appendix k public hearing
DESCRIPTION
ÂTRANSCRIPT
Appendix K
Public Hearings
January 26, 2015
This page is intentionally blank.
Appendix K Public Hearing October 28, 2014
January 26, 2015
This page is intentionally blank.
ADVERTISMENT
MEETING MATERIALS
The same materials pesented in the Public Workshops was presented
SIGN IN SHEETS
There was only one attendee at the Public Hearing, David Bruderly from our Clean Fuels Coalition and there were not comments.
Public Meetings in September
Tue 16th Duval Jacksonville Main Library
Wed 17th Clay Teacher’s Training Center, Fleming Island HS
Thu 18th Nassau American Beach Community Center
Mon 22nd St. John’s Bartram Trail Library
Tue 23rd Duval Jacksonville Beach City Hall 5 PM to 7 PM
Attendance
11
3 5 4
11
34 32
16
0
5
10
15
20
25
30
35
40
Clay Duval Nassau St. Johns
2035 LRTP 2040 LRTP
Public Meeting Comments Subject No. of Comments
Bike/Pedestrian 38 Transit 23 Road 17 Need More Funding Flexibility 12 TSM&O 1 Environment Concerns 1
89 comment forms. Some respondents discussed multiple topics.
Web Site Use
4,847
3,698
8,322
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
Sessions Users Page Views
Prioritization Comparison
78%
3% 2%
17% 14%
67%
2% 1% 8%
22% 23%
10%
25% 30%
12%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Road Bicycle andPedestrian
TSM&O Transit Freight
Needs Plan Cost Feasible Public Perception
Percent of Need Met (All fund sources)
7
28%
44%
9%
21% 26%
47%
RoadwayCapacity
Bicycle andPedestrian
TSM&O ContextSensitiveSolutions
Transit Freight
All Projects by Mode
8
67%
2% 1%
8%
22%
Roadway Capacity
Bicycle and Pedestrian
TSM&O
Context Sensitive Solutions
Transit
Freight
Type Amount (millions) Percent of TOTAL
Roadway Capacity $5,482 67.3%
Bicycle and Pedestrian $135 1.6% TSM&O $6 0.1%
Context Sensitive Solutions $59 0.7% Subtotal Highways $5,682 Transit $624 7.6% Freight $1,839 22.3%
Subtotal Multimodal $2,463 TOTAL $8,146
Adjusted Multimodal Funds for Transit
9
67%
2% 1% 1%
14%
15% Roadway CapacityBicycle and PedestrianTSM&OContext Sensitive SolutionsTransitFreight
Type Amount
(millions) Percent of
TOTAL Roadway Capacity $5,482 67.3% Bicycle and Pedestrian $135 1.6% TSM&O $6 0.1% Context Sensitive Solutions $59 0.7% Subtotal Highways $5,682 Transit $1,190 14.4% Freight $1,273 15.4% Subtotal Multimodal $2,463 TOTAL $8,146
53%
6% 0% 3%
38%
Roadway Capacity
Bicycle and Pedestrian
TSM&O
Context Sensitive Solutions
Transit
TPO Funds by Mode
10
Type Amount
(millions) Percent of
TOTAL Roadway Capacity $862 52.6% Bicycle and Pedestrian $103 6.2% TSM&O $6 0.4% Context Sensitive Solutions $44 2.6% Subtotal Highways $1,015 Transit $624 37.4% Subtotal Multimodal $624 TOTAL $1,640
Prioritization Comparison (TPO Funds)
23%
10%
25% 30%
52%
2% 6%
37%
0%
10%
20%
30%
40%
50%
60%
Road Safety and Operations Bicycle andPedestrian
Transit
Public Perception TPO Funds
All Projects By County
12
17.0%
57.0%
6.0%
20.0% 16.0%
62.0%
9.0% 14.0%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
Clay Duval Nassau St. Johns
% Population % Funding Allocated
TPO Funds by County
13
17.0%
57.0%
6.0%
20.0% 16.0%
52.1%
4.0%
27.9%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
Clay Duval Nassau St. Johns
% Population % Funding Allocated
Cost Benefit Ratio Needs Plan Economic Effect: • $23 billion transportation benefits • Create 11,300 permanent jobs • Impact on economy $24.6 billion • $1.00 : $1.94
Cost Feasible Plan Estimated Economic Effect: • $ 10 billion transportation benefits • Create 5,000 permanent jobs • Impact on economy $10.9 billion
Total Economic and
Transportation Benefits
$47.6 billion
Total Economic and
Transportation Benefits
$20.9 billion
Appendix K North Florida TPO Board MeetingNovember 23, 2014
January 26, 2015
ADVERTISEMENTS
MEETING MATERIALSTechnical Memorandum #10 - Cost Feasible Plan was provided and reviewed by the TPO Board.
ADOPTIONA formal roll-call vote of the board was made as follows.