appendix ienvironmentclearance.nic.in/.../13062015val4mlhsform1.pdf · 2015. 6. 13. · salai, omr,...

18
APPENDIX I FORM-1 (I) Basic Information S.No Item Details 1. Name of the Project E LIGHTS TECHNO PARK PVT LTD 2. S. No. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled. Proposed Capacity: Plot area: 29568.93 Sq.m Total built up area: 109613.97 Sq.m FSI area: 66885.88 Sq.m Non-FSI: 42728.09 Sq.m 4. New/Expansion/Modernization Expansion 5. Existing Capacity/Area etc. 75709.1 Sq.m 6. Category of Project i.e., ‘A’ or ‘B’ B 2 7. Does it attract general condition? If yes, please specify. NA 8. Does it attract specific condition? If Yes, please specify. NA 9. Location Plot/Survey/Khasra No. Survey No. 76/3A1B1, 76/3A1A1, 76/2B1, 76/2A1, 76/2A2B, 76/2B2B & 76/8, 76/3A1A2, 76/3A2A, 76/3A3A, 76/3A4, 77/1 Village Navalur Tehsil Thiruporur District Kancheepuram State Tamil Nadu 10. Nearest Railway Station/Airport along with distance in kms. Railway station- Velachery :13 km Airport- : 18 km 11. Nearest Town, City, District Headquarters along with distance in kms. Chennai – 30 km 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) The President, Navalur Panchayat office, Navallur Village, Thiruporur Taluk, Kancheepuram District, Tamil Nadu, 600130 13. Name of Applicant E LIGHTS TECHNO PARK PVT LTD 14. Registered Address Pacifica Tech Park, No- 23, Rajiv Gandhi Salai, OMR, Navalur, Chennai - 600130 15. Address for correspondence: Name Mr. Vikram Agnihotri Designation (Owner/Partner/CEO) Director – Southern Expanse Address Pacifica Tech Park, No- 23, Rajiv Gandhi

Upload: others

Post on 25-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

APPENDIX IFORM-1

(I) Basic Information

S.No Item Details1. Name of the Project E LIGHTS TECHNO PARK PVT LTD2. S. No. in the schedule 8(a)3. Proposed capacity/area/length/tonnage tobe handled/command area/leasearea/number of wells to be drilled. Proposed Capacity:Plot area: 29568.93 Sq.mTotal built up area: 109613.97 Sq.mFSI area: 66885.88 Sq.mNon-FSI: 42728.09 Sq.m4. New/Expansion/Modernization Expansion5. Existing Capacity/Area etc. 75709.1 Sq.m6. Category of Project i.e., ‘A’ or ‘B’ B 27. Does it attract general condition? If yes,please specify. NA8. Does it attract specific condition? If Yes,please specify. NA9. LocationPlot/Survey/Khasra No. Survey No. 76/3A1B1, 76/3A1A1, 76/2B1,76/2A1, 76/2A2B, 76/2B2B & 76/8,76/3A1A2, 76/3A2A, 76/3A3A, 76/3A4,77/1Village NavalurTehsil ThiruporurDistrict KancheepuramState Tamil Nadu10. Nearest Railway Station/Airport alongwith distance in kms. Railway station- Velachery :13 kmAirport- : 18 km11. Nearest Town, City, District Headquartersalong with distance in kms. Chennai – 30 km12. Village Panchayats, Zilla Parishad,Municipal Corporation, Local body(complete postal addresses with telephonenos. to be given)The President, Navalur Panchayat office,Navallur Village, Thiruporur Taluk,Kancheepuram District, Tamil Nadu, 60013013. Name of Applicant E LIGHTS TECHNO PARK PVT LTD14. Registered Address Pacifica Tech Park, No- 23, Rajiv GandhiSalai, OMR, Navalur, Chennai - 60013015. Address for correspondence:Name Mr. Vikram AgnihotriDesignation (Owner/Partner/CEO) Director – Southern ExpanseAddress Pacifica Tech Park, No- 23, Rajiv Gandhi

Page 2: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Salai, OMR, Navalur, ChennaiPin Code 600130E – mail [email protected] No. 044 – 43328333Fax. No. 044 - 4332838516. Details of Alternate Sites examined, if any.Location of these sites should be shown ona topo sheet No alternative sites examined.17. Interlinked Projects No18. Whether separate application ofinterlinked project has been submitted? NA19. If yes, date of submission NA20. If no, reason NA21. Whether the proposal involvesapproval/clearance under: if yes, details ofthe same and their status to be given.(a) The Forest (Conservation) Act,1980?(b) The Wildlife (Protection) Act, 1972?(c) The C.R.Z. Notification, 1991?

No

22. Whether there is any GovernmentOrder/Policy relevant/relating to the site? Environmental Clearance from MoEF videLetter no 21-471/2006-IA.III dated 3rdApril, 2007 is enclosed in Annexure-123. Forest Land involved (hectares) No24. Whether there is any litigation pendingagainst the product and/or land in whichthe project is propose to set up?(a) Name of the Court(b) Case. No.(c) Orders/Directions of the court, if anyand its relevance with the proposedproject.

No

Page 3: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

(II) Activity1. Construction, operation or decommissioning of the Project involving actions, which

will cause physical changes in the locality (topography, land use, changes in waterbodies, etc.)

Sr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data1.1 Permanent ortemporary change inland use, land cover ortopography includingincrease in intensity ofland use (with respectto local land use plan)

No Construction completed. The Proposed developmentfalls in Urbanisable Use Zone as per LPA land usecertificate No. 174/2005 dated 20.12.2005. The landuse certificate is enclosed as Annexure – 7Planning permission from LPA is enclosed asAnnexure-61.2 Clearance of existingland, vegetation andbuilding? No NA as the construction is completed

1.3 Creation of new landuses No NA as the construction is completed1.4 Pre-constructioninvestigations e.g. borehouses, soil testing? No NA as the construction is completed1.5 Construction works? No NA as the construction is completed1.6 Demolition Works? No No demolition is required.1.7 Temporary sites usedfor construction worksor housing ofconstruction workers?

No NA as the construction is completed1.8 Above groundbuildings, structures orearthworks includinglinear structures, cutand fill or excavations

No NA as the construction is completed1.9 Underground worksincluding mining ortunneling? No NA as the construction is completed

1.10 Reclamation works? No Not Applicable1.11 Dredging? No Not Applicable1.12 Offshore structures? No Not Applicable1.13 Production andmanufacturing Process? No Not Applicable1.14 Facilities for storage ofgoods or materials? No Completed project

Page 4: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data1.15 Facilities for treatmentor disposal of solidwaste or liquideffluents?

No Solid WasteAbout 2800 kg/ day of solid wastes are likely to begenerated due to the proposed project.Waste Quantity

(kg/day)Treatment methodOrganic 1260 Treated in Organic Wasteconverter and used as manureSTP Sludge 40Inorganic 1540 Sold to authorised recyclers

Hazardous Wastes:Name of the

wasteQuantity Mode of

disposalArea of landearmarkedfor storage

and disposalUsed Oil 1000 KL/A Disposedto TNPCBApprovedVendor Waste storagearea – 75 Sq.mWaste / residuecontaining oil 0.5 T/AE-Waste 3.1 T/AAuthorization for Hazardous waste will be obtainedfrom TNPCB before operation of the project.

Liquid EffluentTotal Quantity of water required 353 KLD. Fresh waterdemand is 157 KLD.Phase

Population

Quantityof waterrequired

Sewage/Effluentgenerated

TreatmentmethodOperation 7000 353 322 STP of 350KLD

After treatment, total treated water quantity is 306KLD. Treated water will be reused for Toilet Flushing(196 KLD), HVAC make up (90 KLD), Gardening (20KLD). Water Balance is enclosed in Annexure- 81.16 Facilities for long termhousing of operationalworkers? No NA as the construction is completed1.17 New road, rail or seatraffic duringconstruction oroperation?

No The existing Old Mahabalipuram road (OMR) will beused as access road.1.18 New road, rail, air No Not Applicable

Page 5: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation datawaterborne or othertransport infrastructureincluding new oraltered routes andstations, ports, airportsetc.?1.19 Closure or diversion ofexisting transportroutes or infrastructureleading to changes intraffic movements?

No There will not be any closure or diversion of existingtransportation routes.1.20 New or divertedtransmission lines orpipelines? No Not envisaged1.21 Impoundment,damming, culverting,realignment or otherchanges to thehydrology ofwatercourses oraquifers?

No Not Applicable

1.22 Stream crossings? No No stream crossings exist in the site1.23 Abstraction or transfersof water from groundor surface waters? No Fresh water demand will be met from tankers.1.24 Changes in waterbodies or the landsurface affectingdrainage or run-off

No There will not be any change in the drainage pattern ornearby water bodies.1.25 Transport of personnelor materials forconstruction, operationor decommissioning?

Yes The existing OMR will be utilized for the transportationof material and personnel during operational phase.1.26 Long-term dismantlingor decommissioning orrestoration works? No Not Applicable1.27 Ongoing activity duringdecommissioningwhich could have animpact on theenvironment?

No Not Applicable

Page 6: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data1.28 Influx of people to anarea in eithertemporarily orpermanently?

Yes Operation phaseSince the proposed project is a commercial buildingdevelopment, there will be temporary influx of 7000people.1.29 Introduction of alienspecies? No Not envisaged1.30 Loss of native speciesor genetic diversity? No Not envisaged1.31 Any other actions? No -2. Use of Natural resources for construction or operation of Project (such as land, water,materials or energy, especially any resources which are non-renewable or in shortsupply).

Sr.No.

Information/ChecklistConfirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data2.1 Land speciallyundeveloped oragricultural land (ha) No The proposed project site is earmarked asurbanisable use zone as per the land use certificateof LPA.2.2 Water (expected source& competing users) unitKLD Yes Water consumption: 353 KLD

Source Quantity SourceFresh waterrequirement 157KLD Tanker waterTreated wastewater for toiletflushing. 196 KLD Recycling ofwaste waterHVAC 90 KLD Recycling ofwaste waterLandscaping 20 KLD Recycling ofwaste water2.3 Minerals (MT) No Not applicable2.4 Construction material –stone, aggregates,and/soil (expectedsource-MT)No Not applicable

2.5 Forests and timber(source-MT) No Not applicable

Page 7: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

2.6 Energy includingelectricity and fuels(source, competingusers) Unit: fuel (MT),energy (MW)No Power Requirement : 5500 KVAPower Source : TNEBPower back up:DG – 4 x 2000KVA + 3 x 1500 KVA + 2 x 500 KVA

2.7 Any other naturalresources (useappropriate standardunits)No NA

3. Use, storage, transport, handling or production of substances or materials, whichcould be harmful to human health or the environment or raise concerns about actual orperceived risks to human health

Sr.No.

Information/ChecklistConfirmation

Yes/No

Details thereof (with approximatequantities/ rates, wherever possible) withsource of information data3.1 Use of substances ormaterials, which arehazardous (as per MSIHCrules) to human health or theenvironment (flora, fauna,and water supplies)

No This is a IT park development project & nostorage of hazardous chemicals (as per MSIHCrules), apart from spent oil. Suitablemanagement practice will be adopted for thesame.Approximately 1.5 KLD of HSD (low sulphurvariety) will be used per day and 4.5 KLD (3 daystorage capacity) will be stored in HDPE Drumsfor DG sets. However, the quantity stored will bebelow the threshold limit specified by the MSIHCrules.*DG operation- 2hrs/day3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insect or waterborne diseases)No Suitable drainage and waste managementmeasures will be adopted in operational phase,which will restrict stagnation of water oraccumulation of waste. This will effectivelyrestrict the reproduction and growth of diseasevectors.

Page 8: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

3.3 Affect the welfare of peoplee.g. by changing livingconditions? Yes Welfare of local community has improved byemployment, local vendors etc.3.4 Vulnerable groups of peoplewho could be affected by theproject e.g. hospital patients,children, the elderly etc.,No Not envisaged

3.5 Any other causes No -

4. Production of solid wastes during construction or operation or decommissioning(MT/month)

Sr.No.

Information/ChecklistConfirmation

Yes/No

Details thereof (with approximatequantities/ rates, wherever possible) withsource of information data4.1 Spoil, overburden or mine wastes No NA4.2 Municipal waste (domestic and orcommercial wastes) Yes Solid WasteAbout 2800 Kg / day of solid wastes are likelyto be generated due to the proposed project.

Waste Quantity(kg/day)

TreatmentmethodOrganic 1260 Treated in OrganicWaste converterand used asmanureSTPSludge 40

Inorganic 1540 Sold to authorisedrecyclers

Page 9: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

4.3 Hazardous wastes (as perhazardous waste managementrules) Yes Hazardous Wastes:Name of

the wasteQuantity Mode of

disposalArea of landearmarkedfor storage

and disposalUsed Oil 1000KL/A Disposedto TNPCBApprovedVendor Wastestorage area -75sqmWaste /residuecontaining oil0.5 T/A

E-Waste 3.1 T/ASpent oil of from DG sets will be carefullystored in HDPE drums in isolated coveredfacility. This spent oil will be sold to vendorsauthorized by TNPCB/ MoEF for treatment ofsame. Suitable care will be taken so that spills/ leaks of spent oil from storage could beavoided.* DG Operation: 2 Hrs/Day4.4 Other industrial process wastes No Not Applicable.4.5 Surplus product No Not Applicable.4.6 Sewage sludge or other sludge fromeffluent treatment Yes Sewage sludge: 40 kg/day4.7 Construction or demolition wastes No Not Applicable.4.8 Redundant machinery or equipment No Not Applicable.4.9 Contaminated soils or othermaterials No Not Applicable.4.10 Agricultural wastes No Not Applicable.4.11 Other solid wastes No Not Applicable.

Page 10: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)Sr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximatequantities/ rates, wherever possible)with source of information data5.1 Emissions from combustion offossil fuels from stationary ormobile sources Yes During operation phase, DG sets 4 x2000 kVA, 3 x 1500 kVA, 2 x 500 kVAcapacity provided for power back up willgenerate air pollutants like SOX, NOx. 9 Nos. Of DG stack with anadequate height shall be providedfor safe emission of the flue gases. DG will be operated only duringpower failure While using DG unnecessary loadwill be eliminated to reduce theemission of pollutantsS.No DGCapacity RequiredStack Ht(m)

Availablestackheight(m)123

4 x2000kVA3 x1500kVA2 x500kVA

30 +3 = 33x 430 +3 = 33x 330 +3 = 33x 2

4 x 333 x 332 x 33

5.2 Emission from productionprocesses No There is no production as the proposedproject is Commercial building.5.3 Emissions from materials handlingincluding storage or transport No NA5.4 Emissions from constructionactivities including plant andequipment No NA5.5 Dust or odours from handling ofmaterials including constructionmaterials, sewage and waste No NA5.6 Emissions from incineration of No No incineration of waste.

Page 11: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximatequantities/ rates, wherever possible)with source of information datawaste5.7 Emissions from burning of waste inopen air (e.g. slash materials,construction debris) No Open burning of biomass / othermaterial will be prohibited.5.8 Emissions from any other sources Yes Not Applicable

6. Generation of Noise and vibration and emissions of Light and heat

Sr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source ofinformation data6.1 From operation ofequipment e.g. engines,ventilation plant,crushers

Yes Source of noise in the operational phase will be DGsets and vehicular sources only. The DG sets willbe in operation during power failure only.Moreover, the DG room shall be acousticallyenclosed.6.2 From industrial orsimilar processes No Not Applicable6.3 From construction ordemolition No Not Applicable6.4 From blasting or piling No Not Applicable6.5 From construction oroperational traffic Yes Negligible noise will be generated from vehicularmovement in the operational phase.6.6 From lighting or coolingsystems Yes Chillers plant – 5 x 375 Tr & 2 x 300 Tr6.7 From any other sources Yes Automobiles7. Risks of contamination of land or water from releases of pollutants into the ground orinto sewers, surface waters, groundwater, coastal wasters or the seaSr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximatequantities/ rates, whereverpossible) with source ofinformation data7.1 From handling, storage, use orspillage of hazardous materials Yes Spent oil will be handled withutmost care, spent oil will be storedin HDPE drums stationed overconcrete platforms and will be

Page 12: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximatequantities/ rates, whereverpossible) with source ofinformation datadirectly transferred to vendorsauthorized to handle suchhazardous material.7.2 From discharge of sewage or othereffluents to water or the land(expected mode and place ofdischarge)

No The wastewater generated from theIT Park will be treated in STP andthe treated water will be utilized forlandscaping, HVAC and flushingpurpose.7.3 By deposition of pollutants emittedto air into the land or into water No Proper air pollution controlmeasures will be taken care byproviding adequate stack height andparking facility to avoid depositionof pollutant into nearby land andwater.7.4 From any other sources No Not envisaged.7.5 Is there a risk of long term build upof pollutants in the environmentfrom these sources? No Not envisaged.8. Risk of accidents during construction or operation of the project, which could affecthuman health or the environmentSr.No.

Information/ChecklistConfirmation

Yes/No Details thereof (with approximatequantities/ rates, whereverpossible) with source ofinformation data8.1 From explosions, spillages, fires etcfrom storage, handling, use orproduction of hazardous substances Yes Not envisaged. 4.5 KLD of HSD (lowsulphur variety) will be stored inHDPE Drums for DG sets (3 daystorage capacity)8.2 From any other causes No NA

Page 13: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

8.3 Could the project be affected bynatural disasters causingenvironmental damage (e.g. floods,earthquakes, landslides, could burstetc)?Yes Earthquake zone -III according tothe Indian Standard Seismic ZoningMap. Further it is not flood prone orlandslide prone areas. Howeversuitable seismic coefficients inhorizontal and vertical directionswill be adopted while designing thestructures.In case of any Naturaldisaster/accident-EmergencyPreparedness & Response plan mustbe in place

Emergency siren to besounded Systematic evacuationCommunication between incidentcontroller & security officer will bedone by walkie Talkie/Emergencytelephone number.

9. Factors which should be considered (such as consequential development) which couldlead to environmental effects or the potential for cumulative impacts with other existingor planned activities in the locality.

Sr.No.

Information/ChecklistConfirmation

Yes/No

Details thereof (with approximatequantities/ rates, whereverpossible) with source ofinformation data9.1 Lead to development of supporting,utilities, ancillary development ordevelopment stimulated by theproject which could have impact onthe environment e.g.:Supporting infrastructure (roads,power supply, waste or waste watertreatment, etc)Housing developmentExtractive industriesSupply industries

Yes

YesNoNo

Supporting and ancillary developmentwill not cause any consequences.

Internal Roads, Rainwater Harvesting,STP etc will be provided.

Page 14: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Information/ChecklistConfirmation

Yes/No

Details thereof (with approximatequantities/ rates, whereverpossible) with source ofinformation dataOther No9.2 Lead to after use of the site, whichcould have an impact on theenvironment No Not applicable

9.3 Set a precedent for laterdevelopments Yes This may allow commercial &residential developments near thearea.9.4 Have cumulative effects due toproximity to other existing or plannedprojects with similar effects No No effect on any planned project inthe locality.(III) Environmental Sensitivity

Sr.No.

Areas Name / Identity Aerial distance (with 15-km) Proposedproject location boundary1 Areas protectedunderinternationalconventions,national or locallegislation fortheir ecological,landscape,cultural or otherrelated value

Pallikaranai MarshBuckingham Canal 9.04 km0.75 km

2 Areas which areimportant orsensitive ofecologicalreasons –wetlands, watercourses or otherwater bodies,coastal zone,biospheres,mountains,forests

Pallikarani Marsh

Reserve Forest

Sithalapakkam LakeHastinapuram LakeNanmangalamReserved ForestPudupakkam Lake

9.04 km

6.31 km

12.34 km

9.72 km

8.08 km3 Areas used byprotected,important or Pallikaranai MarshReserved ForestNanmangalam 9.04 km

9.96 km

Page 15: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Areas Name / Identity Aerial distance (with 15-km) Proposedproject location boundarysensitivespecies of floraor fauna forbreeding,nesting,foraging,resting, overwintering,migration

Reserved Forest

4 Inland, coastal,marine orundergroundwatersBuckingham CanalBay of Bengal 0.75 km2.47 km

5 State, nationalboundaries No NA6 Routes orfacilities usedby the public foraccess torecreation orother tourist,pilgrim areas

Lord Siva TempleJumma MasjidJagannath’s Temple 0.33 km3.57 km2.24 km7 Defenseinstallations No NA8 Denselypopulated orbuilt-up area SholinganallurPadurKelambakkamSiruseriKanathurMuttukaduPerungudiMambakkam

6.22 km4.30 km6.64 km2.25 km3.61 km2.95 km14.0 km7.00 km

Page 16: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Areas Name / Identity Aerial distance (with 15-km) Proposedproject location boundary9 Areas occupiedby sensitiveman made landuses (hospitals,

schools, places ofworship,communityfacilities)

YESS.No.

Places Dist. fromProjectSite Km

Schools & Colleges1 Indian Maritime University 2.982 Sri Venkateswara Dentalcollege 0.243 Mohamed Sathak AJ College ofEngineering 1.074 National Management School 2.085 Jeppiar Engineering College 2.876 St. Joseph’s College ofEngineering 3.157 Sathyabama College 3.43Religious Places1 Lord Siva Temple 0.332 Jumma Masjid 3.573 Jagannath’s Temple 2.244 St. Antony’s Church 5.285 Our Lady Church 3.14

Hospitals1 Sri Isari Velan MissionHospital

3.202 Tagore Dental College 10.003 Glopal Hospital 6.694 Chettinad Hospital andResearch Institute 5.415 Sri Balaji Dental College 11.0510 Areascontainingimportant, highquality orscarceresources(ground waterresource, surfaceresources,forestry,agriculture,fisheries,tourism,minerals)

Sithalapakkam LakeHastinapuram LakePudupakkam LakePallikaranai MarshReserved Forest

6.31 km12.34 km8.08 km9.04 km

11 Areas alreadysubjected to No NA

Page 17: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone

Sr.No.

Areas Name / Identity Aerial distance (with 15-km) Proposedproject location boundarypollution orenvironmentaldamage. (those

where existinglegalenvironmentalstandards areexceeded)12 Areassusceptible tonatural hazardwhich couldcause theproject topresentenvironmentalproblems(earthquakes,subsidence,landslides,erosion, floodingor extreme oradverse climaticconditions)

No NA

(IV) Proposed Terms of ReferenceNot Applicable

Page 18: APPENDIX Ienvironmentclearance.nic.in/.../13062015VAL4MLHSFORM1.pdf · 2015. 6. 13. · Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail vagnihotri@pacificacompanies.com Telephone