Appendix K Public Hearing October 28, 2014

January 26, 2015

Page 4: Appendix K public hearing

This page is intentionally blank.

Page 5: Appendix K public hearing

ADVERTISMENT

Page 6: Appendix K public hearing
Page 7: Appendix K public hearing

MEETING MATERIALS

The same materials pesented in the Public Workshops was presented

SIGN IN SHEETS

There was only one attendee at the Public Hearing, David Bruderly from our Clean Fuels Coalition and there were not comments. 

Page 8: Appendix K public hearing
Page 9: Appendix K public hearing

Public Meetings in September

Tue 16th Duval Jacksonville Main Library

Wed 17th Clay Teacher’s Training Center, Fleming Island HS

Thu 18th Nassau American Beach Community Center

Mon 22nd St. John’s Bartram Trail Library

Tue 23rd Duval Jacksonville Beach City Hall 5 PM to 7 PM

Page 10: Appendix K public hearing

Attendance

11

3 5 4

11

34 32

16

0

5

10

15

20

25

30

35

40

Clay Duval Nassau St. Johns

2035 LRTP 2040 LRTP

Page 11: Appendix K public hearing

Public Meeting Comments Subject No. of Comments

Bike/Pedestrian 38 Transit 23 Road 17 Need More Funding Flexibility 12 TSM&O 1 Environment Concerns 1

89 comment forms. Some respondents discussed multiple topics.

Page 12: Appendix K public hearing

Web Site Use

4,847

3,698

8,322

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

Sessions Users Page Views

Page 13: Appendix K public hearing

Prioritization Comparison

78%

3% 2%

17% 14%

67%

2% 1% 8%

22% 23%

10%

25% 30%

12%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

Road Bicycle andPedestrian

TSM&O Transit Freight

Needs Plan Cost Feasible Public Perception

Presenter
Presentation Notes
Project Category Needs (Millions) Revenue (Millions) Road Projects $10,729 $1,811 Safety and Operations Projects $417 $38 Bicycle and Pedestrian Projects $306 $93 Context Sensitive Solutions* $273 ** ($273 in the Needs was added to the Road Projects Total) Transit $2,448 $1,205 Subtotal $14,173 $3,147 SIS $7,173 $2,243 Tolls $1,601 $1,119 Multimodal Projects $3,824 $1,273 (Percentage in table for Multimodal were based on Total number of funds, not the subtotal since they are not really flexible) Total $26,771 $7,782
Page 14: Appendix K public hearing

Percent of Need Met (All fund sources)

7

28%

44%

9%

21% 26%

47%

RoadwayCapacity

Bicycle andPedestrian

TSM&O ContextSensitiveSolutions

Transit Freight

Page 15: Appendix K public hearing

All Projects by Mode

8

67%

2% 1%

8%

22%

Roadway Capacity

Bicycle and Pedestrian

TSM&O

Context Sensitive Solutions

Transit

Freight

Type Amount (millions) Percent of TOTAL

Roadway Capacity $5,482 67.3%

Bicycle and Pedestrian $135 1.6% TSM&O $6 0.1%

Context Sensitive Solutions $59 0.7% Subtotal Highways $5,682 Transit $624 7.6% Freight $1,839 22.3%

Subtotal Multimodal $2,463 TOTAL $8,146

Page 16: Appendix K public hearing

Adjusted Multimodal Funds for Transit

9

67%

2% 1% 1%

14%

15% Roadway CapacityBicycle and PedestrianTSM&OContext Sensitive SolutionsTransitFreight

Type Amount

(millions) Percent of

TOTAL Roadway Capacity $5,482 67.3% Bicycle and Pedestrian $135 1.6% TSM&O $6 0.1% Context Sensitive Solutions $59 0.7% Subtotal Highways $5,682 Transit $1,190 14.4% Freight $1,273 15.4% Subtotal Multimodal $2,463 TOTAL $8,146

Page 17: Appendix K public hearing

53%

6% 0% 3%

38%

Roadway Capacity

Bicycle and Pedestrian

TSM&O

Context Sensitive Solutions

Transit

TPO Funds by Mode

10

Type Amount

(millions) Percent of

TOTAL Roadway Capacity $862 52.6% Bicycle and Pedestrian $103 6.2% TSM&O $6 0.4% Context Sensitive Solutions $44 2.6% Subtotal Highways $1,015 Transit $624 37.4% Subtotal Multimodal $624 TOTAL $1,640

Page 18: Appendix K public hearing

Prioritization Comparison (TPO Funds)

23%

10%

25% 30%

52%

2% 6%

37%

0%

10%

20%

30%

40%

50%

60%

Road Safety and Operations Bicycle andPedestrian

Transit

Public Perception TPO Funds

Presenter
Presentation Notes
Project Category Needs (Millions) Revenue (Millions) Road Projects $10,729 $1,811 Safety and Operations Projects $417 $38 Bicycle and Pedestrian Projects $306 $93 Context Sensitive Solutions* $273 ** ($273 in the Needs was added to the Road Projects Total) Transit $2,448 $1,205 Subtotal $14,173 $3,147 SIS $7,173 $2,243 Tolls $1,601 $1,119 Multimodal Projects $3,824 $1,273 (Percentage in table for Multimodal were based on Total number of funds, not the subtotal since they are not really flexible) Total $26,771 $7,782
Page 19: Appendix K public hearing

All Projects By County

12

17.0%

57.0%

6.0%

20.0% 16.0%

62.0%

9.0% 14.0%

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

Clay Duval Nassau St. Johns

% Population % Funding Allocated

Page 20: Appendix K public hearing

TPO Funds by County

13

17.0%

57.0%

6.0%

20.0% 16.0%

52.1%

4.0%

27.9%

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

Clay Duval Nassau St. Johns

% Population % Funding Allocated

Page 21: Appendix K public hearing

Cost Benefit Ratio Needs Plan Economic Effect: • $23 billion transportation benefits • Create 11,300 permanent jobs • Impact on economy $24.6 billion • $1.00 : $1.94

Cost Feasible Plan Estimated Economic Effect: • $ 10 billion transportation benefits • Create 5,000 permanent jobs • Impact on economy $10.9 billion

Total Economic and

Transportation Benefits

$47.6 billion

Total Economic and

Transportation Benefits

$20.9 billion

Page 22: Appendix K public hearing
Page 23: Appendix K public hearing

Appendix K North Florida TPO Board MeetingNovember 23, 2014

January 26, 2015

Page 24: Appendix K public hearing

ADVERTISEMENTS

 

Page 25: Appendix K public hearing
Page 26: Appendix K public hearing

MEETING MATERIALSTechnical Memorandum #10 - Cost Feasible Plan was provided and reviewed by the TPO Board.

ADOPTIONA formal roll-call vote of the board was made as follows.