A-1 Financial Compliance Each year, the Department provides financial information to the Governor and Legislature. This information includes both a summary of financial information and a statement of assurance that a Comprehensive Annual Financial Report (CAFR) of all funds for the preceding year has been prepared. The financial report must include a report by independent public accountants attesting that the financial statements present fairly the financial position of the Department in conformity with generally accepted accounting principles (GAAP). The Department has prepared a CAFR for Fiscal Year (FY) 2017. A report of the independent public accountants, CliftonLarsonAllen, LLP, is included in the CAFR after audit completion. Also included in the CAFR is a certificate of achievement awarded to the Department for excellence in financial reporting for the FY 2016 CAFR. This award marks the 29th consecutive year that the Department has received the award. The complete CAFR is available by contacting the Department’s Office of Public Affairs at 785-296-3585 (Voice)/(TTY). The FY 2017 CAFR will also be available under the KDOT Financial Disclosures section of the Department’s website at http://www. ksdot.org/bureaus/burFiscal/default.asp. This appendix contains additional transportation information including: •Financial Compliance •Project Selection Criteria •Project list detailing projects currently scheduled for improvement, projects completed in FY 2017 and projects under construction. Also list of aviation, rail and public transit projects. •Transportation Revolving Fund •Modal Information •Federal Fund Exchange Program APPENDIX 2018 Annual Report KANSAS DEPARTMENT OF TRANSPORTATIONS to the Section A

Upload: others

Post on 26-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

A-1

Financial Compliance Each year, the Department provides financial information to

the Governor and Legislature. This information includes both a summary of financial information and a statement of assurance that a Comprehensive Annual Financial Report (CAFR) of all funds for the preceding year has been prepared. The financial report must include a report by independent public accountants attesting that the financial statements present fairly the financial position of the Department in conformity with generally accepted accounting principles (GAAP).

The Department has prepared a CAFR for Fiscal Year (FY) 2017. A report of the independent public accountants,

CliftonLarsonAllen, LLP, is included in the CAFR after audit completion. Also included in the CAFR is a certificate of achievement awarded to the Department for excellence in financial reporting for the FY 2016 CAFR. This award marks the 29th consecutive year that the Department has received the award.

The complete CAFR is available by contacting the Department’s Office of Public Affairs at 785-296-3585 (Voice)/(TTY). The FY 2017 CAFR will also be available under the KDOT Financial Disclosures section of the Department’s website at http://www.ksdot.org/bureaus/burFiscal/default.asp.

This appendix contains additional transportation information including:•FinancialCompliance•ProjectSelectionCriteria•Projectlistdetailingprojectscurrentlyscheduledforimprovement, projectscompletedinFY2017andprojectsunderconstruction.Alsolistofaviation,railandpublictransitprojects.•TransportationRevolvingFund•ModalInformation•FederalFundExchangeProgram

APPENDIX

2018AnnualReportKansas Department of transportation’s

to the

Section A

Page 2: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

A-2

FY 2017 Financial inFormation

The following schedule is a summary of revenues and expenditures for all funds for FY 2017. All amounts are in thousands.

Percent 2017 of Total

REVENUES Motor Fuel Taxes Vehicle Registrations and Permits Intergovernmental Sales and Use Taxes Investment Earnings Other Transfers from Other State Funds

Total revenues

EXPENDITURES Current Operating Maintenance Preservation Modernization

$ 452,598

219,710 426,852 513,533

3,193 10,997

4,272

1,631,155

116,294 329,827 35,699

28

13263201

0

100

6182

254,961 4,912

339,368 23,432

49,750

107,310 89,038

516,763

1,867,354

(236,199)

130

181

3

65

28

100

100

Expansion and enhancement Communications system Local Support Rail, Air and Public Trans. Administration and transportation planning Debt Service Principal Interest and fees Transfers to Other State Funds

Total expenditures

Excess (Deficiency) of Revenues and Other Sources Over Expenditures

%

%

%

%

%

%

Percent 2017 of Total

Page 3: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

A-3

Project Selection CriteriaIn May 2010, the Kansas Legislature passed the transportation

program, Transportation Works for Kansas (T-WORKS) that covers a 10- year period from FY 2011 through FY 2020. Under the direction of T-WORKS, KDOT developed a more strategic approach to high-way project selection. In the previous program, the Comprehensive Transportation Program (CTP), project selection was based solely on engineering factors. However, in T-WORKS, while engineering fac-tors are still used to select projects, they have been augmented with economic impact evaluation and/or local input whenever practical. Additionally, to achieve greater programming flexibility, rather than selecting all projects at the start of the program as was done in past transportation programs, under T-WORKS many projects are being selected on a rolling 2- year basis. Extending project selections over the life of T-WORKS has increased KDOT’s ability to respond to changes in roadway conditions and economic changes as they arise. By implementing these changes, the project selection process pro-vides greater stakeholder input, more flexibility in projects selected and an increased ability to respond to the prevailing economic condi-tions.

Under T-WORKS construction projects are categorized into four core programs: Preservation, Modernization, Expansion and Local Construction. The four core programs group construction projects with similar work types and scopes together. Projects within each of these major programs are further grouped together based upon similar funding sources or project-types into more specific groups or subcategories. In the new project selection process, each of the core programs have evaluation criteria that are used for making project selections.

For the Preservation program, engineering factors are an effec-tive evaluation method for project selection and remain the sole factor used for selecting projects in this program. However, in the Modernization and Expansion programs, engineering factors are augmented with other factors. In the Modernization program, proj-ect selection combines historically strong engineering-based formu-

las with regional priorities and in the Expansion program, project selections combine engineering factors with regional priorities and economic impacts. In each of the programs, proposed projects are scored and ranked based upon how well the proposed projects ad-dress the relevant evaluation criteria. Then, selections are made based upon the combined information. The addition of these new factors helps ensure that a project is not only a sound engineering project but is also a project that aligns with the goals and priorities of a region and in the case of expansion projects provides economic benefits. Project selection for the fourth core program, Local Con-struction, remains unchanged and is determined at the local level by local entities throughout the state with the coordination of KDOT’s Bureau of Local Projects.

Engineering factors for the preservation, modernization and expansion programs are evaluated using the engineering based for-mulas KDOT already has established. Regional priorities are deter-mined through local-consult meetings held throughout the state on a biennial basis. Through these meetings and through the continued interaction between the area and district engineers with local entities, KDOT maintains a dialogue with stakeholders throughout the state concerning regional focus and priorities. The third factor, economic impact is assessed by the agency through computer modeling. Mod-eling estimates the potential increases in jobs, income and economic output for a region resulting from a specific transportation improve-ment.

The chart on the following page illustrates the selection criteria applied to T-WORKS projects in each of the four core programs and the weight given to each criterion.

The Preservation program protects the public’s investment in its highway system by maintaining the “as built” condition of roads and bridges. Projects in this group are varied and range from roadway surfacing rehabilitations and bridge repairs to pavement and bridge replacements.

The engineering factors used when selecting preservation proj-ects relate to the pavement and bridge conditions, like remaining

Page 4: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

A-4

pavement life, rutting, and cracking for roads and joint or bridge deck condition and/or load ratings for bridges. Roads and bridges are evaluated on an annual basis and projects are selected each year based upon this review. Additionally, within the preservation pro-gram, are smaller scale set-aside projects that address such issues as signing, pavement markings and railroad crossing surfaces. These set-aside projects are so named because the funds to perform the work is “set aside” or reserved specifically for the type of work designated by the set-aside category. The set-aside group of projects is selected on an annual basis like the other preservation projects. Since projects in the Preservation program are selected annually and the work involved rarely requires more than one season to complete, the majority of the preservation projects listed in this report are for work to be performed in fiscal year 2018. Selecting and program-ming projects in the Preservation program on an annual basis allows KDOT to maintain flexibility and responsiveness in their project selection process during T-WORKS.

The second core program, Modernization, focuses on improve-ments to the existing system. Projects under this program are designed to enhance safety and/or improve roadways by adding shoulders, flattening hills, straightening curves and upgrading in-tersections on already existing roadways. In May 2011, the final selection of the major modernization projects to be completed under T-WORKS was made. These projects were then jointly announced

in late May and June 2011 by the Governor and Secretary of Transportation. The scopes of the “major” or more complex modernization projects require selections be made early in the transportation program to ensure that there is sufficient time for the design and construction of the project during the T-WORKS program period. Presently, some of the previ-ously programmed Modernization projects for 2018, 2019 and 2020 have been delayed.

Also included within the modernization program are the practical improvement projects which are developed out of the preservation program annual review of roads and bridges and the smaller scale set aside projects. Projects within the

practical improvement umbrella are hybrids with elements of both the preservation and the modernization programs. However, the projects have greater complexity and scope than preservation proj-ects making them a better fit for the modernization program. In con-trast to other modernization projects, practical improvement projects are not selected in advance but rather are selected on a need basis as determined from the annual review of roads. Project scope pertain-ing to shoulder improvement is an example of the type of work that is a good candidate for the practical improvement approach. By employing the practical improvement approach, a project may be completed in the most cost-efficient manner feasible. The implemen-tation of this approach enables KDOT to stretch construction dollars and provide the greatest benefit possible for the dollars spent. Proj-ects in the four subcategories of the modernization program that are in the set aside program address issues like corridor development and smaller safety improvements like adding turn lanes and lighting. The set-aside projects like the practical improvement projects are selected on an annual basis. A small portion of modernization funding has been reserved to fund the practical improvement projects and set aside projects as they are identified as T-WORKS progresses.

The Expansion program, the third principal group under T-WORKS, is intended for projects that expand and enhance the trans-portation system. Projects in this program concentrate on improving access by adding new lanes or interchanges, reducing commute time

T-WORKSProjectSelectionCriteriaProgram EngineeringRegional EconomicOther Factors Priorities Impact

Preservation 100%

Modernization 80% 20%

Expansion 50% 25% 25%

Local Construction 100%

Page 5: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

A-5

and improving air quality by relieving congestion and enhancing economic development in a region by selecting projects with high economic impact. The expansion program, with the exception of the economic development (EDP) and intelligent transportation systems (ITS) set aside, was selected in early FY 2011 and announced by the Governor and Secretary of Transportation in May and June 2011. Due to the complex nature of the Expansion program of projects, early selection is crucial to ensure sufficient planning, design and construction time during the T-WORKS program period. At this time, some of the previously programmed Expansion projects for 2018, 2019 and 2020 have been delayed.

To maintain some flexibility in scheduling in the expansion pro-gram, the economic development and intelligent transportation sys-tems projects have been partially selected. The remaining economic development projects may be selected on an ongoing basis through-out T-WORKS and the intelligent transportation systems projects are selected on an annual basis. In this way, the agency maintains some flexibility to respond to new conditions as they arise throughout the remainder of the T-WORKS program.

The fourth program, Local Construction, focuses on improve-ments to city or county roads. The work encompassed by this program is varied in nature ranging from safety oriented, to mainte-nance of existing roadway, to small-scale expansion type projects. Regardless of the project focus, the common denominator for all projects is that the work is always on a city or county road. Many of the subcategories within the Local Construction program like the K1R-City Connecting Link Resurfacing (KLINK) program and TEX- Transportation Enhancement program to name only two are partnership programs in which KDOT or the federal government partner with local entities to share the costs and enable local dollars to stretch further. To generate candidate projects, many partnership programs employ a solicitation process in which prospective projects are solicited through an application. The pool of project applications is prioritized based upon program specific criteria. Then, projects are selected in order of priority and programmed until the available funds are expended. The schedule for project solicitation varies but

most of the partnership programs solicit projects on an annual basis. In other subcategories within the local construction program, the lo-cals are solely responsible for project selection and development. To assist local entities in their selection process KDOT makes available bridge inspection data, traffic accident data and traffic count data among other resources. In KDOT, the Bureau of Local Projects is the primary point of contact for local construction. Detailed infor-mation concerning the local construction program and specifically the partnership programs is located on the T-WORKS website, the link is provided below.

For an in depth look at the entire T-WORKS program including those projects in the core programs, KDOT has established a website that provides information about all projects selected. This website is a continued effort on KDOT’s part to increase transparency and gain greater stakeholder input. To accomplish this goal, the website is not only a source of more information but is interactive with sites throughout that provide opportunities to submit questions, opportuni-ties for participation in discussions and opportunities for comment submission. The T-WORKS website is located at the following link http://kdotapp.ksdot.org/TWorks/ .

Project ListingsThe project listings can be found starting on page B-1.

Transportation Revolving FundThe Transportation Revolving Fund was a statewide revolving

loan fund that provided loans to local units of government for financing road and bridge improvements on and off the State Highway System. Since August 2004, the fund provided 119 executed loans totaling $141.7 million to 58 cities and counties. KDOT is currently reviewing the status of the TRF program.

Page 6: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

A-6

Modal InformationPublic Transportation

Public transportation in Kansas is supported by a state program and multiple Federal Transit Administration (FTA) funding programs authorized by the FAST Act. These funding programs, which are augmented by local match, provide the funding for 81 rural general public transit service providers, 68 transit providers that service elderly persons and persons with disabilities throughout the state, and six urban transit properties. Without these programs, many citizens would have no access to public transportation.

The FTA 49 U.S.C. 5311 program provides capital, planning, and operating assistance to states to support rural and small urban (under 50,000 population) transportation projects that serve the general public. For Federal Fiscal Year 2017, the 5311 program for the state of Kansas was funded in the amount of $11,314,119.

The FTA 49 U.S.C. 5310 program is intended to enhance mobility for seniors and persons with disabilities by providing funds for programs to serve the special needs of transit-dependent populations beyond traditional public transportation services and Americans with Disabilities Act (ADA) complementary paratransit services. Urbanized areas and nonurban areas with populations under 200,000 are eligible for 5310 funds. For Federal Fiscal Year 2017, the 5310 program for the state of Kansas was funded in the amount of $1,244,380.

Prior to MAP-21, which preceded the FAST Act; FTA programs 5316 and 5317 were initiated. These programs were the Job Access Reverse Commute program (5316) and the New Freedom (5317) program. These programs have rolled into the 5311 and 5310 programs respectively as identified in MAP-21 and the remaining limited amounts of funds are being appropriately administered.

FTA 49 U.S.C. 5304 provides funding to support cooperative, continuous and comprehensive planning for making transportation investment decisions statewide and in nonmetropolitan areas. For Federal Fiscal Year 2017, the state of Kansas was funded in the amount of $140,534.

FTA 49 U.S.C. 5339 provides funding to replace, rehabilitate and purchase buses and related equipment and to construct bus-related

facilities. For Federal Fiscal Year 2017, the state of Kansas was funded in the amount of $2,226,517.

Funding for the state program is available from the Coordinated Public Transportation Assistance Fund. The State Highway Fund provides $11 million annually for needed transportation services in areas of the state lacking public transit services and to expand, improve and enhance existing services.

Rail Service Improvement FundMany areas of the state no longer have service from Class I

railroads. Short line railroads provide rail service to such areas, provide an alternative to trucks for freight (primarily grain) shippers, and keep rural areas of the state connected to the national rail network as well as national and international markets for Kansas grains and products. This alternative provides competition and helps keep shipping rates down. It also reduces the number of trucks that would otherwise be on Kansas roads and highways. This in turn avoids increased maintenance and rehabilitation costs for those roads.

The Rail Service Improvement Fund is administered by KDOT’s freight and rail unit. The fund makes combination grants and loans available to short line railroads, port authorities operating in Kansas and shippers and local units of government. The low-interest, long-term (10-year) loans and grants are used primarily for track rehabilitation, capacity improvement and economic development projects. Funds may also be used for financing and acquisition activities and the purchase of rolling stock. The fund receives $5 million annually.

Kansas Airport Improvement ProgramWhen time is of the essence, no other means of travel can fulfill

time-sensitive requirements the way air transportation does. Airports serve an important role in the state transportation system. The foremost role is to support economic activity generated by companies that rely on airports in their daily business.

According to the 2017 Kansas Aviation Economic Impact Study, aviation contributes over $20.6 Billion to the Kansas economy each

Page 7: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

A-7

year, the highest per capita impact of any state. The Kansas airport system supports air ambulance access and emergency medical services in addition to: agricultural applications, charters, the National Airspace System (NAS), private air travel, and many other career fields.

The goals of the Kansas Airport Improvement Program (KAIP) include:

• Maintain the system’s runway condition rating of “very good”; • Minimize surface travel time to air ambulance pick-up locations; • Improve safety, and; • Enhance airport and community economic development appeal. The program is open to public-use airports in Kansas as defined

in K.S.A. 75-5061. Projects under this program are solicited annually to preserve or modernize facilities, to design or plan continued development and to improve or add equipment. A key element of the program is a local matching requirement of between 5 and 50 percent, which is determined by project category. In FY 2015 the program was increased from $3 million to $5 million per year as part of the T-Works Transportation Program. Typically, the local match results in an overall project value of $2.8 million to $26.9 million per year. Since its inception in FY 2000, the program has supported 546 projects at 119 public-use airports totaling more than $108 million in airport improvements to the state.

Federal Fund Exchange ProgramThe federal fund exchange program is a voluntary program that

allows a local public agency (LPA) to trade all or a portion of its federal funding allocation in a specific federal fiscal year with KDOT in exchange for state transportation dollars or with another LPA in exchange for their local funds.

Under this program the LPA may develop projects following local procedures, criteria, and standards. All work performed shall be con-sistent with the Kansas Statutes, applicable regulations, and

normal engineering practices for the work being done. Any work performed on the state highway or city connecting link will require coordination with the local KDOT Area Office.

Only LPAs that are eligible to receive a federal funding allocation

may participate in the federal fund exchange program. Eligible LPAs include all counties in the state and cities with populations greater than 5,000 that are not located in a Transportation Management Area (TMA). Currently the only TMAs in Kansas are the Mid America Re-gional Council (MARC – Kansas City Region) and the Wichita Area Metropolitan Planning Organization (WAMPO).

Participation in the program is optional. An eligible LPA may choose to exchange its federal funds or it may use the funds to develop a federal aid project following the established procedures.

In general, KDOT will annually determine the amount of state funds available for exchange at the time the federal funding is con-firmed for a federal fiscal year (FFY). KDOT may conduct more frequent reviews of available funding when necessary as a result of funding or budgetary considerations. Around the beginning of each new FFY, KDOT’s Bureau of Local Projects will notify the LPAs in writing of the amount they are eligible to receive for that FFY.

For more details on this program, see KDOT’s website at www.ksdot.org/burlocalproj/.

Page 8: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

B-1

Project Listings

The remaining projects currently scheduled for improvement in T-Works and beyond, projects completed in FY 2017 and projects under construction. All lists are organized by county and route. Each project includes a description, project length, construction cost or estimated construction cost and work type.

K.S.A. Supp. 68-2315, as amended, requires information that includes construction work completed, construction work in progress and planned projects. A detailed explanation of the methods or criteria employed in the selection of projects is also required and may be found in this appendix in section A.

In addition to state highway construction project lists are aviation, rail, and public transit project listings.

NOTE: This section, as well as previous Annual Reports, is available on KDOT’s Internet site at www.ksdot.org/publications.asp.

The project lists are:

Remaining projects currently scheduled for improvement in T-WORKS and beyond, pages B-1 to B-18.

Projects completed in FY 2017, pages C-1 to C-26.

Projects under construction, pages D-1 to D-23.

Aviation, rail and public transit projects, pages E-1 to E-5.

Sections B, C, D, E

Thissectioncontainstheseparateprojectlists.

Page 9: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

B-2

SMPreservationTakingCareofWhatWeHave 1RR - Non Interstate Resurfacing (PMS 1R) BCR - Culvert Repair BSP - Bridge Painting BSR - Bridge Repair CMN - Contract Maintenance (PMS) EMR - Emergency Repair IRP - Interstate Basic Impr. (old RIM split to Preservation) ISR - Interstate Resurfacing (PMS) NHP - Miscellaneous for Preservation PBR - Bridge Replacement/Rehabilitation PCR - Culvert (to Bridge) Rehabilitation PDR - Bridge Redeck PMR - Pavement Marking RIP - Non Interstate Basic Impr (old RIM split to Preservation) RRS - Railroad Crossing Surfacing SLR - Signing & Lighting Repair and Replacement SOS - Highway Signing SRR - State Route Removal Program

MMModernizationSafety&ShoulderImprovements 1RS - Resurfacing w/Improvements (Practical Design) COR - Corridor Management GFU - Guard Fence Upgrades (retired) GSI - General Safety Improvement Projects IRI - Interstate Roadway Geometric Improvements KCC - KCC Railroad Crossing Projects LTG - Highway Lighting MPR - Miscellaneous OVC - Oil Overcharge (retired)

ProgrAM cAtegories

MMModernizationSafety&ShoulderImprovements RIM - Non Interstate Geometric Improvements SAF - Safety Projects (State) SBW - Scenic Byway

SEExpansion/EnhancementAddingSomethingNew AAR - Advanced Acquisition of ROW EDP - Economic Development IRC - Interstate Capacity Improvement (old IRI split to Expansion) ITS - Intelligent Transportation Systems (ITS) RIC Non-Interstate Capacity Improvement (old RIM split to Exp.) RSL - Local Partnership Railroad Grade Separations RSP New Railroad Grade Separations (State) SEB System Enh. - Bypasses (retired) SEC System Enh. - Corridors (retired) SEI System Enh. - Interchanges/Separations (retired) SEW Systen Enh. - Wichita Railroad Crossings (retired)

LCLocalConstruction HAZ - Safety Projects (HSIP, off system) HES - Safety Projects (HSIP, on system) K1R - KLINK Surface Preservation K2R - KLINK Pavement Restoration K3R - Geometric Improvements for KLINKs LBT - Local Bridge Transfer Program LOC - Local Construction (Local Administered & Let) RES - Local Construction (KDOT Administered & Let) RRX - Railroad Crossing Protection (HSIP, on system) RXR - Railroad Crossing Protection (HSIP, off system) SRT - Safe Routes To Schools (Federal) TEX - Transportation Enhancement Program

ThefollowingisabreakdownofthesubcategorieswithineachoftheProgramCategories.

Page 10: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Allen BRIDGE (OVER WOLF PEN CREEK) LOCATED ON LOCAL ROAD 24.9-S.0 LOCATED 3.4 MILES EAST 1.0 MILE SOUTH OF ELSMORE 0.1 Bridge Replacement 371 LC-RES 2020

Allen CITY OF IOLA 0.5 Pedestrian and Bicycle Paths 167 LC-SRT 2018

Allen VARIOUS LOCATIONS IN THE SOUTHEAST DISTRICT - Special 120 SM-1RR 2018

Allen U059 US-59 FROM THE ALLEN/NEOSHO COUNTY LINE NORTH 13.15 MILES TO THE US-54 JUNCTION 13.1 Overlay - SM-1RR 2018

Allen U169 BRIDGE #034 ON U S-169 LOCATED 5.5 MILES NORTHEAST OF THE ALLEN/NEOSHO COUNTY LINE - Bridge Repair 36 SM-BSR 2018

Allen U169 US-169 FROM 5 MILES NORTH OF THE ALLEN/NEOSHO COUNTY LINE NORTH TO 2.7 MILES SOUTH OF US-54 7.2 Pavement Reconstruction 19,536 SM-RIP 2018

Anderson MARTIN CREEK BRIDGE AT THE ANDERSON/ALLEN COUNTY LINE 0.2 Bridge Replacement 294 LC-RES 2018

Atchison ALONG 2ND STREET FROM COMMERCIAL STREET TO DIVISION STREET IN THE CITY OF ATCHISON 0.7 Landscaping and Beautification 656 LC-TEX 2019

Atchison 5TH STREET FROM U STREET TO PARK STREET IN THE CITY OF ATCHISON 0.5 Pedestrian and Bicycle Paths 549 LC-SRT 2019

Atchison BRIDGE OVER STRANGER CREEK LOCATED 0.5 MILE SOUTH AND 0.5 MILE EAST OF FARMINGTON 0.3 Bridge Replacement 656 LC-RES 2019

Atchison K007 K-7 BETWEEN 10TH STREET AND 12TH STREET IN ATCHISON 0.2 Curb and Gutter New,repr Or Repl 509 MM-COR 2018

Atchison U073 US-73 FROM 10TH AND MAIN TO THE SOUTH CITY LIMITS OF ATCHISON 1.8 Surfacing 470 LC-K1R 2018

Barber K002 BRIDGE #030 (LITTLE MULE CREEK) ON K-2 LOCATED 1.81 MILES EAST OF US-281 0.0 Bridge Deck Patching 86 SM-BSR 2018

Barber K002 K-2 FROM THE K-2/US-281 JUNCTION EAST TO THE BARBER/HARPER COUNTY LINE 16.3 Milling and Overlay 1,607 SM-1RR 2018

Barber K00801 K-8 FROM THE OKLAHOMA/KANSAS STATE LINE NORTH TO K-2/K-8 JUNCTION 1.3 Milling and Overlay 407 SM-1RR 2018

Barber K042 K-42 FROM THE PRATT/BARBER COUNTY LINE EAST TO THE BARBER/KINGMAN COUNTY LINE 4.9 Crack Repair - SM-CMN 2018

Barton K&ORR AND 17TH STREET TERRACE IN GREAT BEND - Flashing Light Signal 275 LC-RXR 2018

Barton K&ORR AND NORTHWEST 30TH AVENUE LOCATED 1 MILE NORTHWEST OF GREAT BEND - Flashing Light Signal - LC-RXR 2019

Barton VARIOUS MAJOR COLLECTORS IN NORTH HALF OF THE COUNTY 71.0 Signing 221 LC-LOC 2020

Barton U056 US-56 (10TH STREET) FROM HICKORY STREET TO 1300 FEET WEST OF KIOWA ROAD IN GREAT BEND 0.5 Milling and Overlay 387 LC-K1R 2019

Barton U056 US-56 FROM THE PAWNEE/BARTON COUNTY LINE TO THE EAST CITY LIMITS OF PAWNEE ROCK 0.7 Recycle and O-lay 51 SM-1RR 2018

REMAINING PROJECTS SCHEDULED FOR IMPROVEMENT IN (remaining FY 2018 - 2023)

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-1 (Remaining Projects)

Page 11: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Barton U056 US-56/156/K-96 AND GRANT STREET INTERSECTION IN GREAT BEND 0.1 Intersection Improvement 768 LC-K3R 2018

Bourbon BNSF AND 210TH STREET LOCATED 4 MILES SOUTHWEST OF FORT SCOTT - Flashing Light Signal 375 LC-RXR 2019

Bourbon BNSF AND FERN ROAD LOCATED 5 MILES SOUTHEAST OF FORT SCOTT - Flashing Light Signal 350 LC-RXR 2019

Bourbon LONG SHOALS HISTORIC PARKER TRUSS 0.0 Bridge 684 LC-TEX 2018

Brown DOWNTOWN HIAWATHA/COURTHOUSE SQUARE 0.1 Rehab and Oprtn Hist Trans Bldg 974 LC-TEX 2019

Brown PROVIDE FUNDS TO THE KICKAPOO TRIBE IN KANSAS - Funds Only - LC-LOC 2018

Brown K020 DELAWARE RIVER BANK STABILIZATION ON K-20 LOCATED APPROXIMATELY 4 MILES EAST OF US-75 0.0 Special 334 SM-CMN 2019

Brown U036 US-36 LOCATED 0.2 MILE WEST OF WEST CITY LIMITS OF HIAWATHA EAST TO THE BROWN/DONIPHAN COUNTY LINE 12.4 Milling and Overlay 1,933 SM-1RR 2018

Brown U073 US-73 FROM THE SOUTH CITY LIMITS OF HIAWATHA NORTH TO THE NORTH CITY LIMITS OF HIAWATHA 1.2 Milling and Overlay 236 SM-1RR 2018

Butler 159TH STREET EAST OVER THE KTA IN ANDOVER 0.3 Bridge 2,115 LC-RES 2020

Butler BNSF AND NORTHEAST 140TH STREET LOCATED 1 MILE SOUTHWEST OF CASSODAY - Flashing Light Signal 350 LC-RXR 2018

Butler BRIDGE (OVER FOUR MILE CREEK) LOCATED 2.8 MILES EAST AND 3.0 MILES SOUTH OF ANDOVER 0.3 Bridge Replacement 855 LC-RES 2020

Butler EAST PARK IN THE CITY OF EL DORADO 0.8 Pedestrian and Bicycle Paths 456 LC-TEX 2019

Butler U054 BRIDGE #010 ON US-54 LOCATED 0.74 MILE NORTH OF THE US-400 EAST JUNCTION 0.0 Bridge Removal 1,173 SM-PBR 2018

Butler U054 US-54 EAST OF US-400 APPROXIMATELY 4 MILES AND NORTH OF US-400 APPROXIMATELY 1 MILE 1.0 Guard Fence 44 SM-1RR 2018

Butler U400 US-400 APPROXIMATELY 4.4 MILES WEST OF THE BUTLER/GREENWOOD COUNTY LINE 1.2 Guard Fence 46 SM-1RR 2018

Chase BRIDGE (OVER BLOODY CREEK) LOCATED 3.4 MILES SOUTH AND 5.4 MILES EAST OF COTTONWOOD FALLS 0.2 Bridge Replacement 274 LC-RES 2020

Chase BRIDGE (OVER MIDDLE CREEK) ON LOCAL ROAD .5 MILE SOUTH AND .7 MILE WEST OF WONSEVU 0.2 Bridge Replacement 414 LC-RES 2018

Chase PEARL STREET IN COTTONWOOD FALLS 0.4 Rehab and Oprtn Hist Trans Bldg 712 LC-TEX 2018

Chautauqua U166 PAVEMENT MARKING ON US-166 9.5 Pavement Marking 154 SM-PMR 2018

Cherokee 5TH STREET APPROXIMATELY 0.5 MILE EAST OF US-166 IN BAXTER SPRINGS 0.4 Grade and Surfacing 650 SE-EDP 2018

Cherokee BNSF AND CLEM ROAD LOCATED 4 MILES SOUTHEAST OF COLUMBUS - Flashing Light Signal 300 LC-RXR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-2 (Remaining Projects)

Page 12: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Cherokee BRIDGE (OVER CENTER CREEK) ON SOUTHWEST 100TH STREET LOCATED 0.4 MILE NORTH OF FAULKNER 0.1 Bridge Replacement 456 LC-RES 2019

Cherokee SOUTHEAST 20TH STREET (RS-1171) AT SOUTHEAST BRUSH CREEK ROAD - Grade and Surfacing 382 LC-RES 2020

Cherokee K066 BNSF AND K-66 IN GALENA 0.0 Flashing Light Signal 250 LC-RRX 2019

Cheyenne BIRD CITY/USD 103 SCHOOL CORRIDORS 0.4 Pedestrian and Bicycle Paths 233 LC-SRT 2018

Clark MAJOR COLLECTORS IN NORTHEAST QUARTER OF COUNTY 23.0 Signing 102 LC-RES 2019

Clark U160 US-160 FROM THE SOUTH US-160/US-283 JUNCTION TO THE NORTH US-160/US-283 JUNCTION 6.6 Surface Recycle 494 SM-1RR 2018

Clark U160 US-160 FROM THE MEADE/CLARK COUNTY LINE EAST TO THE NORTHUS-160/US-283 JUNCTION 5.0 Milling and Overlay 471 SM-1RR 2018

Clay BNSF AND 4TH ROAD NORTH OF LONGFORD - Flashing Light Signal 250 LC-RXR 2018

Clay BNSF AND NEIGHBOR ROAD IN LONGFORD - Flashing Light Signal 150 LC-RXR 2018

Cloud BRIDGE (OVER WEST CREEK) ON REPUBLIC ROAD LOCATED 1.0 MILE WEST AND 1.5 MILES NORTH OF HOLLIS 0.2 Bridge Replacement 531 LC-RES 2019

Cloud VARIOUS PAVED MAJOR COLLECTORS IN CLOUD COUNTY 88.0 Signing 234 LC-RES 2019

Coffey BRIDGE (OVER NORTH BIG CREEK) ON FAUNA ROAD LOCATED 3.5 MILES NORTH AND 1.0 MILE EAST OF GRIDLEY 0.2 Bridge Replacement 588 LC-RES 2018

Comanche K001 K-1 AND US-160 IN THE COUNTY 49.2 Signing 5 SM-SOS 2018

Cowley BRIDGE (OVER WALNUT RIVER) ON FOURTEENTH AVENUE (RIVERSIDE AVENUE) LOCATED 1 MILE WEST OF MAIN STREET (US-77) 0.2 Bridge Replacement 1,994 LC-RES 2018

Cowley BRIDGE (OVER CRESTWOOD CREEK) ON CRESTWOOD DRIVE LOCATED NORTH OF MADISON AVENUE 0.0 Bridge Replacement 207 LC-RES 2018

Cowley BRIDGE (OVER SILVER CREEK) ON 132ND ROAD LOCATED 1.5 MILES SOUTH AND 1.6 MILES WEST OF BURDEN 0.2 Bridge Replacement 567 LC-RES 2019

Cowley MAJOR COLLECTORS IN THE MIDDLE THIRD OF THE COUNTY 102.0 Signing 382 LC-RES 2019

Cowley K015 K-15 FROM THE NORTH K-15/US-77 JUNCTION NORTHWEST TO THE EAST CITY LIMITS OF UDALL 5.9 Milling and Overlay 786 SM-1RR 2018

Cowley K055 K-55 FROM THE SUMNER/COWLEY COUNTY LINE EAST TO K-15/K-55 JUNCTION 2.0 Crack Repair 11 SM-CMN 2018

Cowley U077 US-77 FROM THE US-77 BYPASS/US-77 JUNCTION NORTH TO THE SOUTH CITY LIMITS OF WINFIELD 8.0 Overlay 947 SM-1RR 2018

Cowley U077 US-77 (MAIN STREET) FROM NORTH OF 19TH AVENUE TO NORTH OF 11TH AVENUE IN THE CITY OF WINFIELD 0.6 Milling and Overlay 527 LC-K1R 2019

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-3 (Remaining Projects)

Page 13: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Cowley U077 US-77 FROM THE SOUTH US-166 JUNCTION (WEST TYLER AVENUE) TO EAST MADISON AVENUE IN ARKANSAS CITY 0.9 Milling and Overlay 349 LC-K1R 2019

Cowley U077 US-77 FROM THE US-77/K-15 JUNCTION NORTH TO THE COWLEY/BUTLER COUNTY LINE 6.0 Milling and Overlay 1,552 MM-1RS 2018

Cowley U160 US-160 FROM THE SUMNER/COWLEY COUNTY LINE TO THE WEST CITY LIMITS OF WINFIELD 7.6 Crack Repair 38 SM-CMN 2018

Crawford PAVEMENT MARKING AND ROADSIDE IMPROVEMENTS ON 260TH STREET AND 200TH STREET (MAJOR COLLECTORS) 7.0 Grading 368 LC-LOC 2018

Crawford BRIDGE (OVER HICKORY CREEK) ON 580TH STREET BETWEEN 20TH AND 30TH STREETS 0.2 Bridge Replacement 485 LC-RES 2020

Crawford PATH ALONG SOUTH ROUSE AVENUE IN PITTSBURG 0.9 Pedestrian and Bicycle Paths 4,680 LC-TEX 2018

Crawford U069 US-69 AT US-160 (SOUTHEAST QUADRANT) 0.0 Intersection Improvement 66 MM-SAF 2018

Dickinson 1400 AVENUE - EDEN ROAD TO MINK ROAD AND OAT ROAD TO UNION ROAD 15.0 Signing 51 LC-RES 2019

Dickinson CITY OF HERINGTON- SAFE ROUTES TO SCHOOL MASTER PLAN - Preliminary Engineering - LC-SRT 2020

Dickinson K015 K-15, BUCKEYE AVENUE AND 14TH STREET INTERSECTION IN ABILENE 0.1 Intersection Improvement 496 LC-K3R 2018

Doniphan BRIDGE LOCATED 0.5 MILE EAST AND 1.8 MILES NORTH OF TROY 0.1 Bridge Replacement 525 LC-RES 2019

Doniphan U036 US-36 FROM THE BROWN/DONIPHAN COUNTY LINE EAST 0.63 MILE 0.6 Milling and Overlay 101 SM-1RR 2018

Douglas 19TH STREET AND IOWA STREET IN LAWRENCE - Pedestrian and Bicycle Paths 2,180 LC-TEX 2019

Douglas 23RD STREET EAST OF NAISMITH DRIVE IN LAWRENCE KS - Roadside Improvement 113 SE-EDP 2018

Douglas MASSACHUSETTS STREET BETWEEN 11TH AND 14TH STREET IN THE CITY OF LAWRENCE 0.4 Milling and Overlay 109 LC-HAZ 2019

Douglas CITY OF LAWRENCE SCHOOL CORRIDORS 0.4 Pedestrian and Bicycle Paths 258 LC-SRT 2018

Douglas CONSTRUCTION OF A TWO WAY LEFT TURN LANE ON 23RD STREET FROM LOUISIANA STREET TO MASSACHUSETTS STREET IN LAWRENCE - Funds Only 500 SE-RIC 2019

Douglas DRAINAGE IMPROVEMENTS AT 23RD STREET AND OUSDAHL ROAD IN THE CITY OF LAWRENCE - Funds Only 700 SE-RIC 2018

Douglas HISTORIC SANTA FE STATION IN LAWRENCE - Rehab and Oprtn Hist Trans Bldg 1,390 LC-TEX 2018

Douglas RECONSTRUCTION OF 23RD STREET FROM HASKELL BRIDGE TO THE EAST CITY LIMITS OF LAWRENCE - Funds Only 4,000 SE-RIC 2019

Douglas RESURFACING 23RD STREET FROM IOWA STREET TO OUSDAHL ROAD IN LAWRENCE - Funds Only 300 SE-RIC 2018

Douglas ROUTE 458 FROM EAST 1800 ROAD TO EAST 2000 ROAD 2.0 Grading 828 LC-RES 2018

Douglas THROUGHOUT LAWRENCE- SAFE ROUTES TO SCHOOL PHASE 2 - Pedestrian and Bicycle Paths 429 LC-SRT 2018

Douglas VARIOUS REPAIR LOCATIONS IN WAKARUSA TOWNSHIP - Funds Only - SE-RIC 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-4 (Remaining Projects)

Page 14: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Douglas K010 K-10 FROM US-59 EAST TO LOUISIANA STREET IN THE CITY OF LAWRENCE 3.0 Special - SE-EDP 2018

Douglas U056 US-56 FROM THE US-59/US-56 JUNCTION EAST TO THE DOUGLAS/JOHNSON COUNTY LINE 11.8 Milling and Overlay 2,208 SM-1RR 2018

Douglas U059 BRIDGE #022 ON US-59 LOCATED 0.75 MILE NORTH OF K-10 0.0 Bridge Repair 100 SM-EMR 2018

Edwards BNSF AND 190TH AVENUE 0.5 MILE EAST OF LEWIS - Flashing Light Signal 375 LC-RXR 2018

Ellis 230TH AVENUE AND 55TH STREET - Grade and Surfacing 1,500 SE-EDP 2018

Ellis MAJOR AND MINOR COLLECTORS IN THE NORTH HALF OF THE COUNTY 169.0 Signing 158 LC-RES 2018

Ellis MAJOR AND MINOR COLLECTORS IN SOUTHWEST QUARTER OF THE COUNTY 112.0 Signing 125 LC-RES 2019

Ellis I070 I-70 FROM US-183 INTERCHANGE EAST TO THE ELLIS/RUSSELL COUNTY LINE 17.8 Milling and Overlay 9,254 SM-ISR 2018

Ellsworth K004 K-4 FROM THE RICE/ELLSWORTH COUNTY LINE NORTHEAST TO THE ELLSWORTH/MCPHERSON COUNTY LINE 6.7 Milling and Overlay 680 SM-1RR 2018

Finney HALF MILE SOUTH OF US-50/83/400 BETWEEN THIRD STREET AND CAMPUS DRIVE- PIONEER PATHWAY IN GARDEN CITY 1.0 Pedestrian and Bicycle Paths 351 LC-TEX 2019

Finney SOUTH FARMLAND ROAD IN GARDEN CITY - Grade and Surfacing 1,500 SE-EDP 2018

Ford 5TH AVENUE TO 1ST AVENUE NEAR THE RAILROAD TRACKS IN DODGE CITY 0.3 Landscaping and Beautification 203 LC-TEX 2019

Ford BNSF AND 127TH ROAD LOCATED 1 MILE EAST OF SPEARVILLE - Flashing Light Signal 300 LC-RXR 2018

Ford BNSF AND 132ND ROAD LOCATED 1 MILE EAST OF BELLEFONT - Flashing Light Signal 400 LC-RXR 2018

Ford BRIDGE (OVER MULBURRY CREEK) LOCATED 2.6 MILES S AND 3.0 MILES WEST OF FORD 0.2 Bridge Replacement 776 LC-RES 2020

Ford ADA SIDEWALK IMPROVEMENTS AT VARIOUS LOCATIONS IN THE SOUTHWEST DISTRICT SIX - Special 80 SM-1RR 2018

Franklin U059 US-59 FROM THE ANDERSON/FRANKLIN COUNTY LINE NORTH TO THE SOUTH CITY LIMITS OF OTTAWA 12.9 Milling and Overlay 2,414 SM-1RR 2018

Franklin U059 US-59 AND KINGMAN ROAD 0.5 Grade and Surfacing 1,449 MM-COR 2019

Franklin BRIDGE (OVER EIGHT MILE CREEK) ON PAWNEE ROAD LOCATED WEST OF EISENHOWER ROAD 1.0 MILE NORTHWEST OF OTTAWA 0.4 Bridge Replacement 548 LC-RES 2020

Geary WEST 8TH STREET AND EISENHOWER DRIVE IN JUNCTION CITY 0.7 Pedestrian and Bicycle Paths 445 LC-TEX 2019

Geary VARIOUS LOCATIONS ON K-57, K-244 SPUR AND K-244 7.0 Milling and Overlay 1,184 SM-1RR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-5 (Remaining Projects)

Page 15: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Geary U077 US-77 FROM RUCKER ROAD NORTH TO GEARY/RILEY COUNTY LINE 12.9 1.5 Overlay 1,400 SM-1RR 2018

Gove I070 I-70 FROM 1 MILE WEST OF K-23 SPUR (EAST JUNCTION) EAST TO 4 MILES EAST OF K-211 9.0 Grade, Bridge and Surfacing 50,700 SM-IRP 2018

Graham U283 US-283 FROM 2.7 MILES NORTH OF THE GRAHAM/TREGO COUNTY LINE NORTH 12.6 MILES TO BRIDGE #23 12.6 Surface Recycle 1,307 SM-1RR 2018

Gray CITY OF CIMARRON- SAFE ROUTES TO SCHOOL PHASE TWO - Pedestrian and Bicycle Paths 241 LC-SRT 2018

Greeley MAJOR COLLECTORS IN THE COUNTY 154.0 Signing 185 LC-RES 2019

Greenwood U400 US-400 FROM THE BUTLER/GREENWOOD COUNTY LINE EAST TO THE WEST K-99/US-400 JUNCTION 15.3 Overlay 3,073 SM-RIP 2018

Greenwood U400 US-400 FROM THE WEST JUNCTION K-99/US-400 EAST TO THE EAST JUNCTION K-99/US-400 1.0 Overlay 320 SM-RIP 2018

Greenwood U400 US-400; FROM EAST JUNCTION K-99 EAST TO THE WILSON/GREENWOOD COUNTY LINE 15.2 Pavement Patching 1,376 SM-1RR 2018

Harper BRIDGE (OVER SPRING CREEK) ON SOUTHWEST 10TH ROAD LOCATED 1.0 MILE SOUTH AND 0.8 MILE WEST OF ANTHONY 0.2 Bridge Replacement 582 LC-RES 2019

Harper K002 K-2 FROM THE SOUTH US-160/K-2 JUNCTION NORTH 5.9 MILES 5.9 Crack Repair 40 SM-CMN 2018

Harper K002 K-2 FROM THE BARBER/HARPER COUNTY LINE EAST TO SOUTH OF BRIDGE #058 0.2 Milling and Overlay 1,628 SM-1RR 2018

Harper U160 US-160 FROM THE BARBER/HARPER COUNTY LINE EAST 3 MILES 3.0 Milling and Overlay 2,047 SM-1RR 2018

Harvey BNSF AND EMMA CREEK ROAD LOCATED 4 MILES WEST OF NEWTON - Flashing Light Signal 320 MM-KCC 2018

Harvey BNSF AND GOLDEN PRAIRIE ROAD LOCATED 3 MILES WEST OF HALSTEAD - Flashing Light Signal 300 LC-RXR 2018

Harvey BRIDGE (OVER JESTER CREEK) LOCATED 2.0 MILES NORTH OF THE COUNTY LINE AND 0.5 MILE WEST OF I-135 0.1 Bridge Replacement 202 LC-RES 2018

Harvey NORTH NEWTON, KANSAS- KIDRON-BETHEL TRAIL LOOP 1.2 Pedestrian and Bicycle Paths 489 LC-TEX 2019

Hodgeman VARIOUS MAJOR COLLECTOR ROADS IN THE WEST HALF OF COUNTY 64.0 Signing 128 LC-RES 2019

Jackson BRIDGE (OVER SULLIVAN CREEK) LOCATED 3.0 MILES NORTH AND 0.5 MILE WEST OF DELIA 0.1 Bridge Replacement 272 LC-RES 2019

Jackson VARIOUS MAJOR COLLECTOR ROADS WEST OF US-75 AND NORTH OF K-116 131.0 Signing 150 LC-LOC 2019

Jackson U075 US-75 FROM THE JACKSON/SHAWNEE COUNTY LINE NORTH TO 158TH ROAD 8.2 Overlay 3,231 SM-RIP 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-6 (Remaining Projects)

Page 16: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Jefferson BRIDGE (OVER BIG SLOUGH CREEK) ON 98TH STREET LOCATED 0.8 MILE NORTH AND 0.9 MILE WEST OF OSKALOOSA 0.3 Bridge Replacement 679 LC-RES 2019

JeffersonFAIRVIEW ROAD- FROM US-59 TO WELLMAN ROAD; HICKORY POINT ROAD- FROM US-59 TO K-192; 81ST STREET- FROM K-4 TO CLARK ROAD, TO 74TH STREET , TO WEST LAKE ROAD AND TO THE PERRY MARINA

13.6 Signing 192 LC-RES 2019

Jefferson WELLMAN ROAD NEAR 21ST AND 27TH 0.7 Grade and Surfacing 466 LC-RES 2018

Jewell VARIOUS LOCATIONS IN THE NORTHCENTRAL DISTRICT OF KANSAS - Special 80 SM-1RR 2018

Jewell K014 K-14 FROM THE JEWELL/MITCHELL COUNTY LINE NORTH TO THE WEST US-36 JUNCTION 15.3 Sealing 550 SM-1RR 2018

Jewell U036 US-36 FROM THE JEWELL/SMITH COUNTY LINE EAST TO WEST US-36/K-128 JUNCTION 8.5 Surface Recycle 717 SM-1RR 2018

Johnson 143RD STREET FROM WINDSOR TO OVERBROOK 0.9 Grade and Surfacing 7,273 LC-LOC 2019

Johnson 151ST AT SCARBOROUGH AND MUR-LEN ROAD IN OLATHE - Intersection Improvement 2,739 LC-HAZ 2018

Johnson ALONG CEDAR CREEK STREAMWAY BETWEEN LAKE OLATHE AND CEDAR LAKE IN OLATHE 2.4 Pedestrian and Bicycle Paths 1,922 LC-LOC 2020

Johnson BLACK BOB ROAD IMPROVEMENTS INCLUDING THE 159TH STREET INTERSECTION IN OLATHE 0.7 Grade and Surfacing 2,335 LC-LOC 2020

Johnson BRIDGE OVER CAPTAIN CREEK ON 127TH STREET LOCATED 0.4 MILE EAST OF EVENING STAR ROAD 0.1 Bridge Replacement 742 LC-RES 2019

Johnson CENTRAL, RIDGEVIEW, AND FAIRVIEW ELEMENTARY SCHOOLS IN OLATHE - Pedestrian and Bicycle Paths 437 LC-LOC 2019

Johnson CITY OF OVERLAND PARK- ADAPTIVE TRAFFIC SIGNAL SYSTEM - Intelligent Transportation Sys - SE-ITS 2018

Johnson CITY OF OVERLAND PARK INTERSECTION OF 137TH AND LAMAR 0.0 Intersection Improvement 1,456 LC-HAZ 2019

Johnson DOWNTOWN OVERLAND PARK AND WITHIN A THREE MILE RADIUS 3.0 Pedestrian and Bicycle Paths 314 LC-LOC 2018

Johnson I-35 AND GARDNER ROAD INTERCHANGE IN CITY OF GARDNER 0.2 Interchange/s 3,822 LC-RES 2019

Johnson INTERSECTION OF 119TH STREET AND BLACK BOB ROAD IN OLATHE 0.1 Intersection Improvement 342 LC-LOC 2019

Johnson INTERSECTION OF 135TH STREET/SANTA FE STREET AND BLACK BOB ROAD IN OLATHE 0.1 Intersection Improvement 308 LC-LOC 2019

Johnson INTERSECTION OF 95TH STREET AND SANTA FE TRAIL DRIVE IN LENEXA - Intersection Improvement 750 LC-LOC 2019

Johnson LACKMAN ROAD FROM SOUTH OF 87TH STREET PARKWAY TO 95TH STREET AND I-435 IN LENEXA 1.5 Pedestrian and Bicycle Paths 1,357 LC-TEX 2019

Johnson LONE ELM ROAD FROM OLD 56 HIGHWAY TO 151ST STREET IN OLATHE 0.9 Grade and Surfacing 13,118 LC-LOC 2020

Johnson MEADOW LANE TRAIL IN OLATHE 4.6 Pedestrian and Bicycle Paths 1,388 LC-TEX 2018

Johnson METCALF AVENUE FROM 159TH STREET TO 167TH STREET IN OVERLAND PARK 1.0 Pavement Reconstruction 15,790 LC-LOC 2018

Johnson MOONLIGHT ROAD FROM WARREN STREET TO WHITE DRIVE IN GARDNER 0.6 Pedestrian and Bicycle Paths 399 LC-SRT 2020

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-7 (Remaining Projects)

Page 17: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Johnson NORTHVIEW, RIDGEVIEW, RAVENWOOD, AND HAVENCROFT ELEMENTARY SCHOOLS IN THE CITY OF OLATHE 1.5 Pedestrian and Bicycle Paths 350 LC-SRT 2018

Johnson OVERLAND PARK STREETS SOUTH OF I-435 50.0 Pedestrian and Bicycle Paths 500 LC-TEX 2019

Johnson OVERLAND PARK: 159TH AND PFLUMM ROAD 0.5 Intersection Improvement 1,474 LC-HAZ 2019

Johnson QUIVERA ROAD FROM 159TH STREET TO 179TH STREET IN OVERLAND PARK 2.4 Pavement Reconstruction 17,688 LC-LOC 2019

Johnson RENNER BOULEVARD FROM 91ST STREET TO 93RD STREET IN LENEXA 0.4 Pedestrian and Bicycle Paths 363 LC-TEX 2018

Johnson ROE BOULEVARD FROM JOHNSON DRIVE TO WYANDOTTE/JOHNSON COUNTY LINE IN ROELAND PARK 1.4 Grade and Surfacing 8,088 LC-RES 2019

Johnson VARIOUS LOCATIONS IN THE NORTHEAST DISTRICT OF KANSAS - Special 90 SM-1RR 2018

Johnson I035 I-35 BRIDGE NORTH OF 151ST STREET IN OLATHE, KS 0.2 Bridge Widen - SE-EDP 2019

Johnson I435 I-435 FROM THE I-435 AND 87TH STREET INTERCHANGE TO I-435 AND 79TH STREET INTERCHANGE 1.0 Pavement Patching 190 SM-EMR 2018

Johnson I435 I-435 RAMPS AT 95TH STREET 0.0 Milling and Overlay 1,000 SM-ISR 2018

Johnson I635 PAVEMENT MARKING ON I-635 0.4 Pavement Marking 59 SM-PMR 2018

Johnson K007 K-7 (PARKER STREET) FROM DENNIS AVENUE TO SANTA FE STREET IN OLATHE 1.0 Intersection Improvement 2,853 LC-LOC 2018

Johnson K007 K-7 IN MIAMI, JOHNSON, WYANDOTTE, AND LEAVENWORTH COUNTIES 53.2 Traffic Study-access Review - MM-COR 2019

Johnson U056 US-56 AND 199TH STREET INTERSECTION IN EDGERTON 1.0 Construction Contracts 1,553 MM-COR 2020

Johnson U056 US-56 FROM METCALF TO ROE AVENUE 1.7 Milling and Overlay 1,086 SM-1RR 2018

Johnson U056 US-56 FROM THE DOUGLAS/JOHNSON COUNTY LINE EAST TO THE WEST CITY LIMITS OF GARDNER 7.2 Milling and Overlay 916 SM-1RR 2018

Johnson U069 US-69 CORRIDOR FROM 119TH STREET NORTH TO I-35 AND 75TH STREET 3.2 Preliminary Engineering and Row - SE-RIC 2021

Kingman BRIDGE (OVER SOUTH FORK OF NINNESCH RIVER) ON SE 80TH AVENUE LOCATED 0.5 MILE SOUTH AND 2.2 MILES WEST OF MURDOCK 0.2 Bridge Replacement 1,072 LC-RES 2020

Kingman K042 K-42 FROM THE BARBER/KINGMAN COUNTY LINE EAST TO K-42/K-14 JUNCTION 23.7 Crack Repair - SM-CMN 2018

Kingman U054 US-54 FROM WEST OF CHARITON STREET TO LASALLE STREET IN KINGMAN 0.4 Milling and Overlay 321 LC-K1R 2019

Kiowa VARIOUS LOCATIONS IN THE SOUTHCENTRAL DISTRICT - Special 30 SM-1RR 2018

Kiowa U054 VARIOUS SITES ALONG US-54 FROM THE FORD/KIOWA COUNTY LINE EAST TO US-183 13.4 Guard Fence 243 SM-1RR 2018

Kiowa U400 REINFORCED BOX #527 ON US-400 OVER RATTLESNAKE CREEK LOCATED 1.82 MILES EAST OF THE FORD/KIOWA COUNTY LINE 1.0 Bridge Repair 364 SM-CMN 2018

Kiowa U400 VARIOUS LOCATIONS ON US 54 AND US-400 36.7 Signing 4 SM-SOS 2018

Labette U059 JUNCTION OF US-59/US-160 0.2 Intersection Improvement 2,853 LC-HES 2020

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-8 (Remaining Projects)

Page 18: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Labette U059 US-59 BETWEEN BROADWAY AVENUE AND CLARK AVENUE IN PARSONS 0.3 Grade and Surfacing 1,500 MM-COR 2019

Lane K096 KANDORR AND K-96 3 MILES EAST OF DIGHTON 0.0 Flashing Light Signal 275 LC-RRX 2019

Leavenworth CR-05 FROM TONGANOXIE TO LEAVENWORTH; CR-10 FROM JARBALO TO CR-05 23.5 Signing 94 LC-RES 2019

Leavenworth DESOTO ROAD FROM IDA STREET TO EISENHOWER ROAD IN LANSING 2.1 Grade and Surfacing 7,552 LC-RES 2018

Lincoln ALL MAJOR COLLECTORS EAST OF K-14 EXCEPT ELK DRIVE FROM 220TH ROAD TO 280TH ROAD IN THE COUNTY 73.0 Signing 164 LC-RES 2018

Lincoln BRIDGE (OVER SPILLMAN CREEK) ON LOCAL ROAD 87 LOCATED 1.3 MILES NORTH AND 2.0 MILES EAST OF VESPER 0.2 Bridge Replacement 556 LC-RES 2019

Lyon K099 K-99 (COMMERCIAL STREET)FROM KANSAS AVENUE TO BNSF RAILROAD AND 12TH AVENUE TO I-35 IN EMPORIA 1.3 Milling and Overlay 569 LC-K1R 2019

Marion BRIDGE (OVER LYON CREEK) ON 370TH STREET LOCATED 0.5 MILE NORTH AND 1.7 MILES EAST OF RAMONA 0.0 Bridge Replacement 420 LC-RES 2018

Marion HILLSBORO HOSPITAL TRAIL IN HILLSBORO, KANSAS 1.5 Pedestrian and Bicycle Paths 779 LC-TEX 2019

Marion MAIN STREET (K-256) FROM 1ST STREET TO 5TH STREET IN MARION 0.3 Landscaping and Beautification 873 LC-TEX 2018

Marion U050US-150, K-215, K-15, K-256, K-168 IN MARION COUNTY, K-150 IN MARION, AND MCPHERSON COUNTIES, US-56 AND US-56B IN DICKINSON COUNTY, US-77 IN MARION AND DICKINSON COUNTY

145.2 Signing 16 SM-SOS 2018

McPherson MULTIPLE LOCATIONS IN THE CITY OF MCPHERSON 2.0 Pedestrian and Bicycle Paths 450 LC-SRT 2019

McPherson ALL MAJOR COLLECTOR ROADS IN THE NORTHEASTERN QUARTER OF THE COUNTY 71.0 Signing 164 LC-RES 2018

McPherson MOUNDRIDGE, KANSAS- SAFE ROUTES TO SCHOOL PHASE 1 - Preliminary Engineering - LC-SRT 2020

McPherson VALKOMMEN TRAIL FROM THE NORTH TRAILHEAD IN LINDSBORG 1.4 Pedestrian and Bicycle Paths 842 LC-TEX 2018

McPherson K004 K-4 FROM THE ELLSWORTH/MCPHERSON COUNTY LINE EAST TO THE WEST CITY LIMITS OF LINDSBORG 13.0 Milling and Overlay 1,314 SM-1RR 2018

Meade VARIOUS MINOR COLLECTOR ROADS IN THE COUNTY 102.0 Signing 104 LC-RES 2019

Meade U054 US-54 FROM THE SEWARD/MEADE COUNTY LINE EAST TO THE SOUTH CITY LIMITS OF PLAINS 2.9 Milling and Overlay 390 SM-1RR 2018

Meade U160 US-160 FROM THE EAST US-160/US-54 JUNCTION EAST TO THE MEADE/CLARK COUNTY LINE 12.3 Milling and Overlay 1,156 SM-1RR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-9 (Remaining Projects)

Page 19: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Miami BRIDGE (OVER NORTH WEA CREEK) ON 263RD STREET LOCATED 2 MILES NORTH AND 4.2 MILES WEST OF LOUISBURG 0.0 Bridge Replacement 628 LC-RES 2020

Mitchell VICINITY OF ELEMENTARY AND JR HIGH SCHOOLS IN BELOIT 1.9 Pedestrian and Bicycle Paths 540 LC-SRT 2019

Mitchell BRIDGE (OVER LIMESTONE CREEK) LOCATED 1.5 MILES WEST AND 4.5 MILES NORTH OF GLEN ELDER 0.1 Bridge Replacement 542 LC-RES 2020

Mitchell CITY OF BELOIT- SAFE ROUTES TO SCHOOL - Pedestrian and Bicycle Paths 260 LC-SRT 2018

Mitchell KYLE RR AND SOUTH RIVER STREET IN BELOIT - Flashing Light Signal 270 LC-RXR 2018

Mitchell K014 K-14 FROM US-24 NORTH TO THE MITCHELL/JEWELL COUNTY LINE 7.8 Sealing 253 SM-1RR 2018

Mitchell K014 K-14 FROM THE MITCHELL/LINCOLN COUNTY LINE NORTH TO THE SOUTH CITY LIMITS OF BELOIT 16.7 Sealing 543 SM-1RR 2018

Mitchell K014 KYLE RR AND K-14 (HERSEY AVENUE) IN BELOIT 0.0 Flashing Light Signal 325 LC-RRX 2018

Montgomery BRIDGE (OVER HAFER RUN) ON 2100 ROAD LOCATED 3.0 MILES EAST AND 0.9 MILE NORTH OF CANEY 0.2 Bridge Replacement 454 LC-RES 2020

Montgomery COMMUNITY ELEMENTARY SCHOOL IN COFFEYVILLE 1.4 Pedestrian and Bicycle Paths 558 LC-SRT 2019

Montgomery INTERSECTION OF COUNTY ROAD 3900 AND COUNTY ROAD 3400 0.3 Grade and Surfacing 295 LC-RES 2019

Montgomery U160 PAVEMENT MARKING ON US-160 1.2 Pavement Marking 38 SM-PMR 2018

Montgomery U166 US-166 AND WILLOW STREET INTERSECTION IN COFFEYVILLE 0.2 Intersection Improvement 894 LC-K3R 2018

Montgomery U169 SKANDORR AND US-169 (WALNUT STREET) IN COFFEYVILLE 0.0 Flashing Light Signal 250 LC-RRX 2018

Morris BRIDGE (OVER LAIRDS CREEK) ON J AVENUE LOCATED 2.7 MILES EAST OF PARKERVILLE 0.1 Bridge Replacement 523 LC-RES 2019

Morris VARIOUS MAJOR COLLECTOR ROADS IN THE WEST HALF OF THE COUNTY 115.0 Signing 235 LC-RES 2019

Morris VARIOUS LOCATIONS IN THE COUNTY - Grade and Surfacing 444 LC-RES 2018

Morton VARIOUS MAJOR COLLECTOR ROADS IN THE NORTHERN TWO THIRDS OF THE COUNTY 87.0 Signing 116 LC-RES 2019

Nemaha DOWNTOWN SENECA- MAIN STREET FROM 6TH TO 7TH STREETS - Rehab and Oprtn Hist Trans Bldg 717 LC-TEX 2019

Nemaha 6TH STREET FROM MAIN STREET TO NORTH RIDGE CHURCH IN SABETHA 0.5 Pedestrian and Bicycle Paths 543 LC-TEX 2020

Neosho BRIDGE (OVER LABETTE CREEK) ON HARPER ROAD LOCATED 1.3 MILES SOUTH AND 4.0 MILES EAST OF THAYER 0.2 Bridge Replacement 510 LC-RES 2019

Neosho QUEENS ROAD (RS-1633) FROM 10TH TO 100TH STREETS 9.0 Signing 202 LC-RES 2018

Neosho U059 US-59 FROM THE LABETTE/NEOSHO COUNTY LINE NORTH TO THE K-146 JUNCTION 15.4 Surfacing 1,091 SM-1RR 2018

Neosho U169 US-169 AND 190TH SOUTH OF CHANUTE 0.5 Lighting 125 MM-LTG 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-10 (Remaining Projects)

Page 20: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Ness BRIDGE (OVER GUZZLERS GULCH) ON ROAD P LOCATED 3.0 MILES WEST OF US-283 AND 2.2 MILES NORTH OF THE NESS/HODGEMAN COUNTY LINE 0.1 Bridge Replacement 481 LC-RES 2020

Ness MAJOR COLLECTORS IN SOUTHWEST QUARTER OF THE COUNTY 51.0 Signing 91 LC-RES 2019

Ness K004 K-4 FROM THE WEST CITY LIMITS EAST TO THE EAST CITY LIMITS OF BROWNELL 0.3 Grade and Surfacing 799 LC-K3R 2018

Ness K096 K-96 FROM 7TH STREET TO SCHOOL STREET IN NESS CITY 0.6 Grading 891 LC-K3R 2018

Norton BRIDGE (OVER SOLOMON RIVER) ON ROAD W14 LOCATED 0.5 MILE SOUTH AND 2.0 MILES WEST OF NEW ALMELO 0.1 Bridge Replacement 331 LC-RES 2020

Norton U283 STRUCTURE #075 ON US-283 0.0 Flood Damage 156 SM-EMR 2018

Osage BNSF AND DOCKING ROAD LOCATED 4 MILES NORTHEAST OF READING - Flashing Light Signal 350 MM-KCC 2018

Osage BNSF AND JORDAN ROAD LOCATED NORTH OF CARBONDALE - Flashing Light Signal 375 LC-RXR 2018

Osage BRIDGE (OVER SWITZLER CREEK) ON WEST 157TH STREET LOCATED 1.7 MILES NORTH AND 1.4 MILES WEST OF BURLINGAME 0.2 Bridge Replacement 434 LC-RES 2018

Osborne BRIDGE (OVER TRIBUTARY OF TWIN CREEK) ON WEST 180TH DRIVE LOCATED 9 MILES SOUTH AND 1.8 MILES EAST OF OSBORNE 0.2 Bridge Replacement 396 LC-RES 2020

Osborne U281 US-281 FROM MADISON STREET TO VAN BUREN STREET IN OSBORNE 0.3 Recycle and O-lay 487 LC-K3R 2018

Ottawa KYLE RR AND MULBERRY ROAD LOCATED NORTH OF MINNEAPOLIS - Flashing Light Signal 200 LC-RXR 2018

Ottawa K018 K-18 FROM THE OTTAWA/LINCOLN COUNTY LINE EAST TO THE SOUTH JUNCTION OF OLD US-81/K-18 17.2 Surface Recycle 1,428 SM-1RR 2018

Ottawa K106 K-106 FROM THE EAST CITY LIMITS OF MINNEAPOLIS EAST TO THE STATE PARK 7.2 Overlay 719 SM-1RR 2018

Pawnee ALL MAJOR COLLECTOR ROADS EXCEPT RS-524 IN THE CITY OF BURDETT AND RS-975 IN THE CITY OF ROZEL 106.0 Signing 238 LC-RES 2018

Pawnee SAFE ROUTES TO SCHOOLS PLANNING AND PRELIMINARY ENGINEERING IN LARNED KANSAS - Preliminary Engineering - LC-SRT 2020

Pawnee MAJOR AND MINOR COLLECTOR ROADS IN THE SOUTHWESTERN THIRD OF THE COUNTY 65.0 Signing 113 LC-RES 2019

Pawnee U056 US-56 FROM THE EAST CITY LIMITS OF LARNED EAST TO PAWNEE/BARTON COUNTY LINE 7.4 Recycle and O-lay 558 SM-1RR 2018

Pawnee U183 US-183 FROM THE US-183/US-56 JUNCTION NORTH TO US-183/K-156 JUNCTION 12.3 Milling and Overlay 1,424 SM-1RR 2018

Phillips BRIDGE (OVER DEER CREEK) ON EAST 500 ROAD LOCATED 2.0 MILES SOUTH AND 5.0 MILES EAST OF PHILLIPSBURG 0.2 Bridge Replacement 578 LC-RES 2019

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-11 (Remaining Projects)

Page 21: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Pottawatomie ALL MAJOR COLLECTOR ROADS IN THE COUNTY 219.0 Signing 294 LC-LOC 2018

Pottawatomie SOUTHEAST OF US-24 AND EXCEL ROAD 0.2 Concrete Pavement 306 MM-COR 2019

Pottawatomie K013 K-13 LOCATED APPROXIMATELY 0.1 MILE SOUTH OF BRIDGE #020 (CEDAR CREEK) 0.1 Special 175 SM-CMN 2020

Pottawatomie K063 K-63 FROM THE NORTH CITY LIMITS OF SAINT MARYS NORTH TO THE POTTAWATOMIE/NEMAHA COUNTY LINE 26.8 Milling and Overlay 2,626 SM-1RR 2018

Pottawatomie U024 US-24 AND GREEN VALLEY ROAD 0.3 Grade and Surfacing 3,600 MM-COR 2018

Pottawatomie U024 WEST BERTRAND STREET FROM WEST CITY LIMITS THROUGH THE K-63 INTERSECTION IN SAINT MARYS 0.4 Milling and Overlay 380 LC-K1R 2019

Pratt VARIOUS RURAL SECONDARY ROUTES IN THE SOUTH HALF OF THE COUNTY 86.3 Signing 194 LC-RES 2019

Pratt K042 K-42 FROM THE K-42/US-281 JUNCTION TO THE PRATT/BARBER COUNTY LINE 9.0 Crack Repair - SM-CMN 2018

Pratt U054 US-54 FROM THE US-54/K-61 JUNCTION EAST 4.5 MILES TO THE CONCRETE PAVEMENT 4.5 Sealing 207 SM-CMN 2018

Pratt U281 KANDORR AND US-281 IN SAWYER 0.0 Flashing Light Signal 250 LC-RRX 2018

Reno BNSF AND SALEM ROAD LOCATED 3 MILES WEST OF PARTRIDGE - Flashing Light Signal 320 LC-RXR 2018

Reno BNSF AND WHITESIDE STREET LOCATED IN HUTCHINSON - Flashing Light Signal 550 LC-RXR 2018

Reno CITY OF HUTCHINSON- SAFE ROUTE TO SCHOOLS - Pedestrian and Bicycle Paths 235 LC-SRT 2018

Reno VICINITY OF MIDDLE SCHOOL AND MAIN STREET IN HAVEN 0.8 Pedestrian and Bicycle Paths 179 LC-SRT 2019

Reno RENO COUNTY/HUTCHINSON- ADA COMPLIANT BUS SHELTERS - Pedestrian and Bicycle Paths 104 LC-TEX 2019

Reno STATE FAIR ROAD AND 23RD AVENUE FROM MAIN TO SEVERANCE IN HUTCHINSON 1.0 Pedestrian and Bicycle Paths 590 LC-TEX 2019

Reno WASHINGTON STREET FROM NORTH 17TH AVENUE TO NORTH 23RD AVENUE IN HUTCHINSON 0.5 Pedestrian and Bicycle Paths 406 LC-TEX 2019

Reno K014 K-14 FROM 4 MILES SOUTHEAST OF NICKERSON NORTHWEST TO THE EAST CITY LIMITS OF NICKERSON 3.9 Milling and Overlay 799 SM-1RR 2018

Reno K061 K-61 FROM AVENUE G TO N LORRAINE STREET IN HUTCHINSON 0.9 Milling and Overlay 501 LC-K1R 2019

Reno U050 US-50 AND K-61 IN THE COUNTY 40.3 Signing 839 SM-SOS 2018

Reno U050 US-50 FROM SEGO ROAD (NORTHEAST OF ABBYVILLE) EAST TO HERREN ROAD (NORTHEAST OF PARTRIDGE) 6.8 Surface Recycle 1,063 SM-1RR 2018

Republic ALL MAJOR AND MINOR COLLECTOR ROADS EXCEPT GRANT STREET (MCS 07912) IN THE CITY OF COURTLAND 199.0 Signing 227 LC-RES 2019

Republic BRIDGE LOCATED 1.0 MI EAST OF WARWICK 0.1 Bridge Replacement 563 LC-RES 2020

Republic ALL MAJOR AND MINOR COLLECTORS IN THE SOUTHEASTERN QUARTR OF THE COUNTY 101.0 Signing 137 LC-RES 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-12 (Remaining Projects)

Page 22: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Rice MAJOR AND MINOR COLLECTORS EXCEPT RS 986 IN THE CITY OF GENESEO AND AVENUE B (MCS08020) 32.0 Signing 86 LC-RES 2019

Rice K004 K-4 IN ELLSWORTH, MCPHERSON, AND SALINE COUNTIES AND K-141 IN ELLSWORTH COUNTY 52.3 Signing 5 SM-SOS 2018

Riley 11TH AND POYNTZ IN THE CITY OF MANHATTAN - Traffic Signals 571 LC-HAZ 2018

Riley CITY OF MANHATTAN- SAFE ROUTES TO SCHOOL PHASE 2 0.9 Pedestrian and Bicycle Paths 260 LC-SRT 2018

Riley CITY OF MANHATTAN- SAFE ROUTES TO SCHOOL PHASE 2 - Pedestrian and Bicycle Paths 502 LC-SRT 2019

Riley JULIETTE AVENUE FROM LARAMIE STREET TO OSAGE STREET IN MANHATTAN - Rehab and Oprtn Hist Trans Bldg 712 LC-TEX 2018

Riley JULIETTE AVENUE IN MANHATTAN 0.2 Rehab and Oprtn Hist Trans Bldg 1,079 LC-TEX 2019

Riley NEAR OGDEN ELEMENTARY SCHOOL - Pedestrian and Bicycle Paths 200 LC-SRT 2019

Riley PROVIDE FUNDS TO COUNTY FOR TURNBACK ON K-18 - Funds Only 298 SE-RIC 2018

Riley US-24/ TUTTLE CREEK BOULEVARD AND MCCALL ROAD IN MANHATTAN 0.1 Pedestrian and Bicycle Paths 1,602 LC-TEX 2018

Riley I070 I-70 FROM THE GEARY/RILEY COUNTY LINE EAST TO THE KTA TOLL PLAZA 73.4 Signing 1,660 SM-SOS 2018

Rush K096 K-96 FROM THE NESS/RUSH COUNTY LINE EAST TO US-183 15.3 Milling and Overlay 1,722 SM-1RR 2018

Russell I070 PE TO MONITOR-I-70: APPROXIMATELY 4.0 MILES EAST OF THE RUSSELL/ELLIS COUNTY LINE (AREA OF SINKHOLE) 14.0 Preliminary Engineering - SM-ISR 2017

Russell U281 US-281 FROM THE NORTH CITY LIMITS OF RUSSELL TO THE WEST K-18 JUNCTION 15.0 Ultra Thin Bonded Asphalt Surfacing 1,112 SM-1RR 2018

Scott MAJOR COLLECTOR ROADS IN THE NORHWEST SECTION OF THE COUNTY 45.5 Signing 57 LC-RES 2019

Sedgwick 127TH STREET EAST FROM 13TH STREET NORTH TO 21ST STREET NORTH IN WICHITA 1.0 Grade and Surfacing 5,988 LC-LOC 2018

Sedgwick 143RD STREET EAST FROM KELLOGG TO CENTRAL IN WICHITA 0.5 Grade and Surfacing 5,197 LC-LOC 2018

Sedgwick 17TH AND 18TH STREET BIKEWAY IN WICHITA 2.5 Pedestrian and Bicycle Paths 47 LC-TEX 2018

Sedgwick 17TH STREET AND HILLSIDE STREET IN WICHITA KANSAS - Grade and Surfacing 3,000 SE-EDP 2018

Sedgwick 5TH STREET (85TH STREET) BRIDGE OVER WICHITA-VALLEY CENTER FLOODWAY TO BROADWAY 1.5 Pavement Reconstruction 2,182 LC-RES 2018

Sedgwick 61ST STREET NORTH BRIDGE OVER CHISHOLM CREEK 0.1 Bridge 5,706 LC-RES 2019

Sedgwick ALONG MACARTHUR AND ENGLEWOOD TO CONNECT WITH AVIATION PATHWAY- PHASE 1 2.0 Pedestrian and Bicycle Paths 1,426 LC-TEX 2018

Sedgwick DERBY TO MULVANE PATHWAY 2.0 Pedestrian and Bicycle Paths 879 LC-TEX 2019

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-13 (Remaining Projects)

Page 23: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Sedgwick EAST MOUNT VERNON STREET FROM SOUT BROADWAY STREET TO SOUTHEAST BOULEVARD IN WICHITA 0.9 Grade and Surfacing 3,600 LC-LOC 2019

Sedgwick EAST 17TH STREET NORTH FROM NORTH BROADWAY STREET TO I-135 IN WICHITA 0.8 Grade and Surfacing 4,423 LC-LOC 2019

Sedgwick INTERSECTION AT 45TH STREET NORTH AND HILLSIDE IN WICHITA 0.5 Intersection Improvement 4,875 LC-LOC 2018

Sedgwick KANDO AND BOLIN DRIVE IN WICHITA - Flashing Light Signal 275 LC-RXR 2019

Sedgwick KANDO AND HOOVER ROAD IN WICHITA - Flashing Light Signal 300 LC-RXR 2019

Sedgwick KANDO AND SOUTH 135TH STREET WEST LOCATED NORTH OF CLEARWATER - Flashing Light Signal 225 LC-RXR 2019

Sedgwick SOUTH GREENWICH ROAD FROM EAST PAWNEE STREET TO EAST HARRY STREET IN WICHITA 1.0 Grade and Surfacing 5,014 LC-LOC 2018

Sedgwick WESTBOUND PATRIOT AVENUE IN DERBY 0.2 Intersection Improvement 276 LC-RES 2020

Sedgwick WICHITA METRO TMC OPERATIONS ANALYSIS - Intelligent Transportation Sys - SE-ITS 2018

Sedgwick REDBUD PATH FROM K-96 EAST TO 159TH STREET IN WICHITA 2.5 Pedestrian and Bicycle Paths 928 LC-TEX 2019

Sedgwick I135 3 SIGN STRUCTURE LOCATIONS ON I-135 IN WICHITA 0.0 Signing 160 SM-SLR 2018

Sedgwick I235 BRIDGE #106 (LITTLE ARKANSAS RIVER) ON I-235 LOCATED 1.39 MILES EASTOF K-96 (SOUTHBOUND) 0.0 Preliminary Engineering 100 SM-BSR 2020

Sedgwick K015 K-15/SOUTHEAST BOULEVARD/SOUTH WASHINGTON STREET FROM MARKET STREET IN DERBY TO US-54/KELLOGG AVENUE IN WICHITA 9.5 Intelligent Transportation Sys 645 LC-LOC 2018

Sedgwick K096 k-96 FROM THE EAST END OF THE ARKANSAS RIVER BRIDGE EAST TO THE K-96/I-235 JUNCTION 1.0 Pavement Patching 942 SM-1RR 2018

Sedgwick U054 US-54 AND BARBER DRIVE IN GODDARD KANSAS 0.8 Grade and Surfacing 1,400 MM-COR 2019

Sedgwick U081 US-81 FROM THE SUMNER/SEDGWICK COUNTY LINE NORTH 5.9 MILES 5.9 Surfacing 468 SM-1RR 2018

Seward U054 US-54 FROM US-83 EAST TO THE SEWARD/MEADE COUNTY LINE 20.6 Milling and Overlay 2,740 SM-1RR 2018

Seward U083 US-83 FROM THE OKLAHOMA/KANSAS STATE LINE NORTH TO 0.9 MILE NORTH OF K-51 13.7 Milling and Overlay 1,822 SM-1RR 2018

Shawnee EAST TOPEKA- DEER CREEK TRAIL EXTENSION 1.2 Pedestrian and Bicycle Paths 2,386 LC-TEX 2019

Shawnee GAGE STREET FROM EMLAND DRIVE TO I-70 EASTBOUND EXIT RAMP IN TOPEKA - Intersection Improvement 418 LC-HAZ 2019

Shawnee I-470 AND HUNTOON/WANAMAKER JUNCTION IN TOPEKA KANSAS - Grade and Surfacing 1,000 MM-COR 2018

Shawnee INTERSECTION OF 29TH AND MCCLURE IN TOPEKA - Intersection Improvement 627 LC-HAZ 2019

Shawnee 8TH AVENUE AND OTHER VARIOUS LOCATIONS IN TOPEKA KANSAS- - Pedestrian and Bicycle Paths 1,300 LC-TEX 2019

Shawnee QUINCY ELEMENTARY- SAFE ROUTES TO SCHOOL- PHASE 2 IN TOPEKA - Pedestrian and Bicycle Paths 382 LC-SRT 2019

Shawnee IN TOPEKA AT VARIOUS LOCATIONS- TMB BIKE SHARE EXPANSION - FTA Funds Transfer 99 LC-TEX 2018

Shawnee VARIOUS LOCATIONS WITHIN TOPEKA CITY LIMITS- ADA ACCESSIBLE BUS STOP SHELTERS - FTA Funds Transfer - LC-TEX 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-14 (Remaining Projects)

Page 24: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Shawnee VARIOUS LOCATIONS WITHIN TOPEKA CITY LIMITS- ADA ACCESSIBLE BUS STOPS - FTA Funds Transfer 802 LC-TEX 2018

Shawnee I470 I-470 FROM THE I-470/ I-70 JUNCTION TO THE I-470/KTA JUNCTION 6.7 Overlay 9,369 SM-ISR 2018

Shawnee U075 BRIDGES #279 AND #280 LOCATED AT THE JUNCTION US-75/46TH STREET 0.0 Bridge Overlay 202 SM-BSR 2018

Shawnee U075 US-75 FROM 0.5 MILE NORTH AND SOUTH OF NORTH WEST 46TH STREET 0.9 Overlay 711 SM-RIP 2018

Shawnee U075 US-75 FROM 0.70 MILE SOUTH OF NORTH WEST 62ND STREET NORTH TO THE SHAWNEE/JACKSON COUNTY LINE 4.7 Overlay 1,857 SM-RIP 2018

Sherman DOWNTOWN GOODLAND- ON MAIN STREET BETWEEN 9TH AND 10TH STREETS 0.1 Rehab and Oprtn Hist Trans Bldg 727 LC-TEX 2019

Sherman I070 I-70 IN SHERMAN, THOMAS, GOVE, TREGO, ELLIS, RUSSELL COUNTIES 205.0 Signing 651 SM-SOS 2018

Sherman I070 I-70 IN SHERMAN, THOMAS, GOVE, TREGO, ELLIS, RUSSELL COUNTIES 205.0 Signing 43 SM-SOS 2018

Sherman K253 REPLACEMENTS ON K-253, K-27, AND K-267 IN THE COUNTY 31.6 Signing 3 SM-SOS 2018

Smith BRIDGE (OVER OAK CREEK) ON 270 ROAD LOCATED 4.0 MILES NORTH AND 9.5 MILES EAST OF PORTIS 0.2 Bridge Replacement 442 LC-RES 2018

Smith SMITH CENTER, KANSAS- SAFE ROUTES TO SCHOOL PHASE 1 - Preliminary Engineering - LC-SRT 2020

Smith U036 US-36 FROM 0.75 MILE EAST OF HIGHWAY 281 IN SMITH CENTER KANSAS 0.5 Grade and Surfacing 621 MM-COR 2018

Smith U281 MAIN STREET FROM K AND O RAILROAD TO FIRST STREET IN SMITH CENTER KANSAS 0.3 Milling and Overlay 390 LC-K1R 2019

Stafford ST. JOHN KANSAS- SAFE ROUTES TO SCHOOL PHASE 1 - Preliminary Engineering - LC-SRT 2020

Stafford U050 US-50 AT THE US-50/US-281 JUNCTION 0.3 Intersection Improvement 6,006 LC-HES 2019

Stafford U050 US-50 FROM THE US-50/US-281 JUNCTION EAST TO THE STAFFORD/RENO COUNTY LINE 15.0 Milling and Overlay 1,619 SM-1RR 2018

Sumner A AVENUE, CENTRAL AVENUE, WEBB STREET, AND OSAGE STREET IN CALDWELL KANSAS 0.1 Pedestrian and Bicycle Paths 269 LC-SRT 2018

Sumner VARIOUS LOCATIONS IN THE SOUTHCENTRAL DISTRICT - Special 80 SM-1RR 2018

Sumner K053 K-53 FROM THE K-53/US-81 JUNCTION EAST TO THE WEST CITY LIMITS OF MULVANE 4.7 Milling and Overlay 557 SM-1RR 2018

Sumner K055 K-55 FROM THE US-81/K-55 JUNCTION EAST TO THE SUMNER/COWLEY COUNTY LINE 10.1 Crack Repair 36 SM-CMN 2018

Sumner U081 US-81 BANK STABILIZATION ON THE WEST BANK OF THE NINNESCAH RIVER LOCATED 1.4 MILES NORTH OF THE US-81/K-55 JUNCTION- JUST WEST OF KTA 0.0 Special Maintance 1,140 SM-EMR 2019

Sumner U160 US-160 FROM THE EAST CITY LIMITS OF WELLINGTON TO THE SUMNER/COWLEY COUNTY LINE 12.7 Crack Repair 75 SM-CMN 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-15 (Remaining Projects)

Page 25: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Thomas COUNTRY CLUB DRIVE BETWEEN I-70 AND EAST COLLEGE DRIVE 0.9 Concrete Pavement 2,981 MM-COR 2021

Thomas K025 K-25 FROM 1090 FEET NORTH OF COLLEGE DRIVE TO FOURTH STREET IN COLBY 1.0 Milling and Overlay 366 LC-K1R 2019

Wabaunsee BRIDGE OVER HATCH CREEK LOCATED 2.0 MILES SOUTH AND 5.2 MILES EAST OF ESKRIDGE 0.2 Bridge Replacement 365 LC-RES 2020

Wabaunsee K138 K-99 SIGN REPLACEMENT IN COUNTY 10.8 Signing 20 SM-SOS 2018

Wallace ADA RAMPS AT VARIOUS LOCATIONS IN THE NORTHWEST DISTRICT - Special 60 SM-1RR 2018

Washington BRIDGE (OVER TRIBUTARY TO PEATS CREEK) ON LIBERTY ROAD LOCATED 0.2 MILE WEST AND 2.1 MILES NORTH OF PALMER 0.2 Bridge Replacement 437 LC-RES 2018

Washington K009 K-9 FROM WEST STREET TO WILLOW STREET IN CLIFTON 0.3 Milling and Overlay 248 LC-K1R 2019

Washington K009 K-9 FROM THE CLAY/WASHINGTON COUNTY LINE (SOUTH JUNCTION K-9/K-15) NORTH TO THE SOUTH K-9/K-15/K-148 JUNCTION 12.1 Recycle and O-lay 2,008 SM-1RR 2018

Washington K015 K-15 FROM THE K-9/K-15/K-148 JUNCTION NORTH TO THE SOUTH CITY LIMITS OF WASHINGTON 6.8 Recycle and O-lay 1,131 SM-1RR 2018

Washington K015 K-15 FROM THE SOUTH CITY LIMITS OF WASHINGTON NORTH TO EAST K-15/US-36 JUNCTION 0.2 Recycle and O-lay - SM-1RR 2018

Washington K115 K-115 FROM THE K-9/K-15/K-115 JUNCTION WEST TO THE EAST CITY LIMITS OF PALMER 0.7 Overlay 74 SM-1RR 2018

Washington U036 US-36 FROM THE EAST CITY LIMITS OF WASHINGTON EAST TO THE 2 LANE/4 LANE DIVIDED 9.2 Milling and Overlay 918 SM-1RR 2018

Washington U036 US-36 FROM K-22 EAST TO THE WASHINGTON/MARSHALL COUNTY LINE 23.5 Signing 83 SM-SOS 2018

Wichita K-96 IN THE CITY OF LEOTI IN THE SOUTHWEST DISTRICT - Special 30 SM-1RR 2018

Wilson K047 K-47 FROM THE EAST CITY LIMITS OF FREDONIA EAST TO US-75 8.3 Overlay 706 SM-1RR 2018

Wilson U075 BRIDGE #050 ON US-75 LOCATED 1.97 MILES NORTH OF THE MONTGOMERY COUNTY LINE (BEAM FABRICATION) 0.0 Bridge Repair 85 SM-EMR 2018

Wilson U075 BRIDGE #050 ON US-75 LOCATED 1.97 MILES NORTH OF THE MONTGOMERY COUNTY LINE 0.0 Bridge Repair 400 SM-EMR 2018

Wilson U075 US-75 FROM US-400 NORTH TO THE FALL RIVER BRIDGE 2.1 Sealing 36 SM-1RR 2018

Wilson U075B US-75B FROM THE US-75/US-75B JUNCTION NORTH TO NORTH US-75/US-75B JUNCTION 1.6 Sealing 46 SM-1RR 2018

Wyandotte SAFE ROUTES TO SCHOOLS PHASE E INCLUDING EDISON, WHITE AND NOBLE PRENTIS ELEMENTARY SCHOOLS 1.5 Pedestrian and Bicycle Paths 616 LC-TEX 2018

Wyandotte STATE AVENUE AND VILLAGE PARKWAY INTERSECTION 0.5 Grade and Surfacing 2,421 LC-RES 2020

Wyandotte I070 BRIDGE #157 ON I-70 LOCATED AT THE I-70/I-635 INTERCHANGE 0.0 Bridge Deck 1,215 SM-PDR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-16 (Remaining Projects)

Page 26: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Wyandotte I070 BRIDGES #030 AND #173 OF THE LEWIS AND CLARK VIADUCT ON I-70 IN KANSAS CITY KANSAS 0.6 Bridge Replacement 61,300 SM-PBR 2018

Wyandotte I070 I-70 AT CENTRAL AVENUE IN KANSAS CITY KANSAS 0.2 Lighting 118 MM-LTG 2018

Wyandotte I070

I-70- LEWIS AND CLARK VIADUCT- BRIDGES #173 (WESTBOUND) LOCATED 0.49 MILE WEST OF THE MISSOURI STATE LINE; BRIDGE #174 (EASTBOUND) FROM SOUTHBOUND FAIRFAX TO EASTBOUND I-70; BRIDGE #177 (WESTBOUND) LOCATED 0.56 MILE WEST OF THE MISSOUR STATE LINE AND BRIDGE #178 (WESTBOUND) AT MINNESOTA AVENUE

- Bridge Repair 2,432 SM-BSR 2018

Wyandotte I070 I-70 FROM THE EAST EDGE OF QUARRY ROAD BRIDGE EAST TO 0.6 MILE EAST OF THE 38TH STREET BRIDGE 1.6 Pavement Patching 240 SM-ISR 2018

Wyandotte I435 I-435 LOCATED JUST SOUTH OF THE RAMP TO K-32 0.0 Signing 50 SM-SLR 2018

Wyandotte I435 I-435 FROM 0.5 MILE NORTH OF K-5 NORTH TO THE MISSOURI RIVER BRIDGE 1.2 Overlay 5,358 SM-ISR 2018

Wyandotte I435 I-435; FROM THE KANSAS RIVER BRIDGE NORTH TO THE MISSOURI RIVER BRIDGE 11.2 Surfacing 600 SM-ISR 2018

Wyandotte I635 I-635 FROM THE SOUTH JUNCTION K-5/I-635 NORTH TO THE MISSOURI RIVER BRIDGE 1.4 Overlay 1,532 SM-ISR 2018

Wyandotte I635 PAVEMENT MARKING ON I-635 12.0 Pavement Marking 815 SM-PMR 2018

Wyandotte K005 K-5 FROM THE K-5/I-635 JUNCTION NORTHEAST TO SUNSHINE ROAD (1.9 MILES NORTHEAST OF K-5/I-635 JUNCTION) 1.9 Milling and Overlay 315 SM-1RR 2018

Wyandotte K032 K-32/TURNER DIAGONAL INTERCHANGE 0.6 Signing 549 SM-SLR 2018

Statewide DISTRICT WIDE IN DISTRICT THREE - Preliminary Engineering - SM-1RR 2018

Statewide FLINT HILLS NATURE TRAIL DEVELOPMENT 18.7 Special 4,450 LC-TEX 2019

Statewide MOTOR ASSISTANCE PROGRAM FOR FISCAL YEAR 2018 IN KANSAS CITY, TOPEKA, WICHITA AND SALINA METRO AREAS - Preliminary Engineering - SE-ITS 2019

Statewide KCATA TRANSIT IN THE KANSAS CITY METRO REGION - FTA Funds Transfer - LC-RES 2018

Statewide STATEWIDE- TRAFFIC ENGINEERING STUDIES FOR LOCAL PUBLIC AUTHORITIES FOR FISCAL YEARS 2019-2020 - Location Study - LC-RES 2020

Statewide STATEWIDE FEDERAL FISCAL YEARS 2017- 2019 BRIDGE SUBSTRUCTURE INSPECTION - Location Study - LC-RES 2019

Statewide STATEWIDE- KDOT WORK ZONE SAFETY PUBLIC AWARENESS CAMPAIGN (CALENDAR YEAR 2018) - Preliminary Engineering - MM-MPR 2019

Statewide STATEWIDE- KDOT WORK ZONE SAFETY PUBLIC AWARENESS CAMPAIGN (CALENDAR YEAR 2019) - Preliminary Engineering - MM-MPR 2020

Statewide STATEWIDE- PLAN REVIEW OF ROUNDABOUTS - Preliminary Engineering - MM-SAF 2018

Statewide STATEWIDE- KCA SPONSORED SKILLED LABOR TRAINING PROGRAM - Preliminary Engineering - SM-ISR 2018

Statewide STATEWIDE- ACCESS MANAGEMENT ASSISTANCE - Traffic Study-access Review - MM-COR 2020

Statewide STATEWIDE- ACCESS MANAGEMENT ASSISTANCE - Preliminary Engineering - MM-COR 2020

Statewide STATEWIDE - REVIEW ADA REQUIREMENTS - Preliminary Engineering - SM-1RR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-17 (Remaining Projects)

Page 27: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost (1,000's)

Prog Cat & Subcat Fiscal Year

Statewide STATEWIDE DISTRICT MAINTENANCE PROJECT FOR PURCHASE OF RIGHT OF WAY AND EASEMENTS - Right Of Way Only - SM-NHP 2018

Statewide STATEWIDE FOR STATE FISCAL YEAR 2018 TAX EVASION PROJECT - Special - MM-MPR 2019

Statewide FISCAL YEAR 2019 STATEWIDE PRELIMINARY ENGINEERING FOR RAILROAD INSPECTIONS - Flashing Light Signal - LC-RRX 2019

Statewide FISCAL YEAR 2020 STATEWIDE PRELIMINARY ENGINEERING FOR RAILROAD INSPECTIONS - Flashing Light Signal - LC-RRX 2020

Statewide FISCAL YEAR 2021 STATEWIDE PRELIMINARY ENGINEERING FOR RAILROAD INSPECTIONS - Flashing Light Signal - LC-RRX 2021

Statewide FISCAL YEAR 2022 STATEWIDE PRELIMINARY ENGINEERING FOR RAILROAD INSPECTIONS - Flashing Light Signal - LC-RRX 2022

Statewide U-54 FROM LIBERAL TO KINGMAN AND AT VARIOUS LOCATIONS ON U-50 AND I-35 - Intelligent Transportation Sys 920 SE-ITS 2018

Statewide VARIOUS LOCATIONS IN ATCHISON, BROWN, DOUGLAS, JOHNSON, LYON, OSAGE, NEMAHA AND SHAWNEE COUNTIES IN DISTRICT ONE - Mudjacking 372 SM-CMN 2018

Statewide KIOSK UPDATES AT VARIOUS LOCATIONS ON ELEVEN SCENIC AND HISTORIC BYWAYS - Scenic Or Historic Hwy Progs 685 MM-SBW 2018

Statewide VARIOUS LOCATIONS ON US-400 PASSING LANE IMPROVEMENT EVALUATION - Location Study - MM-COR 2020

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF KANSAS - Special 3,673 MM-MPR 2018

Statewide I635 I-635 FROM 0.6 MILE SOUTH OF JOHNSON/WYANDOTTE COUNTY LINE NORTH TO THE SOUTH K-5 JUNCTION 7.5 Pavement Patching 1,153 SM-ISR 2018

Statewide K018 ON K-18 AND US-281 IN RUSSELL COUNTY 43.5 Signing 5 SM-SOS 2018

Statewide K034 K-34, US-283 ANS US-160 IN CLARK COUNTY 69.0 Signing 124 SM-SOS 2018

Statewide U024 US-75, US-24 ANS K-4 IN SHAWNEE COUNTY AND K-30 IN WABAUNSEE COUNTY 53.0 Signing 773 SM-SOS 2018

Statewide U069 US-69 AT THE CHEROKEE/CRAWFORD COUNTY LINE AT THE NORTH US-400 AND US-69 JUNCTION 0.2 Intersection Improvement 2,184 MM-SAF 2018

Statewide U069 US-69, US-56 AND US-169 IN JOHNSON AND WYANDOTTE COUNTY 11.7 Signing 364 SM-SOS 2018

Statewide U166 US-166, K-101, US-160 ANS US-59 IN LABETTE COUNTY 87.1 Signing 9 SM-SOS 2018

Statewide U283 US-283, K-147 AND K-4 IN NESS COUNTY 57.5 Signing 72 SM-SOS 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. B-18 (Remaining Projects)

Page 28: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Allen CITY OF HUMBOLDT (SAFE ROUTES TO SCHOOL) - Pedestrian AND Bicycle Paths 135 LC-SRT 2016

Allen CITY OF IOLA (SAFE ROUTES TO SCHOOL) - Preliminary Engineering - LC-SRT 2017

Allen U054 US-54 FROM RS-1492 TO EAST COUNTY LINE 11.8 Recycle and O-lay 1,742 SM-1RR 2015

Allen U059 US-59: BRIDGE LOCATED 3 MILES NORTH OF THE US-59/US-54 JUNCTION AND JUST SOUTH OF THE COUNTY LINE

0.0 Bridge Repair 332 SM-BSR 2014

Allen U169 BRIDGE #37 ON US-169 (RS0002)- TRAFFIC CONTROL 0.0 Bridge Repair 30 SM-EMR 2017

Allen U169 BRIDGE #37 ON US-169 (RS0002)- BEAM FABRICATION 0.0 Bridge Repair 22 SM-EMR 2017

Allen U169 BRIDGE #37 ON US-169 (RS0002)- BRIDGE REPAIR 0.0 Bridge Repair 175 SM-EMR 2017

Anderson 0.5 MILE SOUTH AND 3.7 MILES EAST OF GARNETT 0.1 Grade, Bridge and Surfacing 571 LC-RES 2011

Anderson 1.5 MILES WEST AND 1.7 MILES SOUTH OF KINCAID 0.1 Grade, Bridge and Surfacing 308 LC-RES 2014

Anderson K031 K-31: BRIDGE #016, OVER KENOMA CREEK, 6.91 MILES SOUTHEAST OF THE ANDERSON/COFFEY COUNTY LINE.

- Bridge Replacement 731 SM-PBR 2014

Anderson U059 US-59: 3 MILES NORTH OF THE NORTH US-59/K-31 JUNCTION 0.0 Bridge Replacement 5,273 SM-PBR 2015

Atchison THREE INTERSECTIONS BETWEEN US-59 AND US-73, 0.5 MILE SOUTH OF ATCHISON 0.3 Intersection Improvement 237 LC-RES 2015

Atchison K007 K-7: FROM THE NORTH CITY LIMITS OF ATCHISON, NORTH TO THE ATCHISON/DONIPHAN COUNTY LINE

5.1 Milling and Overlay 321 SM-1RR 2013

Atchison K009 K-9: FROM THE EAST US-159/K-9 JUNCTION, EAST TO THE US-73/K-9 JUNCTION 4.9 Asphalt Pavement 357 SM-1RR 2013

Atchison K074 K-74: THE BEGINNING OF K-74 (NEAR POTTER) EAST TO THE K-74/US-73 JUNCTION 3.4 Funds Only - SM-SRR 2018

Atchison U059 CORRIDOR: AMELIA EARHART BRIDGE (013) OVER MO RIVER 3.7 Bridge Replacement 64,948 SE-SEC 2009

Atchison U059 US-59 IN ATCHISON COUNTY 0.7 Pavement Marking 69 SM-PMR 2017

Atchison U059 US-59: COUNTY LINE NORTHEAST TO ATCHISON 13.6 Recycle and O-lay 1,212 SM-1RR 2015

Atchison U159 BRIDGE (OVER LITTLE STRANGER CREEK) ON US-159, 4.8 MILES WEST OF THE EAST US-159/K-9 JUNCTION

0.0 Bridge Replacement 668 SM-PBR 2016

Atchison U159 BRIDGE (OVER LITTLE STRANGER CREEK) ON US-159: 4.8 MILES WEST OF THE EAST US-159/K-9 JUNCTION- DETOUR REIMBURSEMENT

0.0 Funds Only 6 SM-PBR 2017

Barber BRIDGE LOCATED 2.2 MILES EAST AND 5.4 MILES NORTH OF SUN CITY OVER MULBERRY CREEK

0.2 Bridge Replacement 128 LC-LBT 2017

Barber BNSF AND GERLANE ROAD 2.5 MILES NORTHEAST OF HAZELTON - Flashing Light Signal 227 LC-RXR 2015

Barber U160 US-160: COUNTY LINE EAST TO THE EAST US-160/US-281 JUNCTION 23.0 Milling and Overlay 2,370 SM-1RR 2014

Barber U281 US-281 FROM STATE LINE NORTH TO THE US-160/US-281 JUNCTION 23.9 Slurry Seal 2,061 SM-1RR 2015

Projects Completed in FY 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-1 (Projects completed in FY 2017)

Page 29: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Barton CULVERT IMPROVEMENTS THROUGHOUT THE COUNTY 33.0 Grading - LC-RES 2017

Barton K096 K-96 FROM WEST COUNTY LINE TO NORTH CITY LIMITS OF GREAT BEND 13.6 Recycle and O-lay 2,384 SM-1RR 2015

Barton U056GREAT BEND ON US-56 FROM MCKINLEY STREET TO HARRISON STREET; KENNEDY STREET TO PATTON ROAD; FREY STREET TO 1,350 FT. WEST OF KIOWA ROAD; AND WASHINGTON STREET TO FREY STREET

2.0 Surfacing 359 LC-K1R 2014

Barton U281 GREAT BEND- US-281 AND RAILROAD AVENUE 0.2 Intersection Improvement 391 LC-K3R 2015

Barton U281 HOISINGTON- US-281 FROM 6TH STREET TO K-4 0.2 Concrete Pavement 659 LC-K1R 2017

Barton U281 US-281 FROM JUNCTION US-281/K-4 TO THE NORTH COUNTY LINE 11.1 Milling and Overlay 1,653 SM-1RR 2015

Bourbon BNSF AND 180TH STREET 8 MILES SOUTHWEST OF FT. SCOTT - Flashing Light Signal 295 LC-RXR 2015

Bourbon NATIONAL FROM 13TH STREET TO 6TH STREET 0.7 Grade and Surfacing 3,444 LC-RES 2015

Bourbon K031 K-31: BRIDGE #038, CLEVER CREEK, 2.96 MILES EAST OF THE EAST K-31/K-7 JUNCTION 0.0 Bridge Replacement 749 SM-PBR 2014

Bourbon U054 US-54/US-69 NORTH JUNCTION IN BOURBON COUNTY 21.6 Lighting 62 SM-SLR 2012

Bourbon U069 US-69 IN FORT SCOTT. 2.0 Intelligent Transportation Sys - MM-COR 2016

Bourbon U069 US-69 IN FORT SCOTT 0.06 MILES NORTH OF 23RD STREET ON EAST SIDE - Grade and Surfacing 40 MM-COR 2008

Brown COMMUNITY BUILDING PARKING AREA - Surfacing 233 LC-RES 2014

Brown HIAWATHA FITNESS AND SCHOOL TRAIL IN THE CITY OF HIAWATHA, BROWN COUNTY

- Pedestrian and Bicycle Paths 928 LC-TEX 2014

Brown K020 K-20: BRIDGE OVER SOUTH FORK WOLF RIVER, 3.95 MILES NORTHEAST OF THE EAST JUNCTION WITH US-73.

0.0 Bridge Replacement 1,505 SM-PBR 2014

Brown K020 K-20: FROM US-75/K-20 JUNCTION, EAST TO THE WEST CITY LIMITS OF HORTON 10.4 Asphalt Pavement 971 SM-1RR 2013

Brown U036 US-36: FROM THE BROWN/NEMAHA COUNTY LINE, EAST TO THE WEST CITY LIMITS OF HIAWATHA

13.7 1.5 Overlay 1,665 SM-1RR 2013

Butler 1.0 MILE WEST AND 3.2 MILES NORTH OF SMILEYBERG 0.2 Bridge Replacement 178 LC-LBT 2017

Butler 159TH STREET EAST FROM KANSAS TURNPIKE AUTHORITY BRIDGE TO 21ST STREET NORTH

1.4 Grade and Surfacing 4,002 LC-RES 2015

Butler ANDOVER ROAD OVER FOUR MILE CREEK 0.7 Grade, Bridge and Surfacing 4,747 LC-RES 2015

Butler BNSF AND NE 90TH STREET- 6 MILES SOUTHWEST OF CASSODAY - Flashing Light Signal 192 LC-RXR 2015

Butler SHUMWAY ROAD 1.5 MILES EAST AND 0.1 MILES SOUTH OF AUGUSTA 0.2 Grade and Surfacing 422 LC-RES 2014

Butler K254 K-254: HAVERHILL ROAD TO JONES STREET IN EL DORADO 0.5 Milling and Overlay 280 LC-K1R 2012

Butler U054 US-54 FROM THE WEST COUNTY LINE TO ANDOVER ROAD 0.9 1.5 Overlay 390 SM-1RR 2015

Chase 0.2 MILE EAST AND 0.5 MILE SOUTH OF BAZAAR 0.2 Grade and Bridge 710 LC-RES 2013

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-2 (Projects completed in FY 2017)

Page 30: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Chase SANTA FE DEPOT AT TOPEKA AVENUE AND K-177 IN STRONG CITY. - Rehab and Oprtn Hist Trans Bldg 529 LC-TEX 2014

Chase K177 K-177: 12 MILES NORTH OF THE COUNTY LINE 0.0 Culvert 767 SM-PCR 2017

Chase K177 K-177: JUST NORTH OF MAIN STREE IN COTTONWOOD FALLS 0.0 Bridge Repair 236 SM-BSR 2014

Chase U050 US-50: APPROXIMATELYIMATELYIMATELY 7 1/2 MILES EAST OF THE US-50/K-177 JUNCTION THEN EAST FOR 1.4 MILES

1.4 Grade and Surfacing 2,253 SE-RIC 2015

Chautauqua 1.0 MILE NORTH AND 1.0 MILE EAST OF CLOVERDALE 0.1 Bridge Replacement 743 LC-RES 2016

Cherokee 0.8 MILE SOUTH AND 2.8 MILES EAST OF NEUTRAL 0.1 Grade, Bridge and Surfacing - LC-RES 2016

Cherokee BNSF AND LIBERTY ROAD 1 MILE NORTH OF SCAMMON - Flashing Light Signal 293 LC-RXR 2015

Cherokee K066 K-66 (EAST OF 7TH) AND FOUR STATES DRIVE 0.2 Grade and Surfacing 516 MM-COR 2013

Cherokee U069 US-69: FROM THE OKLAHOMA/KANSAS STATE LINE, NORTH TO THE US-69/US-166 JUNCTION

2.2 Preliminary Engineering - MM-RIM 2016

Cherokee U069A US-69A IN CHEROKEE COUNTY BEGINNING AT THE KANSAS/OKLAHOMA STATE LINE TO THE US-69A/US-400 JUNCTION

4.0 Milling and Overlay 510 SM-1RR 2015

Cherokee U166 US-166 FROM EAST THE CITY LIMITS OF BAXTER SPRINGS TO THE US-166/K-26 JUNCTION

5.7 Milling and Overlay 854 SM-1RR 2015

Cherokee U166 US-166: FROM THE CHEROKEE/LABETTE COUNTY LINE, EAST TO THE CITY OF BAXTER SPRINGS

18.3 3/4 Overlay 970 SM-1RR 2016

Cherokee U400 US-400 IN CHEROKEE COUNTY BEGINNING AT THE US-69A/US-400 JUNCTION TO THE US-400/US-69A/K-66JUNCTION

1.8 Milling and Overlay 281 SM-1RR 2015

Cheyenne 11.0 MILES SOUTH AND 9.9 MILES WEST OF ST. FRANCIS 0.2 Bridge Replacement 172 LC-LBT 2017

Cheyenne CITY OF BIRD CITY - Preliminary Engineering - LC-SRT 2017

Cheyenne K027K-27: WEST US-36/K-27 JUNCTION THEN NORTH TO THE KANSAS/NEBRASKA STATE LINE 21.1 Milling and Overlay 4,543 SM-RIP 2016

Clark MAJOR COLLECTORS NORTH OF US-160 AND WEST OF ROAD 16 (RS-1337) - Signing 90 LC-RES 2016

Clark U160 US-160: BRIDGE #010 EAST TO THE COUNTY LINE 12.0 Milling and Overlay 1,429 SM-1RR 2015

Clark U160 US-160: INTERSECTION OF US-160/US-183/K-34, 6 MILES EAST OF ASHLAND. 1.3 Grade and Surfacing 2,655 MM-GSI 2015

Clay VARIOUS MAJOR COLLECTORS IN THE COUNTY 252.0 Signing 188 LC-RES 2016

Clay K009 K-9: CLIFTON EAST TO THE SOUTH K-9/K-15 JUNCTION 7.9 Milling and Overlay 702 SM-1RR 2014

Clay K015 K-15 FROM BLUNT STREET TO FRANKLIN STREET 0.9 Milling and Overlay 179 LC-K1R 2016

Clay K015 K-15: 8 MILES NORTH OF THE K-15/K-82 JUNCTION 0.0 Bridge Replacement 788 SM-PBR 2016

Clay U024 US-24: FROM 10TH STREET TO EAST CITY LIMITS IN CLAY CENTER. 0.3 Milling and Overlay 138 LC-K1R 2012

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-3 (Projects completed in FY 2017)

Page 31: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Cloud K009 K-9: BRIDGE #023, OVER COAL CREEK, 7 MILES SOUTHWEST OF K-28. 0.0 Bridge Replacement 929 SM-PBR 2014

Cloud K009 K-9: CONCORDIA EAST TO THE COUNTY LINE (EXCEPT THROUGH THE CITY OF CLYDE)

13.5 Milling and Overlay 1,496 SM-1RR 2014

Cloud 0.5 MILE EAST AND 3.9 MILES SOUTH OF CONCORDIA 0.2 Bridge Replacement 133 LC-LBT 2017

Coffey 2.4 MILES SOUTH AND 2.0 MILES EAST OF GRIDLEY 0.2 Bridge Replacement 133 LC-LBT 2017

Coffey ADA SIDEWALK IMPROVEMENTS AT VARIOUS LOCATIONS IN THE SOUTHEAST DISTRICT

- Special - SM-1RR 2015

Coffey I035 I-35: MILEPOST 155 THEN NORTHEAST TO THE COUNTY LINE 1.4 Pavement Patching 12 SM-ISR 2013

Coffey K058 K-58, BEGINNING AT THE GREENWOOD/COFFEY COUNTY LINE EAST 13.2 MILES TO THE US-75 JUNCTION

13.2 Sealing 174 SM-1RR 2016

Coffey K058 K-58 IN COFFEY COUNTY COVERING 5.5 MILES 5.5 Recycle and O-lay 277 SM-1RR 2016

Coffey K058 K-58: BRIDGE #048 OVER DINNER CREEK LOCATED 0.45 MILE EAST OF COFFEY/GREENWOOD COUNTY LINE

0.0 Bridge Replacement 450 SM-PBR 2014

Cowley SKYLINE ROAD AND 61ST ROAD IN ARKANSAS CITY - Grade and Surfacing 2,600 SE-EDP 2015

Cowley BNSF AND 82ND ROAD LOCATED 9 MILES NORTH OF WINFIELD - Flashing Light Signal 349 LC-RXR 2015

Cowley LOCAL ROADS- VARIOUS MAJOR AND MINOR COLLECTORS - Signing 127 LC-LOC 2016

Cowley U077 BRIDGE ON US-77 (OVER ARKANSAS RIVER), 3 MILES NORTH OF THE STATE LINE 0.0 Bridge Repair 202 SM-BSR 2015

Cowley U077 US-77 FROM 7TH AVENUE TO 4TH AVENUE 0.2 Grading 1,396 LC-K3R 2016Cowley U077 US-77, FROM THE NORTH CITY LIMITS OF WINFIELD NORTH TO K-15 9.8 Crack Repair 54 SM-1RR 2016Cowley U077 US-77: 1 MILE NORTH OF THE US-77/US-160 JUNCTION 0.5 Bridge Replacement 4,467 SM-PBR 2015

Cowley U160 U-160 EAST OF K-360 0.0 Grade and Surfacing 1,000 SE-EDP 2012

Cowley U160 US-160 FROM WEST OF VIKING BOULEVARD EAST TO EAST WINFILED CITY LIMIT 1.1 Milling and Overlay 260 LC-K1R 2016

Cowley U166 EAST EDGE WEAR SURFACE OF ARKANSAS RIVER BRIDGE TO SUMMIT ON MADISON AVE (US-166)

1.0 Milling and Overlay 290 LC-K1R 2010

Cowley U166 US-166 FROM WEST COUNTY LINE TO RS-646 4.8 Milling and Overlay 747 SM-1RR 2015

Crawford CITY OF PITTSBURG - Preliminary Engineering - LC-SRT 2017

Crawford PITTSBURG: ATKINSON ROAD OVER COW CREEK 0.1 Grade, Bridge and Surfacing 1,498 LC-RES 2011

Crawford QUINCY STREET FROM BROADWAY TO JOPLIN 1.0 Grade and Surfacing 1,901 LC-RES 2015

Crawford SKOL RR AND JOPLIN STREET IN PITTSBURG - Flashing Light Signal 355 LC-RXR 2015

Crawford K007 K-47 AND K-7 INTERSECTION 0.3 Intersection Improvement 946 LC-K3R 2016

Crawford K126 K-126: EAST CITY LIMITS OF PITTSBURG EAST TO THE STATE LINE 2.8 Conv Seal 94 SM-CMN 2014

Crawford K126 K-126: K-126/K-7 JUNCTION, EAST TO PITTSBURG 6.0 Milling and Overlay 671 SM-1RR 2014

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-4 (Projects completed in FY 2017)

Page 32: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Crawford K126 K-126: US-400/K-126 JUNCTION NORTH AND EAST TO THE K-126/K-7 JUNCTION 15.1 Conv Seal 326 SM-CMN 2014

Crawford K146 K-146 FROM WEST COUNTY LINE TO JUNCTION K-3/K-146 6.6 Milling and Overlay 519 SM-1RR 2015

Decatur 1.6 MILES SOUTH AND 8.1 MILES WEST OF DRESDEN 0.2 Bridge Replacement 175 LC-LBT 2017

Decatur U036 US-36, FROM OBERLIN EAST TO THE COUNTY LINE 18.1 Milling and Overlay 5,750 SM-RIP 2016

Decatur U083 US-83, FROM 0.76 MILE SOUTH OF THE US-83/US-36 JUNCTION (SAPPA CREEK DRAINAGE)

0.0 Bridge Replacement 939 SM-PBR 2016

Decatur U083 US-83, FROM 9 MILES NORTH OF THE COUNTY LINE. NORTH TO OBERLIN 8.0 Conv Seal 404 SM-1RR 2015

Dickinson ON BROADWAY ADJACENT TO FATHER PADILLA PARK/LAKE IN HERINGTON 0.2 Bridge Replacement 870 LC-RES 2014

Dickinson OLD US-40 BETWEEN ABILENE AND CHAPMAN 9.5 Asphalt Pavement 1,261 LC-RES 2014

Dickinson K004 K-4: COUNTY LINE EAST TO THE K-4/K-43 JUNCTION 17.0 Recycle and O-lay 1,288 SM-1RR 2015

Dickinson K004 K-4, FROM K-4/K-43 JUNCTION EAST TO THE EAST COUNTY LINE 7.9 Recycle and O-lay 625 SM-1RR 2015

Dickinson K209 BEGINNING AT THE NORTH CITY LIMITS OF WOODBINE THENCE EAST TO JUNCTION US-77/K-209

2.5 Milling and Overlay 186 SM-1RR 2016

Dickinson K218 K-218, FROM K-218/K-4 JUNCTION SOUTH TO THE WEST CITY LIMITS OF HERINGTON 1.7 Recycle and O-lay 136 SM-1RR 2015

Dickinson U077 BEGINNING AT NORTH US-56/US-77 JUNCTION NORTH TO THE DICKINSON/MORRIS COUNTY LINE

3.8 Milling and Overlay 366 SM-1RR 2016

Doniphan K007 K-7, FROM 0.5 MILE NORTH OF US-36/K-7 JUNCTION, NORTH TO THE KANSAS/NEBRASKA STATE LINE

17.8 Milling and Overlay 1,312 SM-1RR 2013

Doniphan K007K-7: FROM THE ATCHISON/DONIPHAN COUNTY LINE, NORTH TO APPROXIMATELYIMATELYIMATELY 0.2 MILE SOUTH OF THE K-7/K-20 JUNCTION 5.9 Milling and Overlay 390 SM-1RR 2013

Doniphan U036 US-36 IN DONIPHAN COUNTY 5.4 Pavement Marking 138 SM-PMR 2017

Douglas 23RD STREET IN THE CITY OF LAWRENCE - Intelligent Transportation Sys - SE-ITS 2017

Douglas 9TH AND KENTUCKY STREETS IN LAWRENCE - Traffic Signals 154 LC-HAZ 2014

Douglas ALONG 9TH STREET FROM AVALON TO ARKANSAS STREET - Surfacing and Signal 275 LC-HAZ 2014

Douglas BALDWIN CITY DEPOT - Rehab and Oprtn Hist Trans Bldg 243 LC-TEX 2016

Douglas BNSF AND EAST 1900 ROAD EAST OF LAWRENCE - Flashing Light Signal 272 LC-RXR 2015

Douglas DOUGLAS COUNTY ROUTE 438 (FARMERS TURNPIKE) FROM 3/4 MILE EAST OF ROUTE 1029 TO 1800' EAST

- Grade and Surfacing 291 SE-EDP 2012

Douglas K010 K-10 (SOUTH LAWRENCE TRAFFICWAY)/BOB BILLINGS PKWY ON WEST SIDE OF LAWRENCE

0.5 Grade, Bridge and Surfacing 19,778 SE-RIC 2014

Douglas K010 K-10 AND 27TH STREET IN LAWRENCE 0.0 Traffic Signals 90 SE-RIC 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-5 (Projects completed in FY 2017)

Page 33: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Douglas K010 K-10 CONNECTION FROM SOUTH OF THE US-59/K-10 JUNCTION EAST TO K-10 6.0 Preliminary Engineering and Row - SE-RIC 2014

Douglas K010 K-10 CONNECTION, FROM SOUTH JUNCTION US-59/K-10 EAST TO K-10, SOUTH LAWRENCE TRAFFICWAY

6.0 Grade, Bridge and Surfacing 138,516 SE-RIC 2014

Douglas K010 K-10 CONNECTION, FROM SOUTH JUNCTION US-59/K-10 EAST TO K-10, SOUTH LAWRENCE TRAFFICWAY

6.0 Seeding, Sodding 388 SE-RIC 2016

Douglas K010 K-10 EAST OF OHIO STREET IN LAWRENCE 0.5 Roadside Improvement 6 SE-EDP 2017

Douglas K010 K-10 WEST OF OUSDAHL ROAD IN LAWRENCE 0.5 Roadside Improvement 60 SE-EDP 2017

Douglas U040 BRIDGES #081 AND #082 ON US-40 IN DOUGLAS COUNTY, LOCATED 1.45 MILES EAST OF THE SOUTH US-40/US-59 JUNCTION

0.0 Bridge Repair 236 SM-BSR 2013

Douglas U040 US-40: AT THE INTERSECTION OF US-40/CHAMPION LANE ON THE WEST SIDE OF LAWRENCE

0.3 Traffic Signals 250 MM-RIM 2016

Douglas U056 INTERSECTION OF US-56 AND 6TH STREET IN BALDWIN CITY 0.3 Grade and Surfacing 311 MM-COR 2012

Douglas U056 US-56: EAST FORK TAUY CREEK BRIDGE ABOUT 4 MILES EAST OF US-59 0.0 Bridge Replacement 1,524 SM-PBR 2013

Douglas U056 US-56: FROM EAST 1600 ROAD TO BULLPUP DRIVE 0.6 Grade and Surfacing 975 MM-COR 2013

Douglas U056US-56, FROM MIDDLE FORK TAUY CREEK DRAINAGE BRIDGE ABOUT 2 MILES EAST OF US-59; AND MIDDLE FORK TAUY CREEK BRIDGE ABOUT 2.7 MILES EAST OF US-59 - Bridge Replacement 2,115 SM-PBR 2013

Douglas U059 FRANKLIN-DOUGLAS COUNTY LINE, NORTH TO THE 2L/4L DIVIDED 11.1 Grade and Bridge 60,288 SE-RIC 2009

Douglas U059 US-59 FROM 31ST STREET TO 23RD STREET IN LAWRENCE 1.0 Milling and Overlay 341 LC-K1R 2016

Edwards U050 US-50 FROM THE COUNTY LINE, EAST TO JUST EAST OF THE US-50/US-56 JUNCTION 8.3 Milling and Overlay 1,109 SM-1RR 2014

Elk K099 SKORR AND K-99 NEAR MOLINE 0.0 Flashing Light Signal 128 LC-RRX 2017

Ellis 6.0 MILES NORTH AND 5.3 MILES WEST OF HAYS 0.2 Bridge Replacement 173 LC-LBT 2017

Ellis UPRR AND 160 AVENUE 3 MILES EAST OF ELLIS - Flashing Light Signal 140 LC-RXR 2015

Ellis I070 I-70, BEGINNING AT THE ELLIS/TREGO COUNTY LINE EAST 31.3 MILES TO THE ELLIS/RUSSELL COUNTY LINE

31.2 Pavement Patching 269 SM-1RR 2016

Ellis K247 K-247 FROM ELLIS NORTH TO THE I-70/K-247 JUNCTION 0.1 Milling and Overlay 143 SM-1RR 2015

Ellsworth 1.2 MILES EAST AND 3.4 MILES NORTH OF CARNEIRO 0.2 Bridge Replacement 133 LC-LBT 2017

Ellsworth I070 2 BRIDGES ON I-70 JUST NORTHEAST OF THE I-70/K-156 JUNCTION 0.0 Bridge Repair 554 SM-EMR 2015

Ellsworth I070 I-70 FROM 0.75 MILE WEST OF K-14 (EAST JUNCTION) EAST TO ELLSWORTH/LINCOLN COUNTY LINE

7.0 Grade, Bridge and Surfacing 10,709 SM-IRP 2012

Ellsworth K140 K-140 FROM 1.97 AND 2.1 MILES EAST OF THE K-140/K-141 JUNCTION (WEST SPRING CREEK DRAINAGE)

0.1 Bridge Replacement 1,037 SM-PBR 2016

Ellsworth K232 K-232: K-232/OLD US-40 JUNCTION NORTH TO THE COUNTY LINE 3.3 Milling and Overlay 526 SM-1RR 2015

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-6 (Projects completed in FY 2017)

Page 34: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Finney U050B1 US-50/US-83 FROM KANSAS AVENUE TO FULTON STREET IN GARDEN CITY 0.7 Slurry Seal 400 LC-K1R 2014

Finney U083B BRIDGE 004 (ARKANSAS RIVER) ON US-83B LOCATED 0.74 MILE SOUTH OF THE SOUTH US-50 JUNCTION

0.0 Bridge Repair 68 SM-BSR 2017

Finney U083B US-83B (MAIN STREET) FROM 60 FEET NORTH OF MAPLE STREET NORTH TO FULTON STREET IN GARDEN CITY

0.2 Pavement Reconstruction 445 LC-K1R 2012

Ford BNSF AND 116TH ROAD LOCATED 4 MILES NORTHEAST OF DODGE CITY - Flashing Light Signal 278 LC-RXR 2015

Ford PEDESTRIAN- BIKE PATH IN DODGE CITY - Pedestrian and Bicycle Paths 447 LC-TEX 2016

Ford VARIOUS LOCATIONS IN THE SOUTHWEST PORTION OF DISTRICT SIX - Special - SM-1RR 2015

Ford K094 K-94: BRIDGE #054, WEST FORK RATTLESNAKE CREEK, 2.11 MILES SOUTH OF US-54 0.0 Bridge Replacement 474 SM-PBR 2014

Ford U050 US-50 FROM WEST CITY LIMITS TO EAST CITY LIMITS OF DODGE CITY 1.7 Milling and Overlay 369 LC-K1R 2014

Ford U050 US-50 FROM 10 3/4 MILES EAST OF THE EAST US-50/US-283 JUNCTION THEN NORTHEAST TO THE COUNTY LINE

9.4 Recycle and O-lay 2,481 SM-1RR 2014

Franklin 1.5 MILES NORTH AND 1.1 MILES EAST OF HOMEWOOD 0.2 Bridge Replacement 133 LC-LBT 2017

Franklin OVER APPANOOSE CREEK 2.5 MILES NORTH OF K-68 ON IDAHO ROAD - Flood Damage 66 LC-RES 2017

Franklin I035 I-35 FROM 14 MILES EAST OF THE COUNTY LINE 0.0 Bridge Repair 506 SM-BSR 2013

Franklin I035 I-35 FROM THE COUNTY LINE NORTHEAST TO THE COUNTY LINE 31.1 Pavement Patching 536 SM-ISR 2013

Franklin K068 K-68 FROM EAST OF OTTAWA 6.6 Pavement Marking 201 SM-PMR 2015

Franklin U059 US-59 SOUTH OF OTTAWA 3.2 Traffic Study-access Review - MM-COR 2017

Franklin U169 US-169: ANDERSON/FRANKLIN COUNTY LINE TO THE FRANKLIN/MIAMI COUNTY LINE 2.4 Milling and Overlay 3,770 SM-RIP 2013

Geary 5.0 MILES SOUTH AND 12.0 MILES EAST OF JUNCTION CITY 0.2 Bridge Replacement 391 LC-RES 2014

Geary I070 I-70 BRIDGE LOCATED AT THE I-70/K-177 JUNCTION (WESTBOUND LANES) 0.0 Bridge Repair 312 SM-BSR 2016

Geary K018 K-18 BRIDGE LOCATED AT THE I-70/K-18 JUNCTION 0.0 Bridge Repair 76 SM-BSR 2016

Geary K057 CULVERT 509- WEST BRANCH HUMBOLT CREEK DRAINAGE 1.03 MILES NORTH OF MORRIS -GEARY COUNTY LINE

- Culvert 224 SM-PCR 2009

Geary K157 BEGINNING AT ROCK SPRINGS 4-H RANCH EAST TO THE US-77/K-157 JUNCTION 3.9 Milling and Overlay 439 SM-1RR 2016

Geary U040B3 US-40 BUSINESS FROM CHESTNUT STREET TO I-70 1.0 Milling and Overlay 400 LC-K1R 2016

Geary U040B3 US-40B FROM ASH STREET TO FRANKLIN STREET 0.9 Milling and Overlay 337 LC-K1R 2016

Geary U077 BEGINNING AT THE MORRIS/GEARY COUNTY LINE THENCE NORTH TO 0.76 MILE SOUTH OF OLD 40

8.0 Milling and Overlay 732 SM-1RR 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-7 (Projects completed in FY 2017)

Page 35: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Gove 1.9 MILES SOUTH AND 3.3 MILES EAST OF GOVE 0.2 Bridge Replacement 169 LC-LBT 2017

Gove UPRR AND 48 ROAD EAST AT THE EDGE OF GRAINFIELD - Flashing Light Signal 126 LC-RXR 2014

Graham 2.5 MILES NORTH AND 4.2 MILES WEST OF HILL CITY 0.2 Bridge Replacement 133 LC-LBT 2017

Graham U024 VARIOUS LOCATIONS IN DISTRICT THREE 7.2 Rumble Strip Installation 16 MM-SAF 2017

Grant K190 K-190 FROM THE US-160/K-190 JUNCTION SOUTH AND EAST TO THE COUNTY LINE 6.0 1.5 Overlay 488 SM-1RR 2015

Grant U160 US-160 FROM THE COUNTY LINE EAST TO ULYSSES 8.4 Milling and Overlay 597 SM-1RR 2015

Gray U056 US-56 THROUGH THE CITY OF MONTEZUMA 1.1 Pavement Reconstruction 5,969 SM-RIP 2015

Greenwood BRIDGE LOCATED 3.0 MILES EAST AND 1.5 MILES SOUTH OF MADISON 0.8 Bridge Replacement 855 LC-RES 2016

Greenwood K058 K-58 FROM THE K-99 JUNCTION EAST 12.5 MILES TO THE GREENWOOD/COFFEY COUNTY LINE

12.5 Sealing 166 SM-1RR 2016

Greenwood K249 K-249 FROM THE K-99 JUNCTION NORTH 0.71 MILE TO THE K-58 JUNCTION 0.7 Sealing 11 SM-1RR 2016

Greenwood U400 US-400 FROM 5 MILES EAST OF BUTLER/GREENWOOD COUNTY LINE THEN EAST FOR APPROXIMATELYIMATELY 2 1/2 MILES

2.5 Grade and Surfacing 3,322 SE-RIC 2015

Greenwood U400 US-400 FROM BUTLER/GREENWOOD COUNTY LINE THEN EAST FOR APPOXIMATELY 2 1/2 MILES

2.5 Grade and Surfacing 3,565 SE-RIC 2015

Hamilton VARIOUS MAJOR COLLECTORS IN THE COUNTY - Signing 22 LC-LOC 2016

Hamilton K027 K-27 BEGINNING AT THE STANTON/HAMILTON COUNTY NORTH TO THE SOUTH CITY LIMITS OF SYRACUSE

16.2 Sealing 509 SM-1RR 2016

Hamilton U050 US-50 FROM THE STATE LINE EAST TO SYRACUSE 17.2 Milling and Overlay 2,495 SM-1RR 2015

Harper K002 K-2, BRIDGE #024 OVER CAMP CREEK LOCATED 6.24 MILES EAST OF THE HARPER/BARBER COUNTY LINE

0.0 Bridge Replacement 1,227 SM-PBR 2014

Harvey 6.0 MILES NORTH OF NEWTON 0.2 Bridge Replacement 118 LC-LBT 2017

Harvey KANSAS AND OKLAHOMA RAILROAD AND HICKORY ROAD IN HESSTON - Flashing Light Signal 194 LC-RXR 2016

Harvey TRAFFIC SIGNAL TIMING IN NEWTON, KANSAS - Intelligent Transportation Sys - SE-ITS 2017

Harvey I135 I-135 FROM THE HARVEY/SEDGWICK COUNTY LINE NORTH TO NEWTON 7.5 3in Overlay 8,165 SM-1RR 2016

Harvey U050 US-50 FROM 1 MILE WEST OF ANDERSON AVENUE EAST TO OLD MAIN STREET 1.4 Seeding, Sodding 24 SE-RIC 2015

Harvey U050 US-50 FROM 0.5 MILE EAST OF US-50/K-89 JUNCTION EAST FOR 0.5 MILES (WEST END OF EXISTING PASSING LANES)

0.5 Grade and Surfacing 1,132 SE-RIC 2015

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-8 (Projects completed in FY 2017)

Page 36: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Harvey U050 US-50: APPROXIMATELY 5 1/4 MILES EAST OF THE US-50/K-89 JUNCTION THEN EAST FOR 1.2 MILES

1.2 Grade and Surfacing 3,487 SE-RIC 2015

Harvey U050 US-50: COUNTY LINE EAST TO THE CITY OF BURRTON 1.1 Grade and Surfacing 2,376 SE-RIC 2015

Haskell LOCAL ROADS 115.0 Signing 39 LC-LOC 2015

Haskell K190 K-190: COUNTY LINE EAST TO WEST JUNCTION US-56 AT SANTANA 6.3 1.5 Overlay 517 SM-1RR 2015

Haskell U083 US-83: COUNTY LINE NORTH TO JUST NORTH OF THE US-83/US-160/K-144 JUNCTION 12.2 Recycle and O-lay 2,941 SM-1RR 2015

Haskell U083 US-83: JUST NORTH OF THE US83/US-160/K-144 JUNCTION, NORTH TO THE HASKELL/FINNEY COUNTY LINE

11.8 Milling and Overlay 1,243 SM-1RR 2016

Hodgeman CITY OF JETMORE - Preliminary Engineering - LC-SRT 2017

Hodgeman ALL FAS ROUTES IN THE COUNTY - Signing 78 LC-RES 2016

Hodgeman ON SW 202 ROAD, 6.75 MILES SOUTH OF K-156 - Flood Damage 13 LC-LOC 2017

Jackson BRIDGE LOCATED 2.0 MILES WEST OF DENISON ON 190TH ROAD THEN 0.75 MILE NORTH ON U ROAD TO 195TH ROAD

0.2 Bridge Replacement 395 LC-RES 2016

Jackson 1.0 MILE EAST AND 1.8 MILES SOUTH OF WETMORE 0.2 Bridge Replacement 133 LC-LBT 2017

Jackson VARIOUS MAJOR COLLECTORS IN THE COUNTY - Signing 14 LC-LOC 2016

Jackson K062 K-62 FROM THE K-62/K-16 JUNCTION NORTH TO THE NORTH COUNTY LINE 7.3 1.5 Overlay 732 SM-1RR 2015

Jackson K079 K-79 FROM THE K-79/K-16 JUNCTION NORTH TO CIRCLEVILLE 3.6 1.5 Overlay 393 SM-1RR 2015

Jackson K214 K-214 FROM THE SOUTH US-75/K-214 JUNCTION TO THE NORTH US-75/K-214 JUNCTION 2.0 Milling and Overlay 200 SM-1RR 2015

Jackson U075 US-75 AND BANNER ROAD IN HOLTON 0.3 Traffic Signals 1,150 MM-COR 2016

Jefferson 1.0 MILE SOUTH AND 3.1 MILES EAST OF WINCHESTER 0.2 Bridge Replacement 133 LC-LBT 2017

Jefferson 4.5 MILES EAST OF NORTONVILLE 0.2 Bridge Replacement 417 LC-RES 2017

Jefferson WELLMAN ROAD NEAR THE INTERSECTION OF 13TH ROAD 0.3 Milling 213 LC-RES 2016

Jefferson K004 K-4 AND 46TH STREET 0.5 Intersection Improvement 1,675 MM-SAF 2015

Jefferson K004 K-4: 4 MILES NORTHEAST OF THE K-4/K-16 EAST JUNCTION 0.0 Bridge Repair 291 SM-BSR 2014

Jefferson U024 US-24 IN PERRY 0.2 Traffic Signals 680 LC-HES 2013

Jefferson U024 US-24 FROM SHAWNEE/JEFFERSON COUNTY LINE EAST 11.6 MILES TO LECOMPTON ROAD

11.6 Crack Repair 50 SM-CMN 2014

Jefferson U024 US-24: 2 BRIDGES, 3 AND 4 MILES EAST OF THE COUNTY LINE 0.0 Bridge Repair 105 SM-BSR 2014

Jefferson U024 US-24: BRIDGE #012, KANSAS RIVER DRAINAGE, 3.71 MILES EAST OF THE US-24/US-59 JUNCTION

0.0 Bridge Replacement 915 SM-PBR 2014

Jefferson U059 US-59 FROM 1/2 MILE SOUTH OF THE US-59/K-192 JUNCTION 0.0 Special 79 SM-EMR 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-9 (Projects completed in FY 2017)

Page 37: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Jewell SIX INTERSECTION IN THE CITY OF JEWELL - Special - SM-1RR 2015

Jewell K128 K-128, BRIDGE LOCATED 0.78 MILE NORTH OF THE US-36/K-15 JUNCTION (LIMESTONE CREEK)

0.0 Bridge Replacement 1,122 SM-PBR 2016

Jewell U036US-36 FROM 0.5 MILE WEST OF THE WEST CITY LIMITS OF MANKATO EAST THROUGH MANKATO TO JUST EAST OF THE US-36/BOWIE STREET INTERSECTION 1.4 Pavement Reconstruction 4,840 SM-RIP 2015

Johnson 75TH STREET FROM MISSION TO STATE LINE IN PRAIRIE VILLAGE 1.2 Grade and Surfacing 3,518 LC-RES 2015

Johnson BNSF AND OTTAWA STREET IN DE SOTO - Flashing Light Signal 169 LC-RXR 2015

Johnson CITY OF MISSION- SAFE ROUTES TO SCHOOL PHASE 1 - Funds Only - LC-SRT 2017

Johnson CITY OF OLATHE FLEET EMISSIONS REDUCTION INITIATIVE - Funds Only - LC-LOC 2014

Johnson HEDGE LANE AT CEDAR HILLS AND SPRUCE STREET 0.0 Traffic Study-intersection - MM-SAF 2016

Johnson KANSAS CITY OPERATION GREEN LIGHT - Intelligent Transportation Sys - SE-ITS 2017

Johnson JOHNSON DRIVE OVER TURKEY CREEK IN MERRIAM 0.3 Grade and Bridge 1,682 LC-RES 2014

Johnson MISSION ROAD 0.85 MILES NORTH OF 175TH STREET 0.2 Grade, Bridge and Surfacing 2,534 LC-RES 2015

Johnson PEDESTRIAN -BIKE PATH NEAR US-69 FROM 135TH STREET TO 143RD STREET IN OVERLAND PARK

- Pedestrian and Bicycle Paths 274 LC-TEX 2014

Johnson NORTHWEST QUADRANT OF K-7 AND COLLEGE BOULEVARD - Right Of Way Only - SE-AAR 2016

Johnson OLATHE SAFE ROUTES TO SCHOOL PROGRAM - Funds Only - LC-SRT 2016

Johnson SHAWNEE MISSION PARKWAY AND WOODLAND ROAD INTERSECTION 0.1 Intersection Improvement 623 LC-LOC 2015

Johnson SHAWNEE MISSION PARKWAY FROM MAURER TO WIDMER IN SHAWNEE 1.5 Milling and Overlay 1,089 LC-LOC 2015

Johnson WAVERLY ROAD FROM WEST 199TH STREET NORTH TO US-56 IN EDGERTON 1.6 Surface and Bridge 30,000 LC-LOC 2015

Johnson WAVERLY ROAD FROM WEST 199TH STREET NORTH TO US-56 IN EDGERTON 1.6 Preliminary Engineering - LC-RES 2017

Johnson I035 I-35 FROM THE COUNTY LINE NORTHEAST FOR 11 MILES 11.2 Overlay 5,113 SM-ISR 2014

Johnson I035 I-35 FROM 119TH STREET NORTH TO I-435/I-35/K-10 INTERCHANGE 2.2 Grade and Surfacing 11,088 SE-IRC 2012

Johnson I035 I-35 FROM JUST NORTH OF I-35/K-7 JUNCTION NORTH TO I-35/SANTA FE JUNCTION 2.4 Pavement Reconstruction 18,613 SM-ISR 2015

Johnson I035 MULTIPLE ROUTES IN JOHNSON COUNTY 18.2 Pavement Marking 978 SM-PMR 2016

Johnson I035 SOUTH WEST JOHNSON COUNTY INTERCHANGE PROJECT AT I-35/HOMESTEAD LANE 1.5 Seeding, Sodding 220 SE-IRC 2014

Johnson I435 BRIDGE #216 ON I-435 (JOHNSON DRIVE) 0.0 Bridge Repair 69 SM-EMR 2016

Johnson I435 BRIDGE ON I-435 SOUTH OF THE WYANDOTTE COUNTY LINE 0.0 Bridge Repair 32 SM-EMR 2016

Johnson I435 I-435: BRIDGE LOCATED AT THE I-435/MIDLAND DRIVE INTERCHANGE (NORTHBOUND LANES)

0.0 Bridge Deck 75 SM-BSR 2017

Johnson I435 INTERCHANGE: I-435 AND ANTIOCH ROAD IN OVERLAND PARK - Interchange/s 97,446 SE-SEI 2006

Johnson K007 K-7/K-10 INTERCHANGE 0.5 Surfacing 197 MM-GSI 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-10 (Projects completed in FY 2017)

Page 38: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Johnson K007 ADVANCE ROW ACQUISITION SOUTHWEST QUADRANT OF K-7 AND 75TH STREET 2.0 Right Of Way Only - SE-AAR 2017

Johnson K010 6 BRIDGES ON K-10 IN JOHNSON COUNTY 0.0 Bridge Repair 654 SM-BSR 2015

Johnson K010 K-10 AND RIDGEVIEW ROAD IN JOHNSON COUNTY 0.0 Grade and Surfacing - SE-IRC 2016

Johnson K010 K-10 FROM 9 MILES EAST OF THE COUNTY LINE 0.0 Bridge Repair 245 SM-BSR 2014

Johnson K010 K-10: BRIDGE LOCATED AT THE K-10/SUNFLOWER ROAD JUNCTION (EASTBOUND LANES)

0.0 Bridge Repair 415 SM-BSR 2016

Johnson U056 US-56 AND CENTER STREET 0.2 Grade and Surfacing 698 MM-COR 2014

Johnson U056 US-56: FROM JUST EAST OF ANTIOCH TO JUST EAST OF US-56/US-69 INTERCHANGE 1.4 Milling and Overlay 711 SM-1RR 2015

Johnson U069 PAVEMENT MARKING ON US-69 AND K-10 22.9 Pavement Marking 617 SM-PMR 2017

Johnson U069 US-69 AND 159TH STREET IN THE CITY OF OVERLAND PARK 1.9 Grade, Bridge and Surfacing 14,861 SE-RIC 2015

Johnson U069 US-69 IN KANSAS CITY 3.7 Intelligent Transportation Sys 964 SE-ITS 2015

Johnson U069 US-69 NORTHBOUND OVER 119TH STREET, APPROXIMATELY 1.6 MILES SOUTH OF I-435

0.0 Bridge Repair 474 SM-BSR 2016

Johnson U069US-69 FROM THE SOUTH LIMIT OF THE US-69 NORTHBOUND OFF-RAMP AT 119TH STREET TO THE NORTH LIMIT AT THE END OF THE US-69 NORTHBOUND ON-RAMP AT 199TH STREET

0.4 Milling and Overlay 144 SM-1RR 2016

Johnson U069 US-69 FROM 159TH STREET OVERPASS THEN NORTH FOR 4 MILES 4.0 Milling and Overlay 766 SM-1RR 2014

Johnson U069 US-69 FROM JUST SOUTH OF US-69/US-56 INTERCHANGE TO JUST SOUTH OF I-35 1.8 Milling and Overlay 761 SM-1RR 2015

Kingman SOUTH VALLEY STREET NORTH OF US-54 0.5 Grade and Surfacing 425 SE-EDP 2017

Kingman VARIOUS LOCATIONS IN THE SOUTHCENTRAL DISTRICT - Special - SM-1RR 2015

Kingman K014 K-14: FROM EAST JUNCTION US-54/K-14 NORTH TO THE COUNTY LINE 4.5 Recycle and O-lay 1,200 SM-1RR 2015

Kingman U054 US-54 FROM 3.2 MILES WEST OF US-54/K-14 WEST JUNCTION THEN EAST TO 1 MILE WEST OF US-54/K-14 WEST JUNCTION

2.2 Grade, Bridge and Surfacing 10,663 SE-RIC 2012

Kingman U054 US-54 FROM 7 MILES EAST OF PRATT/KINGMAN COUNTY LINE EAST TO 3.2 MILES WEST OF WEST JUNCTION US-54/K-14

4.9 Grade, Bridge and Surfacing 24,533 SE-RIC 2012

Kingman U054 US-54 FROM THE NEW CONSTRUCTION WEST OF KINGMAN EAST TO KINGMAN 4.4 Milling and Overlay 1,174 SM-1RR 2014

Kiowa FOR DAMAGE REPAIRS ON UNOFFICIAL DETOURS ON K STREET AND SCOTT STREET DURING BRIDGE CONSTRUCTION ON US-183

- Funds Only 1 SM-PBR 2019

Kiowa U400 US-400 FROM COUNTY LINE EAST TO THE US-400/US-54 JUNCTION 6.3 Milling and Overlay 2,370 SM-RIP 2015

Labette 0.5 MILE NORTH AND 3.0 MILES WEST OF EDNA 0.2 Bridge Replacement 133 LC-LBT 2017

Labette PEDESTRIAN- BIKEPATH IN PARSONS - FOREST PARK - Pedestrian and Bicycle Paths 591 LC-TEX 2015

Labette UPRR AND 5000 ROAD 1 MILE NORTH OF CHETOPA - Flashing Light Signal 252 LC-RXR 2016

Labette U059 US-59 FROM 9 MILES NORTH OF THE WEST US-59/US-160 JUNCTION 0.0 Bridge Repair 249 SM-BSR 2014

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-11 (Projects completed in FY 2017)

Page 39: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Labette U059 US-59 FROM WEST JUNCTION OF US-59/US-160, NORTH TO THE CITY OF PARSONS 8.3 Milling and Overlay 5,586 SM-RIP 2015

Labette U166 US-166 FROM CHETOPA EAST TO THE LABETTE/CHEROKEE COUNTY LINE 0.4 3/4 Overlay 32 SM-1RR 2016

Labette U400 BRIDGE #065 ON US-400 LOCATED 8.4 MILES EAST OF US-59 (NEOSHO RIVER) 0.0 Bridge Repair 22 SM-EMR 2016

Lane K004 K-4 FROM THE COUNTY LINE EAST TO THE EAST JUNCTION OF K-4/K-23 11.9 Recycle and O-lay 2,097 SM-1RR 2015

Lane K004 K-4: FROM THE EAST JUNCTION OF K-4/K-23, EAST TO THE LANE/NESS COUNTY LINE 12.3 Recycle and O-lay 1,074 SM-1RR 2013

Lane K096 K-96 FROM THE COUNTY LINE EAST TO DIGHTON 11.4 Recycle and O-lay 1,188 SM-1RR 2015

Leavenworth 11TH STREET BRIDGE NORTH OF CHEROKEE STREET 0.2 Bridge Replacement 133 LC-LBT 2017

Leavenworth BRIDGE LOCATED 2.8 MILES WEST AND 0.4 MILES SOUTH OF BASEHOR ON 178TH STREET OVER HOG CREEK

0.0 Bridge 460 LC-RES 2013

Leavenworth BRIDGE LOCATED ON CEMETERY ROAD OVER DAWSON CREEK NEAR EASTON 0.0 Bridge Replacement 478 LC-RES 2016

Leavenworth LIMIT STREET FROM 20TH STREET TO 15TH STREET IN LEAVENWORTH 0.4 Grade and Surfacing 1,248 LC-RES 2013

Leavenworth NORTH OF US-24 ON WOLF CREEK PARKWAY BETWEEN 153RD STREET AND 150TH STREET IN BASEHOR

0.5 Grade and Surfacing 500 MM-COR 2009

Leavenworth RESTORATION OF HISTORIC UNION PACIFIC RAILROAD DEPOT IN LEAVENWORTH AT 123 NORTH ESPLANADE

- Historic Preservation 1,371 LC-TEX 2014

Leavenworth K032 K-32 FROM 0.6 MILE NORTHEAST OF THE LEAVENWORTH/DOUGLAS COUNTY LINE (K-32 OVER I-70)

0.0 Bridge Replacement 3,772 SM-PBR 2016

Leavenworth U073 US-73 AND K-92 IN LEAVENWORTH 0.8 Milling and Overlay 143 LC-K1R 2012

Leavenworth U073 US-73 IN THE NORTH PART OF THE CITY OF LEAVENWORTH 1.6 Pavement Reconstruction 7,035 SM-RIP 2015

Lincoln K181 K-181 FROM RUSSELL/LINCOLN COUNTY LINE NORTH TO THE RUSSELL/MITCHELL COUNTY LINE

23.8 Milling and Overlay 2,746 SM-1RR 2014

Lincoln K232 K-232: COUNTY LINE NORTH TO COUNTY LINE 5.0 Milling and Overlay 779 SM-1RR 2015

Linn K007 K-7: BRIDGE #012, BIG SUGAR CREEK DRAINAGE, 6 MILES NORTH OF THE K-7/K-52 JUNCTION.

0.0 Bridge Replacement 1,436 SM-PBR 2014

Linn K052 CULVERT #531 ON K-52 LOCATED 3 MILES WEST OF THE SOUTH US-69/K-52 JUNCTION 0.0 Culvert 245 SM-PCR 2015

Logan 13.0 MILES SOUTH AND 13.5 MILES EAST OF RUSSELL SPRINGS 0.2 Bridge Replacement 133 LC-LBT 2017

Logan UPRR AND 280TH ROAD NEAR MONUMENT - Flashing Light Signal 135 LC-RXR 2014

Logan U083 US-83 FROM THE COUNTY LINE NORTH TO THE EAST US-83/US-40 JUNCTION 29.1 Milling and Overlay 4,648 SM-1RR 2015

Lyon 6.5 MILES SOUTH OF PLYMOUTH 0.2 Bridge Replacement 133 LC-LBT 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-12 (Projects completed in FY 2017)

Page 40: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Lyon BNSF AND D ROAD 4 MILES WEST OF EMPORIA - Flashing Light Signal 334 LC-RXR 2017

Lyon WARREN WAY IN EMPORIA 0.5 Grade and Surfacing 500 SE-EDP 2016

Lyon I035 I-35 IN LYON COUNTY 14.7 Signing 488 SM-SOS 2016

Lyon I035

I-35 NORTH BOUND AND SOUTH BOUND MAINLINE FROM STATION 361 25 HEADING NORTH, ENDING AT THE WEST END OF BRIDGES OVER US-50 (EXCLUDES NORTH BOUND INDUSTRIAL DECELERATION RAMP AND US-50 NORTH BOUND ACCELERATION RAMP AND US-50 SOUTH BOUND DECELERATION RAMP)

5.1 Pavement Marking 97 SM-PMR 2010

Lyon U050 PAVEMENT MARKING AT VARIOUS LOCATIONS ON US-50 6.4 Pavement Marking 65 SM-PMR 2010Lyon U050 BNSF AND US-50 AT 6TH AVENUE IN EMPORIA (WEST CROSSING) 0.0 Flashing Light Signal 271 LC-RRX 2016

Lyon U050 US-50 FROM GRAPHIC ARTS ROAD TO PRAIRIE STREET 0.9 Milling and Overlay 415 LC-K1R 2017

Marion 2 MILES EAST AND 7 MILES NORTH OF HILLSBORO ON KANZA ROAD OVER MARION RESERVOIR

- Flood Damage 58 LC-LOC 2016

Marion INTERSECTION OF NIGHTHAWK ROAD AND 130TH ROAD 0.3 Intersection Improvement 426 LC-RES 2016

Marion UPRR AND PAWNEE ROAD SOUTHWEST OF AULNE - Flashing Light Signal 191 LC-RXR 2015

Marion UPRR AND PAWNEE ROAD SOUTHWEST OF RAMONA - Flashing Light Signal 332 LC-RXR 2014

Marion UPRR AND REMINGTON ROAD SOUTHWEST OF MARION - Flashing Light Signal 135 LC-RXR 2015

Marion U056 US-56, ROUNDABOUT AT THE JUNCTION OF US-56/US-77/K-150 0.4 Roundabout 5,405 LC-HES 2015

Marion U056 US-56 FROM COUNTY LINE EAST TO THE EAST US-56/K-15 JUNCTION 8.3 Overlay 3,473 SM-RIP 2016

Marshall 3.0 MILES SOUTH AND 1.5 MILES WEST OF VLIETS 0.2 Grade and Bridge 384 LC-RES 2014

Marshall UPRR AND WILDCAT ROAD SOUTHEAST OF FRANKFORT - Flashing Light Signal - LC-RXR 2009

Marshall U036 CULVERT #551, SNIPE CREEK DRAINAGE, ON US-36, APPROXIMATELY 2 MILES EAST OF US-36/K-99 JUNCTION

0.0 Grade and Culvert 1,172 SM-PCR 2015

Marshall U036 EMERGENCY GUARDRAIL ON US-36 AT THE WEST US-77/US-36 JUNCTION AT MARYSVILLE

0.0 Guard Fence - SM-EMR 2017

Marshall U036 US-36 FROM 17TH STREET TO 20TH STREET 0.3 Grade and Surfacing 1,187 LC-K3R 2016

Mcpherson ALL MAJOR COLLECTORS IN THE COUNTY 74.0 Signing 108 LC-RES 2016

Mcpherson K061 K-61 FROM THE K-61/K-153 SPUR JUNCTION 0.0 Bridge Repair 9 SM-EMR 2016

Mcpherson K153 K-153 FROM US-56 TO 300 FEET SOUTH OF AVENUE A 0.5 Milling and Overlay 177 LC-K1R 2016

Mcpherson K260 K-260 FROM 2 MILES WEST OF THE SOUTH K-260/I-135 JUNCTION 0.0 Bridge Replacement 855 SM-PBR 2015

Mcpherson U056 US-56 FROM MAPLE STREET TO K-153 0.9 Milling and Overlay 221 LC-K1R 2015

Meade VARIOUS MAJOR COLLECTORS IN THE COUNTY - Signing 69 LC-RES 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-13 (Projects completed in FY 2017)

Page 41: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Miami BRIDGE LOCATED 6 MILES SOUTH AND 0.7 MILE WEST OF LOUISBURG 0.2 Bridge Replacement 178 LC-LBT 2017

Miami I035 I-35 FROM THE FRANKLIN/MIAMI COUNTY LINE NORTHEAST TO THE MIAMI/JOHNSON COUNTY LINE

2.8 Pavement Patching 87 SM-ISR 2013

Miami K068 K-68: FROM 0.3 MILE EAST OF US-69 EAST TO 0.34 MILE EAST OF US-69 0.0 Grade and Surfacing 145 MM-COR 2010

Miami U069 US-69 FROM 1 MILE SOUTH OF THE US-69/K-68 JUNCTION NORTH TO THE COUNTY LINE

8.9 Milling and Overlay 5,241 SM-RIP 2014

Miami U169 PAVEMNET MARKING ON US-169 IN MIAMI COUNTY 11.2 Pavement Marking 170 SM-PMR 2017Miami U169 US-169 LOCATED AT THE 363RD STREET BRIDGE (#054) OVER US-169 0.0 Slide Repair 379 SM-1RR 2017

Miami U169 US-169 FROM THE FRANKLIN-MIAMI COUNTY LINE TO 1.2 MILES SOUTHWEST OF K-7. 6.0 Milling and Overlay 10,000 SM-RIP 2013

Mitchell 6 MILES NORTH AND 9.4 MILES EAST OF HUNTER 0.2 Bridge Replacement 133 LC-LBT 2017

Mitchell K014 K-14 NORTH OF 8TH STREET 0.2 Grade and Surfacing 1,191 LC-K3R 2016

Mitchell K181BRIDGE #032 AND CULVERT #521 ON K-181 LOCATED 0.90 MILE AND 0.88 MILE NORTH OF THE MITCHELL/LINCOLN COUNTY LINE (BACON CREEK AND BACON CREEK DRAINAGE)

0.0 Bridge Replacement 1,272 SM-PBR 2016

Mitchell K181K-181 FROM THE MITCHELL/LINCOLN COUNTY LINE TO THE MITCHELL/OSBORNE COUNTY LINE 13.3 Milling and Overlay 1,444 SM-1RR 2014

Montgomery 1.0 MILE OF COUNTY ROAD 3900 FROM US-166 NORTH TO COUNTY ROAD 3800 0.7 Grading 977 LC-RES 2015

Montgomery COUNTY ROAD WEST OF LIBERTY 0.4 Grading 263 LC-RES 2016

Montgomery SKANDO RR AND 5200 STREET NORTH OF CHERRYVALE - Flashing Light Signal 233 LC-RXR 2016

Montgomery U075 US-75 FROM OAK STREET TO MORNINGSIDE DRIVE 1.0 Milling and Overlay 267 LC-K1R 2016

Montgomery U075WEST MAIN STREET (US 75) FROM 10TH STREET TO 18TH STREET IN INDEPENDENCE, KANSAS 1.6 Concrete Pavement 2,000 MM-COR 2014

Montgomery U160 US-160 FROM PARK BOULEVARD TO CEMENT STREET IN INDEPENDENCE 0.6 Milling and Overlay 225 LC-K1R 2016

Montgomery U160 MAIN STREET FROM 10TH STREET TO PARK BOULEVARD IN INDEPENDENCE 0.5 Milling and Overlay 449 LC-K1R 2011

Montgomery U166 INTERSECTION OF US-166/169 AND 8TH STREET IN COFFEYVILLE 0.0 Intersection Improvement 750 LC-K3R 2016

Montgomery U169 US-169 (SOUTH WALNUT STREET) FROM 603 FEET SOUTH OF 15TH STREET TO 567 FEET NORTH OF THE SOUTH LINE OF SECTION 12,35S,16E

1.0 Overlay 598 LC-K1R 2012

Montgomery U169 US-169 FROM JUST SOUTHWEST OF THE US-169/US-166 JUNCTION NORTH TO COUNTY ROAD 3000

5.3 Seeding, Sodding 162 SE-RIC 2014

Morris PEDESTRIAN- BIKE PATH ALONG THE RIVER IN COUNCIL GROVE - Pedestrian and Bicycle Paths 734 LC-TEX 2016

Morris K004K-4 FROM THE MORRIS/DICKINSON COUNTY LINE EAST TO THE MORRIS/WABAUNSEE COUNTY LINE 32.1 Recycle and O-lay 2,488 SM-1RR 2015

Morris K149 K-149 FROM THE K-149/US-56 JUNCTION NORTH TO THE K-149/K-4 JUNCTION 0.1 Culvert 1,059 SM-PCR 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-14 (Projects completed in FY 2017)

Page 42: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Morris U056 BRIDE ON US-56 FROM 1.64 MILES EAST OF THE US-56/K-149 JUNCTION (OVER HAUN CREEK)

0.0 Bridge Replacement 790 SM-PBR 2016

Morris U077 FROM THE US-77/K-209 JUNCTION NORTH TO MORRIS/GEARY COUNTY LINE 6.8 Milling and Overlay 645 SM-1RR 2016

Morris U077 FROM THE DICKINSON/MORRIS COUNTY LINE NORTH TO THE US-77/K-209 JUNCTION 5.3 Milling and Overlay 494 SM-1RR 2016

Morton VARIOUS MAJOR COLLECTORS IN THE COUNTY - Signing 62 LC-RES 2016

Nemaha K062 K-62 FROM THE SOUTH COUNTY LINE NORTH TO THE K-62/K-9 JUNCTION 6.0 1.5 Overlay 628 SM-1RR 2015

Neosho BRIDGE LOCATED 1.0 MILE SOUTH OF GALESBURG 0.1 Bridge Replacement 395 LC-RES 2014

Neosho BRIDGE LOCATED 5.9 MILES EAST OF CHANUTE 0.1 Bridge Replacement 496 LC-RES 2016

Neosho CITY OF CHANUTE (SAFE ROUTES TO SCHOOL) - Pedestrian and Bicycle Paths 271 LC-SRT 2015

Neosho K039 K-39: BRIDGE LOCATED APPROXIMATELY 1 1/2 MILES EAST OF THE EAST US-59/K-39 JUNCTION

0.0 Bridge Repair 105 SM-BSR 2015

Neosho K047 K-47 FROM THE SOUTH US-59/K-47 JUNCTION EAST TO THE WEST CITY LIMITS OF ST. PAUL

4.5 Milling and Overlay 443 SM-1RR 2015

Neosho K047 ON K-47, NEOSHO RIVER BRIDGE LOCATED 3 MILES EAST OF US-59 - Bridge Replacement 4,251 SM-PBR 2012

Neosho U059 BRIDGE ON US-59 NORTH OF K-47 0.0 Bridge Repair - SM-EMR 2016

Ness VARIOUS MAJOR COLLECTORS IN THE COUNTY - Signing 62 LC-RES 2016

Ness K004 K-4: FROM THE LANE/NESS COUNTY LINE, EAST TO THE K-4/US-283 JUNCTION 19.0 Recycle and O-lay 1,642 SM-1RR 2013

Ness K096 K-96 FROM 9 MILES EAST OF THE COUNTY LINE EAST FOR 6 MILES 6.0 Pavement Reconstruction - SM-RIP 2017

Ness K096 K-96 FROM 8 MILES EAST OF THE NESS/LANE COUNTY LINE EAST FOR 5 MILES 5.0 1.5 Overlay - SM-1RR 2016

Norton U036 US-36 FROM BROWN STREET TO US-283 IN THE CITY OF NORTON 0.4 Grade and Surfacing 1,873 LC-K3R 2015

Osage 1.0 MILE NORTH AND 2.1 MILES WEST OF MICHIGAN VALLEY 0.2 Grade and Bridge 359 LC-RES 2014

Osage 1.0 MILE SOUTH AND 0.7 MILE EAST OF MICHIGAN VALLEY 0.2 Bridge Replacement 133 LC-LBT 2017

Osage BNSF AND 269TH STREET 3 MILES SOUTHWEST OF OSAGE CITY - Flashing Light Signal 220 LC-RXR 2015

Osage CITY OF LYNDON (SAFE ROUTES TO SCHOOL) - Pedestrian and Bicycle Paths 246 LC-SRT 2015

Osage I035 I-35 FROM THE COFFEY/OSAGE COUNTY LINE NORTHEAST TO THE OSAGE/FRANKLIN COUNTY LINE

11.5 Pavement Patching 53 SM-ISR 2013

Osage K170 K-170 BRIDGES LOCATED 3.52 MILES AND 3.62 MILES EAST OF THE OSAGE/LINN COUNTY LINE

0.0 Bridge Replacement 1,162 SM-PBR 2014

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-15 (Projects completed in FY 2017)

Page 43: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Osage U075 US-75 FROM OSAGE/COFFEY COUNTY LINE NORTH TO 1 MILE NORTH OF SOUTH US-75/K-31 JUNCTION

7.2 Milling and Overlay 3,279 SM-RIP 2013

Osborne 2.5 MILES EAST OF ALTON 0.2 Bridge Replacement 487 LC-RES 2016Osborne U024 US-24 FROM THE NORTH US-24/US-281 JUNCTION TO 7.1 MILES EAST 7.1 Milling and Overlay 1,035 SM-1RR 2015Osborne U024 US-24 FROM THE COUNTY LINE EAST FOR 6 1/2 MILES (NEAR ALTON) 6.5 Milling and Overlay 2,290 SM-RIP 2014

Ottawa 2.7 MILES EAST AND 6.0 MILES NORTH OF MINNEAPOLIS 0.2 Bridge Replacement 178 LC-LBT 2017

Ottawa U081 US-81 FROM 6.4 MILES NORTH OF US-81/K-106 JUNCTION NORTH TO THE COUNTY LINE

6.7 3in Overlay 2,193 SM-1RR 2015

Pawnee 2.0 MILES NORTH OF LARNED 0.2 Bridge Replacement 133 LC-LBT 2017

Pawnee K019 K-19 FROM THE K-19/K-19 SPUR JUNCTION EAST TO THE COUNTY LINE 10.2 Milling and Overlay 807 SM-1RR 2015

Pawnee K156 K-156 FROM THE HODGEMAN/PAWNEE COUNTY LINE EAST TO THE US-183/K-156 JUNCTION

14.1 Crack Repair - SM-1RR 2016

Pawnee U056 K-156 FROM KANSAS STREET TO BROADWAY AND US-56 FROM BROADWAY TO EAST CITY LIMITS

0.8 Milling and Overlay 267 LC-K1R 2014

Pawnee U183 US-183 FROM THE K-156/US-183 JUNCTION NORTH TO THE PAWNEE/RUSH COUNTY LINE

11.2 Crack Repair 68 SM-1RR 2016

Phillips 1.0 MILE SOUTH AND 1.0 MILE EAST OF GLADE 0.2 Grade and Bridge 446 LC-RES 2014

Phillips BRIDGE LOCATED 3 MILES NORTH AND 4.0 MILES EAST OF LONG ISLAND 0.3 Bridge Replacement 405 LC-RES 2016

Phillips BRIDGE LOCATED 4.5 MILES NORTH OF AGRA 0.2 Bridge Replacement 175 LC-LBT 2017

Phillips K009 BRIDGE ON K-9 LOCATED 1.79 MILES EAST OF THE K-9/US-183 JUNCTION 0.0 Bridge Replacement 220 SM-PBR 2016

Phillips U036 US-36 FROM THE EAST CITY LIMITS OF PHILLIPSBURG, EAST 13.6 MILES TO THE PHILLIPS/SMITH COUNTY LINE

13.6 Sealing 518 SM-1RR 2016

Pottawatomie BRIDGE LOCATED 0.3 MILE SOUTHWEST OF ONAGA 0.2 Bridge Replacement 133 LC-LBT 2017

Pottawatomie BRIDGE LOCATED 2.0 MILES SOUTH AND 1.5 MILES EAST OF FLUSH 0.2 Bridge Replacement 133 LC-LBT 2017

Pottawatomie FLUSH ROAD NORTH OF THE JOHN SCOTT ROAD INTERSECTION 0.2 Grading 260 LC-RES 2016

Pottawatomie UPRR AND SCHOEMAN ROAD EAST OF BELVUE - Flashing Light Signal 210 LC-RXR 2015

Pottawatomie U024 US-24 AND FLUSH ROAD 1.0 Grade and Surfacing 1,044 MM-COR 2016

Pottawatomie U024 BRIDGE # 018 ON US-24 LOCATED 0.54 MILE EAST OF K-63 (COLLEGE CREEK) - Bridge Replacement 838 SM-PBR 2014

Pratt STREESTSCAPE ON MAIN STREET IN PRATT - Landscaping and Beautification 1,269 LC-TEX 2015

Pratt U054 US-54 AND FINCHAM ROAD 0.2 Grade and Surfacing 565 MM-COR 2016

Pratt U054 US-54 FROM US-54/RS-501 JUNCTION EAST TO 1 MILE EAST OF CAIRO INTERSECTION 5.0 Seeding, Sodding 162 SE-RIC 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-16 (Projects completed in FY 2017)

Page 44: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Pratt U281 US-281 FROM BLAINE STREET NORTH TO THE RAILROAD TRACKS 0.4 Concrete Pavement 755 LC-K3R 2016

Pratt U281 US-281 FROM THE NORTH CITY LIMITS OF PRATT TO THE NORTH CITY LIMITS OF IUKA

5.0 Ultra Thin Bonded Asphalt Surfacing 616 SM-1RR 2015

Pratt U281 US-281 FROM US-54 (FIRST STREET) TO BLAINE STREET IN PRATT 0.1 Concrete Pavement 165 LC-K1R 2014

Rawlins BRIDGE LOCATED 1.7 MILES EAST OF ACHILLES 0.2 Bridge Replacement 170 LC-LBT 2017

Reno BNSF AND WOODBERRY ROAD 1 MILE WEST OF BURTON - Flashing Light Signal 210 LC-RXR 2017

Reno NORTHEAST PEDESTRIAN- BIKE TRAIL EXTENSION IN HUTCHINSON - Pedestrian and Bicycle Paths 464 LC-TEX 2015

Reno UPRR AND RED ROCK ROAD SOUTHWEST OF PARTRIDGE - Flashing Light Signal 168 LC-RXR 2015

Reno K014 BRIDGE #114 ON K-14 IN RENO COUNTY AT THE K-14/US-50 JUNCTION 0.0 Bridge Repair 27 SM-EMR 2016

Reno K014 BRIDGE #114 ON K-14 AT THE K-14/US-50 JUNCTION 0.0 Bridge Repair 371 SM-EMR 2016

Reno K014 K-14 FROM THE SOUTH COUNTY LINE TO K-14/K-96 JUNCTION 16.7 Recycle and O-lay 3,610 SM-1RR 2015

Reno K061 BRIDGES #078 AND #079 ON K-61 LOCATED 1.58 AND 1.70 MILES NORTH AND EAST OF JUNCTION US-50

0.0 Bridge Repair 836 SM-BSR 2013

Reno K061 K-61 FROM US-50 TO LORRAINE STREET IN HUTCHINSON 1.9 Surfacing 245 LC-K1R 2015

Reno K061 K-61 FROM LORRAINE STREET TO 11TH AVENUE IN HUTCHINSON 0.7 Milling and Overlay 335 LC-K1R 2016

Reno U050 US-50 FROM EAST END OF EXISTING PAVEMENT ON ENTERPRISE DRIVE EAST TO AIRPORT ROAD INTERSECTION

0.8 Grade, Bridge and Surfacing 1,095 SE-RIC 2004

Reno U050 US-50 FROM APPROXIMATELY 7 1/4 MILES EAST OF THE EAST US-50/K-61 JUNCTION EAST FOR 1.25 MILES

1.3 Grade and Surfacing 3,078 SE-RIC 2015

Reno U050 US-50 FROM WEST OF JUNCTION WITH K-61 EAST TO EAST OF YODER/AIRPORT ROAD. 3.1 Grade, Bridge and Surfacing 31,807 SE-RIC 2011

Republic 0.5 MILE NORTH AND 6.0 MILES WEST OF MUNDEN 0.2 Bridge Replacement 159 LC-LBT 2017

Republic K266 BRIDGE # 039 ON K-266 LOCATED 1.98 MILES NORTH OF US-36 (MUD CREEK) - Bridge Replacement 875 SM-PBR 2013

Republic U036 US-36 FROM 1.1 MILES EAST OF US-81/US-36 JUNCTION EAST TO THE WASHINGTON COUNTY LINE

13.6 Milling and Overlay 2,738 SM-1RR 2016

Republic U036 US-36 FROM THE JEWELL/REPUBLIC COUNTY LINE EAST TO 0.21 MILE EAST OF US-36/US-81 JUNCTION

15.6 Milling and Overlay 10,419 SM-RIP 2014

Republic U036 US-36 FROM JUST EAST OF US-81 0.4 Bridge Replacement 3,157 SM-PBR 2015

Republic U036 US-36 FROM US-36/US-81 JUNCTION EAST TO BELLEVILLE 0.9 Pavement Reconstruction 4,566 SM-RIP 2015

Rice 2.6 MILES EAST AND 3.5 MILES SOUTH OF GENESEO 0.1 Bridge Replacement 279 LC-RES 2016

Rice NORTH FOUNDRY ROAD AND EAST IRONS AVENUE IN LYONS 0.3 Grade and Surfacing 451 SE-EDP 2017

Rice K014CLEVELAND AVENUE TO FOREST AVENUE ON BROADWAY AVENUE (K-14/K-96) IN STERLING 0.4 Slurry Seal 107 LC-K1R 2011

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-17 (Projects completed in FY 2017)

Page 45: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Rice K014 K-14 FROM JEFFERSON STREET TO THE RAILROAD IN STERLING 0.3 Milling and Overlay 267 LC-K1R 2016

Rice U056US-56 FROM PIONEER AVENUE TO EAST CITY LIMITS AND K-14/K-96 FROM THE INTERSECTION OF MAIN STREET AND GRAND AVENUE TO THE SOUTH CITY LIMITS IN LYONS

2.3 Milling and Overlay 597 LC-K1R 2017

Rice U056 US-56 FROM WEST OF CENTURY ROAD EAST TO 2L/4L DIVIDED 0.3 Grade, Bridge and Surfacing 2,026 LC-K3R 2015

Riley 40TH AVENUE BRIDGE OVER MCDOWELL CREEK 0.4 Grade, Bridge and Surfacing 573 LC-RES 2014

Riley BLUEMONT AVENUE, FROM 11TH STREET TO MANHATTAN AVENUE IN MANHATTAN - Intersection Improvement 1,069 LC-HAZ 2013

Riley K113 K-113 AND KIMBALL AVENUE IN MANHATTAN 0.1 Traffic Signals 480 LC-HES 2015

Riley U024 INTERSECTION OF US-24 AND LEAVENWORTH IN MANHATTAN 0.1 Intersection Improvement 336 LC-K3R 2016

Riley U024 US-24 FROM US-24/CASEMENT ROAD INTERSECTION SOUTH FOR 1/2 MILE IN THE CITY OF MANHATTAN

0.5 Preliminary Engineering - SM-CMN 2018

Rooks 3.2 MILES NORTH AND 2.2 MILES WEST OF ZURICH 0.2 Bridge Replacement 188 LC-RES 2015

Rooks 9.2 MILES NORTH AND 7.0 MILES EAST OF DAMAR 0.2 Bridge Replacement 173 LC-LBT 2017

Rooks U024 US-24 FROM STOCKTON EAST TO COUNTY LINE 11.7 Milling and Overlay 4,272 SM-RIP 2014

Russell I070APPROXIMATELY 4.0 MILES EAST OF THE ELLIS/RUSSELL COUNTY LINE (AREA OF THE SINKHOLE) 13.3 Preliminary Engineering - SM-ISR 2004

Russell K181 K-181 FROM K-181/K-232 JUNCTION EAST TO THE COUNTY LINE 0.1 Milling and Overlay 20 SM-1RR 2014

Russell U281 US-281 IN RUSSELL 0.6 Preliminary Engineering - MM-COR 2017

Saline BRIDGE ON GREELEY AVENUE OVER SMOKY HILL RIVER 0.4 Bridge Replacement 487 LC-RES 2016

Saline UPRR AND WYMAN ROAD EAST OF BROOKVILLE - Flashing Light Signal 145 LC-RXR 2015

Saline I135 I-135 FROM SALINE/MCPHERSON COUNTY LINE NORTH TO I-135/US-81 INTERCHANGE 18.8 Pavement Marking 848 SM-PMR 2015

Saline K004 K-4 FROM GYPSUM SOUTH AND EAST TO THE COUNTY LINE 4.3 Recycle and O-lay 320 SM-1RR 2015

Saline K004 K-4 FROM K-4/K-104 JUNCTION EAST TO GYPSUM 10.7 Recycle and O-lay 691 SM-1RR 2015

Saline K140 K-140 FROM 3.5 MILES EAST OF THE SALINE/ELLSWORTH COUNTY LINE (WEST SPRING CREEK DRAINAGE)

0.0 Bridge Replacement 633 SM-PBR 2016

Saline K143 MULBERRY CREEK DRAINAGE BRIDGE ON K-143 LOCATED ABOUT 0.5 MILE NORTH OF THE US-40/K-143 JUNCTION

0.0 Bridge Replacement 1,180 SM-PBR 2013

Saline U081 2 BRIDGES ON US-81 LOCATED APPROXIMATELY 0.3 MILE NORTH OF I-70 OVER THE SALINE RIVER

0.0 Bridge Repair 241 SM-BSR 2016

Scott K004 K-4 FROM THE US-83/K-4 JUNCTION EAST TO THE COUNTY LINE 11.9 Recycle and O-lay 2,073 SM-1RR 2015

Scott U083 US-83 FROM 12TH STREET NORTH TO 4TH STREET IN SCOTT CITY 0.6 Pavement Patching 163 LC-K1R 2013

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-18 (Projects completed in FY 2017)

Page 46: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Sedgwick EAST 143RD STREET TO 1800 FEET NORTH OF SOUTH 71ST STREET 0.2 Grade, Bridge and Surfacing 509 LC-RES 2016

Sedgwick 21ST STREET NORTH AT DERBY REFINERY 0.0 Bridge Replacement 875 LC-LOC 2016

Sedgwick 37TH STREET NORTH FROM BROADWAY TO HYDRAULIC 1.0 Grade and Surfacing 4,258 LC-LOC 2014

Sedgwick 87TH STREET SOUTH 2.7 MILES WEST AND 2.0 MILES SOUTH OF HAYSVILLE OVER DRY CREEK

0.0 Grade, Bridge and Surfacing 526 LC-RES 2014

Sedgwick MARKET STREET AND TOPEKA AVENUE IN WICHITA - Pedestrian and Bicycle Paths 569 LC-TEX 2016

Sedgwick MOUNT VERNON STREET AND OLIVER STREET IN WICHITA - Intersection Improvement 1,000 LC-HAZ 2014

Sedgwick BRIDGE ON OLD LAWRENCE ROAD NORTH OF I-235 IN WICHITA 0.0 Bridge Replacement 174 LC-LOC 2015

Sedgwick REDBUD TRAIL FROM OLIVER TO WOODLAWN IN WICHITA - Pedestrian and Bicycle Paths 230 LC-TEX 2015

Sedgwick SYCAMORE FROM DOUGLAS TO GLENN STREET IN WICHITA 2.0 Pedestrian and Bicycle Paths 57 LC-TEX 2015

Sedgwick UPRR AND WOODLAWN ROAD IN BEL AIRE - Flashing Light Signal 140 LC-RXR 2014

Sedgwick WICHITA METRO REGION- FREE FARES PROJECT - Funds Only - LC-RES 2017

Sedgwick WICHITA METRO REGION- FREE FARES PROJECT - Funds Only - LC-RES 2017

Sedgwick ROBOTIC TOTAL STATION IN WICHITA, KS - Intelligent Transportation Sys - SE-ITS 2017

Sedgwick I035 INTERCHANGE STUDY AT KTA (I-35)/US-54/K-96 JUNCTIONS IN EAST WICHITA 4.5 Preliminary Engineering - SE-RIC 2015

Sedgwick I135 I-135/K-96 AND I-135/I-235 INTERCHANGES 0.2 Surfacing 119 MM-GSI 2015

Sedgwick I135 I-135: BRIDGES LOCATED AT THE JUNCTION OF I-135/PAWNEE AVENUE 0.0 Bridge Repair 553 SM-BSR 2016

Sedgwick I135 I-135: LIGHT TOWER LOCATED 1000 FEET SOUTH OF I-135/101ST STREET 0.0 Lighting 18 SM-SLR 2015

Sedgwick I235 I-235 AND 13TH STREET CONNECTION ON WEST SIDE OF WICHITA 1.0 Grade, Bridge and Surfacing 23,073 SE-IRC 2013

Sedgwick I235 I-235 AND 13TH STREET CONNECTION ON WEST SIDE OF WICHITA 1.0 Seeding, Sodding 104 SE-IRC 2015

Sedgwick K015K-15 IN SEDGWICK COUNTY NORTHBOUND AND SOUTHBOUND FROM THE SOUTH END OF THE KTA BRIDGE TO JUST SOUTH OF 71ST STREET SOUTH/MEADOWLARK IN DERBY

4.7 Pavement Patching 1,465 SM-1RR 2016

Sedgwick K015 K-15 AT 71ST, 63RD, 47TH, AND MACARTHUR ROAD 2.0 Traffic Signals 130 LC-HES 2017

Sedgwick K096 K-96 EASTBOUND EXIT RAMP AT THE K-96/GREENWICH ROAD INTERCHANGE 0.0 Signing - SM-SLR 2015

Sedgwick K096 K-96 EASTBOUND AND WESTBOUND FROM GREENWICH TO US-54 4.5 Pavement Patching 844 SM-1RR 2016

Sedgwick K163 K-163 FROM US-54/K-163 JUNCTION SOUTH TO GARDEN PLAIN 0.5 Funds Only - SM-SRR 2013

Sedgwick K254 BRIDGES ON K-254 (OVER OKT RAILROAD AND MIDDLE BRANCH CHISOLM CREEK), JUST EAST OF OLIVER STREET IN KECHI

0.0 Bridge Repair 509 SM-BSR 2014

Sedgwick U054 US-54 AND EDWARDS (K-42)/MERIDIAN AVENUE 0.1 Lighting 317 MM-LTG 2016

Sedgwick U054 US-54 FROM 111TH STREET WEST TO 119TH STREET WEST 0.6 Milling and Overlay 692 LC-K1R 2015

Sedgwick U054 US-54 FROM EAST CITY LIMITS OF WICHITA TO NEW PAVEMENT WEST OF 159TH STREET

2.0 1.5 Overlay 1,070 SM-1RR 2015

Sedgwick U054 US-54 FROM HILLSIDE ST TO ARMOUR STREET IN WICHITA 2.7 Pavement Marking 240 SM-PMR 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-19 (Projects completed in FY 2017)

Page 47: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Sedgwick U054 US-54 IN WICHITA METROPOLITAN AREA - Preliminary Engineering - MM-SAF 2002

Sedgwick U054 US-54: SOUTH ACCESS ROAD FROM CINDY STREET WEST TO 183RD STREET IN GODDARD

0.8 Grade and Surfacing 832 MM-COR 2010

Sedgwick U081 US-81 FROM 87TH STREET SOUTH TO K-55 AND K-53 FROM US-81 TO K-15 14.1 Preliminary Engineering - MM-COR 2016

Seward U054 US-54 NORTH AND NORTHEAST LEGS OF THE US-54/US-83/2ND STREET/BLUEBELL JUNCTION AND US-83

0.2 Grade and Surfacing 1,970 LC-K3R 2015

Seward U083 US-83 AT THE US-83/US-160 JUNCTION NORTH TO THE COUNTY LINE 8.0 Recycle and O-lay 2,326 SM-1RR 2015

Seward U083 VARIOUS LOCATIONS ALONG US-83 IN THE COUNTY 0.5 Milling and Overlay 168 SM-1RR 2017

Seward U160 US-160 FROM THE US-160/US-83 JUNCTION EAST TO THE SEWARD/MEADE COUNTY LINE

12.9 Milling and Overlay 1,445 SM-1RR 2016

Shawnee CITY WIDE IN TOPEKA - Pedestrian and Bicycle Paths 1,646 LC-TEX 2015

Shawnee I-470 AND HUNTOON/WANAMAKER - Preliminary Engineering - MM-COR 2017

Shawnee I-70 FRONTAGE ROAD 0.5 Recycle and O-lay 232 LC-LOC 2017

Shawnee SEVEN INTERSECTIONS ALONG GAGE BOULEVARD BETWEEN 10TH AND 21ST STREETS

- Intelligent Transportation Sys - SE-ITS 2017

Shawnee UPRR AND CARTER ROAD SOUTHEAST OF ROSSVILLE - Flashing Light Signal 183 LC-RXR 2014

Shawnee WILLARD BRIDGE OVER THE KANSAS RIVER ON NORTHWEST CARLSON ROAD 0.5 Grade, Bridge and Surfacing 8,500 LC-LOC 2016

Shawnee I070 I-70 FROM DANBURY LANE TO ADAMS TRAFFICWAY, INCLUDING ALL RAMPS WITHIN THESE LIMITS TO RADIUS OF RAMPS

4.3 Pavement Patching 3,225 SM-ISR 2010

Shawnee I070 I-70: 3 BRIDGES EAST OF TOPEKA AVENUE INCLUDING THE POLK-QUINCY VIADUCT 0.0 Bridge Repair 3,621 SM-BSR 2014

Shawnee I070 I-70: JUST EAST OF THE CARNAHAN AVENUE/DEER CREEK TRAFFICWAY INTERCHANGE.

- Bridge Repair 5,419 SM-PBR 2015

Shawnee I070 MP 354.695 E TO MP 357.678 AND MP 365.640 TO MP 366.695 4.0 Pavement Patching 3,741 SM-ISR 2009

Shawnee I470 KANSAS TURNPIKE AUTHORITY (KTA) MILEPOST 177 IN SOUTH TOPEKA 3.7 Location Study - SE-IRC 2017

Shawnee U024 US-24 AND RAILROAD STREET 0.0 Intersection Improvement 112 LC-K3R 2016

Shawnee U024 US-24 FROM 0.392 MILES EAST OF MENOKEN ROAD TO 0.102 MILES WEST OF NW ROCHESTER ROAD/NW TYLER AVENUE

3.5 Crack Repair 87 SM-CMN 2014

Shawnee U024 US-24/MAIN AND US-24/ORANGE IN ROSSVILLE - Traffic Signals 18 MM-SAF 2006

Shawnee U024 US-24 FROM THE COUNTY LINE EAST TO JUST WEST OF SILVER LAKE 10.5 Milling and Overlay 1,213 SM-1RR 2014

Sheridan 10.0 MILES SOUTH AND 3.0 MILES EAST OF HOXIE 0.2 Bridge Replacement 200 LC-RES 2015

Sheridan 14.5 MILES SOUTH AND 1.1 MILES WEST OF HOXIE 0.2 Bridge Replacement 178 LC-LBT 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-20 (Projects completed in FY 2017)

Page 48: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Sherman 19TH STREET BETWEEN CHERRY STREET AND MAIN IN GOODLAND - Concrete Pavement 375 SE-EDP 2016

Sherman WEST INDUSTRIAL ROAD JUST WEST OF HIGHWAY 27 IN GOODLAND - Concrete Pavement 241 SE-EDP 2014

Sherman I070 I-35 FROM JUST WEST OF THE I-70/K-27 INTERCHANGE EAST TO THE I-70/K-253 INTERCHANGE (NEAR EDSON)

10.1 Milling and Overlay 5,252 SM-ISR 2015

Sherman I070 I-70 FROM THE COLORADO STATE LINE EAST TO CARUSO (RS-1668) 12.8 Grade, Bridge and Surfacing 51,185 SM-IRP 2011

Sherman I070 I-70 FROM THE I-70/RS-1668 JUNCTION (EXIT 12) EAST TO THE I-70/K-27 JUNCTION (EXIT 17)

4.5 Sealing 399 SM-1RR 2016

Sherman K027 K-27 FROM GOODLAND NORTH TO THE COUNTY LINE 16.6 Ultra Thin Bonded Asphalt Surfacing 1,590 SM-1RR 2015

Sherman U024B US-24BUS FROM THE NORTH JUNCTION OF US-24BUS/K-27 EAST AND SOUTH TO THE EAST JUNCTION OF I-70/US-24BUS

2.3 Milling and Overlay 840 SM-1RR 2015

Smith 1.5 MILES SOUTH AND 2.0 MILES EAST OF SMITH CENTER KANSAS 0.3 Bridge Replacement 374 LC-RES 2016

Smith 2.0 MILES NORTH AND 2.0 MILES EAST OF CLAUDELL 0.2 Grade, Bridge and Surfacing 368 LC-RES 2014

Smith 6.5 MILES NORTH AND 1.0 MILES WEST OF SMITH CENTER 0.2 Bridge Replacement 178 LC-LBT 2017

Stafford K019 K-19 FROM WEST COUNTY LINE EAST TO JUNCTION US-28/K-19 9.0 Milling and Overlay 865 SM-1RR 2015

Stanton K027 K-27 BEGINNING AT THE SOUTH JUNCTION US-160/K-27 NORTH TO THE STANTON/HAMILTON COUNTY LINE

12.0 Sealing 193 SM-1RR 2016

Stanton U160 US-160 FROM THE NORTH JUNCTION OF US-160/K-27 EAST TO THE COUNTY LINE 12.9 Milling and Overlay 1,693 SM-1RR 2015

Stevens CITY OF HUGOTON (SAFE ROUTES TO SCHOOL) - Pedestrian and Bicycle Paths 188 LC-SRT 2016

Stevens K051 K-51 BETWEEN COMMERCIAL AVENUE AND ROAD N 1.4 Construction Contracts 1,074 SE-EDP 2015

Sumner 1.0 MILES NORTH AND 1.1 MILES EAST OF CONWAY SPRINGS 0.2 Bridge Replacement 409 LC-RES 2017

Sumner 3RD STREET OVER HARGIS CREEK IN WELLINGTON 0.0 Grade, Bridge and Surfacing 487 LC-RES 2014

Sumner UPRR AND WEST 80TH STREET SOUTH AT PERTH - Flashing Light Signal 169 LC-RXR 2015

Sumner VENDENBURGH AVENUE FROM 15TH STREET TO A STREET IN WELLINGTON 1.1 Grade and Surfacing 1,861 LC-RES 2013

Sumner K049 K-49 FROM THE K-49/US-81 JUNCTION IN CALDWELL NORTH TO THE US-160/K-49 JUNCTION

17.3 Recycle and O-lay 1,786 SM-1RR 2015

Sumner K053 K-53 FROM WEST CITY LIMITS TO EAST CITY LIMITS IN MULVANE 1.3 Milling and Overlay 427 LC-K1R 2014

Sumner U081 SOUTH MAIN STREET TO US-81 IN CALDWELL 0.3 Milling and Overlay 152 LC-K1R 2012

Sumner U081 US-160/81 FROM 11TH STREET TO 14TH STREET IN WELLINGTON 0.2 Surfacing 267 LC-K1R 2013

Sumner U081US-81 BEGINNING 0.34 MILE NORTH OF THE US-81/US-166 JUNCTION NORTH TO THE US-81/K-53 JUNCTION (NOT TO INCLUDE THE CITY OF WELLINGTON) 28.6 Crack Repair 145 SM-1RR 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-21 (Projects completed in FY 2017)

Page 49: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Sumner U081 US-81 NORTH OF WELLINGTON 0.1 Special 16 MM-SAF 2014

Sumner U081 BRIDGE # 041 ON US-81 LOCATED 1.58 MILES NORTH OF OKLAHOMA STATE LINE (FALL CREEK)

- Bridge Replacement 1,236 SM-PBR 2014

Sumner U160 US-160 FROM THE WEST COUNTY LINE TO WEST CITY LIMITS OF WELLINGTON 21.5 Recycle and O-lay 3,281 SM-1RR 2015

Sumner U160 BRIDGE #72 LOCATED 0.67 MILE WEST OF THE SUMNER/COWLEY COUNTY LINE 0.0 Bridge Repair 96 SM-BSR 2015

Sumner U166 US-166 FROM THE BEGINNING OF THE ASPHALT SECTION EAST TO THE COUNTY LINE 5.0 Milling and Overlay 740 SM-1RR 2015

Sumner U177 US-177 FROM THE STATE LINE TO THE US-81/US-177 JUNCTION 3.5 Milling and Overlay 409 SM-1RR 2015

Thomas I070 I-70 FROM JUST EAST OF THE I-70/RS 886/COUNTY ROAD K INTERCHANGE THEN SOUTHEAST TO THE THOMAS/LOGAN COUNTY LINE

12.0 Milling and Overlay 4,900 SM-1RR 2016

Thomas U024 US-24 FROM K-25 WEST 2850 FEET 0.5 Milling and Overlay 812 LC-K3R 2016

Thomas U083 US-83 BEGINNING AT JUNCTION US-24/US-83 NORTH 11.5 MILES TO THE SHERIDAN/THOMAS COUNTY LINE

11.5 1.5 Overlay 1,445 SM-1RR 2016

Thomas U083 BRIDGE ON US-83 LOCATED 0.44 MILE SOUTH OF US-24 0.0 Bridge Replacement 885 SM-PBR 2016

Trego 4.1 MILES SOUTH AND 4.0 MILES EAST OF WAKEENEY 0.3 Bridge Replacement 230 LC-RES 2015

Trego UPRR AND RIGA ROAD 4 MILES WEST OF ELLIS - Flashing Light Signal 189 LC-RXR 2014

Trego I070 I-70: BRIDGE LOCATED 2 MILES EAST OF THE TREGO/GOVE COUNTY LINE (BANNER RD AND K-198)(WESTBOUND)

0.0 Bridge Repair 179 SM-BSR 2016

Wabaunsee I070BRIDGES #98 AND #100 ON I-70 LOCATED WESTBOUND 1.02 MILES EAST OF K-30 AND 1.20 MILES EAST OF RS-1071 RESPECTIVELY 0.0 Bridge Repair 66 SM-BSR 2014

Wabaunsee K004 K-4 FROM THE WEST CITY LIMITS OF ESKRIDGE EAST AND NORTH TO THE COUNTY LINE

15.6 Recycle and O-lay 1,277 SM-1RR 2015

Wabaunsee K030 K-30 FROM THE I-70/K-30 JUNCTION NORTH TO MAPLE HILL 2.0 Milling and Overlay 190 SM-1RR 2014

Wabaunsee K099 K-99 FROM THE NORTH CITY LIMITS TO THE INTERSECTION OF 7TH AND MISSOURI IN ALMA

0.4 Milling and Overlay 160 LC-K1R 2013

Wabaunsee K099 BRIDGE # 056 ON K-99 LOCATED 4.91 MILES SOUTH OF I-70 - Bridge Replacement 2,296 SM-PBR 2016

Wabaunsee K099K-99 FROM THE NORTH CITY LIMITS OF ALMA, NORTH TO THE WABAUNSEE/POTTAWATOMIE COUNTY LINE (SOUTH CITY LIMITS OF WAMEGO) 12.8 Milling and Overlay 1,518 SM-1RR 2013

Wabaunsee VARIOUS LOCATIONS IN NORTHEAST DISTRICT ONE - Special - SM-1RR 2015

Wallace BRIDGE LOCATED 6.0 MILES SOUTH AND 4.1 MILES WEST OF SHARON SPRINGS 0.2 Bridge Replacement 178 LC-LBT 2017

Wallace TRANSFER A PORTION OF EXISTING K-27 TO WALLACE COUNTY - Funds Only - MM-RIM 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-22 (Projects completed in FY 2017)

Page 50: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Wallace UPRR AND 3 ROAD WEST OF WESKAN - Flashing Light Signal 151 LC-RXR 2014

Wallace UPRR AND WA N-6 ROAD AT WESKAN - Flashing Light Signal 132 LC-RXR 2014

Wallace K027 BRIDGE #009 ON K-27 LOCATED 0.87 MILE NORTH OF WALLACE/GREELEY COUNTY LINE (MIDDLE LADDER CREEK)

0.9 Grade, Bridge and Surfacing 2,498 SM-PBR 2014

Wallace K027K-27 FROM 7.7 MILES NORTH OF THE WALLACE/GREELEY COUNTY LINE NORTH TO APPROXIMATELY 0. 2 MILE SOUTH OF WEST K-27/US-40 JUNCTION 4.7 Grade and Surfacing 10,353 MM-RIM 2015

Washington K009BRIDGES #39 AND #42 ON K-9 LOCATED 2.87 MILES EAST OF THE CLOUD COUNTY LINE (SCRIBNER CREEK) AND 0.55 MILE EAST OF CLOUD COUNTY LINE (DRY CREEK) 0.0 Bridge Overlay 292 SM-BSR 2013

Washington K009 K-9 FROM THE COUNTY LINE EAST TO CLIFTON 5.2 Milling and Overlay 458 SM-1RR 2014

Washington U036 US-36 BEGINNING AT THE WASHINGTON COUNTY LINE EAST TO US-36/K-22 JUNCTION

4.0 Milling and Overlay - SM-1RR 2016

Wilson U075 US-75 FROM THE EAST CITY LIMITS OF NEODESHA TO 4.6 MILES NORTH OF THE US-75/K-47 JUNCTION

13.1 Milling and Overlay 1,832 SM-1RR 2015

Wilson U400 US-400 FROM THE US-400/K-47 JUNCTION EAST AND SOUTH TO THE COUNTY LINE 12.8 Milling and Overlay 6,772 SM-RIP 2015

Woodson BRIDGE LOCATED 1.9 MILES NORTH AND 5.0 MILES WEST OF JUNCTION US-54 AND US-75

0.2 Bridge Replacement 291 LC-RES 2014

Woodson BRIDGE LOCATED 1.1 MILES NORTH AND 3.0 MILES WEST OF US-75/54 JUNCTION 0.2 Grade and Bridge 722 LC-RES 2012

Woodson VARIOUS LOCATIONS IN WOODSON COUNTY - Grading 8 LC-RES 2013

Wyandotte OPERATION GREEN LIGHT IN JOHNSON AND WYANDOTTE COUNTY - Intelligent Transportation Sys - SE-ITS 2017

Wyandotte KANSAS CITY METROPOLITAN AREA REGIONAL BIKE PLAN - Funds Only - LC-LOC 2014

Wyandotte LEAVENWORTH ROAD AT 72ND AND 55TH STREET INTERSECTIONS IN KANSAS CITY - Grade and Surfacing 2,097 LC-RES 2016

Wyandotte MERRIAM LANE FROM 24TH STREET TO 10TH STREET 1.3 Grade, Bridge and Surfacing 7,666 LC-RES 2014

Wyandotte NORTH 55TH STREET SOUTH OF DICKINSON STREET 1.3 Grade, Bridge and Surfacing 989 LC-RES 2013

Wyandotte I035BRIDGES #007 (OVER TURKEY CREEK) AND #008 (OVER MILL STREET) ON I-35 LOCATED 1.02 AND 1.01 MILES NORTHEAST OF US-69 0.3 Special 100 SM-CMN 2013

Wyandotte I035 I-35/18TH EXPRESSWAY INTERCHANGE 0.0 Signing 122 SM-SLR 2014

Wyandotte I070 5 BRIDGES ON I-70 AND I-670 IN KANSAS CITY 0.0 Bridge Repair 514 SM-BSR 2016

Wyandotte I070 BRIDGE ON I-70, LOCATED APPROXIMATELY 0.5 MILE WEST OF THE I-70/I-635 JUNCTION

0.0 Bridge Repair 642 SM-BSR 2016

Wyandotte I070 I-70 FROM JUST WEST OF 110TH STREET EAST TO JUST WEST OF THE I-70 AND I-435 JUNCTION

1.4 Overlay 1,345 SM-ISR 2014

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-23 (Projects completed in FY 2017)

Page 51: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Wyandotte I070 I-70 AT THE K-7 INTERCHANGE - Preliminary Engineering - SE-IRC 2016

Wyandotte I070 I-70 AT THE RIVERVIEW AVENUE OVERPASS 0.9 MILES EAST OF K-7 0.0 Grade, Bridge and Surfacing 4,467 SE-IRC 2013

Wyandotte I070 K-7 AND KANSAS AVENUE PROPOSED INTERCHANGE - Right Of Way Only - MM-COR 2009

Wyandotte I070 LEWIS AND CLARK VIADUCT IN KANSAS CITY KANSAS 0.3 Location Study - SM-PBR 2014

Wyandotte I070 VARIOUS LOCATIONS ON I-70 4.1 3in Overlay 5,942 SM-ISR 2013

Wyandotte I070 WEST HALF OF I-70 AND K-7 INTERCHANGE 1.5 Seeding, Sodding 113 SE-IRC 2015Wyandotte I435 I-435 LOCATED AT THE KANSAS/MISSOURI RIVER BRIDGE 0.0 Special 26 SM-NHP 2017Wyandotte I435 4 BRIDGES ON I-435 AT THE I-435/I-70 JUNCTION 0.0 Bridge Repair 2,008 SM-BSR 2016

Wyandotte I435 I-435 INTERCHANGES AT PARALLEL PARKWAY AND K-5/LEAVENWORTH ROAD 0.0 Signing 186 SM-SLR 2014

Wyandotte I635 BRIDGE #46 ON I-635 LOCATED JUST NORTH OF THE I-635/I-70 JUNCTION (ORVILLE AVENUE OVER I-635)

0.0 Bridge Repair 196 SM-BSR 2017

Wyandotte I635 I-635 BETWEEN MERRIAM DRIVE AND SHAWNEE DRIVE 0.0 Lighting 131 SM-SLR 2014

Wyandotte I635 REDECK BRIDGES #048 AND #049 ON I-635 AT THE I-635/STATE AVENUE JUNCTION 0.0 Bridge Deck 2,000 SM-PDR 2013

Wyandotte K005 K-5 FROM THE US-69/K-5 JUNCTION WEST TO THE NORTH I-635/K-5 JUNCTION 2.2 Pavement Patching 1,243 SM-CMN 2014

Wyandotte K007 CULVERT ON K-7 LOCATED 1 MILE NORTH OF THE K-7/K-32 JUNCTION 0.0 Culvert 921 SM-CMN 2013

Wyandotte U069 US-69 (18TH STREET) FROM THE ROELAND PARK CITY LIMIT ASPHALT ON SOUTH END TO HUMP YARD BRIDGE ON THE NORTH END

3.4 Ultra Thin Bonded Asphalt Surfacing 838 SM-1RR 2015

Wyandotte U069 BRIDGE #142 ON US-69 AT K-32/UP AND KCS RAILROADS 0.0 Bridge Repair 245 SM-BSR 2014

Wyandotte U073 US-73 AND K-7 INTERSECTION ANALYSIS 7.0 Preliminary Engineering - MM-COR 2017

Statewide DIST MAINTENANCE CONTRACT FOR MAINTENANCE STATEWIDE - Special 32 SM-CMN 2016

Statewide DISTRICT WIDE, DISTRICT 1 - Preliminary Engineering - SM-1RR 2016

Statewide DISTRICT WIDE, DISTRICT 2 - Preliminary Engineering - SM-1RR 2016

Statewide DISTRICT WIDE, DISTRICT 3 - Preliminary Engineering - SM-1RR 2016

Statewide DISTRICT WIDE, DISTRICT 4 - Preliminary Engineering - SM-1RR 2016

Statewide DISTRICT WIDE, DISTRICT 5 - Preliminary Engineering - SM-1RR 2016

Statewide DISTRICT WIDE, DISTRICT 6 - Preliminary Engineering - SM-1RR 2016

Statewide DISTRICTS 3, 2 AND 6 FOR SNOW GATES - Special 142 MM-SAF 2008

Statewide ECONOMIC RESEARCH STATEWIDE - Preliminary Engineering - SE-EDP 2016

Statewide FINNEY COUNTY AND 18 SURROUNDING COUNTIES IN SOUTHWEST KANSAS - Intelligent Transportation Sys - SE-ITS 2017

Statewide HEADQUARTERS FOR COMPLETION OF THE SHSP - Preliminary Engineering - MM-SAF 2011

Statewide I-35 RAMP METERING - Intelligent Transportation Sys 609 SE-ITS 2016

Statewide I-70, I-470, US-75 IN TOPEKA AND I-70/K-99 INTERCHANGE ELECTRONIC SIGNS AND CAMERAS

- Intelligent Transportation Sys 358 SE-ITS 2014

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-24 (Projects completed in FY 2017)

Page 52: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Statewide KANSAS CITY METRO SCOUT COMMUNICATION NETWORK DESIGN - Intelligent Transportation Sys - SE-ITS 2017

Statewide KANSAS CITY METRO REGION - Funds Only - LC-RES 2017

Statewide KANSAS CITY METRO REGION - Funds Only - LC-RES 2016

Statewide KANSAS CITY METRO REGION - Funds Only - LC-RES 2017

Statewide KANSAS CITY METRO REGION - Funds Only - LC-RES 2017

Statewide KANSAS CITY METRO REGION - Funds Only - LC-RES 2017

Statewide KANSAS CITY, TOPEKA, WICHITA AND SALINA METRO AREAS - Preliminary Engineering - SE-ITS 2017

Statewide MANUAL FOR DEVELOPMENT OF WORK ZONE TRAFFIC CONTROL PLANS - Special - MM-SAF 2008

Statewide STATEWIDE- PIN AND HANGER BRIDGE INSPECTION - Location Study - LC-RES 2016

Statewide STATEWIDE- KDOT WORK ZONE SAFETY PUBLIC AWARENESS CAMPAIGN - Preliminary Engineering - MM-MPR 2015

Statewide STATEWIDE- PLAN REVIEW OF ROUNDABOUTS - Preliminary Engineering - MM-SAF 2018

Statewide STATEWIDE- PAVEMENT MARKING PROJECTS FOR FY 2010 - Pavement Marking - SM-PMR 2010

Statewide STATEWIDE- KCA SPONSORED SKILLED LABOR TRAINING PROGRAM FY 2016 - Preliminary Engineering - SM-ISR 2016

Statewide STATEWIDE- PAVEMENT MARKING RESEARCH - Special - MM-SAF 2012

Statewide STATEWIDE-SAFETEA-LU REAL TIME RULE SELF-CERTIFICATION PLAN - Intelligent Transportation Sys - SE-ITS 2017

Statewide STATEWIDE- WALKING SCHOOL BUS PROGRAM - Preliminary Engineering - LC-SRT 2017

Statewide STATEWIDE-PURCHASE ELONGATED PAVEMENT MARKING WARNING SIGNS - Special - MM-SAF 2018

Statewide STATEWIDE- DEVELOPMENT OF STANDARD DRAWINGS FOR LOW-COST BRIDGES - Funds Only - LC-RES 2016

Statewide STATEWIDE- ECONOMIC DEVELOPMENT MARKETING MATERIALS - Preliminary Engineering - SE-EDP 2017

Statewide STATEWIDE- PORTABLE RUMBLE STRIPS FOR KDOT MAINTENANCE CREWS - Special - MM-GSI 2017

Statewide STATEWIDE- SIGN AND LIGHT TOWER INSPECTION - Preliminary Engineering - SM-SLR 2014

Statewide STATEWIDE - ADMINISTRATION OF THE SCENIC BYWAY PROGRAM FY 2016 - Scenic Or Historic Hwy Progs - MM-SBW 2016

Statewide STATEWIDE - FISCAL YEAR 2015 1R PROJECTS THROUGH CITIES ONLY - Preliminary Engineering - SM-1RR 2015

Statewide STATEWIDE - FISCAL YEAR 2016 1R PROJECTS THROUGH CITIES ONLY - Preliminary Engineering - SM-1RR 2016

Statewide STATEWIDE - KDOT DIVISION OF ENGINEERING AND DESIGN - Preliminary Engineering - MM-MPR 2016

Statewide STATEWIDE - STORMWATER INSPECTION OF CLOSED PROJECTS FOR STATE FISCAL YEAR 2016

- Special - SM-NHP 2016

Statewide STATEWIDE HIGHWAY SIGNING MASTER PROJECT FOR FISCAL YEAR 2012 - Signing - SM-SOS 2012

Statewide STATEWIDE INTERSTATES AND FREEWAYS LOGO SIGNING AND TOURIST ORIENTED DIRECTIONAL SIGNS (TODS)

- Signing 2,650 MM-RIM 2008

Statewide STATEWIDE ON ALL FEDERAL AND STATE HIGHWAYS - Preliminary Engineering - MM-SAF 2008

Statewide STATEWIDE PE FOR RAILROAD INSPECTIONS - Flashing Light Signal - LC-RRX 2016

Statewide UPDATE KDOT ROUNDABOUT GUIDE - Preliminary Engineering - MM-SAF 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-25 (Projects completed in FY 2017)

Page 53: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location DescriptionLength (Miles) Type of Work

Est FY Const. Cost

(1,000's)Prog Cat and

SubcatFiscal Year

Statewide US-56, US-160, K-144 IN GRAY AND HASKELL COUNTIES 60.9 Signing 138 SM-SOS 2017

Statewide VARIOUS LOCATIONS IN BROWN, LYON, OSAGE, ATCHISON, DOUGLAS AND JOHNSON COUNTIES IN DISTRICT ONE

- Mudjacking 164 SM-CMN 2017

Statewide VARIOUS LOCATIONS IN DISTRICT FIVE 17.5 Rumble Strip Installation 34 MM-SAF 2017

Statewide VARIOUS LOCATIONS IN DISTRICT FOUR 55.0 Rumble Strip Installation 56 MM-SAF 2017

Statewide VARIOUS LOCATIONS IN DISTRICT TWO: CLOUD COUNTY; ELLSWORTH COUNTY; GEARY COUNTY AND WASHINGTON COUNTY

- Milling 11 SM-1RR 2017

Statewide VARIOUS LOCATIONS IN KDOT'S DISTRICT FOUR 218.1 Signing 249 SM-SOS 2011

Statewide VARIOUS LOCATIONS IN KDOT'S DISTRICT ONE. 328.4 Signing 797 SM-SOS 2011

Statewide VARIOUS LOCATIONS IN KDOT'S DISTRICT TWO. 338.8 Signing 156 SM-SOS 2012

Statewide VARIOUS LOCATIONS IN SHAWNEE, JEFFERSON, LYON AND JOHNSON COUNTIES - Milling 9 SM-1RR 2016

Statewide VARIOUS LOCATIONS IN THE NORTHEAST DISTRICT - Special 390 SM-1RR 2014

Statewide VARIOUS LOCATIONS IN THE SOUTHEAST DISTRICT - Milling 11 SM-1RR 2014

StatewideVARIOUS LOCATIONS ON US-54 IN PRATT, SEDGWICK AND BUTLER COUNTIES; K-96 IN RENO AND SEDGWICK COUNTIES; I-135 IN SEDGWICK COUNTY; US-77 IN SUMNER COUNTY; K-254 IN BUTLER COUNTY AND US-400 IN BUTLER COUNTY

- Milling 91 SM-1RR 2016

Statewide I070 DISTRICT THREE ON I-70 IN SHERMAN, THOMAS, GOVE, TREGO AND ELLIS COUNTIES 175.0 Signing 610 SM-SOS 2011

Statewide I070 I-70 IN ELLSWORTH, LINCOLN, SALINE, DICKINSON, AND GEARY COUNTIES 117.0 Signing 1,269 SM-SOS 2013

Statewide K007 K-7 IN JOHNSON AND WYANDOTTE COUNTIES 27.0 Preliminary Engineering - MM-COR 2017

Statewide K009 VARIOUS LOCATIONS IN KDOT'S DISTRICT THREE. 194.1 Signing 91 SM-SOS 2012

Statewide K156 K-156 IN BARTON AND PAWNEE COUNTIES AND K-264 IN PAWNEE COUNTY 70.8 Signing - SM-SOS 2012

Statewide K156 K-156: HODGEMAN AND FINNEY COUNTIES 75.8 Signing - SM-SOS 2012

Statewide U036

US-36 IN MARSHALL, NEMAHA, BROWN AND DONIPHAN COUNTIES, K-87 IN MARSHALL COUNTY, K-110 IN MARSHALL COUNTY, K-178 IN NEMAHA COUNTY, K-187 IN NEMAHA COUNTY, K236 IN NEMAHA COUNTY, K-120 IN DONIPHAN COUNTY, K-136 IN DONIPHAN COUNTY AND K-238 IN DONIPHAN COUNTY (ALL IN DISTRICT ONE)

110.1 Signing 580 SM-SOS 2012

Statewide U036

US-36 IN CHEYENNE, DECATUR, PHILLIPS, RAWLINS, AND SMITH COUNTIES; K-8 IN SMITH COUNTY; K-67 NORTON COUNTY; K-121 IN PHILLIPS COUNTY, K-182 IN SMITH COUNTY; K-204 IN SMITH COUINTY, K-248 IN SMITH COUNTY; K-261 IN NORTON COUNTY; K-117 IN RAWLINS COUNTY; K-161 IN CHEYENNE COUNTY; K217 IN CHEYENNE COUNTY; K-383 IN NORTON AND PHILLIPS COUNTIES; K-60 IN NORTON

317.8 Signing 209 SM-SOS 2013

Statewide U036 VARIOUS LOCATIONS IN KDOT DISTRICT TWO 174.6 Signing - SM-SOS 2013

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is provided preceding the project lists. C-26 (Projects completed in FY 2017)

Page 54: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Allen BRIDGE LOCATED 0.8 MILE NORTH AND 1.0 MILE WEST OF PETROLIA ON 600 STREET 0.2 Bridge Replacement 178 LC-LBT 2017

Allen UPRR AND MINNESOTA ROAD 3 MILES SOUTH OF MORAN - Flashing Light Signal 282 LC-RXR 2018

Allen U054 PAVEMENT MARKING IN ALLEN COUNTY 5.4 Pavement Marking 125 SM-PMR 2017

Anderson UPRR AND 1100 ROAD 0.5 MILE EAST OF WESTPHALIA - Flashing Light Signal 251 LC-RXR 2018

Anderson UPRR AND NE 1900 ROAD NORTHEAST OF GARNETT - Flashing Light Signal 483 LC-RXR 2018

Anderson UPRR AND NORTHEAST 2250 ROAD 1 MILE SOUTHWEST OF GREELEY - Flashing Light Signal 238 LC-RXR 2018

Anderson UPRR AND NORTHEAST THOMAS ROAD SOUTHWEST OF GREELEY - Flashing Light Signal 245 LC-RXR 2017

Anderson UPRR AND SOUTHWEST COLORADO ROAD 1.5 MILES NORTHEAST OF WESTPHALIA - Flashing Light Signal 265 LC-RXR 2018

Anderson U059 US-59 AND HOME RUN DRIVE IN GARNETT 0.5 Grade and Surfacing 319 MM-COR 2017

Atchison 2.5 MILES SOUTH AND 0.5 MILE EAST OF ATCHISON 0.2 Bridge Replacement 636 LC-RES 2017

Atchison 800 BLOCK OF COMMERCIAL STREET IN ATCHISON 0.3 Landscaping and Beautification 944 LC-TEX 2018

Atchison PEDESTRIAN AND AND BICYCLE PATHS ALONG US-73 IN ATCHISON - Pedestrian and Bicycle Paths 1,405 LC-TEX 2017

Atchison VARIOUS MAJOR COLLECTORS IN THE COUNTY 171.0 Signing 204 LC-RES 2018

Atchison U073 US-73 FROM U STREET TO 274TH STREET SOUTH-BOUND LANES ONLY IN ATCHISON 0.6 Grade and Surfacing 1,279 LC-K3R 2017

Barber U160 US-160 BEGINNING AT THE EAST EDGE OF WEARING SURFACE OF BRIDGE #041 EAST TO THE BARBER/HARPER COUNTY LINE 13.2 Milling and Overlay 2,380 SM-1RR 2017

Barber U281 US-281 BEGINNING AT US-160/US-281 JUNCTION NORTH TO THE BARBER/PRATT COUNTY LINE 16.2 Overlay 1,640 SM-1RR 2017

Barton AT NORTHEAST 30TH ROAD AND NORTHEAST 10TH AVENUE - Flood Damage 7 LC-LOC 2016

Barton AT NORTHEAST 30TH ROAD AND NORTHEAST 70TH AVENUE - Flood Damage 41 LC-LOC 2016

Barton AT NORTHEAST 30TH ROAD AND NORTHEAST 90TH AVENUE - Flood Damage 8 LC-LOC 2016

Barton K-4 OVERLOOK OF THE CHEYENNE BOTTOMS - Landscaping and Beautification 191 LC-TEX 2017

Barton NORTHWEST 130TH AVENUE AND NORTHWEST 80TH ROAD - Flood Damage 8 LC-LOC 2016

Barton ON NORTHEAST 30TH ROAD EAST OF NORTHEAST 80TH AVENUE - Flood Damage 48 LC-LOC 2016

Barton ON WEST BARTON COUNTY ROAD NEAR NORTHWEST 140TH AVENUE - Flood Damage 22 LC-LOC 2016

Barton U056 BRIDGE #005 LOCATED 6 MILES EAST OF US-56/K-156 JUNCTION AND IN THE CITY OF ELLINWOOD 1.7 Bridge Replacement 12,267 SM-RIP 2016

Barton U056 US-56 BEGINNING AT THE 2 LANE/4 LANE TRANSITION ON THE EAST SIDE OF ELLINWOOD EAST TO THE BARTON/RICE COUNTY LINE 4.7 Milling And Overlay 589 SM-1RR 2017

PROJECTS UNDER CONSTRUCTION

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-1 (Projects Under Construction as of 12/28/2016)

Page 55: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Barton U056 US-56 IN THE CITY OF ELLINWOOD 0.4 Special 2,466 SM-RIP 2016

Barton U281 US-281 FROM 2ND STREET TO 10TH STREET AND 19TH STREET TO 24TH STREET IN GREAT BEND 0.8 Milling and Overlay 558 LC-LOC 2017

Bourbon BNSF AND DEER ROAD 1 MILE SOUTH OF GARLAND - Flashing Light Signal 262 LC-RXR 2018

Bourbon BNSF AND WAGON ROAD 1 MILE SOUTHWEST OF FULTON - Flashing Light Signal 359 LC-RXR 2017

Bourbon CITY OF FORT SCOTT - Pedestrian and Bicycle Paths 296 LC-SRT 2017

Bourbon MAPLE ROAD BETWEEN 205TH STREET AND THE CITY LIMITS OF FT SCOTT 1.1 Shoulders 431 LC-RES 2017

Bourbon K003 K-3BEGINNING AT THE CRAWFORD/BOURBON COUNTY LINE NORTH TO EAST K-39 JUNCTION 3.0 Milling And Overlay 216 SM-1RR 2018

Bourbon U054 PAVEMENT MARKING ON US-54 IN BOURBON COUNTY 3.5 Pavement Marking 55 SM-PMR 2017

Bourbon U069 BOURBON/CRAWFORD COUNTY LINE NORTH TO THE 2L/4L SECTION (6.0 MILES NORTH OF CRAWFORD/BOURBON COUNTY LINE) 6.0 Grade, Bridge and Surfacing 21,025 SE-RIC 2017

Bourbon U069 INTERSECTION OF US-69 AND 23RD STREET AND INTERSECTION OF US-69 AND 18TH STREET IN FORT SCOTT 0.5 Surfacing 2,064 LC-RES 2016

Bourbon U069 US-69 AND HICKORY ROAD IN FORT SCOTT 0.4 Intersection Improvement 796 MM-COR 2016

Bourbon U069 US-69 FROM SOUTH NATIONAL TO 23RD STREET IN FORT SCOTT 0.4 Grade and Surfacing 811 LC-RES 2016

Brown DOWNTOWN HIAWATHA - Landscaping and Beautification 860 LC-TEX 2017

Brown UPRR AND 340TH STREET 2 MILES NORTH OF RESERVE - Flashing Light Signal 389 LC-RXR 2018

Brown UPRR AND KINGFISHER ROAD NORTH OF HIAWATHA - Flashing Light Signal 493 LC-RXR 2018

Brown K246 K-246 BEGINNING AT US-75/K-246 JUNCTION EAST TO THE WEST CITY LIMITS OF MORRILL (ENTIRE ROUTE) 5.6 Heater Scarification (no overlay) 263 SM-1RR 2017

Brown U075 US-75 FROM THE EAST US-36 JUNCTION NORTH TO 1.0 MILE NORTH OF SABETHA 7.4 Recycle and O-lay 1,223 SM-1RR 2017

Butler BNSF AND 50TH STREET 4 MILES SOUTHWEST OF EL DORADO - Flashing Light Signal 428 LC-RXR 2017

Butler BNSF AND KICKAPOO ROAD 3 MILES SOUTHWEST OF EL DORADO - Flashing Light Signal 248 LC-RXR 2017

Butler FOUR MILE CREEK TO SOUTHWEST 120TH STREET 0.7 Grade and Surfacing 5,809 LC-RES 2018

Butler OHIO STREET FORM 150 FEET NORTHEAST OF FRISCO AND DEARBORN TO 15TH AVENUE IN AUGUSTA 0.8 Grade and Surfacing 3,128 LC-RES 2017

Butler UPRR AND SOUTHWEST ADAMS ROAD 1.5 MILES WEST OF TOWANDA - Flashing Light Signal 271 LC-RXR 2018

Butler K196 K-196: BRIDGES #057 (DRY CREEK), #059 (WHITEWATER RIVER) 0.0 Bridge Replacement 3,127 SM-PBR 2016

Butler K254 K-254 FROM BOYER ROAD TO DIAGONAL ROAD (EAST BOUND) AND BOYER ROAD TO SCHOOL ROAD (WEST BOUND) 0.3 Surfacing 200 LC-K1R 2017

Butler K254 US-254 FROM JONES TO SUMMIT 0.4 Milling and Overlay 600 LC-K1R 2017

Butler U054 US-54 FROM US-400 NORTH 8 MILES TO THE 4 LANE DIVIDE/2 LANE (EASTBOUND LANES) 8.4 Ultra Thin Bonded Asphalt Surfacing 611 SM-1RR 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-2 (Projects Under Construction as of 12/28/2016)

Page 56: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Butler U054 US-54 FROM WEST CITY LIMITS TO WEST OF WALNUT STREET IN AUGUSTA 0.5 Milling and Overlay 449 LC-K1R 2016

Butler U400 US-400 FROM 1 MILE EAST OF LEON TO THE BUTLER/GREENWOOD COUNTY LINE 13.8 Milling and Overlay 1,284 SM-1RR 2017

Chase U050 PAVEMENT MARKING ON US-50 2.0 Pavement Marking 50 SM-PMR 2018

Chase U050 US-50 FROM 8.8 MILES EAST OF THE CHASE/MARION COUNTY LINE FOR 4.5 MILES EAST 4.4 Milling and Overlay 1,030 SM-1RR 2016

Cherokee BRIDGE LOCATED 2.0 MILES NORTH AND 1.3 MILES WEST OF MELROSE 0.2 Bridge Replacement 178 LC-LBT 2017

Cherokee BNSF AND BLACK JACK ROAD 2 MILES NORTHWEST OF BAXTER SPRINGS - Flashing Light Signal 360 LC-RXR 2018

Cherokee K007 K-7 FROM COLUMBUS NORTH TO THE COUNTY LINE 11.1 Grade, Bridge and Surfacing 36,215 MM-RIM 2016

Cherokee K066 K-66 BEGINNING AT THE K-66/US-400 JUNCTION EAST TO THE STATE LINE 5.4 Milling and Overlay 981 SM-1RR 2018

Cherokee U069 US-69 BEGINNING AT THE OKLAHOMA/KANSAS STATE LINE NORTH TO US-166 JUNCTION 2.2 Milling and Overlay 269 SM-1RR 2018

Cherokee U069A US-69A FROM 3RD STREET TO 9TH STREET 0.4 Grade and Surfacing 424 LC-K3R 2017

Cherokee U160 US-160 BRIDGE OVER THE NEOSHO RIVER LOCATED JUST EAST OF THE COUNTY LINE 0.0 Special 997 SM-CMN 2017

Cherokee U400 US-400 BEGINNING AT US-69A/US-400 JUNCTION EAST TO US-166 JUNCTION 3.1 Milling and Overlay 303 SM-1RR 2018

Cheyenne K161 K-161 BEGINNING AT THE US-36 JUNCTION NORTH FOR 17 MILES TO THE NEBRASKA STATE BORDER 17.0 Milling and Overlay 2,870 SM-1RR 2018

Cheyenne U036 US-36 BEGINNING AT THE KANSAS STATE LINE EAST 18.6 MILES TO THE EAST K-27/US-36 JUNCTION 18.6 Milling and Overlay 2,751 SM-1RR 2017

Clark U054 US-54 BEGINNING AT THE MEADE/CLARK COUNTY LINE NORTH EAST TO THE CLARK/FORD COUNTY LINE 10.1 Crack Repair 130 SM-1RR 2016

Clark U283 US-283 FROM NORTH OF NORTH CITY LIMITS MINNEOLA NORTH TO CLARK/FORD COUNTY LINE 1.6 Milling and Overlay 198 SM-1RR 2018

Clay BNSF AND CHEROKEE ROAD 2 MILES NORTH OF LONGFORD - Flashing Light Signal 290 LC-RXR 2018

Clay BRIDGE ON 2ND ROAD WEST OF INDUSTRY OVER BASKET CREEK 0.2 Bridge Replacement 240 LC-RES 2018

Clay U024 US-24 FROM CLAY CENTER EAST TO THE COUNTY LINE 8.1 Milling and Overlay 1,939 SM-RIP 2016

Cloud BNSF AND ROCK ROAD SOUTHEAST OF CONCORDIA - Flashing Light Signal 249 LC-RXR 2017

Cloud BNSF AND WEST ASH STREET AT MILTONVALE - Flashing Light Signal 202 LC-RXR 2017

Cloud MULTIUSE TRAIL IN CONCORDIA - Pedestrian and Bicycle Paths 343 LC-TEX 2017

Cloud K009 BRIDGE #029 AND #026 ON K-9 0.0 Bridge Repair 490 SM-BSR 2017

Cloud K028 K-28 BEGINNING AT THE WEST COUNTY LINE EAST TO K-9/K-28 JUNCTION 14.9 Milling and Overlay 1,217 SM-1RR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-3 (Projects Under Construction as of 12/28/2016)

Page 57: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Cloud U081 INTERSECTION OF US-81 AND UNION ROAD 0.1 Traffic Study-intersection - MM-SAF 2018

Cloud U081 VARIOUS SECTIONS OF US-81 IN THE COUNTY 9.7 Milling and Overlay 9,957 SM-RIP 2014

Coffey 200 FEET EAST OF 16TH ROAD AND ANGUS ROAD ON RS-0148 - Flood Damage 37 LC-LOC 2016

Coffey DOWNTOWN ON BROADWAY STREET IN LEBO 0.1 Landscaping and Beautification 1,020 LC-TEX 2018

Coffey I035 I-35 FROM MILE MARKER 154.766 NORTH TO THE COFFEY/OSAGE COUNTY LINE 1.7 Pavement Patching 35 SM-ISR 2017

Coffey I035 PAVEMENT MARKING IN COFFEY COUNTY 2.6 Pavement Marking 98 SM-PMR 2017

Comanche MAJOR COLLECTORS IN THE COUNTY 70.0 Signing 152 LC-RES 2017

Cowley 12TH STREET WEST OF K-360 IN WINFIELD - Grade and Surfacing 1,118 SE-EDP 2017

Cowley 4.0 MILES SOUTH AND 0.2 MILE WEST OF OTTO 0.2 Bridge Replacement 178 LC-LBT 2017

Cowley APPROXIMATELY 135 FEET SOUTH OF THE INTERSECTION WITH HIGHWAY US-166 TO AREA BY 2ND BOAT RAMP ON THE COWLEY COUNTY STATE LAKE DAM 0.2 4in Overlay 76 SM-1RR 2018

Cowley BNSF AND 42ND ROAD 2 MILES NORTHWEST OF UDALL - Flashing Light Signal 213 LC-RXR 2018

Cowley U077 US-77 FROM THE INTERSECTION WITH US-166 SOUTH TO THE ARKANSAS RIVER BRIDGE IN ARKANSAS CITY 0.6 Milling and Overlay 600 LC-K1R 2017

Cowley U160 US-160 FROM LOOMIS STREET TO COLLEGE STREET AND US-77 FROM 6TH AVENUE TO MANNING STREET IN WINFIELD 1.2 Milling and Overlay 600 LC-K1R 2017

Crawford BNSF AND 540TH AVENUE 3 MILES NORTH OF CHEROKEE - Flashing Light Signal 380 LC-RXR 2018

Crawford BNSF AND 570TH AVENUE 4 MILES SOUTH OF GIRARD - Flashing Light Signal 443 LC-RXR 2018

Crawford BNSF AND 600 AVENUE 1 MILE SOUTH OF GIRARD - Flashing Light Signal 363 LC-RXR 2018

Crawford BNSF AND ELM STREET IN GIRARD - Flashing Light Signal 392 LC-RXR 2016

Crawford BNSF AND FOREST STREET IN GIRARD - Flashing Light Signal 307 LC-RXR 2017

Crawford BNSF AND MAGNOLIA STREET IN GIRARD - Flashing Light Signal 436 LC-RXR 2016

Crawford BNSF AND ORANGE STREET IN GIRARD - Flashing Light Signal 249 LC-RXR 2016

Crawford BNSF AND WILLOW STREET IN GIRARD - Flashing Light Signal 308 LC-RXR 2016

Crawford STREETSCAPE IN DOWNTOWN GIRARD - Landscaping and Beautification 1,598 LC-TEX 2016

Crawford K003 K-3 BEGINNING AT K-47 JUNCTION NORTH TO THE CRAWFORD/BOURBON COUNTY LINE 11.5 Milling and Overlay 645 SM-1RR 2018

Crawford K047 BNSF AND K-47 AT ST. JOHN STREET IN GIRARD 0.0 Flashing Light Signal 247 LC-RRX 2017

Crawford K126 K-126 FROM KCS OVERPASS TO FREE KING HIGHWAY IN PITTSBURG 1.4 Milling and Overlay 594 LC-K1R 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-4 (Projects Under Construction as of 12/28/2016)

Page 58: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Decatur K383 K-383 BEGINNING AT THE SHERIDAN/DECATUR COUNTY LINE EAST 14 MILES TO THE WEST CITY LIMITS OF JENNINGS 14.1 Milling and Overlay 1,551 SM-1RR 2017

Decatur U036 US-36 BEGINNING AT THE RAWLINS/DECATUR COUNTY LINE EAST 10.9 MILES TO THE START OF THE PORTLAND CEMENT CONCRETE PAVEMENT IN OBERLIN 11.0 Milling and Overlay 1,299 SM-1RR 2017

Dickinson BNSF AND 3400 AVENUE AT MANCHESTER - Flashing Light Signal 209 LC-RXR 2017

Dickinson K015 K-15 BEGINNING AT K-15/1400 AVENUE (1.81 MILES NORTH OF RS 191) NORTH TO THE SOUTH CITY LIMITS OF ABILENE 5.8 Sealing 786 SM-1RR 2018

Dickinson U056 US-56 BEGINNING AT THE US-56/US-77 JUNCTION EAST TO THE DICKINSON/MORRIS COUNTY LINE 0.1 Sealing 3 SM-1RR 2018

Dickinson U056 US-56 FROM THE SOUTH COUNTY LINE NORTH TO THE US-56/US-77 JUNCTION 4.3 Milling and Overlay 1,312 SM-RIP 2016

Doniphan 1.25 MILES WEST OF K-20 ON 160TH ROAD - Flood Damage 21 LC-LOC 2016

Doniphan 3.5 MILES NORTH OF US-36 AND 150 FEET SOUTHWEST OF OXIDE ROAD ON OTTUMWA ROAD - Flood Damage 81 LC-LOC 2016

Doniphan MAJOR COLLECTORS IN THE COUNTY 211.0 Signing 202 LC-RES 2018

Doniphan K007 K-7 BEGINNING AT THE K-7/K-20 JUNCTION NORTH TO 1.6 MILES NORTH OF THE US-36/K-7 JUNCTION 5.6 Heater Scarification (no overlay) 382 SM-1RR 2017

Douglas K010 K-10 AT US-59/CR 458 0.0 Traffic Signals 209 SE-RIC 2017

Douglas K010 K-10 AT US-40 SOUTH AND EAST TO US-59 7.2 Intersection Improvement - SE-RIC 2018

Douglas K032 K-32 BEGINNING AT US-24/K-32 JUNCTION EAST TO THE DOUGLAS/LEAVENWORTH COUNTY LINE 0.2 Milling and Overlay 37 SM-1RR 2017

Douglas U024 PAVEMENT MARKING IN DOUGLAS COUNTY 6.6 Pavement Marking 108 SM-PMR 2018

Douglas EUDORA SOUTH TRAIL 0.7 Pedestrian and Bicycle Paths 355 LC-TEX 2017

Douglas HARVARD AND WAKARUSA IN LAWRENCE - Roundabout 1,825 LC-HAZ 2018

Douglas K-10 CONNECTION FROM SOUTH US-59/K-10 JUNCTION EAST TO K-10 - Special - SE-RIC 2019

Douglas WEST LAWRENCE TRAFFIC SIGNAL TIMING - Intelligent Transportation Sys - SE-ITS 2018

Douglas US-59 AND SOUTH LAWRENCE TRAFFICWAY IN LAWRENCE KS - Preliminary Engineering - MM-COR 2018

Douglas U024 US-24 BEGINNING AT THE K-32/US-24 JUNCTION EAST TO THE DOUGLAS/LEAVENWORTH COUNTY LINE 0.2 Milling and Overlay 41 SM-1RR 2017

Douglas U059 PAVEMENT MARKING ON US-59 1.2 Pavement Marking 122 SM-PMR 2018

Edwards U050 US-50 BEGINNING AT THE WEST CITY LIMITS OF KINSLEY EAST TO THE EDWARDS/STAFFORD COUNTY LINE 22.8 Milling and Overlay 5,819 SM-1RR 2017

Edwards U056 US-56 BEGINNING AT THE US-50/US-56 JUNCTION NORTH TO THE EDWARDS/PAWNEE COUNTY LINE 8.0 Milling and Overlay 1,520 SM-1RR 2017

Edwards U056 US-56 THROUGH THE CITY OF KINSLEY 1.3 Pavement Reconstruction 5,130 SM-RIP 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-5 (Projects Under Construction as of 12/28/2016)

Page 59: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Elk ALL MAJOR COLLECTORS EAST OF K-99 EXCEPT RS 228 FROM US-160 TO RS 1624 127.0 Signing 127 LC-RES 2018

Elk MAJOR COLLECTORS IN THE COUNTY 74.0 Signing 85 LC-RES 2018

Ellis BRIDGE ON NORTH COUNTY LINE ROAD OVER TOMCAT CREEK 0.2 Bridge Replacement 224 LC-RES 2017

Ellis MAJOR AND MINOR COLLECTORS IN THE COUNTY 73.0 Signing 126 LC-LOC 2017

Ellis I070 BRIDGES #38 AND #39 ON I-70 LOCATED 3.62 MILES EAST OF JUNCTION K-255 0.0 Bridge Deck 2,021 SM-PDR 2016

Ellis I070 I-70 AND ELLIS AVENUE 0.0 Flood Damage 25 SM-EMR 2017

Ellis U183 TRAFFIC STUDY ON US-183 IN HAYS 0.5 Preliminary Engineering - MM-COR 2019

Ellsworth BRIDGE ON LOCAL ROAD 314 OVER LOSS CREEK 0.2 Bridge Replacement 316 LC-RES 2018

Ellsworth I070 PAVEMENT MARKING IN ELLSWORTH COUNTY 23.2 Pavement Marking 637 SM-PMR 2018

Ellsworth K111 K-111 FROM THE NORTH CITY LIMITS OF KANOPOLIS NORTH TO K-156 JUNCTION 5.3 Milling and Overlay 442 SM-1RR 2017

Ellsworth K141 K-141 BEGINNING AT THE K-4/K-141 JUNCTION NORTH TO K-141/K-140 JUNCTION 13.5 Milling and Overlay 1,067 SM-1RR 2017

Ellsworth K156 K-156 FROM THE K-156/K-140 JUNCTION NORTHEAST TO THE K-156/I-70 JUNCTION 10.7 Milling and Overlay 2,272 SM-1RR 2016

Finney ALONG K-156 AND LESLIE ROAD IN GARDEN CITY - Pedestrian and Bicycle Paths 749 LC-TEX 2016

Finney CITY OF HOLCOMB (SAFE ROUTES TO SCHOOL) - Pedestrian and Bicycle Paths 334 LC-SRT 2018

Finney K156 K-156 FROM MAIN STREET TO THIRD STREET IN GARDEN CITY 0.3 Grade and Surfacing 1,185 LC-K3R 2017

Finney K156 K-156 FROM WEST OF BELMONT TO ANDERSON STREET IN GARDEN CITY 0.3 Concrete Pavement 1,053 LC-K1R 2017

Finney K156 K-156 FROM WEST OF CRESTWAY DRIVE TO EAST OF CRESTWAY DRIVE IN GARDEN CITY 0.2 Concrete Pavement 751 LC-K1R 2017

Finney U050 US-50 FROM THE EAST US-50/ US-83 JUNCTION EAST TO TOWNS ROAD AND US-50B FROM CAMPUS DRIVE EAST TO EAST US-50/US-83/US-50B JUNCTION 3.0 Milling and Overlay 563 SM-1RR 2018

Finney U083 US-83 BEGINNING AT THE HASKELL/FINNEY COUNTY LINE NORTH TO 2.92 MILES NORTH OF RS-247 2.9 Milling and Overlay 1,209 SM-1RR 2017

Finney U083 US-83 FROM ARKANSAS RIVER TO BNSF RAILROAD IN SOUTHEAST GARDEN CITY 0.8 Grade and Surfacing 1,462 SE-EDP 2017

Ford UPRR AND 126 ROAD 1 MILE NORTHEAST OF KINGSDOWN - Flashing Light Signal 250 LC-RXR 2018

Ford U050 US-50 AND FAIRWAY DRIVE INTERSECTION IN DODGE CITY 0.4 Intersection Improvement 1,062 LC-K3R 2017

Ford U050 US-50 BEGINNING AT THE FORD/GRAY COUNTY LINE EAST TO US-56/US-283 JUNCTION 14.8 Milling and Overlay 2,345 SM-1RR 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-6 (Projects Under Construction as of 12/28/2016)

Page 60: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Ford U283 US-283 FROM THE FORD/CLARK COUNTY LINE NORTH TO THE US-56/US-400 JUNCTION 17.1 Milling and Overlay 2,109 SM-1RR 2018

Franklin EAST 15TH STREET IN OTTAWA - Pedestrian and Bicycle Paths 232 LC-TEX 2017

Franklin I035 I-35 BEGINNING AT THE OSAGE/FRANKLIN COUNTY LINE NORTH TO MILE MARKER 195.75 27.8 Pavement Patching 2,077 SM-ISR 2017

Franklin I035 PAVEMENT MARKING ON I-35 14.3 Pavement Marking 465 SM-PMR 2017

Franklin K068 K-68 BEGINNING AT NEVADA TERRACE (RS 1164) EAST TO K-33 6.6 2in Overlay 2,530 SM-1RR 2017

Franklin K068 BRIDGE ON K-68 LOCATED 8 1/2 MILES EAST OF THE OSAGE COUNTY LINE (MARAIS DES CYGNES RIVER) 0.0 Bridge Replacement 3,839 SM-PBR 2016

Franklin K068 INTERSECTION OF K-68 AND MAIN STREET IN OTTAWA 0.1 Intersection Improvement 395 LC-K3R 2017

Franklin U059 PAVEMENT MARKING ON US-59 7.8 Pavement Marking 209 SM-PMR 2017

Geary WEST 8TH STREET IN JUNCTION CITY - Pedestrian and Bicycle Paths 982 LC-TEX 2017

Geary K057 K-57 FROM 6TH STREET NORTH TO 18TH STREET IN JUNCTION CITY 0.9 Milling and Overlay 457 LC-K1R 2017

Geary K057 K-57 BEGINNING AT I-70/K-57 JUNCTION TO THE GEARY/MORRIS COUNTY LINE 17.6 Milling and Overlay 1,257 SM-1RR 2017

Geary K177 K-177 BEGINNING 1.0 MILE SOUTH OF THE GEARY/RILEY COUNTY LINE NORTH TO THE GEARY/RILEY COUNTY LINE 1.0 Milling and Overlay 434 SM-1RR 2016

Geary K177 K-177 BEGINNING AT THE MORRIS/GEARY COUNTY LINE NORTH TO THE 2L/4L DIVIDE SOUTH OF K-177/I-70 JUNCTION 13.7 Sealing 443 SM-1RR 2018

Geary U040B3 K-57 AND J HILL ROAD INTERSECTION IN GRANDVIEW PLAZA 0.2 Intersection Improvement 297 LC-K3R 2017

Geary U077 US-77/K-18 JUNCTION APPROXIMATELY 2 MILES NORTH OF I-70 1.5 Grade, Bridge and Surfacing 16,556 SE-RIC 2016

Grant MAJOR COLLECTORS IN WESTERN HALF OF THE COUNTY 26.0 Signing 19 LC-RES 2018

Grant K025 K-25 AT THE DITCH ON WEST SIDE SOUTHWEST OF ULYSSES 0.7 Location Study - SM-NHP 2018

Gray MAJOR COLLECTORS IN THE COUNTY 81.0 Signing 48 LC-RES 2017

Gray K144 K-144 BEGINNING AT THE HASKELL/GRAY COUNTY LINE EAST TO THE US-56 JUNCTION 4.8 Milling and Overlay 884 SM-1RR 2017

Gray U050 US-50 BEGINNING AT THE EAST CITY LIMITS OF CIMARRON EAST TO THE FORD/GRAY COUNTY LINE 6.9 Milling and Overlay 825 SM-1RR 2017

Gray U050 US-50 FROM THE GRAY/FINNEY COUNTY LINE EAST TO CIMARRON 18.1 Milling and Overlay 2,597 SM-1RR 2017

Gray U056 US-56 BEGINNING AT THE GRAY/HASKELL COUNTY LINE NORTH EAST TO THE WEST CITY LIMITS OF ENSIGN 23.8 Ultra Thin Bonded Asphalt Surfacing 1,723 SM-1RR 2017

Gray U056 US-56 THROUGH THE CITY OF COPELAND 0.6 Pavement Reconstruction 2,649 SM-RIP 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-7 (Projects Under Construction as of 12/28/2016)

Page 61: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Greeley K096 K-96 FROM THE WEST CITY LIMITS OF TRIBUNE EAST TO GREELEY/WICHITA COUNTY LINE 12.1 Milling and Overlay 1,294 SM-1RR 2018

Hamilton MAJOR COLLECTORS IN THE COUNTY 103.0 Signing 85 LC-LOC 2017

Hamilton K027 K-27 BEGINNING AT THE WEST US-50 JUNCTION NORTH TO HAMILTON/GREELEY COUNTY LINE 19.9 Milling and Overlay 2,179 SM-1RR 2017

Hamilton U050 BRIDGE #010 ON US-50 LOCATED 7.49 MILES EAST OF THE HAMILTON COUNTY/STATE LINE 0.0 Bridge Replacement 1,623 SM-PBR 2018

Hamilton U050 BRIDGE #019 ON US-50 LOCATED 0.86 MILE WEST OF THE K-27 WEST JUNCTION 0.0 Bridge Replacement 1,623 SM-PBR 2018

Harper U160 3 BRIDGES ON US-160 LOCATED EAST OF THE COUNTY LINE AND 3 BRIDGES ON US-160 LOCATED WEST OF THE SOUTH US-160/K-2 JUNCTION - Bridge Replacement 9,763 SM-PBR 2016

Harvey BNSF AND NORTH ROCK ROAD 1 MILE NORTHEAST OF WALTON - Flashing Light Signal 330 LC-RXR 2017

Harvey BNSF AND NORTH HILLSIDE STREET 1 MILE NORHEAST OF NEWTON - Flashing Light Signal 353 LC-RXR 2016

Harvey BNSF AND SOUTHWEST 24TH STREET IN NEWTON - Flashing Light Signal 223 LC-RXR 2017

Harvey UPRR AND EAST 125TH STREET NORTH ON THE SEDGWICK-HARVEY COUNTY LINE - Flashing Light Signal 243 LC-RXR 2017

Harvey K196 K-196 RAILROAD GRADE CROSSING 0.5 Traffic Signals 63 MM-SAF 2018

Harvey U050 US-50 BEGINNING AT THE NORTH I-135/US-50 JUNCTION EAST 3.5 MILES 3.5 3in Overlay 1,012 SM-RIP 2018

Harvey U050 WEST CITY LIMITS OF WALTON TO THE HARVEY/MARION COUNTY LINE 8.2 Overlay 1,216 SM-1RR 2018

Haskell 0.1 MILE NORTHWEST OF US-56 ON COUNTY ROAD CC - Flood Damage 289 LC-RES 2018

Haskell K144 K-144 BEGINNING 0.79 MILES EAST OF JUNCTION US-83 EAST TO THE HASKELL/GRAY COUNTY LINE 11.2 Milling and Overlay 626 SM-1RR 2017

Haskell U083 US-83 AT THE US-83/US-56 INTERSECTION NEAR CITY OF SUBLETTE 0.3 Grade and Surfacing 4,503 SM-RIP 2015

Haskell U083 US-83 FROM 1.75 MILE SOUTH OF US-83/US-160/K-144 JUNCTION NORTH TO 4.5 MILES NORTH OF US-83/US-160/K-144 JUNCTION 6.2 Grade and Surfacing 23,729 SE-RIC 2016

Hodgeman U283 US-283 BEGINNING AT BEST STREET IN JETMORE NORTH TO THE HODGEMAN/NESS COUNTY LINE 12.1 Milling and Overlay 1,445 SM-1RR 2017

Jackson K062 K-62 FROM THE K-62/K-16 JUNCTION NORTH TO THE COUNTY LINE 7.3 Signing 6 SM-SOS 2016

Jefferson EAST OF JACKSON ROAD ON HALF MOUND ROAD - Flood Damage 127 LC-RES 2018

Jefferson FERGUSON ROAD AND WELLMAN ROAD 38.4 Signing 93 LC-RES 2017

Jefferson NORTHEAST OF OSKALOOSA AND EAST OF SALINE ROAD ON FAIRVIEW ROAD - Flood Damage 14 LC-LOC 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-8 (Projects Under Construction as of 12/28/2016)

Page 62: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Jefferson SOUTH OF 190TH STREET ON EFFINGHAM ROAD - Flood Damage 74 LC-RES 2018

Jefferson WEST OF WELLMAN ROAD ON 13TH STREET - Flood Damage 148 LC-RES 2017

Jefferson WEST OF WELLMAN ROAD ON 13TH STREET - Flood Damage 148 LC-RES 2018

Jefferson K004 K-4 FROM 1 MILE NORTHEAST OF MERIDEN 0.0 Special 215 SM-CMN 2018

Jefferson K016K-16 BEGINNING AT THE WEST COUNTY LINE EAST TO THE WEST K-4/K-16 JUNCTION, EAST TO THE K-4/K-16 JUNCTION AND THEN NORTHEAST TO THE US-59/K-16 JUNCTION

16.0 Milling and Overlay 1,198 SM-1RR 2018

Jefferson U024 PAVEMENT MARKING ON US-24 4.4 Pavement Marking 48 SM-PMR 2018

Jefferson U059 PAVEMENT MARKING ON US-59 25.0 Pavement Marking 223 SM-PMR 2018

Jewell K028 K-28 BEGINNING AT THE K-28/K-148 JUNCTION EAST TO THE EAST COUNTY LINE 8.0 Milling and Overlay 712 SM-1RR 2018

Johnson 143RD STREET FROM PFLUMM ROAD TO QUIVIRA ROAD IN OLATHE 1.0 Grade and Surfacing 7,902 LC-LOC 2017

Johnson 159TH STREET FROM OLD US-56 TO I-35 IN OLATHE 2.0 Surfacing 13,498 LC-LOC 2016

Johnson 193RD STREET AND ESSEX ROAD IN EDGERTON, KS - Concrete Pavement 2,550 SE-EDP 2017

Johnson FOUR LOCATIONS FROM THE SOUTH CEDAR CREEK PEDESTRIAN/BIKE PLAN IN OLATHE - Preliminary Engineering - LC-LOC 2018

Johnson BRIDGE OVER BNSF RAILROAD ON SHAWNEE MISSION PARKWAY IN MERRIAM 0.3 Bridge Repair 2,414 LC-RES 2017

Johnson CITY OF OLATHE FLEET EMISSIONS REDUCTION INITIATIVE - Funds Only - LC-LOC 2019

Johnson CLEAR CREEK TRAIL AND GUM SPRINGS PARK IN SHAWNEE 0.2 Pedestrian and Bicycle Paths 798 LC-TEX 2017

Johnson COFFEE CREEK FROM HALLET ROAD TO SWITZER ROAD IN THE COUNTY 1.8 Pedestrian and Bicycle Paths 2,375 LC-TEX 2016

Johnson I-435, I-35 AND K-10 JUNCTION IN NORTHEAST JOHNSON COUNTY - Preliminary Engineering - SE-IRC 2018

Johnson INTERCHANGE OF I-35/119TH STREET - Landscaping and Beautification 397 LC-TEX 2017

Johnson KANSAS CITY METRO- SCOUT EQUIPMENT REPLACEMENT PHASE 1 - Intelligent Transportation Sys 1,167 SE-ITS 2015

Johnson KANSAS CITY METRO- SCOUT EQUIPMENT REPLACEMENT PHASE 2 - Intelligent Transportation Sys 1,448 SE-ITS 2017

Johnson KANSAS CITY METRO- MOTORIST ASSISTANCE VEHICLE IMPROVEMENTS - Intelligent Transportation Sys - SE-ITS 2018

Johnson KANSAS CITY METROPOLITAN AREA- FFY 2016 OPERATION GREEN LIGHT - Intelligent Transportation Sys - SE-ITS 2018

Johnson KANSAS CITY METROPOLITAN AREA- FFY 2017-2018 OPERATION GREEN LIGHT - Intelligent Transportation Sys - SE-ITS 2019

Johnson KANSAS CITY METROPOLITAN AREA- PLANNING SUSTAINABLE PLACES PROGRAM - Funds Only - LC-LOC 2018

Johnson KANSAS CITY REGION- LOCAL SPOKES BICYCLE SAFETY EDUCATION - Funds Only - LC-RES 2018

Johnson MONTROSE STREET AND 196TH STREET IN EDGERTON, KS - Concrete Pavement 1,507 SE-EDP 2016

Johnson PENROSE LANE FROM 87TH STREET TO HAMPTON STREET 0.3 Pedestrian and Bicycle Paths 582 LC-TEX 2017

Johnson RIDGEVIEW ROAD BETWEEN COLLEGE BOULEVARD AND 106TH STREET IN OLATHE KS - Grade and Surfacing 269 SE-EDP 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-9 (Projects Under Construction as of 12/28/2016)

Page 63: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Johnson US-69 IN OVERLAND PARK KANSAS - Preliminary Engineering - MM-COR 2018

Johnson I035 I-35 NEAR BRIDGE #069 (TURKEY CREEK DRAINAGE) 0.5 Signing 134 SM-SLR 2018

Johnson I035 PAVEMENT MARKING ON I-35, US-56 AND US-169 IN THE COUNTY 9.6 Pavement Marking 402 SM-PMR 2017

Johnson I035 NORTHBOUND I-35 BETWEEN US-69 AND 75TH IN LENEXA 1.2 Preliminary Engineering - MM-COR 2018

Johnson I035 SOUTHBOUND I-35 AT RAMP TO SOUTHBOUND US 69 IN LENEXA 0.0 Signing 41 SM-SLR 2018

Johnson I435 I-435, I-35 AND K-10 JUNCTION IN NORTHEAST JOHNSON COUNTY 5.6 Preliminary Engineering - SE-IRC 2018

Johnson I435 I-435, I-35 AND K-10 JUNCTION IN NORTHEAST JOHNSON COUNTY 5.6 Grade, Bridge and Surfacing 248,426 SE-IRC 2014

Johnson I435 I-435, I-35 AND K-10 JUNCTION IN NORTHEAST JOHNSON COUNTY 5.6 Special - SE-IRC 2017

Johnson I435 I-435 FROM 0.5 MILE EAST OF THE I-435/QUIVIRA ROAD JUNCTION EAST TO METCALF AVENUE IN OVERLAND PARK 2.5 Pavement Reconstruction 16,834 SM-ISR 2017

Johnson K007 K-7 FROM I-35 NORTH TO OLD US-56 IN OLATHE 0.9 Milling and Overlay 1,077 LC-K1R 2017

Johnson K007 K-7 REALIGNMENT IN OLATHE 3.0 Preliminary Engineering - MM-COR 2018

Johnson K007 K-7/JOHNSON DRIVE/55TH STREET INTERCHANGE IN SHAWNEE 0.0 Preliminary Engineering - SE-RIC 2015

Johnson U069 US-69 IN JOHNSON COUNTY 16.9 Signing 369 SM-SOS 2018

Johnson U169 INTERSECTION OF US-169 AND 175TH STREET AND 199TH STREET 0.2 Intersection Improvement 362 MM-SAF 2017

Johnson U169 US-169 BETWEEN 48TH TERRACE AND 49TH TERRACE IN WESTWOOD HILLS 0.1 Grading 117 LC-K3R 2018

Johnson U169 US-169 BEGINNING AT THE JOHNSON/MIAMI COUNTY LINE NORTH TO 0.01 MILE SOUTH OF 175TH STREET 5.3 Overlay 3,587 SM-RIP 2018

Kiowa MAJOR COLLECTORS IN THE COUNTY 77.0 Signing 55 LC-RES 2018

Kiowa U054 US-54 FROM THE FORD/KIOWA COUNTY LINE EAST TO GREENSBURG 14.4 Milling and Overlay 2,060 SM-1RR 2017

Labette U059 US-59 FROM CRAWFORD AVENUE NORTH TO NORTH BOULEVARD IN PARSONS 0.8 Milling and Overlay 389 LC-K1R 2017

Labette U059 US-59 AND CATTLE DRIVE IN PARSONS KS 0.4 Grade and Surfacing 1,039 MM-COR 2018

Labette U400 PAVEMENT MARKING ON US-400 11.3 Pavement Marking 141 SM-PMR 2018

Labette U400 US-400 FROM APPROXIMATELY 5 MILES SOUTHEAST OF US-400/US-59 JUNCTION EAST FOR 2 MILES 2.0 Grade and Surfacing 4,153 SE-RIC 2015

Lane CITY OF DIGHTON- SAFE ROUTES TO SCHOOL - Preliminary Engineering - LC-SRT 2018

Leavenworth K032 K-32 BEGINNING AT THE DOUGLAS/LEAVENWORTH COUNTY LINE EAST TO THE WEST SIDE OF BRIDGE OVER I-70 0.5 Milling and Overlay 51 SM-1RR 2017

Leavenworth U024 PAVEMENT MARKING ON US-24 10.3 Pavement Marking 339 SM-PMR 2018

Leavenworth U024 US-24 BEGINNING AT THE DOUGLAS/LEAVENWORTH COUNTY LINE EAST TO K-16/4TH STREET JUNCTION 9.4 Milling and Overlay 790 SM-1RR 2017

Leavenworth U073 US-73 AND MARION STREET INTERSECTION IN LEAVENWORTH 0.0 Grade and Surfacing 484 LC-K3R 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-10 (Projects Under Construction as of 12/28/2016)

Page 64: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Lincoln I070 PAVEMENT MARKING ON I-70 7.2 Pavement Marking 187 SM-PMR 2018

Linn U069 US-69 BEGINNING AT THE NORTH EDGE OF BRIDGES #032 AND #047 NORTH TO THE LINN/MIAMI COUNTY LINE 6.2 3in Overlay 5,190 SM-RIP 2018

Lyon BNSF AND CR 200 3 MILES NORTHEAST OF EMPORIA - Flashing Light Signal 206 LC-RXR 2017

Lyon I035 BRIDGE #118 (NEOSHO RIVER) ON I-35 LOCATED 3.69 MILES EAST OF K-99 JUST EAST OF US-50 JUNCTION 0.0 Bridge Repair 140 SM-BSR 2018

Lyon K099 K-99 BEGINNING AT THE K-99/K-170 JUNCTION NORTH TO K-99/US-56 JUNCTION 9.1 Milling and Overlay 799 SM-1RR 2018

Lyon K099 BRIDGE ON K-99 AT K-99 AND KTA NORTH JUNCTION - Bridge Deck 691 SM-PDR 2011

Lyon U050 US-50 PAVEMENT MARKING 7.0 Pavement Marking 188 SM-PMR 2018

Marion UPRR AND 250TH ROAD AT ANTELOPE - Flashing Light Signal 216 LC-RXR 2017

Marion K015 K-15 IN MARION COUNTY BEGINNING AT THE JUNCTION US-56/K-15 THENCE NORTH TO THE MARION/DICKINSON COUNTY LINE 17.0 Sealing 560 SM-1RR 2018

Marshall ALL MAJOR COLLECTORS EXCEPT RS 436 AND RS 1222 IN THE CITY OF BLUE RAPIDS 254.0 Signing 375 LC-RES 2017

Marshall CITY OF MARYSVILLE SOUTH OF WALNUT ON US-77 0.3 Pedestrian and Bicycle Paths 112 LC-TEX 2018

Marshall K009 K-9 FROM THE MARSHALL/WASHINGTON COUNTY LINE EAST TO THE WEST K-9/US-77 JUNCTION 3.2 Milling and Overlay 398 SM-1RR 2016

Marshall U036 US-36 FROM FOURTH STREET TO SEVENTEENTH STREET 0.9 Milling and Overlay 521 LC-K1R 2017

Marshall U036 US-36 BEGINNING AT THE WASHINGTON/MARSHALL COUNTY LINE EAST TO THE WEST CITY LIMITS OF MARYSVILLE 6.8 Milling and Overlay 1,074 SM-1RR 2017

Marshall U036 TRAFFIC STUDY ON US-36 IN MARYSVILLE 3.4 Preliminary Engineering - MM-COR 2019

Marshall U077 US-77 FROM THE WEST US-77/K-9 JUNTION EAST AND NORTH TO THE SOUTH CITY LIMITS OF MARYSVILLE (SOUTH END OF BRIDGE OVER RAILROAD) 16.6 Milling and Overlay 2,242 SM-1RR 2016

McPherson AVENUE A AT THUNDERBIRD STREET EAST TO CENTENNIAL DRIVE THEN NORTH TO SOUTH FRONT STREET 1.5 Pedestrian and Bicycle Paths 775 LC-TEX 2018

McPherson PEDESTRIAN/BIKE PATH ALONG AVENUE A IN MCPHERSON - Pedestrian and Bicycle Paths 1,123 LC-TEX 2017

McPherson ALL MAJOR COLLECTORS IN THE SOUTHEASTERN QUARTER OF THE COUNTY 70.0 Signing 85 LC-RES 2017

McPherson I135 PAVEMENT MARKING ON I-135 IN MCPHERSON COUNTY 8.0 Pavement Marking 714 SM-PMR 2017

McPherson I135 I-35 AT THE JUNCTION OF I-135 AND MOHAWK ROAD 1.0 Grade, Bridge and Surfacing 7,216 SE-IRC 2016

McPherson K260 K-260 FROM AVENUE A TO AVENUE C IN MOUNDRIDGE 0.3 Pavement Reconstruction 317 LC-K3R 2017

McPherson U056 US-56 (KANSAS AVENUE) FROM MAXWELL STREET TO EBY STREET IN MCPHERSON 0.3 Milling and Overlay 134 LC-K1R 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-11 (Projects Under Construction as of 12/28/2016)

Page 65: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

McPherson U056 US-56, US-81 BUSINESS, K-153, K-153 SPUR IN MCPHERSON COUNTY 34.2 Signing 21 SM-SOS 2016

McPherson U056 US-56 FROM EBY STREET EAST TO THE US-56/I-135 INTERCHANGE 1.2 Pavement Reconstruction 8,001 SM-RIP 2016

Meade K098 K-98 FROM EAST 6TH STREET SOUTH TO UNION PACIFIC RAILROAD 0.3 Milling and Overlay 371 LC-K1R 2017

Meade U054 US-54 IN MEADE COUNTY BEGINNING AT THE SOUTH CITY LIMITS OF PLAINS EAST TO CONCRETE AT THE WEST CITY LIMITS OF MEADE 13.7 Milling and Overlay 1,457 SM-1RR 2017

Meade U160 BRIDGE ON US-160 LOCATED APPROXIMATELY 11 MILES EAST OF US-54 0.0 Bridge Replacement 1,938 SM-PBR 2016

Miami BRIDGE LOCATED 1.3 MILES EAST OF OSAWATOMIE ON 347TH STREET 0.2 Bridge Replacement 1,693 LC-RES 2017

Miami K068 K-68 AND METCALF IN LOUISBURG 0.2 Grade and Surfacing 2,258 MM-COR 2017

Miami K068 K-68 BEGINNING AT THE K-68/US-169 JUNCTION EAST TO THE K-68/US-69 JUNCTION 7.6 Surfacing 643 SM-1RR 2017

Miami U069 PAVEMENT MARKING ON US-69 10.8 Pavement Marking 260 SM-PMR 2017

Miami U169US-169 BEGINNING APPROXIMATELY 1 1/2 MILES SOUTH OF THE SOUTH CITY LIMITS OF SPRING HILL ( OR 1/4 MILE SOUTH OF RS 1803) NORTH TO THE MIAMI/JOHNSON COUNTY LINE

1.3 Overlay 1,254 SM-RIP 2018

Miami U169 US-169 FROM BAPTISTE DRIVE NORTH FOR 10.4 MILES TO JUST SOUTH OF THE MIAMI/JOHNSON COUNTY LINE 10.4 Ultra Thin Bonded Asphalt Surfacing 1,146 SM-1RR 2016

Montgomery 14TH, 15TH, AND WILLOW STREETS NEAR THE ACME FOUNDRY IN COFFEYVILLE 0.6 Grade and Surfacing 748 SE-EDP 2017

Montgomery COFFEYVILLE- SAFE ROUTES TO SCHOOL PHASE 1 - Preliminary Engineering - LC-SRT 2017

Montgomery SKORR AND WEST MAPLE STREET IN INDEPENDENCE - Flashing Light Signal 280 LC-RXR 2017

Montgomery UPRR AND 3600 ROAD 4.5 MILES SOUTHWEST OF INDEPENDENCE - Flashing Light Signal 396 LC-RXR 2018

Montgomery UPRR AND 6200 ROAD NORTH OF SYCAMORE - Flashing Light Signal 239 LC-RXR 2017

Montgomery U075 US-75 AT THE INTERSECTION OF US-75/160 AND PETER PAN ROAD IN INDEPENDENCE 0.1 Intersection Improvement 836 LC-K3R 2017

Montgomery U075 US-75 FROM CHESTNUT STREET TO OAK STREET IN INDEPENDENCE 0.9 Milling and Overlay 471 LC-K1R 2017

Montgomery U166 US-166 FROM THE WEST CITY LIMITS TO BUCKEYE STREET IN COFFEYVILLE 2.0 Surfacing 699 LC-K1R 2017

Montgomery U169 US-169 AT THE SKO RAILROAD CROSSING LOCATED APPROXIMATELY 3 MILES SOUTH OF THE NORTH US-169/US-160 JUNCTION 0.1 Grade and Surfacing 765 SE-RIC 2017

Morris UPRR AND SOUTH 3000 ROAD 2.5 MILES SOUTHWEST OF LATIMER - Flashing Light Signal 341 LC-RXR 2018

Morris K057 K-57 FROM THE GEARY/MORRIS COUNTY LINE SOUTH TO THE K-4/K-57 JUNCTION 2.1 Milling and Overlay 235 SM-1RR 2017

Morris K177 K-177 BEGINNING AT THE NORTH CITY LIMITS OF COUNCIL GROVE NORTH TO THE MORRIS/GEARY COUNTY LINE 14.2 Sealing 437 SM-1RR 2018

Morris U056 US-56 BEGINNING AT THE MORRIS/DICKINSON COUNTY LINE EAST TO THE WEST CITY LIMITS OF COUNCIL GROVE 22.9 Sealing 825 SM-1RR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-12 (Projects Under Construction as of 12/28/2016)

Page 66: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Morton U056 US-56 FROM WILLIAM STREET EAST TO EMERY LANE IN ELKHART 0.3 Grade and Surfacing 536 LC-K3R 2017

Morton U056 US-56 BEGINNING WEST OF THE WEST CITY LIMITS OF ROLLA EAST TO THE MORTON/STEVENS COUNTY LINE 7.9 Milling and Overlay 969 SM-1RR 2018

Neosho CITY OF ERIE- SAFE ROUTES TO SCHOOL - Pedestrian and Bicycle Paths 203 LC-SRT 2017

Neosho ELK ROAD FROM 230TH TO 250TH IN THE COUNTY 2.2 Signing 36 LC-RES 2017

Neosho UPRR AND 50TH ROAD WEST OF SOUTH MOUND - Flashing Light Signal 230 LC-RXR 2017

Neosho UPRR AND 60TH ROAD 5 MILES NORTH OF PARSONS - Flashing Light Signal 261 LC-RXR 2018

Neosho UPRR AND 80TH ROAD 5 MILES SOUTH OF ERIE - Flashing Light Signal 261 LC-RXR 2017

Neosho UPRR AND TREGO ROAD SOUTHWEST OF KIMBAL - Flashing Light Signal 252 LC-RXR 2017

Ness ALL MAJOR COLLECTORS IN THE NORTHERN HALF OF THE COUNTY 81.0 Signing 67 LC-RES 2017

Ness U283 US-283 FROM MAIN STREET TO CHESTNUT STREET IN NESS CITY 0.1 Milling and Overlay 351 LC-K1R 2017

Ness U283 US-283 BEGINNING AT THE HODGEMAN/NESS COUNTY LINE NORTH TO RAILROAD TRACKS IN NESS CITY 13.2 Milling and Overlay 1,405 SM-1RR 2017

Norton 4.0 MILES EAST OF LENORA ON ROAD W2 OVER NORTH FORK SOLOMON RIVER 0.2 Bridge Replacement 295 LC-RES 2017

Norton K009 6.9 MILES EAST OF DECATUR/NORTON COUNTY LINE EAST 1.5 MILES 1.5 Flood Damage 51 SM-EMR 2017

Norton K009 STRUCTURE #533 ON K-9-LOCATED 1.36 MILES WEST OF THE WEST US-283/K-9 JUNCTION 0.1 Flood Damage 27 SM-EMR 2017

Norton K009 STRUCTURE #534 ON K-9 WEST OF THE WEST K-9/US-283 JUNCTION 0.0 Flood Damage 24 SM-EMR 2017

Norton K009 STRUCTURE #536 ON K-9 EAST OF THE EAST K-9/US-283 JUNCTION 0.1 Flood Damage 18 SM-EMR 2017

Norton K009 STRUCTURE #537 ON K-9 EAST OF THE EAST K-9/US-283 JUNCTION 0.6 Flood Damage 11 SM-EMR 2017

Norton K009 STRUCTURE #526 EAST OF THE DECATUR/NORTON COUNTY LINE 0.1 Flood Damage 10 SM-EMR 2017

Norton K009 STRUCTURE #527 EAST OF THE DECATUR/NORTON COUNTY LINE 0.2 Flood Damage 6 SM-EMR 2017

Norton U283 US-283 FROM NORTH OF THE WEST K-9 JUNCTION 0.1 Flood Damage 45 SM-EMR 2017

Osage I035 I-35 BEGINNING AT THE COFFEY/OSAGE COUNTY LINE TO THE OSAGE/FRANKLIN COUNTY LINE 13.5 Pavement Patching 269 SM-ISR 2017

Osage I035 PAVEMENT MARKING ON I-35 11.5 Pavement Marking 388 SM-PMR 2017

Osage K031 K-31 FROM EAST MARTIN STREET EAST TO WEST OF 4TH STREET IN OSAGE CITY 0.4 Overlay 245 LC-K1R 2012

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-13 (Projects Under Construction as of 12/28/2016)

Page 67: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Osborne BRIDGE LOCATED SOUTHEAST OF OSBORNE ON SOUTH 90 AVENUE OVER THE SOUTH FORK SOLOMON RIVER 0.2 Bridge Replacement 524 LC-RES 2017

Pawnee U056 US-56 FROM THE INTERSECTION OF MAIN STREET/US-56 EAST 450 FEET 0.1 Concrete Pavement 400 LC-K1R 2017

Pawnee U056 US-56 BEGINNING AT THE EDWARDS/PAWNEE COUNTY LINE TO THE SOUTH CITY LIMITS OF LARNED 16.9 Milling and Overlay 1,107 SM-1RR 2017

Phillips U036 BRIDGE #015 ON US-36 LOCATED 12.5 MILES EAST OF THE EAST US-183/US-36 JUNCTION 0.0 Guard Fence 125 SM-CMN 2018

Phillips U036 US-36 BEGINNING AT THE PHILLIPS/NORTON COUNTY LINE EAST 17.3 MILES TO JUST WEST OF THE WEST US-36/US-183 JUNCTION 17.3 Milling and Overlay 2,931 SM-1RR 2018

Phillips U183 US-183 BEGINNING 0.6 MILES NORTH OF THE WEST US-36/US-183 JUNCTION NORTH 18.0 MILES TO THE KANSAS/NEBRASKA STATE LINE 18.1 Milling and Overlay 2,577 SM-1RR 2017

Pottawatomie BRIDGE LOCATED 0.5 MILE EAST OF WESTMORELAND ON DUTCH HOLLOW ROAD OVER ROCK CREEK 0.2 Bridge Replacement 392 LC-RES 2018

Pratt K061 K-61 FROM THE CITY OF PRATT NORTHEAST TO THE PRATT/RENO COUNTY LINE 16.9 1.5 Overlay 2,227 SM-1RR 2016

Pratt U281 US-281 FROM SANTA FE ROAD SOUTH TO PRATT CITY LIMITS 0.3 Milling and Overlay 267 LC-K1R 2017

Reno BNSF AND KENT ROAD 3 MILES EAST OF HUTCHINSON - Flashing Light Signal 450 LC-RXR 2018

Reno DOWNTOWN HUTCHINSON STREETSCAPE - Landscaping and Beautification 1,422 LC-TEX 2017

Reno KANDORR AND 1ST STREET IN HAVEN - Flashing Light Signal 270 LC-RXR 2018

Reno K061 K-61 AND 4TH AVENUE INTERSECTION IN HUTCHINSON 0.1 Intersection Improvement 93 LC-K3R 2017

Reno K061 K-61 FROM THE RENO/PRATT COUNTY LINE NORTHEAST TO THE CITY OF ARLINGTON 17.7 1.5 Overlay 2,795 SM-1RR 2016

Republic K148 CULVERT #516 (COAL CREEK) LOCATED 6 MILES EAST OF US-81 0.0 Culvert 400 SM-PCR 2015

Republic U081 US-81 FROM 8 MILES NORTH OF THE COUNTY LINE NORTH TO 1 MILE NORTH OF US-81/US-36 JUNCTION 3.7 Pavement Reconstruction 7,756 SM-RIP 2016

Republic MAJOR AND MINOR COLLECTORS IN THE SOUTHEASTERN PORTION OF THE COUNTY 95.0 Signing 81 LC-RES 2017

Rice U056 US-56 BEGINNING AT THE BARTON/RICE COUNTY LINE EAST TO THE WEST CITY LIMITS OF LYONS 14.1 Milling and Overlay 1,874 SM-1RR 2017

Rice DOWNTOWN LITTLE RIVER - Landscaping and Beautification 660 LC-TEX 2017

Rice ALL MAJOR AND MINOR COLLECTORS IN THE COUNTY 37.0 Signing 103 LC-RES 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-14 (Projects Under Construction as of 12/28/2016)

Page 68: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Riley JULIETTE AVENUE FROM BLUEMONT AVENUE SOUTH TO LARAMIE STREET IN MANHATTAN - Rehab and Oprtn Hist Trans Bldg 707 LC-TEX 2017

Riley COLLEGE AND CLAFLIN IN MANHATTAN - Traffic Signals 132 LC-HAZ 2017

Riley K018 K-18 FROM K-113 TO BRIDGE OVER WILDCAT CREEK 0.3 Milling and Overlay 269 LC-K1R 2014

Riley K113 TRAFFIC STUDY ON K-113 IN MANHATTAN 5.6 Preliminary Engineering - MM-COR 2018

Riley K113 K-113 BEGINNING AT THE K-18/K-113 JUNCTION NORTH TO US-24/K-113 JUNCTION 5.6 Milling and Overlay 2,041 SM-1RR 2017

Riley K113 NEAR K-113 AND K-18 INTERCHANGE IN MANHATTAN 0.2 Intersection Improvement 2,588 LC-K3R 2017Riley K177 K-177 BEGINNING AT THE GEARY/RILEY COUNTY LINE NORTH 6.9 MILES 6.9 Milling and Overlay 1,753 SM-1RR 2016

Riley U024 US-24 BEGINNING AT THE CLAY/RILEY COUNTY LINE EAST TO THE WEST US-24/US-77 JUNCTION 11.7 Sealing 281 SM-1RR 2018

Rooks KDOT STOCKTON SUB AREA OFFICE IN THE CITY OF STOCKTON - Special 110 SM-NHP 2018

Rooks K018 K-18 FROM THE K-18/US-183 JUNCTION EAST TO THE COUNTY LINE 14.9 Milling and Overlay 4,115 SM-RIP 2016

Rush BRIDGE OVER WALNUT CREEK LOCATED AT THE NORTHWEST CORNER OF ALEXANDER ON LOCAL ROAD 5 0.2 Bridge Replacement 351 LC-RES 2017

Rush K004 K-4 BEGINNING AT THE NESS/RUSH COUNTY LINE EAST TO THE RUSH/BARTON COUNTY LINE 36.7 Surface Recycle 3,603 SM-1RR 2018

Russell U281 US-281 BEGINNING AT THE BARTON/RUSSELL COUNTY LINE NORTH 11.7 MILES TO THE SOUTH CITY LIMITS OF RUSSELL 11.7 Ultra Thin Bonded Asphalt Surfacing 1,019 SM-1RR 2017

Russell U281 US-281/FOSSIL STREET FROM DORRANCE STREET NORTH TO WICHITA AVE/US-40 B 0.5 Grade and Surfacing 2,196 LC-K3R 2017

Saline I070 EAST BOUND LANES OF I-70 FROM CRYSTAL SPRINGS ROAD EAST APPROXIMATELY 0.56 MILE 0.6 Special - SM-ISR 2018

Saline K143 K-143 FROM I-70 JUNCTION TO US-81 JUNCTION 4.7 Ultra Thin Bonded Asphalt Surfacing 419 SM-1RR 2018

Saline SALINA, KANSAS- TRAFFIC SIGNAL TIMING - Intelligent Transportation Sys - SE-ITS 2018

Scott K095 K-95 BEGINNING AT THE SOUTH US-83 JUNCTION NORTH TO THE NORTH US-83 JUNCTION 6.6 Surfacing 374 SM-1RR 2017

Scott K096 WICHITA/SCOTT COUNTY LINE EAST TO SCOTT CITY 11.8 Surface Recycle 1,357 SM-1RR 2018

Scott U083 US-83 NORTH CITY LIMITS OF SCOTT CITY NORTH TO SCOTT/LOGAN COUNTY LINE 15.0 Milling and Overlay 2,024 SM-1RR 2018

Sedgwick 13TH STREET AND EDGEMOOR STREET IN WICHITA - Intersection Improvement 700 LC-HAZ 2016

Sedgwick 37TH STREET FROM OLIVER TO WOODLAWN IN WICHITA 1.0 Grade and Surfacing 3,336 LC-LOC 2017

Sedgwick 53RD STREET NORTH AND BROADWAY AVENUE INTERSECTION IN PARK CITY 0.2 Intersection Improvement 899 LC-RES 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-15 (Projects Under Construction as of 12/28/2016)

Page 69: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Sedgwick 53RD STREET NORTH FROM PRIMROSE TO 1/2 MILE EAST OF HYDRAULIC IN PARK CITY 1.6 Grade and Surfacing 3,949 LC-RES 2016

Sedgwick AVIATION PATHWAY RUNNING PARALLEL TO BUCKNER AND OLIVER FROM COMMERCE DRIVE TO 47TH STREET SOUTH 1.9 Pedestrian and Bicycle Paths 977 LC-TEX 2016

Sedgwick BROADWAY BRIDGE AT 34TH STREET IN WICHITA 0.5 Bridge Replacement 12,823 LC-LOC 2013

Sedgwick DOUGLAS AT LINDEN DRIVE IN WICHITA 0.0 Bridge Replacement 1,437 LC-LOC 2016

Sedgwick KANDORR AND SOUTH 29TH STREET IN WICHITA - Flashing Light Signal 228 LC-RXR 2018

Sedgwick MADISON AVENUE AT DERBY HIGH SCHOOL IN DERBY 0.7 Milling and Overlay 1,876 LC-RES 2017

Sedgwick MERIDIAN FROM PAWNEE TO MCCORMICK IN WICHITA 1.5 Grade and Surfacing 8,532 LC-LOC 2016

Sedgwick NORTHWEST OF THE K-254/ROCK ROAD INTERSECTION IN KECHI - Special 3,493 SE-RIC 2017

Sedgwick PAWNEE FROM HYDRAULIC TO GROVE IN WICHITA 0.5 Grade and Surfacing 6,558 LC-LOC 2017

Sedgwick TIGUA ROAD IN KECHI, KS - Grade and Surfacing 438 MM-COR 2017

Sedgwick TIGUA ROAD IN KECHI, KS - Grade and Surfacing 733 MM-COR 2018

Sedgwick UPRR AND EAST 117TH STREET NORTH- 1 MILE NORTHEAST OF FURLEY - Flashing Light Signal 228 LC-RXR 2017

Sedgwick UPRR AND EAST 37TH STREET NORTH IN BEL AIRE - Flashing Light Signal 208 LC-RXR 2016

Sedgwick UPRR AND EAST 77TH STREET NORTH- 1.5 MILES NORTHEAST OF KECHI - Flashing Light Signal 237 LC-RXR 2017

Sedgwick UPRR AND GREENWICH ROAD IN BEL AIRE - Flashing Light Signal 262 LC-RXR 2017

Sedgwick UPRR AND WEST 3RD STREET IN FURLEY - Flashing Light Signal 253 LC-RXR 2017

Sedgwick UPRR AND WEST 95TH STREET SOUTH- 2 MILES SOUTH OF HAYSVILLE - Flashing Light Signal 238 LC-RXR 2017

Sedgwick WICHITA METRO- TRAFFIC MANAGEMENT CENTER PHASE III - Intelligent Transportation Sys 1,570 SE-ITS 2015

Sedgwick WICHITA METROPOLITAN AREA- PLANNING WALKABLE PLACES PROGRAM - Funds Only - LC-LOC 2018

Sedgwick WICHITA, KANSAS- TRAFFIC MANAGEMENT CENTER PHASE IV - Intelligent Transportation Sys 634 SE-ITS 2016

Sedgwick WICHITA, KANSAS- FIBER LOOP ALONG I-135, I-235, I-35 AND K-96 - Intelligent Transportation Sys 1,984 SE-ITS 2016

Sedgwick WICHITA, KANSAS- REGIONAL TRANSPORTATION SYSTEM STUDY - Intelligent Transportation Sys - SE-ITS 2018

Sedgwick WICHITA: DOUGLAS AND HYDRAULIC - Intersection Improvement 1,638 LC-HAZ 2017

Sedgwick I135 BRIDGES #024 AND #026 LOCATED APPROXIMATELY 1 MILE NORTH OF I-135/21ST STREET 0.0 Bridge Repair 1,156 SM-BSR 2017

Sedgwick I135 I-135 FROM THE I-35/ K-96 (37TH STREET NORTH) JUNCTION TO THE NORTH CITY LIMITS OF PARK CITY 6.9 Milling and Overlay 18,893 SM-IRP 2014

Sedgwick I235 BRIDGE #105 (LITTLE ARKANSAS RIVER) ON I-235 LOCATED 1.4 MILES EAST OF K-96 0.0 Bridge Repair 29 SM-BSR 2018

Sedgwick I235 I-235 AND THE INTERCHANGES AT I-235/US-54 (KELLOGG) 2.6 Grade, Bridge and Surfacing 106,131 SE-IRC 2016

Sedgwick I235 5 BRIDGES ON I-235 IN THE CITY OF WICHITA BETWEEN ZOO BOULEVARD AND K-96 0.0 Bridge Replacement 20,063 SM-PBR 2016

Sedgwick I235 I-235 (NORTHBOUND AND SOUTHBOUND) THE ENTIRE ROUTE INCLUDING MOST RAMPS 16.5 Pavement Patching 3,929 SM-1RR 2016

Sedgwick K015 K-15 AND MEADOWLARK ROAD/NELSON DRIVE 0.0 Intersection Improvement 867 LC-HES 2017

Sedgwick K015 PAVEMENT MARKING ON K-15 3.5 Pavement Marking 373 SM-PMR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-16 (Projects Under Construction as of 12/28/2016)

Page 70: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Sedgwick K042 K-42 FROM HOOVER TO I-235 IN WICHITA 0.6 Milling and Overlay 1,000 LC-K1R 2017

Sedgwick U054 EAST BOUND US-54 OVERHEAD SIGN (HILLSIDE EXIT) - Special - SM-EMR 2009

Sedgwick U054 PAVEMENT MARKING ON US-54 21.0 Pavement Marking 577 SM-PMR 2018

Sedgwick U054 US-54 EASTBOUND AND WESTBOUND AT VARIOUS LOCATIONS IN THE COUNTY 7.2 Pavement Patching 740 SM-1RR 2016

Sedgwick U054 TRAFFIC STUDY ON US-54 IN THE CITY OF GODDARD 2.3 Traffic Study-access Review - MM-COR 2019

Sedgwick U054 US-54 FROM JUST WEST OF GREENWICH ROAD EAST TO 127TH STREET 10.0 Grade, Bridge and Surfacing 54,500 SE-RIC 2017

Sedgwick U054 US-54 FROM KELLOGG AVENUE FROM CYPRESS EAST TO WIEDEMANN IN WICHITA 1.2 Grade, Bridge and Surfacing 79,583 SE-RIC 2015

Seward U054 INTERSECTION OF US-54 AND CLAY STREET 0.0 Intersection Improvement 1,785 LC-K3R 2017

Seward U054US-54 FROM 0.5 MILE SOUTHWEST OF THE US-54/COUNTY ROAD O INTERSECTION THEN NORTHEAST TO JUST SOUTHWEST OF THE US-54/R PARK ROAD INTERSECTION.

3.6 Grade and Surfacing 15,918 SE-RIC 2016

Shawnee 29TH AND FAIRLAWN IN TOPEKA, KS - Preliminary Engineering - MM-COR 2018

Shawnee CITY WIDE IN TOPEKA - Pedestrian and Bicycle Paths 393 LC-TEX 2017

Shawnee TOPEKA FROM 29TH AND MCLURE TO I-470 0.5 Pedestrian and Bicycle Paths 511 LC-TEX 2017

Shawnee I070 I-70 POLK QUINCY VIADUCT 0.8 Lighting 159 MM-LTG 2017

Shawnee I070 I-70 FROM GAGE BOULEVARD EAST 2.37 MILES IN TOPEKA 2.4 Pavement Patching 1,384 SM-ISR 2011

Shawnee K004 K-4 FROM THE COUNTY LINE EAST AND NORTH TO AUBURN ROAD (RS-514) 10.1 Milling and Overlay 1,749 SM-1RR 2015

Shawnee U075 US-75 BEGINNING 0.09 MILE SOUTH OF TOPEKA BOULEVARD NORTH TO SOUTHWEST 49TH STREET IN TOPEKA 6.0 Overlay 2,139 SM-RIP 2017

Sheridan U024 US-24 FROM HOXIE EAST TO THE COUNTY LINE 15.5 Milling and Overlay 5,537 SM-RIP 2018

Sheridan U083 US-83 FROM THE COUNTY LINE EAST TO US-83/K-23 JUNCTION 11.3 Grade and Surfacing 14,876 SM-RIP 2015

Sherman I070 I-70 BEGINNING JUST EAST OF THE I-70/K-253 INTERCHANGE EAST 7.9 MILES TO THE SHERMAN/THOMAS COUNTY LINE 7.9 Ultra Thin Bonded Asphalt Surfacing 493 SM-1RR 2017

Sherman K253 K-253 BEGINNING AT THE SOUTH RADIUS OF I-70 NORTH 0.7 MILES TO THE OLD US-24/K-253 JUNCTION 0.7 Sealing 521 SM-1RR 2017

Stafford BNSF AND 40TH AVENUE 3 MILES SOUTHWEST OF ST. JOHN - Flashing Light Signal 191 LC-RXR 2018

Stafford BNSF AND 90TH AVENUE 0.5 MILE EAST OF STAFFORD - Flashing Light Signal 213 LC-RXR 2018

Stafford BNSF AND PRAIRIE STREET IN ST JOHN - Flashing Light Signal 245 LC-RXR 2018

Stafford MINOR COLLECTORS IN THE NORTHWESTERN SECTION OF THE COUNTY 363.0 Signing 37 LC-LOC 2017

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-17 (Projects Under Construction as of 12/28/2016)

Page 71: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Stevens K025 K-25 FROM THE OKLAHOME/KANSAS STATE LINE NORTH TO WEST US-56 JUNCTION 10.9 1.5 Overlay 1,092 SM-1RR 2017

Stevens K051 K-51 THROUGH THE CITY OF HUGOTON 0.9 Pavement Reconstruction 3,967 SM-RIP 2017

Sumner BNSF AND 120TH NORTH AVENUE LOCATED 4 MILES NORTHWEST OF UDALL - Flashing Light Signal 241 LC-RXR 2017

Sumner BNSF AND CALDWELL ROAD LOCATED 3 MILES WEST OF MAYFIELD - Flashing Light Signal 378 LC-RXR 2017

Sumner BNSF AND DIXON ROAD LOCATED 2 MILES EAST OF ARGONIA - Flashing Light Signal 436 LC-RXR 2017

Sumner UPRR AND E 140TH AVENUE NORTH LOCATED 1 MILE SOUTH OF PECK - Flashing Light Signal 213 LC-RXR 2017

Sumner UPRR AND E 50TH AVENUE NORTH LOCATED 3 MILES NORTH OF WELLINGTON - Flashing Light Signal 242 LC-RXR 2017

Sumner K049 BRIDGE #096 ON K-49 LOCATED 6.11 MILES NORTH OF US-81 0.0 Bridge Replacement 655 SM-PBR 2017

Sumner U081 US-81 (A STREET) FROM 17TH STREET TO HILLSIDE IN WELLINGTON 0.9 Milling and Overlay 300 LC-K1R 2017

Sumner U081 US-81 FROM 1,000 FEET SOUTH OF HARVEY STREET NORTH 4,000 FEET IN WELLINGTON 0.8 Grade and Surfacing 1,144 LC-K3R 2017

Sumner U081 BRIDGE (FALL CREEK DRAINAGE) ON US-81 FROM 0.24 MILE EAST OF THE US-81/K-49 JUNCTION 0.0 Bridge Replacement 816 SM-PBR 2016

Thomas I070 I-70 FROM THE SHERMAN/THOMAS COUNTY LINE EAST 0.45 MILES 0.4 Ultra Thin Bonded Asphalt Surfacing 518 SM-1RR 2017

Thomas I070 UNDER BRIDGE #029 (OVERPASS COUNTY ROAD F) ON I-70 LOCATED APPROXIMATELY 1.39 MILES NORTH WEST OF US-83 JUNCTION 0.0 Guard Fence 26 SM-CMN 2018

Thomas K025 K-25 FROM I-70 NORTH 1.15 MILES IN COLBY 1.2 Milling and Overlay 641 LC-K1R 2017

Thomas U083 BRIDGE ON US-83 LOCATED AT THE I-70/US-83 JUNCTION 0.0 Bridge Repair 970 SM-BSR 2017

Trego U283 US-40 BUSINESS, US-283, K-147, AND K-198 IN THE COUNTY 50.7 Signing 6 SM-SOS 2016

Wabaunsee K177 K-177 FROM THE MORRIS/WABAUNSEE COUNTY LINE NORTH TO THE K-99/K-177 JUNCTION 1.9 Sealing 62 SM-1RR 2018

Wallace K027 K-27 FROM THE GREELEY/WALLACE COUNTY LINE NORTH TO THE WALLACE/SHERMAN COUNTY LINE 30.5 Milling and Overlay 4,493 SM-1RR 2018

Washington BRIDGE LOCATED 1.9 MILES WEST AND 0.5 MILE SOUTH OF WASHINGTON 0.2 Bridge Replacement 430 LC-RES 2017

Washington HOLLENBERG AVENUE BETWEEN THE LITTLE BLUE RIVER AND HOLLENBERG - Flood Damage 67 LC-LOC 2017

Washington U036 US-36 FROM THE EAST EDGE OF WEARING SURFACE OF THE LITTLE BLUE RIVER BRIDGE TO THE WEST MARSHALL COUNTY LINE 4.3 2in Overlay 1,390 SM-1RR 2017

Wichita K096 EAST CITY LIMITS OF LEOTI EAST TO THE WICHITA/SCOTT COUNTY LINE 11.9 Surface Recycle 1,397 SM-1RR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-18 (Projects Under Construction as of 12/28/2016)

Page 72: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Wichita K096 FROM THE GREELEY/WICHITA COUNTY LINE EAST THRROUGH LEOTI 12.0 Milling and Overlay 1,449 SM-1RR 2018

Wilson UPRR AND 700 ROAD LOCATED 4 MILES NORTH OF NEODESHA - Flashing Light Signal 242 LC-RXR 2018

Woodson UPRR AND 130TH ROAD LOCATED NORTHEAST OF YATES CENTER - Flashing Light Signal 255 LC-RXR 2017

Woodson UPRR AND 150TH ROAD LOCATED 4.5 MILES NORTHEAST OF YATES CENTER - Flashing Light Signal 282 LC-RXR 2018

Woodson UPRR AND 70TH ROAD 4 MILES SOUTHEAST OF YATES CENTER - Flashing Light Signal 308 LC-RXR 2018

Woodson K105 K-105 FROM THE BEGINNING OF THE ROUTE NORTH TO THE US-54/K-105 JUNCTION (ENTIRE ROUTE) 10.4 Sealing 411 SM-1RR 2018

Wyandotte SAFE ROPUTES KANSAS CITY KANSAS WALKING SCHOOL BUS EXPANSION AT 10 SCHOLLS IN THE CITY - Funds Only - LC-SRT 2018

Wyandotte CENTRAL AVENUE AND 18TH STREET INTERSECTION 0.1 Intersection Improvement 825 LC-RES 2017

Wyandotte FLINT HILLS NATURE TRAIL 4.5 Pedestrian and Bicycle Paths 748 LC-RES 2017

Wyandotte KANSAS CITY KANSAS SPEEDWAY AND VILLAGE WEST DEVELOPMENT - Intelligent Transportation Sys - SE-ITS 2018

Wyandotte KANSAS CITY METROPOLITAN AREA - Funds Only - LC-LOC 2017

Wyandotte MERRIAM LANE FROM COUNTY LINE ROAD TO 24TH STREET 0.7 Grade and Surfacing 4,666 LC-RES 2016

Wyandotte SOUTHWEST QUADRANT OF K-7 AND 130TH STREET - Right Of Way Only - SE-AAR 2018

Wyandotte TURNER DIAGONAL AND RIVERVIEW AVENUE IN KANSAS CITY, KS - Grade and Surfacing 6,200 SE-EDP 2017

Wyandotte I070 TRAFFIC STUDY AT I-70 AND TURNER DIAGONAL 2.8 Preliminary Engineering - MM-COR 2018

Wyandotte I070 TRAFFIC STUDY OF I-70 IN WYANDOTTE COUNTY 2.8 Preliminary Engineering - MM-COR 2018Wyandotte I070 I-70 FROM COLLECTOR RAMP (RAMP TO KAW DRIVE/PARK DRIVE) 0.0 Signing 43 SM-SLR 2017Wyandotte I070 I-70 STUDY FOR THE LEWIS AND CLARK VIADUCT IN KANSAS CITY KANSAS 0.9 Location Study - MM-IRI 2012

Wyandotte I070 I-70 FROM THE I-70/K-7 INTERCHANGE EAST TO THE I-70/110TH STREET INTERCHANGE 1.7 Grade and Surfacing 21,529 SE-IRC 2015

Wyandotte I070 BRIDGE INSPECTIONS FOR NBIS REQUIREMENTS ON THE LEWIS AND CLARK VIADUCT IN KANSAS CITY KANSAS 0.3 Location Study - SM-PBR 2015

Wyandotte I070 BRIDGES #030 AND #173 OF THE LEWIS AND CLARK VIADUCT IN KANSAS CITY KANSAS 0.2 Location Study - SM-PBR 2018

Wyandotte I070 PAVEMENT MARKING ON I-70, I-670 AND K-5 8.6 Pavement Marking 415 SM-PMR 2017

Wyandotte I435 I-435 AND WOODEND ROAD INTERCHANGE INCLUDING MIDWEST DRIVE 0.3 Traffic Study-design Review - MM-SAF 2018

Wyandotte I435 PAVEMENT MARKING ON I-435 12.0 Pavement Marking 728 SM-PMR 2017

Wyandotte K005 K-5 (LEAVENWORTH ROAD) FROM 63RD STREET TO 38TH STREET 2.3 Grade and Surfacing 10,265 LC-RES 2018

Wyandotte K007 PAVEMENT MARKING ON K-7 4.4 Pavement Marking 224 SM-PMR 2018

Wyandotte K032 PAVEMENT MARKING ON K-32 10.0 Pavement Marking 322 SM-PMR 2018

Wyandotte U024 PAVEMENT MARKING ON US-24 1.2 Pavement Marking 52 SM-PMR 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-19 (Projects Under Construction as of 12/28/2016)

Page 73: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Wyandotte U069 CRACK ANALYSIS ON BRIDGE #136 ON US-69 (KANSAS RIVER/BNSF RAILROAD) 0.0 Special - SM-BSR 2019

Wyandotte U069 US-69 FROM TAUROMEE AVENUE TO WASHINGTON BOULEVARD 0.5 Milling and Overlay 400 LC-K1R 2017

Wyandotte U069 BRIDGES #067 ABD #151 ON US-69 OVER THE MISSOURI RIVER IN WYANDOTTE COUNTY, KANSAS AND PLATTE COUNTY, MISSOURI 0.1 Bridge Replacement 35,581 SM-PBR 2015

Statewide 3D CADD DEVELOPMENT STAFF TRAINING - Special - MM-MPR 2017

Statewide ASSISTANCE WITH THE CMS REPLACEMENT PROJECT - Preliminary Engineering - SM-NHP 2018

Statewide BRIDGE LOAD RATING FOR BRIDGES STATEWIDE - Preliminary Engineering - SM-PBR 2018

Statewide BRIDGE LOAD RATING FOR BRIDGES STATEWIDE - Preliminary Engineering - SM-PBR 2018

Statewide DISTRICT MAINTENANCE CONTRACT FOR MAINTENANCE STATEWIDE - Special - SM-CMN 2018

Statewide DISTRICT WIDE, DISTRICT ONE - Preliminary Engineering - SM-1RR 2018

Statewide DISTRICT WIDE, DISTRICT TWO - Preliminary Engineering - SM-1RR 2018

Statewide DISTRICT WIDE, DISTRICT FOUR - Preliminary Engineering - SM-1RR 2018

Statewide DISTRICT WIDE, DISTRICT FIVE - Preliminary Engineering - SM-1RR 2018

Statewide DISTRICT WIDE, DISTRICT SIX - Preliminary Engineering - SM-1RR 2018

Statewide FLINT HILLS NATURE TRAIL- PHASE 2 - Special 1,277 LC-TEX 2016

Statewide FLINT HILLS NATURE TRAIL- PHASE 3 - Special 2,360 LC-TEX 2016

Statewide FLINT HILLS NATURE TRAIL- PHASE 4 26.5 Special 3,182 LC-TEX 2017

Statewide I-35 NEAR THE INTERMODAL FACILITY - Preliminary Engineering - MM-MPR 2016

Statewide TIGER GRANT APPLICATION FOR I-35 FROM THE JOHNSON/MIAMI COUNTY LINE EAST TO THE KANSAS/ MISSOURI STATE LINE - Special - MM-MPR 2014

Statewide K-7 BETWEEN BONNER SPRINGS AND LANSING AND VARIOUS KANSAS CITY METRO LOCATIONS - Intelligent Transportation Sys 928 SE-ITS 2018

Statewide KANSAS CITY METRO REGION- REGIONAL ACTIVE TRANSPORTATION PROGRAM - Funds Only - LC-RES 2017

Statewide KANSAS CITY METRO REGION- REGIONAL ACTIVE TRANSPORTATION PROGRAM - Funds Only - LC-RES 2017

Statewide KANSAS CITY METRO REGION- REGIONAL AIR QUALITY PUBLIC EDUCATION - Funds Only - LC-RES 2018

Statewide KANSAS CITY METRO REGION- REGIONAL AIR QUALITY PUBLIC EDUCATION - Funds Only - LC-RES 2018

Statewide KANSAS CITY METRO REGION- REGIONAL RIDESHARE PROGRAM - Funds Only - LC-RES 2018

Statewide KANSAS CITY METRO REGION- REGIONAL RIDESHARE PROGRAM - Funds Only - LC-RES 2018

Statewide KANSAS CITY METRO REGION- REGIONAL RIDESHARE PROGRAM - Funds Only - LC-RES 2018

Statewide KANSAS CITY, TOPEKA, WICHITA AND SALINA METRO AREAS - Preliminary Engineering - SE-ITS 2018

Statewide KDOT HEADQUARTERS- STIC INCENTIVE SOFTWARE INSTALLATION - Funds Only - LC-RES 2019

Statewide NUMEROUS ROUTES AND COUNTIES IN SOUTH CENTRAL KANSAS - Signing - SM-SOS 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-20 (Projects Under Construction as of 12/28/2016)

Page 74: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Statewide OVER AND UNDER CLEARANCES IN DOUGLAS, JOHNSON, LEAVENWORTH, LYON, MIAMI, SEDGWICK, SHAWNEE AND WYANDOTTE COUNTIES METRO AREAS - Location Study - MM-MPR 2018

Statewide STATEWIDE LOCAL BRIDGE LOAD RATING PROGRAM - Bridge - LC-RES 2017

Statewide STATEWIDE- LOCAL ROAD SAFETY PLANS - Location Study - LC-RES 2018

Statewide STATEWIDE- TEAP CONSULTANTS - Location Study - LC-RES 2017

Statewide STATEWIDE- ROADWAY DATA INVENTORIES - Special - MM-GSI 2019

Statewide STATEWIDE-TECHNICAL ASSISTANCE FOR THE ACCESS MANAGEMENT UNIT - Preliminary Engineering - MM-COR 2018

Statewide STATEWIDE- FRACTURE CRITICAL BRIDGE INSPECTION PROGRAM - Bridge - LC-RES 2018

Statewide STATEWIDE- SOFTWARE REQUIREMENTS FOR STATEWIDE ATMS SOFTWARE - Intelligent Transportation Sys - SE-ITS 2018

Statewide STATEWIDE- SIGN AND LIGHT TOWER INSPECTION - Preliminary Engineering - SM-SLR 2018

Statewide STATEWIDE- DEVELOP DEFINITIONS FOR LOW DISTORTION PROJECTS (LDP) - Location Study - SM-PBR 2017

Statewide STATEWIDE- VISSIM MODEL REVIEW - Preliminary Engineering - MM-COR 2018

Statewide STATEWIDE - KANSAS DEPARTMENT OF TRANSPORTATION - K-HUB - Preliminary Engineering - MM-MPR 2019

Statewide STATEWIDE - SCENIC BYWAY PROGRAM FY 2017 - Scenic Or Historic Hwy Progs 5 MM-SBW 2018

Statewide STATEWIDE - STORMWATER INSPECTION OF CLOSED PROJECTS FOR STATE FISCAL YEAR 2017 - Special - SM-NHP 2018

Statewide STATEWIDE - TRANSLOAD FACILITY SITE ANALYSIS - Location Study - MM-MPR 2016

Statewide STATEWIDE - UNDERWATER BRIDGE INSPECTION - Preliminary Engineering - SM-PBR 2020

Statewide STATEWIDE- FFY 2016, FFY 2017, FFY 2018, FFY 2019 AND FFY 2020 PIN AND HANGER BRIDGE INSPECTION - Location Study - LC-RES 2021

Statewide STATEWIDE TAX EVASION PROEJCT FOR STATE FISCAL YEAR 2016 - Special - MM-MPR 2018

Statewide STATEWIDE KANSAS LOCAL BRIDGE LOCAL RATING PROGRAM FOR FY 2016 - Bridge - LC-RES 2018

Statewide STATEWIDE KANSAS LOCAL BRIDGE LOCAL RATING PROGRAM FOR FY 2017 - Bridge - LC-RES 2019

Statewide STATEWIDE- KDOT WORK ZONE SAFETY PUBLIC AWARENESS CAMPAIGN (CALENDAR YEAR 2017) - Preliminary Engineering - MM-MPR 2018

Statewide STATEWIDE LOCAL BRIDGE INSPECTION REVIEWS - Location Study - LC-RES 2018

Statewide STATEWIDE- MOBILE RETROREFLECTIVITY READINGS - Pavement Marking - SM-PMR 2018

Statewide STATEWIDE PE FOR RR INSPECTIONS - Flashing Light Signal - LC-RRX 2018

Statewide STATEWIDE- PROVIDE STATISTICAL ANALYSIS SERVICES FOR THE TRAFFIC SAFETY SECTION - Preliminary Engineering - MM-SAF 2018

Statewide STATEWIDE- REGIONAL OPERATIONS FORUM TRAINING (SHRP2) - Intelligent Transportation Sys - SE-ITS 2018

Statewide STATEWIDE- REVIEW 2017 FEDERAL AID 1R SAFETY IMPROVEMENTS 44.0 Location Study - SM-1RR 2018

Statewide STATEWIDE- REVIEW FY 2018 FEDERAL AID 1R SAFETY IMPROVEMENTS - Location Study - SE-RIC 2018

Statewide STATEWIDE- SCHOOL ZONE SIGING AND PAVEMENT MARKING - Special 19 MM-SAF 2018

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-21 (Projects Under Construction as of 12/28/2016)

Page 75: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Statewide STATEWIDE- TECHNICAL ASSISTANCE FOR THE ACCESS MANAGEMENT UNIT - Preliminary Engineering - MM-COR 2018

Statewide STATEWIDE- TRAFFIC ENGINEERING STUDIES FOR LPA's FY 2017-2018 - Location Study - LC-RES 2018

Statewide STATEWIDE- TRAFFIC INCIDENT MANAGEMENT (TIM) PROGRAM - Intelligent Transportation Sys - SE-ITS 2018

Statewide STATEWIDE TRAFFIC MODELING - Location Study - MM-MPR 2018

Statewide STATEWIDE- TRAFFIC SIGNAL AND LIGHTING FOUNDATION DESIGN - Safety Roadway Safety - MM-SAF 2018

Statewide STATEWIDE: KANSAS DEPARTMENT OF TRANSPORTATION - CONSTRUCTION MANAGEMENT SYSTEM (CMS) - Preliminary Engineering - MM-MPR 2021

Statewide STATEWIDE: UPDATE POST TENSIONED HAUNCHED SLAB BRIDGE STANDARDS - Preliminary Engineering - SM-PBR 2018

Statewide US-169 FROM OLATHE TO STATE LINE - Administration - SE-ITS 2021

Statewide US-183, K-1, AND K-96 IN VARIOUS COUNTIES IN THE STATE 232.1 Signing 65 SM-SOS 2014

Statewide VARIOUS LOCATIONS IN DISTRICT ONE 64.9 Rumble Strip Installation 116 MM-SAF 2017

Statewide VARIOUS LOCATIONS IN THE SOUTHWEST DISTRICT - Milling 7 SM-1RR 2017

Statewide VARIOUSREST AREA LOCATIONS IN THE STATE OF MICHIGAN - Special 251 MM-MPR 2017

Statewide VARIOUS LOCATIONS ON US-83 IN HASKELL COUNTY, US-283 IN CLARK COUNTY AND US-160 IN SEWARD COUNTY - Milling 6 SM-1RR 2016

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF INDIANA - Special 3,066 MM-MPR 2017

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF IOWA - Special 3,396 MM-MPR 2017

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF KANSAS - Special 4,014 MM-MPR 2018

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF KENTUCKY - Special 1,943 MM-MPR 2017

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF MICHIGAN - Special 1,422 MM-MPR 2017

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF MINNESOTA - Special 845 MM-MPR 2017

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF OHIO - Special 5,357 MM-MPR 2017

Statewide VARIOUS REST AREA LOCATIONS IN THE STATE OF WISCONSIN - Special 1,498 MM-MPR 2017

Statewide VARIOUS REST AREA LOCATIONS IN THE STATES OF KANSAS, INDIANA, IOWA, KENTUCKY, MICHIGAN, MINNESOTA, OHIO AND WISCONSIN - Special - MM-MPR 2019

Statewide I035 I-35 IN JOHNSON AND WYANDOTTE COUNTIES 33.5 Signing 1,363 SM-SOS 2018

Statewide I035 I-35 IN MIAMI, FRANKLIN, COFFEY, AND OSAGE COUNTIES 58.5 Signing 629 SM-SOS 2017

Statewide I070 PAVEMENT MARKING ON I-70 IN SALINE AND DICKINSON COUNTY 15.2 Pavement Marking 373 SM-PMR 2017

Statewide I070 ON I-70 IN ELLSWORTH, LINCOLN, SALINE, DICKINSON, AND GEARY COUNTIES 111.0 Signing 1,168 SM-SOS 2017

Statewide I435 I-435 FROM THE KANSAS/MISSOURI STATE LINE WEST AND NORTH TO THE KANSAS/MISSOURI STATE LINE 28.0 Preliminary Engineering - SM-BSR 2014

Statewide U050 US-50, US-56, K-19 IN EDWARDS AND STAFFORD COUNTY 57.7 Signing 8 SM-SOS 2016

Statewide U054 US-54, US-75, K-58, K-105 IN COFFEY AND WOODSON COUNTIES 88.6 Signing 45 SM-SOS 2016

Statewide U069 US-69, US-69 ALT, US-166, US-400, K-7, K-26, K-66, K-102, K-103 AND K-171 IN CHEROKEE AND CRAWFORD COUNTIES 119.1 Signing 76 SM-SOS 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-22 (Projects Under Construction as of 12/28/2016)

Page 76: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

County Route Location Description Length (Miles)

Type of WorkEst FY

Const. Cost (1,000's)

Prog Cat & Subcat

Fiscal Year

Statewide U281 US-56, US-281, K-4, K-96 IN BARTON AND STAFFORD COUNTIES 115.4 Signing 67 SM-SOS 2016

Blanks in the Const. Cost column indicate that the project does not have a construction work phase. A breakdown of the Program Cat and Subcat column is providedpreceding the project lists. D-23 (Projects Under Construction as of 12/28/2016)

Page 77: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

C-67

Project Listings for Aviation,

Rail and Public Transit

Page 78: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

Kansas Airport Improvement ProgramProject Summary by County - FY 2018

County Project Total Cost State Funds Local Funds

B-68 (Aviation - 1)E-1

Atchison Atchison Fuel system upgrade and re-location $239,487.00 $208,250.00 $31,237.00

Butler Augusta Mill/overlay south 1000’ runway 18/36 $85,000.00 $76,500.00 $8,500.00

Douglas Baldwin City Draingage culvert replacement (under runway) $47,834.00 $43,055.00 $4,779.00

Douglas Baldwin City Solar powered lighted windsock $8,650.00 $7,785.00 $865.00

Mitchell Beloit Replace fuel system $63,500.00 $53,975.00 $9,525.00

Neosho Chanute Design pavement repairs for aprons/hgr taxilanes $10,000.00 $9,500.00 $500.00

Thomas Colby Design pavement repairs for runway and taxiways $5,000.00 $4,750.00 $250.00

Thomas Colby Pavement repairs for runway and taxiways $50,000.00 $45,000.00 $5,000.00

Lane Dighton Height & hazard overlay ordinance $35,000.00 $33,250.00 $1,750.00

Ford Dodge City Airline pax boarding ramp (disability access) $33,750.00 $28,690.00 $5,060.00

Butler El Dorado Entrance road/parking lot replacement, materials $40,000.00 $36,000.00 $4,000.00

Greenwood Eureka Runway repairs $52,550.00 $47,295.00 $5,255.00

Bourbon Fort Scott Upgrade AWOS-3 to AWOS-3PT $109,060.00 $109,060.00 $10,906.00

Barton Great Bend Replace primary runway regulators $38,380.00 $34,545.00 $3,835.00

Morris Herington Fuel system replacement/upgrade (100LL) $48,500.00 $41,225.00 $7,275.00

Reno Hutchinson Crack seal/re-do markings runway 4/22 $350,000.00 $315,000.00 $35,000.00

Montgomery Independence Jet fuel card reader $35,000.00 $29,750.00 $5,250.00

Kingman Kingman PAPI and AWOS ceilometer replacements $32,000.00 $28,800.00 $3,200.00

Douglas Lawrence KU ramp pavement replacement $148,400.00 $133,560.00 $14,840.00

Lincoln Lincoln Construct new runway (4200 x 60) w/ grading $800,000.00 $720,000.00 $80,000.00

Russell Lucas Pavement maint.-crack/surface seal; rwy markings $88,011.00 $79,210.00 $8,801.00

Jewell Mankato Pavement presv.-crack/surface seal/markings $146,520.00 $133,200.00 $13,320.00

McPherson McPherson Rehab turf crosswind runway $67,500.00 $60,750.00 $6,750.00

City

Page 79: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

B-69 (Aviation - 2)E-2

Kansas Airport Improvement ProgramProject Summary by County - FY 2018

County Project Total Cost State Funds Local FundsCity

Ness Ness City Preserve one city-owned hangar $43,987.00 $38,250.00 $5,737.00

Decatur Oberlin Rehab terminal building $10,000.00 $8,500.00 $1,500.00

Labette Parsons Pavement-design/repair joints/cracks, markings $10,000.00 $9,500.00 $500.00

Crawford Pittsburg Partial txwy (Rwy16 old end to new end) $346,500.00 $315,000.00 $31,500.00

Pratt Pratt Reconstruct Aprons $250,000.00 $225,000.00 $25,000.00

Sedgwick Rose Hill Pavement maint: crack seal for rwy and txwy $8,000.00 $7,200.00 $800.00

Sedgwick Rose Hill Taxiway A Rehab & extension $125,000.00 $112,500.00 $12,500.00

Saline Salina Design-apron repair $356,831.00 $338,990.00 $17,841.00

Saline Salina Apron repair $100,000.00 $90,000.00 $10,000.00

Dickinson Seneca Main apron pavement preservation $107,250.00 $96,525.00 $10,725.00

Cheyenne St. Francis Replace rotating beacon and AWOS ceilometer $42,000.00 $37,800.00 $4,200.00

Hamilton Syracuse Pavement maint: crack/surface seal and markings $30,000.00 $27,000.00 $3,000.00

Sumner Wellington Airport utilities--incorporates AV-2018-28 $290,535.00 $261,481.50 $29,053.50

Sumner Wellington Runway utilities w/ FAA $145,012.00 $138,107.00 $6,905.00

Cowley Winfield Pavementmaint:Designsealsandspallingrepairs $7,000.00 $6,650.00 $350.00

Cowley Winfield Pavement-constructionforseals/spallingrepair $290,000.00 $261,000.00 $29,000.00

Page 80: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

B-70

Rail Service Improvement FundMany areas of the state no longer have service from Class I railroads. Short line railroads provide rail service to such areas, provide an alternative to trucks for freight (primarily grain) shippers, and keep rural areas of the state connected to the national rail network as well as national and international markets for Kansas grains and products. This alternative provides competition and helps keep shipping rates down. It also reduces the number of trucks that would otherwise be on Kansas roads and highways. This in turn avoids increased maintenance and rehabilitation costs for those roads.

The Rail Service Improvement Fund is administered by KDOT’s freight and rail unit. The fund makes available to short line railroads and port authorities operating in Kansas, and shippers and local units of government in coordination with the serving railroad, low-interest, long-term (10-year) loans and grants to be used primarily for track rehabilitation, capacity improvement and economic development projects.Fundsmayalsobeusedforfinancingandacquisitionactivitiesandthepurchaseofrollingstock.

Included in the list below are projects completed in FY 2017, FY 2017 projects still in progress and new projects with signed agreements.

(Rail)

ProjectNumber Rail Line Segment

GrantAmount Project Description

LoanAmount

28 RF-0045-01

63 RF-0048-01

5 RF-0049-01

28 RF-0050-01

3 RF-0051-01

63 RF-0052-01

Garden City Western Railway

South Kansas and Oklahoma Railroad

Kansas and Oklahoma Railroad

City of Garden City

Cargill, Inc.

South Kansas and Oklahoma Railroad

311,756.68

227,290.80

3,000,000.00

3,000,000.00

976,515.38

379,967.40

Replacement/upgrade of 13 switches.

Re-routing of main line and expansion of indus-try track at Beachner Grain in Independence.

Construction and rehabilitation of rail line at newGreat Bend Transload Facility.

Construction of rail line into new Garden CityTransload Facility.

Construction of rail line into grain facility.

Construction of connecting track and realignmentof existing signals at crossing in Coffeyville.

415,657,57

303,054.40

1,302,020.50

506,623.20

E-3

Page 81: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

Counties Served LocalShare

TotalVehicle Costs

Coordinated Transit District (CTD) Operating

FederalShare

StateShare

FederalShare

StateShare

LocalShare

TotalOperating

Costs

State/Federal Public Transit Programs - Contracts

FY 2018 Coordinated Transit District (CTD) Operating

B-71(Public Transit - 1)

Urban Corridor Coordinated Trancil Council (CTD 1)

Central Kansas Coordinated Transit Council (CTD 2)

Northeast Kansas Coordinated Transit Council (CTD 3)

Flint Hills Coordinated Tranist Council (CTD 4)

East Central Coordinated Transit Council (CTD 5)

Southwest Kansas Coordinated Transit Council (CTD 6)

North Central Kansas Coordinated Transit Council (CTD 7)

Northwest Kansas Coordinated Transit Council (CTD 8)

South Central Kansas Coordinated Transit Council (CTD 9)

Southeast Kansas Coordinated Transit Council (CTD 10)

Douglas, Johnson, Leavenworth, Wyandotte

Barber, Barton, Marion, McPherson, Pratt, Reno, Rice, & Stafford

Atchinson, Brown, Doniphan, Jackson, Jefferson, Leavenworth, Nemaha

Clay, Dickenson, Geary, Marshall, Pottawatomie, Riley, Washington

Anderson, Chase, Coffey, Franklin, Greenwood, Linn, Lyon, Miami, Morris, Osage, Wabaunsee

Clark, Comanche, Edwards, Finney, Ford, Grant, Gray, Greeley, Hamilton, Haskell, Hodgeman, Kiowa, Lane, Kearney, Meade, Morton, Ness, Pawnee, Scott, Seward, Stanton, Stevens, Wichita

Cloud, Ellsworth, Jewell, Lincoln, Mitchell, Ottawa, Republic, Saline

Cheyenne, Decatur, Ellis, Gove, Graham, Logan, Norton, Osborne, Phillips, Rawlins, Rooks, Russell, Sheridan, Sherman, Smith, Thomas, Trego, Wallace

Butler, Cowley, Harper, Harvey, Kingman, Sedgwick, Sumner

Allen,Bourbon,Chautauqua,Cherokee,Crawford, Elk, Labette, Montgomery, Neosho, Wilson, Woodson

$484,076.89

$2,363,872.58

$992,792.82

$1,281,754.00

$1,887,980.72

$2,334,384.32

$2,981,323.89

$1,555,670.82

$1,647,202.25

$1,996,729.39

$17,525,787.69

$137,802.72

$685,957.80

$276,410.23

$361,899.20

$532,864.73

$662,846.93

$865,941.30

$441,178.62

$471,430.87

$578,505.19

$5,014,837.59

$129,007.20

$463,834.80

$167,377.60

$240,186.80

$344,280.00

$403,954.40

$562,893.60

$274,063.20

$336,316.40

$383,447.20

$3,305,361.20

$217,267.00

$1,214,080.00

$549,005.00

$679,668.00

$1,010,836.00

$1,267,583.00

$1,552,489.00

$840,429.00

$839,455.00

$1,034,777.00

$9,205,589.00

$478,113.00

$503,966.00

$157,292.00

$618,127.00

$665,846.00

$201,707.00

$356,744.00

$229,072.00

$430,399.00

$313,933.00

$3,955,199.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$382,490.40

$403,172.80

$125,833.60

$494,501.60

$532,676.80

$161,365.60

$285,395.20

$183,257.60

$344,319.20

$251,146.40

$3,164,159.20

*These amounts include all federal and state operating monies given to the CTD’s, CTD Federal Administration dollars and 5310 State operating expenses.

$95,622.60

$100,793.20

$31,458.40

$123,625.40

$133,169.20

$40,341.40

$71,348.80

$45,814.40

$86,079.80

$62,786.60

$791,039.80TOTAL:

E-4

Page 82: APPENDIX - Kansas Department of Transportation€¦ · In May 2010, the Kansas Legislature passed the transportation program, Transportation Works for Kansas (T-WORKS) that covers

FY 2018 Other Misc. Contracts

Counties Served LocalShare

TotalVehicle Costs

FederalShare

StateShare

FederalShare

StateShare

LocalShare

Other Misc. Contracts

Totals:

FY 2018 Urban Metropolitan ContractsCounties Served Local

ShareTotal

Vehicle Costs

FederalShare

StateShare

FederalShare

StateShare

LocalShare

TotalOperating

CostsUrban Metropolitan Contracts

Totals:

Wichita Transit

Johnson County Transit

UnifiedGovt.ofWyandotteCounty/KansasCity Kansas

Topeka Transit

City of Lawrence/Lawrence Transit

Flint Hills ATA

Wichita Urbanized Area

Johnson County Urbanized Area

Kansas City Kansas Urbanized Area

Topeka Urbanized Area

Lawrence Urbanized Area

Manhattan Urbanized Area

$1,609,035.00

$1,181,726.00

$841,633.00

$724,077.00

$1,199,138.00

$385,592.00

$5,941,201.00

Kansas University Center for Research - RTAP

Kansas Public Transit Association

Kansas CTD Council

Flint Hills Coordinated Transit Council - Mobility Manager

North Central Kansas Coordinated Transit Council - Mobility Manager

Statewide Projects

Statewide Projects

Statewide Project

Clay, Dickenson, Geary, Marshall, Pottawatomie, Riley, Washington

Cloud, Ellsworth, Jewell, Lincoln, Mitchell, Ottawa, Republic, Saline

$128,574.00

$55,125.00

$22,500.00

$89,197.00

$99,480.00

$394,876.00

$0.00

$5,125.00

$0.00

$17,839.40

$19,896.00

$42,860.40

$0.00

$0.00

$4,500.00

$71,357.60

$0.00

$75,857.60

$128,574.00

$50,000.00

$18,000.00

$0.00

$79,584.00

$276,158.00

B-72 (Public Transit - 2)

TotalOperating

Costs