CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (V.4) APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) The Northampton Gateway Rail Freight Interchange Order 201X CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (V.4) | 19 MARCH 2019 www.northampton-gateway.co.uk

Upload: others

Post on 31-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

CONSTRUCTION ENVIRONMENTAL MANAGEMENT

PLAN (V.4)

APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2)

The Northampton Gateway Rail Freight Interchange Order 201X

CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (V.4) | 19 MARCH 2019

www.northampton-gateway.co.uk

Page 2: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted
Page 3: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

i

Construction Environmental Management Plan ENVIRONMENTAL STATEMENT APPENDIX 2.1

Client Roxhill (Junction 15) Limited Project Northampton Gateway Strategic Rail Freight Interchange Date March 2019

Page 4: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

ii

Contents 1.0 Purpose of the Construction Environmental Management Plan (CEMP) .............................. 1

2.0 Description of the Works ................................................................................................... 2

3.0 General Site Management ................................................................................................. 2

Roles and Responsibilities ......................................................................................................... 2

Communications ........................................................................................................................ 3

4.0 Components and Logic ...................................................................................................... 4

Key Activities ............................................................................................................................. 4

Key Restraints Governing the Logical Phasing of Works ................................................. 6

Indicative Master Programme................................................................................................ 8

5.0 Pollution and Contamination ............................................................................................. 8

6.0 Measures for Controlling Noise and Vibration .................................................................. 10

Noise ........................................................................................................................................ 10

Vibration .................................................................................................................................. 11

Working Hours ......................................................................................................................... 11

7.0 Soil Management and Measures for Controlling Emission of Dust .................................... 12

8.0 Contractor’s Facilities including Compound areas, Temporary Buildings and Fencing,

Parking areas and Storage of Plant and Materials .................................................. 13

9.0 Waste Management........................................................................................................ 14

10.0 Storage of Fuel, Oil and other Chemicals .......................................................................... 16

11.0 Development affecting a Watercourse ............................................................................. 17

12.0 Temporary Lighting ......................................................................................................... 17

13.0 Prevention of Debris on Highways ................................................................................... 18

14.0 Routing of Construction Traffic ........................................................................................ 18

15.0 Protecting Biodiversity Interests ...................................................................................... 18

16.0 Roade Cutting SSSI .......................................................................................................... 26

16.1 The Roade Bypass (Works No. 13) affects the Roade Cutting SSSI. All works close to or

within the Roade Cutting SSSI shall be carried out in accordance with a method

statement to be prepared and included in the relevant P-CEMP and agreed with

Natural England. ................................................................................................... 26

17.0 Advisory Signage ............................................................................................................. 26

18.0 Temporary Surface Water Management System .............................................................. 26

19.0 Public Rights of Way ....................................................................................................... 27

20.0 Traffic Management ........................................................................................................ 27

Appendix 02 – Main Site Phasing Plan (ref NGW-BWB-GEN-XX-SK-C-SK39-S3-P6) ......................... 31

Page 5: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

iii

Appendix 03 – Built Development Area and Landscape Surrounds – Proposed Components and

Sequence (ref 5772-L-39 rev B) .............................................................................. 32

Appendix 04 – A508 Temporary Ghost Island Construction Access and Main Site Compounds (ref

SK-C-SK07-rev-P4) ................................................................................................. 33

33

Appendix 05 - Illustrative Rail Terminal (ref 4054-17 – rev- S1) .................................................... 34

34

Page 6: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

1

1.0 Purpose of the Construction Environmental Management Plan (CEMP)

1.1 In this document “DCO” means The Northampton Gateway Rail Freight Interchange Order 201[

] as made by the Secretary of State.

1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems

and controls that will be adopted during the construction of the Northampton Gateway Strategic

Rail Freight Interchange scheme to minimise any adverse environmental impacts in accordance

with the conclusions of the Environmental Statement and Construction Good Practice. The

CEMP provides the framework with which all Phase and construction component specific

Construction Environmental Management Plans (P-CEMPs) required for each component of

development by DCO Schedule 2 Requirement 12, must accord.

1.3 This CEMP and in turn P-CEMPS, will cover matters which are also set out in the DCO

Schedule 2 Requirements. The governing document for all construction activity is the DCO

with its requirements. Where matters are dealt with differently in the CEMP or P-CEMP to the

Requirements, it is the DCO Requirements that will take precedent.

1.4 The exact number of P-CEMPs will depend on the precise split of components of construction

work which has yet to be confirmed. However, P-CEMPs will be provided for:

Main site (potentially split further into the earthworks, drainage, roads and landscaping)

Rail terminal

Rail connection and railway works

Each component of the highway works as defined by Parts 2 and 3 of Schedule 13 of the

DCO

Each warehouse developed

Obligations, Compliance and Enforcement

1.5 The principles set out by the CEMP and the arrangements established through the P-CEMPs,

will be incorporated within all construction contracts arising from the development of the scheme

and all contractors, their subcontractors and supplier will be required to comply with the

overarching principles and details contained in each P-CEMP.

1.6 Any non-conformance or infringement with either the CEMP or P-CEMP shall be reported to

the Project Manager with 24 hours and proposals for rectifying the non-conformance shall be

submitted to the Project Manager within 7 days. The management and reporting of non-

conformances will be the responsibility of the Environmental Manager.

Page 7: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

2

1.7 The contractor shall submit proposals to the Project Manager, before work commence, for the

internal and external auditing of compliance with the CEMP and the P-CEMP. Copies of all

audit reports are to be provided to the Project Manager within 7 days of the audit. Furthermore,

the Project Manager will undertake audits as and when he sees fit.

1.8 Failure to rectify a non-conformance within an agreed timescale may result in relevant works

being suspended until the Project Manager is satisfied that the non-conformance has been

corrected, or in extreme cases termination of the contract.

1.9 The CEMP will remain valid throughout the construction phase of the scheme.

2.0 Description of the Works

2.1 The development comprises a Strategic Rail Freight Interchange together with landscaping,

access and other supporting infrastructure works. It consists of:

An intermodal freight terminal including container storage and HGV parking, rail sidings

to serve individual warehouses, and the provision of an aggregates facility as part of the

intermodal freight terminal, with the capability to also provide a ‘rapid rail freight’ facility;

Up to 468,000 sq. m (approximately 5 million sq. ft.) (gross internal area) of warehousing

and ancillary buildings, with additional floorspace provided in the form of mezzanines;

A secure, dedicated, HGV parking area of approximately 120 spaces including driver

welfare facilities to meet the needs of HGVs visiting the site or intermodal terminal;

New road infrastructure and works to the existing road network, including the provision

of a new access and associated works to the A508, a new bypass to the village of Roade,

improvements to Junction 15 and to J15A of the M1 motorway, the A45, other highway

improvements at junctions on the local highway network and related traffic management

measures;

Strategic landscaping and tree planting, including diverted public rights of way;

Earthworks and demolition of existing structures on the SRFI site.

3.0 General Site Management

Roles and Responsibilities

3.1 The site wide coordination and implantation of the principles established in this CEMP through

the preparation and agreement of each component specific Construction Environmental

Management Plan (P-CEMP), will be the responsibility of the Developer’s Project Manager with

the support of the developer’s Environmental Consultant.

Page 8: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

3

3.2 As each contract comes forward an Environmental Manager will be appointed for that Contract,

generally this will be a contractor appointment but in some circumstances the Project Manager

may undertake this role or appoint others. The Environmental Manager shall ensure that the

principles of the CEMP shall be fully integrated into all site procedures, processes and activities,

through the preparation and agreement of P-CEMPs and ensure that appropriate environmental

management systems, under BS 14000 or similar, are put in place through each P-CEMP.

3.3 The Developer’s Project Manager who will carry out appropriate audits of the contractors’

arrangements to ensure full compliance with the P-CEMP. Any infringement of the P-CEMP or

any environmental incident shall be immediately reported to the Project Manager. The

contractor will be required to fully investigate the issue and take appropriate corrective action.

3.4 The key contacts are:

Developer – Mr Ian Rigby, Segro plc

Project Manager – TBC (Developer Appointment)

Ecological Consultant – FPCR

Landscape Consultant – FPCR

Engineering Consultant – BWB Consulting

Principal Contractor – TBC (Developer Appointment)

Principal Designer – David Matthews - Watermans

Site Manager – TBC (Contractor Appointment)

Environmental Manager – TBC (Contractor Appointment)

Health and Safety Manager – TBC (Contactor Appointment)

3.5 The key firms and individuals may change as the scheme develops, and each P-CEMP should

set out and update as appropriate the list of key contacts.

Communications

3.6 The effective implementation of the CEMP through each P-CEMP is intrinsically linked to good

communications between all the project stakeholders and the public.

3.7 To promote effective communications during any contract each P-CEMP shall require the

following to be implemented at the commencement of each contract:

The Project Manager will brief the contractor’s senior management team on the

philosophy and content of the CEMP and details of the relevant P-CEMP, which will

generally include the Director responsible for the scheme.

The Ecological Consultant shall brief the contractor’s senior management team on all

ecological aspects of the scheme.

Page 9: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

4

The contractor’s Director shall be responsible for developing a site-specific induction for

all those working or visiting his site. The scope of the induction will be agreed in advance

with the Project Manager.

3.8 The contractor’s monthly progress report shall include reporting on compliance with the P-

CEMP.

3.9 The contractor will provide a programme to achieve continuous improvement of environmental

matters during the contract. The Developer wishes to see positive training on environmental

matters on an on-going basis.

3.10 The contractor shall develop an appropriate strategy for communicating with the public both

before commencement and during the contract. This must be in accordance with protocol for

community liaison pursuant to Requirement 29 and, for any highway works on the strategic

road network, the scheme for stakeholder liaison agreed pursuant to Part 2 of Schedule 13.

4.0 Components and Logic

4.1 This section of the Construction Environmental Management Plan outlines the different

components of works to be carried out and outlines the possible restraints which may have an

impact on the way the components are assembled. It sets out how these matters have informed

the approach adopted in the preparation of the Indicative Master Programme (see Appendix

One).

4.2 A P-CEMP must be prepared for each component of development. Where necessary, for

example if several contractors are involved in the delivery of a particular component, it may be

necessary for multiple P-CEMPs (each specific to individual contractors) to be prepared. Each

P-CEMP must accord with the principles set out in this CEMP and must have regard to the

details contained in other P-CEMPs for that component of development.

4.3 Each P—CEMP must place an obligation on the contractor to ensure that all relevant

requirements set out in the Development Consent Order have been discharged / approved,

prior to work commencing. For example, works cannot start until Requirement 14,

(archaeological investigation and mitigation) has been discharged. Each P-CEMP must fully

accord with all the details agreed pursuant to all the Requirements where relevant.

Key Activities

Page 10: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

5

4.4 The following table provides a summary of the Key Activities:

Key activity Works No.

Main Site Earthworks and Drainage

Within all of Works Nos. 1, 2, 3, 4,5 and 6

Main Site Roads 5

Main Site Landscaping 6

Railway works 1 and 3

Rail terminal 2

Main Site Buildings 4

Highway works 7, 8, 9, 11, 12, 13, 14, 15 ,16 & 17

Foul drainage outfall 10

4.5 These activities are described more fully in Schedule 1 of the DCO and the relevant works

areas are shown on the Works Plans (Document 2.2).

Highway works

4.6 The Highway works are to be undertaken in accordance with the timescales as set out in

Schedule 2 Requirement 5 and 6 of the DCO. These timescales are determined as set out in

the Transport Assessment and take account of the restraints on phasing of the highway works

set out below.

Main Site Earthworks, Drainage, Roads and Landscaping

4.7 The Earthworks, drainage and landscaping is split into two phases as shown on drawing NGW-

BWB-GEN-XX-SK-C-SK39 (see Appendix 2) and drawing 5772 – L-39 (see Appendix 3).

These phases are split into the years of construction.

4.8 The Main Site Road is split into three phases as shown on drawing NGW-BWB-GEN-XX-SK-

C-SK39 (see Appendix 2).

Main Site from the Access (Component 1) to the end of Zone A1a

End of Zone A1a to the rail terminal

End of Zone A1a to end of Zone A1c (end of site road)

4.9 In order for works to commence on the Main Site a temporary Ghost Island construction access

will be formed on the A508 together with the creation of temporary construction access tracks

and main site compounds as shown on drawing NGW-BWB-GEN-XX-SK-C-SK07 (at Appendix

4).

Page 11: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

6

Railway

4.10 The Railway works (Works Nos. 1, 2 and 3) comprise:

Connection to Network Rail and Signalling (Part of Works No. 1)

New Terminal (Works No. 2)

Reception Sidings (Part of Works No. 1)

Main Site Railway outside of the development zones (Part of Works No. 1)

Main Site Railway within the development zones (Works No. 3)

4.11 The Phasing of Railway works is shown on Plan ref 4054-17 (see Appendix 5)

Main Site Buildings

4.12 The Buildings are split into zones as indicated on the Parameters Plan (Document 2.10)

Key Restraints Governing the Logical Phasing of Works

Highway works

4.13 The Phasing of highway works will be undertaken in accordance with Requirement 5 and 6.

4.14 The following highway works can be undertaken at the commencement of the scheme:

Works No. 7 Site Access

Works Nos. 8 and 9 (M1 Junction 15 / A45)

4.15 The construction of the Roade Bypass (Works No. 13) will be governed by the methodology

and availability of possessions for the bridge over the West Coast Main Line. The other

highway works on the A508 are associated with the timing of the construction of the Roade

Bypass.

4.16 Works No. 11 (M1 J15A improvements) cannot be constructed at the same time as Works

Nos. 7, 8 & 9 (J15 improvements and site access) to avoid working on two adjacent motorway

junctions concurrently.

4.17 Other practical restraints may include:

Design resources

Construction resource

Availability of materials

Page 12: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

7

The mitigation of delays and disruption to the existing highway network

Statutory Undertaker imposed restraints

Other third party-imposed restraints such as the M1 J13-J16 Smart Motorway to be

undertaken by Highways England

Scale of the Scheme

4.18 The importance of managing the phasing of the works to mitigate delays and disruption on

the existing highway network is perhaps the most significant practical restraint. Generally,

this is best achieved by diverted traffic onto new alignments away from works under

construction and controlling the level of interference on the networks at any time.

4.19 The indicative master programme plans the highway works to be carried out sequentially but

some overlap should be possible following the detailed design and with agreement from

Highways England and Northamptonshire County Council.

Main Site Earthworks, Drainage, Road and Landscaping

4.20 The Phasing of all components of the works will be undertaken in accordance with details

agreed pursuant to Requirement 3 for the Main Site,

4.21 The scale of the Main Site earthworks is such that it would be appropriate to adopt a phased

approach so that subsequent activities can commence before all the previous tasks have been

completed.

4.22 Logically, it would be appropriate to commence the earthworks adjacent to the access point

and work away from the access. Therefore, the Main Site Earthworks, Drainage and

Landscaping have been divided into two phases as shown on drawing NGW-BWB-GEN-XX-

SK-C-SK39 (Appendix 2).

4.23 Phase 1 opens up the development plateaus for the rail terminal and Zones A1a and A4 (refer

to the Parameters Plan, Document 2.10) and constructs the key sections of the perimeter

screening bund appropriate to screening these areas. This component provides the

necessary permanent and temporary drainage and balancing ponds with suitable outfalls.

4.24 Phase 2 opens up the development plateau for the rest of the site and constructs the sections

of the perimeter screening bund adjacent to this area. This component provides the necessary

permanent and temporary drainage and balancing ponds with suitable outfalls.

4.25 Landscaping will be installed in accordance with the timings agreed pursuant to Requirement

10.

Page 13: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

8

4.26 The order of the Main Site Earthworks, Drainage and Landscaping is shown on the Indicative

Master Programme (Appendix 1); however, the actual order may change as market needs

may dictate, and in accordance with details agreed pursuant to Requirement 3.

4.27 The Main Site Road (Works No. 5) will generally be constructed concurrently with the

development of the adjacent building plateau and in accordance with details agreed pursuant

to Requirement 3.

Railway

4.28 The key restraints to the Railway components are:

The Terminal and railway infrastructure cannot be completed until the earthworks have

been completed.

The Connection to the Northampton Loop line, including the signalling have to be

constructed by Network Rail and a 2-year period has been allowed for the lead in period

and construction / commissioning of the connection.

Buildings

4.29 The building units can only be provided on plots that have a plateau and the screening,

bunding and landscaping associated with that building has been provided as indicated on

drawing 3252-L39 (Appendix 3). Buildings will not be occupied until the screening and bunding

associated with that building are in place.

Indicative Master Programme

4.30 The Indicate Master Programme contained in Appendix 1 shows how the works may be

assembled.

4.31 Final assembly of the works will be undertaken following detailed design, selection of

materials and the appointment of key contractors and in accordance with phasing agreed

pursuant to Requirement 3 for the Main Site, and Requirements 5 and 6 for the highway works.

5.0 Pollution and Contamination

5.1 Pollution and contamination can be pre-existing or caused by construction activities.

Page 14: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

9

5.2 Where pre-existing contamination has been found to exist, Contractors will be required in

accordance with Requirement 25 to undertake remediation measures identified in the geo-

environmental assessment, investigations and reports in a suitable and acceptable manner and

at such time as is appropriate. These measures must be agreed with the Environment Agency

(EA) before any measures are implemented and verification reports shall be prepared and

issued to the EA on completion of the remediation.

5.3 A UXO/UXB risk assessment will be undertaken before any intrusive works are undertaken.

5.4 In the event that suspected contaminated material is uncovered during the works an appropriate

area will be protected, all works will be suspended and a suitably qualified person shall be

engaged to investigate and develop a suitable strategy for dealing with any contaminated

material.

5.5 The contractor shall plan and execute his work to ensure that hazardous or polluting substances

do not cause harm to underlying aquifers, surface water systems, landscaping and associated

ecology.

5.6 At the commencement of any component of earthworks the necessary permanent drainage

basins for that component will be constructed and outfalls into the existing water courses will

be provided, in accordance with the drainage strategy contained in the Environmental

Statement, Requirements 17 and 18, the surface water drainage scheme agreed pursuant to

Requirement 18 and any approvals required under DCO Article 21.

5.7 Additional settlement and control ponds will be provided as necessary during a component to

prevent pollution entering the existing water courses.

5.8 The scheme requires significant earthworks which will inevitably increase the risk of pollution

to the surface water system. All contractors shall adopt water pollution prevention procedures

in line with good practice. In preparing the procedures the contractor shall consider the following

as a minimum:

Published guidance from the Environment Agency

Control of water pollution from construction site and other documents published by CIRIA

The site-specific requirements of the EA

Arrangements for monitoring water bodies to ensure and demonstrate water quality

Fuelling of plant and equipment

Maintenance of plant and equipment

Storage of hazardous materials

Control of concrete truck washout arrangements

Flood warnings

The landscape and ecological environment

Page 15: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

10

5.9 All contractors will be required to include water pollution prevention in all inductions and shall

arrange update tool box talks at appropriate intervals during the contract.

5.10 All incidents involving water pollution shall be immediately reported to the Project Manager.

6.0 Measures for Controlling Noise and Vibration

Noise

6.1 Contractors will implement measures to minimise the disturbance caused by construction traffic

and activities.

6.2 When planning all activities contractors should predict noise levels and review the likely impacts

and what can be done to mitigate any adverse impacts.

6.3 If construction activities are likely to cause a potential disturbance at sensitive receptors

consideration should be given to noise measurements before and during construction. The

thresholds set out in Table 8.1 of the Environmental Statement should be used to determine

the extent of the potential disturbance.

6.4 The guidance given in BS 5228-1: 2009+A1:2014 “Code of Practice for Noise and Vibration

Control on Construction and Open Sites Part 1: Noise” relating to “Methods of Work” will be

followed and will be incorporated, as appropriate, within the method statement which will form

the basis for the implementation of construction works.

6.5 As a precaution, check monitoring will be undertaken at the start of the different phases of the

works to determine whether the noise levels from construction activities are as predicted in the

P-CEMP for that phase of work.

6.6 At least 28 days prior to any construction works commencing, a construction monitoring protocol

would be agreed with the Local Planning Authority. This will establish the frequency, duration

and location of the noise monitoring. It will also identify the construction noise thresholds at the

appropriate receptor locations and the protocol that shall be followed if these thresholds are

exceeded or any complaints are received.

6.7 In planning their work contractors shall consider the following as a minimum:

Selection of plant and equipment

Timing of an operation in the programme

Timing of the activity during the day

Duration of tasks

Page 16: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

11

Maintenance of plant and equipment

Use of sound reducing equipment at source

Closing down equipment during period of non-use

Location access routes and haul roads

6.8 Details of the contractor’s proposals for the use of best practical means to manage construction

noise control shall be included in each P-CEMP.

Vibration

6.9 Contractors will implement measures to minimise the disturbance caused by construction traffic

and activities.

6.10 When planning all activities contractors should consider vibration and review the likely impacts

and what can be done to mitigate any adverse impacts. The thresholds set out in Table 8.2 of

the Environmental Statement should be used to determine the extent of the potential impact.

6.11 The guidance given in BS 5228-2:2009+A2:2014 “Code of Practice for Noise and Vibration

Control on Construction and Open Sites Part 2: Vibration”, will be used and incorporated, as

appropriate, within the method statement which will form the basis for the implementation of the

construction works.

In planning their work contractors should consider the following as a minimum:

Selection of plant and equipment

Methods of working

Duration of activities

Working hours

Use of measures at source to reduce the level of vibration generated.

Working Hours

6.12 Construction work within the development site will be controlled by Requirement 21 and

confined to the following:

07:00 -19:00 hours Monday to Friday,

07:00 -16:00 hours Saturday,

6.13 No works will be undertaken on Sundays or public holidays, save in exceptional circumstances

only and with prior notification to the LPA.

6.14 Any changes to the above working hours will also be agreed with the LPA

Page 17: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

12

6.15 All delivery vehicles and plant arriving and leaving the site will also comply with the same time

restrictions, although site personnel will be permitted to access the site 30 minutes before these

hours and exit the site 30 minutes after them. Adherence to the codes of practice for

construction working given in British Standard BS 5228 will be required.

6.16 Construction work outside the development site will require some night working to comply with

the requirements of Highways England or for practical and safety reasons.

7.0 Soil Management and Measures for Controlling Emission of Dust

7.1 To prevent and minimise the loss or damage of soil resources requires the adoption of Soil

Management measures. Each relevant P-CEMP and in accordance with Requirement 13,

should incorporate a Soil Management Plan to be undertaken by a suitably qualified practitioner

in accordance with the principles outlined in the Construction Code of Practice for Sustainable

Use of Soils on Construction Sites. Each P-CEMP will be required to include details such as:

Depth and method of topsoil stripping and stockpiling, including separation of topsoil

resources of different potential.

Methods of stripping and stockpiling of higher quality re-useable subsoil (if appropriate).

Identification of landscaping topsoil requirements and assessment of suitability and

availability of on-site resources (if appropriate).

Means of protection of subsoil from compaction damage and remedial measures

(ripping/subsoiling) to remove damage.

7.2 Many construction activities increase the risk of dust nuisance. Each P-CEMP will be required

to set out the details of a dust management plan setting out the methods to be used to control

dust and other emissions to air. These should accord with the principles set out below.

7.3 Contractors will plan their activities to reduce the level of risk and mitigate any residual impacts

in accordance with ‘Institute of Air Quality Management (IAQM) Guidance on Assessment of

Dust from Demolition and Construction 2014’.

7.4 Generally, the most effective method of dust control is damping using a fine spray. The

contractor will fully investigate sources of water and where possible use recycled water. Potable

water should not be used.

7.5 When sensitive receptors are in close proximity to the site and sources of dust generation the

contractor should consider dust monitoring before and during construction. The contractors will

be advised to discuss their arrangements with the Environmental Health Officer (EHO).

Page 18: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

13

7.6 In planning his activities, contractors should consider the following as a minimum:

Damping down arrangements including using sprinklers

Sources of water for damping down

Location of haul roads and their surface types and exposed soil following earthworks.

Stabilisation of temporary haul roads.

Sweeping arrangements of hard surfaces

Site speed limits

Selection of plant and equipment

Maintenance of plant and equipment

Covering of payloads while in transit

Covering of skips, chutes and conveyors

Location and surface treatment of stockpiles

Burning will not be permitted on site

Consideration of prevailing wind direction

Programme and seasonal timing, including consideration of time of day and weather

conditions

The siting of dust generating activities relative to sensitive receptors

Use of windbreaks

Duration of activities.

8.0 Contractor’s Facilities including Compound areas, Temporary Buildings

and Fencing, Parking areas and Storage of Plant and Materials

8.1 It is likely that more than one contractor will be working on the development at any time, each

requiring different facilities located at different locations. It is assumed that only one contractor

shall be working on any part of the development at any one time.

8.2 Indicative locations of the Contractors’ Facilities on the Main Site are shown on the Plans at

Appendices 2 and 4. It is envisaged that these facilities will also be used as the main

compounds for the highway works adjacent to the main site (Works Nos. 7, 8 and 9).

8.3 Indicative locations of the Contractors’ Facilities for the Roade Bypass (Works No. 13) are

shown on the Highway Plans (Documents 2.4D and 2.4E). It is envisaged that these facilities

will also be used as the main compounds for the other works on the A508 (Works Nos. 12 and

14 to 17).

8.4 Additional facilities may be provided for each area of works.

Page 19: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

14

8.5 Each P-CEMP shall include details of the Contractor’s facilities including compound areas,

temporary buildings and fencing, parking areas and storage of plant and materials.

8.6 When preparing details in accordance with this requirement consideration, as a minimum, shall

be given to:

Size and location

Separation from other facilities

Separating access routes from working areas

Separation of the public from access routes and working areas

Storage of Plant and Materials

Arrangements for removal following completion of construction.

Publishing details of internal circulation routes within the site. The plans shall show

how pedestrian routes will be segregated from plant and equipment routes.

9.0 Waste Management

9.1 Each P-CEMP shall set out details of construction waste management in accordance with the

Framework Site Waste Management Strategy Appendix 14.2 of the Environmental Statement.

It is inevitable that some waste will be produced during the construction works. Throughout the

construction process, all activities will seek to minimise the generation of waste, utilising the

waste hierarchy where practicable, to manage waste. The waste hierarchy seeks to reduce

waste through elimination, reduction, re-use, recycling through to disposal as the final option.

Handling and disposal of waste must be carried out under the ‘Duty of Care’ Regulations and

current legislation.

9.2 Waste management procedures shall be developed and will include the following topics:

Identification of the types of waste that may be generated;

Implementation of re-use and recycling strategies;

Implementation of waste minimisation strategies;

Set up of waste disposal facilities;

Control and management of the disposal of different types of waste;

Roles and responsibilities;

Monitoring, reporting and auditing of waste produced on site.

9.3 Waste can also be controlled through the use of particular construction techniques and use of

recycled materials. Each P-CEMP, where relevant, will include a requirement to work with the

supply chain to identify and utilise suitable recycled aggregates where they are available within

Page 20: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

15

suitable travelling distance to minimise the import of clean aggregates. Each P-CEMP, where

relevant, will also include a requirement to explore and utilise prefabricated construction

techniques where practical to do so.

9.4 If unknown made ground deposits are encountered a Material Management Plan (MMP), in

accordance with the CL:AIRE DoW CoP, will be prepared which will define how the made

ground materials may legitimately and safely be reused as part of the development earthworks.

The MMP must be based upon suitable risk assessment that underpins the remediation strategy

or/and Design Statement concluding that the objectives of preventing harm to human health

and pollution of the environment will be met if materials are reused in the proposed manner and

positions. It will also define the method of verification. This has to be reviewed and agreed by

an independent Qualified Person registered with Cl:AIRE not involved in the project. Thus,

safeguarding the integrity of the Materials Management Plan and its use in practice.

Earthworks/Spoil

9.5 The proposed development will seek to minimise the import and export of material, wherever

possible. The re-use of materials around the site, as suitable engineering material or infill

material, will be carried out whenever possible, in accordance with details agreed pursuant to

Requirement 13.

Reduction

9.6 A number of potential options are available to complement construction waste reduction

including maximising off-site fabrication, efficient design specification of standardised

components/materials, implementing a just-in-time delivery system to minimise the volume of

goods/materials stored on site and therefore exposed to inclement weather conditions and other

site damage sources.

Re-Use

9.7 Certain materials may have a relatively high level of re-use (e.g. timber, aggregates, bituminous

planings, brick and block-work) within the construction stage operations. Such wastes may

arise from spoiled materials, and natural waste from construction processes. Procedures will

include:

Separate skips/receptacles will be provided to receive different types of specific waste

which can be re-used on site.

Licensed waste carriers will be required to identify possibilities of local community re-

use of waste materials.

Page 21: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

16

Recycling

9.8 Certain materials may have a feasible recycling value (e.g. timber, aggregates, plastics, glass,

and metals). These may arise from similar construction processes as those identified above

for re-use.

Procedures will include: -

Separate marked skips/receptacles will be provided for the depositing of particular

types of waste suitable for efficient recycling; and

Discussion with licenced waste carriers in respect to the feasibility/efficiency of specific

materials recycling.

Disposal

9.9 It is inevitable that certain materials will have to be removed from site for disposal as they

have no re-use/recovery value. Procedures to be considered in preparing a Site Waste

Management details will include:

All wastes which require removal from site for final disposal will be subject to an effective

management control regime ensuring statutory compliance. The key components of this

regime are illustrated below:

o Appointing competent and suitably registered waste carrier(s);

o Establishing an effective site waste stream strategy (recycling, re-use, disposal);

o Providing an effective waste skip strategy to suit the waste stream strategy and

which differentiates between hazardous, non-hazardous and inert wastes;

o Should asbestos be encountered all potentially asbestos containing materials will

be disposed of by a suitably licensed contractor in accordance with relevant

guidance and legislation;

o Providing adequate information/training to site operatives in respect of the waste

stream strategy; and

o Implementing an effective audit procedure, to audit the waste disposal regime from

source to licensed disposal facility(s). This will include reviewing all relevant

Waste Management Licences and Waste Transfer Licences of all waste

contractors on the project. In addition, a record will be kept of all Waste Transfer

Notes to ensure that all waste movements from the site are properly documented.

Non-Conformance Reports would be issued to ensure any deficiencies are

corrected.

10.0 Storage of Fuel, Oil and other Chemicals

Page 22: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

17

10.1 Each P-CEMP will set out details for the arrangements for the storage of fuel, oils and chemicals

having regard to the location of contractor compounds.

10.2 All fuel, oil and chemicals shall be stored in accordance with the Manufacturer’s

recommendations and any tanks shall be in accordance with PPG7 (above ground oil storage

tanks) and PPG22 dealing with spills; or subsequent amendments or replacements thereof.

11.0 Development affecting a Watercourse

11.1 Each P-CEMP shall set out details of any watercourse that may be affected by the works. All

works affecting a watercourse shall be carried out in accordance with a method statement to

be prepared and included in each P-CEMP.

11.2 No works within an ordinary watercourse or within the by-law protected strip either side shall

commence until approval has been granted, by the lead local flood authority pursuant to Article

21 of the DCO.

11.3 No works within a Main River or within the by-law protected strip either side shall commence

until an Environmental Permit has been issued by the Environment Agency.

11.4 Each P-CEMP shall set out details of any works that affect any floodplain and such works must

not be commenced until approval for the works is obtained pursuant to Requirement 19.

12.0 Temporary Lighting

12.1 No works within the Main Site are planned to be undertaken in periods of darkness and

therefore it is unlikely that task lighting will be required. However, unplanned events can occur

for which task lighting may be required for short periods; in this event each P-CEMP shall set

out the maximum height of lighting lanterns and the average lux levels.

12.2 The P-CEMP for any component of the highway works shall provide details of requirements for

night working and any associated proposals for lighting.

12.3 Temporary lighting will be provided in the contractor’s compound for security and safety

reasons. Details shall be set out in the P-CEMP including the average lux level.

12.4 Task lighting shall ensure that there is no upward light.

12.5 Lighting will be switched off when not required for safety or security.

Page 23: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

18

13.0 Prevention of Debris on Highways

13.1 Each P-CEMP shall include details of the contractor’s proposed measure for cleaning vehicles

before leaving site and other measures to ensure mud and other deleterious material is not

deposited on the public highway. This shall include arrangements for the use of suction

sweepers in accordance with ‘Institute of Air Quality Management (IAQM) Guidance on

Assessment of Dust from Demolition and Construction 2014’.

14.0 Routing of Construction Traffic

14.1 Details of the routing of construction traffic shall be set out in the P-CEMP and agreed with

the project manager and Highways England and Northamptonshire County Council as

appropriate for the relevant component.

14.2 A site wide strategy may be agreed with the appropriate authorities and incorporated into each

P-CEMP. All contractors shall then comply with the requirements of that strategy.

14.3 Details of directional signage shall be set out in each P-CEMP to mitigate any adverse impact

to the local highway network as a result of vehicles visiting the development during

construction. All advisory signage shall be erected before work commences.

14.4 The contractor shall provide details of the prohibited and preferred routes to all suppliers and

contractors.

14.5 As a minimum the following routes are prohibited for use by heavy construction vehicles:

All existing routes that have environmental weight restrictions (for example Watering

Lane / Collingtree Road);

Routes that will be covered by environmental weight limit Zones A and D pursuant to

Article 19 and Part 3 of Schedule 9 of the DCO; and

The A508 south of the main site except for vehicles associated with the construction

of Works Nos. 12 to 17.

15.0 Protecting Biodiversity Interests

Landscape

Page 24: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

19

15.1 The Landscape Designer will identify existing landscaping or newly planted landscaping that

needs to be protected and details shall be set out in each P-CEMP. Protection shall be

provided in accordance with BS 5837: 2012 Trees in relation to design, demolition and

construction – Recommendations. Any tree surgery required will be carried out in accordance

with BS 3998:2010 Tree Work Recommendations.

Ecology 15.2 All P-CEMPs will be prepared in accordance with the Landscape and Ecological Management

Plan LEMP.

Habitats - General

15.3 The following principles should be incorporated into each P-CEMP where appropriate.

15.4 As a result of the relatively long (in ecological terms) duration of works, itself a result of the

restraints associated with the key activities as outlined in section 4.0 above, each P-CEMP

will be informed by an update walkover survey that will ensure that an up-to-date baseline

informs the specific construction site management measures during each phase to avoid

and/or reduce effects on habitats and species.

15.5 Key measures are outlined below and would be expected to be required for each P-CEMP.

15.6 Prior to the commencement of construction activity, including that required to bring about the

change in levels and establish the development platform, a sturdy fence, as detailed in each

P-CEMP will be established on the perimeter of development areas at an appropriate distance

to take account of tree root protection zones in line with British Standard BS 5837:2012 Trees

in relation to design, demolition and construction - Recommendations. This would where

necessary be informed by an up-to-date Arboricultural survey of the phase in question.

15.7 No temporary storage of materials, construction of haul routes, or site machinery would be

sited within retained habitats as identified in the P-CEMP and access by construction site

personnel would be prevented.

15.8 An ecological clerk of works will ensure that measures will be implemented to prevent

inadvertent damage to retained or created habitats throughout the construction phase

particularly where vegetation is to be removed or during works close to retained habitat.

15.9 This is to ensure that retained woodland, trees, hedgerows and other vegetation are not

adversely affected during the construction process, particularly through compaction of the soil

and inadvertent encroachment and damage.

Page 25: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

20

15.10 All site personnel will be made aware of the importance of retained vegetation through a

briefing prior to commencing work. Movement of earth to facilitate the necessary changes in

levels will be undertaken in such a way as not to impact on retained habitats, either through

soil compaction or subsidence.

15.11 Environment Agency Guidance for Pollution Prevention (GPPs) will be adhered to at all times

in order to reduce the chance of chemical spills and other pollution events. Relevant spill kits

will be kept on site for the rapid treatment of any spillages, with staff trained in their use present

at all times when work is underway. Exclusion fencing will be established along the routes of

watercourses and particular care taken in terms of movement of machinery and storage of

materials in proximity to these features.

15.12 Best practice measures for the industry will be employed according to agreed standards in

order to minimise adverse effects on the surrounding area through dust deposition. This will

include wheel washes of construction vehicles and dust suppression techniques during

periods of dry weather and / or high winds. Measures for the control of dust are considered

in greater detail elsewhere in this document.

Habitats - specific

15.13 Grassland translocation has been identified as a component of Roade Bypass (Works No.

13). Prior to any construction on the bypass route the P-CEMP will detail the programme of

works. Consideration will be given to minimise the duration of storage of the translocated

topsoil from the affected section of Roade Field (supporting the seedbed) and preparation of

the receptor area.

15.14 The P-CEMP will detail the timing, sequencing and soil-transfer methods for grassland

translocation. Initial and aftercare management of the translocation material and establishing

grassland is detailed in the LEMP.

15.15 High value hedgerows are to be translocated as part of both Phases 1 and 2 of the main site

earthworks and during the construction of the Roade Bypass (Works No. 13). Prior to the

construction of that component and where hedgerows are to be affected, the P-CEMP for that

phase will detail construction site methods used to translocate hedgerow sections. Early

consideration will be given to the need to translocate during the dormant season from the end

of November to the end of February and as far as possible re-establish hedgerows in a form

that matches their original, with the key principals being to transfer as much of the hedgerow

material, shrubs and desirable ground flora as possible and minimise disturbance of the soil

and damage to roots.

Page 26: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

21

15.16 The size and species composition of the hedgerow to be translocated may allow larger

sections to be moved through the use of specialist machinery. It is paramount that the time

taken between lifting the hedge and establishing it in its new location should be as short as

practicably possible as this is when the roots are at their most susceptible to damage. Sections

of the translocated hedgerow should be planted in the same order that they were removed.

The P-CEMP will detail the sequencing, methods and any watering regime required for

translocated hedgerows.

Fauna Badgers

15.17 The Protection of Badgers Act 1992 consolidates the previous legislation on badgers. It aims

to protect the species from persecution rather than being a response to an unfavourable

conservation status, as the species is common over most of Britain, with particularly high

populations in the southwest.

15.18 As well as protecting the animal itself, the 1992 Act also makes the intentional or reckless

destruction, damage or obstruction of a badger sett an offence. A sett is defined by Natural

England as “any structure or place which displays signs indicating current use by a badger”.

15.19 In addition, the intentional elimination of sufficient foraging area to support a known social

group of badgers may, in certain circumstances, be construed as an offence by constituting

‘cruel ill treatment’ of a badger.

15.20 ‘Interim guidance’ issued by Natural England in September 2007 specifically states “it is not

illegal, and therefore a licence is not required, to carry out disturbing activities in the vicinity

of a sett if no badger is disturbed and the sett is not damaged or obstructed.”

15.21 Prior to the commencement of any construction a pre-commencement badger survey will be

conducted to identify the current status of any setts that have been identified or excavated in

the interim.

15.22 It is anticipated given the current baseline that a licence will be required prior to the

commencement of any phase that affects badger setts (e.g. Phases 1 and 2 of the Main Site

earthworks). This will be applied for and no construction works undertaken within 30m of any

badger sett until this has been granted

15.23 The relevant P-CEMP will detail any specific measures required under that licence including

details of exclusion zones around existing, retained and proposed artificial setts and any

measures proposed to ensure access to retained habitats is maintained.

Page 27: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

22

15.24 Consideration will be given by the Project and Environmental Managers, under advice from

the ecologist where necessary, to the normal requirement to conduct licensable activities,

such as sett closure, to outside of the period from December to June (inclusive).

15.25 In the event that any setts are excavated within the application site during the construction

period an ecologist will be contacted for advice. Any trenches or holes excavated will be

covered or left with a means of escape for Badgers (such as a plant of wood) so that they do

not become trapped overnight.

15.26 Careful consideration will be given to the storage of mounds of soil, which could be used by

Badgers to excavate setts. In particular, the establishment of the landscaped earth bund will

require close attention to ensure that Badgers are not harmed during its construction. Areas

of the bund to be worked on will be inspected every morning. In the event any evidence of

use by badgers is noted work in the area will cease while consideration is given to the best

way to proceed.

Bats

15.27 All bats are protected under Schedule 5 of the Wildlife and Countryside Act 1981 (as

amended) and included on Schedule 2 of the Conservation of Habitats and Species

Regulations 2017 (“the Habitats Regulations”). These include provisions making it an offence:

Deliberately to kill, injure or take (capture) bats;

Deliberately to disturb bats in such a way as to :-

o be likely to impair their ability to survive, to breed or rear or nurture their young; or to

hibernate or migrate; or

o to affect significantly the local distribution or abundance of the species to which they

belong;

To damage or destroy any breeding or resting place used by bats;

Intentionally or recklessly to obstruct access to any place used by bats for shelter or

protection (even if bats are not in residence).

15.28 The words deliberately and intentionally include actions where a court can infer that the

defendant knew that the action taken would almost inevitably result in an offence, even if

that was not the primary purpose of the act.

Page 28: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

23

15.29 The offence of damaging (making it worse for the bat) or destroying a breeding site or resting

place is an absolute offence. Such actions do not have to be deliberate for an offence to be

committed.

15.30 In accordance with the Habitats Regulations the licensing authority (Natural England) must

apply the three derogation tests as part of the process of considering a licence application.

These tests are that:

the activity to be licensed must be for imperative reasons of overriding public interest

or for public health and safety;

there must be no satisfactory alternative; and

the favourable conservation status of the species concerned must be maintained.

15.31 Survey work has identified the presence of a small occasionally used bat roost within a field

Barn (Barn C) within the Main Site, which was found to support at least five bats during

2013. No bats were identified in the most recent surveys. No evidence of roosting bats was

observed in association with any trees on site.

15.32 Pre-commencement bat surveys will be completed prior to the production of P-CEMP

affecting both mature trees and buildings to ascertain whether potential bat roost habitat is

present and, in the event that it is, the up-to-date status of bats within any buildings or trees.

15.33 Where surveys identify that suitable habitat is present within trees and given the often-

transitory nature of bat tree roosts, their removal will be carried out according to a

precautionary method statement. In brief, this will include precautionary pre-felling nocturnal

surveys and / or aerial tree climbing inspections to ensure the sensitive removal of the trees

only when it is confirmed to be unoccupied by bats. Providing that no bats are observed the

tree will be section felled by experienced arborists under the supervision of an appropriately

licensed bat worker.

15.34 Where bats are identified roosting within features to be removed during pre-commencement

surveys a licence may be required to facilitate the demolition of buildings or felling of trees

identified as supporting a bat roost. Where relevant the P-CEMP will detail construction site

measures required under a condition of any licence to prevent impacts to roosting bats. This

may, depending on the status and nature of any roost identified, have strict season

restrictions.

15.35 To avoid disturbance to commuting or foraging bats during the construction period, the

potential for impacts to bats from the use of floodlighting within any construction areas would

be mitigated by the sensitive design of lighting. Measures to reduce impacts within the P-

CEMP may include:

Page 29: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

24

The use of directional floodlighting around construction areas and site compounds to

avoid spill onto retained habitats;

The use of the lowest intensity possible;

The use of low-pressure sodium (as opposed to high pressure) where possible; and

The avoidance of lighting that emits high levels of blue/ultra-violet or red/infra-red

light.

Great Crested Newts (GCN) 15.36 The presence of GCN within the site and surrounding landscape is confirmed, although

populations are highly localised. In common with bat species as above, GCN are protected

under Schedule 5 of the Wildlife and Countryside Act 1981 (as amended) and included on

Schedule 2 of the Conservation of Habitats and Species Regulations 2017 (“the Habitats

Regulations”).

15.37 Where relevant the P-CEMP will detail construction site measures required to ensure that

the favourable conservation status of GCN is maintained. Detailed measures will be

dependent on detailed proposals, programme and any conditions attached to a licence.

Measures are likely to include, where necessary:

An assessment of the need for a licence to be in place for that phase depending on

the location and status of GCN;

Where necessary, an outline of measures required to remove GCN from working

areas;

An outline of measures required to prevent GCN from accessing working areas during

construction;

Measures required to prevent inadvertent damage or disturbance to retained GCN

habitats.

Reptiles 15.38 The presence of reptiles within the site is confirmed, although populations are highly

localised and at a low density. Populations of common lizard are confined to the railway

corridor, while grass snake, being a much more mobile species generally is likely to occur

at low density more widely.

15.39 Construction works that may have an effect include the of the Roade Bypass (Works No.

13) and bridge over the West Coast Mainline. The P-CEMP for this phase will detail the

methodology and availability of possessions for the bridge over the West Coast Main Line

and incorporate measures to prevent harm to reptiles, specifically the population of common

lizard at this location.

Page 30: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

25

15.40 The broad principles of removal of reptiles from working areas will utilise a range of methods

based on the suitability of the habitat to be affected and season:

Clearance of vegetation over winter, where no suitable over-wintering/hibernacula

habitat occurs.

Passive displacement, where clearance of small isolated areas or homogenous

vegetation or suboptimal habitat is proposed.

15.41 Each P-CEMP will set out detailed measures to avoid harm to reptiles which will be based

on an up-to-date assessment of suitable habitat location, which can vary year on year

depending on land/agricultural use.

Birds

15.42 Section 1 of the Wildlife & Countryside Act is concerned with the protection of wild birds.

With certain exceptions all wild birds and their eggs are protected from intentional killing,

injuring and taking; and their nests, whilst being built or in use, cannot be taken, damaged

or destroyed.

15.43 Schedule 1 of the Wildlife & Countryside Act 1981 is a list of the nationally rarer and

uncommon breeding birds for which all offences carry special (i.e. greater) penalties. These

species also enjoy additional protection whilst breeding, as it is also an offence to disturb

adults or their dependant young when at the nest.

15.44 Wherever possible, clearance of vegetation will be undertaken outside of the bird nesting

season (typically taken as March to August inclusive). Where this is not possible a check

for nesting birds will be undertaken by an ecologist; in the event that any are identified, an

exclusion zone will be established around the nest until the young have fledged. This will

be marked clearly will hazard tape and/or Heras fencing. The size of any exclusion area will

be determined by the project ecologist, taking into account the species concerned and the

activities proposed in proximity to the nest.

15.45 Where relevant P-CEMPs will set out measures to prevent disturbance of barn owls if

suitable nesting habitat is or has been identified during pre-commencement survey. The

installation of barn owl boxes, within the DCO limits, would also be detailed for suitable

locations as instructed by the project ecologist; with consideration given to potential future

disturbance during subsequent works/phases.

Page 31: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

26

Other Species

15.46 Survey work has been undertaken for other protected species including water voles and

white-clawed crayfish as part of the ecological impact assessment process. This work has

not recorded the presence of these species. In the event that these or other protected

species are identified during pre-commencement surveys appropriate measures, including

the obtaining of any licenses, would be set out in the P-CEMP for that component.

16.0 Roade Cutting SSSI

16.1 The Roade Bypass (Works No. 13) affects the Roade Cutting SSSI. All works close to or within

the Roade Cutting SSSI shall be carried out in accordance with a method statement to be

prepared and included in the relevant P-CEMP and agreed with Natural England.

17.0 Advisory Signage

17.1 Each P-CEMP shall set out details of advisory signage to be provided at each public access

point advising of possible hazards including the potential for sudden noise. Signage may

be required at the following locations:

Planned accesses to the works

Where public rights of way (PROW) pass adjacent to the site;

Along substituted RROW;

At any other location where public access is being achieved, authorised or not, and

Open bodies of water.

Advisory signage may include:

Warnings that you are entering a construction site;

Warning of deep water adjacent to open bodies of water;

Advisory signs that a PROW has been closed along with a plan of the substituted

route;

Directional signs along substituted PROW;

Details on how to register a complaint, and

Emergency telephone numbers.

18.0 Temporary Surface Water Management System

Page 32: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

27

18.1 The arrangements for the temporary management of surface water shall be set out in each

P-CEMP.

18.2 Before any works are undertaken temporary measures to deal with surface water

management shall be set out. Where such works affect watercourses the requirements of

Section 11 above shall also be followed.

18.3 Measures shall be adopted in accordance with PPG5, particular Section 2.2b (balancing

lagoons) and 2.2c (filtration) and CIRIA Report C532 “Control of water pollution from

construction sites”; or subsequent amendments or replacements thereof.

18.4 Monitoring points shall be established downstream of any temporary balancing lagoons to

monitor water quality so that the effectiveness of the measures can be assessed and

improved if necessary. Details of monitoring techniques shall be set out in each P-CEMP.

18.5 Testing parameters shall be agreed with the Environment Agency or lead local flood authority

as appropriate ahead of collection of baseline test data.

19.0 Public Rights of Way

19.1 The existing and proposed Rights of Way are shown on the Access and Rights of Way Plans

(Document 2.3).

19.2 A combination of appropriate temporary diversions and closures will be implemented before the

commencement of any component of works and details shall be set out in P-CEMPs where

appropriate.

19.3 All permanent routes will be constructed and implemented as soon as practical.

19.4 Details of the strategy for the management of Public Rights of Way shall be set out in each P-

CEMP, the details shall include temporary routes and the timing of the provision of access to

permanent routes.

19.5 Any permanent and temporary stopping up of rights of way must be undertaken in accordance

with Article 12 of the DCO and any necessary approvals obtained accordingly.

20.0 Traffic Management

Page 33: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

28

20.1 Details of Traffic Management shall be set out in each P-CEMP. This shall have regard to the

routing requirements set out in Section 14 and any works required to enable construction

access to the site. Details shall also be set out of the Provision for Operatives, Visitors and

Delivery vehicles. The contractor’s arrangements shall ensure that all vehicles are clearly

directed to the contractor’s site and suitable arrangements are in place on that site to receive

and manage the delivery.

20.2 No parking of any kind will be permitted on completed infrastructure either on or off site with the

exception of vehicles directly engaged in the maintenance of that infrastructure.

20.3 The development shall be carried out in such a manner so as to ensure that emergency vehicles

visiting the development, or adjacent properties are unhindered at all times and provided with

free flow passage as far as is practicable.

20.4 All works on the strategic road network maintained by Highways England shall be carried out

in accordance with the Transport Chapter of the Environmental Statement and the traffic

management arrangements agreed with Highways England pursuant to Part 2 of Schedule 13

of the DCO.

20.5 All works on the local road network maintained by Northamptonshire County Council shall be

carried out in accordance with the Transport Chapter of the Environmental Statement and the

traffic management arrangements agreed with Northamptonshire County Council pursuant to

Part 3 of Schedule 13 of the DCO.

20.6 The P-CEMP shall set out details of the relevant temporary speed limits that shall be provided

in accordance with Article 16 and Part 4 of Schedule 8 of the DCO.

21.0 Site Rules

21.1 A set of site rules will be displayed within the site office to set the minimum standard to be

adopted by all contractors and Sub-contractors. These will be based on the following:

All operatives and visitors must wear appropriate PPE (hard hat, high visibility jacket

and protective footwear as a minimum), with further equipment to be determined

through method statement/risk assessment.

All operatives and visitors must receive site induction training, including the

environmental induction.

All reversing vehicles must be appropriately supervised by a trained banksman.

Page 34: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

29

All power tools using temporary electrics are to be transformed down to 110 volts.

No operative is to misuse or abuse any mechanical or other equipment.

Only authorised vehicle routes shall be used.

Segregated pedestrian routes shall be provided.

Operatives must not report for work if under the influence of alcohol or drugs or

consume alcohol or drugs at work or during breaks.

All operatives and visitors must report any potential safety incidents identified and

must not continue with an activity that has been identified as a risk, without an

appropriate risk assessment being in place.

The site will operate a permit to dig system, which will be granted following a review

by the Principal Contractor of service drawings and cable locator scan of the area.

Any accident or incident on site, which requires medical treatment or time off, should

be reported immediately to the Site Manager.

A Site Accident and Incident Log will be maintained by the site manager.

21.2 Parking of vehicles shall only be permitted in designated parking areas. Parking on the Public

Highway or the Development Roads will not be permitted.

Page 35: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

30

Appendix 01 – Indicative Master Programme

Page 36: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

31

Appendix 02 – Main Site Phasing Plan (ref NGW-BWB-GEN-XX-SK-C-SK39-S3-P6)

Page 37: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

32

Appendix 03 – Built Development Area and Landscape Surrounds – Proposed

Components and Sequence (ref 5772-L-39 rev B)

Page 38: APPENDIX 2.1 TO ENVIRONMENTAL STATEMENT (DOCUMENT 5.2) · 1.2 This Construction Environmental Management Plan (CEMP) sets out the overarching systems and controls that will be adopted

33

Appendix 04 – A508 Temporary Ghost Island Construction Access and Main Site