annexure 1 -...
TRANSCRIPT
Annexure 1
Land Allocation Letters from SIDCO before and after the proposed revision in
layout to provide drain and to ensure that there is no disturbance to the existing
natural storm water course.
Annexure 3
NOC from the District Collector for the construction of flood protection walls
and forming bunds along the SIDCO boundary