Sokarahatu Part B 22.000 478.536 NCB Post 15th to 28th

February 2011  

253JH-1081

Banalat Reo Raod To Jamati 8.750 190.043 NCB Post 15th to 28th

February 2011  

254 Banari Ghaghra Road To Bethod 3.500 78.692 NCB Post 15th to 28th

February 2011  

255 JH-1085 Tangatoli To Kamalpur Kambatoli

4.500 106.247 NCB Post 15th to 28th February 2011

 

256 T01 Palmadipa To Turiyamba Part B 2.500 56.614 NCB Post 15th to 28th

February 2011  

257JH-10NBCC-17

Ramja To Bhijpur 3.575 78.852 NCB Post 15th to 28th February 2011  

258JH-10NBCC-18

Kasir Road To Lalmati 3.400 81.715 NCB Post 15th to 28th February 2011  

259 JH-1105 T06 Rud More To Gwaltola Dumraon 6.250 129.649 NCB Post 15th to 28th

February 2011  

260

JH-1106

Nh-33 Birhortola To Dangi 2.300 48.474 NCB Post 15th to 28th

February 2011  

261 T03 Deoriya More To Ghaghra Khurd 3.500 77.535 NCB Post 15th to 28th

February 2011  

262 Daria To Phuphundi 5.450 113.615 NCB Post 15th to 28th February 2011  

263 JH-1108 Reo Road To Madhopur 5.200 112.724 NCB Post 15th to 28th February 2011  

264JH-1109

Guljartola To Dudhpania 0.950 20.317 NCB Post 15th to 28th February 2011  

265 Reo Road To Bairisal 5.700 124.884 NCB Post 15th to 28th February 2011  

266

JH-1110

Nh-100 To Murkoi 4.400 93.172 NCB Post 15th to 28th February 2011  

267 T013 To Burwadih 1.425 30.369 NCB Post 15th to 28th February 2011  

268 Bankharo To Uchaghana 2.450 54.603 NCB Post 15th to 28th February 2011  

269 JH-1111 Jharpo To Garisaram 7.950 178.899 NCB Post 15th to 28th February 2011  

270 JH-1113 Nh Gorhar To Patitiri 3.800 87.494 NCB Post 15th to 28th February 2011

 

271 Nh2 To Meramgadda 1.900 43.823 NCB Post 15th to 28th February 2011  

272JH-1115

Garu Khura To Gotia 1.500 37.109 NCB Post 15th to 28th February 2011  

273 Gt Road To Dhurgargi 3.000 69.559 NCB Post 15th to 28th February 2011  

274JH-1116

Suji To Hathinder 3.525 79.192 NCB Post 15th to 28th February 2011  

275 Uchahi To Parsawan 1.500 35.932 NCB Post 15th to 28th February 2011  

276

JH-1122

Balsara Mandu Main Road To Dariya 1.450 34.223 NCB Post 15th to 28th

February 2011  

277 Budhibagi To Royang 3.325 74.380 NCB Post 15th to 28th February 2011  

278 Rikwa To Kurra 2.800 64.420 NCB Post 15th to 28th February 2011  

279JH-1124

Ango To Bedam 3.225 81.342 NCB Post 15th to 28th February 2011  

280 Bahera To Chanaro 2.645 58.871 NCB Post 15th to 28th February 2011  

281JH-1126

Deria Khurd To Deori Kala 1.825 40.344 NCB Post 15th to 28th

February 2011  

282 Sinuari To Nagari 2.000 44.892 NCB Post 15th to 28th February 2011  

283JH-1131

T01 To Magarpatta 4.400 104.390 NCB Post 15th to 28th February 2011  

284 Churchu To Pipra 1.150 28.511 NCB Post 15th to 28th February 2011  

285JH-1138

Hutpa To Tarwa 2.825 63.353 NCB Post 15th to 28th February 2011  

286 Demotand To Bakaspura 0.800 20.234 NCB Post 15th to 28th February 2011  

287

JH-1117

Gt Road To Kendua 3.225 75.433 NCB Post 15th to 28th February 2011  

288 Gt Road To Ahari Nawadih 2.500 54.715 NCB Post 15th to 28th

February 2011  

289 Jagdishpur To Gangaahar 1.100 24.261 NCB Post 15th to 28th February 2011  

290JH-1118

Nawaghar To (Mahuabab) Kanti 2.050 47.381 NCB Post 15th to 28th

February 2011  

291 Reo Road To Ramchak 2.739 65.899 NCB Post 15th to 28th February 2011  

292JH-1119

Gaira To Bero Khurd 2.075 54.190 NCB Post 15th to 28th February 2011  

293 Gaida To Basramo 2.400 56.788 NCB Post 15th to 28th February 2011  

294JH-1120

Daihar To Sohara 4.300 96.851 NCB Post 15th to 28th February 2011  

295 Gt Road To Jokat 4.175 93.156 NCB Post 15th to 28th February 2011  

296JH-1121

Bhadel To Amroli 4.300 99.112 NCB Post 15th to 28th February 2011  

297 Chaikala To Akurahawa 2.125 47.618 NCB Post 15th to 28th February 2011  

298JH-1123

2Nd Km Of T05 To Telaniadih 8.500 185.555 NCB Post 15th to 28th

February 2011  

299 T012 To Beram 5.400 116.217 NCB Post 15th to 28th February 2011  

300

JH-1125

Ango To Deogarha 4.425 100.991 NCB Post 15th to 28th February 2011  

301 Badam To Pakaria Tola 3.500 78.646 NCB Post 15th to 28th February 2011  

302 Gondalpura To Kadmatola 1.100 32.467 NCB Post 15th to 28th

February 2011  

303JH-1127

Pandaul To Mardu Soti 1.900 44.141 NCB Post 15th to 28th February 2011  

304 Sikari Gaon To Parpain 3.750 87.978 NCB Post 15th to 28th February 2011  

305

JH-1128

Edla To Hesakudar 5.000 109.265 NCB Post 15th to 28th February 2011  

306 Odrana To Jamuaria 3.400 74.810 NCB Post 15th to 28th February 2011  

307 Raibar To Horia 3.000 60.841 NCB Post 15th to 28th February 2011  

308JH-1129

T08 Simraia To Ara 4.750 105.531 NCB Post 15th to 28th February 2011  

309 Katkamsandi To Ulanj 3.400 71.991 NCB Post 15th to 28th February 2011  

310

JH-1130

Nh-100 To Bhutahi Murgaon 3.800 83.378 NCB Post 15th to 28th

February 2011  

311 Nh-100 To Chalanga 2.750 58.544 NCB Post 15th to 28th February 2011  

312 Sarukudar To Chihuta 3.750 80.799 NCB Post 15th to 28th February 2011  

313JH-1132

Reo Road Bero Kala To Ghorbanda 5.000 112.011 NCB Post 15th to 28th

February 2011  

314 Manpur To Kendua 2.025 52.391 NCB Post 15th to 28th February 2011  

315JH-1133

Alagdiha To Barano 3.700 96.439 NCB Post 15th to 28th February 2011  

316 Reo Toad Kimania To Burhiadih 3.250 89.726 NCB Post 15th to 28th

February 2011  

317 JH-1134 3Rd Km Of T05 To Mangaro 5.300 123.866 NCB Post 15th to 28th

February 2011  

318 1St Km Of T03 To Gundro

2.125 47.282 NCB Post 15th to 28th February 2011

 

319 Ledi More To Simaria 4.250 93.857 NCB Post 15th to 28th February 2011  

320 JH-1135 Kenduadih To Amatand 6.000 124.552 NCB Post 15th to 28th February 2011  

321

JH-1136

2Nd Km T05 To Bhelwachar 2.150 47.409 NCB Post 15th to 28th

February 2011  

322 Bara To Gantarbara 1.825 39.199 NCB Post 15th to 28th February 2011  

323 Govindpur Kala To Govindpur Khurd 3.450 72.852 NCB Post 15th to 28th

February 2011  

324 T010 Uprouli Murgaon 2.825 62.407 NCB Post 15th to 28th February 2011  

325 JH-1137 Debo To Margoja 5.600 127.915 NCB Post 15th to 28th February 2011  

326

JH-1139

Bundu More To Telodih 1.200 26.093 NCB Post 15th to 28th February 2011  

327 Gt Road To Jarahiya 2.850 59.625 NCB Post 15th to 28th February 2011  

328 Reo Road To Chatro 2.000 43.938 NCB Post 15th to 28th February 2011  

329 Gt Road To Laskari 1.500 32.495 NCB Post 15th to 28th February 2011  

330 JH-1140 Nh-33 To Dumardiha 4.675 102.447 NCB Post 15th to 28th February 2011  

331JH-1141

Bedo Kala To Chandgarha 2.350 60.687 NCB Post 15th to 28th

February 2011  

332 Palma More To Sewatarn 3.525 79.081 NCB Post 15th to 28th February 2011  

333JH-1143

Ramjita To Nayakhap Sirma 2.400 51.518 NCB Post 15th to 28th

February 2011  

334 Rampur To Asnabad 2.225 52.073 NCB Post 15th to 28th February 2011  

335 JH-11-HS-15 Nh-2 To Jawar Paharpur 7.055 172.702 NCB Post 15th to 28th

February 2011  

336 JH-14-NPCC-35 Hesla Rud Road To Betar 15.200 376.060 NCB Post 15th to 28th

February 2011  

337 JH-14-NPCC-38 Tarwadih To Kodag 5.000 138.850 NCB Post 15th to 28th

February 2011  

338 JH-14-NPCC-39 Rechuguta To Bathatkala 3.250 85.440 NCB Post 15th to 28th

February 2011  

339 JH-14-NPCC-40 Pakrar To Jadiang 3.400 92.630 NCB Post 15th to 28th

February 2011  

340 JH-14-NPCC-41 Nindir To Kudag 1.000 27.170 NCB Post 15th to 28th

February 2011  

341 JH-14-NPCC-42 Latehar To Orea 4.800 125.670 NCB Post 15th to 28th

February 2011  

342 JH-14-NPCC-44 Demu To Sakwar 7.450 191.520 NCB Post 15th to 28th

February 2011  

343 JH-14-NPCC-45 Nawadih To Kuku 3.600 93.400 NCB Post 15th to 28th

February 2011  

344 JH-14-NPCC-46

Pwd Road Labhar To Karmdih 7.000 187.450 NCB Post 15th to 28th

February 2011  

345 JH-14-NPCC-49

Labhar Mandal Road To Gasedag 1.200 32.410 NCB Post 15th to 28th

February 2011  

346 JH-14-NPCC-50 Pwd Road To Ladi 3.500 96.260 NCB Post 15th to 28th

February 2011  

347 JH-14-NPCC-51

Mahuadar To Parewa Via Chatkpur 4.100 105.870 NCB Post 15th to 28th

February 2011  

348 JH-14-NPCC-52

Pwd Road Akashi To Korgi 20.000 564.520 NCB Post 15th to 28th

February 2011  

349 JH-14-NPCC-53 Pwd Road To Harmunda 3.000 78.460 NCB Post 15th to 28th

February 2011  

350 JH-14-NPCC-56 Namudag To Manikdih 2.000 54.030 NCB Post 15th to 28th

February 2011  

351 JH-14-NPCC-57 Nh Road To Deobar 3.100 84.840 NCB Post 15th to 28th

February 2011  

352 JH-14-NPCC-58 Bandua To Hesatu 5.600 147.700 NCB Post 15th to 28th

February 2011  

353 JH-14-NPCC-59 Nadbelwa To Sewan 2.000 52.070 NCB Post 15th to 28th

February 2011  

354 JH-14-NPCC-60 Nh99 To Gurway 2.700 68.440 NCB Post 15th to 28th

February 2011  

355 JH-14-NPCC-61 Rajwar To Lakshipur 2.000 54.840 NCB Post 15th to 28th

February 2011  

356 JH-14-NPCC-62 Endwa To Sirsa Madh 2.500 65.240 NCB Post 15th to 28th

February 2011  

357 JH-14-NPCC-63

Pwd Road To Mukundpur Via Korwatoli 14.500 409.180 NCB Post 15th to 28th

February 2011  

358 JH-14-NPCC-65

Korwa Toli To Purni Dabri 2.500 67.560 NCB Post 15th to 28th

February 2011  

359 JH-14-NPCC-66 Pwd Garu To Henar 8.000 223.990 NCB Post 15th to 28th

February 2011  

360JH-15NBCC-01

Kota More To Dumari 2.025 47.568 NCB Post 15th to 28th February 2011  

361JH-15NBCC-02

Kaspur More To Kaspur 3.050 66.015 NCB Post 15th to 28th February 2011  

362 JH-15-NBCC-03

Dhanamunjee More To Dhanamunjee 0.850 17.833 NCB Post 15th to 28th

February 2011  

363 JH-15-NBCC-04 Nawa Toli To Akhileshar 1.975 45.160 NCB Post 15th to 28th

February 2011  

364 JH-15-NBCC-05

Reo Road Barkichapi More To Dubang 1.800 49.512 NCB Post 15th to 28th

February 2011  

365 JH-15-NBCC-06

Pwd Road Rajrom To Chitakoni 3.100 73.099 NCB Post 15th to 28th

February 2011  

366 JH-15-NBCC-07

Reo Road Sinju More To Bardih Rcc Bridge 2.125 52.029 NCB Post 15th to 28th

February 2011  

367JH-15NBCC-08

Pwd Road Pandra More To Pandra Village 1.850 40.044 NCB Post 15th to 28th

February 2011  

368JH-15NBCC-09

Reo Road Sukumar More To Kamale More Via Sukumar

2.350 54.434 NCB Post 15th to 28th February 2011  

369 JH-15-NBCC-10

Pwd Road Madarsa To Chirana 2.575 58.733 NCB Post 15th to 28th

February 2011  

370JH-15NBCC-11

Hisri To Aroga 6.400 143.185 NCB Post 15th to 28th February 2011  

371JH-15NBCC-12

Nirhu More To Nirhu 2.125 52.948 NCB Post 15th to 28th February 2011  

372JH-15NBCC-13

Pajhri To Semra More 4.400 97.025 NCB Post 15th to 28th February 2011  

373JH-15NBCC-14

Reo Road Kundgaraha More To Kungarha 2.250 49.927 NCB Post 15th to 28th

February 2011  

374JH-15NBCC-15

Bitpi More To Bitpi 2.500 57.408 NCB Post 15th to 28th February 2011  

375 JH- 1507 REO Road Salagi More to Khambhar 5.250 113.670 NCB Post 15th to 28th

February 2011  

376 JH- 1508 Kisko to Agardih Banpur to Bhushar 30.550 73.040 NCB Post 15th to 28th

February 2011  

377 JH- 1509 Bagru to Kerar 30.550 658.750 NCB Post 15th to 28th February 2011  

378 JH-1510 Barki Champi to Hotwar 5.200 110.420 NCB Post 15th to 28th  

February 2011

379 JH- 1511 REO Road Bandu Sarna Toli to Chatakpur 5.000 102.580 NCB Post 15th to 28th

February 2011  

380 JH-18-NBCC-44

Kota Village Maszid To Sarnatoli 1.000 23.281 NCB Post 15th to 28th

February 2011  

381 JH-18-NBCC-45 Edcherro More To Lada 1.500 31.497 NCB Post 15th to 28th

February 2011  

382 JH-18-NBCC-60

T06 (Karra Dumargari Lodhma Road) To Sardula

2.200 50.343 NCB Post 15th to 28th February 2011  

383 JH-18-NBCC-61 Tilmi To Masko 2.500 57.701 NCB Post 15th to 28th

February 2011  

384 JH-18-NBCC-62 Jamhar To Samundar 1.500 39.681 NCB Post 15th to 28th

February 2011  

385 JH-18-NBCC-63 Gari To Tetartoli 3.600 92.048 NCB Post 15th to 28th

February 2011  

386 JH-18-NBCC-64 Mahuatoli To Limra 1.500 36.978 NCB Post 15th to 28th

February 2011  

387 JH-18-NBCC-65 Nimdih To Nakidih 1.000 24.344 NCB Post 15th to 28th

February 2011  

388 JH-18-NBCC-66 Reo Road To Kuryamu 1.750 43.199 NCB Post 15th to 28th

February 2011  

389 JH-18-NBCC-67 Murutdih To Galau 1.500 40.761 NCB Post 15th to 28th

February 2011  

390 JH-18-NBCC-68 Jamudag To Magandih 2.000 50.585 NCB Post 15th to 28th

February 2011  

391 JH-18-NBCC-69 T03 Jamudag To Sigidh 2.000 46.779 NCB Post 15th to 28th

February 2011  

392 JH-18-NBCC-70 Fadimarch To Chututoli 1.400 34.235 NCB Post 15th to 28th

February 2011  

393 JH-18-NBCC-71

Puriyo Chachkopi Road To Graha Toli 1.750 41.433 NCB Post 15th to 28th

February 2011  

394 JH-18-NBCC-72 Tuju To Nachaldag 0.900 21.352 NCB Post 15th to 28th

February 2011  

395 JH-18-NBCC-73 Nh33 Harbul To Jaraya 3.000 73.196 NCB Post 15th to 28th

February 2011  

396 JH-18-NBCC-74

Raisatoli Tunju Road Jirkitoli To Sogad 3.100 72.819 NCB Post 15th to 28th

February 2011  

397 JH-18-NBCC-75

Sh Bhursudih To Domadih 4.630 106.733 NCB Post 15th to 28th

February 2011  

398 JH-18-NBCC-78

Bijupara Khelari Road To Bokatoli 2.200 53.314 NCB Post 15th to 28th

February 2011  

399 JH-18-NBCC-80 T03 To Irku 1.300 37.288 NCB Post 15th to 28th

February 2011  

400 JH-18-NBCC-83

Choriya Road To Nawagardh 1.300 30.950 NCB Post 15th to 28th

February 2011  

401 JH-18-NBCC-85

L001 Baludih To Ichahatu Via Tetla 2.400 55.443 NCB Post 15th to 28th

February 2011  

402

JH-2402

Patratu To Mundudih 2.575 61.894 NCB Post 15th to 28th February 2011  

403 Chakarbali To Hethkhakbra 3.400 83.759 NCB Post 15th to 28th

February 2011  

404 Korambe To Hesai 3.250 81.056 NCB Post 15th to 28th February 2011  

405 Bazartand To Butgorwa 2.125 52.103 NCB Post 15th to 28th February 2011  

406 JH-2403 Betul Kalan To Betul Khurd 2.475 57.413 NCB Post 15th to 28th

February 2011  

407 Bariatu Tonaghatu 1.550 35.311 NCB Post 15th to 28th February 2011  

408 Sondimra To Uladaka 1.650 41.060 NCB Post 15th to 28th February 2011  

409 Uparbarga To Asharhi Bagan

0.544 11.854 NCB Post 15th to 28th February 2011

 

410 Golamuri To Govindpur 2.164 55.089 NCB Post 15th to 28th February 2011  

411 Jangi To Tutatola 0.900 23.030 NCB Post 15th to 28th February 2011  

412 Gola To Barbatar 1.450 37.630 NCB Post 15th to 28th February 2011  

413 JH-2405 Churchu Simana To Tutki 13.650 298.785 NCB Post 15th to 28th February 2011  

414 JH-2406 Oriyatu To Ormanjhi Ranchi Sima 9.250 221.210 NCB Post 15th to 28th

February 2011  

415JH-2407

Teliyatu To Kander 4.125 99.015 NCB Post 15th to 28th February 2011  

416 Chetma To Lem 1.900 54.111 NCB Post 15th to 28th February 2011  

417JH-2408

Tapin To Routa - 2 5.500 138.850 NCB Post 15th to 28th February 2011  

418 Hesagarha To Bhutahi 3.320 77.657 NCB Post 15th to 28th February 2011  

419JH-2409

Bargon To Bhuiadih 3.660 87.989 NCB Post 15th to 28th February 2011  

420 Laiyo To Gaichandawa 6.750 161.335 NCB Post 15th to 28th February 2011  

421 JH-22-NPCC-19

Chambrasai to Chhota Guli 3.300 79.773 NCB Post 15th to 28th

February 2011  

422 JH-22-NPCC-20 Siyaljora to Baisai 2.550 65.492 NCB Post 15th to 28th

February 2011  

423 JH-22-NPCC-21 Gangimud to Jangiburu 7.200 185.630 NCB Post 15th to 28th

February 2011  

424 JH-22-NPCC-22

Banisagar Kharpos Road to Janumpi 2.350 640.056 NCB Post 15th to 28th

February 2011  

425 JH-22-NPCC-23 Kochra to Papupi 2.850 682.308 NCB Post 15th to 28th

February 2011  

426 JH-22-NPCC-24

Jojosai to Bunumlata Road 2.900 72.568 NCB Post 15th to 28th

February 2011  

427 JH-22-NPCC-25 Kasiyapecha to Jojogutu 4.350 115.910 NCB Post 15th to 28th

February 2011  

428 JH-22-NPCC-26 REO Road to Pradhanpali 2.800 70.160 NCB Post 15th to 28th

February 2011  

429 JH-22-NPCC-27

PWD Main Road to Bara Kudhna 1.750 43.315 NCB Post 15th to 28th

February 2011  

430 JH-22-NPCC-28

RWD Road to Roagat Road Via Kotagara 1.750 375.451 NCB Post 15th to 28th

February 2011  

431 JH-22-NPCC-29

Kotagara to Jonkopai Road 2.350 61.254 NCB Post 15th to 28th

February 2011  

432 JH-22-NPCC-30

Jomro to Ragrakocha Via Ghaghra 3.450 85.745 NCB Post 15th to 28th

February 2011  

433 JH-22-NPCC-31

Chaibasa Main Road To Tunia Border 4.300 101.059 NCB Post 15th to 28th

February 2011  

434 JH-22-NPCC-32

Bara Main Road To Jamjuri 2.300 55.053 NCB Post 15th to 28th

February 2011  

435 JH-22-NPCC-33

Bogda Main Road Tarkatocha 3.050 79.274 NCB Post 15th to 28th

February 2011  

436 JH-22-NPCC-34

Kuira Main Road Patahatu 2.250 57.449 NCB Post 15th to 28th

February 2011  

437 JH-22-NPCC-35

Toklo to Hessalkuti Via Kumrmunda Road 3.000 70.889 NCB Post 15th to 28th

February 2011  

438 JH-22-NPCC-36

Chainpur To Dudhkundi Road 2.250 56.624 NCB Post 15th to 28th

February 2011  

439 JH-22-NPCC-37 Jatragara to Bhutnasa 2.050 52.306 NCB Post 15th to 28th

February 2011  

440 JH-22-NPCC-38 Porahat to Upper Tola 4.650 107.415 NCB Post 15th to 28th

February 2011  

441 JH-22-NPCC-39 Matkambiri to Chadai 1.750 41.889 NCB Post 15th to 28th

February 2011  

442 JH-22-NPCC-40

Bachichamhatu to Churgui 3.050 70.644 NCB Post 15th to 28th

February 2011  

443 JH-22-NPCC-41

PWD Ganjubasa to Talabasa 2.750 65.356 NCB Post 15th to 28th

February 2011  

444 JH-22-NPCC-42

Bara Raikaman to Baida Road 2.200 56.395 NCB Post 15th to 28th

February 2011  

445 JH-22-NPCC-43

Barabalijori to Meralgora Road 5.650 132.184 NCB Post 15th to 28th

February 2011  

446 JH-22-NPCC-44 Ichakuti to Torlo 2.600 59.542 NCB Post 15th to 28th

February 2011  

447 JH-22-NPCC-45

Pwd Damodarpur To Kochra 5.100 121.129 NCB Post 15th to 28th

February 2011  

448 JH-22-NPCC-46

Matkamhatu To Kudapi Road 3.000 73.030 NCB Post 15th to 28th

February 2011  

449 JH-22-NPCC-47

Nawagaon To Bishwanathpur 1.950 58.092 NCB Post 15th to 28th

February 2011  

450 JH-22-NPCC-48 Balandia To Baibera 1.500 39.570 NCB Post 15th to 28th

February 2011  

451 JH-22-NPCC-49 Reo Road To Pendergarai 1.350 34.017 NCB Post 15th to 28th

February 2011  

452 JH-22-NPCC-50

Hesabandh To Kumartoli Road Part Ii 3.175 73.338 NCB Post 15th to 28th

February 2011  

453 JH-22-NPCC-51 Baihatu To Ladurasai 10.600 264.377 NCB Post 15th to 28th

February 2011  

454 JH-22-NPCC-52

Pwd Main Road To Nawada 17.500 446.088 NCB Post 15th to 28th

February 2011  

455 JH-22-NPCC-53

Porenger Road To Ganjana 6.450 151.150 NCB Post 15th to 28th

February 2011  

456 JH-22-NPCC-54 Chorarappa To Sidua 5.500 148.746 NCB Post 15th to 28th

February 2011  

457 JH-22-NPCC-55

Lumbai To Matiloyang Road 3.500 92.932 NCB Post 15th to 28th

February 2011  

458 JH-22-NPCC-56

Dhobasai To Tilopoda Road 3.300 79.685 NCB Post 15th to 28th

February 2011  

459 JH-22-NPCC-57

Ichapi To Jowaribhanga Road 5.150 124.338 NCB Post 15th to 28th

February 2011  

460 JH-22-NPCC-65

Dalposi To Adiwasi Tolly Road 4.100 98.927 NCB Post 15th to 28th

February 2011  

461 JH-22-NPCC-69

Kharpos To Benisagar Sima Benisagar Sima Via Panguaburu

5.600 135.930 NCB Post 15th to 28th February 2011  

462 JH-22-NPCC-70

Nayagaon Gobardhan Road 2.250 52.707 NCB Post 15th to 28th

February 2011  

463 JH-22-NPCC-71

Pwd Main Road To Tartara Via Tirla 3.200 77.526 NCB Post 15th to 28th

February 2011  

464 JH-22-NPCC-73 Dondari To Salai 2.850 74.918 NCB Post 15th to 28th

February 2011  

465 JH-22-NPCC-75 Barakasel To Jojobir 3.350 82.616 NCB Post 15th to 28th

February 2011  

466 JH-22-NPCC-76 Pansua To Kurabir 4.750 130.720 NCB Post 15th to 28th

February 2011  

467 JH-22-NPCC-77

Chhota Kudabera To Porlong Part Ii 2.250 54.484 NCB Post 15th to 28th

February 2011  

468 JH-22-NPCC-79 Parsa To Jamkojun 2.425 57.538 NCB Post 15th to 28th

February 2011  

469 JH-22-NPCC-80 Tergo To Tantnagar 1.600 43.497 NCB Post 15th to 28th

February 2011  

470 JH-22-NPCC-81

Mundasai To Sanmirghingi To Nimdih 2.225 52.108 NCB Post 15th to 28th

February 2011  

471 JH-22-NPCC-82 Gura To Buyasai Road 2.650 61.152 NCB Post 15th to 28th

February 2011  

472 JH-22-NPCC-83 Ruia Road To Ichapi 1.250 29.002 NCB Post 15th to 28th

February 2011  

473 JH-22- Rutasai To Bichhagutu 3.800 91.260 NCB Post 15th to 28th  

NPCC-84 February 2011

474 JH-22-NPCC-85 Tentre Road To Murdih 1.700 44.841 NCB Post 15th to 28th

February 2011  

475 JH-22-NPCC-86

Pwd Main Road To Kulaburu Road 4.850 111.442 NCB Post 15th to 28th

February 2011  

476 JH-22-NPCC-87

Pasuhatu To Galubasa Road Part Ii 5.175 119.027 NCB Post 15th to 28th

February 2011  

477 JH-22-NPCC-88 Badia To Mahulsai Road 7.200 168.167 NCB Post 15th to 28th

February 2011  

478 JH-22-NPCC-89

Manjhari Canal To Jangiulla Road 3.050 74.139 NCB Post 15th to 28th

February 2011  

479 JH-22-NPCC-90

Ukamadkam To Pukripi Road 2.650 61.052 NCB Post 15th to 28th

February 2011  

480 JH-22-NPCC-91 Konabasa To Harila 2.000 46.304 NCB Post 15th to 28th

February 2011  

481 JH-22-NPCC-92

Ulihatu To Manjhagaon Benisagar Sonaposi Road 3.375 81.139 NCB Post 15th to 28th

February 2011  

482 JH-22-NPCC-93

Bpdp Road To Rugari Road 1.700 41.647 NCB Post 15th to 28th

February 2011  

483 JH-22-NPCC-94

Sarjamdih To Kishunpur Road 6.300 149.191 NCB Post 15th to 28th

February 2011  

484 JH-22-NPCC-95 Munda Tola To Udaypur 1.050 25.854 NCB Post 15th to 28th

February 2011  

485 JH-22-NPCC-97 Rajbijaypur To Tilopoda 1.050 26.953 NCB Post 15th to 28th

February 2011  

486 JH-22-NPCC-98 Reo Road To Jilingutu 1.500 39.251 NCB Post 15th to 28th

February 2011  

    Total 1662.92 40404.95        4. Meghalaya

1 MG/03/01 Mustem-Iongnoh 5.00 340.73 NCB Post 20th March to 15th May 2011  

2 MG/03/02 Lakadong to Madanpohkseh 8.00 572.69 NCB Post 20th March to

15th May 2011  

3 MG/03/03 Barato to Iongkwang 4.00 241.64 NCB Post 20th March to 15th May 2011  

4 MG/03/04 Mulait to Mukhain 6.20 387.01 NCB Post 20th March to 15th May 2011  

5 MG/03/05 Sutnga- Sumer to Kyrluh 3.70 267.44 NCB Post 20th March to 15th May 2011  

6 MG//03/06 Syntuksiar to Chyrmang 5.50 125.78 NCB Post 20th March to 15th May 2011  

7 MG/03/07 Mynsngad to Umladang 9.00 322.86 NCB Post 20th March to 15th May 2011  

8 MG/03/08 DSSMH to Thuruk 14.50 1067.98 NCB Post 20th March to 15th May 2011  

9 MG/04/01 UJ road to Pamrinai via Pamlaban 7.40 592.43 NCB Post 20th March to

15th May 2011  

10 MG/04/02 Umsning-Mawrong road to Banbudai 4.00 282.39 NCB Post 20th March to

15th May 2011  

11 MG/04/03 Umta to Mawkangi 4.62 329.36 NCB Post 20th March to 15th May 2011  

12 MG/04/04 MMR Road to Nongrim Jirang 10.00 853.18 NCB Post 20th March to

15th May 2011  

13MG/04/05

Myrdon-Mawtari road to Myrdon Nongbah 2.50 83.41 NCB Post 20th March to

15th May 2011  

14 Umsning-Mawrong road to Syngku 3.00 87.32 NCB Post 20th March to

15th May 2011  

15 MG/04/06 17th.km of UK road to Sohjarang-Umpdem 15.75 503.00 NCB Post 20th March to

15th May 2011  

16 MG/04/07 Sonidan-Lamalong Road 9.00 315.05 NCB Post 20th March to 15th May 2011  

17 MG/01/01 Chekweibibra-Rongbing Boldak 4.16 183.09 NCB Post 20th March to

15th May 2011  

18 MG/01/02 T03-Gabil Koksi 4.21 270.03 NCB Post 20th March to 15th May 2011  

19 MG/01/03 T03-Mandalanggre-Bulpoma 5.00 471.81 NCB Post 20th March to

15th May 2011  

20 MG/01/04 Rongdu Haslong- Dabitgittim 9.71 689.17 NCB Post 20th March to

15th May 2011  

21 MG/01/05 T02-New Kantolguri 1.537 86.96 NCB Post 20th March to 15th May 2011  

22 MG/01/06 L32-Millawe 2.045 150.71 NCB Post 20th March to 15th May 2011  

23 MG/01/07 Williamnagar-Chekwebibra 3.07 157.30 NCB Post 20th March to

15th May 2011  

24 MG/05/01 Jongkol to Dabram 2.50 89.00 NCB Post 20th March to 15th May 2011  

25 MG/05/02 Kenegre to Emandurabanda 6.00 195.94 NCB Post 20th March to

15th May 2011  

26 MG/05/03 Jaisrugittim to Darang Boldak via Darang Dura 9.907 836.44 NCB Post 20th March to

15th May 2011  

27 MG/05/04 Budugre to Jetragre 11.752 626.97 NCB Post 20th March to 15th May 2011  

28 MG/06/01 70th km of AMPT Road to Singwilgre 1.998 105.92 NCB Post 20th March to

15th May 2011  

29 MG/06/02 Baljek Agal to Rongsep Adinggre 3.323 212.26 NCB Post 20th March to

15th May 2011  

30 MG/06/03 10th km of AMPT Road (Gnarugre) to Rongalgre 4.660 283.21 NCB Post 20th March to

15th May 2011  

31 MG/06/04 Kalchenggre to Rongramgre (Phase II) 2.557 156.30 NCB Post 20th March to

15th May 2011  

32 MG/06/05 18th km of AP Road to Somonpara 3.227 215.51 NCB Post 20th March to

15th May 2011  

33 MG/06/06 Rongchadenggre to Wakantagre 1.807 124.85 NCB Post 20th March to

15th May 2011  

( upto Jamanggre ) Sec - I

34 MG/06/077th km of Ampati Boldamagre Road to Kangbakpara

3.927 247.03 NCB Post 20th March to 15th May 2011  

35 MG/06/08 Joyfar to Kashra Phase I (upto Belbari) 2.906 156.10 NCB Post 20th March to

15th May 2011  

36 MG/06/09 4th km of KG Road to Dinangpara 4.779 335.29 NCB Post 20th March to

15th May 2011  

37 MG/06/10 58th km of AMPT Road to Balujhora 2.181 182.09 NCB Post 20th March to

15th May 2011  

38 MG/06/11 Waringtonggre to Gondenggre 2.935 168.39 NCB Post 20th March to

15th May 2011  

39 MG/06/12 Kamaboldakgre to Sotmarenggre 3.714 230.52 NCB Post 20th March to

15th May 2011  

40 MG/06/13 Hatisil to Muji Agalgre 1.711 114.94 NCB Post 20th March to 15th May 2011  

41 MG/06/14Rongchadenggre to Wakantagre ( Sec-II )

5.962 331.46 NCB Post 20th March to 15th May 2011  

42 MG/06/15 Damal Asim to Tebronggre upto Dipogre 5.846 367.47 NCB Post 20th March to

15th May 2011  

43 MG/06/16 Pedaldoba Raksamgre Road to Megapara 5.284 386.81 NCB Post 20th March to

15th May 2011  

44 MG/06/17 14th km of KG Road to Rongsepgre 4.564 433.15 NCB Post 20th March to

15th May 2011  

45 MG/06/183rd km of Chengjora Anderkhona Road to Abiselagre

2.141 145.15 NCB Post 20th March to 15th May 2011  

46 MG/06/192nd km. of Selsella Tangaon Road to Chamaguri

4.422 323.89 NCB Post 20th March to 15th May 2011  

47 MG/06/20 Bokda Apal to Waram 4.359 165.03 NCB Post 20th March to  

Asimgre 15th May 2011

48 Dolong Manda to Chikasingre 8.000 202.14 NCB Post 20th March to

15th May 2011  

49 Rongkhon to Darechikgre 2.000 86.85 NCB Post 20th March to 15th May 2011  

5039th km of Rongram Phulbari Road to Sadolpara

2.825 97.88 NCB Post 20th March to 15th May 2011  

51

MG/06/21

TD Road (NH-51) to Agindarenggre 3.620 96.49 NCB Post 20th March to

15th May 2011  

52 TD Road (NH-51) to Kharonggre 1.600 60.06 NCB Post 20th March to

15th May 2011  

53 Dengnakpara to Rongchadenggre 4.000 102.50 NCB Post 20th March to

15th May 2011  

54 Chengjhora to Anderkhona 3.000 91.76 NCB Post 20th March to

15th May 2011  

55 109th km of AMPT Road to Dopatchigre 2.000 70.06 NCB Post 20th March to

15th May 2011  

56

MG/06/22

Betasing Bazar to Banduraja 2.000 95.50 NCB Post 20th March to

15th May 2011  

57 Marharlipara to Garagre 2.500 107.59 NCB Post 20th March to 15th May 2011  

58 8th km of AP Road to Darugre via Chepagre 3.550 125.26 NCB Post 20th March to

15th May 2011  

59

MG/06/23

Shyamnagar to Gopalthan 2.000 88.22 NCB Post 20th March to 15th May 2011  

60 60th km of AMPT Road to Askikandi 1.640 50.98 NCB Post 20th March to

15th May 2011  

61 New Bhaitbari to Peradanga 1.500 53.94 NCB Post 20th March to

15th May 2011  

62 44th km of AMPT Road to Puskarnipara 1.000 32.92 NCB Post 20th March to

15th May 2011  

63MG/06/24

Bollongitok to Dolwakgre 8.500 295.11 NCB Post 20th March to 15th May 2011  

64 NEC Bye Pass to Kalajhar 3.707 114.28 NCB Post 20th March to 15th May 2011  

65 MG/02/012nd km of Mawlat Wahlakhiat Road to Mawkria Wahlyngdoh

6.000 398.17 NCB Post 20th March to 15th May 2011  

66 MG/02/02 Rangphlang to Rasong 6.000 666.92 NCB Post 20th March to 15th May 2011  

67 MG/02/03 Khrang to Sder 8.000 779.28 NCB Post 20th March to 15th May 2011  

68 MG/02/04 Mawryngkang to Nongthymmai (Mawshun) 2.500 256.11 NCB Post 20th March to

15th May 2011  

69 MG/02/05 Lyngkhat Tmar to Nongsohphan (Sec- II) 3.000 278.83 NCB Post 20th March to

15th May 2011  

70 MG/02/06 Extension of LLMS Road to Sohkynduh (Sec- II) 2.750 245.15 NCB Post 20th March to

15th May 2011  

71 MG/02/10 Mawkhanu to Jaroit (Stage - II) 5.000 168.65 NCB Post 20th March to

15th May 2011  

72

MG/02/11

Hurupukni to Pyndengborsora,Lalpani (Sec - II) (i/c Stage II)

2.488 199.39 NCB Post 20th March to 15th May 2011  

73Balat Shella Road to Terajamra,Khadarbri (Sec - II) (i/c Stage - II)

2.342 171.97 NCB Post 20th March to 15th May 2011  

74

MG/02/12

TTM Road to Thynroit (Stage - II) 2.000 52.66 NCB Post 20th March to

15th May 2011  

75 Laitkor to Nonglum (Stage - II) 1.856 47.57 NCB Post 20th March to

15th May 2011  

76 Smit Umiew to Maw-U-Sam (Stage - II) 2.402 66.13 NCB Post 20th March to

15th May 2011  

77 MG/02/13 Pomlakrai to Mawnarain 1.500 40.96 NCB Post 20th March to  

(Stage - II) 15th May 2011

78 Laitkor to Lumheh (Stage - II) 1.674 38.90 NCB Post 20th March to

15th May 2011  

79 Maweitnai to Lyngkien (Stage - II) 2.922 69.11 NCB Post 20th March to

15th May 2011  

80

MG/02/14

NN Road to Bangla (Stage - II) 1.500 44.56 NCB Post 20th March to

15th May 2011  

81 SWN Road to Umsaw Village (Stage - II) 1.500 44.00 NCB Post 20th March to

15th May 2011  

823rd km of MM Road to Mawreng (Sohtun) (Stage - II)

1.000 23.76 NCB Post 20th March to 15th May 2011  

83 16th km of NH-40 to Nongbet (Stage - II) 1.000 24.71 NCB Post 20th March to

15th May 2011  

84 16 th km of NH-40 to Lyngkien (Stage - II) 1.000 24.70 NCB Post 20th March to

15th May 2011  

85MG/02/15

Bororyngku to Betgora (Stage - II) 1.900 102.40 NCB Post 20th March to

15th May 2011  

86 Mawphlang Balat Road to Lumdiengngan 1.000 34.73 NCB Post 20th March to

15th May 2011  

87 MG/02/07 T-05 (Mawpyrshong) to Madan Langning 4.354 586.14 NCB Post 20th March to

15th May 2011  

88 MG/02/08 Mawlong to Lumkseh 7.475 870.58 NCB Post 20th March to 15th May 2011  

89 MG/02/09 JAROIT TO Nonghali & Mynriang 10.190 1058.21 NCB Post 20th March to

15th May 2011  

90 MG/07/01 Shngimawlein to Sohma 4.270 354.99 NCB Post 20th March to 15th May 2011  

91 MG/07/02 Photjaud to Mawbidong 5.500 382.88 NCB Post 20th March to 15th May 2011  

92 MG/07/03 Umjarain to Diwah 8.000 566.86 NCB Post 20th March to 15th May 2011  

93 MG/07/04 Mawdoh to Synia 5.000 272.27 NCB Post 20th March to 15th May 2011  

94 MG/07/05 Rangthong to Ngunraw 12.000 366.71 NCB Post 20th March to 15th May 2011  

95 MG/07/07 Mawkyrwat to Marshillong 5.000 111.20 NCB Post 20th March to

15th May 2011  

96 MG/07/10 Tyllang to Nongriat 5.000 105.59 NCB Post 20th March to 15th May 2011  

97 MG/07/12 Nongjri to Jynruniang-brak 20.000 1802.06 NCB Post 20th March to

15th May 2011  

98 MG/07/13 Nayapara to Koltapara 3.000 184.00 NCB Post 20th March to 15th May 2011  

    Total 446.93 27026.75        5. Uttarakhand

1 UT/01/01 Jakoli Bend to Gauna Motor RoadStage-I 20.55 1233.00 NCB Post 15th to 31st

May 2011  

2 UT/01/02 Sadar to Saknana Motor Road-Stage-I 5.00 300.00 NCB Post 15th to 31st

May 2011  

3 UT/01/03 Chamtola to Papoli Motor Road-Stage-I 2.25 135 NCB Post 15th to 31st

May 2011  

4 UT/01/04 Dayalikhet to Airoli Motor Road-Stage-I 15.00 900 NCB Post 15th to 31st

May 2011  

5 UT/03/01Meen dagoti Rd to Hanskoti Motor Road-Stage-I

4.00 240 NCB Post 15th to 31st May 2011  

6 UT/03/02 Mathar to Airoli Motor Road-Stage-I 4.00 240 NCB Post 15th to 31st

May 2011  

7 UT/03/03 Kanak Chauri to Pangatha Motor Road-Stage-I 3.00 180 NCB Post 15th to 31st

May 2011  

8 UT/07/01 Matholia Gaon to Majuli Motor Road-Stage-I 5.00 300 NCB Post 15th to 31st

May 2011  

9 UT/07/02 Sarana to Khawakhet 5.00 300 NCB Post 15th to 31st  

Motor Road-Stage-I May 2011

10 UT/09/01 Nachani to Bhaiskot Motor Road-Stage-I 15.00 900 NCB Post 15th to 31st

May 2011  

11 UT/10/01 Lambgondi to Tulanga Motor Road-Stage-I 9.00 540 NCB Post 15th to 31st

May 2011  

12 UT/10/02 Chopda to Udamanda Motor Road-Stage-I 18.00 1080 NCB Post 15th to 31st

May 2011  

13 UT/13/01Gyansu-Sald-Uprikot to Bharar Gaon Motor Road-Stage-I

7.50 450 NCB Post 15th to 31st May 2011  

14 UT/13/02 Jakhol to Liwari Motor Road-Stage-I 20.00 1200 NCB Post 15th to 31st

May 2011  

15 UT/01/05 ODR-36 to Jalahat Motor Road-Stage-II 4.70 188 NCB Post 15th to 31st

May 2011  

16 UT/01/06 Maniyagar to Khola Motor Road-Stage-II 7.79 311.6 NCB Post 15th to 31st

May 2011  

17 UT/01/07Petshal-Bamanswal to Kapkot Motor Road-Stage-II

15.18 607.2 NCB Post 15th to 31st May 2011  

18 UT/01/08Guranabanj to Chami Archoli Motor Road-Stage-II

13.36 534.4 NCB Post 15th to 31st May 2011  

19 UT/01/09Saundhar to Panua Dekhan Motor Road-Stage-II

15.75 630 NCB Post 15th to 31st May 2011  

20 UT/02/01 Harsila to Nan Kanyalikot Motor Road-Stage-II 10.00 400 NCB Post 15th to 31st

May 2011  

21 UT/02/02 MunarBend to Supi Motor Road-Stage-II 8.00 320 NCB Post 15th to 31st

May 2011  

22 UT/02/03 Mathro Patli to Lakhani Motor Road-Stage-II 14.00 560 NCB Post 15th to 31st

May 2011  

23 UT/02/04 Simar to Kansyari Motor 4.62 184.8 NCB Post 15th to 31st  

Road-Stage-II May 2011

24 UT/02/05Kafligair-Kholsir to Naugaon Sainj Motor Road-Stage-II

6.66 266.4 NCB Post 15th to 31st May 2011  

25 UT/02/06 Ayatula Wajula to Charon Motor Road-Stage-II 1.86 74.4 NCB Post 15th to 31st

May 2011  

26 UT/03/04Upper Chamoli to Khainuri Motor Road-Stage-II

7.83 313.20 NCB Post 15th to 31st May 2011  

27 UT/03/05 Thirpak to Kandai Motor Road-Stage-II 14.81 592.40 NCB Post 15th to 31st

May 2011  

28 UT/03/06 Parkhal to Dungri Motor Road-Stage-II 11.95 478.00 NCB Post 15th to 31st

May 2011  

29 UT/03/07 Bareth to Pindwali Motor Road-Stage-II 8.72 348.80 NCB Post 15th to 31st

May 2011  

30 UT/03/08 Mulagarh to Matai Motor Road-Stage-II 10.84 433.60 NCB Post 15th to 31st

May 2011  

31 UT/03/09 Tharali to Kurar Motor Road-Stage-II 16.89 675.60 NCB Post 15th to 31st

May 2011  

32 UT/03/10 Dungri to Ratgaon Motor Road-Stage-II 6.01 240.40 NCB Post 15th to 31st

May 2011  

33 UT/04/01PDL Road-Stage-II to Salna- Kanakot Motor Road-Stage-II

10.30 412 NCB Post 15th to 31st May 2011  

34 UT/04/02

Lipulekh-Bhind Road Km-329 to PanchPakhariya Motor Road Stage-II

1.07 42.8 NCB Post 15th to 31st May 2011  

35 UT/04/03 Walik to Gagar Motor Road-Stage-II 17.00 680 NCB Post 15th to 31st

May 2011  

36 UT/04/04 Mandlak Pande to Selpar Motor Road-Stage-II 4.65 186 NCB Post 15th to 31st

May 2011  

37 UT/04/05Champawat-Kharkkarki to Mudiyani Motor Road-Stage-II

8.50 340 NCB Post 15th to 31st May 2011  

38 UT/04/06 Bagoti to Dungraleti Motor Road-Stage-II 9.50 380 NCB Post 15th to 31st

May 2011  

39 UT/04/07Dungrabora Kayal Km-1 to Matiyani Motor Road-Stage-II

7.00 280 NCB Post 15th to 31st May 2011  

40 UT/04/08Champawat Munch to Neerh Motor Road-Stage-II

6.00 240 NCB Post 15th to 31st May 2011  

41 UT/04/09 Vantoli to Dayartoli Motor Road-Stage-II 5.63 225.2 NCB Post 15th to 31st

May 2011  

42 UT/04/10Tanakpur-Tawaghat Road to Bapratalla Motor Road Stage-II

4.50 180 NCB Post 15th to 31st May 2011  

43 UT/05/01 Langha to Binhar Motor Road-Stage-II 15.59 623.6 NCB Post 15th to 31st

May 2011  

44 UT/05/02 Hanol to Chatra Motor Road-Stage-II 3.03 121.2 NCB Post 15th to 31st

May 2011  

45 UT/05/03 Lokhandi Tibba to Lohari Motor Road-Stage-II 4.91 196.4 NCB Post 15th to 31st

May 2011  

46 UT/05/04Pajitilani to Chhibau Khamroli Motor Road-Stage-II

2.92 116.8 NCB Post 15th to 31st May 2011  

47 UT/05/05Chakrata-Mussoorie Road Km-72 to Hayo Tagri Motor Road Stage-II

12 480 NCB Post 15th to 31st May 2011  

48 UT/05/06JPPR Road Km-156 to Radu Mundhol Motor Road Stage-II

18.46 738.4 NCB Post 15th to 31st May 2011  

49 UT/05/07 JPRR-Raigi Road to 9.51 380.4 NCB Post 15th to 31st  

Kulha Motor Road Stage-II May 2011

50 UT/05/08 Kimari to Rikholi Motor Road-Stage-II 3.05 122 NCB Post 15th to 31st

May 2011  

51 UT/05/09

Starting Point of Horawala-Koti-Dhalani Motor Road-Stage-II (Missing Link)

2.55 102 NCB Post 15th to 31st May 2011  

52 UT/05/10JPRR Motor Road Km-158 to Raigi Motor Road Stage-II

7.49 299.6 NCB Post 15th to 31st May 2011  

53 UT/05/11 Chhachwakhera to Dungri Motor Road-Stage-II 10.83 433.2 NCB Post 15th to 31st

May 2011  

54 UT/05/12 Kyarapur to Kota Myunda Motor Road-Stage-II 21.63 865.2 NCB Post 15th to 31st

May 2011  

55 UT/07/03 Chhirakhan to Amjar Motor Road-Stage-II 26.28 1051.2 NCB Post 15th to 31st

May 2011  

56 UT/07/04Kathgodam-Bhawali-Nathuwakhan to Gargaon Motor Road-Stage-II

5.00 200 NCB Post 15th to 31st May 2011  

57 UT/08/01 Bedikhal to Chorkinda Motor Road-Stage-II 4.35 174 NCB Post 15th to 31st

May 2011  

58 UT/08/02 Naudkhal to Mallakota Motor Road-Stage-II 8.28 331.2 NCB Post 15th to 31st

May 2011  

59 UT/08/03 Dharkot to Kalwari Motor Road-Stage-II 4.03 161.2 NCB Post 15th to 31st

May 2011  

60 UT/08/04 Majiyari to Kulasu Motor Road-Stage-II 10.28 411.2 NCB Post 15th to 31st

May 2011  

61 UT/08/05 Bungidhar to Riksal Motor Road-Stage-II 2.33 93.2 NCB Post 15th to 31st

May 2011  

62 UT/08/06 Pinanidhar to Pinani Motor Road-Stage-II 3.66 146.4 NCB Post 15th to 31st

May 2011  

63 UT/08/07 Sadarbend to Aithi Motor Road-Stage-II 7.00 280 NCB Post 15th to 31st

May 2011  

64 UT/08/08Parsundakhal to Kandai Malli Motor Road-Stage-II

6.63 265.2 NCB Post 15th to 31st May 2011  

65 UT/08/09 Piplipani to Nauli Dharkot Motor Road-Stage-II 6.32 252.8 NCB Post 15th to 31st

May 2011  

66 UT/08/10 Bharoli to Maithana Motor Road-Stage-II 1.60 64 NCB Post 15th to 31st

May 2011  

67 UT/08/11 Chakisain to Jakh Motor Road-Stage-II 1.50 60 NCB Post 15th to 31st

May 2011  

68 UT/09/02 Timta-Bungligunth Motor Road-Stage-II Km-1 to 29 29.00 1160.00 NCB Post 15th to 31st

May 2011  

69 UT/09/03Gurna Gogina Km-5 to Salla Motor Road-Stage-II

16.10 644.00 NCB Post 15th to 31st May 2011  

70 UT/09/04Thal Munsyari Road-Stage-II Km-43 to Samkot Motor Road-Stage-II

16.05 642.00 NCB Post 15th to 31st May 2011  

71 UT/09/05 Dasaithal to Uprara Motor Road-Stage-II 5.25 210.00 NCB Post 15th to 31st

May 2011  

72 UT/09/06 Sangor to Dasholi Danu Motor Road-Stage-II 4.00 160.00 NCB Post 15th to 31st

May 2011  

73 UT/09/07 Khirmande to Naini Motor Road-Stage-II 8.00 320.00 NCB Post 15th to 31st

May 2011  

74 UT/09/08Chaunala Barsunbari to Damde Motor Road-Stage-II

3.50 140.00 NCB Post 15th to 31st May 2011  

75 UT/09/09Kafaldungri Sangar Baste Gangara Motor Road-Stage-II

5.00 200.00 NCB Post 15th to 31st May 2011  

76 UT/09/10 Bansbagar to Dhamigaon 8.00 320.00 NCB Post 15th to 31st  

Motor Road-Stage-II May 2011

77 UT/09/11

Starting Point of Devalthal Urai Motor Road-Stage-II (Missing Link)

0.82 32.80 NCB Post 15th to 31st May 2011  

78 UT/10/03Basukedar to Kyark Basuri Motor Road-Stage-II

2.85 114.00 NCB Post 15th to 31st May 2011  

79 UT/10/04 Barawmalla to Kandi Motor Road-Stage-II 8.10 324.00 NCB Post 15th to 31st

May 2011  

80 UT/10/05Gorpa Sirwari to Kurchhola Motor Road-Stage-II

19.15 766.00 NCB Post 15th to 31st May 2011  

81 UT/10/06 Basti to Hat Motor Road-Stage-II 17.78 711.20 NCB Post 15th to 31st

May 2011  

82 UT/11/01 Shivpuri to Timli Motor Road-Stage-II 16.02 640.8 NCB Post 15th to 31st

May 2011  

83 UT/11/02 Tipri to Chahgadoliya Motor Road-Stage-II 14.97 598.8 NCB Post 15th to 31st

May 2011  

84 UT/11/03 Khola to Dharpayankoti Motor Road-Stage-II 17.66 706.4 NCB Post 15th to 31st

May 2011  

85 UT/11/04PT Road-Stage-II Km-20 to Kaflog Motor Road-Stage-II

5.00 200 NCB Post 15th to 31st May 2011  

86 UT/11/05 Naini to Pathwara Motor Road-Stage-II 12.86 514.4 NCB Post 15th to 31st

May 2011  

87 UT/11/06 Gairiraj to Kordi Motor Road-Stage-II 3.65 146 NCB Post 15th to 31st

May 2011  

88 UT/11/07Khatwar Bend to Ringoli Malli Motor Road-Stage-II

6.00 240 NCB Post 15th to 31st May 2011  

89 UT/11/08 Hindolakhal to Unana 6.07 242.8 NCB Post 15th to 31st  

Motor Road-Stage-II May 2011

90 UT/13/03 Lakhamandal to Bhankoli Motor Road-Stage-II 9.14 365.60 NCB Post 15th to 31st

May 2011  

91 UT/13/04 Phoolchatti to Kharsali Motor Road-Stage-II 8.77 350.80 NCB Post 15th to 31st

May 2011  

92 UT/13/05 Barkot to Bhatiya Motor Road-Stage-II 5.88 235.20 NCB Post 15th to 31st

May 2011  

93 UT/13/06 ODR-6 (Mori) to Nanai Motor Road-Stage-II 6.53 261.20 NCB Post 15th to 31st

May 2011  

94 UT/13/07Km- 65 of MDR-5 to Kishanpur Motor Road-Stage-II

3.69 147.60 NCB Post 15th to 31st May 2011  

95 UT/13/08Khalsi Link Road to Khalsi Motor Road Stage-II

18.79 751.60 NCB Post 15th to 31st May 2011  

96 UT/13/09Extn. of Rajgarhi-Gangtari-Sarnaul Motor Road-Stage-II

15.77 630.80 NCB Post 15th to 31st May 2011  

97 UT/13/10 Gangori to Nald Motor Road-Stage-II 6.48 259.20 NCB Post 15th to 31st

May 2011  

98 UT/13/11NH-94 Khurmola to Naggaon Motor Road-Stage-II

8.05 322.00 NCB Post 15th to 31st May 2011  

99 UT/01/10 Patigair to Dangkarkoti Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

100 UT/01/11 Dudliy Bisht to Sungari Motor Road 15.00 900.00 NCB Post 15th to 31st

May 2011  

101 UT/01/12 Baur Malla to Baur Talla Motor Road 3.00 180.00 NCB Post 15th to 31st

May 2011  

102 UT/01/13 Katkinal to Ajoli Talli Motor Road 10.00 600.00 NCB Post 15th to 31st

May 2011  

103 UT/02/07 Balighat Dofar to Khuldor 9.00 540.00 NCB Post 15th to 31st  

Motor Road May 2011

104 UT/02/08 Jarkhot Sundil to Sundil Junayal Motor Road 2.00 120.00 NCB Post 15th to 31st

May 2011  

105 UT/02/09 Bijarijhal to Ukhalson Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

106 UT/02/10 Wacham to Khati Motor Road 6.00 360.00 NCB Post 15th to 31st

May 2011  

107 UT/02/11 Dangoli to Bunga Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

108 UT/03/11 Pokhari to Kandai Motor Road 16.00 960.00 NCB Post 15th to 31st

May 2011  

109 UT/04/11 Walson to Puniyal Motor Road 11.00 660.00 NCB Post 15th to 31st

May 2011  

110 UT/04/12 Barakot to Kothera Motor Road 15.00 900.00 NCB Post 15th to 31st

May 2011  

111 UT/05/13 Silikhad to Jabrad Motor Road 6.00 360.00 NCB Post 15th to 31st

May 2011  

112 UT/05/14 Sahastradhara to Naliwala Motor Road 10.00 600.00 NCB Post 15th to 31st

May 2011  

113 UT/05/15 Kotha Band to Pajiya Motor Road 15.00 900.00 NCB Post 15th to 31st

May 2011  

114 UT/07/05 Takura Bridge Rd Km 4 to Tugrar Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

115 UT/07/06 Bereilly Almora Rd Km 172 to Sirsa Motor Road 3.00 180.00 NCB Post 15th to 31st

May 2011  

116 UT/07/07 Dove to Mallatirdakot Motor Road 4.00 240.00 NCB Post 15th to 31st

May 2011  

117 UT/07/08 NH-87 Km-97 to Maluti Motor Road 9.00 540.00 NCB Post 15th to 31st

May 2011  

118 UT/07/09 Saliakot to Anarpa Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

119 UT/08/12 Dhabkhal to Uneri Motor 12.00 720.00 NCB Post 15th to 31st  

Road May 2011

120 UT/08/13 Patoli to Kalun Motor Road 3.00 180.00 NCB Post 15th to 31st

May 2011  

121 UT/08/14 Paithani to Mankhohi Motor Road 6.00 360.00 NCB Post 15th to 31st

May 2011  

122 UT/08/15 Chakisain to Banjkot Motor Road 8.00 480.00 NCB Post 15th to 31st

May 2011  

123 UT/09/12 Bansbagar to Manidhami Motor Road 15.00 900.00 NCB Post 15th to 31st

May 2011  

124 UT/09/13 Girgaon to Gimmi Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

125 UT/09/14 Bungchina to Kusail Motor Road 12.00 720.00 NCB Post 15th to 31st

May 2011  

126 UT/10/07 Jakhali Guptkashi Mt Rd. to Taljaman Motor Road 3.00 180.00 NCB Post 15th to 31st

May 2011  

127 UT/10/08 Nag Jagagi to Damar Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

128 UT/10/09 San to Bajyun Motor Road 14.00 840.00 NCB Post 15th to 31st

May 2011  

129 UT/10/10 Kyark Band to Pailing Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

130 UT/11/09 Binak Khal to Kundi Motor Road 6.00 360.00 NCB Post 15th to 31st

May 2011  

131 UT/11/10 Amani to Kimkhola Motor Road 6.00 360.00 NCB Post 15th to 31st

May 2011  

132 UT/11/11 Meletha to Jakher Motor Road 17.00 1020.00 NCB Post 15th to 31st

May 2011  

133 UT/13/12 D T Road to Kumarkot Motor Road 3.00 180.00 NCB Post 15th to 31st

May 2011  

134 UT/13/13 Malla to Sari Motor Road 10.00 600.00 NCB Post 15th to 31st May 2011  

135 UT/13/14 Kalasi to Bingasari Motor 8.00 480.00 NCB Post 15th to 31st  

Road May 2011

136 UT/13/15 Gajoli to Naugaon Motor Road 5.00 300.00 NCB Post 15th to 31st

May 2011  

    Total 1196.58 56569.20        6. Rajasthan (Abstract)

1  $ Alwar 2.80 60.80 NCB Post  01st to 15th Feb. 2011                 

 2  $ Banswara 61.50 1620.55 NCB Post  3  $ Barmer 14.28 332.60 NCB Post  4  $ Bhilwara 27.93 715.02 NCB Post  5  $ Bikaner 16.00 286.95 NCB Post  6 $ Bundi 1.10 35.14 NCB Post  7 $ Dungarpur 82.06 1953.48 NCB Post  8 $ Jaipur 2.00 41.90 NCB Post  9 $ Jalore 15.52 369.37 NCB Post  10 $ Jhalawar 0.90 33.08 NCB Post  11 $ Jhunjhunu 10.75 344.93 NCB Post  12 $ Jodhpur 25.10 389.45 NCB Post  13 $ Pali 5.60 117.40 NCB Post  14 $ Pratapgarh 22.00 543.86 NCB Post  15 $ Rajsamand 1.03 48.87 NCB Post  16 $ S.Madhopur 1.80 49.52 NCB Post  17 $ Sikar 1.60 75.01 NCB Post  18 $ Udaipur 43.63 1344.26 NCB Post  19 $ Ajmer 19.30 523.40 NCB Post  

   01st to 15th Feb. 2011

  

 20 $ Banswara 274.25 7114.97 NCB Post  21 $ Baran 104.65 2243.41 NCB Post  22 $ Bikaner 165.75 3219.54 NCB Post  23 $ Churu 5.20 100.87 NCB Post  

24 $ Dungarpur 464.67 10893.77 NCB Post  

25 $ Jaipur 1.80 45.02 NCB Post  

                                

26 $ Jaiselmer 18.00 281.56 NCB Post  27 $ Jalore 160.70 3694.50 NCB Post  28 $ Jhunjhunu 90.80 2930.68 NCB Post  29 $ Jodhpur 463.14 7740.58 NCB Post  30 $ Nagaur 89.82 1793.15 NCB Post  31 $ Hanumangarh 7.85 210.16 NCB Post  32 $ Pali 57.45 1572.16 NCB Post  33 $ Pratapgarh 47.00 1187.94 NCB Post  34 $ Rajsamand 6.20 146.62 NCB Post  35 $ Sikar 29.43 1037.75 NCB Post  

36 $ Udaipur 435.07 15883.81 NCB Post  

37 $ Ajmer 18.46 571.98 NCB Post  38 $ Alwar 66.25 1843.85 NCB Post  39 $ Baran 12.05 594.25 NCB Post  40 $ Bharatpur 34.22 944.98 NCB Post  41 $ Bhilwara 64.91 1820.16 NCB Post  42 $ Bundi 23.68 890.40 NCB Post  43 $ Chittor 3.80 117.31 NCB Post  44 $ Dausa 4.75 140.26 NCB Post  45 $ Dholpur 31.73 881.58 NCB Post  46 $ Jaipur 30.78 1019.03 NCB Post  47 $ Karauli 49.70 1991.15 NCB Post  48 $ Kota 7.50 332.79 NCB Post  49 $ Pratapgarh 19.00 532.55 NCB Post  50 $ Rajsamand 16.91 627.45 NCB Post  51 $ S.Madhopur 12.88 457.14 NCB Post  52 $ Sirohi 21.70 1115.58 NCB Post  53 $ Tonk 21.83 645.49 NCB Post  54 $ Udaipur 14.50 503.91 NCB Post  55 $ Baran 66.50 2526.52 NCB Post  

  

56 $ Bhilwara 83.75 2508.00 NCB Post  57 $ Jodhpur 143.05 2487.07 NCB Post  58 $ Rajsamand 76.80 2507.30 NCB Post  

  Total 3601.43 94040.83        $ -Details of bid packages to be invited district wise are tabulated above. Package wise details will be added subsequently.6. Uttar Pradesh

1 UP0151 Agra 4.593 152.69 NCB Post 15th to 31st March 2011

2 UP0152 Agra 6.060 201.66 NCB Post 15th to 31st March 2011

3 UP0153 Agra 5.350 177.35 NCB Post 15th to 31st March 2011

4 UP0154 Agra 4.500 145.39 NCB Post 15th to 31st March 2011

5 UP0155 Agra 2.650 84.93 NCB Post 15th to 31st March 2011

6 UP0461 Ambedkarnagar 5.800 244.58 NCB Post 15th to 31st March 2011

7 UP0462 Ambedkarnagar 10.300 441.59 NCB Post 15th to 31st March 2011

8 UP0463 Ambedkarnagar 7.300 309.95 NCB Post 15th to 31st March 2011

9 UP0464 Ambedkarnagar 5.350 230.93 NCB Post 15th to 31st March 2011

10 UP0465 Ambedkarnagar 5.175 251.94 NCB Post 15th to 31st March 2011

11 UP0466 Ambedkarnagar 6.375 278.02 NCB Post 15th to 31st March 2011

12 UP0467 Ambedkarnagar 6.000 252.52 NCB Post 15th to 31st March 2011

13 UP0468 Ambedkarnagar 8.375 375.42 NCB Post 15th to 31st

March 2011

14 UP0545 Auraiya 1.425 66.94 NCB Post 15th to 31st March 2011

15 UP0546 Auraiya 4.400 214.01 NCB Post 15th to 31st March 2011

16 UP0547 Auraiya 1.975 99.32 NCB Post 15th to 31st March 2011

17 UP0978 Bahraich 6.320 363.93 NCB Post 15th to 31st March 2011

18 UP0979 Bahraich 7.800 452.26 NCB Post 15th to 31st March 2011

19 UP0980 Bahraich 6.900 407.71 NCB Post 15th to 31st March 2011

20 UP0981 Bahraich 8.250 511.00 NCB Post 15th to 31st March 2011

21 UP0982 Bahraich 6.800 383.05 NCB Post 15th to 31st March 2011

22 UP0983 Bahraich 9.950 584.01 NCB Post 15th to 31st March 2011

23 UP0984 Bahraich 7.100 415.52 NCB Post 15th to 31st March 2011

24 UP1147 Balrampur 5.800 267.55 NCB Post 15th to 31st March 2011

25 UP1148 Balrampur 8.300 482.53 NCB Post 15th to 31st March 2011

26 UP1149 Balrampur 8.700 472.76 NCB Post 15th to 31st March 2011

27 UP1150 Balrampur 6.200 280.73 NCB Post 15th to 31st March 2011

28 UP1147 Balrampur 1.300 62.62 NCB Post 15th to 31st March 2011

29 UP2038 Deoria 3.250 134.81 NCB Post 15th to 31st

March 2011

30 UP2039 Deoria 4.150 158.82 NCB Post 15th to 31st March 2011

31 UP2175 Etah 5.035 198.91 NCB Post 15th to 31st March 2011

32 UP2176 Etah 3.675 146.22 NCB Post 15th to 31st March 2011

33 UP2177 Etah 6.905 270.57 NCB Post 15th to 31st March 2011

34 UP2178 Etah 5.310 225.01 NCB Post 15th to 31st March 2011

35 UP2179 Etah 6.540 252.45 NCB Post 15th to 31st March 2011

36 UP2180 Etah 8.440 321.53 NCB Post 15th to 31st March 2011

37 UP2181 Etah 5.100 240.23 NCB Post 15th to 31st March 2011

38 UP2356 Faizabad 3.950 193.65 NCB Post 15th to 31st March 2011

39 UP2357 Faizabad 6.050 295.04 NCB Post 15th to 31st March 2011

40 UP2358 Faizabad 3.650 164.50 NCB Post 15th to 31st March 2011

41 UP2359 Faizabad 5.600 304.84 NCB Post 15th to 31st March 2011

42 UP2360 Faizabad 5.865 239.75 NCB Post 15th to 31st March 2011

43 UP2459 Farrukhabad 4.150 185.43 NCB Post 15th to 31st March 2011

44 UP2478 Farrukhabad 5.875 282.73 NCB Post 15th to 31st March 2011

45 UP2455 Farrukhabad 8.500 387.41 NCB Post 15th to 31st

March 2011

46 UP2550 Fatehpur 4.150 176.27 NCB Post 15th to 31st March 2011

47 UP2551 Fatehpur 5.100 207.66 NCB Post 15th to 31st March 2011

48 UP2552 Fatehpur 4.250 171.97 NCB Post 15th to 31st March 2011

49 UP2553 Fatehpur 5.830 242.78 NCB Post 15th to 31st March 2011

50 UP2554 Fatehpur 4.250 181.82 NCB Post 15th to 31st March 2011

51 UP2555 Fatehpur 4.600 193.53 NCB Post 15th to 31st March 2011

52 UP2556 Fatehpur 5.850 200.57 NCB Post 15th to 31st March 2011

53 UP2557 Fatehpur 6.300 212.23 NCB Post 15th to 31st March 2011

54 UP2558 Fatehpur 4.650 157.02 NCB Post 15th to 31st March 2011

55 UP2559 Fatehpur 4.300 149.32 NCB Post 15th to 31st March 2011

56 UP3045 Gonda 3.830 176.41 NCB Post 15th to 31st March 2011

57 UP3046 Gonda 5.225 243.97 NCB Post 15th to 31st March 2011

58 UP3047 Gonda 3.915 218.00 NCB Post 15th to 31st March 2011

59 UP3048 Gonda 7.400 361.64 NCB Post 15th to 31st March 2011

60 UP3049 Gonda 5.250 235.18 NCB Post 15th to 31st March 2011

61 UP3050 Gonda 3.970 195.72 NCB Post 15th to 31st

March 2011

62 UP3184 Gorakhpur 2.000 120.49 NCB Post 15th to 31st March 2011

63 UP3374 Hardoi 3.900 187.45 NCB Post 15th to 31st March 2011

64 UP3375 Hardoi 3.250 162.59 NCB Post 15th to 31st March 2011

65 UP3376 Hardoi 5.600 249.77 NCB Post 15th to 31st March 2011

66 UP3377 Hardoi 5.900 258.88 NCB Post 15th to 31st March 2011

67 UP3538 J.B.F.Nagar 4.305 198.91 NCB Post 15th to 31st March 2011

68 UP4052 Kanpur Dehat 7.450 384.13 NCB Post 15th to 31st March 2011

69 UP4053 Kanpur Dehat 3.925 208.15 NCB Post 15th to 31st March 2011

70 UP4054 Kanpur Dehat 5.475 273.52 NCB Post 15th to 31st March 2011

71 UP4055 Kanpur Dehat 4.475 241.65 NCB Post 15th to 31st March 2011

72 UP4056 Kanpur Dehat 5.600 251.61 NCB Post 15th to 31st March 2011

73 UP4452 Lakhimpur-Kherii 6.000 308.54 NCB Post 15th to 31st March 2011

74 UP4453 Lakhimpur-Kherii 9.125 442.01 NCB Post 15th to 31st March 2011

75 UP4454 Lakhimpur-Kherii 6.350 314.69 NCB Post 15th to 31st March 2011

76 UP4455 Lakhimpur-Kherii 4.700 212.88 NCB Post 15th to 31st March 2011

77 UP4456 Lakhimpur-Kherii 4.650 208.79 NCB Post 15th to 31st

March 2011

78 UP4457 Lakhimpur-Kherii 8.490 393.70 NCB Post 15th to 31st March 2011

79 UP4458 Lakhimpur-Kherii 5.450 246.72 NCB Post 15th to 31st March 2011

80 UP4459 Lakhimpur-Kherii 9.940 436.69 NCB Post 15th to 31st March 2011

81 UP4460 Lakhimpur-Kherii 4.530 224.33 NCB Post 15th to 31st March 2011

82 UP4461 Lakhimpur-Kherii 3.400 154.96 NCB Post 15th to 31st March 2011

83 UP4462 Lakhimpur-Kherii 5.830 252.81 NCB Post 15th to 31st March 2011

84 UP4659 Lucknow 4.150 209.09 NCB Post 15th to 31st March 2011

85 UP4660 Lucknow 2.775 152.73 NCB Post 15th to 31st March 2011

86 UP4661 Lucknow 3.825 186.37 NCB Post 15th to 31st March 2011

87 UP4662 Lucknow 2.955 138.91 NCB Post 15th to 31st March 2011

88 UP4755A Maharajganj 2.925 175.43 NCB Post 15th to 31st March 2011

89 UP4755B Maharajganj 4.250 234.12 NCB Post 15th to 31st March 2011

90 UP4756A Maharajganj 2.525 154.40 NCB Post 15th to 31st March 2011

91 UP4756B Maharajganj 2.850 241.69 NCB Post 15th to 31st March 2011

92 UP4757A Maharajganj 2.200 118.24 NCB Post 15th to 31st March 2011

93 UP4757B Maharajganj 3.495 229.45 NCB Post 15th to 31st

March 2011

94 UP5149 Mau 3.450 149.68 NCB Post 15th to 31st March 2011

95 UP5150 Mau 2.400 106.41 NCB Post 15th to 31st March 2011

96 UP5151 Mau 6.100 267.68 NCB Post 15th to 31st March 2011

97 UP5152 Mau 3.250 139.20 NCB Post 15th to 31st March 2011

98 UP5153 Mau 5.050 213.23 NCB Post 15th to 31st March 2011

99 UP5154 Mau 6.550 365.98 NCB Post 15th to 31st March 2011

100 UP5374 Mirzapur 4.800 150.15 NCB Post 15th to 31st March 2011

101 UP5375 Mirzapur 3.750 105.06 NCB Post 15th to 31st March 2011

102 UP5376 Mirzapur 10.500 368.01 NCB Post 15th to 31st March 2011

103 UP5377 Mirzapur 8.850 319.03 NCB Post 15th to 31st March 2011

104 UP5495 Moradabad 4.125 197.36 NCB Post 15th to 31st March 2011

105 UP5657 Pilibhit 1.800 75.67 NCB Post 15th to 31st March 2011

106 UP5869 Rae Bareli 3.700 178.76 NCB Post 15th to 31st March 2011

107 UP5870 Rae Bareli 4.750 231.13 NCB Post 15th to 31st March 2011

108 UP5871 Rae Bareli 4.000 179.50 NCB Post 15th to 31st March 2011

109 UP5872 Rae Bareli 5.200 218.41 NCB Post 15th to 31st

March 2011

110 UP5873 Rae Bareli 3.900 197.94 NCB Post 15th to 31st March 2011

111 UP5874 Rae Bareli 7.850 393.29 NCB Post 15th to 31st March 2011

112 UP5875 Rae Bareli 5.000 209.89 NCB Post 15th to 31st March 2011

113 UP6133 S.R. Nagar(Bhadohi) 5.650 230.51 NCB Post 15th to 31st March 2011

114 UP6134 S.R. Nagar(Bhadohi) 5.500 230.52 NCB Post 15th to 31st March 2011

115 UP6135 S.R. Nagar(Bhadohi) 3.950 155.11 NCB Post 15th to 31st March 2011

116 UP6136 S.R. Nagar(Bhadohi) 7.850 305.74 NCB Post 15th to 31st March 2011

117 UP6137 S.R. Nagar(Bhadohi) 7.300 286.04 NCB Post 15th to 31st March 2011

118 UP6138 S.R. Nagar(Bhadohi) 8.800 352.09 NCB Post 15th to 31st March 2011

119 UP6384 Shahjahanpur 3.250 165.78 NCB Post 15th to 31st March 2011

120 UP6385 Shahjahanpur 5.900 279.68 NCB Post 15th to 31st March 2011

121 UP6386 Shahjahanpur 3.450 172.58 NCB Post 15th to 31st March 2011

122 UP6387 Shahjahanpur 5.500 308.94 NCB Post 15th to 31st March 2011

123 UP6388 Shahjahanpur 5.500 256.02 NCB Post 15th to 31st March 2011

124 UP6389 Shahjahanpur 3.700 193.36 NCB Post 15th to 31st March 2011

125 UP6390 Shahjahanpur 2.650 141.94 NCB Post 15th to 31st

March 2011

126 UP6391 Shahjahanpur 2.400 119.92 NCB Post 15th to 31st March 2011

127 UP6559 Siddharathnagar 4.360 178.04 NCB Post 15th to 31st March 2011

128 UP6560 Siddharathnagar 4.905 260.04 NCB Post 15th to 31st March 2011

129 UP6561 Siddharathnagar 4.050 214.85 NCB Post 15th to 31st March 2011

130 UP6562 Siddharathnagar 4.655 228.26 NCB Post 15th to 31st March 2011

131 UP6563 Siddharathnagar 5.450 289.54 NCB Post 15th to 31st March 2011

132 UP6564 Siddharathnagar 5.600 310.09 NCB Post 15th to 31st March 2011

133 UP6565 Siddharathnagar 5.825 299.71 NCB Post 15th to 31st March 2011

134 UP6566 Siddharathnagar 6.450 333.68 NCB Post 15th to 31st March 2011

135 UP6657 Sitapur 5.800 270.81 NCB Post 15th to 31st March 2011

136 UP6658 Sitapur 5.850 353.29 NCB Post 15th to 31st March 2011

137 UP6659 Sitapur 4.100 229.01 NCB Post 15th to 31st March 2011

138 UP6660 Sitapur 5.510 306.48 NCB Post 15th to 31st March 2011

139 UP6661 Sitapur 4.950 249.82 NCB Post 15th to 31st March 2011

140 UP6662 Sitapur 5.250 279.50 NCB Post 15th to 31st March 2011

141 UP6663 Sitapur 5.975 305.29 NCB Post 15th to 31st

March 2011

142 UP6664 Sitapur 4.675 272.44 NCB Post 15th to 31st March 2011

143 UP6665 Sitapur 4.850 261.65 NCB Post 15th to 31st March 2011

144 UP6666 Sitapur 3.300 183.51 NCB Post 15th to 31st March 2011

145 UP6667 Sitapur 4.700 241.86 NCB Post 15th to 31st March 2011

146 UP6668 Sitapur 4.500 219.74 NCB Post 15th to 31st March 2011

147 UP68116 Sultanpur 4.250 190.48 NCB Post 15th to 31st March 2011

148 UP68117 Sultanpur 4.500 189.22 NCB Post 15th to 31st March 2011

149 UP68118 Sultanpur 7.350 290.34 NCB Post 15th to 31st March 2011

150 UP68119 Sultanpur 7.625 287.87 NCB Post 15th to 31st March 2011

151 UP68120 Sultanpur 8.675 320.03 NCB Post 15th to 31st March 2011

152 UP6968 Unnao 5.330 317.96 NCB Post 15th to 31st March 2011

153 UP6969 Unnao 5.050 289.84 NCB Post 15th to 31st March 2011

154 UP6970 Unnao 7.225 362.51 NCB Post 15th to 31st March 2011

155 UP6971 Unnao 4.025 197.19 NCB Post 15th to 31st March 2011

156 UP6972 Unnao 3.000 153.73 NCB Post 15th to 31st March 2011

157 UP6973 Unnao 2.400 118.71 NCB Post 15th to 31st

March 2011

158 UP6974 Unnao 6.575 337.88 NCB Post 15th to 31st March 2011

159 UP6988 Unnao 7.455 376.28 NCB Post 15th to 31st March 2011

160 UP6989 Unnao 2.000 94.52 NCB Post 15th to 31st March 2011

161 UP6990 Unnao 3.200 161.37 NCB Post 15th to 31st March 2011

Total 838.098 39350.77

Grand Total301566.10

Procurement plan with Method & Time Schedule for 18 Months period -- for GOODS & EQUIPMENT

Ref No.

Contract (Description)

Estimated Cost (Rs. In Lakhs) Procurement Method

Domestic Preference (Yes/No)

Review by Bank

(Prior/Post)

Expected Bid-Opening

Date)

Comments

A. NRRDA   PCU Office1 Office furniture for

PCU **  

Shopping  No Post  **   

2 Procurement of Synchronized Chip Sealing Machine for improved bituminous surface

  ** 

ICB Yes prior  **  

** Details of Goods and Equipments to be procured by NRRDA are being worked out and will be added to the procurement plan at a later stage.B. STATES1. Himachal Pradesh - To be decided later on, if required  2. Punjab- To be decided later on, if required  3. Jharkhand- To be decided later on, if required  4. Meghalaya- To be decided later on, if required  5. Rajasthan (package wise details will be submitted by Rajasthan at a later Stage.)  

1 IT Equipments, Softwares, Survey and Quality Control Equipments

495       

   

6. Uttar Pradesh- To be decided later on, if required  7. Uttarakhand- To be decided later on, if required  

Procurement plan with Method & Time Schedule for 18 Months period -- for CONSULTANCY

Ref. No.

Description of Assignment Estimated Cost Selection Method

Review by

Bank (Prior / Post)6

Expected Proposals

Submission Date

Comments

A. NRRDA 1. Consultancy services for Project

Performace Review US $ 3,000,000 QCBS Prior March/April

20112. Consultancy services for Procurement

Capacity Building in the participating states

US $ 350,000 QCBS Prior May/June 2011

3. Selection of Chartered Accountant firm for internal audit in the seven participating states

QCBS

B. StatesHIMACHAL PRADESH

1 Consultancy Services for selection of a consultancy firm to provide Project Management Services

US $ 1,500,000 QCBS Prior Feb./March 2011

2 Road Maintenance Management System and road condition inventories.

US $ 327,000 QCBS Prior @

3 Road Maintenance Policy formulation US $ 100,000 QCBS Post @PUNJAB

1 Consultancy Services for selection of a consultancy firm to provide Project Management Services

US $ 1,000,000QCBS Prior Feb./March

2011

2 Road Maintenance Management System and road condition inventories.

US $ 850,000 QCBS Prior @

3 Road Maintenance Policy formulation US $ 100,000 QCBS Post @JHARKHAND

1 Consultancy Services for selection of a consultancy firm to provide Project Management Services

US $ 3,000,000 QCBS Prior Feb./March 2011

Ref. No.

Description of Assignment Estimated Cost Selection Method

Review by

Bank (Prior / Post)6

Expected Proposals

Submission Date

Comments

2 Road Maintenance Management System and road condition inventories.

US $ 1,886,000 QCBS Prior @

3 Road Maintenance Policy formulation US $ 100,000 QCBS Post @

MEGHALAYA1 Consultancy Services for

selection of a consultancy firm to provide Project Management Services

US $ 2,500,000 QCBS Prior Feb./March 2011

2 Road Maintenance Management System and road condition inventories.

US $ 323,000 QCBS Prior @

3 Road Maintenance Policy formulation

US $ 100,000 QCBS Post @

RAJASTHAN1 Consultancy Services for

selection of a consultancy firm to provide Project Management Services

US $ 2,000,000 QCBS Prior Feb./March 2011

2 Road Maintenance Management System and road condition inventories.

US $ 600,000 QCBS Prior @

3 Road Maintenance Policy formulation

US $ 100,000 QCBS Post @

UTTAR PRADESH

1 Consultancy Services for selection of a consultancy firm to provide Project Management Services

US $ 3,000,000 QCBS Prior Feb./March 2011

2 Road Maintenance Management System and road

US $ 1,313,000 QCBS Prior @

Ref. No.

Description of Assignment Estimated Cost Selection Method

Review by

Bank (Prior / Post)6

Expected Proposals

Submission Date

Comments

condition inventories.3 Road Maintenance Policy

formulationUS $ 100,000 QCBS Post @

UTTRAKHAND1 Consultancy Services for

selection of a consultancy firm to provide Project Management Services

US $ 2,000,000 QCBS Prior Feb./March 2011

2 Road Maintenance Management System and road condition inventories.

US $ 300,000 QCBS Prior @

3 Road Maintenance Policy formulation

US $ 100,000 QCBS Post @

@ - These details are being worked out and will be advised at a later stage.