“Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

Upload: others

Post on 24-Sep-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

“Repeatability”

Chris PhilpAdditive Process Manager, Additive Integrated Product Team (IPT)GE Aviation

October 17, 2019

Page 2: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019
Page 3: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

REPEATABILITY

REPEATABILITY REPEATABILITY

Page 4: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

1-Column Layout

4

Who?Where?Why?How?When?Why? (again)

Page 5: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

To lead the aviation industry in the application of additive technologies from design through industrialization to impact engine cost, weight, & performance.

ONE Aviation TeamONE Additive Mission

GE Aviation Additive IPT(Integrated Product Team)

5

The Who?

Page 6: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

6

GE Aviation Additive IPT Global Footprint

BEC – Bangalore

Avio Aero – Turin (TAL)• “ATC Europe” & EBM Tech MatGEIQ – Queretaro

ATC – Cincinnati• Headquarters• NPI & cost out across PLs• Full technology roadmap

GEAC – PragueEDC – Warsaw

TTC – Istanbul

Auburn • DMLM Production

Avio Aero – Cameri• GE9x EBM Production

Avio Aero – Brindisi• Future Catalyst DMLM

Production

Engineering/Development

Component Production

Pittsburgh • DMLM & Future

EBM Production

The Where?

Page 7: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

7

3rd

generationCMC materials

2nd#1most efficient engine in its class

generation Additive parts

4th

Generation compositefan blades

5th

generationarchitecture

~

M A R G I N

CAEP 8 NOxregulations

10%L O W E R

Specific FuelBurnversus GE90-115B

30%

5%

SFCthan any 2020 twin-aisle engine in service

8 dbStg 5 noise regulations

M A R G I N

B E T T E R

SPECIFIC FUEL CONSUMPTION

The Why? GE9X … world’s largest engine entering service in 2020

Page 8: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

8

28

Inducers8

STAGE 5 & 6LPT BLADES

228T25 SENSOR

1

HEAT EXCHANGER

1COMBUSTOR

MIXERS

28

FUEL NOZZLES

GE9X … highest number of additive parts to date

Page 9: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

9

DURABLE5x More

PARTS20 1

PRECISE30% More

PARTS10 1

LIGHTER50%

T25 SENSOR

FUEL NOZZLE

STAGE 5&6LPT BLADE

INDUCER

DURABLE2x More

PARTS13 1

MIXER

DURABLE3x More

LIGHTER6%

PARTS163 1

LIGHTER40%

SERVO HX

Buy to Fly3 2Target

GE9X … power of Additive

Page 10: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

10

https://www.youtube.com/watch?v=v6frvqHwQfI

GE9X … world record breaker:134,000 lbs. of thrust

Page 11: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

11

Page 12: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

12

The How?

Typical production challenges…

• Printing repeatability

• Part quality

• Manufacturing productivity

Page 13: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

13

The How?

Key factors contributing to variation

• Not monitoring the “critical Xs”

• Poor understanding of the ranges of control

• Lack of machine configuration control

• Incomplete work instructions for operators and maintenance

• No experienced additive machine engineers

and lack of repeatability

Page 14: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

14

The How?

Critical Xs

• Beam Spot Size & Focal Flatness

• Beam Quality/Shape (Beam Profiling/Caustic)

• Scanfield Alignment (Position/Overlap)

• Power (Laser Degradation)

• Z Axis Accuracy (Layer Thickness)

• Airflow Consistency (Filter Cleanliness)

• Oxygen (Material Properties)

• Recoater Blade (Alignment & Reuse)

• Cleanliness (Affects all the above)

• Standard Work

Page 15: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

15

The When?

Timing & Reoccurrence

• Initially always refer to the OEM preventative maintenance and suggested calibration intervals

• Check and verify the critical X’s regularly as you learn get more experience on the machine

• Validate the consistency of your critical X’s over time

• Determine the calibration intervals required to maintain your part quality

• Remember the key events that should trigger a recalibration:•Machine Movement •Replacement of key components •Software updates •Material changes

Page 16: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

16

Production Reality

Org

an

iza

tio

na

l e

nth

usi

asm

Time

InitialInvestment

ProductionChallenges

Scaling Challenges

Initial Production

The Why? (again)

REPEATABILITY

REPEATABILITY REPEATABILITY

Page 17: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

17

The GE Catalyst engine

Combustor test schedule reduced from 12 months to 6 months

PARTS855 12 LOWER

20%

FUEL BURN

WEIGHT 5%

REDUCTION

The Why? (again)

REPEATABILITY

REPEATABILITY REPEATABILITY

Page 18: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019

18

The Why? (again)

REPEATABILITY

REPEATABILITY REPEATABILITY

Oct 30 2018 - 30,000LEAP Fuel tips shipped

Current build rate 4,000 tips/month

Page 19: “Repeatability” User Grou… · “Repeatability” Chris Philp Additive Process Manager, Additive Integrated Product Team (IPT) GE Aviation October 17, 2019