Anticipated Outcomes from CEOS WGs in 2010
Strategic Discussion on what the WGs should seek to achieve
123rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009
Working Groups Priorities
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 2
1. Closely coordinate with CEOS and SIT
2. Strengthen internal Coordination and Cooperation
3. Provide satellite arm of GEO System of Systems
4. Work closely with and support CEOS Virtual Constellations
5. Work closely with and collaborate as appropriate within the Working Groups
6. Support enhanced outreach for CEOS activities
Working Group onInformation Systems and Services
WGISS 2010 Priorities and Expected Outcomes
Martha Maiden – NASAPakorn Apaphant – GISTDA
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 3
2010 WGISS Priorities and Expected Outcomes
1. Closely coordinate with CEOS and SIT2. Strengthen internal Coordination and Cooperation
• Application and Technology Subgroups• Boost up User Vice Chairs
Support the initiation of new promising projects and interest groups (IG’s)• Security Project• Water Community of Practice Portal Project• CWIC: The CEOS WGISS Integrated Catalog• Global DEM quality Project• Emerging idea: Data Management IG
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 4
2010 WGISS Priorities:GEO Tasks with WGISS Participation
3. Provide satellite arm of GEO System of Systems• AR-09-02a: Virtual Constellations• AR-09-02C: Flood Sensor web Emergency Response
Prototype• DA-09-01b: Data, Metadata, and Products Harmonization• DA-09-03d: Global DEM• DI-06-09: Use of Satellite for Risk Management• DA-09-01a: GEOSS Quality Assurance Quality – QA4EO• HE-09-01: Information System for Health• DA-09-02a: Data Integration and Analysis• AR-09-01b: GEOSS Architecture Implementation Pilot
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 5
2010 GEO Expected Outcomes• Enhancement of Atmospheric Composition and Land Surface Imaging
Constellation Portals (AR-09-02a: Virtual Constellations)• Implement an Emergency Response Prototype for evaluation and
eventual use by IFRC and GEOSS (AR-09-02C: Flood Sensor Web Emergency Response Prototype, DI-06-09: Use of Satellite for Risk Management)
• Provide Wide Area Grid Implementation for Malaria Project & Water-borne Epidemics Risk Assessment (AR-09-01b, GEOSS Architecture Implementation Pilot)
• GEO Task led by WGISS for CEOS, develop domain model consistent with GCI con-ops, with relevant standards, guidelines, CWIC (DA-09-01b: Data, Metadata, and Products Harmonization)
• Cooperate with WGCV to provide quality information in LSI Portal using CWIC model (DA-09-01a: GEOSS Quality Assurance Quality – QA4EO)
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 6
2010 WGISS Priorities and Expected Outcomes
4. Work closely with and support CEOS Virtual Constellations• Cooperate with VCs to Develop and/or Improve capability of Portals for
Virtual Constellations• Demonstrate Portals Use of CWIC model
5. Work closely with and collaborate as appropriate within the Working Groups• WGCV: QA4EO, Global DEM Quality Project• WEdu: Training for information technology needs
6. Outreach• Continue supporting the Data Democracy program, making available
software packages• Strengthen relationship with other international entities
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 7
Working Group onCalibration and Validation
WGCV 2010 priorities and expected outcome
Pascal Lecomte – ESAGreg Stensaas – USGS
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 8
2010 WGCV Priorities and Expected Outcomes
1. Closely coordinate with CEOS and SIT• COVE
2. Strengthen internal Management• Revise the WGCV 5-year Plan• Re-enforce the role of the Sub-Groups• Prepare new Vice Chair elections
3. Provide satellite arm of GEO System of SystemsS
upport Other GEO Tasks
• Calibration and Validation – reference site catalogue• Quality Assurance Aspects – QA4EO implementation
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 9
2010 WGCV Priorities and Expected Outcomes
3. Provide satellite arm of GEO System of Systems• DA-09-01a_5: Benchmark Mission Coordination• DA-09-01a_6: Ground-based Cal/Val Campaign• DA-09-01a_7: DOME C Experiment• DA-09-01a_8: Cal/Val & Post-launch Test Sites (Reference
Standards)• DA-09-01a_9: Radiometric Standards• DA-09-01a_10: QA4EO• DA-09-01a_11: Reference Test Site Data Collaboration &
Comparison• DA-09-01b_1: Land Product Harmonisation• DA-09-01b_2: Data, Metadata & Product Harmonisation• DA-09-03d_3 and DA-09-03d_4: Global DEM
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 10
2010 WGCV Priorities and Expected Outcomes
4. Work closely with and support CEOS Virtual Constellations• Identify Cal / Val requirements with VCs
5. Work closely with and collaborate as appropriate with WGISS and WGEdu• QA4EO – technical aspects & training / outreach• Global DEM Quality Project
6. Outreach• Strengthen relationship with other international entities and in
particular Coordination and Cooperation.• Encourage international collaboration for Cal/Val exercises such
as intercomparisons
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 11
Working Group onEducation, Training and Capacity
Building
WGEdu 2010 priorities and expected outcomes
Gordon Bridge – EUMETSAT,Outgoing WGEdu Chair
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 12
WGEdu 2010 Expected Outcomes
1. Closely coordinate with CEOS and SIT on all education, training and capacity building issues
2. Strengthen internal Coordination and Cooperation of CEOS Members and Associates in the area of education, training and capacity building.
3. Support CEOS response to GEO CB tasks in particular, but also other tasks as requested.
4. Support WGCV in outreach aspects of QA4EO, Build closer links with WGISS and WGCV
5. Work closely with and support CEOS Virtual Constellations, again especially in the area of outreach
6. General support to CEOS Outreach activities
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 13
Specific Deliverables for 2010
• Organise one Remote Sensing Workshop, currently planned to take place in Brazil, in March 2010, in coordination with CEOS Chair.Theme disaster management in Latin Americas. Target audience - primarily secondary level teachers, but some training managers.
• Further upgrades to the WGEdu Portal in response to requests from CEOS Members, Associates, Constellations and specific GEO tasks.
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 14
Specific Deliverables for 2010
• Develop the GNC Training Channel concept into a real educational and training data exchange mechanism, in cooperation with GNC partners, professional training institutes such as ITC, COMET, etc, and the evolving needs of potential user communities.
• By end of 2010 produce one “Eduflow” training module addressing ocean/coastal ecosystem issues of importance to Argentina (host of next WGEdu annual meeting). This will be training material for students, produced by students, managed and funded by SEO office (NASA Langley).
23rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 15