Page 1: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

APPENDIX 2

AUTOMATIC TRAFFIC AND CYCLE COUNTS

Page 2: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix
Page 3: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix. ATC Data is available in 2008 for: • Site 00190191/2 A579 Trinity Street, Bolton • Site 00190321/2 A673 Topp Way, Bolton • Site 00190671/2 A58 Moss Bank Way, Halliwell • Site 00190981/2 A666 St. Peter’s Way, Farnworth • Site 00190991/2 A6027 De Havilland Way, Horwich ACC Data is available in 2008 for: • Site 00002223 Middlebrook Way, Gilnow Lane, Bolton • Site 00002224 Middlebrook Way, Lostock Arms, Bolton • Site 00002225 Middlebrook Way, Ox Hey Lane, Bolton • Site 10170171 A673 Chorley New Road, Lostock (Cycle Lane) • Site 10170281 A58 Moss Bank Way, Halliwell (Cycle Lane) • Site 1017029 1 A676 Folds Road, Bolton (Cycle Lane) • Site 10170301 B6536 Manchester Road, Burnden (Cycle Lane) Data is unavailable in 2008 for: • Site 10170181 A579 St. Helens Road, Bolton (Cycle Lane) For each site the following graphs and tables are given:

• A graph showing 24-hour average daily traffic flows in 2008.

• A graph showing average weekday flows in 2008 by month.

• A graph showing annual average 24-hour weekday flows by year.

• Tables showing daily average flows for each direction in 2008.

• Tables showing monthly average flows for each direction in 2008.

• Graphs showing average hourly weekday, Saturday and Sunday flows in 2008 for each direction.

Page 4: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

æ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ

æ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ

æ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ æææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ

æ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ

æ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ æææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ

æ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ

n nnnn nnnn nnn n nnn

n nnnn nnn

n nnnn nnn

n nnnn nnn

A579-1

0170181

B6536-1

0170301

A676-1

0170291

A58-1

0170281

A673-1

0170171

A579-0

0190191

A579-0

0190192

A673-0

0190322

A673-0

0190321

A58-0

0190672

A58-0

0190671

A666-0

0190981

A6027-0

0190991

A6027-0

0190992

00002223

00002224

00002225

A666-0

0190982

Dra

wn

By :

R.

Da

vie

sD

ate

: 0

4/0

9/2

00

9G

MT

U R

ep

ort

No

14

77

A2

Bo

lto

n A

uto

ma

tic T

raff

ic a

nd

Cycle

Co

un

ter

Site

sG

MT

US

ALIS

BU

RY

HO

US

EG

RA

NB

Y R

OW

MA

NC

HE

ST

ER

M

1 7

AH

This

map

is

rep

rod

uce

d f

rom

Ord

nan

ce S

urv

ey m

ater

ial

wit

h t

he

per

mis

sio

n o

f O

rdnan

ce S

urv

ey o

n b

ehal

f o

f th

e

Co

ntr

oller

of

Her

Maj

esty

's S

tati

oner

y O

ffic

e

© C

row

n c

opyri

ght.

Unau

tho

rise

d r

epro

duct

ion infr

inges

Cro

wn c

opyri

ght

and m

ay lea

d t

o p

rose

cuti

on o

r

civil p

roce

edin

gs.

MC

C L

A 1

00019568 2

009.

Ke

y AT

C s

ite

AC

C s

ite

æ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææ æ æ æ æ æ ææn nnn

Page 5: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

East Bound West Bound Two way

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190191/2 A579 Trinity Street Bolton

Fig.1 24-Hour Average Daily Traffic Flow 2008

0

5000

10000

15000

20000

25000

30000

35000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s p

er d

ay

Fig.2 Average Weekday Traffic Flows 2008 (by month)

0

5000

10000

15000

20000

25000

30000

35000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s p

er d

ay

Fig.3 Average Weekday Traffic Flows (by year)

0

5000

10000

15000

20000

25000

30000

35000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Veh

icle

s p

er d

ay

Page 6: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 92 77 80 90 98 168 197 87 115

01 52 43 40 47 56 129 149 48 74

02 36 28 28 35 38 100 126 33 56

03 24 25 27 25 29 73 97 26 43

04 35 37 35 33 39 54 67 36 43

05 107 106 107 108 114 85 64 108 99

06 320 325 320 329 320 149 97 323 266

07 886 882 888 905 856 263 139 883 688

08 1117 1103 1128 1142 1112 576 197 1120 911

09 998 1028 1003 1055 1042 840 358 1025 903

10 926 972 937 994 1013 1048 766 968 951

11 979 1021 980 1053 1061 1128 1027 1019 1036

12 1042 1043 1058 1080 1095 1164 1082 1064 1081

13 1054 1079 1061 1096 1089 1150 1115 1076 1092

14 1036 1043 1032 1082 1153 1123 1058 1069 1075

15 1033 1041 1033 1069 1136 1103 920 1062 1048

16 1081 1108 1077 1150 1118 981 653 1107 1024

17 1045 1060 1071 1099 1023 808 510 1060 945

18 853 860 858 923 874 688 486 874 792

19 616 660 650 717 721 564 417 673 621

20 460 485 506 533 529 470 356 503 477

21 372 384 404 428 415 387 289 401 383

22 254 268 262 289 334 319 224 281 279

23 140 154 160 171 258 261 161 177 186

TOTALS

12050 12240 12126 12648 12572 10872 8311 12327 11546

3001 3013 3019 3102 3010 1679 694 3028 2502

6070 6199 6101 6374 6547 6716 5968 6258 6283

2979 3028 3006 3172 3015 2477 1649 3041 2761

14558 14832 14745 15453 15523 13631 10555 15023 14188

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour - - - - - 11945 11902 11521 12181 12878 12572 12700

24 hour - - - - - 14722 14587 14155 14775 15645 15254 15508

Saturdays

12 hour - - - - - 10793 10710 10371 10973 10970 10793 10841

24 hour - - - - - 13708 13534 13121 13688 13715 13360 13584

Sundays

12 hour - - - - - 8063 8190 7798 8262 8405 8577 8476

24 hour - - - - - 10358 10633 9994 10453 10647 10696 10607

© GMTU 2009

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

East Bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190191 A579 Trinity Street Bolton

Fig.4 Average Hourly Traffic Flow 2008

0

200

400

600

800

1000

1200

1400

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 7: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 112 101 101 110 120 205 229 109 140

01 68 56 56 63 66 141 163 62 88

02 44 35 33 37 45 111 140 39 64

03 32 32 33 36 42 84 104 35 52

04 42 38 40 37 46 73 81 41 51

05 106 106 98 103 108 85 87 104 99

06 257 247 263 263 258 125 106 258 217

07 693 733 731 726 718 216 143 720 566

08 991 994 1002 1017 973 384 188 995 793

09 913 934 917 943 920 611 298 925 791

10 860 892 875 938 921 878 532 897 842

11 975 1022 992 1052 1087 1095 843 1026 1009

12 1092 1131 1125 1169 1199 1236 1077 1143 1147

13 1130 1142 1143 1149 1211 1217 1189 1155 1169

14 1166 1154 1151 1174 1214 1205 1143 1172 1172

15 1171 1159 1171 1193 1239 1245 1168 1187 1192

16 1212 1225 1236 1259 1266 1218 999 1240 1202

17 1314 1285 1267 1301 1266 1100 648 1287 1169

18 1026 1075 1056 1118 1096 872 546 1074 970

19 744 792 795 871 836 647 460 808 735

20 568 600 633 676 639 502 383 623 572

21 439 454 470 488 456 392 321 461 431

22 309 333 336 345 406 341 245 346 331

23 173 179 191 214 309 292 164 213 217

TOTALS

12543 12746 12666 13039 13110 11277 8774 12821 12022

2597 2661 2650 2686 2611 1211 629 2640 2150

6394 6500 6457 6675 6871 6876 5952 6580 6531

3552 3585 3559 3678 3628 3190 2193 3601 3341

15437 15719 15715 16282 16441 14275 11257 15920 15019

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour - - - - - 12425 12214 12022 12754 13450 13127 13110

24 hour - - - - - 15555 15302 15122 15746 16635 16251 16338

Saturdays

12 hour - - - - - 10924 11128 10840 11593 11487 11105 11022

24 hour - - - - - 14130 14279 13839 14453 14491 13859 14048

Sundays

12 hour - - - - - 8561 8347 8291 8797 8830 9136 9105

24 hour - - - - - 11155 10894 10815 11209 11365 11438 11561

© GMTU 2009

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

West Bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190192 A579 Trinity Street Bolton

Fig.5 Average Hourly Traffic Flow 2008

0

200

400

600

800

1000

1200

1400

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 8: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix
Page 9: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

East bound West bound Two way

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190321/2 A673 Topp Way Bolton

Fig.1 24-Hour Average Daily Traffic Flow 2008

0

5000

10000

15000

20000

25000

30000

35000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s p

er d

ay

Fig.2 Average Weekday Traffic Flows 2008 (by month)

0

5000

10000

15000

20000

25000

30000

35000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s p

er d

ay

Fig.3 Average Weekday Traffic Flows (by year)

0

5000

10000

15000

20000

25000

30000

35000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Veh

icle

s p

er d

ay

Page 10: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 70 58 63 66 72 153 170 66 93

01 39 35 34 38 41 94 109 37 56

02 28 25 27 28 30 70 82 28 41

03 28 28 25 31 32 57 59 29 37

04 46 39 41 43 42 62 51 42 46

05 141 144 142 146 142 96 57 143 124

06 423 444 433 419 401 148 79 424 335

07 956 970 959 961 918 239 118 953 732

08 1034 1035 1040 1026 1018 458 175 1031 827

09 863 884 906 888 864 612 335 881 765

10 780 801 824 817 830 781 596 810 776

11 837 846 857 861 908 940 727 862 854

12 874 884 898 902 952 986 863 902 908

13 914 921 927 945 958 965 908 933 934

14 907 930 935 944 994 957 839 942 929

15 953 981 983 1004 1036 936 758 991 950

16 1117 1141 1125 1126 1113 842 661 1124 1018

17 1057 1098 1082 1075 1009 757 557 1064 948

18 789 827 829 846 823 627 535 823 754

19 605 631 641 696 688 560 468 652 613

20 466 499 527 532 513 434 372 507 478

21 362 378 395 409 372 337 301 383 365

22 230 262 257 279 293 287 212 264 260

23 127 135 154 155 227 242 135 160 168

TOTALS

11081 11318 11365 11395 11423 9100 7072 11316 10395

2853 2889 2905 2875 2800 1309 628 2865 2324

5265 5363 5424 5473 5678 5565 4691 5440 5351

2963 3066 3036 3047 2945 2226 1753 3011 2720

13646 13996 14104 14237 14276 11640 9167 14051 13011

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 11329 11291 11533 11597 11435 11283 11042 10916 11111 11255 11249 11333

24 hour 13928 13963 14279 14440 14249 14097 13816 13605 13774 13997 13952 14114

Saturdays

12 hour 8878 9506 9118 9101 9133 9123 8914 8574 8951 9513 9273 8843

24 hour 11297 12028 11635 11846 11699 11755 11547 11084 11423 12055 11680 11262

Sundays

12 hour 7014 7229 7441 7122 6916 6967 6863 6820 6994 7333 7059 7097

24 hour 8988 9171 9431 9362 9120 9270 9106 8989 9003 9374 8964 9083

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190321 A673 Topp Way Bolton

East bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Traffic Flow 2008

0

200

400

600

800

1000

1200

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 11: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 93 74 78 86 104 183 205 87 118

01 50 39 41 45 52 120 143 45 70

02 30 26 28 30 35 92 107 30 50

03 24 26 25 29 34 76 91 28 44

04 37 40 40 39 42 62 63 40 46

05 108 112 104 111 109 84 70 109 100

06 280 302 290 297 291 152 100 292 245

07 809 817 821 814 799 262 148 812 639

08 1101 1136 1137 1144 1120 513 194 1128 906

09 927 982 966 997 972 701 379 969 846

10 878 921 891 915 929 884 590 907 858

11 908 932 930 941 969 1035 706 936 917

12 930 960 954 972 1022 1093 858 968 970

13 970 985 987 1014 1068 1056 913 1005 999

14 992 1014 1016 1022 1095 1035 884 1028 1008

15 1086 1089 1098 1103 1147 1012 856 1105 1056

16 1116 1128 1129 1134 1136 935 744 1129 1046

17 1148 1157 1165 1166 1147 831 627 1157 1034

18 957 998 1015 1032 944 714 561 989 889

19 686 725 752 788 747 608 495 740 686

20 488 515 542 574 582 480 416 540 514

21 378 407 397 447 437 382 334 413 397

22 284 295 314 347 369 328 253 322 313

23 153 165 191 195 289 298 171 199 209

TOTALS

11822 12119 12109 12254 12348 10071 7460 12133 11168

2837 2935 2924 2955 2891 1476 721 2909 2391

5764 5901 5876 5967 6230 6115 4807 5949 5808

3221 3283 3309 3332 3227 2480 1932 3275 2969

14433 14845 14911 15242 15439 12936 9908 14978 13960

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 12105 12176 12322 12331 12208 12142 11803 11783 12095 11880 12049 12313

24 hour 14771 14903 15178 15309 15151 15128 14718 14652 14886 14659 14808 15273

Saturdays

12 hour 9800 10594 10070 10158 10105 10082 9699 9305 9987 10303 10220 9861

24 hour 12547 13415 12879 13175 13043 13062 12773 12166 12685 13187 13000 12721

Sundays

12 hour 7336 7805 7698 7460 7343 7282 7220 7110 7336 7751 7610 7664

24 hour 9673 10205 9991 10065 9878 9902 9853 9661 9691 10183 9867 10004

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190322 A673 Topp Way Bolton

West bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.5 Average Hourly Traffic Flow 2008

0

200

400

600

800

1000

1200

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 12: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix
Page 13: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

East Bound West Bound Two way

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190671/2 A58 Moss Bank Way Bolton

Fig.1 24-Hour Average Daily Traffic Flow 2008

0

5000

10000

15000

20000

25000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s p

er d

ay

Fig.2 Average Weekday Traffic Flows 2008 (by month)

0

5000

10000

15000

20000

25000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s p

er d

ay

Fig.3 Average Weekday Traffic Flows (by year)

0

5000

10000

15000

20000

25000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Veh

icle

s p

er d

ay

Page 14: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 39 33 34 40 49 116 139 39 64

01 16 14 15 17 21 59 72 17 31

02 9 9 6 12 12 31 36 10 16

03 12 9 11 13 13 25 27 12 16

04 17 14 15 16 17 17 18 16 16

05 42 45 44 42 45 26 16 44 37

06 163 169 170 173 169 66 37 169 135

07 599 612 618 593 584 129 63 601 457

08 796 814 808 807 792 257 112 803 627

09 519 524 540 516 531 437 226 526 470

10 424 426 456 437 460 510 388 441 443

11 490 487 505 497 542 620 476 504 517

12 517 524 532 534 604 695 644 542 579

13 519 532 542 540 612 667 678 549 584

14 571 579 597 602 682 654 644 606 618

15 655 676 695 694 744 640 658 693 680

16 787 810 809 810 796 650 632 802 756

17 860 862 901 884 810 633 504 863 779

18 662 707 692 729 654 546 401 689 627

19 483 532 554 550 566 476 341 537 500

20 377 425 433 453 409 332 272 419 386

21 275 295 301 320 281 205 195 294 267

22 195 215 227 244 227 198 142 222 207

23 92 109 119 139 184 178 81 129 129

TOTALS

7399 7553 7695 7643 7811 6438 5426 7619 7137

1914 1950 1966 1916 1907 823 401 1930 1554

3176 3224 3327 3304 3644 3786 3488 3335 3421

2309 2379 2402 2423 2260 1829 1537 2354 2162

9119 9422 9624 9662 9804 8167 6802 9527 8941

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 7180 7361 7442 7387 7419 7165 7038 6775 8122 7981 8011 8988

24 hour 8933 9152 9314 9235 9355 9064 8935 8630 10145 9903 9920 11179

Saturdays

12 hour 5840 6568 5978 6368 6179 5863 5866 5686 7034 6652 6842 7385

24 hour 7439 8221 7556 8184 7860 7530 7584 7255 8974 8292 8450 9261

Sundays

12 hour 4965 5150 5128 5125 5416 5296 5244 4828 6026 5883 5308 6081

24 hour 6209 6355 6376 6444 6840 6705 6676 6229 7556 7330 6562 7568

© GMTU 2009

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks, football matches, football matches etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

East Bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks, football matches, football matches etc)

Hour starting

12 hour (0700-1900)

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190671 A58 Moss Bank Way Bolton

Fig.4 Average Hourly Traffic Flow 2008

0

100

200

300

400

500

600

700

800

900

1000

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 15: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 39 33 39 46 48 131 158 41 71

01 18 15 15 18 21 68 84 17 34

02 13 11 12 13 16 41 47 13 22

03 15 13 13 14 16 31 36 14 20

04 23 22 24 24 25 27 26 24 24

05 82 89 91 92 90 55 32 89 76

06 277 290 306 294 290 109 65 291 233

07 791 808 802 785 768 224 111 791 613

08 887 882 894 887 878 426 165 886 717

09 726 759 757 773 749 610 364 753 677

10 634 653 651 660 685 734 547 657 652

11 662 669 697 681 731 827 670 688 705

12 674 675 707 689 760 885 806 701 742

13 698 700 730 711 792 897 841 726 767

14 710 704 737 719 822 843 801 738 762

15 803 823 847 826 869 787 717 834 810

16 967 960 992 1007 979 745 653 981 900

17 955 983 998 983 901 641 537 964 857

18 691 748 773 773 745 552 452 746 676

19 565 597 626 650 633 518 384 614 568

20 394 435 446 455 438 364 312 434 406

21 300 330 323 338 301 253 232 318 297

22 189 236 251 259 267 248 162 240 230

23 93 108 130 133 219 213 92 137 141

TOTALS

9198 9364 9585 9494 9679 8171 6664 9465 8878

2404 2449 2453 2445 2395 1260 640 2430 2007

4181 4224 4369 4286 4659 4973 4382 4344 4438

2613 2691 2763 2763 2625 1938 1642 2691 2433

11206 11543 11861 11830 12043 10229 8294 11697 11000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 9243 9597 9581 9695 9780 9470 9209 9128 9234 9357 9388 9727

24 hour 11407 11808 11825 11992 12105 11799 11543 11357 11432 11504 11542 11987

Saturdays

12 hour 7776 8679 7980 8498 8296 7877 7708 7651 8194 8484 8236 8114

24 hour 9823 10798 9972 10640 10359 9968 9922 9638 10225 10411 10136 10189

Sundays

12 hour 6264 6558 6695 6536 7126 6857 6784 6348 6903 6851 6390 6569

24 hour 7848 8171 8314 8194 8834 8633 8532 8077 8491 8415 7827 8170

© GMTU 2009

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks, football matches, football matches etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

West Bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks, football matches, football matches etc)

Hour starting

12 hour (0700-1900)

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190672 A58 Moss Bank Way Bolton

Fig.5 Average Hourly Traffic Flow 2008

0

100

200

300

400

500

600

700

800

900

1000

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 16: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix
Page 17: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

North bound South bound Two way

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190981/2 A666 St Peter's Way Farnworth Bolton

Fig.1 24-Hour Average Daily Traffic Flow 2008

0

10000

20000

30000

40000

50000

60000

70000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s p

er d

ay

Fig.2 Average Weekday Traffic Flows 2008 (by month)

0

10000

20000

30000

40000

50000

60000

70000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s p

er d

ay

Fig.3 Average Weekday Traffic Flows (by year)

0

10000

20000

30000

40000

50000

60000

70000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Veh

icle

s p

er d

ay

Page 18: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 203 165 177 200 219 344 400 193 244

01 109 99 108 108 125 237 275 110 152

02 85 84 81 87 100 190 224 87 122

03 70 78 79 80 97 145 170 81 103

04 77 79 85 88 98 107 129 85 95

05 212 214 207 214 225 148 124 214 192

06 538 574 571 585 582 268 184 570 472

07 1396 1487 1468 1529 1531 476 271 1482 1165

08 2207 2319 2249 2294 2295 879 350 2273 1799

09 1680 1725 1715 1759 1680 1133 539 1712 1462

10 1387 1438 1431 1443 1462 1325 921 1432 1344

11 1406 1434 1436 1479 1549 1516 1169 1461 1427

12 1512 1537 1550 1601 1744 1694 1376 1589 1573

13 1615 1646 1684 1700 1871 1697 1513 1703 1675

14 1772 1810 1831 1850 1964 1623 1468 1845 1760

15 2097 2126 2148 2170 2399 1517 1428 2188 1984

16 2521 2509 2517 2504 2442 1448 1315 2499 2179

17 2591 2577 2617 2544 2334 1348 1268 2533 2183

18 2123 2209 2226 2234 1892 1227 1103 2137 1859

19 1200 1389 1370 1493 1340 1019 879 1358 1241

20 807 887 927 1007 978 782 732 921 874

21 613 700 721 787 745 606 556 713 675

22 545 611 619 662 692 552 458 626 591

23 299 338 379 376 502 501 331 379 389

TOTALS

22307 22817 22872 23107 23163 15883 12721 22854 20410

5283 5531 5432 5582 5506 2488 1160 5467 4426

9789 9991 10080 10243 10989 9372 7875 10218 9763

7235 7295 7360 7282 6668 4023 3686 7169 6221

27065 28035 28196 28794 28866 20782 17183 28191 25560

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 22712 23670 23721 23286 23613 21893 21834 20141 22013 22615 22733 23556

24 hour 27237 28928 29142 28768 29232 27412 27163 25287 27174 27762 27449 29230

Saturdays

12 hour 15832 16682 16246 16069 16398 15631 14816 13843 15419 15794 16008 15406

24 hour 20597 21148 21001 21270 21664 20972 20071 18604 20067 20639 20843 20342

Sundays

12 hour 12554 13346 13319 12426 12759 12524 12694 11228 12051 12790 12903 13139

24 hour 16914 17965 17622 16946 17452 17333 17429 15658 16274 17263 17138 17489

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190981 A666 St Peter's Way Farnworth Bolton

North bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks, football matches etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks, football matches etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Traffic Flow 2008

0

500

1000

1500

2000

2500

3000

3500

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 19: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 143 120 135 141 158 305 340 139 192

01 86 74 80 87 97 198 239 85 123

02 72 68 69 71 87 152 182 73 100

03 101 100 101 105 114 152 171 104 121

04 245 230 230 245 236 189 150 237 218

05 637 630 628 620 596 309 178 622 514

06 2006 2068 2056 2035 1935 530 318 2020 1564

07 3067 3080 3044 3034 2884 705 360 3022 2311

08 2307 2334 2339 2331 2333 997 482 2329 1875

09 1913 1963 1947 1960 1918 1215 757 1940 1668

10 1596 1623 1652 1665 1722 1432 1100 1652 1541

11 1604 1624 1648 1685 1751 1650 1427 1662 1627

12 1638 1670 1704 1743 1805 1785 1621 1712 1709

13 1701 1710 1761 1784 1840 1741 1659 1759 1742

14 1639 1690 1704 1724 1894 1649 1537 1730 1691

15 1797 1833 1854 1897 2027 1603 1423 1882 1776

16 2202 2287 2263 2308 2213 1528 1307 2255 2015

17 2331 2416 2400 2386 2184 1387 1039 2343 2020

18 1478 1552 1572 1590 1531 1119 928 1545 1396

19 993 1061 1104 1152 1191 902 809 1100 1030

20 724 784 787 862 800 682 661 791 757

21 545 592 624 641 576 532 494 596 572

22 387 434 451 494 501 488 357 453 445

23 218 247 264 283 397 412 254 282 296

TOTALS

23273 23782 23888 24107 24102 16811 13640 23831 21371

7287 7377 7330 7325 7135 2917 1599 7291 5854

9975 10150 10323 10498 11039 9860 8767 10397 10086

6011 6255 6235 6284 5928 4034 3274 6143 5431

29430 30190 30417 30843 30790 21662 17793 30333 27303

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 24300 24485 24424 24350 23840 23296 23147 22930 23017 23266 23918 24836

24 hour 30621 30953 31062 31024 30585 29880 29591 29009 29163 29479 29780 31958

Saturdays

12 hour 17304 17519 17168 16826 16650 16644 16284 15663 16418 16686 17171 16483

24 hour 22349 21584 21920 21883 21563 21745 21388 20480 21220 21296 21788 21186

Sundays

12 hour 13667 13621 14253 13389 13309 13498 13460 12900 13129 13758 13899 14173

24 hour 17557 17800 18190 17626 17509 17923 17789 16986 17130 17866 17826 18173

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190982 A666 St Peter's Way Farnworth Bolton

South bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks, football matches etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks, football matches etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.5 Average Hourly Traffic Flow 2008

0

500

1000

1500

2000

2500

3000

3500

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 20: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix
Page 21: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Southwest bound Northeast bound Two way

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190991/2 A6027 De Havilland Way Horwich Bolton

Fig.1 24-Hour Average Daily Traffic Flow 2008

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s p

er d

ay

Fig.2 Average Weekday Traffic Flows 2008 (by month)

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s p

er d

ay

Fig.3 Average Weekday Traffic Flows (by year)

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

50000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Veh

icle

s p

er d

ay

Page 22: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 66 97 100 103 135 216 233 100 136

01 39 53 55 59 89 148 135 59 83

02 40 49 48 43 50 102 95 46 61

03 40 51 45 45 56 96 65 47 57

04 73 75 77 72 80 98 50 75 75

05 187 183 195 182 176 159 71 185 165

06 622 635 633 620 587 229 121 619 492

07 1023 1074 1083 1070 1037 321 182 1057 827

08 1101 1154 1158 1167 1139 500 261 1144 926

09 936 934 970 978 1009 771 412 965 859

10 998 993 1008 1055 1140 1134 678 1039 1001

11 1138 1130 1165 1201 1334 1448 1170 1194 1227

12 1252 1276 1305 1358 1535 1640 1556 1345 1417

13 1336 1344 1345 1396 1593 1567 1612 1403 1456

14 1437 1432 1465 1494 1691 1632 1607 1504 1537

15 1531 1547 1606 1617 1784 1724 1678 1617 1641

16 2007 2027 2071 2061 2030 1766 1486 2039 1921

17 2188 2190 2212 2252 2201 1539 1066 2209 1950

18 1562 1532 1562 1633 1620 1230 651 1582 1399

19 1108 1113 1182 1243 1211 816 505 1171 1025

20 948 931 994 1033 938 640 461 969 849

21 536 599 629 670 641 441 336 615 550

22 403 456 532 506 594 498 304 498 470

23 231 241 298 308 414 405 199 298 299

TOTALS

16509 16633 16950 17282 18113 15272 12359 17098 16161

3060 3162 3211 3215 3185 1592 855 3166 2612

7692 7722 7894 8121 9077 9145 8301 8102 8279

5757 5749 5845 5946 5851 4535 3203 5830 5270

20802 21116 21738 22166 23084 19120 14934 21780 20423

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 16672 17217 17041 17096 16948 16897 16783 18051 17187 17563 17566 18105

24 hour 20964 21551 21413 21583 21487 21499 21585 23754 22150 22854 23138 23190

Saturdays

12 hour 15302 15999 14997 14225 14842 14783 14863 15863 16706 16575 16298 15504

24 hour 18668 19384 18225 18506 18137 18284 18704 20347 21475 21319 20272 19043

Sundays

12 hour 12558 12758 12291 11993 11744 11741 11912 13596 13416 14106 13059 12280

24 hour 14829 14992 14403 14288 14135 14216 14686 17468 15883 17338 16165 14537

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190991 A6027 De Havilland Way Horwich Bolton

Southwest bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks, football matches etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks, football matches etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Traffic Flow 2008

0

500

1000

1500

2000

2500

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 23: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 65 75 90 94 126 156 207 90 116

01 39 45 51 68 85 105 111 58 72

02 41 37 56 50 61 104 94 49 63

03 71 56 59 56 82 105 69 65 71

04 54 58 60 68 108 96 64 70 73

05 155 172 179 175 206 177 76 177 163

06 493 551 534 538 535 290 142 530 440

07 1364 1389 1389 1400 1423 463 235 1393 1095

08 2136 2159 2146 2133 2115 859 314 2138 1695

09 1535 1585 1587 1619 1663 1238 598 1598 1404

10 1161 1221 1192 1260 1359 1490 1213 1239 1271

11 1232 1249 1248 1306 1398 1631 1558 1287 1375

12 1281 1254 1266 1338 1468 1647 1644 1321 1414

13 1319 1282 1354 1365 1522 1728 1759 1368 1476

14 1222 1233 1266 1267 1463 1761 1659 1290 1410

15 1296 1324 1336 1374 1531 1574 1320 1372 1394

16 1457 1446 1476 1509 1642 1383 955 1506 1410

17 1543 1532 1541 1604 1603 1145 800 1565 1395

18 1436 1485 1523 1561 1440 998 698 1489 1306

19 984 1006 1088 1140 1205 845 646 1085 988

20 622 646 689 702 778 689 513 687 663

21 416 426 435 460 493 378 320 446 418

22 276 275 291 302 363 302 216 301 289

23 147 167 177 196 258 268 146 189 194

TOTALS

16982 17159 17324 17736 18627 15917 12753 17566 16645

5035 5133 5122 5152 5201 2560 1147 5129 4194

7511 7563 7662 7910 8741 9831 9153 7877 8340

4436 4463 4540 4674 4685 3526 2453 4560 4111

20345 20673 21033 21585 22927 19432 15357 21313 20195

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 17393 17685 17552 17481 17339 17253 17295 18371 17413 18401 18783 -

24 hour 20645 20951 20950 20978 20869 20912 21061 23088 21512 23240 23824 -

Saturdays

12 hour 15755 16467 15302 15760 15213 15124 15360 16283 16673 17212 17753 -

24 hour 18706 19473 18268 18952 18185 18284 18650 20549 21245 22290 23338 -

Sundays

12 hour 12931 12899 12612 12358 12070 12509 12322 13669 13572 13738 13907 -

24 hour 14894 14925 14731 14472 14369 14800 14934 17349 17895 17836 17781 -

© GMTU 2009

Greater Manchester Transportation Unit

Automatic Traffic Counter Data 2008

Site No: 00190992 A6027 De Havilland Way Horwich Bolton

Northeast bound

Average vehicle flows (excluding School Holidays, Bank Holidays, roadworks, football matches etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks, football matches etc)

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.5 Average Hourly Traffic Flow 2008

0

500

1000

1500

2000

2500

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Ve

hic

les

pe

r h

ou

r

Average weekday Average Saturday Average Sunday

Page 24: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Bank Holidays and School Holidays included

Both directions

© GMTU 2009

Automatic Cycle Counter Data 2008Site No: 00002223 Middlebrook Way Gilnow Lane Bolton

Greater Manchester Transportation Unit

Fig.1 24-Hour Average Daily Cycle Flow 2008

0

10

20

30

40

50

60

70

Mon Tues Wed Thurs Fri Sat Sun

Cyc

les p

er d

ay

Fig.2 Average Weekday Cycle Flows 2008 (by month)

0

10

20

30

40

50

60

70

80

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Cyc

les p

er d

ay

Fig.3 Average Weekday Cycle Flows (by year)

0

10

20

30

40

50

60

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Cyc

les p

er d

ay

Page 25: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 0 0 0 0 0 0 0 0 0

01 0 0 0 0 0 0 0 0 0

02 0 0 0 0 0 0 0 0 0

03 0 0 0 0 0 0 0 0 0

04 0 0 0 0 0 0 0 0 0

05 0 0 0 0 0 0 0 0 0

06 2 2 2 2 2 0 0 2 1

07 3 3 3 3 3 0 0 3 2

08 3 4 3 4 3 1 1 3 3

09 4 3 4 3 3 2 2 3 3

10 8 1 2 2 4 2 3 3 3

11 7 2 1 1 4 3 4 3 3

12 5 2 2 2 3 3 3 3 3

13 4 3 12 3 3 3 4 5 4

14 3 3 5 2 3 3 5 3 4

15 3 2 4 2 5 2 4 3 3

16 5 4 4 4 4 3 3 4 4

17 8 8 8 6 4 3 3 7 6

18 5 5 6 5 2 1 1 5 4

19 3 3 3 3 1 1 1 3 2

20 2 1 2 1 0 0 0 1 1

21 1 0 1 0 0 0 0 0 0

22 0 0 0 0 0 0 0 0 0

23 0 0 0 0 0 0 0 0 0

TOTALS

57 39 53 38 42 26 35 46 42

10 10 10 9 9 4 4 10 8

31 13 26 13 23 16 23 21 21

17 16 17 15 10 7 8 15 13

65 47 61 45 47 29 38 53 47

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour - - 34 42 50 60 58 50 51 48 43 18

24 hour - - 39 50 60 74 69 60 57 50 46 19

Saturdays

12 hour - - 13 30 33 34 26 29 35 27 17 14

24 hour - - 13 33 39 38 32 32 36 28 18 15

Sundays

12 hour - - 28 22 37 52 39 34 48 44 20 21

24 hour - - 31 25 40 58 45 37 49 46 21 22

Greater Manchester Transportation Unit

Automatic Cycle Counter Data 2008

Site No: 00002223 Middlebrook Way Gilnow Lane Bolton

Both directions

Average cycle flows (Bank Holidays and School Holidays included)

Hour starting

12 hour (0700-1900)

Average cycle flows (Bank Holidays and School Holidays included)

© GMTU 2009

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Cycle Flow 2008

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Cy

cle

s p

er h

ou

r

Average weekday Average Saturday Average Sunday

Page 26: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Bank Holidays and School Holidays included

Both Directions

© GMTU 2009

Automatic Cycle Counter Data 2008

Site No: 00002224 Middlebrook Way Lostock Arms Bolton

Greater Manchester Transportation Unit

Fig.1 24-Hour Average Daily Cycle Flow 2008

0

10

20

30

40

50

60

70

80

90

Mon Tues Wed Thurs Fri Sat Sun

Cycl

es p

er d

ay

Fig.2 Average Weekday Cycle Flows 2008 (by month)

0

10

20

30

40

50

60

70

80

90

100

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Cy

cles

per

da

y

Fig.3 Average Weekday Cycle Flows (by year)

0

10

20

30

40

50

60

70

80

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Cy

cles

per

da

y

Page 27: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Both Directions

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 0 0 0 0 0 0 0 0 0

01 0 0 0 0 0 0 0 0 0

02 0 0 0 0 0 0 0 0 0

03 0 0 0 0 0 0 0 0 0

04 0 0 0 0 0 0 0 0 0

05 0 0 0 0 0 0 0 0 0

06 2 3 2 2 2 0 0 2 2

07 5 6 5 5 5 1 1 5 4

08 5 5 5 5 4 1 2 5 4

09 3 2 3 2 2 3 4 3 3

10 8 1 2 2 5 4 5 4 4

11 9 3 2 3 5 4 7 4 5

12 6 2 2 3 3 4 6 3 4

13 5 3 14 3 4 4 7 6 6

14 5 4 6 4 5 5 8 5 5

15 5 3 5 3 6 5 9 4 5

16 6 4 5 4 5 6 6 5 5

17 9 9 10 8 5 3 5 8 7

18 8 6 8 7 4 2 2 6 5

19 6 4 7 4 2 1 2 4 4

20 3 2 3 1 1 1 1 2 2

21 1 1 1 0 0 0 0 1 0

22 0 0 0 0 0 0 0 0 0

23 0 0 0 0 0 0 0 0 0

TOTALS

73 48 66 49 53 43 59 58 56

14 13 13 12 11 5 6 13 11

36 16 31 18 28 27 40 26 28

23 18 22 19 14 11 13 19 17

84 58 79 56 58 46 63 67 63

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour - - 41 47 65 72 71 69 66 58 53 28

24 hour - - 45 58 78 94 87 81 74 60 58 29

Saturdays

12 hour - 26 42 59 53 38 55 62 31 23 30

24 hour - 26 47 63 56 47 59 66 31 23 30

Sundays

12 hour - 41 36 58 76 69 66 97 84 33 25

24 hour - 42 39 64 84 76 70 99 85 33 25

Greater Manchester Transportation Unit

Automatic Cycle Counter Data 2008

Site No: 00002224 Middlebrook Way Lostock Arms Bolton

Average cycle flows (Bank Holidays and School Holidays included)

Hour starting

12 hour (0700-1900)

Average cycle flows (Bank Holidays and School Holidays included)

© GMTU 2009

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Cycle Flow 2008

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Cy

cle

s p

er h

ou

r

Average weekday Average Saturday Average Sunday

Page 28: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Bank Holidays and School Holidays included

Both Directions

© GMTU 2009

Automatic Cycle Counter Data 2008

Site No: 00002225 Middlebrook Way Ox Hey Lane Bolton

Greater Manchester Transportation Unit

Fig.1 24-Hour Average Daily Cycle Flow 2008

0

10

20

30

40

50

60

70

80

Mon Tues Wed Thurs Fri Sat Sun

Cycl

es p

er d

ay

Fig.2 Average Weekday Cycle Flows 2008 (by month)

0

10

20

30

40

50

60

70

80

90

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Cy

cles

per

da

y

Fig.3 Average Weekday Cycle Flows (by year)

0

10

20

30

40

50

60

70

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Cy

cles

per

da

y

Page 29: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Both Directions

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 0 0 0 0 0 0 0 0 0

01 0 0 0 0 0 0 0 0 0

02 0 0 0 0 0 0 0 0 0

03 0 0 0 0 0 0 0 0 0

04 0 0 0 0 0 0 0 0 0

05 1 1 1 0 1 0 0 1 0

06 3 4 3 2 3 1 0 3 2

07 4 5 4 4 3 1 1 4 3

08 4 4 4 4 3 2 2 4 3

09 2 2 3 2 2 2 4 2 2

10 5 1 3 2 3 5 5 3 3

11 8 2 2 2 5 6 7 4 5

12 4 2 2 3 3 5 6 3 4

13 3 3 2 3 4 3 6 3 3

14 4 4 5 4 4 5 9 4 5

15 4 3 5 3 5 4 7 4 4

16 5 4 4 4 4 5 6 4 4

17 8 8 8 7 4 3 5 7 6

18 6 4 5 6 4 2 3 5 4

19 6 4 6 4 2 1 2 4 4

20 2 2 4 2 1 1 1 2 2

21 1 1 1 0 0 0 0 1 0

22 0 0 0 0 0 0 0 0 0

23 0 0 0 0 0 0 0 0 0

TOTALS

58 43 48 42 45 43 58 47 48

10 11 11 9 8 4 6 10 8

29 16 19 16 24 29 39 21 25

19 17 18 17 12 10 13 16 15

71 55 62 51 52 47 63 58 57

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour - - 33 34 51 54 57 63 53 50 43 26

24 hour - - 39 44 63 75 75 79 64 57 51 29

Saturdays

12 hour - - 31 39 51 48 41 64 59 31 35 18

24 hour - - 31 45 57 55 49 69 62 32 39 19

Sundays

12 hour - - 58 34 55 68 66 65 93 96 33 20

24 hour - - 60 39 60 74 77 70 97 98 34 20

Greater Manchester Transportation Unit

Automatic Cycle Counter Data 2008

Site No: 00002225 Middlebrook Way Ox Hey Lane Bolton

Average cycle flows (Bank Holidays and School Holidays included)

Hour starting

12 hour (0700-1900)

Average cycle flows (Bank Holidays and School Holidays included)

© GMTU 2009

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Cycle Flow 2008

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Cy

cle

s p

er h

ou

r

Average weekday Average Saturday Average Sunday

Page 30: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Bank Holidays and School Holidays included

East bound

© GMTU 2009

Automatic Cycle Counter Data 2008

Site No: 10170171 A673 Chorley New Road (cycle lane) Bolton

Greater Manchester Transportation Unit

Fig.1 24-Hour Average Daily Cycle Flow 2008

0

10

20

30

40

50

60

70

Mon Tues Wed Thurs Fri Sat Sun

Cycl

es p

er d

ay

Fig.2 Average Weekday Cycle Flows 2008 (by month)

0

10

20

30

40

50

60

70

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Cy

cles

per

da

y

Fig.3 Average Weekday Cycle Flows (by year)

0

10

20

30

40

50

60

70

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Cy

cles

per

da

y

Page 31: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 0 0 0 0 0 0 0 0 0

01 0 0 0 0 0 0 0 0 0

02 0 0 0 0 0 0 0 0 0

03 0 0 0 0 0 1 0 0 0

04 0 1 1 1 0 1 0 1 1

05 1 2 2 2 2 1 0 2 1

06 5 3 3 3 2 1 1 3 2

07 3 3 3 3 3 2 1 3 3

08 3 3 4 3 3 2 2 3 3

09 1 2 2 3 2 2 5 2 2

10 1 3 2 2 2 2 5 2 2

11 3 3 3 4 2 3 7 3 4

12 2 4 3 5 3 5 6 4 4

13 3 3 2 3 4 3 5 3 3

14 2 3 3 4 4 2 4 3 3

15 3 3 4 3 4 3 5 3 4

16 5 5 6 5 4 3 4 5 4

17 7 7 8 7 4 3 4 7 6

18 4 3 4 3 2 2 2 3 3

19 3 3 3 3 2 1 1 3 2

20 4 4 3 3 2 1 1 3 2

21 1 1 1 1 1 0 1 1 1

22 1 1 1 1 0 0 0 1 0

23 0 0 1 1 0 0 0 0 0

TOTALS

38 42 43 45 38 32 50 41 41

7 8 8 9 9 6 8 8 8

15 19 17 21 19 17 32 18 20

16 15 19 14 10 8 10 15 13

54 57 57 58 48 37 55 55 52

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 24 29 28 29 49 42 46 42 44 41 39 30

24 hour 31 36 34 40 62 59 61 57 57 51 46 38

Saturdays

12 hour 20 19 19 23 39 38 26 39 25 24 25 23

24 hour 27 24 20 30 46 42 33 41 31 29 28 27

Sundays

12 hour 47 35 40 25 56 47 60 54 67 51 42 39

24 hour 49 38 42 25 59 53 65 59 69 53 45 43

Greater Manchester Transportation Unit

Automatic Cycle Counter Data 2008

Site No: 10170171 A673 Chorley New Road (cycle lane) Bolton

East bound

Average cycle flows (Bank Holidays and School Holidays included)

Hour starting

12 hour (0700-1900)

Average cycle flows (Bank Holidays and School Holidays included)

© GMTU 2009

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Cycle Flow 2008

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Cy

cle

s p

er h

ou

r

Average weekday Average Saturday Average Sunday

Page 32: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Bank Holidays and School Holidays included

East bound

© GMTU 2009

Automatic Cycle Counter Data 2008

Site No: 10170281 A58 Moss Bank Way (cycle lane) Bolton

Greater Manchester Transportation Unit

Fig.1 24-Hour Average Daily Cycle Flow 2008

0

2

4

6

8

10

12

14

16

18

Mon Tues Wed Thurs Fri Sat Sun

Cycl

es p

er d

ay

Fig.2 Average Weekday Cycle Flows 2008 (by month)

0

5

10

15

20

25

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Cy

cles

per

da

y

Fig.3 Average Weekday Cycle Flows (by year)

0

2

4

6

8

10

12

14

16

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Cy

cles

per

da

y

Page 33: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 0 0 0 0 0 0 0 0 0

01 0 0 0 0 0 0 0 0 0

02 0 0 0 0 0 0 0 0 0

03 0 0 0 0 0 0 0 0 0

04 0 0 0 0 0 0 0 0 0

05 1 1 0 1 1 0 0 1 0

06 1 1 1 1 1 0 0 1 1

07 1 2 1 1 1 0 0 1 1

08 1 2 2 1 1 1 1 1 1

09 1 1 1 1 1 1 1 1 1

10 0 0 1 0 1 1 1 1 1

11 1 1 1 1 1 1 2 1 1

12 1 1 0 1 1 1 2 1 1

13 1 1 1 1 1 1 2 1 1

14 1 1 1 1 1 1 1 1 1

15 1 1 1 1 1 1 1 1 1

16 1 1 1 1 1 1 1 1 1

17 1 1 1 1 1 1 1 1 1

18 1 1 1 1 1 1 1 1 1

19 1 1 1 1 1 0 1 1 1

20 1 1 1 1 1 0 1 1 1

21 1 0 1 0 0 0 0 0 0

22 0 0 0 0 0 0 0 0 0

23 0 0 0 0 0 0 0 0 0

TOTALS

10 11 10 10 10 9 15 10 11

3 4 4 3 3 2 2 4 3

4 4 4 5 4 5 9 4 5

3 3 3 2 3 2 3 3 3

15 15 14 14 14 11 17 14 14

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 9 8 7 9 14 11 12 9 11 8 9 7

24 hour 11 10 9 14 19 15 16 13 14 10 11 9

Saturdays

12 hour 5 5 5 7 10 10 8 9 12 9 6 8

24 hour 7 6 5 8 12 12 10 10 13 10 6 9

Sundays

12 hour 12 9 11 12 15 12 16 15 20 17 14 13

24 hour 14 11 12 13 17 13 20 17 21 18 16 16

Greater Manchester Transportation Unit

Automatic Cycle Counter Data 2008

Site No: 10170281 A58 Moss Bank Way (cycle lane) Bolton

East bound

Average cycle flows (Bank Holidays and School Holidays included)

Hour starting

12 hour (0700-1900)

Average cycle flows (Bank Holidays and School Holidays included)

© GMTU 2009

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Cycle Flow 2008

0.0

0.5

1.0

1.5

2.0

2.5

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Cy

cle

s p

er h

ou

r

Average weekday Average Saturday Average Sunday

Page 34: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Bank Holidays and School Holidays included

Southwest bound

© GMTU 2009

Automatic Cycle Counter Data 2008

Site No: 10170291 A676 Folds Road (cycle lane) Bolton

Greater Manchester Transportation Unit

Fig.1 24-Hour Average Daily Cycle Flow 2008

0

10

20

30

40

50

60

Mon Tues Wed Thurs Fri Sat Sun

Cycl

es p

er d

ay

Fig.2 Average Weekday Cycle Flows 2008 (by month)

0

10

20

30

40

50

60

70

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Cy

cles

per

da

y

Fig.3 Average Weekday Cycle Flows (by year)

0

10

20

30

40

50

60

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Cy

cles

per

da

y

Page 35: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 0 0 0 0 0 0 0 0 0

01 0 0 0 0 0 0 0 0 0

02 0 0 0 0 0 0 0 0 0

03 0 0 0 0 0 0 0 0 0

04 0 0 0 0 0 0 0 0 0

05 1 1 1 1 1 0 0 1 1

06 4 5 5 4 4 1 1 5 4

07 8 10 8 8 9 2 2 9 7

08 5 4 4 4 4 2 2 4 4

09 4 4 5 4 4 2 3 4 4

10 3 3 2 3 3 3 3 3 3

11 3 3 2 3 3 2 3 3 3

12 3 3 3 3 3 2 2 3 3

13 3 3 2 3 3 2 2 3 3

14 3 3 2 3 3 2 3 3 3

15 3 3 2 2 3 1 2 3 2

16 3 3 4 3 3 1 2 3 3

17 3 4 3 3 3 1 1 3 3

18 1 2 2 2 1 1 1 2 1

19 2 2 1 1 1 1 0 1 1

20 1 1 1 1 1 1 0 1 1

21 1 0 0 0 0 0 0 0 0

22 1 0 0 0 1 1 0 1 1

23 0 0 0 0 0 0 0 0 0

TOTALS

41 45 40 42 42 23 25 42 37

17 19 17 16 18 7 7 17 14

17 18 14 17 17 13 14 17 16

7 8 9 9 7 4 4 8 7

50 54 50 51 51 28 29 51 45

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 28 31 29 37 49 51 42 40 44 44 40 34

24 hour 33 35 34 52 61 62 51 47 52 51 42 40

Saturdays

12 hour 16 15 15 23 23 31 19 21 30 22 17 19

24 hour 22 20 17 30 29 37 24 26 35 27 20 22

Sundays

12 hour 25 18 21 20 25 26 34 25 27 27 27 16

24 hour 27 21 23 24 29 30 38 30 31 29 31 20

Greater Manchester Transportation Unit

Automatic Cycle Counter Data 2008

Site No: 10170291 A676 Folds Road (cycle lane) Bolton

Southwest bound

Average cycle flows (Bank Holidays and School Holidays included)

Hour starting

12 hour (0700-1900)

Average cycle flows (Bank Holidays and School Holidays included)

© GMTU 2009

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Cycle Flow 2008

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Cy

cle

s p

er h

ou

r

Average weekday Average Saturday Average Sunday

Page 36: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Bank Holidays and School Holidays included

North bound

© GMTU 2009

Automatic Cycle Counter Data 2008

Site No: 10170301 B6536 Manchester Road (cycle lane) Bolton

Greater Manchester Transportation Unit

Fig.1 24-Hour Average Daily Cycle Flow 2008

0

10

20

30

40

50

60

70

80

Mon Tues Wed Thurs Fri Sat Sun

Cycl

es p

er d

ay

Fig.2 Average Weekday Cycle Flows 2008 (by month)

0

10

20

30

40

50

60

70

80

90

100

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Cy

cles

per

da

y

Fig.3 Average Weekday Cycle Flows (by year)

0

10

20

30

40

50

60

70

80

90

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Cy

cles

per

da

y

Page 37: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE …...AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Bolton is shown in this Appendix

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day

00 0 0 0 0 0 0 0 0 0

01 0 0 0 0 1 1 0 0 0

02 0 0 0 0 0 0 0 0 0

03 0 0 0 0 0 0 0 0 0

04 0 1 1 1 1 0 0 1 1

05 2 2 2 2 2 1 1 2 2

06 3 3 4 3 3 1 0 3 2

07 7 8 8 8 7 2 2 8 6

08 6 6 6 6 5 2 2 6 5

09 3 3 3 2 3 2 4 3 3

10 4 3 4 3 3 2 3 3 3

11 4 4 3 4 4 2 3 4 3

12 3 4 3 3 5 2 3 4 3

13 3 3 4 4 4 2 3 4 3

14 4 4 5 4 4 3 3 4 4

15 5 5 6 5 6 2 2 5 4

16 8 7 9 9 8 2 2 8 6

17 8 9 8 9 6 2 2 8 6

18 4 3 3 4 3 2 2 3 3

19 2 2 2 2 2 1 1 2 2

20 1 1 1 1 1 1 1 1 1

21 1 1 2 1 1 0 1 1 1

22 1 1 1 1 0 1 1 1 1

23 0 0 0 0 1 0 0 0 0

TOTALS

59 60 61 61 57 25 30 60 50

16 18 17 16 15 5 8 16 14

23 23 25 23 26 14 16 24 21

20 20 20 22 16 6 6 20 16

70 73 76 73 69 32 37 72 62

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Weekdays

12 hour 33 43 42 56 67 74 62 63 65 61 56 38

24 hour 40 49 48 72 82 92 77 73 78 71 68 46

Saturdays

12 hour 18 17 18 19 34 35 28 23 32 19 25 16

24 hour 26 23 24 25 40 41 39 33 42 25 31 22

Sundays

12 hour 30 22 21 20 31 40 42 32 40 32 20 22

24 hour 35 27 26 24 40 45 50 39 47 38 25 27

Greater Manchester Transportation Unit

Automatic Cycle Counter Data 2008

Site No: 10170301 B6536 Manchester Road (cycle lane) Bolton

North bound

Average cycle flows (Bank Holidays and School Holidays included)

Hour starting

12 hour (0700-1900)

Average cycle flows (Bank Holidays and School Holidays included)

© GMTU 2009

am peak (0700-1000)

off peak (1000-1600)

pm peak (1600-1900)

24 hour (0000-2400)

Fig.4 Average Hourly Cycle Flow 2008

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Hour Starting

Cy

cle

s p

er h

ou

r