annual pcb management plan dec 08,2009
TRANSCRIPT
-
8/6/2019 Annual Pcb Management Plan Dec 08,2009
1/9
PCB MANAGEMENT PLAN
This PCB Management Plan is submitted in compliance with the provisions of Republic Act No. 6969,
its Implementing Rules and Regulations, and DENR Administrative Order no. 01, Series of 2004 otherwise
known as "Cemical Control Order for Polychlorinated Biphenyls."
I. General Description
Data Required Data
1 Name of Owner and operator National Power Corporation
2
3 Industrial activities at the premises Operations of Diesel Power Plant
4 Number of employees
II. Uses of PCBs at the Premise
Data Required Data
1 Description of the uses of PCBs at the premises Power generation
2
3 Listing of PCB wastes generated at the premises
None
4 Mass balance of PCBs through the premises None
5 Description of pollution control devices in use at the premises
6
7PCB Spill Oil Contigency Plan
III. Pollution Prevention Program
Data Required
1 Pollution prevention/control devices
2
3
IV. Training Program
Data Required Data
1 Scope or coverage of training or copy of the training Manual None
2
No trained personnel
Prepared by: Approved by: Date:
ItemNo.
Location of the facility of the PCBs, PCB equipment, PCB-contaminated equipment, non-PCB equipment, PCB article,PCB packaging or PCB wastes (site specific)
Taytay Diesel Power Plant, So Nalbot,Poblacion, Taytay, Palawan
6 permanent NPC personnel includingthree security guard and one utility
ItemNo.
Listing of PCB equipment, PCB contaminated equipment, non-PCB equipment and PCB articles
Power Transformer 3, attached laboratoryresults analysis made by CRLEnvironmental Corporation datedFebruary 05, 2009. (PCB's Not detected)Attached Certificate of PCB free from
San Jiang electric Mfg. Co. Ltd.
Each unit contain Smoke stack withsilencer
Description of compliance with the environmental laws andregulations (attach separate sheet if necessary)
Permit to Operate and Discharge Permitis available in the plant. Quarterlysubmission of SMR.
Description of emergency procedures and contingency plan incase of accidents (attach separate sheet if necessary)
ItemNo.
Containment in concrete enclosure/drumcontainers with seal
Inspection schedule and checklist (please attach sampleinspection checlist)
Weekly, but limited only to visualinspection for leaks and safety conditionof the equipment
Equipment and/or materials to used during spills and /oremergencies (attach separate sheet if necessary)
Empty drums is available, rags, safetygoggles, respirator and first aid kit
ItemNo.
List of personnel trained, particularly those workers in contactwith PCBs, PCB equipment, PCB-contaminated equipment,
non_PCB equipment, PCB wastes, PCB articles or PCBpackaging
-
8/6/2019 Annual Pcb Management Plan Dec 08,2009
2/9
PAQUITO G. ALMENDRAL JEFFREY MO. D. OLLERAS
Pollution Control Officer Manager, Palawan Area
-
8/6/2019 Annual Pcb Management Plan Dec 08,2009
3/9
Chemical Control Order for Polychlorinated BiphenylsDENR ADMINISTRATIVE NO. 01, SERIES OR 2004
PCB INVENTORY REPORT
\ Period Covered: CY 2010
I. COMPANY INFORMATION
Name of Company NATIONAL POWER CORPORATION / TAYTAY DPP
Business Address Agham Road, Corner Quezon Avenue, Diliman Quezon City
Location of NPC-SPUG-PALAWAN AREA-TAYTAY DIESEL POWER PLANT
Installation/Storage
Facility So. Nalbot, Poblacion, Taytay, Palawan
II. CONTACT INFORMATION
Authorized Representative PAQUITO G. ALMENDRAL
Position/Designation Principal Engineer C / Pollution Control Officer
Telephone no./ Fax 048-434-4982
Facsimile No.
E-mail address
III. PCB INVENTORY
Date/s of Inventory 8-Dec-09
Transformers Capacitors Others
In Use 3 0 0
On Standby 0 0 0
For Rework 0 0 0
On Storage for Disposal 0 0 0
Total 3 0 0
EquipmentInformation
mailto:[email protected]:[email protected] -
8/6/2019 Annual Pcb Management Plan Dec 08,2009
4/9
Inventory
Name-Plated PCB Equipment, PCB-Contaminated Equipment, non-PCB Equuipment, PCB Articles and Labeled PCB Packaging
Manufacturer Statu
116113 1990 2020 1992 360 liters None In se
116157 1990 2020 1992 445 liters None In se
944545 2005 2040 2006 655 liters None In se
* i.e. transformer, capacitor, circuit breaker, etc.
** i.e. Retro-filled, Repaired, Replaced, Decommissioned or Moved*** Status of PCB Equipment whether in Service, Idle, Unserviceable or in Storage
**** Identification code corresponding to the equipment analyzed, i.e. sample number or lot number of the laboratory test report
***** Method or procedure used to establish PCB concentration
Non-Plated PCB Equipment, PCB-Contaminated Equipment, non-PCB Equuipment, PCB Articles and Suspected PCB Packaging
Equipment*/Device/Article/P
ackaging Model/Serial
Number
Date ofManufactur
e
Electrical/Industrial Rating
ProjectedRetirement
Date
Capacity/Dimensions of
Unit
Date Ac-quired
Quantity/Volume of
Oil
PCB Concentration(ppm PCB)
MaintenanceHistory**
Amount ofPCB
WastesGenerated
PowerTransformer
South Wales
Transformer 225KVA/voltage
ratio:14400Vprimary
480Vsecondary
1490 x1310 x1750 (mm)
Attached Lab.
Results of Analysisand Quality ControlData Report made
by CRLEnvironmental
Corporation lastFebruary 05, 2009
No majorrepair has
been doneto the unit as
of to date
PowerTransformer
South WalesTransformer
400KVA/voltage
ratio:14400Vprimary
480V
secondary
1490 x1345 x1900 (mm)
Attached Lab.Results of Analysisand Quality ControlData Report made
by CRLEnvironmental
Corporation lastFebruary 05, 2009
No majorrepair hasbeen done
to the unit asof to date
PowerTransformer
MAN CXZTransformerSan Jiang
ManufactureLimited
700KVA/voltage
ratio:14400Vprimary
480Vsecondary
2150 x 1850 x2000 (mm)
Attached Certificateof free from PCB
content powertransformer
No majorrepair hasbeen done
to the unit asof to date
-
8/6/2019 Annual Pcb Management Plan Dec 08,2009
5/9
Status*
NONE
* i.e. transformer, capacitor, circuit breaker, etc.
** i.e. Retro-filled, Repaired, Replaced, Decommissioned or Moved
*** Status of PCB Equipment whether in Service, Idle, Unserviceable or in Storage
**** Identification code corresponding to the equipment analyzed, i.e. sample number or lot number of the laboratory test report
***** Method or procedure used to establish PCB concentration
Equipment*/Device/Article
/Packaging Model/Serial
Number
Manufacturer
Date ofManufact
ure
Electrical/Industrial Rating
ProjectedRetirement
Date
Capacity/Dimensions of
Unit
Date Ac-quired
Quantity/Volumeof Oil
PCB Concentration(ppm PCB)
MaintenanceHistory**
Amount ofPCB
WastesGenerated
-
8/6/2019 Annual Pcb Management Plan Dec 08,2009
6/9
IV. PCB WASTES
Quantity of PCB Wastes Generated Per Unit Time
Waste Type* Quantity Generated for the Year Location
None No suspected PCB waste being genererated
*fluids, sludge, slurry, scraps, contaminated equipment, soilm, and others
Total Quantity of PCB Wastes for the Year: NONE
I hereby certify that the above information are true and correct.
Done this _____________ day of __________________, at __ Puerto Princesa City, Palawan
PAQUITO G. ALMENDRAL - PCO
Name/Signature of Authorized Representative
J. Mo. D. OLLERAS Manager, Palawan Area
Name/Signature of President/CEO/General Manager
SUBSCRIBED AND SWORN before me, a Notary Public, this __________ day of
____________________, affiant exhibiting to me his Community Tax Receipt:
Name CTR# Issued at Issued On
______________________ ________ ____________________ _______________
PAQUITO G. ALMENDRAL 16672929 Puerto Princesa City Mar. 20, 2009
Doc. No.
Page No.
Book No. Notary Public
Series of
-
8/6/2019 Annual Pcb Management Plan Dec 08,2009
7/9
PCB Spill Prevention and Clean-up Plan
This PCB Spill Prevention and Clean-up Plan is submitted in compliance with the provisions of
Republic act No. 6969, its implementing Rules and Regulations, and DENR Administrative Order No. 01,
Series of 2004 otherwise known as "Chemical Control Order for Polychlorinated Biphenyls".
I. Personnel Training
1. Personnel must undergo on training regarding toxic and hazardous waste management
specially on PCB and chemicals
2. Personnel must acquired fundamental knowledge on industrial safety and chemical safety
3. Regular training and seminars shall provide to all operations personnel to equip them with
knowledge on how to handle emergencies.
II. Markings and Labeling
1. Containers with PCB contaminated are marked with hazardous waste, and must stored
in a designated area complete with marking and labelling for proper identification.
2. Containers with PCB concentrated are labeled with PCB sign warning/danger and stored in
designated are with proper identification.
III. Assignment/Resposibilities of Response Team
1. All plant personnel including security guard and utilitiy are responsible in the storage,
safekeeping, handling, labeling and inspection of hazardous waste from time to time.
occurs and a contigency plan must place in a designated bullitin for safety.3. All plant personnel shall report to the Plant In-charge any inccident on spill or leak of
containers and followed emergency procedure based on contigency plan.
4. For any uncontrollable situation, Plant In-charge shall immediately inform the Area Manager,
EMD and NPC Corporate Safety Officer
5. The Plant In-charge/PCO shall report immediately to DENR-EMB and or PENRO/CENRO
all accidents or spills and action taken to control release of chemicals to environment.
6. Regular inspection of waste storage area shall be conducted by on duty personnel from
time to time
7. Proper wearing of PPE's shall be used at all time in handling hazardous wastes.
2. All plant personnel shall responsible for the immediate action taken where aPCB spill
-
8/6/2019 Annual Pcb Management Plan Dec 08,2009
8/9
IV. Emergency Plans
NPC Corporate Contingency Plan must placed in a designated area
for regular reminder's
V. Decontamination Procedures
1. To decontaminate a PCB container, flush the internal surfaces of the container three
times with solvent containing no level of PCB or less tha 2.0 ppm PCB.
Each rinse shall use a volume of the flushing solvent equal to approx. 10% of the
PCB container capacitty
2. To decontaminate movable equipment contaminated with PCB, tools and sampling
equipment, any of the follwing is done:
a. Swabbing surfaces that have contacted PCB with solvent
b. A double wash/rinse as defined in procedure no. 1.
3. The decontamination solvent used is either kerosene or diesel
4. all contaminated materials are placed in containers or plastic bags and properly
labeled
5. Proper handling and disposal of waste materials shall be undertaken
VI. Disposal of Contaminated Debris and Materials
1. Proper coordination to implementing body for the safe and dispossal of PCB
VII. Reporting and Record Keeping
1. Quarterly submission of Self Monitoring Report
2. Submission of Annual PCB Report every December.
3. Semi-Annualy submission of Pro-Forma Proponent Compliance Monitoring Report(CMR) Module 5 of SMR
VIII. Persons/Institutions to Contact in case of Emergency
1. NPC - Environmental Management Department
2. NPC Corporate Safety Officer
3. CENRO - Taytay, Palawan
4. LGU - Taytay, Palawan
Prepared by: Approved by:
PAQUITO G. ALMENDRAL JEFFREY Mo. D. OLLERAS
PEC/Pollution Control Officer Manager, Palawan Area
-
8/6/2019 Annual Pcb Management Plan Dec 08,2009
9/9
PCB Storage Facility Closure Plan
This PCB Storage Facility Closure Plan is submitted in compliance with the provisions of
Republic act No. 6969, its implementing Rules and Regulations, and DENR Administrative Order No. 01,
Series of 2004 otherwise known as "Chemical Control Order for Polychlorinated Biphenyls".
I. Certification of Financial Liability Approved by the Bureau
1. Provide pollution liability insurance coverage
2. Post annual surety bond equivalent of 150 % current cost of proper PCB disposal
II. Steps and Procedures for Closure
1. Transformer oil suspected PCB will be stored in a sealed container with marking
and labelling and placed in designated area.
2. Container suspected PCB will be stored in a concrete enclosure area, well ventilated,
roof covered room, and concrete flooring with proper marking and labelling
III. Post closure and monitoring
1. Weekly inspection for suspected PCB equipment
2. Visual inspection for leaking container to avoid spillage
IV. Cost Estimates Approved by the Bureau
1. Submit volume of suspected PCB to be disposed for cost estimate by the bureau
Prepared by: Approved by:
PAQUITO G. ALMENDRAL JEFFREY MARIO D. OLLERASPEC/Pollution Control Officer Manager, Palawan Area