API 17G UpdateAPI SC17 Winter Meeting
07 Feb 2018
API 17G Update - 2018 SC17 Winter Meeting 107 Feb 2018
Agenda
• new leadership
• how we’re working
• November Workshop
• organization
• where we are today
• results from ongoing reviews
• where we’re going
• key milestones
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 2
17G Co-Chairs
Assumed new co-chair role Oct 2017
Gregg Walz (Anadarko Petroleum Company)
• Current role: Sr. Engineering Advisor
• Been at Anadarko for 4 years
• 37 years industry experience
Mike Byrd (Retired BP)
• Last role: Director Subsea Wells (Global Wells Organization)
• Worked for BP 23 years
• Major projects and wells organizations
• 38 years industry experience (offshore & deep water)
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 5
API 17G Task Group Leadership
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 6
Name Company Role Task Group
Walz, Gregg Anadarko Petroleum Company Co-Chair, API 17G Design and Manufacture of Subsea Well Intervention EquipmentByrd, Mike Byrd Energy Services Co-Chair, API 17G
Muff, Anthony TechnipFMC (Retired) Co-Chair, API 17G1 System Configuration and Operation of Subsea Well Intervention SystemsStawaisz, Ray Chevron Energy Technology Co Co-Chair, API 17G1
Hess, MikeShell International Exploration and Production
Chair, API 17G2 Subsea Pumping Well Intervention Systems
Dziekonski, Mitch Altiss Technologies, Inc Chair, API 17G3Design of Subsea Well Intervention Systems using Non-Ferrous Alloys
Crawford, Neil Oceaneering International, Inc Chair, API 17G4 Riserless Subsea Well Intervention
Hennig, Jake Anadarko Petroleum Company Co-Chair, API 17G5 Recommended Practice for Intervention Workover Controls Systems (IWOCS) (1)Hill, Chris Oceaneering International. Inc. Co-Chair, API 17G5
Note:1. SRRR for 17G5 has been submitted to SC17 Chair and is awaiting disposition by CSOEM
17 G1-G4 Status
• 17G1-17G4 documents are all on hold until a new Working Draft of 17G is complete. • G1 - System Configuration and Operation of Subsea Well Intervention Systems
• have addressed most of comments, need to finish Clause 4 & GRA
• GRA likely to move to TR
• will need to wait and see updated draft of G and check for changes which may be required to conform to G
• G2 - Subsea Pumping Well Intervention Systems• Based on conformance to 17G 2nd Edition
• Will need to see new draft of 17G and validate conformance
• G3 – Design of Subsea Well Intervention Systems using Non-Ferrous Alloys• Met with both the Aluminum and Titanium groups to further discuss field experiences
• Waiting for new draft of 17G to look where G3 can interface with the final document
• G4 – Riserless Subsea Well Intervention• Had a working session in June to discuss the ballot draft comments and most have been addressed
in this draft.
• Have a few comments remaining and should address them over the next few months.API 17G Update - 2018 SC17 Winter Meeting 707 Feb 2018
17G Content Workshop
• Held 14 Nov 2017• 45 attendees (Operators, Manufacturers, Consultants, Integrators)• The purpose of the workshop was to:
• articulate the forward strategy, principles, and preliminary timing for producing a new ballot draft of 17g which is more concise and less prescriptive (without compromising safety)
• identify key issues which are important to voters (especially those that drove the previous ballot results)
• identify which organizations will be willing to provide resources in support of work groups
The deliverables of the workshop were:1. written guidance to work groups in order to create a new working draft of
17G which is more concise and less prescriptive (without compromising safety)
2. a list of workgroups required to address each clause and annex3. a list of organizations w/contacts support the workgroups
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 9
Approach to new 3rd Edition DraftPeople
• interface Team – Acts as advisory team to Co-Chairs and provides guidance to workgroups
• 9 Workgroups made up of 75 volunteers from manufacturing, operating, and integration companies
• workgroups co-lead by Operator and Manufacturing representative
Process
• Performance manage like a project
• All “shall” statements and previous ballot comments will be evaluated
• clear guidance, objectives, and scope for evaluating requirements• New Requirement Guidelines (NRG)
• well defined and systematic process to review ALL “Shall” requirements and address previous ballot comments
Tools
• provided workgroups with spreadsheets which have a:• complete list of previous ballot comments
• complete list of “Shall” statements (2nd & 3rd edition)
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 10
General Guidance Principles
• create fit for purpose document which promotes safety and allows for future innovation
• judicious use of shall/should statements
• define a minimum set of requirements and standards for international use. The document is not intended to be:
• used for monograming equipment
• a substitute for highly detailed regionally specific internal specifications for the manufacturer, integrator, or operator.
• minimize use of teaching and/or instruction
• maximize referencing of existing published industry documents and standards.
• will not attempt to fix other API documents (17D, TR7, TR8, etc).
• references to 17G1 will be informative only (no normative requirements)
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 11
• The requirement or “shall” is only necessary if it:• enhances environmental and personal safety
• enhances equipment reliability
• codifies relevant post-Macondo lessons
• codifies relevant new and accepted technology and manufacturing practices
• incorporates new and updated references to documents which may have changed or did not exist in 2006
• The requirement or “shall” needs to:• set a minimum requirement
• tell what needs to be done, not how to do it
• utilize an existing API or other standard requirement (if possible)
• work in all regions and not be regional specific
• be evaluated for negative impacts if it is or is not adopted
• be measurable or auditable so compliance is clear
• Adhere to API:• document format and style manual (2009)
• procedure for standards development (2016)
New Requirement Guidelines (NRG)
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 12
WorkgroupsWorkgroup Content Workscope
1Common - Scope, References, Datasheets, Functional
Clause 1 – ScopeClause 2 – Normative ReferencesClause 3 - Definitions, Abbreviations and SymbolsAnnex F - (informative) Equipment Specification DatasheetsClause 4 - Functional Requirements (Common)
2 Subsea Test Tree - Functional Requirements and Validation Testing
Clause 4 – Functional Requirements (Subsea Test Tree)
Annex G - (normative) Verification and Validation Testing of Subsea Test Tree Assemblies and Associated Accessories
3Open Water Systems - Functional Requirements and Validation Testing
Clause 4 – Functional Requirements (Open Water Systems)
Annex H - (normative) Verification and Validation Testing of Well Control Devices for open-water Intervention Systems
4 Design - Loading, FatigueClause 5 – Design RequirementsAnnex C - (normative) Load CapacitiesAnnex D - (normative) Fatigue Load Capacities
5 Materials & Welding Requirements Clause 7 – Welding RequirementsClause 6 – Material Requirements
7Quality, Shipping, Storage & Documentation Requirements
Clause 8 – Quality RequirementsClause 9 – Documentation RequirementsClause 10 – Marking Requirements Clause 11 – Preservation, Storage, and Shipping
8 Validation of Connectors Annex E - (normative) Validation of Connectors9 Interface Team API 17G & G1 - Interface Workgroup
10 IWOCS New Document - IWOCS07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 13
17G Interface Team
Name Company Category
Walz, Gregg Anadarko Petroleum Company Co-Chair
Byrd, Mike Byrd Energy Services, LLC Co-Chair
Skeels, Brian TechnipFMC SC17 Committee Tag
Kaculi, Jim DrilQuip Manufacturer
Smith, Craig OneSubsea Manufacturer
Stawaisz, Ray Chevron Energy Technology Company
Operator
Hess, Mike Shell International Exploration and Production
Operator
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 14
API 17G, 3rd Edition,
2017 (Ballot Doc &
comments)
NRGFilter
Creating a revised 3rd edition
API RP 17G, 2nd Edition,
2006
API 17G, 3rd Edition,
2018 (Ballot Draft)
Lot’s of good stuff here… let’s not
create anything new unless absolutely
necessary!
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 15
Sense check revised document against 2nd
edition for consistency and undergo group
review
API 17G, 3rd Edition,
2018 (Updated
Document)
Workflow
API 17G Update - 2018 SC17 Winter Meeting 16
Apply NRG to 3rd
Edition requirements and “shall” statements.
Address comments from 3rd Edition ballot
(4136)
Sense check the final results with the 2nd
Edition to make sure nothing important has
been omitted.
Each workgroup aggregates changes into respective draft clauses
Create Working Draft (WD)
reviewed by WG9 (Interface Team)
WD External Review(Workshop Attendees)
Create Ballot Draft (BD)Incorporate comments
from review.
BD reviewed by WG9 (Interface Team)
BD ready for submittal to API
WG9
Workgroups
07 Feb 2018
What we are not doing:
We are not:
• building a compendium of individual or personal lessons learned, preferred practices, and preferences.
• creating a “primer” document on how to design or build intervention equipment
• only addressing comments from the 3rd edition
• defining any particular component as a well control barrier – this will be left to the operator
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 17
Workgroup Progress
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 19
0
500
1000
1500
2000
2500
3000
3500
Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18
Progress (Number of Shalls & Comments)
Planned Actual
• Teams holding weekly meetings• Attendance running 50-75%• Excellent engagement• Overall good progress – on track –
10% planned vs 11% actual• Have resolved approximately 11% of
“shall’s” and 9% of “comments” against 10%/0% respectively
• Approximately 44% of “shall’s” resolved so far will be removed from document
Key 17G Milestones
• Oct 2017 – New leadership in place
• Nov 2017 – Held 17G Content Workshop to define the principles and plan to develop new draft
• Dec 2017 – Identification an deployment of workgroups, work began addressing requirements and comments
• May 2018 – Workgroups complete preliminary text edit of respective sections based on review of “shall” statements and previous ballot comments.
• Jun 2018 – Complete Working Draft
• Jul 2018 – Complete external review of Working Draft
• Aug 2018 – Complete and submit Ballot Draft to API
API 17G Update - 2018 SC17 Winter Meeting 2107 Feb 2018
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 22
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 23
17G Interface TeamPurpose
• provide guidance and direction to the workgroups in application of the NRG’s
• ensure consistency in the work products
• participate in the review the final document
Team Make-Up and Responsibilities
• members are appointed and led by Co-Chairs
• members (7)
• 17G Co-Chairs x 2
• One representative from SC17 Leadership x 1
• Operator representative x 2
• Manufacturing representative x 2
• must be committed and accountable to:
• NRG application process (consistent, systematic, & rigorous)
• Principle of “more concise” and “less prescriptive” document
• must be prepared to challenge workgroup results if necessary
• ensure workgroups apply the NRG’s in a systematic, consistent, and rigorous manner
• need to be able to see big picture
• each Interface Team member will be assigned one or more workgroups
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 24
Workgroup Leadership
API 17G Workgroup Leadership Name Interface Team Tag
1 - Common - Scope, References, Datasheets, Functional Gregg Walz&
Mike ByrdChevron Energy Technology Company Steve PierceExpro Jamie Walker
2 - Subsea Test Tree - Functional and Validation TestingCraig SmithBP Exploration and Production, Inc. Paul Anderson
National Oilwell Varco Eric Wehner3 - Open Water Systems - Functional and Validation Testing
Mike HessExxonMobil Production Company Gaston GauthierTechnipFMC Roy Whiteman
4 - Design - Loading, Fatigue Jim Kaculi&
Ray StawaiszOneSubsea, A Schlumberger Company Gary RytlewskiShell International Exploration and Production Tom Klepcyk
5 - Materials & WeldingCraig SmithChevron Energy Technology Company Will Lamberth
OneSubsea, A Schlumberger Company Richard Marques7 - Common - Quality, Marking, Storage, etc Gregg Walz
&Mike Byrd
Anadarko Petroleum Corporation Ken PeurifoyNational Oilwell Varco Paul Beauchamp
8 - Validation of Connectors Jim Kaculi&
Ray StawaiszDril-Quip Andrew GrohmannENI Petroleum Bill Cowan
10 - IWOCSBrian SkeelsAnadarko Petroleum Corporation Jake Hennig
Oceaneering International, Inc. Chris Hill
2507 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting
Progress
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 26
Workgroups
Shall Statements Comments
Total Shall's Resolved % Resolved Accepted (1) % of
Resolved Removed (2) % of Resolved Total Resolved
% Resolved
Workgroup 1 - (C 1, 2, 3, & 4 Common) 87 13 15% 11 85% 2 15% 125 29 23%
Workgroup 2 - (C2, AG) (In-Riser) 287 63 22% 30 48% 33 52% 61 61 100%Workgroup 3 - (C4, AH) (Open Water) 451 31 7% 19 61% 12 39% 155 0 0%Workgroup 4 - (C5, AC, AD) (Design) 494 36 7% 14 39% 22 61% 247 0 0%Workgroup 5 - (C6 & 7) (Materials & Welding) 150 0 0% 0 #DIV/0! 0 #DIV/0! 57 0 0%Workgroup 7 - (C8-11) (Quality, Doc, Mark, Pres) 189 0 0% 0 #DIV/0! 0 #DIV/0! 87 0 0%Workgroup 8 - (AE) (Connector Validation) 132 15 11% 0 0% 15 100% 57 2 4%Workgroup 9 - Misc Common Comments 16 0 0%Workgroup 10 - (G5) IWOCS 277 0 0% 0 #DIV/0! 0 #DIV/0! 201 0 0%Total 2067 158 8% 74 47% 84 53% 1006 92 9%
Notes:1. Accepted = “Agree” + “Agree in Principle”2. Removed = “Disagree” + “Noted”
Workgroup Roster
07 Feb 2018 API 17G Update - 2018 SC17 Winter Meeting 27
API 17G Workgroup List Name1 - Common - Scope, References, Datasheets, Functional
Anadarko Petroleum Corporation Jake HennigChevron Energy Technology Company Rafael Ramirez (S)Chevron Energy Technology Company Steve Pierce (P)Consultant Jeff GoetzExpro Jamie WalkerExxonMobil Production Company Gaston GauthierNational Oilwell Varco Paul BeauchampOneSubsea, A Schlumberger Company Craig Smith
2 - Subsea Test Tree - Functional and Validation Testing
Aker Solutions Chris CusackAnadarko Petroleum Corporation Ron QuatesBP Exploration and Production, Inc. Matthew LawBP Exploration and Production, Inc. Paul AndersonChevron Energy Technology Company Sylvester Anyanti (P)Chevron Energy Technology Company Yanez Singh (S)Dril-Quip Todd ScaggsExpro Jamie WalkerExxonMobil Production Company Gaston GauthierNational Oilwell Varco Eric WehnerOneSubsea, A Schlumberger Company Jonathan CroyTechnipFMC Craig PiercyTechnipFMC Jonathan Morley
3 - Open Water Systems - Functional and Validation Testing
Aker Solutions Jan HerlandAnadarko Petroleum Corporation Ron QuatesBP Exploration and Production, Inc. Oskar KudlaChevron Energy Technology Company Ray Stawaisz (P)Chevron Energy Technology Company Remy Viana (S)Dril-Quip Todd ScaggsExpro Paul DeaconExxonMobil Production Company Gaston GauthierHelix David LauerNational Oilwell Varco Steve DeshotelsOceaneering International, Inc. Andy HendersonOneSubsea, A Schlumberger Company Jackie PhanOneSubsea, A Schlumberger Company Mark PattonTechnipFMC David CharvozTechnipFMC Roy Whiteman
API 17G Workgroup List Name4 - Design - Loading, Fatigue
Anadarko Petroleum Corporation David BaskettBP Exploration and Production, Inc. Bob JohansenBP Exploration and Production, Inc. Martin PritchettChevron Energy Technology Company Daniel Sadenwater (P)Chevron Energy Technology Company Mauricio Baez (S)Dril-Quip Andrew GrohmannExpro Paul DeaconNational Oilwell Varco Paul BeauchampOneSubsea, A Schlumberger Company Gary RytlewskiOneSubsea, A Schlumberger Company Parth PathakShell International Exploration and Production Tom KlepcykTechnipFMC Anders WormsenTechnipFMC Sam Lee
5 - Materials & WeldingAnadarko Petroleum Corporation Stella MoscaluChevron Energy Technology Company Will LamberthDril-Quip Steven ShademanExpro Danial Bany AmeryNational Oilwell Varco Eric WehnerNational Oilwell Varco Lucien HehnOneSubsea, A Schlumberger Company Jim AlbanOneSubsea, A Schlumberger Company Richard MarquesShell International Exploration and Production Tom Klepcyk
7 - Common - Quality, Marking, Storage, etcAnadarko Petroleum Corporation Ken PeurifoyChevron Energy Technology Company Matthew Ischy (P)Chevron Energy Technology Company Tim Vines (S)Expro Paul DeaconNational Oilwell Varco Paul BeauchampOneSubsea, A Schlumberger Company Steve Guresh
API 17G Workgroup List Name
8 - Validation of ConnectorsAker Solutions Geir Ivar HolbergAnadarko Petroleum Corporation David BaskettChevron Energy Technology Company Lisa Metrick (S)Chevron Energy Technology Company Rush Patel (P)Dril-Quip Andrew GrohmannDril-Quip Jim KaculiENI Petroleum Bill CowanExpro Jamie WalkerExpro Simon RobertsNational Oilwell Varco Lalit KarlapalemOneSubsea, A Schlumberger Company John MeijerOneSubsea, A Schlumberger Company Scott RichmondShell International Exploration and Production Glen WaldTechnipFMC David SnarheimTechnipFMC Roy Whiteman
9 - Interface TeamAnadarko Petroleum Corporation Gregg WalzBES, LLC Mike ByrdChevron Energy Technology Company Ray Stawaisz (P)Dril-Quip Jim KaculiOneSubsea, A Schlumberger Company Craig SmithShell International Exploration and Production Mike HessTechnipFMC Brian Skeels
10 - IWOCSAker Solutions Paul OtterdalAnadarko Petroleum Corporation Jake HennigChevron Energy Technology Company Jose Barreto (P)Chevron Energy Technology Company Matt Albers (S)Expro Dariusz SzpunarOceaneering International, Inc. Chris HillOneSubsea, A Schlumberger Company Dave GillespieOneSubsea, A Schlumberger Company Ronald SpencerSubsea 7 Ronny HancockTechnipFMC Kim Mikkel Skibrek