appalachian state university. middleware (identity mgmt., netreg, address management) storage and...
TRANSCRIPT
Information Technology Infrastructure & Systems
Appalachian State University
Network and Computing Infrastructure – what is it?
Middleware (Identity Mgmt., Netreg, Address Management)
Storage and Backup Systems
Server Systems
Security Systems
Data Center
Network Equipment
Fiber Plant
Fiber Plant Capacity
Current fiber plant built in early 1990s ~72 pair of Single Mode, long distance &
high speed 24 pair of Multimode, outdated, little value
Design connects Data Centers and Distribution buildings via redundant paths
Distribution buildings to others is single path
New 144 pair paths are being pulled to tie Raley to StateFarm DC
Network Capacity
Wired Connections ~40000 ports Wireless Connections
98% of internal space is covered by wireless canopy 1759 access points: 915 ResNet + 844 Admin &
Academic 7000 average users/day with peaks to 12,000 30% of our bandwidth with peaks to 60%
Registered Clients 48,016 registered devices on the network 24,494 student devices 412 Servers providing services to the world (272
Central & 141 Distributed)
Data Center Capacity
Primary Data Center – Raley Hall▪ ~2200 SqFt / Very near capacity ▪ (8) Server racks - 272 rack units ▪ (6) Storage racks – 252 rack units ▪ (6) Network racks – 252 rack units ▪ 360KW Back up generator▪ (3) 10 ton Air handler units ▪ (3) UPS – 220Kw battery backup
Secondary Data Center – Anne Belk Hall▪ ~600 SqFt / Capacity exhausted
Bond growth taxed our Data Center capacities▪ More computers -> More power -> More cooling REPEAT
Security Capacity
Firewalls: Internet edge and between Border and Core
VPN: Protect and provide remote access to protected services such as INB Banner and Ustor
Intrusion Detection: Monitor traffic signatures for threats to the network and/or clients
Virus Protection and Quarantine Process: Manage stability and integrity of network, infected devices removed from the network until cleaned and stabilized. Average deleting and cleaning >100 virus infections/month
Spam Filters: Filter >70% of the email that hits our servers
Systems Capacity
~132 Physical Servers 13 of these provide virtualization service
for 308 VMs Operating Systems distribution
256 Windows Servers 141 Linux Servers 30 SUN/Oracle Solaris
Storage and Backup Capacity Storage and Backup Services
Two storage architectures▪ Banner/Email – 27Tb total 17 Tb used▪ EMC Disk-based backup - 87% Data reduction thru
compression and deduplication
▪ Other Enterprise App. Storage and Departmental/User▪ 21.9 Tb total 16.3 Tb used (80% usable limit)
▪ NetApp Disk-based backup – 65 Tb total 44.8 Tb used
Tape library – 219 tapes ~500 Tb of data
How we got here.
2000 – NC Infrastructure Bond. (2000-2007) 4+ Million dollar infusion in to IT
infrastructure and Capital Building projects. One time money primarily earmarked for▪ IT Infrastructure▪ Building Infrastructure▪ Network Infrastructure ▪ Security Infrastructure▪ Systems Infrastructure ▪ Data Center Infrastructure
▪ Capital Building Projects
What we did with the money (cont.)
Building & Fiber Infrastructure upgrade Built additional capacity into campus fiber
plant Upgraded building wiring to cat 5
specification Network Upgrade
Forklift upgrade of all Network electronics▪ Core and Distribution routers – 1 GB connectivity▪ Edge switches - 10/100 MB port for every office
Expanded Wireless to near 100% campus coverage for convenience use
What we did with the money (cont.)
Data Center Upgrades Established 2nd Data Center in Belk Began building High Availability services New HVAC Units providing more cooling New UPS units to power more equipment New generator for Belk for backup power
What we did with the money (cont.)
Security Upgrade Implemented Intrusion Prevention Implemented & Upgrade Firewalls
Systems Upgrade Purchase Sun E2900 Server in 2003 for
Banner Upgrade to Email and Portal
Infrastructure Storage Area Network
Purchased Initial SAN storage in ~2003
What have we done since then?
2000-2007: Tremendous growth, no refresh plan and realization of managing enterprise resources and data center capacity
2008: Banner and Email Storage to SAN ($525K), upgraded storage drives, split Banner out to SUN Storage.
2009: Upgraded NetApp controllers and added storage shelves
2010: Implemented Intrusion Detection technology
What have we done since then?
2011: Replace Banner servers ($250K)
2012: Upgraded Core, Border, and Distribution routers to 10+ gig ~$1.2 mil (operational lease), Invested ~$400,000 in wireless infrastructure
2013: Rebuilt/upgraded campus edge/firewall hardware to 10Gig. ~$225k, Upgraded network bandwidth from 1 gig to unlimited - $155k/year, Upgrade IDS to accommodate 10 Gig 2013
Addressing the Gap
End of life – Much of what we purchased in 2000-2007 has reached its vendor supported end-of-life.
Security & Feature Updates are no longer developed
Rely on 3rd party support for much of our Enterprise services
Addressing the Gap
Network edge - Self Support maintenance model since 2010▪ Next Gen Technology identified, refreshing as funds
become available.
Security - Encryption, policy, data loss prevention, PCI, scanning tools
Several services/applications and their systems are showing age. Portal and Email technologies are 8+ years old.
Most storage on the SAN will reach EOL in 12-24 months. Consolidating storage strategies and developing the use of cloud storage will create efficiencies in management and budgeting
Evaluate our service catalog and refresh technologies where necessary
Addressing the Gap
Proposed Data Center – State Farm Warehouse▪ ~3000 SqFt▪ Capacity will be initially 1.5 times Raley▪ Growth to ~3 times Raley▪ Will become Primary & potentially our only DC▪ Implements current technologies to optimize
environmental efficiencies▪ Funded primarily through Energy Performance
contracts
Budget and Strategic Planning Governance Portfolios to assess, manage
and set strategy for technology services
Master plan for network and computing infrastructure investments Fiber plant strategy consultation Network and Telecom convergence model Security program and strategy Put vendors head to head on server solutions Developing storage plan focusing on cloud
Budget and Strategic Planning Budget Sustainability
IT budget was originally divided between operation costs and growth(refresh) costs.
Bond and subsequent investments created imbalance – Maintenance consumes greatest percentage of operating budget
Need to work toward budget model that supports strategic investment AND refresh cycle