annex 9.d port maritime and inland ...cfrsa.cfr.ro/files/ddr/2020 network statement/annex 9d...cfr...
TRANSCRIPT
CFR NETWORK STATEMENT - 2020
ANNEX 9.d PORT, MARITIME AND INLAND INFRASTRUCTURES
RELATED TO RAILWAY ACTIVITIES
Validity: 15.12.2019 – 12.12.2020
Version: 9.1
Update: 30.06.2020
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 2 / 13
Content
1. Regional Branch CFR Bucharest .............................................................................................. 3
1.1 Giurgiu Port Station ............................................................................................................................ 3
1.2 Olteniţa Port Station ........................................................................................................................... 3
2. Regional Branch CFR Craiova .................................................................................................. 4
2.1 Drobeta Turnu Severin Station .......................................................................................................... 4
2.2 Calafat Station ..................................................................................................................................... 4
2.3 Corabia Station .................................................................................................................................... 4
2.4 Turnu Măgurele Station ...................................................................................................................... 4
2.5 Zimnicea Station ................................................................................................................................. 4
3. Regional Branch CFR Timişoara .............................................................................................. 5
3.1 Orşova Station ..................................................................................................................................... 5
3.2 Orşova Port Station ............................................................................................................................ 5
4. Regional Branch CFR Galaţi ..................................................................................................... 6
4.1 Galaţi Station ....................................................................................................................................... 6
4.2 Brăila Station ....................................................................................................................................... 7
4.3 Barboşi Station .................................................................................................................................... 7
5. Regional Branch CFR Constanţa .............................................................................................. 8
5.1 Constanţa Port Zone A Station .......................................................................................................... 8
5.2 Constanţa Port Zona B Station ........................................................................................................ 10
5.3 Constanţa Port Mol 5 Station ........................................................................................................... 11
5.4 Constanţa Port Station ..................................................................................................................... 12
5.5 Mangalia Station ................................................................................................................................ 12
5.6 Călăraşi Station ................................................................................................................................. 13
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 3 / 13
1. REGIONAL BRANCH CFR BUCHAREST
1.1 Giurgiu Port Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Main line Port (den. veche Giurgiu Canal - Cioroiu, km 74+102-75+568, de la sch.nr. 304
maneuver Lr = 1466 m No Yes LFI without RTE
2 Line 1 st. Giurgiu Port maneuver
Lc = 202 m Lr =169 m
No Yes LFI without RTE
3 Line 2 st. Giurgiu Port maneuver
Lc = 244 m Lr = 211 m
No Yes LFI without RTE
4 Diag. 507- 509 - Lr = 60 m No Yes LFI without RTE
5 CF line between sch.507 – sch. 510 aferent L1 maneuver Lr = 60 m No Yes LFI without RTE
6 Sch. 505 aferent L1 - Lr = 33 m No Yes LFI without RTE
7 Sch. 507 aferent L1 - Lr = 33 m No Yes LFI without RTE
8 Sch. 509 aferent L1 - Lr =33 m No Yes LFI without RTE
9 Sch. 510 aferent L1 - Lr = 33 m No Yes LFI without RTE
1.2 Olteniţa Port Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Line VIII Oltenita Port km 81+ 440 – 81+ 915 maneuver L = 474 m No Yes LFI without RTE
2 Line X Oltenita Port km 81+540 – 81+ 924 maneuver L = 384 m No
3 Current line Oltenita Port km 81+073 – 81+ 420
- L = 347 m No
4 Line IX Oltenita Port km 81+ 440 – 81+ 924 maneuver L = 484 m No
5 Line III Oltenita Port km 80+402 – 81+022 maneuver L = 620 m No Yes LFI without RTE
6 Line II Oltenita Port km 80+357 – 81+092 maneuver L = 735 m No Yes LFI without RTE
7 Line XI Oltenita Port km 81+503 – 81+875 maneuver L = 372 m No
8 Line XII Oltenita Port km 81+265 – 81+875 maneuver L = 610 m No
9 Line II Oltenita Port km 81+ 000 – 81+145 maneuver L = 930 m No Yes LFI without RTE
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 4 / 13
2. REGIONAL BRANCH CFR CRAIOVA
2.1 Drobeta Turnu Severin Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 line 37 maneuver 212 Yes LFI ADPF
2.2 Calafat Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 line 9Pa maneuver 65 Yes - -
2 line 10P avoidance 42 Yes - -
3 lines: 1Pa,1Pb, 2P, 3P, 4P, 5P, 6P, 9Pb, 9Pc, 11P, 12P
- - No - Lines 3P, 4P, 5P have scrapping approval
2.3 Corabia Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Current line Corabia- Corabia Port - - No - -
2 lines 1CP, 3CP - - No - Lines 1CP, 3CP, have scrapping approval
2.4 Turnu Măgurele Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 lines 1N, 2N, 1, 2, 3, 4, 5 - - No - Belong to the group of lines Port Turnu Magurele
2 line Flamanda - - No - Belong to the group of lines Port Turnu Magurele
2.5 Zimnicea Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Collector line Port Zimnicea- Zimnicea
- - No - -
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 5 / 13
3. REGIONAL BRANCH CFR TIMISOARA
3.1 Orşova Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Line 11 Pull port 656 No
connection from st. Orşova inadequate condition closed line
3.2 Orşova Port Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Line 1P upload - download
686 No connection from line 1P by Exchange. ”c” at LFI Santier Naval Orsova - line in conservation
access through His; inadequate condition, closed line
2 Line 2P upload - download
454 No
without connection to the CF line; inadequate condition, closed line
3 Line 3P scale 835 No
without connection to the CF line; inadequate condition, closed line
4 Line 4P storage 426 No
without connection to the CF line; inadequate condition, closed line
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 6 / 13
4. REGIONAL BRANCH CFR GALATI
4.1 Galaţi Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Lane rolling depot lines 45 - 47 maneuver 435 Yes
cu LFI PBN LOGISTICS SA, LFI SC CITY GAS SRL şi LFI SC UNICOM OIL TERMINAL SA
Included lines 1 si 2 Pacura
2 Sing line maneuver 356 Yes
3 fence line maneuver 907 Yes
4 Line 1 Cheu maneuver 773 Yes
5 Line 2 Cheu maneuver 716 Yes
6 Normal CF connection for SC CITY GAZ SRL maneuver 58 Yes
7 Taken over linesUNICOM OIL TERMINAL maneuver 305 Yes
8 Racord cf dane Apatita Gl Larga - Bazin Lemnarie
maneuver 540 Yes
9 Racord Larga Ana - Bazin Dane maneuver 1429 Yes
10 Line Opritor dane maneuver 135 Yes
11 Line Galati Calatori - Port Docuri maneuver 1525 Yes Public
12 Line nr. 1 maneuver 595 Yes
13 Line nr. 2 maneuver 654 Yes
14 Line nr. 3 Cale Larga maneuver 887 Yes
15 Line nr. 4 maneuver 86 Yes
16 Line nr. 6 maneuver 521 Yes
17 Line nr.8 maneuver 101 Yes
18 Line nr. 9 maneuver 80 Yes
19 Line nr. 10 maneuver 92 Yes
20 Line nr. 11 maneuver 347 Yes
21 Line nr.12 maneuver 93 Yes
22 Line CF Dana 26 - 28 maneuver 447 Yes
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 7 / 13
4.2 Brăila Station
(Group Brăila Port)
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Line nr. I receiving-shipping
998 Yes With LFI SC HERCULES SA şi LFI SC TTS PORTURI FLUVIALE SRL GALAŢI - Sucursala Brăila
2 Line nr. II receiving-shipping
677 Yes With LFI SC HERCULES SA şi LFI SC TTS PORTURI FLUVIALE SRL GALAŢI - Sucursala Brăila
3 Triple Line receiving-shipping
668 Yes With LFI SC HERCULES SA şi LFI SC TTS PORTURI FLUVIALE SRL GALAŢI - Sucursala Brăila
4 Line 1 dead accumulation Bruto
239 No
5 Line 1 private upload - download
749 No
6 Line shed upload - download
498 No
7 Line current Vad maneuver 319 Yes With LFI SC HERCULES SA şi LFI SC TTS PORTURI FLUVIALE SRL GALAŢI - Sucursala Brăila
8 Line 2 sorting Port receiving-shipping
519 Yes With LFI R.A. A.Z.L. Brăila Perimeter 1
9 Line 3 sorting Port receiving-shipping
519 Yes With LFI R.A. A.Z.L. Brăila Perimeter 1
10 Line 4 sorting Port receiving-shipping
1158 No With LFI R.A. A.Z.L. Brăila Perimeter 1
11 Line shooting sorting shooting 80 Yes With LFI R.A. A.Z.L. Brăila Perimeter 1
12 Line wall ramp upload - download
84 Yes
4.3 Barboşi Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Line nr. 1 receiving-shipping
582 Yes With LFI SC ROMPORTMET SA
2 Line nr. 2 receiving-shipping
528 Yes With LFI SC ROMPORTMET SA
3 Line nr. 3 receiving-shipping
576 Yes With LFI SC ROMPORTMET SA
4 Line nr. 4 receiving-shipping
548 Yes With LFI SC ROMPORTMET SA
5 Line nr. 5 receiving-shipping
572 Yes With LFI SC ROMPORTMET SA
6 Line nr. 6 Avoidance 95 Yes
7 Line nr. 7 shooting 89 Yes
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 8 / 13
5. REGIONAL BRANCH CFR CONSTANTA
5.1 Constanţa Port Zone A Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 L1 – receiving-shipping maneuver 741 Yes From firing line 1, through the switch 47S connects LFI SC Santierul Naval SA C-ta L max convoi = 200 m
2 L2 – receiving-shipping maneuver 723 Yes
3 L3 – receiving-shipping maneuver 744 Yes
4 L4 – receiving-shipping maneuver 318 Yes
5 L1 – washing cars maneuver 306 No
6 L2 – washing cars maneuver 86 No
7 L3 – washing cars maneuver 137 No
8 L4 – washing cars maneuver 450 Yes
9 L5 – washing cars maneuver 449 Yes
10 L1 – sorting Port Nou maneuver 227 No
11 L2 – sorting Port Nou maneuver 229 No
12 L3 – sorting Port Nou maneuver 290 No
13 L4 – sorting Port Nou maneuver 387 Yes
14 L5 – sorting Port Nou maneuver 334 No
15 L6 – sorting Port Nou maneuver 186 Yes
16 L7 – sorting Port Nou maneuver 283 Yes
17 L1 – big sorting maneuver 241 Yes
18 L2 – big sorting maneuver 241 Yes
19 L3 – big sorting maneuver 196 Yes
20 L4 – big sorting maneuver 218 Yes
21 L4 – little sorting maneuver 274 Yes L1 and L2 through the switch 105 and 107 connects LFI SNTFM CFR MARFA - close
L3 ,through the switch 109 connects LFI SC Romania Euroest SA-Remiza Loc. (si SC Tehnotrans SRL) L max convoi = 100 m
22 L1 – third Concrete maneuver 245 Yes
23 L2 – third Concrete maneuver 167 Yes
24 L3 – third Concrete maneuver 232 No
25 L4 – third Concrete maneuver 232 No
26 L5 – third Concrete maneuver 233 No
27 L1 – warehouses upload/ download 139 Yes
28 L2 – warehouses upload/ download 139 Yes
29 L3 – warehouses upload/ download 324 No
30 L1 – north Quay upload/ download 559 Yes
31 L2 – north Quay upload/ download 559 Yes
32 L3 – north Quay upload/ download 590 Yes
33 L4 – north Quay upload/ download 622 No
34 L5 – north Quay upload/ download 589 No
35 L6 – north Quay upload/ download 267 No
36 L8 – north Quay upload/ download 325 No
37 L6 – timber upload/ download 267 Yes
38 L4 – Genovez Quay upload/ download 274 No
39 L5 – Genovez Quay upload/ download 259 Yes
40 L1 – train maritime upload/ download 262 No
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 9 / 13
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
41 L2 – train maritime upload/ download 254 No
42 L3 – train maritime upload/ download 311 No
43 L4 – train maritime upload/ download 264 No
44 L1 – sorting old port maneuver 601 Yes Din prel.liniei 1,prin mac.237 se racord. LFI CN APM SA – Danele 0-7 L max convoi = 450 m
45 L2 – sorting old port maneuver 321 Yes
46 L3 – sorting old port maneuver 312 Yes
47 L4 – sorting old port maneuver 373 Yes Din prel.liniei 1,prin mac.237 se racord. LFI CN APM SA – Digul de Nord L max convoi = 450 m
48 L5 – sorting old port maneuver 242 Yes
49 L6 – sorting old port maneuver 260 Yes
50 L7 – sorting old port maneuver 260 Yes Din prel.liniei 4,prin mac.231 se racord. LFI CN APM SA – Danele 6-7 L max convoi = 300 m
51 L8 – sorting old port maneuver 332 Yes
52 L1 – sorting silage 1 maneuver 419 Yes
Din prel.liniei 3, prin mac.60 se racord. LFI SC SILO-PORT SRL L max convoi = 104 m
53 L2 – sorting silage 1 maneuver 383 Yes
54 L3 – sorting silage 1 maneuver 438 Yes
55 L4 – sorting silage 1 maneuver 267 No
56 L5 – sorting silage 1 maneuver 252 Yes
57 L6 – sorting silage 1 maneuver 292 Yes
58 L1 – sorting silage 2 maneuver 400 Yes
Din prel.liniei 3, prin mac.50 se racord. LFI SC NIVA PRODCOM SRL L max convoi = 104 m
59 L2 – sorting silage 2 maneuver 371 Yes
60 L3 – sorting silage 2 maneuver 404 Yes
61 L4 – sorting silage 2 maneuver 364 Yes
62 L5 – sorting silage 2 maneuver 341 No
63 L6 – sorting silage 2 maneuver 425 No
64 L1 – sorting silage 3 maneuver 301 Yes Din prel.liniei 4, prin mac.40 se racord. LFI SC NIVA PRODCOM SRL L max convoi = 104 m
65 L2 – sorting silage 3 maneuver 340 Yes
66 L3 – sorting silage 3 maneuver 371 Yes
67 L4 – sorting silage 3 maneuver 272 No
68 L5 – sorting silage 3 maneuver 144 Yes Din prel.liniei 5, prin TDJ 36/38 se racord. LFI SC FRIAL SA linia 1 L max convoi = 106 m
69 L6 – sorting silage 3 maneuver 169 Yes Din prel.liniei 6, prin mac.48 se racord. LFI SC FRIAL SA linia 2 L max convoi = 140 m
70 L1 – Ceremag upload/ download 172 No
71 L2 – Ceremag upload/ download 244 Yes
72 L3 – Ceremag upload/ download 244 No
73 L1 – Cheu Cereale upload/ download 556 No (pe Dane 20 si 21)
74 L2 – Cheu Cereale upload/ download 556 No
75 L3 – Cheu Cereale upload/ download 500 No
76 L4 – Cheu Cereale upload/ download 470 No
77 L5 – Cheu Cereale upload/ download 280 Yes
78 L6 – Cheu Cereale upload/ download 10 No
79 L1 – sorting Mol 1 maneuver 121 Yes
80 L2 – sorting Mol 1 maneuver 168 No
81 L3 – sorting Mol 1 maneuver 172 Yes
82 L4 – sorting Mol 1 maneuver 161 Yes
83 L5 – sorting Mol 1 maneuver 181 Yes
84 L6 – sorting Mol 1 maneuver 138 No
85 L7 – sorting Mol 1 maneuver 111 Yes
86 L8 – sorting Mol 1 maneuver 130 Yes
87 L1 – berths Mol 1 upload/ download 670 Yes
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 10 / 13
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
88 L2 – berths Mol 1 upload/ download 670 Yes
89 L3 – berths Mol 1 upload/ download 668 Yes
90 L4 – berths Mol 1 upload/ download 668 No
5.2 Constanţa Port Zona B Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Line 1 old sorting Maneuver 275 Yes
2 Line 2 old sorting Maneuver 263 Yes
3 Line 3 old sorting Maneuver 409 Yes
4 Line 4 old sorting Maneuver 394 Yes
5 Line 5 old sorting Maneuver 394 Yes
6 Line 6 old sorting Maneuver 300 Yes
7 Line 7 old sorting Maneuver 263 Yes
8 Line 8 old sorting Maneuver 239 Yes
9 Line 9 old sorting Maneuver 157 Yes
10 Line 10 old sorting Maneuver 135 Yes
11 Line 11 old sorting Maneuver 360 Yes
12 Line 12 old sorting Maneuver 328 Yes
13 Line 13 old sorting Maneuver 454 Yes
14 Line 14 old sorting Maneuver 261 Yes
15 Line 1 new sorting Maneuver 292 Yes
16 Line 2 new sorting Maneuver + weighing
315 Yes
17 Line 3 new sorting Maneuver 353 Yes
18 Line 4 new sorting Maneuver 335 Yes
19 Line 5 new sorting Maneuver 405 Yes
20 Line 6 new sorting Maneuver 336 Yes
21 Line 7 new sorting Maneuver 213 Yes
22 Line 8 new sorting Maneuver 174 Yes
23 Line 9 new sorting Maneuver 213 Yes
24 Line 10 new sorting Maneuver 283 Yes
25 Line 11 new sorting Maneuver 308 Yes
26 Line 12 new sorting Maneuver + weighing
206 Yes
27 Line 13 new sorting Maneuver 206 Yes OMV PETROM SA
28 Line 1 berths 35 Maneuver + Upload/download
701 Yes
29 Line 2 berths 35 Maneuver + Upload/download
728 Yes
30 Line 3 berths 35 Maneuver + Upload/download
834 Yes
31 Line 4 berths 35 Maneuver + Upload/download
763 Yes
32 Line 5 berths 35 Maneuver + Upload/download
763 Yes
33 Line 6 berths 35 Maneuver + Upload/download
768 Yes
34 Line 7 berths 35 Maneuver + Upload/download
768 Yes
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 11 / 13
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
35 Line 1 berths 44 Maneuver + Upload/download
351 Yes
36 Line 2 berths 44 Maneuver + Upload/download
351 Yes
37 Line 3 berths 44 Maneuver + Upload/download
+ weighing
328 Yes
38 Line 4 berths 44 Maneuver + Upload/download
25 Yes
39 Line 5 berths 44 Maneuver + Upload/download
331 Yes
40 Line 1 berths 45 Maneuver + Upload/download
817 Yes
41 Line 2 berths 45 Maneuver + Upload/download
817 Yes
42 Line 3 berths 45 Maneuver + Upload/download
+ weighing
422 Yes
43 Line 4 berths 45 Maneuver + Upload/download
422 Yes
44 Line 5 berths 45 Maneuver + Upload/download
375 Yes
45 Line 6 berths 45 Maneuver + Upload/download
375 Yes
46 Line 7 berths 45 Maneuver + Upload/download
399 Yes
47 Line 1 A2
Maneuver 438 Yes SC CHIMPEX SA Magazii 2,3,4 POST REVIZIE Liniile 1,2,3 PAE Constanta
48 Line 1F Home / exp + locomotive crossing
693 Yes
5.3 Constanţa Port Mol 5 Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 1Z P/E 745 Yes CRH Ciment sa Bucuresti
2 2Z P/E 742 Yes CRH Ciment sa Bucuresti
3 3TZone V Maneuver 529 Yes
4 4TZone V Maneuver 300 Yes
5 5TZone V Maneuver 307 Yes
6 6TZone V Maneuver 308 Yes North Star Shipping Dana64
7 7TZone V Maneuver 395 Yes
8 8TZone V Maneuver 271 Yes
9 9TZone V Maneuver 270 Yes
10 1TZone IV Maneuver 111 Yes
11 2TZone IV Maneuver 187 No
12 3TZone IV Maneuver 201 No
13 4TZone IV Maneuver 273 Yes Chimpex Descarcare Uree
14 5TZone IV Maneuver 368 Yes
15 6TZone IV Maneuver 414 Yes
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 12 / 13
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
16 7TZone IV Maneuver 255 Yes
17 8TZone IV Maneuver 184 Yes
18 9TZone IV Maneuver 205 Yes
19 10TZone IV Maneuver 243 Yes
20 11TZone IV Maneuver 227 Yes Chimpex Incarcare Fosfat
21 1TZone III Maneuver 429 Yes
22 2TZone III Maneuver 392 Yes
23 3TZone III Maneuver 374 Yes
24 4TZone III Maneuver 374 Yes
25 5TZone III Maneuver 392 Yes
26 6TZone III Maneuver 437 Yes SC Frial Liniile 1,2,3
27 7TZone III Maneuver 133 Yes SC Frial Liniile 1,2,3
28 8TZone III Maneuver 123 Yes
29 9TZone III Maneuver 416 Yes
30 10TZone III Maneuver 420 Yes
31 1 berths 49 Upload/download 1200 Yes
32 2 berths 49 Upload/download 1200 Yes
33 3 berths 49 Upload/download 684 Yes
34 4 berths 49 Upload/download 684 Yes
35 1 berths 54 Upload/download 881 Yes
36 2 berths 54 Upload/download 881 Yes
37 2bis D54 Upload/download 1104 Yes
38 3 berths 54 Upload/download 1104 Yes
39 3 berths 54 Upload/download 918 Yes
40 1 berths 59 Upload/download 879 Yes
41 2 berths 59 Upload/download 879 Yes
42 3 berths 59 Upload/download 1123 Yes
43 1 berths 64 Upload/download 776 Yes
44 2 berths 64 Upload/download 780 Yes
5.4 Constanţa Port Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Line 1 Maneuver 345 Yes LFI CNAPMC Mol 1 Sud si Zona Libera, LFI APM Terminal , LFI CNAPMC Poarta 10 Port, LFI SCHENKER Logistics,
5.5 Mangalia Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Connection line Mangalia – Mangalia Port
Maneuver 9334 Yes LFI Callatis Gas Constanta Terminal GPL Mangalia, LFI COMCM Sa Constanta PL Mangalia
Compania Naţională de Căi Ferate “CFR” S.A. România
13 CFR Network Statement - 2020 ANNEX 9.d Version: 9.1 Update: 30.06.2020 Pag: 13 / 13
5.6 Călăraşi Station
No. Infrastructure element Affectation Lenght
[m] Operable
Connection with LFI
Observation
1 Connection line Calarasi Sud - Calarasi Port
Maneuver 3450 No
2 Calarasi Port L1 Upload/download 504 No LFI 3 T , LFI ADPF Giurgiu
3 Calarasi Port L2 Upload/download 480 No
4 Calarasi Port L3 Upload/download 448 No