annual performance plan 2018/2019 - pmg · dr nz qunta date: 26/02/2018 official sign-off it is...

54
ANNUAL PERFORMANCE PLAN 2018/2019

Upload: others

Post on 20-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • 1 RSR Annual Performance Plan 2018/2019

    ANNUAL PERFORMANCE PLAN2018/2019

  • 2 RSR Annual Performance Plan 2018/2019

  • 3 RSR Annual Performance Plan 2018/2019

    Minister’s Foreword

    This year South Africa, together with the rest of the world celebrates the centenary of Nelson Mandela, our statesman who became a global icon through his unfailing humility, abiding compassion and unquestionable integrity. As we celebrate this giant of history, we need to emulate his spirit of resilience despite the challenges that confront us in our areas of operation.

    The National Development Plan (NDP) 2030 and the National Transport Master Plan (NATMAP) 2050 recognise the need for South Africa to maintain and expand its transport infrastructure to continue supporting its economic growth and social development goals. NATMAP further states that rail is an essential long-term component of freight and passenger transport networks in the country.

    With over 3 180km of suburban rail networks, commuters continue to receive passenger rail service in the metropolitan areas of the Eastern Cape, Gauteng and KwaZulu-Natal and Western Cape at an affordable price. In tandem, Gauteng boasts the state-of-the-art Gautrain, which comprises two links: one between Tshwane and Johannesburg and another between OR Tambo International Airport and Sandton. Using the standard gauge lines, the train operates at a maximum speed of 160km/h. This is an unprecedented milestone in the history of South African rail and has assisted in significantly alleviating traffic from our roads.

    Our freight network, consisting of 31 000 track kilometres and 22 500 route kilometres, is also well-developed to connect to the strategic rail lines of landlocked neighbouring countries. The use of the Cape gauge allows interconnectivity and the mutual use of rolling stock and traction between neighbouring countries without any infrastructure complications. However, due to speed limitations inherent in the Cape gauge, it was resolved by the African Union and the Union of African Railways that the standard gauge should be adopted for all new railways lines in the continent.

    It was further expressed that South Africa should, on existing lines, slowly transform to a standard gauge network using a step-by-step process to introduce new standard gauge lines on a master plan basis and not by a general conversion of the existing network. Continuous investment and maintenance is

    underway on the existing network, together with a constant lookout for opportunities to migrate portions to standard gauge network where sensible.

    While I am delighted by the transformation of our rail environment, I cannot accentuate enough that with every development, come new risks that needs to be responded to through an equally developed and robust regulatory regime. The Railway Safety Regulator (RSR), therefore, plays a pivotal role in ensuring that safety remains the bedrock of South African railway operations.

    I have interrogated the RSR’s Annual Performance Plan 2018/19 and I am confident that guided by its Strategic Outcomes, the Regulator together with the operators, will portray Madiba’s resilience in addressing the safety concerns in the rail environment.

    ___________________

    MINISTER OF TRANSPORT

    Dr BE Nzimande

  • 4 RSR Annual Performance Plan 2018/2019

    __________________________

    ACTING CHIEF EXECUTIVE OFFICER

    Ms T Kgare

    Date: 02/03/2018

    __________________________

    ACTING GENERAL MANAGER: STRATEGY AND BUSINESS DEVELOPMENT

    Dr C Malan

    Date: 02/03/2018

    ________________________

    MINISTER OF TRANSPORT

    DR BE Nzimande

    Date: 07/03/2018

    __________________________

    CHIEF FINANCIAL OFFICER

    Mr R Gouws

    Date: 02/03/2018

    __________________________

    CHAIRPERSON: RSR BOARD

    Dr NZ Qunta

    Date: 26/02/2018

    Official Sign-off

    It is hereby certified that this Annual Performance Plan for the period 2018-2019 was developed by the management of the Railway Safety Regulator under the guidance of the Department of Transport and the RSR Board. It considers all the relevant policies, legislation and other mandates for which the Railway Safety Regulator is responsible. The Annual Performance Plan accurately reflects the strategic outcome oriented goals and objectives which the Railway Safety Regulator will endeavour to achieve over the period 2018/19.

  • 5 RSR Annual Performance Plan 2018/2019

    Chairperson’s Overview

    It is my pleasure to present the Annual Performance Plan of the Railway Safety Regulator for the 2018/2019 Financial Year. It is the Regulator’s vision to have an APP that is aligned to and reflects the industry’s safety goals so that there is a common vision for railway safety in South Africa. We are still a long way off that vision, but this APP along with the Strategic Plan on which it is based are the first step towards the whole industry aligning itself towards a common goal in achieving a shared vision for railway safety.

    As the custodian of rail safety in South Africa, the RSR is committed to enhancing safety in the rail industry, not only for the benefit of the countless passengers who rely on rail as a mode of transport, but also for the economic benefit of the country.

    The economic benefits of a robust rail network are extensive. Significant investment is being made in rolling stock, signalling equipment, infrastructure and in improving processes and efficiencies. These investments are long overdue and will strongly impact economic growth and drastically improve safety within the industry. The investment into the rail network is not only essential, but is likely to boost the South African economy.

    The most recent State of Safety Report indicates that during the 2016/17 Financial Year, 98% of operators complied with the reporting requirements in line with RSR guidelines. It is encouraging to note that compliance from operators is increasing year on year. This is a step in the right direction and an indication of operators’ commitment to ensuring that we do things right. This achievement did not happen overnight; it required an extensive effort from the Regulator to demonstrate how reporting compliance is an integral part of safety compliance.

    Safety is everyone’s responsibility and only when everyone takes collective responsibility, can we actively and positively impact safety within our sector. Only when we are all willing to promote safe, reliable transport will we be able to address and

    resolve the current rail challenges and reposition the rail sector as the preferred mode of land transport.

    I am confident that the APP 2018/2019 will enable the RSR to discharge its legislative responsibilities and decisively reduce occurrences in the five priority areas of the RSR. I, therefore, want to encourage all stakeholders to support the APP and to work earnestly to achieve the vision of the RSR.

    __________________________

    Dr NZ Qunta

    CHAIRPERSON: RSR BOARD

  • 6 RSR Annual Performance Plan 2018/2019

  • 7 RSR Annual Performance Plan 2018/2019

    GLOSSARY OF TERMS 8

    DEFINITIONS 9

    PART A: STRATEGIC OVERVIEW 10

    SITUATIONAL ANALYSIS 10

    PERFORMANCE DELIVERY ENVIRONMENT 12

    ORGANISATIONAL ENVIRONMENT 17

    PART B: PROGRAMME AND SUB-PROGRAMME PLANS 24

    STRATEGIC OUTCOME 1: RAILWAYS ARE SAFER 24

    STRATEGIC OUTCOME 2: SUSTAINABLE INSTITUTIONAL GROWTH AND DEVELOPMENT 28

    STRATEGIC OUTCOME 3: IMPROVED STAKEHOLDER SERVICE 30

    BUDGET INFORMATION 53

    ANNEXURE A: TECHNICAL INDICATOR DESCRIPTIONS

    Contents

  • 8 RSR Annual Performance Plan 2018/2019

    BOI Board of Inquiry

    CEO Chief Executive Officer

    COGTA Department of Cooperative Governance

    DoT Department of Transport

    DPE Department of Public Enterprise

    EXCO Executive Committee

    FY Financial Year

    HFM Human Factor Management

    HR Human Resources

    ICT Information, Communication and Technology

    IDP International Development Plan

    IMS Information Management System

    KPI Key Performance Indicator

    MANCO Management Committee

    MOU Memorandum of Understanding

    MTSF Medium Term Strategic Framework

    NATMAP National Transport Management Plan

    NDP National Development Plan

    NIMS National Information Monitoring System

    NRSR National Railway Safety Regulator

    PRASA Passenger Rail Agency of South Africa

    RSR Railway Safety Regulator

    SADC Southern African Development Community

    SDIX Service Delivery Index

    “THE ACT’ National Railway Safety Regulator Act (2002)

    TFR Transnet Freight Rail

    Glossary of Terms

  • 9 RSR Annual Performance Plan 2018/2019

    CSM–CA Common Safety Method for Conformity Assessment is applied by railway safety inspectors in the assessment of the adequacy of an operator’s Safety Management System (SMS). It is also used by the operator to ensure that their application conforms to the minimum requirements of the RSR.

    CSM-RA Common Safety Method for Risk Assessment gives a harmonised framework for the risk assessment process through the prescription of Hazard Identification, Risk Analysis and Risk Evaluation. This CSM gives a broad framework for the use of risk assessment methodologies to assess changes to the railway system.

    RM3 Railway Management Maturity Model is a tool for assessing and managing a railway operator’s ability to control safety risks, to help identify areas for improvement and provide a benchmark for year-on-year comparison. The RM3 helps to guide rail operators towards excellence in safety risk management.

    SMS Safety Management System is a formal framework for integrating safety into day-to-day railway operations and includes safety goals and performance targets, risk assessment, responsibilities and authorities, rules and procedures, monitoring and evaluation processes and any matter as prescribed.

    SRM Safety Risk Model consists of a series of fault tree and event tree models representing a large number of hazardous events (HEs) that collectively define the overall level of risk on the railway. It provides a structured representation of the causes and consequences of potential accidents arising from railway operations and maintenance.

    Note: At the core of a Safety Permit lies the Safety Management System of an operator. All the above-mentioned acronyms (CSM-CA; CSM-RA; RM3) deal with ensuring that an operator’s SMS is robust enough to mitigate risks arising from railway operations, which will ensure continuous safety improvement and the achievement of excellence in railway operations.

    The SRM will provide the RSR and the industry a holistic view of the industry’s collective and individual risks and will serve as a decision-making tool for the RSR and operators for risk control measures to be implemented.

    Definitions

  • 10 RSR Annual Performance Plan 2018/2019

    Situ

    atio

    nal

    an

    alys

    is

    PEST

    LE A

    NALY

    SIS

    POLI

    TICA

    LEC

    ONOM

    ICSO

    CIAL

    TECH

    NOLO

    GYLE

    GAL

    ENVI

    RONM

    ENT

    STRA

    TEGY

    Stra

    ined e

    cono

    my;

    Labo

    ur un

    rest;

    Decli

    ne in

    loca

    l ra

    il inv

    estm

    ent

    prog

    ramm

    es;

    Relax

    ation

    of tr

    ade

    barri

    ers w

    hich w

    ill co

    ntribu

    te to

    grow

    th in

    inter

    natio

    nal

    rail i

    nves

    tmen

    t pr

    ogra

    mmes

    ;Ro

    ad co

    nges

    tion w

    ill be

    the

    catal

    yst fo

    r a po

    licy

    and/o

    r reg

    ulatio

    n to

    enco

    urag

    e the

    road

    -to-

    rail m

    igrati

    on fo

    r fre

    ight

    Integ

    rated

    Tran

    spor

    t Pl

    annin

    g/Stra

    tegy.

    Incre

    ase i

    n urb

    anisa

    tion;

    High

    rate

    of un

    emplo

    ymen

    t.

    New

    rollin

    g stoc

    k; Ke

    ep ab

    reas

    t of n

    ew

    techn

    ologie

    s (dig

    ital, c

    loud

    base

    d com

    munic

    ation

    sy

    stems

    and i

    nfras

    tructu

    re/

    rollin

    g stoc

    k app

    licati

    ons,

    pred

    ictive

    tech

    nolog

    ies tr

    ain

    contr

    ol);

    Conv

    erge

    nce o

    f tec

    hnolo

    gies;

    ICT

    impr

    ovem

    ent.

    Regu

    lator

    y fra

    mewo

    rk ex

    pand

    ed an

    d re

    engin

    eere

    d (po

    licy,

    regu

    lation

    s, re

    vised

    Ac

    t, etc)

    ;Ac

    credit

    ation

    as

    Train

    ing P

    rovid

    er.

    Matur

    ed ra

    il ind

    ustry

    – qu

    ality

    and c

    onten

    t of

    regu

    lation

    s will

    be

    more

    risk-b

    ased

    for

    a mo

    re ef

    ficien

    t ap

    proa

    ch;

    Priva

    te 3r

    d par

    ty op

    erato

    rs;Re

    giona

    l clie

    ntele

    (SAD

    C);

    Fres

    h foc

    us on

    pr

    otecti

    on of

    the

    envir

    onme

    nt.

    STRU

    CTUR

    E St

    ructu

    ral

    acco

    untab

    ility

    rema

    ins th

    e sam

    e (R

    SR an

    d ope

    rator

    s in

    the pu

    blic s

    ector

    ).

    Loca

    l and

    regio

    nal

    (SAD

    C) ra

    il and

    oth

    er in

    frastr

    uctur

    e de

    velop

    ment.

    Grea

    ter de

    mand

    for s

    afe,

    relia

    ble an

    d affo

    rdab

    le pu

    blic t

    rans

    port.

    High

    spee

    d tra

    ins;

    Rollin

    g stoc

    k (tec

    hnolo

    gy

    adva

    ncem

    ents)

    ;Es

    tablis

    hmen

    t of lo

    cal

    maint

    enan

    ce de

    pots

    and

    traini

    ng an

    d tes

    ting c

    entre

    s

    Regu

    lator

    y ser

    vices

    wi

    ll be r

    e-str

    uctur

    ed

    in lin

    e with

    secto

    rial

    chan

    ges

    Confl

    ict of

    inter

    est

    (sing

    le pa

    rent

    for

    refer

    ee an

    d play

    er)

    Rollin

    g stoc

    k and

    inf

    rastr

    uctur

    e ex

    pans

    ion

    PROC

    ESS

    Oper

    ators

    are r

    enew

    ing

    their r

    olling

    stoc

    k whic

    h wi

    ll give

    oppo

    rtunit

    y to

    new

    ways

    of co

    nduc

    ting

    busin

    ess.

    Expa

    nsion

    s in t

    he ra

    il ind

    ustry

    will

    see m

    ore

    role

    playe

    rs an

    d safe

    ty su

    pplie

    rs.

    Best

    prac

    tice r

    ailwa

    y tec

    hnolo

    gy;

    Big d

    ata in

    busin

    ess

    intell

    igenc

    e.

    Stre

    ngthe

    ned

    enfor

    ceme

    nt be

    caus

    e of e

    xpan

    ded

    regu

    lator

    y fra

    mewo

    rk.

    Deve

    lopme

    nt of

    envir

    onme

    nt sp

    ecific

    stan

    dard

    s.

    PART

    A: S

    trate

    gic

    Ove

    rvie

    w

  • 11 RSR Annual Performance Plan 2018/2019

    PEST

    LE A

    NALY

    SIS

    POLI

    TICA

    LEC

    ONOM

    ICSO

    CIAL

    TECH

    NOLO

    GYLE

    GAL

    ENVI

    RONM

    ENT

    BRAN

    D &

    COMM

    UNIC

    ATIO

    N Te

    am S

    outh

    Afric

    a (G

    over

    nmen

    t, bus

    iness

    an

    d lab

    our).

    Use o

    f soc

    ial m

    edia

    to ma

    rket a

    nd po

    sition

    the

    RSR

    (bra

    nd pr

    otecti

    on).

    Elec

    tronic

    med

    ia – s

    hift fr

    om

    tradit

    ional

    PR to

    tech

    -centr

    ic ma

    rketin

    g;So

    cial m

    edia

    will c

    reate

    an

    incre

    asing

    chall

    enge

    and

    comp

    etitio

    n.

    SYST

    EMS

    Lack

    of tr

    iple-

    helix

    pa

    rtner

    ship

    solut

    ions

    (relat

    ionsh

    ip bu

    ilding

    ) wi

    th go

    vern

    ment,

    ind

    ustry

    and

    orga

    nised

    labo

    ur

    withi

    n the

    railw

    ay

    envir

    onme

    nt.

    Grea

    ter in

    volve

    ment

    of me

    dia an

    d com

    munit

    ies;

    Partn

    ersh

    ips w

    ith ot

    her

    regu

    lator

    s loc

    ally (

    e.g,

    RTMC

    , CAA

    ) and

    int

    erna

    tiona

    lly (e

    .g, F

    OT,

    TSB,

    ORR

    , RSS

    B, et

    c.).

    Elec

    tronic

    repo

    rting (

    State

    of

    Safet

    y, Di

    recti

    ves);

    Autom

    ated A

    udits

    and

    Inspe

    ction

    s;El

    ectro

    nic do

    cume

    nt ma

    nage

    ment;

    Onlin

    e rea

    l-time

    repo

    rting

    of ra

    il occ

    urre

    nces

    and

    incide

    nts.

    Co-o

    pera

    tive

    gove

    rnan

    ce A

    ct (IG

    R);

    Prote

    ction

    of IP

    and

    softw

    are.

    Re-o

    penin

    g and

    se

    rvicin

    g of b

    ranc

    h-lin

    es.

    FINA

    NCIA

    L SU

    STAI

    NABI

    LITY

    Limite

    d fun

    ding f

    or

    SOEs

    ;Re

    struc

    turing

    of S

    OEs.

    Expa

    nsion

    of ra

    il pr

    ogra

    mmes

    .Co

    nflict

    of in

    teres

    t (si

    ngle

    pare

    nt for

    re

    feree

    and p

    layer

    ).

    New

    entra

    nts –

    perm

    it hold

    ers.

    PEOP

    LE

    Partn

    ersh

    ips w

    ith

    indep

    ende

    nt sa

    fety

    cons

    ultan

    ts.

    High

    rate

    of un

    emplo

    ymen

    t.So

    cial d

    iscon

    tent.

    Focu

    s of s

    afety

    camp

    aigns

    an

    d edu

    catio

    n on

    comm

    uters/

    comm

    unitie

    s;

    More

    dive

    rsifie

    d rail

    us

    ers

    KNOW

    LEDG

    E Mo

    re ef

    fectiv

    e re

    gulat

    ory c

    apac

    ity

    need

    ed

    Tech

    nolog

    y adv

    ance

    ment:

    Pr

    edict

    ive te

    chno

    logies

    ;E-

    learn

    ing; M

    ulti-s

    killin

    g.

    Heigh

    tened

    focu

    s on

    : upg

    radin

    g of

    statio

    ns, c

    ertifi

    catio

    n of

    Safet

    y Criti

    cal

    Grad

    es an

    d ac

    credit

    ation

    of

    third

    partie

    s (e.g

    . su

    pplie

    rs an

    d ma

    nufac

    turer

    s)

  • 12 RSR Annual Performance Plan 2018/2019

    In executing its legislative oversight mandate, the RSR performs the following duties and functions:

    • Issues and manages safety permits: The Safety Management System and concomitant Safety Permit provide the legal interface between the RSR and railway operators. This relationship enables, and promotes, continuous improvements in safe railway operations. Annually the RSR evaluates the Safety Improvement Plans and the Safety Management Systems Report submitted by operators outlining directives and/or interventions to improve safety in the operational environment.

    • Conducts inspections and audits: the RSR is mandated to play an oversight safety role in the railway industry. This role is undertaken through various strategic initiatives such as conducting safety related audits and inspections of operators’ activities. The key objectives of safety audits and inspections are to critically assess safety systems and processes employed by operators. These assessments provide an in-depth knowledge and understanding of required interventions which the RSR provides to the operators to promote the attainment of safe rail operations.

    • Conducts safety assessments: The RSR fulfils its safety oversight mandate on railway new works and technology developments by conducting safety assessment and providing approvals on all life cycle phases of railway projects to ensure that safety is not compromised in the revitalisation of the local rail industry. These regulatory safety assessments also aim to ensure that the impact of the intended changes

    is considered within the immediate environment of its application and from a systemic perspective encompassing asset/operational system life cycle.

    • Investigates railway occurrences: To achieve safety improvement and reduction of occurrences, the RSR conducts investigations of occurrences that have led to major loss including fatalities, injuries and major damage to property to identify the root cause and to prevent reoccurrences. Operators are obligated to report all occurrences to the RSR to ensure that analysis and review of incidences and the causes thereof are consolidated to assist the RSR in providing tools and strategic direction in addressing safe rail operations.

    • Develops regulations, safety standards and regulatory prescripts: In terms of Section 29, 30 and 50 of the Act, the RSR is mandated to develop regulations, safety standards and related regulatory prescripts which form an integral part of the regulatory regime adopted for the oversight and enforcement of safe railway operations.

    • Issues notices of non-conformance and non-compliance: The RSR issues operators with such notice to indicate conditions within the operators’ system that are deemed to be sub-standard or not in compliance with regulatory prescripts that ensure safe rail operations in terms of the adopted regulatory regime and, continues to impose penalties for non-compliance with the Act and safety standards adopted by the Board of Directors of the RSR.

    Performance Delivery Environment

  • 13 RSR Annual Performance Plan 2018/2019

    • Supports and promotes occupational health and safety and security: To address occupational health and safety and security issues that impact on railway safety, the RSR conducts investigations, audits and inspections. Occupational health and safety legal requirements are included in the Human Factors Management Standard and are, therefore, continuously promoted during the technical workshops that are conducted by the RSR.

    • Co-operates with relevant organs of state to improve safety performance and oversight functions: In compliance with the Act, the RSR must conclude appropriate co-operative agreements with relevant state organs to give effect to co-operative government and inter-governmental relations as contemplated in Chapter 3 of the Constitution. To this end, RSR has concluded 12 cooperative agreements, nine with various government departments and three with industry associations. The MoU’s with Government departments aim to eradicate duplication where there is dual jurisdiction, promoting collaboration, while the agreements with industry associations aim to share best practice with the industry and maintain an interactive approach in enforcing compliance in order to achieve an occurrence-free environment. All these 12 agreements focus on different issues, while the common denominator for all of them is ensuring rail safety.

    • Plays a leading role in the alignment of the railway safety regime of South Africa with those of the Southern African Development Community: The RSR plays a significant role in harmonising the rail safety regime within

    the SADC region. Through the Southern African Railways Association (SARA), the RSR workshops and facilitates its South African standards with the vision of adapting them at SADC level, once approved by the SARA Board.

    • Conducts research: Promotes and facilitates research in areas related to the strategic goals of the RSR.

    • Data management and analysis: This function is in support of Section 37 and Section 39 of the Act, which requires that all occurrences be reported to the RSR. The Act also requires the RSR to establish a National Information and Monitoring System (NIMS). In terms of risk identification and management as well as strategic and operational planning, it is imperative for the RSR to maintain an accurate data management system. The data must be reliable and analysed for risks on a regular basis. This enables the RSR to accurately identify major safety relevant risks that will require actions such as inspections, audits, investigations, awareness campaigns, etc, to increase the level of operational safety within the South African rail environment.

    The State of Safety Report, which is tabled in Parliament annually, remains the highlight of the data management and analysis function, and provides insight into the current state of rail safety, areas of concern as well as RSR actions and activities towards addressing challenges and root causes of occurrences.

    To achieve its objectives in terms of the Act, the RSR may conduct several other activities relating to safe railway operations. This provision affords the RSR the opportunity to go beyond that, which is expressly contained in the Act to achieve its objectives.

  • 14 RSR Annual Performance Plan 2018/2019

    Our Strategic Mandate

    STRATEGIC PILLARS

    STRATEGIC OUTCOMES

    GOAL STATEMENT STRATEGIC OBJECTIVES

    Triple E: Enforcement, Education and Engineering/ Human Factors

    1. Safer railways To change from an adversarial industry approach towards a collaborative risk based approach in mitigating the risks of railway occurrences and thereby reducing the number of occurrences.

    1.1 Establishment of a common platform for regular engagement between the RSR and high-risk operators to agree on minimum safety objectives to be achieved by individual operators to ensure that high risk railway operators meet or exceed their safety objectives.

    1.2 Develop and implement a Safety Risk Model (SRM) representative of the overall risk estimate of the railway industry to support critical decision making.

    1.3 Enhance the Safety Management System (SMS) by the development and implementation of a Determination for a Common Safety Method for Conformity Assessment (CSM CA) and a Common Method for Risk Assessment (CSM RA) for railway operators to ensure that operational risk exposures are identified, analysed, prioritised and appropriately mitigated.

    1.4 Introducing and phasing in of Operational Excellence with the major operators through Railway Management Maturity Model (RM3). The RM3 will assist railway operator to achieve operational excellence through the effectiveness of their Safety Management Systems.

    1.5 Roll-out of a Human Factors Management programme to all railway operators designed to:

    • Standardise Competency Management Systems (CSM) in place with all operators.

    • Determine acceptable vacancy rates within safety critical grades.

    • Ensure effective workload planning for staff involved with safety critical work.

    • Safe Systems of Work.

    1.6 Develop and implement a Determination for Verbal Safety Critical Communications. This strategic initiative will ensure that the correct communications protocols to be observed between safety critical staff during train authorisations and which will reduce the risk of SPADS’s and Collisions during degraded mode

    1.7 Establishment of an Industry Workgroup on Inter-operability and Interface Management. This strategic thrust must ensure safe inter-operability between operators on the common network and the review of all interface management agreements between operators addressing the operational risks at the common network and interface of railway operations

    Strategic Outcome-Oriented goals of the RSR

  • 15 RSR Annual Performance Plan 2018/2019

    STRATEGIC PILLARS

    STRATEGIC OUTCOMES

    GOAL STATEMENT STRATEGIC OBJECTIVES

    Excellence 2. Sustainable institutional growth and development

    We strive for excellence by enriching our governance processes and procedures with applicable compliance frameworks and risk strategies.

    2.1 To secure a sustainable operational financial base.

    2.2 To ensure performance excellence.

    2.3 Develop and implement an integrated Information Management System (IMS) which can enable the RSR to measure the effectiveness of the compliance monitoring initiatives.

    Relevance 3. Improved stakeholder service

    By providing a platform for collaboration with all stakeholders and interested parties, we will be recognised as a leading safety regulator by improving on the levels of awareness amongst operators, commuters and the public.

    3.1 To promote safe railway behaviour.

    3.2 Establishment of an Industry Stakeholder Interest Group on Infrastructure and Rolling Stock. This shall ensure that all stakeholders are kept abreast on the roll-out of new infrastructure and rolling stock technology and investment programmes; improved maintenance strategies and universal access to ensure that rail safety considerations play a major role.

    3.3 Implement a platform for regular engagement with organised labour, stakeholders and affected parties to share on lessons learnt to further improve on railway safety.

  • 16 RSR Annual Performance Plan 2018/2019

    Organisational EnvironmentIn line with international best practices regarding railway safety management, the RSR must guide the railway industry towards excellence in railway safety management to reduce the operational risks in the railway environment to as low as reasonably practical (ALARP). The strategic aspirations of the RSR to achieve the reduction of risk are documented in the RSR Strategic Plan 2018/19 – 2022/23, which sets out the specific RSR strategic objectives to be achieved during this period.

    While what we do is designed to protect the interests of rail users, we also strive to be transparent in our work so that we ourselves are accountable. Data and evidence must drive our decisions; clear processes and governance must set out how our work is delivered. While being the enforcing authority for safety legislation on South Africa’s railways, we also play an advisory and training role on various safety regulatory tools and techniques to other regulators and operators in the SADC region.

    Figure 1: Railway Safety Oversight Operational Model

    The RSR comprises seven functional departments, which in a collaborative and integrative manner, are accountable for the execution of the Strategic Plan. The specific strategic contributions are contained in Strategic Interventions and Projected Performance schedule.

  • 17 RSR Annual Performance Plan 2018/2019

    Core Operational

    Office of the Chief Operations Officer

    The Office of the Chief Operations Officer (OCOO) comprises the following four core operational departments: Technical Services, Regional Operations including Human Factors Management, Standards and Regulations, and Technical Skills Development. The portfolio includes Legal Services as a critical pillar to executing the OCOO mandate.

    In line with the RSR’s strategic vision of “Zero Occurrences”, the mandate of the OCOO is to provide operations leadership in support of the organisation’s business objectives through the articulation, initiation and implementation of professional operations and ensuring operational compliance and control.

    Technical Services

    The Technical Services unit is the powerhouse of technical knowledge within the RSR. The unit has four functions namely, Perway and Civil Works; Electrical Signalling and Telecommunications; Rolling Stock, and Maintainer Regulation and are responsible for:

    • Advising on and auditing new works and technology developments within the railway industry;

    • Participating in the development of Regulations, Standards, safety protocols, guides and railway related manuals;

    • Supporting the harmonisation of relevant standards in the SADC region by providing relevant expertise;

    • Conducting technical studies to assist with technical expertise during technical awareness training;

    • Providing assistance to the Occurrence Investigations department during Boards of Inquiry as well as safety compliance for inspections and audits;

    • Monitoring the movement of dangerous goods by rail;

    • Conducting research on railway safety related matters;

    • Implementing a regulatory regime for the suppliers of safety critical services and components;

    • Providing technical support on demand within the RSR as well as to operators;

    • Providing assurance that safety critical components procured by operators do not compromise safety;

    • Developing accreditation, certification criteria for suppliers; and

    • Developing and maintain a database of certified suppliers.

    Safety Compliance enforced through Regional Operations

    The role of Safety Compliance is to monitor and enforce safety compliance in the rail sector by issuing safety permits and proactively conducting inspections and audits. The unit comprises five regional offices, which monitor and enforce safety compliance by issuing permits and proactively conducting inspections and audits. Safety Compliance is responsible for:

    • Assessing the adequacy of Safety Management Systems Reports of railway operators against predetermined criteria to make informed decisions on the issuance of new Safety Permits;

    • Assessing the adequacy of Safety Improvement Plans submitted by operators outlining their interventions to improve safety;

    • Monitoring safety compliance through targeted safety audits of operators’ safety management systems and risk based inspections of railway operations;

    • Enforcing regulatory instruments where non-compliances are detected;

    • Following through on and the timely closure of all open directives;

    • Enforcing and monitoring compliance with the Human Factors Management Strategy, including focused Human Factor Audit Reviews. The Human Factor Unit:

    Ø oversees the licensing and reviews competency assessments of Safety Critical workers;

    Ø provides technical information/inputs for technology reviews;

    Ø provides consultancy/advisor services in Human Factors domains; and

    Ø provides applied human factors training for the advancement of knowledge.

    • Capacitating the industry to deliver safe railway operations through effective and timely communication and a consistent approach on interventions; and

    • Conducting annual Permit Fee determinations and effecting

  • 18 RSR Annual Performance Plan 2018/2019

    the management and administration thereof.

    Standards and Regulations

    The Standards and Regulations unit was established to provide specialist and technical expertise through:

    • The development of standards, protocols, guides and railway related manuals;

    • Facilitating the implementation of applicable regulations;

    • The provision of technical awareness workshops; and

    • Supporting the engagement of the RSR with relevant organs of state through conclusion and execution of memoranda of understanding (MoU).

    Technical Skills Development

    The Technical Skills Development unit provides appropriate internal and external training courses, modules, railway technology and standards support; capacity development; and technical skills enhancement through:

    • Technical Training (Internal): Ensure the provision of identified technical skills training (Internal);

    • Technical Training (External): Ensure the provision of appropriate technical skills training (External);

    • Mentoring: Ensure authoritative experience-based mentoring.

    Legal Services

    The Legal Services unit provides legal advice and guidance to the RSR. The unit’s mandate can be summarised as follows:

    • Creating a regulatory environment that is in accordance with the applicable and relevant legislation;

    • Managing a comprehensive, relevant, innovative and pro-active in-house legal service;

    • Guarding the reputation of the RSR by ensuring that the organisation is not exposed to legal risks;

    • Taking responsibility for providing managers and front-line staff with sufficient legal knowledge so that they are able to act in the interest of the organisation at all times; and

    • Providing support and assistance with litigation matters.

    Operational Intelligence And

    Planning

    The department is the entity’s nerve-centre and supports both the operational business units and the Strategic and Business Development department with essential business intelligence services. Given that the RSR is a data-driven and evidence-based organisation, the Operational Intelligence and Planning department is responsible for the collection, validation, analysis and dissemination of rail-safety data from across the rail industry. It provides commentary and interpretation of the trends across rail themes. The following provide an overview of the department’s key functions:

    • Data collection, collation and management;

    • Analyse relevant safety data trend analysis;

    • Monitor and disseminate safety performance of the rail landscape

    • Compilation of submission of the Annual State of Safety Report

    • Conduct regulatory research;

    • Applied scientific/engineering research and material testing and finite element assessments;

    • Safety assurance through the continuous improvement of the SMS;

    • Business plan and project plan reviews;

    • Provide project management support and coordination and;

    • Manage change in the organisation.

    Occurrence Investigations

    The Occurrence Investigations department investigates railway occurrences. The objectives of conducting these investigations are to determine the facts of the

  • 19 RSR Annual Performance Plan 2018/2019

    occurrences, determine the immediate and root causes and make recommendations to prevent or reduce the risk of recurrence. The department comprises three units, namely, Railway Security, Investigations, and Board of Inquiry. Their key functions are as follows:

    • Investigations conducts investigations on occurrences;

    • Board of Inquiry (BOI) is responsible for coordinating and facilitating all BOIs.

    • Railway Security collaborates with relevant organs of State such as South African Police Service (SAPS) and railway police and with railway operators to ensure the security of staff, contractors, and rail users.

    Finance The department, comprising Finance, Supply Chain Management and Enterprise-Wide Risk Management (ERM) Business Units, provides financial management leadership and endorses all financial information and risks submitted to EXCO, the Accounting Officer and the Accounting Authority. It maintains a healthy Supply Chain Management System that is effective, efficient, transparent, competitive and fair. The department also ensures that the RSR complies with external regulatory requirements (that is, King IV, Public Finance Management Act, Treasury Regulations, GRAP and any other relevant prescripts). It is responsible for ensuring that financial policies and guidelines are complied with and that the quality and timelines of financial information and reporting are assured. In addition, it develops and maintains an effective and efficient budget planning and monitoring system, which not only ensures compliance with government budget cycle, but also ensures qualitative improvement in how the RSR conducts its business by:

    • Ensuring that the organisation optimally utilises its financial resources by partnering with Business Units and continuously improving its financial management processes;

    • Establishing a climate that fosters good financial management practices;

    • Promoting a service and risk aware culture across the organisation resulting in finance being the point of contact around business and finance matters;

    • Enhancing the RSR’s investment decision-making

  • 20 RSR Annual Performance Plan 2018/2019

    competencies and capabilities;

    • Anticipating and manage cash shortages and surplus;

    • Facilitating, integrating and coordinating the RSR’s risk management activities; and

    • Integrating risk in strategic and financial planning and decision making.

    Corporate Affairs

    The entity’s corporate functions find expression in the Corporate Affairs department. It is made up of the following department: Information and Communication Technology (ICT); Human Resources, Media and Communications and Facilities and Fleet Management.

    Information and Communication Technology (ICT)

    The Information and Communication Technology (ICT) department ensures that the RSR is electronically sound and on par with the latest technological developments. ICT’s main responsibilities include:• Managing the organisation’s hardware, software and

    physical communication; • Providing guidance for technology issues for employees; • Maintaining information security, availability and

    accessibility;• Providing guidance and perspective on information

    technology initiatives.

    Human Resources

    The Human Resources department provides advice and support to the executive and line management on human resources issues. The department incorporates a full suite of human resources functions. Within this framework, the department has developed and implemented effective human resources management processes to develop leadership and create a learning organisation that values the importance of service delivery and empowering people for operational excellence. The following provide an overview of this Units core functions:

    • Recruitment and Selection: To ensure the provision of suitably qualified and experienced employees in line with the business demands;

    • Remunerations and Benefits: To ensure equitable remuneration and benefits in line with the market;

    • Learning and Development: To provide development for employees to acquire competencies relevant for their roles, to enhance performance and delivery of business objectives;

    • Performance and Organisational Development: To provide effective performance management system as well as strategic operational and technical leadership with regards to business process design or redesign, change management to support the organisation.

    Facilities and Fleet Management

  • 21 RSR Annual Performance Plan 2018/2019

    • Facilities Management:

    Ø To provide, oversee and manage adequate and response facilities that support the strategic objectives of the organisation to enable the organisation to function and perform at its most efficient and effective level within a conducive working environment.

    Ø Achieves the above through a process of identifying and analysing appropriate facility resource needs and requirements for the organisation.

    Ø To provide day-to-day management, maintenance and oversee of the RSR offices and provision of the conducive working environment.

    • Fleet Management:

    Ø To provide, oversee and manage and maintain comprehensive fleet that response and support the strategic objectives of the RSR.

    • Security Management:

    Ø To ensure the implementation of all security policy functions to ensure safety and security of people, assets, information (including ICT) and attainment of strategic objectives.

    Media and Communications

    The Media and Communications department provides a comprehensive communications service to the RSR. It is

    responsible for developing and delivering clear and compelling communications messages and materials to key audiences, internally and externally. It drives the strategic management of the RSR’s reputation and builds a profile between the RSR, the media and the public.

    Strategy and Business Development

    The Strategy and Business Development department’s mandate is to build and secure the RSR’s social, reputational and financial capital (i.e. long-term value) while ensuring a stable and productive internal environment that is geared towards performance excellence by identifying and implementing appropriate and relevant enablers.

    Strategy and Performance

    This Business Unit provides advice and support to executive and line management on strategic and operational planning issues. In doing so, it ensures compliance to PFMA prescripts by:

    • Facilitating the development and production of the RSR’s MTSF and APP;

    • Overseeing and monitoring the implementation of the RSR’s MTSF and APP;

    • Overseeing and managing organisational performance using the MQS and Balance Score Card approaches; and

    • Overseeing the development of the RSR’s Annual Report.

    Staff and EXCO meetings, therefore, constitute an important

  • 22 RSR Annual Performance Plan 2018/2019

    oversight function where the performance of the organisation and its strategic objectives are reported on, monitored and assessed to ensure that risks are identified and mitigated and that the requisite support can be provided for the organisation to achieve its desired objectives.

    Business Development

    This Business Unit’s activities span across the following domains: sales, marketing, product and vendor management, networking, negotiations, partnerships and cost-saving efforts.

    • Sales: The Sales team is responsible for developing and implementing cutting-edge railway safety sales strategies that are tailored for specific markets and their respective clientele/customer base to achieve targeted revenue.

    • Marketing: It involves the promotion and advertising aimed towards the successful sale of the RSR’s products/service offerings to the end-customers by using relevant technology, media, research and expertise to ensure correct market segmentation and messaging. This function plays a complementary role in achieving sales targets.

    • Strategic Initiatives/Partnerships: This function identifies joint-venture opportunities with firms intending to or already

    operating in targeted new market segments.

    • Business Planning: This involves project, product and vendor management activities. This function is responsible for developing a thorough understanding of market needs, scoping the RSR’s service offerings and customising these to cater for expressed and unexpressed needs thereby ensuring the organisation’s competitiveness in the field. The project management function then takes over by designing the market capture and penetration strategy.

    • Negotiations, networking and lobbying: To penetrate and capture new markets, networking, negotiations and/or lobbying with third parties such as suppliers, transport agencies, government authorities, and regulators is needed.

    • Cost savings: Business development is not only about increasing our revenue base through market reach. Strategic decisions to improve the organisation’s bottom line include cost-cutting measures such as outsourcing non-core work, leveraging off joint-venture partnerships for market research/intelligence and penetration, etc.

  • 23 RSR Annual Performance Plan 2018/2019

    PART

    B:

    Prog

    ram

    me

    and

    Sub-

    prog

    ram

    me

    Plan

    sS

    trat

    eg

    ic O

    utc

    om

    e 1

    : R

    ailw

    ays

    are

    saf

    er

    Objec

    tive s

    tate

    men

    t: In

    reco

    gnisi

    ng an

    d ac

    know

    ledgi

    ng th

    at sa

    fe ra

    ilway

    ope

    ratio

    ns ar

    e fun

    dam

    enta

    l to

    the s

    afet

    y of a

    ll per

    sons

    and

    the e

    nviro

    nmen

    t, th

    e RSR

    has

    com

    mitt

    ed to

    pr

    ovid

    e saf

    ety a

    ssur

    ance

    to al

    l sec

    tors

    of s

    ociet

    y tha

    t int

    erac

    t with

    the c

    ount

    ry’s

    natio

    nal r

    ailwa

    y sys

    tem

    in a

    man

    ner c

    onsis

    tent

    with

    hum

    an an

    d ec

    osys

    tem

    hea

    lth an

    d we

    llbein

    g.

    Safe

    ty as

    sura

    nce i

    s ens

    ured

    by f

    ocus

    ing

    and

    repo

    rting

    on

    the p

    erfo

    rman

    ce an

    d ov

    erall

    effe

    ctive

    ness

    of o

    pera

    tors

    ’ est

    ablis

    hed

    safe

    ty ri

    sk co

    ntro

    ls.

    Stra

    tegi

    c ob

    jectiv

    e 1.1

    Key

    perfo

    rman

    ce

    indi

    cato

    r

    Audi

    ted/

    actu

    al pe

    rform

    ance

    Estim

    ated

    pe

    rform

    ance

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    To en

    sure

    that

    high r

    isk ra

    ilway

    op

    erato

    rs me

    et or

    exce

    ed

    their s

    afety

    objec

    tives

    Numb

    er of

    high

    ris

    k ope

    rator

    s for

    whic

    h safe

    ty pe

    rform

    ance

    tar

    gets

    are s

    et

    --

    -Sa

    fety

    Perfo

    rman

    ce

    Agre

    emen

    ts co

    nclud

    ed

    with

    10

    Categ

    ory A

    op

    erato

    rs by

    31 M

    arch

    20

    18

    1.1.1

    Safet

    y Per

    forma

    nce

    Agre

    emen

    ts se

    t for 1

    5 Ca

    tegor

    y A op

    erato

    rs by

    31

    Mar

    ch 20

    19

    Safet

    y Per

    forma

    nce

    Agre

    emen

    ts se

    t for 2

    0 Ca

    tegor

    y A op

    erato

    rs by

    31

    Mar

    ch 20

    20

    Safet

    y Per

    forma

    nce

    Agre

    emen

    ts se

    t for 2

    5 Ca

    tegor

    y A op

    erato

    rs by

    31

    Mar

    ch 20

    21

    Objec

    tive s

    tate

    men

    t: To

    mak

    e rail

    ways

    safe

    r by i

    dent

    ifyin

    g th

    e ove

    rall r

    isk p

    rofil

    e of t

    he ra

    ilway

    indu

    stry

    to su

    ppor

    t crit

    ical r

    isk m

    itiga

    tion

    decis

    ion

    mak

    ing

    thro

    ugh

    the d

    evelo

    pmen

    t of

    an in

    dust

    ry sa

    fety

    risk

    mod

    el

    Stra

    tegi

    c ob

    jectiv

    e 1.2

    Key

    perfo

    rman

    ce

    indi

    cato

    r

    Audi

    ted/

    actu

    al pe

    rform

    ance

    Estim

    ated

    pe

    rform

    ance

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    To de

    velop

    an

    d imp

    lemen

    t a S

    afety

    Risk

    Mo

    del (S

    RM)

    repr

    esen

    tative

    of

    the ov

    erall

    risk

    estim

    ate of

    the

    railw

    ay in

    dustr

    y

    Safet

    y Ri

    sk M

    odel

    deve

    loped

    and

    imple

    mente

    d

    New

    Indica

    tor1.2

    .1Sa

    fety r

    isk m

    odel

    frame

    work

    deve

    loped

    thr

    ough

    indu

    stry

    worki

    ng co

    mmitte

    es by

    31

    Mar

    ch 20

    19

    Gaze

    tte on

    Occ

    urre

    nce

    Repo

    rting P

    ublis

    hed b

    y 31

    Mar

    ch 20

    20

    Valid

    ate th

    e haz

    ard l

    og by

    31

    Mar

    ch 20

    21

    1.2.1.

    1Dr

    aft D

    eterm

    inatio

    n for

    Oc

    curre

    nce R

    epor

    ting

    deve

    loped

    for p

    ublic

    co

    mmen

    ts by

    31 M

    arch

    20

    19

    Indus

    try w

    ide ha

    zard

    log

    comp

    leted

    by 31

    Mar

    ch

    2020

  • 24 RSR Annual Performance Plan 2018/2019

    Objec

    tive s

    tate

    men

    t: To

    mak

    e rail

    ways

    safe

    r by e

    mbe

    ddin

    g Op

    erat

    iona

    l Exc

    ellen

    ce w

    ithin

    the S

    afet

    y Man

    agem

    ent S

    yste

    ms o

    f all t

    he C

    lass A

    ope

    rato

    rs th

    roug

    h:•

    A RS

    R de

    termi

    natio

    n on S

    afety

    Mana

    geme

    nt Sy

    stems

    • A

    RSR

    Deter

    mina

    tion o

    n Com

    mon S

    afety

    Metho

    d on C

    onfor

    mity

    Asse

    ssme

    nt•

    A RS

    R De

    termi

    natio

    n on C

    ommo

    n Safe

    ty Me

    thod o

    n Risk

    Ass

    essm

    ents

    • Th

    e imp

    lemen

    tation

    of a

    Risk

    Man

    agem

    ent M

    aturity

    asse

    ssme

    nt too

    l

    Stra

    tegi

    c ob

    jectiv

    e 1.3

    Key

    perfo

    rman

    ce

    indi

    cato

    r

    Audi

    ted/

    actu

    al pe

    rform

    ance

    Estim

    ated

    pe

    rform

    ance

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    Intro

    duce

    a ro

    bust

    Safet

    y Ma

    nage

    ment

    Syste

    m ba

    sed

    on in

    dustr

    y-co

    nsult

    ed R

    isk

    Asse

    ssme

    nt To

    ols an

    d Me

    thodo

    logies

    RSR

    Deter

    mina

    tion

    on S

    MS

    imple

    mente

    d

    --

    Rese

    arch

    and

    deve

    lopme

    ntNe

    w Ind

    icator

    1.3.1

    Comm

    on S

    afety

    Metho

    d for

    Con

    formi

    ty As

    sess

    ments

    (CSM

    CA

    ) imple

    mente

    d by

    31 M

    arch

    2019

    Comm

    on S

    afety

    Metho

    d for

    Risk

    As

    sess

    ments

    (CSM

    RA

    ) tes

    ted w

    ith 3

    Clas

    s A op

    erato

    rs by

    31

    Mar

    ch 20

    20

    Comm

    on S

    afety

    Metho

    d for

    Risk

    Ass

    essm

    ents

    (CSM

    RA)

    gaze

    tted b

    y 31

    Mar

    ch 20

    21

    1.3.1.

    1Fr

    amew

    ork f

    or C

    SM

    RA de

    velop

    ed by

    31

    March

    2019

    -Fr

    amew

    ork f

    or C

    ommo

    n Sa

    fety M

    ethod

    for

    Supe

    rvisio

    n dev

    elope

    d by

    31 M

    arch

    2021

    Imple

    menta

    tion

    of ra

    ilway

    ma

    nage

    ment

    matur

    ity

    asse

    ssme

    nts

    --

    -Ne

    w Ind

    icator

    1.3.2

    Railw

    ay M

    anag

    emen

    t Ma

    turity

    asse

    ssme

    nt too

    l ado

    pted b

    y 31

    March

    2019

    Railw

    ay M

    anag

    emen

    t Ma

    turity

    Ass

    essm

    ent

    Repo

    rt for

    Tran

    snet

    by

    31 M

    arch

    2020

    Railw

    ay M

    anag

    emen

    t Ma

    turity

    Ass

    essm

    ent

    Repo

    rts fo

    r PRA

    SA an

    d BO

    C by

    31 M

    arch

    2021

  • 25 RSR Annual Performance Plan 2018/2019

    Objec

    tive s

    tate

    men

    t: To

    mak

    e rail

    ways

    safe

    r by m

    anag

    ing

    the r

    isks a

    ssoc

    iated

    with

    Saf

    ety R

    elate

    d Gr

    ades

    in ra

    ilway

    ope

    ratio

    ns. T

    he p

    rogr

    amm

    e is a

    imed

    at ad

    dres

    sing

    the

    iden

    tified

    risk

    s ass

    ociat

    ed w

    ith sa

    fety

    criti

    cal w

    ork a

    t hig

    h ris

    k ope

    rato

    rs to

    : •

    Stan

    dard

    ise C

    ompe

    tenc

    y Man

    agem

    ent S

    yste

    ms (

    CSM)

    in p

    lace w

    ith al

    l ope

    rato

    rs•

    Dete

    rmin

    e acc

    epta

    ble V

    acan

    cy ra

    tes w

    ithin

    safe

    ty cr

    itica

    l gra

    des

    • En

    sure

    effe

    ctive

    wor

    kload

    plan

    ning

    for s

    taff

    invo

    lved

    with

    safe

    ty cr

    itica

    l wor

    k

    Stra

    tegi

    c obj

    ectiv

    e 1.4

    Key

    perfo

    rman

    ce

    indi

    cato

    r

    Audi

    ted/

    actu

    al pe

    rform

    ance

    Estim

    ated

    pe

    rform

    ance

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    Deve

    lop an

    d co

    nduc

    t a

    Huma

    n Fac

    tors

    Mana

    geme

    nt Ca

    pacit

    y buil

    ding

    prog

    ramm

    e aim

    ed

    at:

    1) S

    tanda

    rdisi

    ng

    Comp

    etenc

    y Ma

    nage

    ment

    Syste

    ms (C

    SM)

    2) D

    eterm

    ining

    ac

    cepta

    ble V

    acan

    cy

    rates

    with

    in sa

    fety

    critic

    al gr

    ades

    3) E

    nsur

    ing ef

    fectiv

    e wo

    rkloa

    d plan

    ning

    for st

    aff in

    volve

    d wi

    th sa

    fety c

    ritica

    l wo

    rk

    HFM

    Capa

    city

    Build

    ing

    prog

    ramm

    e de

    velop

    ed an

    d co

    nduc

    ted

    for hi

    gh ris

    k op

    erato

    rs

    New

    Indica

    tor1.4

    .1Ind

    ustry

    acce

    pted

    frame

    works

    deve

    loped

    to

    addr

    ess:

    • Co

    mpete

    ncy

    Mana

    geme

    nt

    • Sa

    fety C

    ritica

    l va

    canc

    ies

    • W

    ork l

    oad p

    lannin

    g

    Deve

    loped

    by 31

    Mar

    ch

    2019

    Safet

    y Criti

    cal G

    rade

    s as

    sess

    ment

    repo

    rt by

    31

    March

    2020

    Comp

    etenc

    y stan

    dard

    s an

    d agr

    eed w

    ork l

    oad

    plann

    ing es

    tablis

    hed b

    y 31

    Mar

    ch 20

    20

    Evalu

    ation

    repo

    rt of

    comp

    etenc

    y ma

    nage

    ment

    by 31

    Ma

    rch 20

    21

    State

    of co

    mplia

    nce

    repo

    rt on

    im

    pleme

    ntatio

    n of

    work

    load p

    lans b

    y 31

    Mar

    ch 20

    21

  • 26 RSR Annual Performance Plan 2018/2019

    Objec

    tive s

    tate

    men

    t: To

    mak

    e rail

    ways

    safe

    r by a

    ddre

    ssin

    g th

    e risk

    s ass

    ociat

    ed w

    ith tr

    ain co

    llisio

    ns an

    d sig

    nal p

    asse

    d at

    dan

    ger w

    hen

    man

    ual t

    rain

    auth

    orisa

    tions

    take

    plac

    e in

    degr

    ade m

    ode T

    his w

    ill en

    sure

    that

    the c

    orre

    ct co

    mm

    unica

    tions

    pro

    toco

    ls to

    be o

    bser

    ved

    betw

    een

    safe

    ty cr

    itica

    l sta

    ff du

    ring

    train

    auth

    orisa

    tions

    and

    prot

    ocol

    s whi

    ch w

    ill re

    duce

    the

    risk o

    f SPA

    Ds an

    d co

    llisio

    ns

    Stra

    tegi

    c obj

    ectiv

    e 1.5

    Key p

    erfo

    rman

    ce

    indi

    cato

    rAu

    dite

    d/ac

    tual

    perfo

    rman

    ceEs

    timat

    ed

    perfo

    rman

    ce

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    Deve

    loped

    and

    imple

    mente

    d De

    termi

    natio

    n on

    Verb

    al Sa

    fety C

    ritica

    l Co

    mmun

    icatio

    ns

    Verb

    al Sa

    fety

    Comm

    unica

    tion

    deter

    mina

    tion

    deve

    loped

    --

    -Ne

    w Ind

    icator

    1.5.1

    Draft

    indu

    stry n

    ation

    al pr

    otoco

    l for V

    erba

    l Safe

    ty Cr

    itical

    Comm

    unica

    tion

    publi

    shed

    for c

    omme

    nts by

    31

    Mar

    ch 20

    19

    Verb

    al Sa

    fety C

    ritica

    l Co

    mmun

    icatio

    n de

    termi

    natio

    n pub

    lishe

    d by

    31 M

    arch

    2020

    Verifi

    catio

    n of in

    dustr

    y im

    pleme

    ntatio

    n of th

    e Ve

    rbal

    Safet

    y Criti

    cal

    Comm

    unica

    tion

    Proto

    col b

    y 31 M

    arch

    20

    21

    Objec

    tive s

    tate

    men

    t: To

    miti

    gate

    risk

    s of o

    ccur

    renc

    es as

    socia

    ted

    with

    inte

    r-ope

    rabi

    lity b

    etwe

    en o

    pera

    tors

    on

    the c

    omm

    on n

    etwo

    rk at

    the i

    nter

    face

    of r

    ailwa

    y ope

    ratio

    ns

    Stra

    tegi

    c obj

    ectiv

    e 1.6

    Key p

    erfo

    rman

    ce

    indi

    cato

    rAu

    dite

    d/ac

    tual

    perfo

    rman

    ceEs

    timat

    ed

    perfo

    rman

    ce

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    Inter

    -ope

    rabil

    ity

    conc

    erns

    iden

    tified

    an

    d all i

    nterfa

    ce

    agre

    emen

    ts ali

    gned

    wi

    th the

    iden

    tified

    op

    erati

    onal

    risk

    expo

    sure

    s

    Inter

    face

    agre

    emen

    ts ali

    gned

    wi

    th op

    erati

    onal

    risks

    --

    -Ne

    w Ind

    icator

    1.6.1

    Inter

    face A

    gree

    ment

    Fram

    ewor

    k dev

    elope

    d by 3

    1 Ma

    rch 20

    19

    Inter

    face A

    gree

    ment

    audit

    repo

    rt by

    31

    March

    2020

    Repo

    rt on

    the s

    tate o

    f int

    er-o

    pera

    bility

    by 31

    Ma

    rch 20

    21

  • 27 RSR Annual Performance Plan 2018/2019

    Str

    ate

    gic

    Ou

    tco

    me

    2:

    Su

    stai

    nab

    le In

    stitu

    tion

    al G

    row

    th A

    nd

    Dev

    elo

    pm

    ent

    Objec

    tive s

    tate

    men

    t: En

    surin

    g re

    venu

    e stre

    ams t

    hat a

    llow

    for t

    he su

    stain

    ed an

    d ef

    fect

    ive ex

    ecut

    ion

    of o

    ur le

    gisla

    tive a

    nd st

    rate

    gic m

    anda

    tes

    Stra

    tegi

    c ob

    jectiv

    e 2.1

    Key

    perfo

    rman

    ce

    indi

    cato

    r

    Audi

    ted/

    actu

    al pe

    rform

    ance

    Estim

    ated

    pe

    rform

    ance

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    To se

    cure

    an

    adeq

    uate

    oper

    ation

    al fin

    ancia

    l bas

    e

    Prog

    ress

    ma

    de in

    re

    vising

    the

    Per

    mit

    Fee M

    odel

    deve

    loped

    in

    2014

    /15

    R79 7

    09 89

    6 ge

    nera

    ted fr

    om

    Perm

    it Fee

    s

    R107

    080 9

    80

    of Re

    venu

    e ge

    nera

    ted fr

    om

    Perm

    it Fee

    s

    R123

    500 0

    00

    of Re

    venu

    e ge

    nera

    ted fr

    om

    main

    reve

    nue

    sour

    ce

    Perm

    it Fee

    Mod

    el re

    viewe

    d by 3

    1 Ma

    rch 20

    18

    2.1.1

    Revis

    ed P

    ermi

    t Fee

    Mo

    del v

    alida

    ted

    and fi

    nalis

    ed by

    31

    March

    2019

    Annu

    al Pe

    rmit F

    ee

    Mode

    l gaz

    etted

    by

    31 M

    arch

    2020

    Annu

    al Pe

    rmit

    Fee M

    odel

    gaze

    tted b

    y 31

    March

    2021

    Objec

    tive s

    tate

    men

    t: Su

    stain

    ed p

    erfo

    rman

    ce ca

    n be

    achi

    eved

    by t

    he ef

    fect

    ive m

    anag

    emen

    t of t

    he o

    rgan

    isatio

    n th

    roug

    h aw

    aren

    ess o

    f the

    org

    anisa

    tion’s

    envir

    onm

    ent b

    y lea

    rnin

    g an

    d by

    the a

    ppro

    priat

    e app

    licat

    ion

    of im

    prov

    emen

    t and

    /or i

    nnov

    atio

    ns. T

    his r

    equi

    res a

    robu

    st, in

    tegr

    ated

    and

    objec

    tive p

    erfo

    rman

    ce m

    anag

    emen

    t sys

    tem

    , tha

    t is,

    a Man

    agem

    ent Q

    ualit

    y Sy

    stem

    (MQS

    ) tha

    t can

    evalu

    ate t

    he m

    atur

    ity le

    vel o

    f the

    org

    anisa

    tion

    – cov

    erin

    g its

    lead

    ersh

    ip, s

    trate

    gy, m

    anag

    emen

    t sys

    tem

    s, re

    sour

    ces a

    nd co

    re b

    usin

    ess p

    roce

    sses

    – to

    iden

    tify

    area

    s of s

    treng

    ths a

    nd w

    eakn

    esse

    s and

    opp

    ortu

    nitie

    s for

    impr

    ovem

    ent a

    nd/o

    r inn

    ovat

    ions

    .

    Stra

    tegi

    c ob

    jectiv

    e 2.2

    Key

    perfo

    rman

    ce

    indi

    cato

    r

    Audi

    ted/

    actu

    al pe

    rform

    ance

    Estim

    ated

    Pe

    rform

    ance

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    To en

    sure

    pe

    rform

    ance

    ex

    celle

    nce

    Year

    -on-

    year

    Ser

    vice

    Deliv

    ery I

    ndex

    (S

    DIX)

    grow

    th

    RSR

    Servi

    ce

    Deliv

    ery I

    ndex

    (S

    DIX)

    = 35

    RSR

    Servi

    ce

    Deliv

    ery I

    ndex

    (S

    DIX)

    = 37

    .7

    RSR

    Servi

    ce

    Deliv

    ery I

    ndex

    (S

    DIX)

    = 46

    RSR

    Servi

    ce

    Deliv

    ery I

    ndex

    (S

    DIX)

    =51

    by 31

    Ma

    rch 20

    18

    2.2.1

    RSR

    Servi

    ce

    Deliv

    ery I

    ndex

    (S

    DIX)

    =55

    by 31

    Ma

    rch 20

    19

    RSR

    Servi

    ce

    Deliv

    ery I

    ndex

    (S

    DIX)

    = 58

    by 31

    Ma

    rch 20

    20

    RSR

    Servi

    ce

    Deliv

    ery I

    ndex

    (S

    DIX)

    = 60

    by 31

    Ma

    rch 20

    21

    Effec

    tive

    mana

    geme

    nt of

    huma

    n an

    d fina

    ncial

    re

    sour

    ces

    throu

    gh

    budg

    etary

    contr

    ol an

    d go

    vern

    ance

    me

    asur

    es

    --

    -Ne

    w Ind

    icator

    2.2.2

    Annu

    al Ex

    pend

    iture

    va

    rianc

    e not

    exce

    eding

    5% of

    ap

    prov

    ed bu

    dget

    for 20

    18/19

    Annu

    al Ex

    pend

    iture

    va

    rianc

    e not

    exce

    eding

    5% of

    ap

    prov

    ed bu

    dget

    for 20

    19/20

    Annu

    al Ex

    pend

    iture

    va

    rianc

    e not

    exce

    eding

    5% of

    ap

    prov

    ed bu

    dget

    for 20

    20/21

  • 28 RSR Annual Performance Plan 2018/2019

    Objec

    tive

    stat

    emen

    t: De

    velo

    pmen

    t and

    impl

    emen

    tatio

    n of

    an

    RSR

    Info

    rmat

    ion

    Mana

    gem

    ent S

    yste

    m (I

    MS) t

    o de

    liver

    dat

    a in

    tegr

    ity to

    sup

    port

    oper

    atio

    nal i

    ntell

    igen

    ce in

    ass

    urin

    g th

    e ef

    fect

    ivene

    ss o

    f the

    RSR

    ’s co

    mpl

    iance

    activ

    ities

    . Thi

    s will

    also

    enab

    le th

    e RSR

    to en

    sure

    that

    all a

    udits

    , insp

    ectio

    ns an

    d in

    vest

    igat

    ions

    are c

    lose

    d su

    cces

    sful

    ly.

    Stra

    tegi

    c ob

    jectiv

    e 2.3

    Key p

    erfo

    rman

    ce

    indi

    cato

    rAu

    dite

    d/ac

    tual

    perfo

    rman

    ceEs

    timat

    ed

    perfo

    rman

    ce

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    To de

    velop

    and

    imple

    ment

    an

    integ

    rated

    IMS

    in pla

    ce w

    hich

    can i

    nform

    the

    effec

    tiven

    ess

    of the

    RSR

    ’s co

    mplia

    nce

    monit

    oring

    ini

    tiativ

    es

    IMS

    imple

    mente

    d to

    direc

    t the

    comp

    lianc

    e mo

    nitor

    ing

    initia

    tives

    New

    Indica

    tor2.3

    .1IM

    S sc

    ope c

    omple

    ted

    by 3

    1 Mar

    ch 20

    19IM

    S de

    velop

    ed

    and c

    alibr

    ated b

    y 31

    Mar

    ch 20

    20

    IMS

    data

    integ

    rity

    and c

    omple

    tenes

    s va

    lidate

    d

    IMS

    repo

    rting

    and m

    onito

    ring

    cond

    ucted

    by 31

    Ma

    rch 20

    21

  • 29 RSR Annual Performance Plan 2018/2019

    Str

    ate

    gic

    Ou

    tco

    me

    3:

    Imp

    rove

    d S

    take

    ho

    lde

    r S

    erv

    ice

    Objec

    tive s

    tate

    men

    t: A

    ddre

    ss th

    e lac

    k of a

    ware

    ness

    rega

    rdin

    g ra

    ilway

    safe

    ty th

    roug

    h ed

    ucat

    ion,

    com

    mun

    icatio

    n an

    d tra

    inin

    g in

    itiat

    ives w

    ithin

    the c

    omm

    unity

    and

    amon

    g op

    erat

    ors

    Stra

    tegi

    c ob

    jectiv

    e 3.1

    Key p

    erfo

    rman

    ce

    indi

    cato

    rAu

    dite

    d/ac

    tual

    perfo

    rman

    ceEs

    timat

    ed

    perfo

    rman

    ce

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    To pr

    omote

    safe

    railw

    ay be

    havio

    urNu

    mber

    of

    safet

    y pro

    motio

    n ini

    tiativ

    es

    cond

    ucted

    19 E

    duca

    tion

    awar

    enes

    s ca

    mpaig

    ns

    cond

    ucted

    on a

    spec

    ified t

    opic

    22 A

    ware

    ness

    ca

    mpaig

    ns

    cond

    ucted

    RSR

    Profi

    ling a

    nd

    Stak

    ehold

    er

    Enga

    geme

    nt St

    rateg

    y de

    velop

    ed an

    d im

    pleme

    nted

    14 R

    ailwa

    y sa

    fety p

    romo

    tion

    initia

    tives

    co

    nduc

    ted by

    31

    March

    2018

    3.1.1

    20 R

    ailwa

    y safe

    ty pr

    omoti

    on in

    itiativ

    es

    cond

    ucted

    by 31

    Ma

    rch 20

    19

    22 R

    ailwa

    y sa

    fety p

    romo

    tion

    initia

    tives

    co

    nduc

    ted by

    31

    March

    2020

    28 R

    ailwa

    y safe

    ty pr

    omoti

    on in

    itiativ

    es

    cond

    ucted

    by 31

    Ma

    rch 20

    21

  • 30 RSR Annual Performance Plan 2018/2019

    Objec

    tive s

    tate

    men

    t: To

    pro

    mot

    e saf

    ety a

    s a m

    ajor d

    ecid

    ing

    fact

    or th

    roug

    h, b

    ut n

    ot lim

    ited

    to:

    • In

    vest

    men

    t in

    railw

    ay in

    frast

    ruct

    ure a

    nd ro

    lling

    stoc

    k and

    to st

    ream

    line t

    he in

    trodu

    ctio

    n of

    new

    tech

    nolo

    gy an

    d ca

    pita

    l inve

    stm

    ent

    • Im

    prov

    ed ra

    ilway

    main

    tena

    nce s

    trate

    gies

    , and

    • Im

    prov

    ed aw

    aren

    ess a

    nd ac

    cess

    to ra

    ilway

    tran

    spor

    tatio

    n fo

    r peo

    ple w

    ith im

    paire

    d m

    obilit

    y

    Stra

    tegi

    c obj

    ectiv

    e 3.2

    Key p

    erfo

    rman

    ce

    indi

    cato

    rAu

    dite

    d/ac

    tual

    perfo

    rman

    ceEs

    timat

    ed

    perfo

    rman

    ce

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    To ad

    dres

    s ide

    ntifie

    d sa

    fety r

    isks w

    ith th

    e int

    rodu

    ction

    of ne

    w tec

    hnolo

    gies,

    includ

    ing

    maint

    enan

    ce st

    rateg

    ies

    and t

    o pro

    mote

    safet

    y co

    nside

    ratio

    n of u

    niver

    sal

    acce

    ss, b

    y mea

    ns of

    an

    nual

    Indus

    try S

    afety

    Inter

    venti

    ons w

    hich w

    ill foc

    us on

    selec

    ted ra

    ilway

    sa

    fety t

    heme

    s

    Annu

    al ind

    ustry

    sa

    fety t

    hema

    tic

    inter

    venti

    ons

    cond

    ucted

    --

    -Ne

    w Ind

    icator

    3.2.1

    Annu

    al ind

    ustry

    safet

    y the

    matic

    inter

    venti

    on

    cond

    ucted

    by 31

    Ma

    rch 20

    19

    Annu

    al ind

    ustry

    safet

    y the

    matic

    inter

    venti

    on

    cond

    ucted

    by 31

    Mar

    ch

    2020

    Annu

    al ind

    ustry

    safet

    y the

    matic

    inter

    venti

    on

    cond

    ucted

    by 31

    Mar

    ch

    2021

    Objec

    tive s

    tate

    men

    t: E

    ncou

    rage

    the c

    ollab

    orat

    ion

    and

    parti

    cipat

    ion

    of in

    tere

    sted

    and

    affe

    cted

    par

    ties i

    n im

    prov

    ing

    railw

    ay sa

    fety

    Stra

    tegi

    c obj

    ectiv

    e 3.3

    Key p

    erfo

    rman

    ce

    indi

    cato

    rAu

    dite

    d/ac

    tual

    perfo

    rman

    ceEs

    timat

    ed

    perfo

    rman

    ce

    2017

    /18

    NoMe

    dium

    -term

    targ

    ets

    2014

    /1520

    15/16

    2016

    /1720

    18/19

    2019

    /2020

    20/21

    Regu

    lar en

    gage

    ment

    with

    orga

    nised

    labo

    ur

    and i

    ntere

    sted p

    artie

    s to

    enco

    urag

    e coll

    abor

    ation

    tow

    ards

    impr

    oved

    ra

    ilway

    safet

    y of

    emplo

    yees

    , com

    muter

    s an

    d the

    publi

    c

    Indus

    try-

    discu

    ssion

    foru

    m im

    pleme

    nted

    --

    -Ne

    w Ind

    icator

    3.3.1

    Indus

    try-d

    iscus

    sion f

    orum

    es

    tablis

    hed b

    y 31 M

    arch

    2019

    4 Ind

    ustry

    foru

    m dis

    cuss

    ions c

    ondu

    cted

    by 31

    Mar

    ch 20

    20

    4 Ind

    ustry

    foru

    m dis

    cuss

    ions

    cond

    ucted

    by 31

    Ma

    rch 20

    21

    3.3.1.

    13 I

    ndus

    try or

    ganis

    ed la

    bour

    for

    ums d

    iscus

    sion c

    ondu

    cted b

    y 31

    Mar

    ch 20

    20

  • 31 RSR Annual Performance Plan 2018/2019

    Annu

    al P

    erfo

    rman

    ce P

    lan

    Str

    ate

    gic

    Ou

    tco

    me

    1:

    Rai

    lway

    s ar

    e s

    afe

    r

    Stra

    tegi

    c obj

    ectiv

    e 1.1:

    To

    ensu

    re th

    at h

    igh

    risk r

    ailwa

    y ope

    rato

    rs m

    eet o

    r exc

    eed

    their

    safe

    ty o

    bjec

    tives

    Objec

    tive s

    tate

    men

    t: In

    reco

    gnisi

    ng an

    d ac

    know

    ledgi

    ng th

    at sa

    fe ra

    ilway

    ope

    ratio

    ns ar

    e fun

    dam

    enta

    l to

    the s

    afet

    y of a

    ll per

    sons

    and

    the e

    nviro

    nmen

    t, th

    e RSR

    has

    com

    mitt

    ed to

    pr

    ovid

    e saf

    ety a

    ssur

    ance

    to al

    l sec

    tors

    of s

    ociet

    y tha

    t int

    erac

    t with

    the c

    ount

    ry’s

    natio

    nal r

    ailwa

    y sys

    tem

    in a

    man

    ner c

    onsis

    tent

    with

    hum

    an an

    d ec

    osys

    tem

    hea

    lth an

    d we

    llbein

    g.

    Safe

    ty as

    sura

    nce i

    s ens

    ured

    by f

    ocus

    ing

    and

    repo

    rting

    on

    the p

    erfo

    rman

    ce an

    d ov

    erall

    effe

    ctive

    ness

    of o

    pera

    tors

    ’ est

    ablis

    hed

    safe

    ty ri

    sk co

    ntro

    ls.

    Key p

    erfo

    rman

    ce

    indi

    cato

    rRe

    porti

    ng

    perio

    dNo

    Annu

    al ta

    rget

    2018

    /19

    Quar

    terly

    targ

    et

    1st

    2nd

    3rd

    4th

    Good

    s and

    se

    rvice

    s (Ra

    nds)

    Numb

    er of

    high

    risk

    oper

    ators

    for w

    hich

    safet

    y per

    forma

    nce

    targe

    ts ar

    e set

    Quar

    terly

    1.1.1

    Safet

    y Per

    forma

    nce

    Agre

    emen

    ts se

    t for 1

    5 Ca

    tegor

    y A O

    pera

    tors

    by 31

    Mar

    ch 20

    19

    -3 S

    afety

    Perfo

    rman

    ce

    Agre

    emen

    ts co

    nclud

    ed

    7 Safe

    ty Pe

    rform

    ance

    Ag

    reem

    ents

    conc

    luded

    5 Safe

    ty Pe

    rform

    ance

    Ag

    reem

    ents

    conc

    luded

    R774

    046

    Stra

    tegi

    c obj

    ectiv

    e 1.2:

    Indu

    stry

    safe

    ty ri

    sk p

    rofil

    ing

    towa

    rds i

    ncre

    ased

    criti

    cal r

    isk m

    itiga

    tion

    decis

    ions

    Objec

    tive s

    tate

    men

    t: To

    mak

    e rail

    ways

    safe

    r by i

    dent

    ifyin

    g th

    e ove

    rall r

    isk p

    rofil

    e of t

    he ra

    ilway

    indu

    stry

    to su

    ppor

    t crit

    ical r

    isk m

    itiga

    tion

    decis

    ion

    mak

    ing

    thro

    ugh

    the

    deve

    lopm

    ent o

    f an

    indu

    stry

    safe

    ty ri

    sk m

    odel

    Key

    Perfo

    rman

    ce

    Indi

    cato

    r

    Repo

    rting

    pe

    riod

    NoAn

    nual

    targ

    et

    2018

    /19

    Quar

    terly

    targ

    ets

    Good

    s and

    se

    rvice

    s (Ra

    nds)

    1st

    2nd

    3rd

    4th

    Indus

    try S

    afety

    Risk

    Pro

    file

    deve

    loped

    Quar

    terly

    1.2.1

    Safet

    y risk

    mod

    el fra

    mewo

    rk de

    velop

    ed

    by 31

    Mar

    ch 20

    19

    Indus

    try w

    orkin

    g co

    mmitte

    e es

    tablis

    hed

    --

    Safet

    y risk

    mod

    el fra

    mewo

    rk de

    velop

    edR8

    74 04

    6

    1.2.1.

    1Dr

    aft D

    eterm

    inatio

    n for

    Occ

    urre

    nce

    Repo

    rting d

    evelo

    ped

    for pu

    blic c

    omme

    nts

    by 31

    Mar

    ch 20

    19

    --

    Socio

    Eco

    nomi

    c Im

    pact

    Asse

    ssme

    nt stu

    dy (S

    EIAS

    ) co

    mplet

    ed

    Draft

    Dete

    rmina

    tion

    for O

    ccur

    renc

    e Re

    portin

    g dev

    elope

    d for

    publi

    c com

    ments

    R374

    046

  • 32 RSR Annual Performance Plan 2018/2019

    Stra

    tegi

    c obj

    ectiv

    e 1.3:

    Indu

    stry

    -con

    sulte

    d Ri

    sk A

    sses

    smen

    t Too

    ls an

    d Me

    thod

    olog

    ies

    Objec

    tive s

    tate

    men

    t: To

    mak

    e rail

    ways

    safe

    r by e

    mbe

    ddin

    g Op

    erat

    iona

    l Exc

    ellen

    ce w

    ithin

    the S

    afet

    y Man

    agem

    ent S

    yste

    ms o

    f all o

    pera

    tors

    thro

    ugh:

    • A

    RSR

    deter

    mina

    tion o

    n Safe

    ty Ma

    nage

    ment

    Syste

    ms•

    A RS

    R De

    termi

    natio