annex c water quality case studies discharge of … · discharge of restaurant waste and greywater...

37
Annex C Water Quality Case Studies Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei Ma Wan New Village

Upload: vodung

Post on 24-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Annex C Water Quality Case Studies

Discharge of restaurant waste and greywater in storm water drains

Case Studies

Lung Mei

Ma Wan New Village

Page 2: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Small House number increases = Water Quality seriously impacted

Wat

er Q

ual

ity

Small House No.

Page 3: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

How bad is the situation?

Page 4: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Case Study No. 1 Lung Mei, Tai Po

Page 5: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Long-term trend of Water Quality degradation (Data from EPD)

Page 6: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

More and more Small Houses built in Lung Mei

2005

2013 2001

1998

Page 7: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Area already equipped with Public Sewers and Facilities

Why is there still poor water quality?

Page 8: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

“Eating Place” – Always Permitted at the Ground Floor of Small House

Page 9: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

“Eating Place” of course generates waste waters

Page 10: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Construction and Operation of Small House both generate waste waters

Page 11: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

An Outlet at Lung Mei

Page 12: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Who produces the waste waters? In reality, how to enforce the law

(Water Pollution Control Ordinance)?

Page 13: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Underground Drainpipe being Built at Lung Mei

Page 14: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Underground Drainpipe being Built at Lung Mei – Direct discharge to a nearby seasonal stream

Page 15: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

After the works is done, how to enforce the law?

Page 16: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Case Study No. 2 Ma Wan New Village, Tung Chung

Page 17: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Re-located Village due to Tung Chung New Town Development

Page 18: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Surrounded by woodland, with a nearby stream and a V zone

Page 19: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Early village houses should have been connected with public sewer

1996

1998 2000

Page 20: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Small Houses built later are using Septic Tank and Soak-away System

2007 2001

2004

Page 21: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Full of Small Houses now

2008

2011

2013

Page 22: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Location of the site, and the E. coli level in the nearby stream (Data from EPD)

Page 23: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

E. coli and Faecal Coliforms Levels – Sharp Increase with Small House number (Data from EPD)

0

20000

40000

60000

80000

100000

120000

140000

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Faecal coliforms

E. coli

E. coli (WQO)

1998 2001 2007 2011

E. coli: 120

F.C.: 1066

E. coli: 850

F.C.: 6300

E. coli: 3100

F.C.: 11000

E. coli: 18000

F.C.: 54000

E.coli WQO: 1000

Page 24: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Ammonia Level – Sharp Increase with Small House number (Data from EPD)

1998 2001 2007 2011

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Ammonia-N

WQO

Ammonia:

0.04

Ammonia:

0.07

Ammonia:

0.37

Ammonia:

1.35

Ammonia WQO: 0.021

Page 25: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Ma Wan New Village

Page 26: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

The stream next to Ma Wan New Village

Page 27: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Highly polluted water observed

Page 28: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Highly polluted water from an outlet

Page 29: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

The outlet connected with U-channels running through Small Houses

Page 30: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Another outlet from unknown source(s)

Page 31: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Potential pollutants – domestic sewage and discharge from the operation of the restaurants

Page 32: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Outlets (supposed discharging stormwater only) along the channelised section of the same stream

Page 33: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

Unusual high mortality of wild frogs

Page 34: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

How bad is “High”?

Page 35: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

How many Small Houses are found at this site?

• Approximately 120 Small Houses in Ma Wan New Village (about 44 suspected to be connected with public sewer; remaining 76 Small Houses suspected using septic tank systems)

• 3 – 4 restaurants

• 2010 – 2013

E. coli: 18,000 – 39,000

Faecal coliforms: 54,000 – 120,000

Ammonia: ~ 1.4 mg/L

• Pollution Status

- Similar to Tin Shui Wai Channel, Yuen Long Nullah, Tuen Mun River

- Worse than Shing Mun River

Page 36: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

ProPECC does NOT Protect

• Ma Wan New Village – Built after the ProPECC PN 5/93 was adopted

• It seems that no one follows the ProPECC requirements

• ProPECC is NOT Enforceable in reality

• It is a planning problem!

Page 37: Annex C Water Quality Case Studies Discharge of … · Discharge of restaurant waste and greywater in storm water drains Case Studies Lung Mei ... •It is a planning problem! End

End