1 Executive Summary 2
2 Introduction 3
3 Planning Policy Position 5
4 Analysis of completions in 2019/20 7
5 Housing Supply 10 The housing requirement for Huntingdonshire 10 Housing Delivery Test (HDT) 11 Gypsy and Traveller Site Provision 15
Housing Trajectory September 2020 and 5 year housing land supply 17
Position as at March 2020 19
6
7
Appendices
1 Net completions by Parish from 2011/12 to 2019/20 24
Housing Trajectory Data: Local Plan to 2036 28
Trajectory survey responses for SEL1.1, SEL1.2, HU1 and SEL2 62
2
3
Contact details Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Contact details The Council have prepared this document so that it is compliant with the website accessibility requirements where possible; however some sections such as the housing trajectory are not fully accessible due to the reliance on tables. If you need further accessibility adjustments to any sections of this document or if you would like a translation of this document, a large text version or an audio version please contact the Planning Policy Team on the contact details set out below and we will try to meet your needs.
This document is formatted to be printed at A3.
Date of original publication: 9 November 2020
Further copies of this document can be obtained from:
Planning Policy Team Development Pathfinder House St Mary's Street Huntingdon PE29 3TN
It can also be viewed on our website at www.huntingdonshire.gov.uk
The Development Plans Team can be contacted on 01480 388424 or by email at [email protected]
© Huntingdonshire District Council 2020
1
1 Executive Summary Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
1 Executive Summary Housing Development and Supply
1.1 The 2019 housing trajectory predicted completions of 1,003 dwellings in 2019/20.The actual number of completions was 1,010. The majority of new dwellings were built in Brampton (230), Huntingdon (141), Godmanchester (115), Fenstanton (73) and Ramsey (71). The parish of the Stukeleys saw 124 completions 119 of which are from the Alconbury Weald development, which will form its own distinct settlement.
1.2 As at 31 March 2020, 1,108 dwellings were under construction. Completions in 2020/21 are anticipated to be 966 dwellings.
1.3 A housing trajectory has been prepared presenting the situation as at 31 March 2020 to reflect the formal monitoring period for this AMR. This indicates a five year housing land supply of 5,517 dwellings compared to a target of 5,269 which includes making up the shortfall in delivery since 2011 in full and allowing for a 10% buffer. This equates to 5.24 years. The Council can therefore demonstrate a 5 year supply of housing land. Predicted completions over the next 5 years will exceed the target and fully make up the current shortfall. Therefore, the policies for the supply of housing should be considered to be up-to-date.
1.4 38.71% of dwellings completed in the monitoring year were on previously-developed land (PDL).
1.5 The availability of housing that is affordable is a major issue in the District, with a growing gap between average earnings and housing costs. In 2019/20 338 new affordable homes were completed, amounting to 32.91% of all new dwellings completed, and 38.45% of completions on qualifying sites (ie those that meet the affordable housing policy criteria). 301 of these affordable completions were on proposed Local Plan allocations (88.01% of the affordable total). This is a slight increase from last year.
2
• •
• •
• • • • • •
Introduction 2
2 Introduction Background to the Annual Monitoring Report
2.1 Regulation 34 of the Town and Country Planning (Local Planning) (England) Regulations 2012 requires local planning authorities to produce a monitoring report. The Regulations have removed the requirement to make this an annual report submitted to the Secretary of State. Instead the Regulations require the monitoring report to contain information on the progress made in the production of documents specified in the Local Development Scheme (LDS), and the extent to which policies set out in adopted documents are being achieved and targets being met, including policies which are not being implemented. Local authorities must publish this information at least annually and must also report on activity relating to the duty to cooperate. The report can also include other information such as up to date information on Neighbourhood Plans and Community Infrastructure Levy payments, but these can also be published separately if the Authority wishes to do so.
2.2 The Council has made the decision to carry on with the production of an annual monitoring report, as it is felt that this effectively fulfils the purpose of sharing the performance and achievements of the planning service with the local community, as well as showing historic trends through the framework of existing indicators. The start date of this report is 1 April 2019. At this date the Huntingdonshire Local Plan to 2036 had completed its proposed main modifications consultation (closing dates for comments was 29 January 2019) and the Council were awaiting the Inspector's final report. Since 1 April, the final Inspector's report was received on 29 April 2019 which concluded that with the recommended main modifications, the plan is sound and can be adopted. The Local Plan to 2036 was adopted at Full Council on 15 May 2019. Given that the majority of the monitoring period fell after this date, and despite a one month overlap with previous development policies, this edition of the AMR has been fully updated to reflect the Huntingdonshire Local Plan to 2036.
2020 AMR
2.3 This is the 16th Annual Monitoring Report (AMR) to be produced by Huntingdonshire District Council and covers the reporting period 1 April 2019 to 31 March 2020. It has been decided to split the AMR into two parts. This is Part 1 (Housing Supply) and covers the following:
Commentary on housing provision in this period Housing trajectory showing past performance and estimating future performance in terms of housing delivery, and demonstrating a 5 year supply of housing land The Housing Delivery Test Parish and settlement completions
Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
2.4 Part 2 (Non-housing supply) of the 2020 AMR will be published by 31 December 2020 and will cover the following:
Local Development Scheme (LDS) progress Analysis of performance of adopted policies as at 31 March 2020 Detail of actions the Council has taken under its 'Duty to Co-operate' Update on Community Infrastructure Levy (CIL) Update on the progress of Neighbourhood Plans Update on custom and self-build register and brownfield register
Monitoring in Huntingdonshire
2.5 Monitoring of development for the Cambridgeshire district councils is carried out in collaboration with the Business Intelligence (Research) Team at Cambridgeshire County Council. Monitoring conducted by the Business Intelligence (Research) Team includes housing, employment, retail, leisure and some renewable energy proposals.
2.6 The Business Intelligence (Research) Team at the County Council manages an annual development survey which takes place in April each year, and involves officers from the County and District Councils inspecting sites with extant planning permission to ascertain whether development is completed, is under construction, or yet to be started.
2.7 Covid-19 has made the annual development survey more challenging this year due to government guidance on social distancing and travel. Through working closely with the Business Intelligence (Research Team) and utilising other sources of data such as building control records, community infrastructure levy documents and council tax records, the Council was able to continue actively monitoring the progress made on sites across the district. Site visits were also undertaken and complied with Government guidance in place at the time.
2.8 From the data collected, the Business Intelligence (Research) Team produces annual topic reports with full details of completions and outstanding commitments for each type of development. These reports are available on Cambridgeshire Insight the County Council's shared knowledge base for the Cambridgeshire and Peterborough Area.The district data is then extracted from these reports to provide results for the indicators in the AMR. Huntingdonshire District Council works closely with the County Council and colleagues at Cambridgeshire's other districts to ensure that systems are constantly being reviewed, and improved where possible to reflect any changes to requirements.
3
2 Introduction Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
2.9 Other data required for the AMR is obtained from other divisions of the County Council, District Council, and statutory bodies such as the Environment Agency. The Council also contacts house builders, agents and developers to obtain data required for the housing trajectory.
4
• • • • •
• •
•
Planning Policy Position 3 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
3 Planning Policy Position 3.1 As at 1 April 2019, the planning policy context for Huntingdonshire was as follows:
Huntingdonshire Local Plan 1995; Local Plan Alteration 2002; Core Strategy 2009; Huntingdon West Area Action Plan 2011; and Made neighbourhood Plans of St Neots, Godmanchester and Houghton and Wyton.
3.2 On the 15 May 2019, the Huntingdonshire Local Plan to 2036 was adopted and supersedes all previous development plans apart from made neighbourhood plans. In addition, the Huntingdon Neighbourhood Plan has now been adopted.
3.3 Therefore, at the 31 March 2020, the development plan for Huntingdonshire is:
Huntingdonshire Local Plan to 2036; Made neighbourhood plans for St Neots, Godmanchester, Houghton and Wyton and Huntingdon; and Cambridgeshire and Peterborough Minerals and Waste Plans
3.4 The Development Plan is supported by a series of other planning policy documents which can be found on the Huntingdonshire District Council website.
Local Plan to 2036
3.5 Changes in the national planning policy position, as well as changes in local circumstances, accelerated the need for the Council to pro-actively reconsider its local planning policy position.
3.6 Of major significance locally, part of Alconbury Airfield was designated an Enterprise Zone in August 2011, which triggered a requirement to consider undertaking a review all of the Council's Local Development Documents. The Enterprise Zone, covering 150ha, was designated to help deliver the economic growth aspirations of the Greater Cambridge Greater Peterborough Local Enterprise Partnership (LEP) by encouraging new investment and creating around 8,000 high-quality jobs. The owners of Alconbury Airfield (Urban and Civic) submitted an outline planning application in September 2012 for a major high quality mixed use development, including up to 5000 dwellings, as well as the Enterprise Zone (1201158OUT) which was approved in October 2014. Subsequent Reserved Matters have been approved for residential, business, community and leisure uses, and
development is well underway, with a number of homes and business units already occupied and a primary school in use. Up to date information on progress at Alconbury Weald can be found on its website.
3.7 The new Local Plan to 2036 is a comprehensive plan incorporating both new local planning policies and identifying development allocations. It was submitted on 29 March 2018 for examination by an independent Inspector. Public examination hearings were held between 17-20 July and 10-27 September 2018, after which the Inspector declared that the Council complied with its duty to co-operate and that the Plan could be made sound through main modifications. An outline of proposed main modifications from the Inspector was published on 14 November 2018 and consultation on these ran between 10 December 2018 and 29 January 2019. All representations relating to the proposed main modifications and associated sustainability appraisal were passed on to the Planning Inspector for consideration.
3.8 Following the receipt of the final Inspector's Report on 29 April 2019, the Huntingdonshire Local Plan to 2036 went to Full Council on 15 May 2019 where it was formally adopted.This meant that it has superseded all previous development plans apart from any made neighbourhood plans and the Cambridgeshire and Peterborough Waste and Minerals Plan.
Neighbourhood Plans
3.9 Huntingdonshire has currently four made neighbourhood plans: St Neots (2016), Godmanchester (2017), Houghton and Wyton (2018) and Huntingdon (2019). Progress on neighbourhood planning in the District is kept on the District Council's website and will be monitored in more detail in Part 2 of the AMR in December 2020.
National Planning Policy Framework
3.10 A revised NPPF was published in July 2018, implementing reforms previously announced through the Housing White Paper, the planning for the right homes in the right places consultation and the draft revised NPPF consultation. The NPPF (2018) had a strong emphasis on delivery of housing as well as the presumption in favour of sustainable development. Further changes were made to the NPPF following the Government's Technical consultation on updates to national planning policy and guidance which was consulted upon between 26 October 2018 and 7 December 2018.The consultation document covered topics such as local housing need, housing land supply, the definition of deliverable and development requiring a Habitats Regulations Assessment. A further updated NPPF was published in February 2019.
5
3 Planning Policy Position Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Planning Practice Guidance
3.11 In March 2014, the government introduced online Planning Practice Guidance (PPG). This is updated on an intermittent basis throughout the year.
6
•
• • •
•
•
•
• •
Analysis of completions in 2019/20 4 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
4 Analysis of completions in 2019/20 4.1 The 2019 trajectory predicted completions of 1,003 in 2019/20 against an annual average target for the plan period of 804. The actual number of completions was 1,010. The majority of new dwellings were built in Brampton (230), Huntingdon (141), Godmanchester (115), Fenstanton (73), Ramsey (71), and Warboys (65). The Parish of the Stukeleys saw 124 completions, it must be noted that 119 of these are from the Alconbury Weald development, which will form its own distinct settlement. The sites contributing the highest numbers of completions include Brampton Park, Alconbury Weald, Bearscroft (Romans' Edge) in Godmanchester, and Drovers Place in Huntingdon.
Key headlines from the 2019/20 data:
2019/20 saw the construction of 1,010 net completions (1,027 new dwellings with 17 demolitions), this exceeded the 2019 housing trajectory of 1,003 dwellings and the Council's annual housing target of 804 dwellings. Of these 1,010 net completions, 774 (76.63%) were on Local Plan allocations. 38.71% of these dwellings were completed on previously-developed land (PDL). 338 new affordable homes were completed (a significant increase from last year), this amounts to 32.91% of all new dwellings completed. 301 of these affordable completions were on Local Plan allocations (88.01% of the affordable total). Of the 338 affordable completions, 64.79% were for social rent (161 houses and 58 flats) and 35.21% shared ownership (98 houses and 21 flats). Across all tenures and dwelling types, the majority of net completions were 3 bedroomed properties (338), followed by 4+ bedroomed properties (328), then 2 bed (227), then 1 bed (113) and 4 unknown number of bedrooms. On sites of greater than 9 dwellings that have now built out, most dwellings (244) were built on sites with a density of more than 50 dwellings per hectare (dph), these were on completed sites in Alconbury Weald and Drovers Place in Huntingdon. The higher density of these sites is due to the number of built flats. A total of 56 dwellings were built on sites with a density between 30-50dph, at Parkview in Brampton, and 24 on sites with a density less than 30dph, at Brampton Park and Abbotsley. 4 gypsy and traveller pitches were delivered. As at 31 March 2020, 1,108 dwellings were under construction.
4.2 Some of these key headlines are illustrated in the series of graphs and charts over the page.
4.3 To reflect the settlement hierarchy in the adopted Local Plan, Table 4.1 breaks down the 2019/20 completions by Spatial Planning Area (SPA), Key Service Centre (KSC) and Small Settlement. The results are then illustrated in Figure 4.2. The outcome for 2019/20 shows that the majority of completions were in the Spatial Planning Areas, followed by KSCs and Small Settlements. This follows the adopted settlement hierarchy used in the Local Plan to 2036. The distribution of the completions across the SPA's is expected, in future monitoring years, to be more spread out once further Local Plan sites and existing permissions start to build out. Overall the Huntingdon and St Neots SPAs are expected to have higher levels of growth as a result of the two strategic expansion locations (Alconbury Weald and St Neots East).
4.4 A further breakdown of the 2019/20 net completions by tenure type and by parish has been compiled in Appendix 1, this includes net completions from the start of the Local Plan period in the 2011/2012 monitoring year.
7
180
160
140
120
100
80
60
40
20
0
Greenfield Land 58.72%
LAND TYPE
Previously Developed
Land 38 . .71%
Garden Land 2.57%
Affordable Tenures and Dwell ing Type
Social Rent (House) Social Rent (lflat ) Shared Ownership (House)
Shared Ownership (Flat )
I 400
350
300
250
200
150
100
50
0
more than so dph 75 . .3%
DENSITY Less than 30 dph
7.4%
Between 30 - 50 dph / 17.3%
Number of Bedrooms
Unkown 1 Bed 2 Bed 3 Bed 4+ Be d Bedrooms
4 Analysis of completions in 2019/20 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
8
Key Service Centres
19%
Ramsey SPA 8%
St Ives SPA 4%
Small Settlements
2%
Huntingdon SPA 60%
Analysis of completions in 2019/20 4 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Table 4.1 2019/20 Net Completions by Settlement Hierarchy Category
Total OtherAffordable MarketLocationHierarchy
14106279HuntingdonHuntingdon SPA
2300101129Brampton
11503877Godmanchester
11902198Alconbury Weald
6050222383Total
160016St NeotsSt Neots SPA
0000Little Paxton
160016Total
4001030St Ives St Ives SPA
4001030Total
6902940Ramsey Ramsey SPA
130013Bury
8202953Total
6006Buckden Key Service Centres
7303043Fenstanton
3701621Sawtry
10307Somersham
6503134Warboys
2002Yaxley
193377113Total
Total OtherAffordable MarketLocationHierarchy
741073 Small Settlements
Small Settlements
741073Total
10104338668District Total
9
5 Housing Supply Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
5 Housing Supply The housing requirement for Huntingdonshire
5.1 Huntingdonshire's Local Plan to 2036 was brought forward under the 2012 National Planning Policy Framework (NPPF) and examined under the transitional arrangements provided for plans which were well progressed when the 2018 NPPF was introduced. It was therefore not required to provide for local housing need as assessed by the standard method. The 2012 NPPF required LPAs to meet their full objectively assessed housing needs (OAN). HDC’s evidence on housing requirements is set out in Huntingdonshire Objectively Assessed Need April 2017 which gives HDC a housing requirement of 20,100 new dwellings for 2011-2036, equivalent to 804 dwellings per year.
5.2 The Local Plan to 2036 supports the overall provision of at least 20,100 new homes between 2011 and 2036 along with supporting infrastructure and services. The increase in housing supply will help to support the delivery of additional affordable housing which comprises a substantial element of the district's overall housing requirement. Together with developments completed and committed within the plan period so far the proposed allocations along with other anticipated sites are expected to meet Huntingdonshire's OAN for housing development in full.
Table 5.1 Plan Period and Housing Requirement - Local Plan to 2036
Total Housing Required
No. of Years Remaining
Total No. of Years
End of Plan Period
Start of Plan Period
Source of Plan Requirement
20,100162531 March 20361 April 2011 Local Plan to 2036
5.3 The Council’s housing trajectory identifies the Council’s progress towards the housing requirement of 20,100 dwellings by 2036. The housing trajectory identifies the full details of sites and commitments in terms of housing allocations, extant planning permissions, applications approved subject to S106, prior approvals, small sites, rural exception sites and windfall schemes which are counted towards meeting this need.
5.4 Cambridgeshire County Council Business Intelligence (Research) Team also provide details of housing completions and commitments. Table 5.2 shows the position as at 31 March 2020. From 1 April 2011 to 31 March 2020, a total of 6,466 dwellings (net) were completed. Housing commitment figures in this data include all extant planning permissions and housing allocations. The total number of commitments identified in the table will differ from that of the housing trajectory
for a number of reasons. Firstly the County Council data does not take into account the build-out rate of sites and will therefore include dwellings that may be completed outside of the plan period. Secondly the Council takes a more cautious approach to the completion rate on small sites by applying a discount rate to sites not yet under construction to account for the potential non-implementation of some planning permissions.
Table 5.2 Housing Commitments and completions 2011-2020
23,77517,3094,7342,7381,1088,7296,466
Net Outline Under Full/Reserved Allocations Total Total Dwellings Planning Construction Matters with No Commitments Completions Completed Permission Permission, Planning plus 2011-2020 Not Started Permission Commitments
10
• • •
• •
•
• •
Housing Supply 5
Housing Delivery Test (HDT)
5.5 The Housing Delivery Test (HDT) was introduced in the revised National Planning Policy Framework (NPPF) in July 2018. It provides a new additional indicator for measuring net housing delivery over the previous 3 years against the housing requirement for the area.
5.6 It is the Government's aim that Local Planning Authorities (LPAs) should aim to achieve a housing delivery rate of at least 95%. This is measured by a 3 year requirement which is based on either household projections or the latest adopted housing requirement, whichever is lower. The annual requirement of either of these over 3 years is totalled to give an overall 3 year requirement. To assess if an LPA has passed or not, the net completions recorded for those 3 years are divided by the requirement to give a delivery percentage.
5.7 Paragraph 75 of the NPPF sets out that to pass the test without any further actions, a delivery rate of at least 95% over the past 3 years’ worth of net completions against the requirement must be achieved. If the identified housing requirement is not delivered, the following cumulative consequences are applied in an attempt to boost housing supply:
the publication of an action plan if housing delivery falls below 95%; a 20% buffer on the LPAs 5-year housing land supply if housing delivery falls below 85%; the presumption in favour of sustainable development if housing delivery falls below 75%, once transitional arrangements have ended.
5.8 The Housing Delivery Test applied an element of student and communal accommodation (C2) by applying a multiplier to the housing completions, this explains why there are slightly differing completions figures between the AMR and MHCLG's figures. The idea of including C2 into these delivery figures is that they can release C3 dwelling houses when people make the move from their own home to a care facility for example thus reducing the need for new build market houses.
5.9 In the first result published in February 2019, Huntingdonshire achieved 92%, meaning that an action plan was required to be prepared in order to identify ways to proactively boost housing supply. This outcome remained in place until the subsequent results were published. Huntingdonshire's Action Plan was approved at Cabinet in July 2019 and was published on the Council's website on 1 August 2019. It details the key issues that have impacted housing delivery and the actions that are being undertaken to address these issues. Data from the 2018 Annual Monitoring Report was also used to demonstrate the likely future supply of homes across the remainder of the Local Plan period.
Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
5.10 In the most recent result published in February 2020, Huntingdonshire passed with a delivery rate of 110% (shown in Table 5.3). This means that no update to the Action Plan is required and it is no longer valid. Furthermore, with another year of completions surpassing the Local Plan target, the next HDT results will likely show a further increase in delivery.
5.11 The Action Plan stated that the actions identified to boost housing supply would be monitored in the AMR. Even though the Action Plan is no longer valid, a short review has been included here for completeness as it was valid during the monitoring year (see Table 5.4).
Table 5.3 HDT Result for Huntingdonshire as published in February 2020
Housing Delivery
Housing Delivery
Total number
Number of homes delivered
Total number
Number of homes required Test: 2019
consequence Test: 2019 measurement
of homes delivered
of homes required
2018/192017/182016-172018/192017-182016-17
None110%2,5321,0677467192,295804784707
C2 commitments and completions
5.12 2017/18 saw 0 C2 completions while there were 48 C2 rooms recorded as complete in 2018/19, this excludes 7 HMO rooms (Houses in Multiple Occupation) which were completed in 2018/19. There was 1 room completed in 2019/20.
5.13 C2 commitments are not included in the housing trajectory as they do not form part of the Local Plan housing requirement. Some allocated sites in the Local Plan to 2036 do include some C2 provision, these sites are:
SEL1.1 - Alconbury Weald - up to 400 units permitted as part of 1201158OUT in October 2014 HU3 - Former Policy HQ site, Huntingdon - including supported housing or care home and/or supporting health care uses (units unspecified) alongside 75 dwellings HU11 - Brampton Park - 19/00406/REM details approved in February 2020 for a care home of approximately 70 bedrooms SEL2 - St Neots East - 1300388OUT permitted care accommodation in August 2019 SM2 - Newlands, St Ives Road, Somersham - 15/00917/OUT for a care home for between 40 and 50 residents permitted in November 2017
11
• • • • • •
5 Housing Supply Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
5.14 A further six sites are committed and are either unimplemented or under construction as at 31 March 2020, totaling 154 additional C2 rooms:
Farcet Parish - Conquest Drove - 1 room (19/01262/FUL) permitted November 2019 Ramsey parish - Bury Road - 66 rooms (18/00948/FUL) permitted January 2019 Abbotsley parish - Pitsdean Road - 5 rooms (17/01072/FUL) permitted September 2017 Wyton-on-the-Hill parish - RAF Wyton - 72 rooms (17/01528/FUL) permitted December 2017 Yaxley parish - Park Close - 10 rooms (18/02165/FUL) permitted February 2019 Godmanchester parish - on west side of A1198 - 46 dwellings and a 65 room care home (18/00532/OUT) permitted April 2019. The subsequent submission of a reserved matters application (20/00505/REM) for 46 dwellings is pending consideration. The care facility will likely come forward under a separate reserved matters application.
Table 5.4 Monitoring of actions and responses identified in the HDT Action Plan (August 2019)
Progress made Identified actions and responsesIssueIssue category
The implementation of Local Plan policies continues and discussions surrounding viability where relevant continues in the determination of planning applications.
Huntingdonshire District Council in their newly adopted Local Plan to 2036 have policies which allow for viability assessments to be taken into account when relevant to reduce the impact of this constraint and not affect housing delivery.
Land values and viability
Site constraints
Working relationships with Environmental Health continues in the determination of planning applications.
Continue working relations with Environmental Health in assessing risk and potential mitigation so that land contamination does not affect housing delivery. Making the relevant information and documentation available to Environment Health and any other relevant bodies is key to assisting with this.
Land contamination issues
Working relationships with the Environment Agency continues in the determination of planning applications.
An SFRA was produced as part of the Local Plan evidence base to inform the selection of site allocations and also support the determination of planning applications. This document and the continuation of our working relationship with the Environment Agency will be important actions to
Flooding
sustain when assessing schemes for new housing in areas of flood risk. In addition, the use of the sequential test in the planning process has enabled housing delivery to be maximised in areas of low flood risk.
The implementation of Local Plan policies surrounding heritage continues alongside heritage legislation to protect and conserve heritage assets and refuse applications which will have a detrimental impact upon them.
Local Plan policies require schemes to be well designed so that they do not have a detrimental impact on heritage assets; this is considered to be reasonable given the level of protection afforded to heritage assets in law.
Heritage
12
Housing Supply 5 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Issue Issue category
Lack of skills and labour availability
Availability of materials
Supply issues HDC have no control over this issue. HDC have no control over this issue. Availability of house builders and Registered Social Landlords
Market absorption
Identified actions and responses
The housing and mixed-use allocations in the new Local Plan promotes growth up to 2036, thus facilitating an increase in the working age population in the District. Huntingdonshire's Economic Development team are working closely with Alconbury Weald and the designated Enterprise Zone including their IMET training facility as well as working to rejuvenate market towns and key service centres to bring about economic growth and greater opportunities for employment. These were identified as key areas for attention in the Huntingdonshire Economic Growth Plan 2013-2023 which can continue the delivery of this vision now the Huntingdonshire Local Plan has been adopted.
HDC have no control over this issue.
Huntingdonshire's Local Plan supports a broad mix of tenures and dwellings sizes to avoid over supply of certain dwelling sizes and tenures in the housing market. In addition, HDC has been cautious in its approach to market absorption in the AMR.The 2018 AMR housing trajectory reflects comments made by the Planning Inspector during the Local Plan examination in regard to market absorption and build out rates of two main clusters of sites. A cap of 300 dwellings a year has been recorded for sites SEL1.1, SEL1.2 and HU1 in the Alconbury Weald and north-western area of Huntingdon and a cap of 200 dwellings a year from site SEL2 in St Neots. It should be noted the cap is only to calculate the housing trajectory and 5 year housing land supply figure. There is no actual cap on delivery on any of these sites and the developers/housebuilders involved anticipate housing completions in excess of the capped figures. Further reviews of this position will be undertaken in subsequent AMRs.
Progress made
Working relationships with Alconbury Weald and the designated Enterprise Zone and the implementation of Local Plan policies to support economic growth continue.
The ongoing Covid-19 health emergency have brought additional challenges to supporting our market towns and high streets which HDC are actively working with partners on. The housing trajectory survey for 2019/20 asked developers what impact they anticipate Covid-19 may have on the delivery of new homes to further understand the pressures the pandemic may bring.
HDC have no control over this issue.
The Council in the housing trajectory have retained the cap on the two clusters of sites to ensure a cautious trajectory of housing. The agents, housebuilders and owners of these sites (as with all other major sites) are contacted each year as part of the housing trajectory survey to gather up to date information on the progress made on site and any constraints to delivery (such as market absorption).The information gathered informs the forecasting made in the housing trajectory to ensure it is robust. A trajectory as per the survey responses for the capped sites are included in Appendix 3 of the AMR Part 1, they show that the agents, housebuilders and owners for the sites anticipate delivery to be higher than the capped amounts.
13
5 Housing Supply Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Issue Issue category
Time to determine planning applications, respond to pre-application enquiries and discharge conditions
Planning process
Identified actions and responses
The Local Plans Team work with Neighbourhood Planning Groups including those who wish to undertake a housing needs assessment. The housing needs assessment allows for more detailed housing mix policies specifically targeted at the housing mix and housing need of the existing Neighbourhood Plan Area. This allows for greater diversity of housing supply to enhance market absorption.
In addition, Huntingdonshire is keen to promote Self and Custom Build housing as demonstrated in Local Plan policy LP25. Huntingdonshire has a Self and Custom Build Register open whereby people can register their interest for a plot. Monitoring of the Self and Custom Build Register shows that there is growing demand for this type of housing, so to help meet this growing need in the District, work between Planning/Housing teams and Parish Councils to promote suitable sites is underway
Multiple actions are being undertaken across the Development Service. Firstly, a LEAN review is underway across the planning teams with the overall aim to maximise efficiency. This review has seen various actions completed including: a publication of a new Planning Guide for applicants and agents; revised validation checklists to minimise the time applications are invalid and to ensure consistency; agent forums; and training for staff, members and Parish Councils on the planning process and requirements. Secondly, a revision to the scheme of delegation has been put in place whereby applications for single dwellings no longer need to go to Development Management Committee. Thirdly, a review of conditions is underway making them more flexible in terms of triggers.
An update of the Landscape and Townscape Supplementary Planning Document (2007) will start in Summer 2019.This will allow for applicants and agents to have up to date guidance on landscape issues. This has the potential to help speed up the planning process by reducing the need for amended proposals, saving officer and planning agents' time.
Finally, agreements are in place on our two strategic site allocations (Alconbury Weald and Wintringham Park) whereby dedicated officers are assigned to these sites to ensure that officer knowledge of the site is retained and that good working relationships are sustained throughout the life of both of these long-term developments. In addition, to identify any delivery problems rapidly, quarterly monitoring statistics are expected from both strategic sites.
Progress made
HDC continue to work with Neighbourhood Planning Groups to support the production of Neighbourhood Plans. More details on the progress made on neighbourhood planning in Huntingdonshire is found in the AMR Part 2.
HDC continue to promote self and custom build housing and monitors entries made on the Self and Custom Build Register. The current register opened on 31 October 2020 and runs to 30 October 2021.
Significant efforts have been made by the Development Service to streamline and increase efficiencies. Further efforts continue where possible in response to the ongoing Covid-19 health emergency and the pressures it has brought to the Service.
Work continues on the revised Landscape and Townscape SPD.
Positive engagement between planning officers and the developers/ housebuilders for our two strategic site allocations have continued to ensure their continued delivery.
HDC have no control over this issue. HDC have no control over this issue. Uncertainty over Brexit
14
Housing Supply 5 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Progress made Identified actions and responsesIssueIssue category
Monitoring of S106 Agreements continue. Monitoring of the timescales taken in the preparation and conclusion of S106 Agreements will continue.
Time to agree planning obligations and S106 agreements
The adoption of the Huntingdonshire Local Plan has simplified the Development Plan. The adoption of the Local Plan and the delivery of sites allocated within it means HDC is no longer in the tilted balance and can demonstrate in the housing trajectory a healthy supply of new homes over the Plan period.
Before the adoption of the current Local Plan, the development plan for Huntingdonshire was complex with a number of saved policies and plans in place (see 3 'Huntingdonshire Policy Context'), this resulted in a period of complex decision making. Also, the creation of the National Planning Policy Framework in 2012 saw the introduction of the tilted balance. Huntingdonshire had the tilted balance engaged as a result of persistent under delivery, in part as a result of not allocating land for housing since 2002 and for not having an up to date development plan.
Status of the Development Plan
Works are continuing on the improved A14. A 12 mile bypass to the south of Huntingdon running between Ellington and Swavesey opened on 9 December 2019. Work continues on
Works by Highways England on the improved A14 are expected to be completed and open to the public in 2020.These works have removed the need for schemes to provide a nil detrimental impact on the A14 and have created additional capacity for future housing allocations to be delivered.
Timelines of wider transport projects such as the A14
Infrastructure and services
removing the Huntingdon Railway Viaduct. On 31 October the new Pathfinder link road which provides a route to Huntingdon from the A1307 (the old A14) was opened. Work to build the new Mill Common and Views Common link roads continue.
Works with Highways England and the Combined Authority on the A428 and East-West Rail projects continue.
Work with Highways England on the A428 and East-West Rail projects to remove future constraints to the southern part of the District will continue. In addition, Huntingdonshire continues to work in partnership with the Combined Authority on their 10 key projects to further minimise the lack of appropriate transport infrastructure as a constraint to housing delivery and boost the connectivity of the Cambridgeshire and Peterborough area.
Existing transport network and service provision
Gypsy and Traveller Site Provision
5.15 Planning Policy for Traveller Sites was issued by the government in March 2012. The policy states that local planning authorities should, in producing their Local Plan, identify and update annually a supply of specific deliverable sites sufficient to provide five years’ worth of sites against their locally set targets, and identify a supply of specific, developable sites or broad locations for growth for years six to ten and, where possible, for years 11-15.
5.16 In accordance with the requirements of the NPPF and Planning Policy for Traveller Sites, the Local Plan to 2036 sets out how the Council is positively seeking to meet the objectively assessed needs of Gypsy and Travellers. The October 2016 Gypsy and Traveller Accommodation Assessment has identified an approximate need for an additional 9 pitches for travelling households in Huntingdonshire between 2016 and 2036, and up to 19 additional pitches for households whose travelling status was recorded as unknown and no need for yards for travelling show people.
5.17 Between the base date of the GTAA at 1 February 2016 and 31 March 2020 23 pitches were granted permission across 7 sites. Four permanent pitches for Gypsies and Travellers were completed in 2019/20.
15
•
•
•
•
• • • • • •
•
•
5 Housing Supply Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
5.18 Three planning applications for permanent Gypsy and Traveller pitches were determined within the monitoring year:
Bluntisham parish - Needingworth Road - 1 pitch (18/00980/FUL) - permission granted July 2019 and completed within monitoring year. Somersham parish - Parkhall Road - 3 pitches (18/01312/FUL) - permission granted August 2019 Somersham parish - St Ives Road - 4 pitches - (19/02298/FUL) - permission granted in March 2020 Ramsey - Middle Drove - 2 pitches - (17/00591/FUL) - permission was refused August 2017, an appeal was allowed in June 2019
5.19 As at 31 March 2020 there were six planning applications under consideration for Gypsy and Traveller pitches:
Somersham parish - Legacy Park - 4 pitches (18/00840/FUL) - received April 2018 Bluntisham parish - Needingworth Road - 1 pitch - (19/00925/FUL) - received May 2019 Bluntisham parish - Needingworth Road - 1 pitch - (19/00926/FUL) - received May 2019 Bluntisham parish - Needingworth Road - 1 pitch - (19/01737/FUL) - received September 2019 Somersham - Parkhall Road - 2 pitches - (20/00608/FUL) - permission granted July 2020 Somersham parish - St Ives Road - retention of 1 pitch (19/00020/FUL) - permission granted August 2020
5.20 Looking further ahead than five years, it is considered that additional pitches will come forward as windfall adjoining existing pitches and in other areas with reasonable access to local health services and primary schools.
Ramsey parish - Middle Drove - retention of land for 1 pitch (20/00978/FUL) - received June 2020 Ramsey parish - Middle Drove - retention of land for 1 pitch (20/00981/FUL) - received June 2020
16
• •
•
Housing Trajectory September 2020 and 5 year housing land supply 6 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
6 Housing Trajectory September 2020 and 5 year housing land supply 6.1 The NPPF requires Local Planning Authorities to assess and demonstrate the extent to which existing plans fulfill the requirement to identify and maintain a rolling 5-year supply of deliverable land for housing. Development plan documents should set out policies and strategies for delivering the required level of housing provision. Sufficient specific deliverable sites should be identified to deliver housing in the first 5 years, with a further supply of specific developable sites for years 6-10 and, where possible, years 11-15.
6.2 For a site to be considered deliverable, the NPPF states it should be:
available - the site is available now suitable - the site offers a suitable location for development now and would contribute to the creation of sustainable, mixed communities achievable - there is a reasonable prospect that housing will be delivered on the site within 5 years
6.3 Revisions through the publication of the NPPF 2019 state that sites with outline planning permission, permission in principle, allocated in the development plan or identified on a brownfield register should only be considered deliverable where there is clear evidence that housing completions will begin on site within five years. This has been taken into account when compiling the Council's housing trajectory for this AMR. Updates to the Planning Practice Guidance in July 2019 provide further details on the sort of evidence that can be used to demonstrate deliverability. The NPPF also states that for sites that are not major developments or that have detailed planning permission, should be considered to be deliverable until the permission expires, unless it can be clearly demonstrated that it cannot be developed within 5 years.
6.4 For a site to be considered developable, it should be in a suitable location for housing development, and there should be a reasonable prospect that it will be available for, and could be developed at, a specific point in time.
6.5 Housing trajectories show past performance and estimate future performance in relation to housing delivery, enabling local planning authorities to monitor any shortfall or surplus in housing supply, and to manage future provision to ensure the required amount of housing is delivered. The trajectory shows current anticipated delivery based on data collected from September to October 2020 and provides a snapshot view of anticipated future delivery to 2036.
6.6 This year's trajectory is based on actual housing completions up to 31 March 2020 (Source: CCC Monitoring & Research - Annual Development Survey) and projected completions up to 2036 on sites allocated for housing and non-allocated sites with extant planning permission.Where sites have outline planning permission only, a potential figure for housing capacity has been made based on the developer's response to a trajectory questionnaire, or officer's assessment of the site. However, it must be stressed that final numbers on such sites will be determined at reserved matters stage, and the numbers in the trajectory are indicative only. Sites have also been included where the principle of development has been accepted, such as sites with a resolution to approve subject to the signing of a Section 106 agreement and sites identified as allocations in the Local Plan to 2036.
6.7 In last year's survey, the questionnaire used for the trajectory survey was reviewed in line with the revised definition of deliverable in the NPPF 2019, in particular if outline permission was granted or sought for a site. This revised survey form was used again for this year's survey. Those contacted were asked to provide information on the aspirations for their sites; the type of planning permission sought if not already granted; any constraints to development and viability; the number of already agreed or potential housebuilders involved and the trajectory for the site (and where possible, a breakdown of when the affordable and market dwellings were expected to be built). An additional question surrounding the potential impacts of the current Covid-19 pandemic was included to understand how this may impact housing delivery.
6.8 Questionnaires were sent out in September 2020 to developers and agents of allocated sites which had not yet been built out as at 31 March 2020, and to those representing sites of 10+ dwellings with either outline or full planning permission and not yet completed, as well as those representing sites with applications submitted where the principle of development had been accepted (approved at Development Management Committee and are awaiting the signing of a S106 Agreement), and sites identified as having potential to deliver housing in the Local Plan to 2036. In instances where no reply was received an estimate was made based on the most up-to-date knowledge of the site by the relevant planning officer. Where it was felt that agents/developers were being over-optimistic in their predictions, the building programme was deferred to give a more cautious timeframe. This is noted in the 'comments' field of relevant sites in the trajectory data table. These deferrals resulted in reduction of the anticipated 5 year housing land supply from 7,409 dwellings (7.03 years' worth) to 5,517 dwellings (5.24 years' worth).
6.9 Sites of less than 10 dwellings with outline, permission in principle, reserved matters or full planning permission have also been included in the trajectory. It would not have been practical to contact developers of each and every small site. Sites with reserved matters or full planning permission were grouped together. A 10% discount was applied to those small sites with full or reserved matters approval not yet under construction and to sites with outline permission or
17
6 Housing Trajectory September 2020 and 5 year housing land supply Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
permission in principle to allow for some sites which may not be developed. It should be noted that historically small sites often have the advantage of being built out more quickly than some larger sites.
6.10 Strategic housing growth will be mainly concentrated in the proposed Strategic Expansion Locations of Alconbury Weald and St Neots East, and the Spatial Planning Areas of Huntingdon, St Neots, St Ives and Ramsey, as set out in the Local Plan to 2036.
6.11 It must be noted that the trajectory is an attempt at providing a reasonable and pragmatic forward planning tool. It is acknowledged that trajectories are not intended to produce perfect forecasts of the future. They should however provide as good an indication as possible of the prospects for housing delivery, based on developers’ and agents’ aspirations, or officers’ best estimates of delivery based on site knowledge.
6.12 The Council uses the ‘Sedgefield’ method to calculate the 5 year supply.
The NPPF states that LPAs may make an allowance for windfall sites in the 5 year supply if they have compelling evidence that such sites have been consistently available and are likely to remain so, an approach supported by the Local Plan Inspector in his report dated 29 April 2019. It is anticipated, however, that some non-strategic housing sites are likely to come forward within the built-up areas of towns and villages in line with the scale of development set out in the Settlement Hierarchy, which will add further to the housing supply.
18
Position as at March 2020 7 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
7 Position as at March 2020 7.1 This trajectory was produced reflecting the position as at March 2020, the technical monitoring period and is set out below. Table 7.1 sets out the annual number of actual housing completions up to 31 March 2020, and projected future completions to 2036, based on the results of the 2020 survey, and compares these totals with the annual Local Plan requirement to 2036. It should be noted that the number of completions in previous years has in some cases been revised from data previously published due to ongoing assessment by the Cambridgeshire County Council Business Intelligence (Research) Team.
Table 7.1 Trajectory Data Against Local Plan Requirement as at March 2020
Yr 16Yr 15Yr 14Yr 13Yr 12Yr 11Yr 10Yr 9Yr 8Yr 7Yr 6Yr 5Yr 4Yr 3Yr 2Yr 1
2035
-36
2034
-35
2033
-34
2032
-33
2031
-32
2030
-31
2029
-30
2028
-29
2027
-28
2026
-27
2025
-26
2024
-25
2023
-24
2022
-23
2021
-22
2020
-21
2019
-20
2018
-19
2017
-18
2016
-17
2015
-16
2014
-15
2013
-14
2012
-13
2011
-12
1,0101,040746688526514686412844Past Completions
6756756907767718018809831,0361,2311,2611,0661,2541,1551,076966Projected Completions
21,76221,08720,41219,72218,94618,17517,37416,49415,51114,47513,24411,98310,9179,6638,5087,4326,4665,4564,4163,6702,9822,4561,9421,256844
Past/Projected
Cumulative Completions
20,10019,29618,49217,68816,88416,08015,27614,47213,66812,86412,06011,25610,4529,6488,8448,0407,2366,4325,6284,8244,0203,2162,4121,608804
Local Plan Requirement
Cumulative over 25 years
1,6621,7911,9202,0342,0622,0952,0982,0221,8431,6111,18472746515-336-608-770-976-1,212-1,154-1,038-760-470-35240
No. Dwellings Above or
Below Cumulative
Requirement
19
7 Position as at March 2020 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
7.2 The 5 year supply is shown in Table 7.2. Taking into account the 6,466 completions between 2011/12 and 2019/20, there is a shortfall of 770 dwellings against the requirement for those 9 years. Adding this to the 5 year requirement for 4,020 dwellings and then incorporating a 10% buffer gives an overall requirement of 5,269 dwellings. A 10% buffer was used as the Council has a recently adopted Local Plan where the Inspector of the Local Plan confirmed that the Council can demonstrate it can meet its housing targets. In addition, the Housing Delivery Test results for the Council confirm that a 20% buffer is not necessary.
7.3 The 5 year supply, as identified in the trajectory in Appendix 2 is 5,517 dwellings, which equates to 5.24 years. The shortfall of completions against requirements is a short term issue arising from a 50% increase in the requirement between the Core Strategy (2009) and the Local Plan to 2036. Predicted completions over the next 5 years are expected to exceed the requirement and fully make up the current shortfall.
7.4 The trajectory also includes a yearly cap on total housing delivery rates at two clusters of sites. The Inspector of the Huntingdonshire Local Plan to 2036 proposed a cap of 300 dwellings per year to be across allocations SEL 1.1 (Alconbury Weald), SEL 1.2 (RAF Alconbury) and HU1 (Ermine Street). A cap of 200 dwellings per year was proposed across the two parts of SEL 2 St Neots Strategic Expansion Site (Loves Farm and Wintringham Park).This was due to his concerns over market absorption and build out rates for developments in close proximity. The cap is only to calculate the housing trajectory and 5 year housing land supply figure, there is no actual cap on delivery on any of these sites and the developers/housebuilders involved anticipate housing completions well in excess of the capped figures for most years (see Appendix 3). The number of anticipated prior approvals to be delivered were also capped to 20 per year and rural exception sites to 35 dwellings per year. The average small site completions, including change of use and excluding prior approvals, over the past 9 years has been 132 completions with 6 out of the 9 years achieving over 120.The cap for small sites has therefore been recalibrated from 80 to 120 to reflect a more realistic picture on small site delivery going forward.
7.5 The Council can demonstrate a 5 year supply of housing land, therefore its policies for the supply of housing should be considered to be up-to-date.
20
Position as at March 2020 7 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Table 7.2 Five Year Housing Supply Against Local Plan Requirement as at March 2020
25Total Number of Years in Local Plan Period
16Years Remaining in Local Plan Period
20,100Local Plan Dwelling Requirment to 2036
804Annual Requirement
7,236Target 2011 to 2020 (804 x 9)
6,466Completions 2011 to 2020
770Shortfall on target 2011-2020 (7,236 - 6,466)
4,7905 Year Requirement (804 x 5) + Shortfall
5,2695 Year Requirment + Shortfall x 10%
1,054Annual Equivalent of Target + Shortfall x 10% Buffer
5,5175 Year Supply (taken from trajectory) 1 April 2020 to 31 March 2025
104.7%Achievable Supply (as a % of requirement + shortfall + 10% buffer)
5.24Equivalent Years of Requirement + Shortfall + 10% Buffer
21
1400
1 200
1000
m 800 en C:
400
200
0
844
746
686 688
514 5 26
41 2
Housing Trajec ory - Period 2011 - 2036
1,040 1,0 10
9 66
1,25
1,155
1,076
1,26 1,231
1,066 1,036
9 83
Past co rnp leti o ms
Projecte d! Gomplet iorns
880
801 771 776
690 67 5 675
7 Position as at March 2020 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Figure 7.1 Housing Trajectory Data Shown in Graph Layout
22
.31l,OOO ~------------------------------------------------
- Past/ Projected Cum ulat ive Complet ions
- Lo ca l Plan requ irement cum ulat ive over 25
25,000
20,000
ill! 11D
a,
& '!ii- lS, ' 0 i..
" .a E :s z
1 000 '
5, ([IO ,.
Position as at March 2020 7 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Figure 7.2 Housing Trajectory Data Against Local Plan Requirement
23
Appendix 1 Net completions by Parish from 2011/12 to 2019/20 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Appendix 1 Net completions by Parish from 2011/12 to 2019/20 Total 2019/20202018/20192017/20182016/20172015/20162014/20152013/20142012/20132011/2012Parish
14050504000Abbots Ripton
149-123-11001Abbotsley
8000520100Alconbury
2021100-10-1Alconbury Weston
0100-100000Alwalton
10100001-10Barham and Woolley
1021020-1042Bluntisham
5852302199411511024Brampton
2321419-2490210Brington and Molesworth
711303-1000Broughton
21631-121324Buckden
53132100015211Bury
5000113000Bythorn and Keyston
182201001102Catworth
-110-10-10000Chesterton
344162111234Colne
220001-1000Conington (H)
1010000000Covington
-10000000-10Denton and Caldecote
250131403121Earith
2001100000Easton
7003101-14-1Ellington
10400230100Elton
24
Net completions by Parish from 2011/12 to 2019/20 Appendix 1 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total 2019/20202018/20192017/20182016/20172015/20162014/20152013/20142012/20132011/2012Parish
5020000021Farcet
162733784000211Fenstanton
5004100000Folksworth and Washingley
-100-11-101-10Glatton
4981151479593328314Godmanchester
12-10000000Grafham
601014-1100Great Gidding
643-3000101Great Gransden
1000100000Great Paxton
102-11211-114Great Staughton
1300050315-1Hail Weston
2100000001Hamerton and Steeple Gidding
0-100020-100Hemingford Abbots
206152102702897Hemingford Grey
6111000021Hilton
15137002002Holme
12240100104
Holywell-cum-
Needingworth
13015041002Houghton and Wyton
7731417156115141121127-1314Huntingdon
1001782-10011Kimbolton
4000010120Kings Ripton
1000000010Leighton
420-13-1920837445125Little Paxton
469251100604Offord Cluny and Offord D'Arcy
25
Appendix 1 Net completions by Parish from 2011/12 to 2019/20 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total 2019/20202018/20192017/20182016/20172015/20162014/20152013/20142012/20132011/2012Parish
10000350002Old Hurst
6123-100100Old Weston
1000010000Perry
30746811102Pidley cum Fenton
244716625131877928Ramsey
331376923226828822Sawtry
1322221302-1
Sibson-cum-
Stibbington
5510123931197Somersham
3010002000Southoe and Midloe
14013400015Spaldwick
56240112673533174212393St Ives
1208162536121191156218110335St Neots
221132220110Stilton
30202-10000Stow Longa
43412411311748-1201516The Stukeleys
7010120300Tilbrook
1000000001Toseland
310-1021000Upton and Coppingford
233550202-17Upwood and the Raveleys
24865497232135615Warboys
1000100000
Waresley-cum-
Tetworth
2000002000Water Newton
3000110010Winwick
26
Net completions by Parish from 2011/12 to 2019/20 Appendix 1 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total 2019/20202018/20192017/20182016/20172015/20162014/20152013/20142012/20132011/2012Parish
8031002002Wistow
1100000000Woodhurst
11226000100Wood Walton
000-1100000Wyton-on-the-Hill
1632165305931731Yaxley
5000010121Yelling
6,46610101040746688526514686412844Total
27
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
Existing Planning Permissions - Unallocated sites
12000000000000001201212120
Brownfield. Further Listed Building Consent granted
in April 2019 under 19/00450/LBC to enable its
0.023-5 Bridge Place,
Godmanchester
Full
1301798FUL
refurbishment and change of use to residential units.
Conversion work is underway. Estimated.
470000000000000004747604713
Brownfield. Construction on site is under way with all
remaining units under construction. Evera is the
2.4Former Clinic RAF
Upwood
Full
15/00029/FUL
landowner for the site with two house builders (Geda
and Longhurst Group). Trajectory amended to reflect
completions on site.
14000000000000000141414140
Brownfield. Development commenced in June 2018
and is now well advanced. All flats therefore will all
complete in the same year. Estimated.
0.17 - 8 New Road, St
Ives
Full
18/00556/FUL
1000000100000000000010100
Brownfield. Rough foundations in place so material
start has been implemented some years ago and no
progress since. Estimated.
0.6The Old Granary,
Gidding Rd,
Sawtry
Reserved Matters
0301597REM
10000000001000000027126
Brownfield. Agent confirmed in the 2018/19 survey
that one dwelling (The Lodge) is left to be built on site.
Estimated.
9.3Waters Edge, Ship
End Quarry,
Wansford
Reserved Matters
0200293REM
16000000000006100001616160
Greenfield. The agent for the site anticipates a
reserved matters to be submitted by March 2021.The
0.83Land East Of 66
Thrapston Road,
Brampton
Outline
18/02569/OUT
agent also states there are no constraints to delivery
with the first completions to take place in 2021/22,
with potentially three housebuilders on site, and the
site being built over 2 years. Deferred by two years
to reflect no reserved matters being submitted yet.
28
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
14000000000000001401414140
Greenfield. Dwellings on site are under construction.
This is a rural exception site. Estimated.
0.57Land Between
Victoria House
Full
17/01077/FUL
Rural exceptions
site
And Fair View,
Bluntisham Road,
Needingworth
141000000000040404021001011411410
Greenfield. Two reserved matters were submitted in
April 2019 by David Wilson Homes. 19/00795/REM
9Land West Of Park
Road And The
Outline
16/01530/OUT
Reserved Matters
19/00795/REM
19/00796/REM
for 71 dwellings was approved in October 2020 and
19/00796/REM for 70 dwellings is awaiting
determination. An additional application
Malting On Biggin
Lane, Ramsey
(19/00797/FUL) for a further 47 dwellings on site is
also pending consideration. The capacity for the site
has been kept to that granted under the original outline
application. Deferred by two years and have reduced
anticipated completions to 21 in 2020/21 from 41 as
numbers submitted exceeded the total dwellings
permitted.
39000000000000000393939390
Brownfield. Housebuilder for the site anticipates all
units to be delivered in 2020/21, all of which will be
0.76Land At 81 To 85
And 97 A B And C
Full
17/01385/FUL
19/00519/FUL affordable units. Site construction is well advanced. Huntingdon Street,
St Neots A re-plan of several units to increase the overall
capacity to 39 was approved in October 2019
(19/00519/FUL). As of March 2020 all 39 dwellings
were under construction.
14000000000000000141414140
Brownfield. Permission granted in April 2018,
construction is now well advanced. All flats therefore
will all complete in the same year. Estimated.
0.111-12 Ferrars
Road, Huntingdon
Full
16/02712/FUL
14000000000000000141414140
Brownfield. Construction is now well advanced. The
agent for the site expects all units to be completed in
0.122 East Street, St
Ives
Full
17/02529/FUL
29
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
2020/21. All flats therefore will all complete in the
same year.
1000000000000055001010100
Brownfield. Reserved matters application was
approved in April 2020 (18/02660/REM). Estimated.
0.4Shotbolt
Engineers,
Outline
17/01024/OUT
Reserved Matters
18/02660/REM
Newtown Road,
Ramsey
11900000000000415028001191201200
Part greenfield/part brownfield. A reserved matters
submitted by David Wilson Homes was approved in
6.44Land South Of The
A1123 And West
Outline
17/01687/OUT
April 2020 (19/01166/REM). Existing land use is Of Bluntisham
predominately agricultural, an existing bungalow will Road,
Needingworth be demolished giving a net gain of 119 dwellings
(reflected in trajectory). Estimated.
19900000019505050300000001991990
Greenfield. Outline permission for a mixed-use
development including 199 dwellings was granted in
9.86Land at
Riversfield, Great
Outline
18/01492/OUT
December 2018. The site also benefits from outline North Road, Little
Paxton approval for business and industrial uses
(9002015OUT), granted in 2015. Four reserved
matters are currently pending consideration for this
earlier outline. The mixed-use outline was submitted
as a result of changing employment needs in the area.
Estimated.
10000000000000010001010100
Brownfield. Permission granted in February 2019, no
commencement on site. Estimated.
0.25Land At North
West End Of
Full
17/01926/FUL
Former Anglian
House Site
Ambury Road
South Huntingdon
10000000000000001001010100
Brownfield. Permission granted in December 2018,
conditions have been discharged. Archaeological
0.16Former British Red
Cross Society,
Huntingdon
Full
18/00212/FUL
30
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
works are complete. Constructed to floorplate level
by August 2020. Estimated.
400000000000002020004040400
Greenfield. Outline permission granted in February
2019, a reserved matters application (19/01467/REM)
1.85Land North East
Of Mandene
Outline
17/01375/OUT
was permitted in May 2020. A housebuilder (Hayfield
Homes) is involved with the site. Estimated.
Gardens Great
Gransden
10000000000000010001010100
Brownfield. Outline permission was granted in
November 2018, and a reserved matters was
0.1Co-Op Food Store,
Tebbutts Road, St
Neots
Outline
18/01490/OUT
Reserved Matters
19/02487/REM
submitted in December 2019 and approved in June
2020 (19/02487/REM). Estimated.
590000000000004019005959590
Greenfield. The site had been approved at DMC in
February 2018 with the S106 signed in May 2019.
2.85Dexters Farm,
Bearscroft Lane,
Godmanchester
Outline
18/01850/OUT
The agent for the site expects a reserved matters
application to be submitted in the first quarter of 2021.
Bellway Homes currently involved on site. Agent
expects all dwellings to be built out in 2022/23.
Deferred part by 1 year.
20000000000000012802020200
Greenfield. The site was approved at DMC in June
2018 with S106 agreement signed in April 2019 and
0.88Land West Of 52
Wood End,
Bluntisham
Full
18/00102/FUL
Rural exceptions
site
decision notice sent. One housebuilder on site (Rose
Homes), agent expects first completions in 2020/21,
building out over two years. Rural exception site.
Deferred by 1 year.
10000000000000001001010100
Greenfield. The site was approved at Development
Management Committee in August 2018 with the
decision notice sent out in May 2019. Estimated.
0.68Manor Farm, High
Street, Offord
Darcy
Full
16/01672/FUL
250000000000010150002525250
Brownfield. The site was approved at Development
Management Committee in March 2019 with the
0.99D J C Produce,
Pingle Bank,
Holme
Outline
17/00101/OUT
decision notice sent out in May 2019. A reserved
31
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
matters application (20/00923/REM) was submitted
in May 2020 and is currently pending consideration.
Estimated.
450000000000252000002045450
Greenfield. The site was approved at Development
Management Committee in November 2018 with the
4.6Land Rear Of 92
To 108 High
Outline
18/01073/OUT
decision notice sent out in April 2019. A reserved
matters application has yet to be submitted. Estimated.
Street,
Needingworth
26000000000131300000026260
Greenfield. The site was approved at Development
Management Committee in November 2018 with the
1.15North of 10 Station
Road, Bluntisham
Outline
17/01015/OUT
decision notice sent out in May 2019. In last year's
survey the agent for the site said it is being sold. No
reserved matters have been submitted. Estimated.
70000000000353500000070700
Greenfield. The site was approved at Development
Management Committee in April 2019 with the
4.25
Land West Of 26
To 34 High Street,
Stilton
Outline
18/02192/OUT
decision notice sent out in May 2019. The site has
been sold to Cross Keys Homes. No reserved matters
applications have been submitted. Estimated.
1000000000001000000010100
Greenfield. This outline was submitted in October
2018 and approved at Development Management
0.59
Land At Fenton
Fields Farm,
Outline
18/02245/OUT
Committee in September 2019, the decision noticeBencroft Lane,
Warboys was sent out later that month. Access has been
secured off WB4 (South of Farrier's Way) which is
under construction. No reserved matters applications
have been submitted. Estimated.
9200000000000036362009292920
Greenfield. As at March 2019, the site had been
approved at Development Management Committee
3.7Land West Of
Garden Court And
Full
18/01692/FUL
in February with the decision notice sent out in May 1 To 16 Upwood
Road, Bury 2019.The agent of the site says there are no
constraints to delivery and anticipates the first
32
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
completions in 2020/21 with the site being built out
over 3 years. Deferred by 1 year.
186000000000000009393186186186n/a
No discount applied as sites which are already started
are expected to be delivered
n/an/aTotal of small sites
Full or Reserved
Matters under
construction
32900000000000083828282329329329n/a
A 10% discount has been applied to the total of sites
not yet started to allow for some sites which may not
be developed
n/an/aTotal of small sites
Full or Reserved
Matters not started
at 31/03/19
460000000000001615150464646n/a
A 10% discount has been applied to the total of sites
not yet started to allow for some sites which may not
be developed
n/an/aTotal of small sites
Outline
28000000000000141400282828n/a
A 10% discount has been applied to the total of sites
not yet started to allow for some sites which may not
be developed
n/an/aTotal of small sites
Permission in
Principle
1,6660000010195050991531173292722643031,2851,7061,66739Subtotal
Local Plan Allocations
Alconbury/North-West Huntingdon cluster - SEL1.1, SEL1.2 and HU1
4,3313003003003003003003003003003003002082082092071991,0314,7257,726394
The Local Plan Inspector considered that an overall
cap of 300 dwellings per year was an appropriately
830Alconbury Weald/
RAF Alconbury/
Existing Planning
Permissions - Local
Plan Allocations
Part Reserved
Matters/ Part
Outline
1201158OUT,
numerous REMs
33
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Status / Site Name and Approx. Notes Units Extant Total Number 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total
reference as at address of site site built no. on in -21 -22 -23 -24 -25 -26 -27 -28 -29 -30 -31 -32 -33 -34 -35 -36 2020
31/03/2020 area site by years Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr Yr Yr Yr Yr Yr Yr -2036
gross 2036 1-5
Local Plan
Allocation SEL1.1
Local Plan
Allocation SEL1.2
Planning
application
submitted
18/01918/OUT
Local Plan
Allocation HU1 -
cautious approach reflecting the proximity of the sites
and market absorption rates. Using the capped
approach, it anticipates 3,001 dwellings could be
delivered outside of the Plan period.
North Huntingdon
HU1 cluster
Alconbury Weald - brownfield - the site is progressing
well with several housebuilders involved (Hopkins
Homes, Morris Homes, Redrow Homes, Civic Living,
Campbell Buchanan and Crest Nicholson, as well as
Cross Keys Homes for the affordable housing) and
reserved matters applications submitted and with
Ermine Street
(South)
approval and the delivery of site-wide infrastructure
Local Plan
Allocation HU1 -
moving into phase 2.The Agent for the site anticipates
will ensure continued delivery. Development is now
the capacity of the site to be 6,500, however, the
Ermine Street
(North)
trajectory provided only accounts for the original 5,000
dwellings permitted under 1201158OUT. It anticipates
that approximately 1,300 dwellings may be delivered
outside of the plan period.
RAF Alconbury - brownfield. The site is scheduled
for disposal from around 2024, a planning strategy
has not yet been determined. The agent anticipates
that the site will go beyond the 1,680 capacity. It is
envisaged that the Defence Infrastructure Organisation
will bring this site forward as part of a Long-Term
Strategic Development Partnership.
Ermine Street (South) - greenfield. Outline
application awaiting determination (18/01918/OUT)
for a mixed use development including 1,000
dwellings. Estimated.
Ermine Street (North) - greenfield. Outline application
20/00847/OUT was submitted in May 2020 for 648
dwellings.
10 11 12 13 14 15 16
(ha)
34
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
34200000000051921059400019934234203.0Total for Site Allocation HU5
00000000000065001111110
Brownfield. Conditions discharged for the scheme.
Estimated completions to reflect completion of A14
works. Site remains unimplemented.
0.6Gas Depot, Mill
Common,
Huntingdon
Existing Planning
Permissions - Local
Plan Allocations
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
4,3313003003003003003003003003003003002082082092071991,0314,7257,726394830.0
Total for Site Allocation SEL1.1,
SEL1.2 and HU1
Site Allocation HU3
750000010402500000000075750
Greenfield. Public sector land. Suitable for mixed use
development. The proposed access road Huntingdon
6Former Police HQ
site,
Local Plan
Allocations without
connecting the realigned A14 to Hinchingbrooke Park Hinchingbrooke Planning
Permission Road is not expected to be completed until late 2021,
and would therefore delay development. Estimated
Park Road,
Huntingdon
7500000104025000000000757506.0Total for Site Allocation HU3
Site Allocation HU5
3420000000005192105940001993423420
Brownfield.The site has been cleared with remediation
works completed. An archaeological investigation is
3Edison Bell Way Existing Planning
Permissions - Local
Plan Allocations
Full
17/00733/FUL and
17/01950/FUL
yet to commence. The high levels of completions
annually reflect the high proportion of flats within this
scheme. Application 18/02318/S73 was submitted in
October 2018 and approved in August 2019 for a
variation of condition 2 of 17/00733/FUL.This variation
sought to omit apartments 211,212 and 213 and
replace these with a resident's hub. Development
expected to start mid-2021 with a build out rate over
three years, with unknown number of housebuilders.
Estimated as trajectory not supplied within response
.
Site Allocation HU6
11
35
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
Full
16/02093/FUL
11000000000000650011111100.6Total for Site Allocation HU6
Site Allocation HU7
550000000000025300005555550
Greenfield. Outline for a residential development of
between 50 and 60 dwellings was approved in June
1.1Land south of
Colebrook Road
Existing Planning
Permissions - Local
Plan Allocations
Outline
17/02123/OUT
2019 (17/02123/OUT), and S106 agreement signed
in May 2019. A reserved matters application
(20/01126/REM) was submitted in June 2020 and is
currently pending consideration. Estimated.
(California Road)
Huntingdon
5500000000000253000055555501.1Total for Site Allocation HU7
Site Allocation HU10
102000000000000019424110215010248
Greenfield. The site is progressing well, the agent for
the site anticipates that the development will be built
12North West End Of
Dorling Way,
Brampton
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
17/01879/REM
out over the next 3 years. Kept trajectory over three
years, but reduced numbers to reflect completions.
10200000000000001942411021501024812.0Total for Site Allocation HU10
Site Allocation HU11
1170000000000000424233117219117102
Brownfield. Parcel A is nearing completion with
construction now underway on parcel C. Linden
Homes is the house builder. Estimated.
12Parcels A and C
Brampton Park
(formerly RAF
Brampton)
Existing Planning
Permissions - Local
Plan Allocations
16/01319/REM and
18/00504/REM
36
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
9000000000000000992109201
Brownfield. The site is nearing completion. The site
is being overseen by the Metropolitan Housing Trust.
Estimated.
6.61Parcel D
Brampton Park
(formerly RAF
Brampton)
Existing Planning
Permissions - Local
Plan Allocations
16/00789/REM
120000000000000001212581246
Brownfield. The site is progressing well, the
housebuilder (Campbell Buchanan) expects the site
to be completed in 2020/21.
5.92Parcel E
Brampton Park
(formerly RAF
Brampton)
Existing Planning
Permissions - Local
Plan Allocations
16/00605/REM and
16/00751/FUL
32000000000000022553232320
Permission has been granted to convert the former
Officer's Mess and gatehouse into 2 dwellings and
4Parcels F,G and H
Brampton Park
(formerly RAF
Brampton)
Existing Planning
Permissions - Local
Plan Allocations
15/02016/FUL and
19/00028/FUL
the construction of 30 dwellings under 15/02016/FUL.
The 30 new dwellings will be built out by Windborough
Homes. The gatehouse has been sold to a private
individual for one dwelling. An amendment to this
application was submitted in January 2019 to convert
Brampton Park House (former Officer's Mess) into 13
dwellings and was permitted in June 2020
(19/00028/FUL), however listed building consent for
these works has not yet been approved
(19/00029/LBC). The capacity has been kept to 32 in
line with the original permission.
170000000000000044675917051917034928.5Total for Site Allocation HU11
Site Allocation HU12
40000000000000004468464
Greenfield. Site is nearing completion. Estimated. 3Brampton Park
Golf Club
Existing Planning
Permissions - Local
Plan Allocations
Full
17/01959/FUL
37
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
400000000000000044684643.0Total for Site Allocation HU12
Site Allocation HU14
900000000030303000000090900
Brownfield. Agent expects a full application to be
submitted in the autumn of 2021. They believe the
3.8RGE Engineering,
Godmanchester
Local Plan
Allocations without
site could contain 125 dwellings. The capacity has Planning
Permission been kept at 90 in line with the Local Plan allocation.
Agent did not supply a trajectory. Estimated.
9000000000303030000000909003.8Total for Site Allocation HU14
Site Allocation HU15
5000000000000000551358
Greenfield. Site is nearing completion. Estimated. 0.7Wigmore Farm
Buildings, Silver
Existing Planning
Permissions - Local
Plan Allocations
Full
16/01477/FUL
St,
Godmanchester
50000000000000005513580.7Total for Site Allocation HU15
Site Allocation HU16
26500000000000009010075265694265429
Greenfield.The site is progressing well, 429 dwellings
completed, many of which are occupied.The majority
41.8
Bearscroft Farm
(Romans' Edge),
Godmanchester
Existing Planning
Permissions - Local
Plan Allocations
Part Reserved
Matters/ Part
Outline
1200685OUT
of the outline has now been superseded by
subsequent reserved matters applications.
19/00489/OUT has partially superseded the original
outline, reducing the commitments on 1200685OUT
down to 694. Estimated.
460000000000002620004646460
Greenfield. Outline approved in April 2019. Outline
permission was granted for either 46 dwellings and a
1.97Existing Planning
Permissions - Local
care facility, or 59 dwellings and no care facility. APlan Allocations
Subject to S106
Outline
38
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
18/00532/OUT
Local Plan
Allocation HU16
reserved matters (20/00505/REM) was submitted in
March 2020 for 46 homes and is pending
consideration. Therefore capacity in the trajectory is
kept at 46. This brings the overall capacity on site to
799. Estimated.
590000000000030290005959590
Greenfield. Outline Application was approved in March
2020 for 59 dwellings. Reserved matters was
3.54Existing Planning
Permissions - local
Plan Allocations
Outline
19/00489/OUT
submitted in June 2020 and is pending consideration
(20/01150/REM). Estimated.
3700000000000030551101007531174037042943.8Total for Site Allocation HU16
St Neots East (Loves Farm/Wintringham Park) cluster - SEL2
2,918200200200200200200200200200200200200200150125437182,9223,8164
The Local Plan Inspector considered that an overall
cap of 200 dwellings per year being delivered across
131.1St Neots East
Loves Farm
Local Plan
Allocations without
this cluster was an appropriately cautious approach (1300388OUT)/Planning
Permission
Local Plan
Allocation SEL2
Wintringham Park -
Reserved Matters
18/02719/REM
18/02708/REM
reflecting the proximity of the sites and market
absorption rates. Using the capped approach,
removing the completed dwellings and taking into
consideration the trajectory responses from the agents
for the sites, there are 898 dwellings forecasted
outside of the planning period.
Wintringham Park - greenfield. A hybrid planning
application has been approved (17/2308/OUT) in
Wintringham Park
(17/2308/OUT)
November 2018 for up to 2,800 dwellings as part of
a mixed use development. Several reserved matters
relating to landscaping and housing have been
approved and have commenced on site. The agent
anticipates 10 plus housebuilders on site (currently
Cala, Durkan and Morris Homes already involved). A
£26 million loan from Homes England has been
39
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
secured by the development partnership to accelerate
housing delivery and enable early delivery of
community facilities to maximise the potential of this
strategic expansion location.
Loves Farm - greenfield. S106 for outline application
(1300388OUT) was approved in August 2019, the
agent expects a reserved matters application to be
submitted in quarter 2 of 2021/22.
2,918200200200200200200200200200200200200200150125437182,9223,8164131.1Total for Site Allocation SEL2
Site Allocation SN1
Existing Planning 0.9 Brownfield. This site has come forward in several
Permissions - Local applications, the trajectory reflects this. 0900411FUL
Plan Allocations was permitted for 24 dwellings in December 2014 with
Full 21 under construction as September 2019. Other
0900411FUL, smaller applications have come forward on the site
1301969FUL, but have not yet started, these are: 17/01446/FUL for
17/01446/FUL, the conversion of the former chapel into 2 dwellings
17/01994/FUL, permitted in February 2018 with 18/01696/FUL
18/01696/FUL and amending the top floor flat into 2 dwellings (permitted
18/00497/FUL St Mary's Urban in December 2018) and 17/01994/FUL to convert
Village, St Neots Brook House into 5 dwellings (permitted in May 2018).
3 dwellings have been completed on site under
1301969FUL (permitted in May 2014). Estimated.
An application for 9 dwellings (18/00497/FUL) was
approved, however a condition application was
submitted in April 2020 and is pending consideration.
Agent expects site to be built in 2020/21.Deferred by
1 year.
The residual number of dwellings left on this allocation
total 1. 3 42 45 41 24 9 8 0 0 1 0 0 0 0 0 0 0 0 0 0 42
40
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
420000000000100892441454230.9Total for Site Allocation SN1
Site Allocation SN2
410000000000002021004141410
Greenfield. Reserved matters received in February
and approved in June 2019. Estimated.
1Loves Farm
Reserved Site (At
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
19/00384/REM
junction of
Dramsell Rise &
Cambridge Rd), St
Neots
4100000000000020210041414101.0Total for Site Allocation SN2
Site Allocation SN3
80000000050300000000080800
Mixed green/brownfield. Woods Hardwick have
submitted an outline application for 83 dwellings in
2.6Cromwell Road
North, St Neots
Local Plan
Allocations without
May 2020 and is currently pending consideration Planning
Permission (20/00896/OUT). Capacity kept to 80 inline with the
local plan allocation. The agent expects the site to be
sold if outline permission secured. Response received
but no trajectory provided. Estimated.
800000000503000000000808002.6Total for Site Allocation SN3
Site Allocation SN4
0000000000000000000210
Brownfield. Approved subject to S106 completion.
Trajectory survey response indicates this S106 will
0.6Cromwell Road
Car Park, St Neots
Existing Planning
Permissions - Local
not progress to completion. Sealed Air have indicated
their intention to retain the site. Estimated.
Plan Allocations
Subject to S106
Outline
0901288OUT
00000000000000000002100.6Total for Site Allocation SN4
Site Allocation SN5
41
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
35000000000201500000035350
Greenfield. Agent anticipates an outline for 38
dwellings to be submitted imminently. Capacity kept
4.7North of St James
Road to North of
Local Plan
Allocations without
at 35 in line with the Local Plan allocation and deferred
by 1 year.
High Street, Little
Paxton
Planning
Permission
350000000002015000000353504.7Total for Site Allocation SN5
Site Allocation SI1
22000000000000003192218622164
Greenfield. Reserved matters (17/00589/REM) was
approved for 125 dwellings in June 2017. A partial
15.1St Ives West - The
Spires (Former St
Ives Golf Course)
Existing Planning
Permissions - Local
Plan Allocations
Outline
1301895OUT -
hybrid application
17.00589/REM
17/02325/FUL
re-plan of 1301895OUT was approved providing two
additional units (17/02325/FUL), increasing the
capacity of the site to 186. Construction is progressing
well with a high proportion of dwellings on site now
occupied. Only 3 dwellings required a further reserved
matters application in August 2019 a full application
for these three dwellings was submitted and lalter
approved in April 2020 (19/01671/FUL). This
application now supersedes the remainder of the
original outline. 19 dwellings are under construction.
Estimated.
000000000000000000070
Greenfield. Applications 1201890FUL and
1201891FUL are still under consideration but the
2.7St Ives West -
north & east of The
How
Local Plan
Allocations without
Planning
Permission
Planning
application
submitted
1201890FUL &
1201891FUL
progress of decision is uncertain following the listing
of the How and several newer applications have been
submitted which are outlined below for information,
therefore no completions data forecast to reflect the
evolving situation on site.
A revised full application (19/02280/FUL) has been
made which includes the sites for the two previous
applications and additonal land.Therefore the revised
application could potentially raise the capacity from 7
42
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
to 18 with the refurbishment of the Lodge and its
retention as a single dwelling.This revised application
was submitted in November 2019 and is pending
consideration. Application 19/01161/LBC was
submitted in June 2019 for the conversion of the
grange into 5 apartments, this is pending
consideration.
18000000000004140001818180
Greenfield. A full application was submitted in August
2019 and is currently pending consideration.This site
2.5Land North Of The
How, Houghton
Road,St Ives
Local Planning
Allocations without
Planning
Permissions
Planning
application
submitted
19/02280/FUL
occupies part of the site for applications 1201890FUL
and 1201891FUL. Agent expects site to start in
2021/22 and build out over two years. Deferred by 2
years.
9000000000000353520009090900
Brownfield. A reserved matters application
(19/01180/REM) for 99 dwellings was submitted to
10.4St Ives West -
Houghton Grange,
St Ives
Existing Planning
Permissions - Local
Plan Allocations
Outline
1402210OUT
the Council in June 2019 on behalf of Morris Homes
and later approved in July 2020. The capacity has
been kept to 90 to reflect the status of the application
as at the base date of 31st March. Estimated.
125000000004050350000001251250
Greenfield. A revised outline application for 120
dwellings is expected to be submitted in quarter 4 of
18.7St Ives West -
Land Between
Local Plan
Allocations without
2020/21 following the withdrawl of 1301056OUT. Houghton Grange
& The How
Planning
Permission
Planning
application
submitted
1301056OUT
Homes England anticipates site to start in 2023/24
and build out over three years. Capacity has been
kept in line with the Local Plan allocation as the outline
is yet to be submitted. Deferred by 2 years.
2550000000040503539492031913041926216449.4Total for Site Allocation SI1
43
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
Site Allocation SI2
30000000000151500000030300
Greenfield. Outline application for 30 dwellings granted
permission in September 2018. Development
1.3St Ives Football
Club
Existing Planning
Permissions - Local
Plan Allocations
Outline
16/01485/OUT
dependent on the successful relocation of the football
pitch which was approved in June 2019 under
18/01662/FUL. An outline application for a new
clubhouse on this site has also been approved in June
2019 under 18/01663/OUT. No reserved matters have
been submitted. Application 19/01483/S73 for removal
of condition 25 was submitted in July 2019 and is
pending consideration. Estimated.
300000000001515000000303001.3Total for Site Allocation SI2
Site Allocation RA1
860000000000060260008686860
A revised full application for 86 affordable dwellings
was submitted on behalf of Accent Group in August
4.2Ramsey Gateway,
High Lode
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
1101894REM
Local Plan
Allocation RA1
2019 (19/01576/FUL) and is currently pending
consideration. Site capacity taken down from 110
approved under 1101894REM to 86 in light of revised
application to ensure a cautious trajectory. the site
has funding from Homes England. Estimated.
8600000000000602600086868604.2Total for Site Allocation RA1
Site Allocation RA2
52000000000000646005252520
Brownfield. Permission for 52 dwellings granted in
December 2018. It is understood that the site is to be
2Ramsey Gateway
(Land Adjacent St
Existing Planning
Permissions - Local
Plan Allocations
Full
16/00311/FUL
developed after 94 Great Whyte. One builder on site
(Seagate Developments) agent expects site to be
completed in 2022/23, although has highlighted
Marys Road
Industrial Estate)
administrative issues and COVID-19 restrictions as
44
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
possible constrains on delivery. Deferred by 1 year to
reflect the site is being built after RA6.
520000000000006460052525202.0Total for Site Allocation RA2
Site Allocation RA3
30001515000000000000030300
Brownfield. Due to the preference to retain the
Northern Mill, the site owner is concerned about
0.8West Station Yard
& Northern Mill
Local Plan
Allocations without
viability. Access to the site has been secured throughPlanning
Permission the granting of planning approval of 16/00311/FUL on
the adjoining site (RA2). Exploratory developer interest
shown in summer 2020. Survey response submitted
without trajectory. Estimated.
300015150000000000000303000.8Total for Site Allocation RA3
Site Allocation RA4
170000000000000041317941777
Greenfield. The site is progressing well. A partial
re-plan of the site which involves substituting house
5.2Field Road,
Ramsey
Existing Planning
Permissions - Local
Plan Allocations
Full
18/00916/REM
19/00621/FUL
types and increasing the site capacity to 94 was
approved at Development Management Committee
in July 2019 (and granted permission in September
2020), capacity has been amended to reflect this.
Estimated.
1700000000000000413179417775.2Total for Site Allocation RA4
Site Allocation RA5
40000000020200000000040400
Brownfield. From previous year's trajectory, it was
understood that the developer had concerns over legal
0.9Whytefield Rd,
Ramsey
Local Plan
Allocations without
and viability constraints impacting on scheme design.
No planning application submitted. Estimated.
Planning
Permission
400000000202000000000404000.9Total for Site Allocation RA5
45
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
Site Allocation RA6
32000000000000003203232320
Brownfield. Application for 32 dwellings approved June
2018. Two housebuilders on site (Platform Housing
0.794 Great Whyte,
Ramsey
Existing Planning
Permissions - Local
Plan Allocations
Full
15/02384/FUL
Group and Seagate Homes). It is understood that the
development will take place before the Ramsey
Gateway site, and agent anticipates site to be
completed in 2021/22.
320000000000000032032323200.7Total for Site Allocation RA6
Site Allocation RA7
900000000040401000000090900
Greenfield. Outline application has been submitted
(20/00863/OUT) in May 2020 and is pending
3.6East of Valiant
Square, Bury
Local Plan
Allocations without
consideration. Site to be sold once application has Planning
Permission been approved. Agent expects site to be completed
in 2023/24. Deferred by 4 years.
9000000000404010000000909003.6Total for Site Allocation RA7
Site Allocation RA8
160000000000002260601801601601600
Brownfield. A reserved matters (20/00161/REM) for
phase one (1201274OUT for 160 dwellings) was
14.5
RAF Upwood &
Upwood Hill House
Existing Planning
Permissions - Local
Plan Allocations
Outline
1201274OUT
submitted in January 2020 and approved in
September 2020. One condition remaining to be
discharged. Evera Homes is the housebuilder for the
site, with another yet to be determined. Agent expects
site to be completed in 2024/25.
29000036363636363737360000002902900
Brownfield. A full application for phase two (the
remainder of the site) is expected to be submitted late
10.5Local Plan
Allocations without
2020/early 2021 for 330 dwellings, which could Planning
Permission increase site capacity from 450 to 490. Evera Homes
is expected to be the housebuilder. Agent anticipates
46
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
site to start in 2023/24 and finish in 2030/31. Capacity
kept at that of Local Plan allocation and deferred by
2 years.
4500003636363636373736226060180160450450025.0Total for Site Allocation RA8
Site Allocation BU1
270000505050505020000000002702700
Greenfield. An outline application (18/02753/OUT)
was submitted in December 2018 and is pending
14.8East of Silver
Street and South
of A1, Buckden
Local Plan
Allocations without
Planning
Permission
Planning
application
submitted
18/02753/OUT
consideration due to ongoing discussions between
Highways England, Cambridgeshire County council
and the applicant. Agent for the site anticipates a
capacity of 290 for the site. Site is expected to be sold
if application is approved. Capacity kept to 270 in line
with Local Plan allocation and deferred by 5 year and
split over 6 years.
27000050505050502000000000270270014.8Total for Site Allocation BU1
Site Allocation BU2
175000000000000464645381751801755
Greenfield. Allowed on appeal July 2017. Reserved
matters application (18/02485/REM) approved in July
9.7Land off Lucks
Lane And W. & S.
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
18/02485/REM
2019 and commenced in August 2019. A full
application (19/02584/FUL) was submitted in
December 2019 and approved in April 2020, but does
not affect capacity of site. Estimated.
of The Osiers &
Springfield Close,
Buckden
1750000000000004646453817518017559.7Total for Site Allocation BU2
Site Allocation FS1
5400000000000000243054885434
Brownfield. The site is progressing well with several
completions and 54 under construction. Estimated.
3.2Crown Place
(former Dairy
Crest), Fenstanton
Existing Planning
Permissions - Local
Plan Allocations
Full
47
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
16/01206/FUL
Local Plan
Allocation FS1
54000000000000002430548854343.2Total for Site Allocation FS1
Site Allocation FS2
130000000000000001313861373
Greenfield. The site is nearing completion with 13
dwellings remain, expected to be completed by end
of 2020/21. Estimated.
4Cambridge Road,
Fenstanton - West
(South of
Oaklands)
Existing Planning
Permissions - Local
Plan Allocations
Full
16/00582/FUL
1300000000000000013138613734.0Total for Site Allocation FS2
Site Allocation FS3
35000000000201500000035350
Greenfield. In last year's trajectory the Agent for the
site anticipated a capacity of 47 with a planning
2.4Cambridge Road,
Fenstanton - East
Local Plan
Allocations without
application due to be submitted in the winter of 2020.Planning
Permission Application has yet to be submitted. Capacity kept at
35. Estimated.
350000000002015000000353502.4Total for Site Allocation FS3
Site Allocation SY1
60000000000000006680674
Greenfield. The site is progressing well. Six dwellings
remain under construction. A full application
3.8East of Glebe
Farm, Sawtry
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
18/00633/REM
(19/01294/FUL) for a further six dwellings was
submitted in June 2019 and is pending decision.
Capacity kept at that of Local Plan allocations.
Estimated.
600000000000000066806743.8Total for Site Allocation SY1
Site Allocation SY2
48
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
295000000000155050505050302302952950
Greenfield. Outline permission granted May 2018.
Site acquired by Bovis Homes and a reserved matters
10.8South of Gidding
Rd, Sawtry
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
19/00462/REM
application was approved in November 2019
(19/00462/REM). The site is now under construction.
29500000000015505050505030230295295010.8Total for Site Allocation SY2
Site Allocation KB1
21000000000000610502121210
Greenfield. Three Builders currently involved on site,
including BPHA. Agent expects site to be completed
in 2022/23. Deferred by 1 year.
1.5West of Station
Road, Kimbolton
Existing Planning
Permissions - Local
Plan Allocations
Full
18/01411/FUL
210000000000006105021212101.5Total for Site Allocation KB1
Site Allocation KB2
650000000520202000000065650
Greenfield. No planning application yet submitted for
the site although there have been some
pre-application discussions. Estimated.
2.5North of Station
Road/Stow Road,
Kimbolton
Local Plan
Allocations without
Planning
Permission
6500000005202020000000656502.5Total for Site Allocation KB2
Site Allocation SM1
55000000302500000000055550
Greenfield. No planning application yet submitted for
the site. Estimated.
1.8College Farm,
West of Newlands
Local Plan
Allocations without
Industrial Estate,
Somersham
Planning
Permission
550000003025000000000555501.8Total for Site Allocation SM1
Site Allocation SM2
49
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
450000000000025200004545450
Greenfield. Outline application for 45 dwellings and a
residential care home in November 2017. A reserved
2.5Newlands,
Somersham
Existing Planning
Permissions - Local
Plan Allocations
Outline
15/00917/OUT
matters application (19/02220/REM) for 45 dwellings
was submitted in November 2019 by Rose Homes. A
reserved matters (19/02289/REM) for a residential
care home was also submitted in November 2019.
Both are currently pending consideration. A condition
application is yet to to be discharged. Estimated.
4500000000000252000045454502.5Total for Site Allocation SM2
Site Allocation SM3
1500000000010500000015150
Greenfield. In last year's survey, the Agent anticipated
a capacity of 10 dwellings under 19/00594/FUL and
0.9The Pasture,
Somersham
Local Plan
Allocations without
a further 8 on adjoining land accessed off Rectory Planning
Permission Lane (19/00579/FUL) both awaiting determination,
however capacity has been kept at 15 in line with the
Local Plan allocation. Estimated.
15000000000105000000151500.9Total for Site Allocation SM3
Site Allocation SM4
45000000002520000000045450
Greenfield. Relocation of the football club required as
housing development on this site is tied to this being
achieved. Estimated.
3.8Somersham Town
Football Club,
Somersham
Local Plan
Allocations without
Planning
Permission
450000000025200000000454503.8Total for Site Allocation SM4
Site Allocation SM5
1200000000363636120000001201200
Greenfield. An outline for the site was submitted in
September 2019 (19/01790/OUT) for 150 dwellings
2.1North of The Bank,
Somersham
Local Plan
Allocations without
by Larkfleet Homes. A reserved matters application Planning
Permission is due to be submitted mid 2021. Agent anticipates
50
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
first completions to be in 2022/23, and build out over
five years. Deferred by 3 years and split over four
years, wih capacity maintained in line with Local Plan.
12000000003636361200000012012002.1Total for Site Allocation SM5
Site Allocation WB1
240000000088800000024240
Greenfield. Site is in dual ownership. The Agent for
the Southern part of the site (20/00308/OUT)
0.9West of Ramsey
Road, Warboys
(Southern part)
Local Plan
Allocations without
Planning
Permission
anticipates that 24 dwellings can be delivered and
completed in 2023/24. A separate application
(20/00723/FUL) for the demolition of 21 Ramsey Road
to allow for access to the site was submitted in May
2020. Deferred by 4 years.
21000000101100000000021210
Greenfield. Site is in dual ownership. The Northern
part of the site is estimated.
0.8West of Ramsey
Road, Warboys
(Northern part)
450000001011888000000454501.7Total for Site Allocation WB1
Site Allocation WB2
100000000055000000010100
Greenfield. Agent expects an outline application to be
submitted in 2021/22 following the relocation of the
0.6Manor Farm
Buildings,
Warboys
Local Plan
Allocations without
Planning
Permission
current farmyard use. The agent expects up to two
housebuilders to be involved with the site. Deferred
by 4 years to reflect no outline submitted.
1000000000550000000101000.6Total for Site Allocation WB2
Site Allocation WB3
500000102020000000000050500
Greenfield. No planning application yet submitted for
the site. Estimated.
3.8South of Stirling
Close, Warboys
Local Plan
Allocations without
51
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
Planning
Permission
5000001020200000000000505003.8Total for Site Allocation WB3
Site Allocation WB4
45000000000000010211445744529
Greenfield. Reserved matters approved in August
2018 (18/00531/REM). The site is progressing well.
3.6South of Farrier's
Way, Warboys
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
18/00531/REM
Agent expects site to be completed in 2022/23.
Trajectory amended to reflect completions.
450000000000000102114457445293.6Total for Site Allocation WB4
Site Allocation WB5
4400000000000000143044804436
Greenfield. Reserved matters approved in November
2018 (18/00776/REM). Work has commenced on site
3.7Extension to W of
Station Rd,
Warboys
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
18/00776/REM
continuing on from the West of Station Road
development which has now completed. The site is
progressing well. Estimated.
44000000000000001430448044363.7Total for Site Allocation WB5
Site Allocation YX1
900000000000009009990
Part Greenfield/Brownfield. A reserved matters
application (18/01341/REM) was approved in
1.2Askews Lane,
Yaxley
Existing Planning
Permissions - Local
Plan Allocations
Reserved Matters
18/01341/REM
December 2018. The site has been sold to a
developer, contamination is a potential issue on site
but a strategy is in place to deal with this. Since the
31st March a new full application (20/00741/FUL) for
9 dwellings is pending consideration. Trajectory
deferred by 2 years to reflect revised application.
9000000000000090099901Total for Site Allocation YX1
52
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
11,1705005005156015966166867588118778447648768177666433,80712,90215,4911,791Subtotal
Other Commitments: Subject to S106
1000000000004050100000101001000
Greenfield. Outline application was submitted in March
2019 and approved at DMC in November 2019, a
4.01Land West Of The
Avenue, Ramsey
Outline approved
subject to signing of
S106
19/00552/OUT
reserved matters is expected to be submitted in
November 2020. Agent expects site to be
implemented in 2021/22, and built out over three
years. Deferred by 3 years.
11000000000000011001111110
Greenfield. Application was submitted in March 2017
and approved subject to the signing of S106 at DMC
0.45O S 1283
Middlemoor Road,
Ramsey St Marys
Full application
subject to S106
17/00630/FUL in March 2020. Chorus Homes are bringing the site
forward. The site has funding from the combined
authority and is anticipated to start in early 2021. Rural
exception site. Estimated.
11100000000040501001100211111110Subtotal
Other Sources - 'Prior Approval' Conversions to C3 residential use under GPDO
110
Greenfield. Estimated. Under construction. 0.05Marshalls Farm,
Farcet
Prior approval
16/01611/PMBPA
110
Brownfield. This supersedes 16/02689/PSPPA.
Estimated.
0.08White Gates,
Bythorn
Prior approval
18/01026/P3PPA
110
Greenfield. This supersedes 17/00121/PMBPA.
Estimated. Under construction.
0.04Church
Farmhouse,
Catworth
Prior approval
18/01672/PMBPA
110
Greenfield. Estimated. 0.005Mere Farm Yard,
Harpers Drove
Prior approval
17/00465/PMBPA
53
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
Catchwater Bank,
Ramsey Heights
Greenfield. Estimated. 0.2Orchard
Bungalow, Colne
Road, Somersham
Prior approval
17/00844/PMBPA
Greenfield. Estimated. 0.1Hollow Head
Farm, Hollow
Lane, Ramsey
Prior approval
17/00972/PMBPA
Brownfield. Estimated 0.007Great Whyte,
Ramsey
Prior approval
17/01187/P3JPA
Greenfield. Estimated. 0.02Model Farm,
Conington Road,
Fenstanton
Prior approval
17/01388/PMBPA
10
Greenfield. Estimated. Under construction 0.04Agricultural
Building West Of
Prior approval
17/01487/PMBPA
17 Dillington,
Great Staughton
10
Greenfield. Estimated. 0.009Yew Trees Farm,
Brington Road, Old
Weston
Prior approval
17/01670/PMBPA
220
Greenfield. Estimated. Under construction 0.02Thorns Farm,
Hamerton Road,
Alconbury Weston
Prior approval
17/01721/PMBPA
330
Greenfield. Estimated. 0.09Abbey Farm,
Bridge Street,
Woodwalton
Prior approval
17/01954/PMBPA
220
220
220
110
1
1
Number 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total
in -21 -22 -23 -24 -25 -26 -27 -28 -29 -30 -31 -32 -33 -34 -35 -36 2020
years Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr Yr Yr Yr Yr Yr Yr -2036
1-5 10 11 12 13 14 15 16
54
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
110
Greenfield. Estimated. 0.02Tea Kettle Barn,
Old North Road,
Stilton Fen Stilton
Prior approval
17/02014/PMBPA
110
Greenfield. Estimated. Under construction 0.05Land At Barn
Manor House
Prior approval
17/02129/PMBPA
Farm, St. Judiths
Lane, Sawtry
110
Greenfield. Estimated. 0.09Woodfield Farm,
Gamlingay Road,
Waresley
Prior approval
17/02174/PMBPA
220
Greenfield. Estimated. Under construction. 0.08Tower Farm, New
Long Drove,
Holme
Prior approval
17/02208/PMBPA
110
Greenfield. This supersedes 17/02421/PMBPA.
Estimated.
0.02Heath Road,
Warboys
Prior approval
18/01858/PMBPA
110
Greenfield. This superseded 17/02588/PMBPA.
Estimated.
0.03Yew Trees Farm,
Brington Road, Old
Weston
Prior approval
18/01052/PMBPA
110
Greenfield. Estimated. 0.25Land South Of
Pidley Lodge
Prior approval
19/00068/PMBPA
Farm, The Lane,
Old Hurst
110
Greenfield. Estimated. Under construction 0.33Denton Lodge
Farm, Old North
Prior approval
18/02631/PMBPA
Road, Stilton Fen,
Stilton
55
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
110
Greenfield. Estimated. 0.04North East Of Yew
Trees, Brington
Road, Old Weston
Prior approval
18/02510/PMBPA
220
Greenfield. Estimated. 0.07Land Adjacent
Pasturelands,
Prior approval
18/02446/PMBPA
Taylors Lane,
Buckden
330
Greenfield. Estimated. 0.06Land Adjacent To
Thorns Farm,
Prior approval
18/02140/PMBPA
Hamerton Road,
Alconbury Weston
110
Greenfield. Estimated. Under construction. 0.08Barn, Redshanks
Farm, Conquest
Drove, Farcet
Prior approval
18/01799/PMBPA
330
Greenfield. Estimated. 0.07Mill Barn Farm,
Bridge Road,
Broughton
Prior approval
18/01765/PMBPA
110
Greenfield. Estimated. Under construction. 0.17Bungalow Farm,
Hollow Road,
Ramsey Forty Foot
Prior approval
18/01680/PMBPA
220
Greenfield. Estimated. Under construction. 0.03Hungary Hall
Farm, Old Hurst
Road, Wyton
Prior approval
18/01425/PMBPA
550
Greenfield. Estimated. 0.11Cottage Farm,
Leighton Road,
Hamerton
Prior approval
18/01151/PMBPA
Number 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total
in -21 -22 -23 -24 -25 -26 -27 -28 -29 -30 -31 -32 -33 -34 -35 -36 2020
years Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr Yr Yr Yr Yr Yr Yr -2036
1-5 10 11 12 13 14 15 16
56
Housing Trajectory Data: Local Plan to 2036 Appendix 2
Status / Site
reference as at
31/03/2020
Prior approval
18/00928/PMBPA
Prior approval
18/00908/PMBPA
Prior approval
18/00790/PMBPA
Prior approval
18/00732/PMBPA
Prior approval
18/00272/PMBPA
Prior approval
16/00039/PMBPA
Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Number 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total
in -21 -22 -23 -24 -25 -26 -27 -28 -29 -30 -31 -32 -33 -34 -35 -36 2020
years Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr Yr Yr Yr Yr Yr Yr -2036
1-5 10 11 12 13 14 15 16
Total
no. on
site by
2036
3
1
330
Greenfield. Estimated. 0.05Grange Farm,
Upwood Road,
Great Raveley
Prior approval
18/00897/PMBPA
1
1
1
220
Greenfield. Estimated. 0.07Snowcap
Mushrooms, St
Prior approval
17/02671/PMBPA
Ives road,
Woodhurst
Name and
address of site
Redwood Lodge
Farm, Grafham
Road, Ellington
The Old Piggery,
Bluntisham Road,
Colne
Floral Elegance
Florist, Pidley
Sheep Lane,
Pidley
Home Farm, Main
Street, Old Weston
Mast Hall, Green
Farm, Low Road,
Fenstanton
Agricultural
Buildings North
West Of Grange
Farm, Keyston
Road, Covington
Approx.
site
area
gross
(ha)
0.52
0.01
0.04
0.03
0.02
0.03
Notes
Greenfield. Estimated.
Greenfield. Estimated.
Greenfield. Estimated. Under construction.
Brownfield. Estimated.
Greenfield. Estimated.
Greenfield. Estimated.
Units
built
0
0
0
0
0
0
Extant
3
1
1
1
1
1 1
57
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
110
Greenfield. Estimated. 0.19Glatton Lodge
Farm, Infield Road,
Glatton
Pior approval
19/00073/PMBPA
550
Greenfield. Estimated. 0.13Farm Buildings,
Manor Farm,
Prior approval
19/00373/PMBPA
Church End,
Woodwalton
110
Greenfield. Estimated. Under construction. 0.05Oaklands,
Caldecote Road,
Prior approval
19/00696/PMBPA
Washingley,
Peterborough, PE7
3SN
440
Greenfield. Estimated. Under construction. 0.1Tower Farm, New
Long Drove,
Holme
Prior approval
18/00756/PMBPA
550
Greenfield. Estimated. 0.13Agricultural
Buildings, Top
Prior approval
19/00757/PMBPA
Farm, Long Drove,
Holme
220
Brownfield. Estimated. 0.02Rear Of 26 To 28,
High Street,
Prior approval
19/00794/P3JPA
Fenstanton,
Huntingdon, PE28
9JZ
110
Greenfield. Estimated. 0.16Building Adjacent,
Straight Drove,
Wistow
Prior approval
19/00820/PMBPA
110
Greenfield. Estimated. 0.04Agricultural
Building Orchard
Prior approval
19/01328/PMBPA
Number 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Total
in -21 -22 -23 -24 -25 -26 -27 -28 -29 -30 -31 -32 -33 -34 -35 -36 2020
years Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr Yr Yr Yr Yr Yr Yr -2036
1-5 10 11 12 13 14 15 16
58
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
On East Side Of
Mere Way, Wyton
550
Greenfield. Estimated. 0.23Buildings At Manor
Farm, Barham
Road, Buckworth
Prior approval
18/02468/PMBPA
320202020202020202020202020202020202522520
The Local Plan Inspector considered that an overall
cap of 20 dwellings per year being delivered across
prior approval sites was an appropriately cautious
approach reflecting future likely supply. Projecting 20
dwellings a year over the remaining plan period results
in 340 dwellings. This comprises the sites identified
and an allowance for future sites to come forward.
320202020202020202020202020202020201003353350Subtotal
Planning applications received before 31st March and approved between April and October 2020
79000000000403900000079790
An outline application was submitted in August 2016
which was approved at DMC in October 2019. The
3.87Land Between The
Railway Line And
Outline
16/01507/OUT
decision notice was sent out in September 2020. No St Neots Bypass
reserved matters applications have been submitted.
Estimated.
And Potton Road,
Eynesbury
540000000000002925005454540
An outline application was submitted in September
2019 which was approved at DMC in May 2020. The
4.6Land South Of
Buryfield, Bury
Outline
19/01881/OUT
decision notice was sent out in June 2020. A full
application (20/01864/FUL) was submitted in
September 2020 for access and demolition works.
The site has funding from Homes England and is
anticipated to start in next three months. Rural
exception site. Estimated.
59
Appendix 2 Housing Trajectory Data: Local Plan to 2036 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
13300000000040390292500541331330Subtotal
Windfall and Rural Exception Sites
1,44012012012012012012012012012012012012000001201,200960n/a
Based on small site completions, including change of
use and excluding prior approvals, for the past 9 years
n/an/a
Windfall small sites
(less than 10
dwellings) the number of dwellings a year has been recalibrated
to 120. The average over the past 9 years has been
132 completions with 6 out of the 9 years acheiving
over 120. 120 has been selected as the more
conservative estimate. Have subtracted the outline
permissions from the annual estimate of 120.
45635353535353535353535353501026071525453n/a
The Inspector for the Local Plan in his final report
dated 29 April 2019, states that 35 dwellings a year
n/an/a
Rural Exception
Sites
from 2021/2022 is reasonable given the evidence
provided on historic delivery in the Local Plan hearing
sessions held in July and September 2018.
Rural exception site for 14 dwellings listed separately
above (17/01077/FUL).
18/00102/FUL (Land West of 52 Wood End,
Bluntisham) approved for 20 rural exception houses,
9 of which are anticipated to complete in year 3 so
have subtracted these from the capacity here.
19/01881/OUT was submitted for 54 dwellings
anticipated to build in years three and four, so have
reduced the allowance as appropriate in those years.
17/00630/FUL was submitted for 11 dwellings
estimated to be completed in year four and have
amended year four to reflect this.
1,8961551551551551551551551551551551551550102601911,7251,413n/aSubtotal
60
I I I I I I I I I I I I I I I I I I
Housing Trajectory Data: Local Plan to 2036 Appendix 2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status / Site
reference as at
31/03/2020
15,2966756756907767718018809831,0361,2311,2611,0661,2541,1551,0769665,45816,91219,150Total
5,517
6,466Completions between 2011 - 2020
21,762Total predicted completions 2020/21 to 2035/36 + completions from 2011-2020
61
Appendix 3 Trajectory survey responses for SEL1.1, SEL1.2, HU1 and SEL2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Appendix 3 Trajectory survey responses for SEL1.1, SEL1.2, HU1 and SEL2 Trajectory responses as submitted for the capped clusters
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status/Site
reference as at
31/03/2020
Alconbury and north-west Huntingdon cluster
3,3192082082082082082082082082082082082082082092071991,0313,7134,592394
Brownfield. The site is progressing well with several
housebuilders involved (Hopkins Homes, Morris
575Alconbury Weald Part Reserved
Matters/ Part Outline
1201158OUT
Local Plan Allocation
SEL1.1
Homes, Redrow Homes, Civic Living, Campbell
Buchanan and Crest Nicholson, as well as Cross Keys
Homes for the affordable housing) and reserved matters
applications submitted and with approval and the
delivery of site-wide infrastructure will ensure continued
delivery. Development is now moving into phase 2.The
Agent for the site anticipates the capacity of the site to
be 6,500, however, the trajectory provided only
accounts for the original 5,000 dwellings permitted
under 1201158OUT. It anticipates that approximately
1,300 dwellings may be delivered outside of the plan
period.
1,680200200200200150150150150100100800000001,6801,6800
Brownfield. The site is scheduled for disposal from
2024, a planning strategy has not yet been determined.
84RAF Alconbury Local Plan Allocation
SEL1.2
The agent anticipates that the site will go beyond the
1,680 capacity. It is envisaged that the Defence
Infrastructure Organisation will bring this site forward
as part of a Long-Term Strategic Development
Partnership.
1,000000000013013013013013013013070204801,0001,0400
Greenfield. Outline application awaiting determination
(18/01918/OUT) for a mixed use development including
54Ermine Street
(South),
Huntingdon
Planning application
submitted
18/01918/OUT
62
Trajectory survey responses for SEL1.1, SEL1.2, HU1 and SEL2 Appendix 3 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Trajectory responses as submitted for the capped clusters
1,000 dwellings. Trajectory was not provided.
Estimated.
6480000008880808080808080002406484000
Greenfield. Outline application 20/00847/OUT was
submitted in May 2020 for 648 dwellings.
6,6474084084084083583584465685185184984184184192772191,7517,0417,712394Subtotal
Local Plan Allocation
HU1
33Ermine Street
(North),
Huntingdon
Planning application
submitted
20/00847/OUT
(pending
consideration)
Local Plan Allocation
HU1
63
Appendix 3 Trajectory survey responses for SEL1.1, SEL1.2, HU1 and SEL2 Huntingdonshire District Council 2020 | Annual Monitoring Report 2020 Part 1 (Housing Supply)
Trajectory responses as submitted for the capped clusters
Total
2020
-2036
2035
-36
Yr
16
2034
-35
Yr
15
2033
-34
Yr
14
2032
-33
Yr
13
2031
-32
Yr
12
2030
-31
Yr
11
2029
-30
Yr
10
2028
-29
Yr 9
2027
-28
Yr 8
2026
-27
Yr 7
2025
-26
Yr 6
2024
-25
Yr 5
2023
-24
Yr 4
2022
-23
Yr 3
2021
-22
Yr 2
2020
-21
Yr 1
Number
in
years
1-5
Total
no. on
site by
2036
ExtantUnits
built
NotesApprox.
site
area
gross
(ha)
Name and
address of site
Status/Site
reference as at
31/03/2020
St Neots East cluster
1,0200000025651151151851851859550003301,0201,0200
Greenfield. Outline granted in August 2019 for 1,020
dwellings, the agent expects a reserved matters
application to be submitted in quarter 2 of 2021/22.
71.5St Neots East -
Loves Farm East
Outline
1300388OUT
Local Plan Allocation
SEL 2
2,80030175208208208208208208208208208208197150125437232,8002,8004
Greenfield. A hybrid planning application has been
approved (17/2308/OUT) in November 2018 for up to
59.6St Neots East -
Wintringham Park
Part Reserved
Matters/ Part Outline
17/02308/OUT
Local Plan Allocation
SEL 2
2,800 dwellings as part of a mixed use development.
Several reserved matters relating to landscaping and
housing have been approved and have commenced
on site. A £26 million loan from Homes England has
been secured by the development partnership to
accelerate housing delivery and enable early delivery
of community facilities to maximise the potential of this
strategic expansion location.
3,82030175208208208233273323323393393393292200125431,0533,8203,8204Subtotal
64