ANR Monthly Customer Update – September 2017

September 27, 2017

Page 2: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

ANR Customer Update Meeting, September 2017

Agenda Presenters

• Storage Update Jeff Keck, Storage Planning & Development

• Operational Update Alfred F. DeGrazia Jr., Gas Control & Planning

• Noms & Scheduling Ralph Del Rio, Noms & Scheduling

2

Page 3: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

Storage Update

Jeff Keck – Storage Planning and Development

Page 4: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

EIA Storage Position: The Big Picture

DateANR’s Reported EIA Storage Inventory

(MMcf)

9/15/2017 203,082

9/16/2016 203,272

9/18/2015 165,862

3.408 Tcf as of Friday, September 15, 2017

Page 5: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

Storage Position

Working gas in underground storage compared with the 5-year maximum and minimum

(Volumes in MMcf)

Page 6: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

Storage Inventory – 2017 vs. 2016

% of Storage

Capacity 2017 Percent Full

YOY Difference

(2016 - 2017)

Sep 21st

ANR Pipeline 83% 1.1%

ANRSCo 89% -3.3%

Blue Lake 94% -0.1%

Eaton Rapids 63% -23.5%

Page 7: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

• The current volume in storage exceeds the five-year average level by roughly 20 Bcf. This has moderated over the last three months from about 40 Bcf over the five-year level earlier in the summer and is well within reasonable parameters.

• Injections for the summer have averaged 478 MMcf/d. Over the last month, injections have averaged 561 MMcf/d. The impact of the heat wave over the last several days was not reflected in these numbers since it mostly occurred after September 21.

• There are no concerns with meeting firm customer demand for injection.

Storage Operations

Page 8: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

Operational UpdateAlfred F. DeGrazia Jr.

Gas Control & Operations Planning

Page 9: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

ANR August Average Daily System Flows

ANR

Great Lakes

9

1

2

3

4

5

6

7

8

9

SW Headstation: 624-MDth/641-MDth/d

Wisconsin: 480-MDth/2,244-MDth/d

Michigan Leg South flows through St. John averaged 1,059-MDth/1,261-MDth per day in the eastbound direction. July flows averaged 1,162-MDth/d

The Michigan Leg North volumes flowed northbound with average deliveries of 1,416-MDth/d between Bridgman and Woolfolk compressor stations. July flows averaged 1,343-MDth/d

ANRPL Storage injections averaged 608-MDth/d

In the Southeast Area, offshore receipts averaged 193-MDth/day and deliveries averaged 644-MDth/day between Eunice and Patterson and Eunice and Grand Chenier

Flows along the south end of the Southeast Mainline averaged 758-MDth/d southbound through the Jena Compressor Station.

On the north end of the Southeast Mainline, REX Shelbyville receipts averaged 1,241-MDth/d – a minimal decrease over July receipts. Flows into Defiance from the south averaged 1,014-MDth/d versus 948-Mdth/d in July

Deliveries to MichCon at Willow Run averaged 796-MDth/day –an 8% increase over July levels

1

2

3

4

5

6

7

8

9

Page 10: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

ANR Monthly Deliveries to Power Plants

1

0

103.7

73.282.1

121.5135.1

230.4

127.4 129.3

232.5

284.9

173.2

0

25

50

75

100

125

150

175

200

225

250

275

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

MM

Dth

Dec

Nov

Oct

Sep

Aug

Jul

Jun

May

Apr

Mar

Feb

Jan

Page 11: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

ANR Posted Capacity Impacts September 2017

Posted Capacity Restrictions as of September 2017

Eunice Eastbound - DRN #226641 PSO ID #8172

29-MMcf/d (leaving 588-MMcf/d available) 7/26 - 10/31

St. Martinville LRC Delivery - DRN #218192 CN ID #8305

Limiting delivery nominations to 65-MMcf/d 9/16 - 10/15

Jena Southbound - DRN #9505489 CN ID #8318

247-MMcf/d (leaving 903-MMcf/d available) 9/25 - 10/31

Slaughters TGT Delivery - DRN #6470 CN ID #8306

Shut-in due to pressure incompatibility 9/16 - 10/15Lebanon Dominion - DRN #1387755 CN ID #8327Scheduling Alert to ANR customers for Dominion Shut-in

Pipeline maintenance on Dominion side 10/2 - 10/6

SWML Northbound - DRN #226630 PSO ID #8327

90-MMcf/d (leaving 609-MMcf/d) 9/25 - 9/30

50-MMcf/d (leaving 649-MMcf/d) 10/1 - 10/3

90-MMcf/d (leaving 609-MMcf/d) 10/4 - 10/5

50-MMcf/d (leaving 649-MMcf/d) 10/6 - 10/10

90-MMcf/d (leaving 609-MMcf/d) 10/11 - 10/12

50-MMcf/d (leaving 649-MMcf/d) 10/13 - 10/16

80-MMcf/d (leaving 619-MMcf/d) 10/17 - 10/31

Page 12: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

ANR Posted Capacity Impacts September 2017

Posted Capacity Restrictions as of September 2017

Marshfield Viking Gas Interconnect DRN #288733 PSO ID #8314

Scheduling to 180-MMcf/d 9/18 - 10/5

Crystal Falls-Fortune Lake Interconnect DRN #11661 PSO ID #8329Scheduling to 235-MMcf/d 9/27 - 10/31

St. John Eastbound - DRN #226633 PSO ID #8303

75-MMcf/d (leaving 1,206-MMcf/d available) 9/13 - 10/9

720-MMcf/d (leaving 561-MMcf/d available) 10/10 - 10/14

420-MMcf/d (leaving 861-MMcf/d available) 10/15 - 10/19

Joliet NGPL - DRN #2610 PSO ID #8316

Scheduling Firm Primary Only 10/2 - 10/9

Page 13: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

2017 ANR Mainline Compressor and Pipeline Maintenance Projects

ANR

Great Lakes

SEML Compressor OverhaulsPosted September capacity impacts to Eunice

Eastbound, Eunice Southbound, Jena South Planned Maintenance

*Will impact IT and FS Services

13

SWML Pipeline Integrity DigsMissouri/Illinois Area Digs through August and

SeptemberSWML Compressor Overhauls

*Will impact IT and FS Services

Tie-Line Compressor OverhaulNo impact to services

HCA Class Change ProjectSt. John, Indiana

10/10 – 10/19*Will impact IT, FS and portion of FP

Pipeline Integrity Projects MLS

*Commissioning activities ongoing for SEML Overhauled Units – Delhi, Sardis, Celestine

and Shelbyville

Page 14: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

• Service Impacts are estimates. Actual nominations, markets, weather and pipeline conditions, etc., will determine any level of curtailments.

• Projects may be added, altered, delayed, or cancelled. Emergent work cannot be planned and will happen from time to time.

• Notice of such planned work, including any additions or changes, will be provided via a posting under the Planned Service Outage (PSO) category in GEMS. Emergent work will be posted under the Critical Notice category as soon as possible.

14

Outage Postings

Page 15: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

ANRPL Nominations & Scheduling

Ralph Del Rio

Noms & Scheduling

Page 16: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

Westrick Interconnect & Eunice Total Capacity

ANR

Great Lakes

WestrickDRN # 513105

Westrick Interconnect (513105)

• Effective Date 9/1/17• Operational Capacity

1,776,500-MDth• Average daily flow rate

625,000- MDth• Decrease volumes at Rex

Shelbyville receipt & Defiance South flow thru

Eunice Total 906,612-MDTH

• Eunice Southbound (DRN # 226640)

• Eunice Eastbound (DRN # 226641)

• Duralde Evangeline Delivery (DRN # 312115)

Eunice TotalDRN # 505592

Page 17: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

• We encourage all Shippers with FSS storage accounts with ratchet levels to monitor and review their activity in GEMS under the Storage Ratchet Summary & Storage Overrun Summary screens as follows:

ANRPL Storage Balance Reminder

17

Page 18: ANR Monthly Customer Update September 2017 - anrpl.com · ANR Monthly Customer Update –September 2017 September 27, ... 230.4 127.4 129.3 ... HCA Class Change Project

ANR Customer Assistance

For further customer assistance concerning scheduling priorities related to your specific firm service agreement(s),

firm service rights and features, GEMS new user training, virtual and face-to-face meetings, etc., please contact

the ANR Noms & Scheduling Team:

Toll Free: 1-800-827-5267

Group Email: [email protected]

Web address for the ANRPL Tariff: www.anrebb.transcanada.com