Page 1 of 3 DAILY POINTS TO RECALL (DAY 7) C:\Users\user\Desktop\PV\API 510\API 510 Course - Integrated Training\API 510 Integrated Training - Daily Points To Recall\API_510_PTR_7.doc 6/19/2014 / 5:19:25 PM / NCD 1. Local PWHT may be substituted for 360-degree banding if: a. Original PWHT was not due to service requirement b. Effects of Local strains/distortions are considered c. Pre-heat & maintainance of 300 deg. F during welding d. PWHT temp is maintained beyond the weld upto twice base metal thickness e. Heat is applied to any nozzles /attachments within PWHT area. 2. For repairs of following : a. Cracks: By preparing V or U-shaped groove and depositing weld metal — Cracks at area of stress concentrations (i.e., nozzle welds) shall not be repaired without consulting the pressure vessel engineer. b. Localized corroded area: By weld deposit. Low strength electrodes may be used if thickness of deposit is increased by ratio of B.M. strength to W.M. strength and — Depth of deposit does not exceed half of thickness — Increased thickness is blended with 3:1 taper 3. For repair welds, the weld preparation before welding, and the completed weld shall be checked by PT or MT. Additionally, the butt-welds shall be radiographed by the rules of original Code of construction (depending on joint efficiency). 4. The carbon and alloy steel materials used in making repairs and alterations shall not have carbon content over 0.35%. 5. Pressure test is required after repair/alterations, if authorised inspector thinks it necessary. Pressure test is normally required after alteration. 6. Insert patches must be with full penetration welds. Fillet patches shall be approved by P.V. Engineer. Normally, a fillet patch equivalent to reinforced opening is okay.

Upload: chowhk

Post on 23-Nov-2015

27 views

Category:

Documents


0 download

DESCRIPTION

API_510_PTR_7.pdf

TRANSCRIPT

  • Page 1 of 3

    DAILY POINTS TO RECALL (DAY 7)

    C:\Users\user\Desktop\PV\API 510\API 510 Course - Integrated Training\API 510 Integrated Training - Daily Points To

    Recall\API_510_PTR_7.doc 6/19/2014 / 5:19:25 PM / NCD

    1. Local PWHT may be substituted for 360-degree banding if:

    a. Original PWHT was not due to service requirement b. Effects of Local strains/distortions are considered c. Pre-heat & maintainance of 300 deg. F during welding d. PWHT temp is maintained beyond the weld upto twice base

    metal thickness e. Heat is applied to any nozzles /attachments within PWHT area.

    2. For repairs of following :

    a. Cracks: By preparing V or U-shaped groove and depositing weld metal

    Cracks at area of stress concentrations (i.e., nozzle welds) shall not be repaired without consulting the pressure vessel engineer.

    b. Localized corroded area: By weld deposit. Low strength electrodes may be used if thickness of deposit is increased by ratio of B.M. strength to W.M. strength and Depth of deposit does not exceed half of thickness Increased thickness is blended with 3:1 taper

    3. For repair welds, the weld preparation before welding, and the

    completed weld shall be checked by PT or MT. Additionally, the butt-welds shall be radiographed by the rules of original Code of construction (depending on joint efficiency).

    4. The carbon and alloy steel materials used in making repairs and

    alterations shall not have carbon content over 0.35%. 5. Pressure test is required after repair/alterations, if authorised

    inspector thinks it necessary. Pressure test is normally required after alteration.

    6. Insert patches must be with full penetration welds. Fillet patches

    shall be approved by P.V. Engineer. Normally, a fillet patch equivalent to reinforced opening is okay.

  • Page 2 of 3

    DAILY POINTS TO RECALL (DAY 7)

    C:\Users\user\Desktop\PV\API 510\API 510 Course - Integrated Training\API 510 Integrated Training - Daily Points To

    Recall\API_510_PTR_7.doc 6/19/2014 / 5:19:25 PM / NCD

    7. Normally, temporary repairs are replaced by permanent repairs at next available maintenance opportunity. But temporary repairs can remain for longer period if approved by P.V. engineer.

    8. Non-penetrating nozzles (including pipe caps) are accepted method

    of long term repairs for other than cracks. 9. Full encircle lap band is considered as long term repair for other

    than cracks. 10. Full encircle lap band is considered as long term repair for other

    than cracks.

    11. Re-rating calculations shall be done by pressure vessel engineer, and the inspector shall oversee the new stamping or New name plate showing rerating (new MAWP, temp.) is attached to vessel.

    12. Procedure qualifications give suitability of weld for required

    mechanical properties (i.e., strength, ductility), while performance qualifications show ability of the welder to make sound weld.

    13. Tension test gives tensil value, while bend test shows ductility and

    soundness. Radiography also indicates soundness. Thus, Procedure Qualification : by Tension test + Bend test Performance Qualification: by Bend test or Radiography

    14. Tensile test for procedure qualification is passed if failure is in:

    a. Weld metal at strength>= Base metal SMTS or b. Base metal at strength>= 95% of base metal SMTS.

    15. Bend test crack shall not exceed 1/8 in any direction. Radiography

    criteria are stricter than radiography for job.

    16. P-numbers represent parent metal classification of similar composition and properties, i.e., similar strength and ductility.

    F-numbers give similar usability aspects of filler material. A-numbers give similar chem. comp. In As welded condition.

  • Page 3 of 3

    DAILY POINTS TO RECALL (DAY 7)

    C:\Users\user\Desktop\PV\API 510\API 510 Course - Integrated Training\API 510 Integrated Training - Daily Points To

    Recall\API_510_PTR_7.doc 6/19/2014 / 5:19:25 PM / NCD

    17. Essential variables (EV), if changed require new procedure qualification. Non-essential variables (NEV) may be changed without new procedure qualification.

    18. Supplementary essential variables (SEV) are considered as (EV)

    only if there is impact strength requirement. Otherwise they are non- essential variables.

    19. EV and SEV are included in PQR document. EV, SEV and NEV are

    included in WPS document.

    20. PQR gives data used in PQR test and test results, and cannot be revised.

    21. WPS gives parameters to be used in production job, and must be

    within ranges qualified by the PQR test.

    22. WPS may be revised within the EVs qualified. The NEVs can always be revised without affecting validity of PQR.

    23. For performance, 1G is flat, 2G is horizontal, 3G is vertical and 4G

    is overhead position. Pipe 5G qualifies 1G, 3G and 4G, but pipe 6G qualifies all positions.

    24. Welder who welds test coupon for procedure qualification test in

    certain position also qualifies for performance in that position if procedure Qualification was OK

    25. Performance Qualification of welder is affected if he has not welded

    with that process for last 6 months. 26. Inspector can revoke performance qualification if welder is

    repeatedly unable to produce satisfactory welds meeting the requirements.

    ------------------------------------------End------------------------------------