applicability of small fast reactor “4s” for oil sands ... documents/guests/computare pdf...

23
Copyright 2009, Toshiba Corporation. 1 Applicability of Small Fast Reactor “4S” for Oil Sands Recovery Kazuo Arie Plant Project Engineering Department Nuclear Energy Systems & Services Division Power Systems Company Toshiba Corporation 30 th Annual CNS Conference / Western Focus Seminar May 31 - June 3, 2009 Calgary TELUS Convention Centre Calgary, AB, Canada AS-2009-000024 Rev.2 PSN-2009-0430

Upload: others

Post on 23-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

Copyright 2009, Toshiba Corporation.1

Applicability of Small Fast Reactor “4S”

for Oil Sands Recovery

Kazuo Arie

Plant Project Engineering Department

Nuclear Energy Systems & Services Division

Power Systems Company

Toshiba Corporation

30th Annual CNS Conference / Western Focus SeminarMay 31 - June 3, 2009

Calgary TELUS Convention CentreCalgary, AB, Canada

AS-2009-000024 Rev.2

PSN-2009-0430

Page 2: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

2/22

Copyright 2009, Toshiba Corporation.

Co-authors

S. Matsuyama, Y. Nishiguchi, Y. Sakashita, S. Kasuga

Toshiba Corporation

Yokohama, Japan

M. Kawashima

Toshiba Nuclear Engineering Services Corporation

Yokohama, Japan

T. Grenci

Westinghouse

Waddell, Arizona, USA

Page 3: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

3/22

Copyright 2009, Toshiba Corporation.

Outline

1. Overview

2. Design Description

3. Advantages

4. Concluding Remarks

Page 4: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

4/22

Copyright 2009, Toshiba Corporation.

1. Overview

Features

History

4S Versions and Applications

2. Design Description

3. Advantages

4. Concluding Remarks

Page 5: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

5/22

Copyright 2009, Toshiba Corporation.

Features

Reactor

Steam

Generator

Turbine/

Generator

Sodium cooled pool type

fast reactor

Versions

– 30 MWt (10MWe)

– 135 MWt (50MWe)

Main features– Passive safety

– No onsite refueling or long interval

30 MWt: 30 years

135 MWt: 10 years

– Low maintenance requirements for

static equipment

– Security enhanced by below grade

siting

Page 6: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

6/22

Copyright 2009, Toshiba Corporation.

History

1988: Began conceptual design study in Toshiba

1991: IAEA seawater desalination study with CRIEPI

1993: US DOE’s interest

2002 - 06: Innovative technology development funded by MEXT

2003: Galena, Alaska’s interest

2004: US DOE’s environmental assessment for Galena matter

2006: White paper for 4S introduction issued by Galena

2006: Selected one of the candidate reactors in GNEP SMR

Working Group (collaboration between DOE – METI)

2007: Began study for application to oil sands treatment

2007: Began the pre-review of US NRC on 10MWe-4S

2008: Began key components demonstration funded by METI

Page 7: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

7/22

Copyright 2009, Toshiba Corporation.

4S Versions and Applications

FWP Heater

Pump

Condenser

Turbine

GeneratorSeparator

Heater

RVACS

Air

Primary Na

Secondary Na

Water/Steam

IHX

EMP

Core

EMP

EMF

ACS

SG

RVACS IHX

EMP

Core

    

SG

EMP

EMF

Heater FWP Heater

Pump

Condenser

Turbine

GeneratorSeparetor

Air Cooler

10MWe / 30 MWt

Non-refueling (30 years)

50MWe / 135 MWt

Refueling Interval: 10years

Electric supply versions

In this study, “4S-135MWt” is applied to supply steam instead of

electricity for bitumen recovery from oil sands assuming Steam

Assisted Gravity Drainage (SAGD) method.

Page 8: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

8/22

Copyright 2009, Toshiba Corporation.

In Situ Projects

Bitumen

Production

[b/d]

Required Power

for Steam

Supply

[MWt]

In Situ Projects

Bitumen

Production

[b/d]

Required Power

for Steam

Supply

[MWt]

Chevron Canada Ellis River 100,000 767 KNOC BlackGold 20,000 153

CNRL Birch Mountain 30,000 230 Laricina Germain 1,800 14

CNRL Gregoire Lake 30,000 230 MEG Christina Lake 23,880 183

CNRL Kirby 30,000 230 NAOSC (Statoil) Kai Kos Dehseh 140,000 1073

CNRL Leismer 15,000 115 Nexen Long Lake 72,000 552

CNRL Primrose/Wolf Lake 120,000 920 Nexen Long Lake South 70,000 537

Connacher Great Divide 10,000 77 North Peace Energy Red Earth 1,000 8

ConocoPhillips Surmont 25,000 192 Patch Ells River 10,000 77

Devon Jackfish 35,000 268 Petrobank (Whitesands) 90,000 690

EnCana Borealis 32,500 249 Petro-Canada Chard 40,000 307

EnCana Christina Lake 30,000 230 Petro-Canada Meadow Creek 40,000 307

EnCana Foster Creek 30,000 230 Petro-Canada Lewis 40,000 307

Enerplus Kirby 25,000 192 Petro-Canada MacKay River 40,000 307

Husky Caribou Lake 10,000 77 Shell (BlackRock) Orion (Hilda

Lake)

10,000 77

Husky Sunrise 50,000 383 Shell Peace River 50,000 383

Husky Tucker 30,000 230 Suncor Firebag 68,000 521

Imperial Oil Cold Lake 30,000 230 Total (Deer Creek) Joslyn 15,000 115

JACOS Hangingstone 25,000 192 Value Creation Terre de Grace 40,000 307

Application for Canadian Oil Sands

Assumption: 230 MWt for 30,000 b/d

Source: Strategy West Inc. Report (2008)

Many sites require small power system (red columns)

Page 9: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

9/22

Copyright 2009, Toshiba Corporation.

1. Overview

2. Design Description

Reactor System

Heat Transport System

Reactor Building

3. Advantages

4. Concluding Remarks

Page 10: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

10/22

Copyright 2009, Toshiba Corporation.

Metallic fuel core (U-10%Zr)

Reactivity control by movable

reflectors

Shutdown system by reflectors

and a shutdown rod

Passive shutdown by metallic

fuel properties during ATWS

Electromagnetic pumps have

no moving parts

Reactor System

IHX

EM Pumps

Core

ReflectorShutdown rod

Page 11: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

11/22

Copyright 2009, Toshiba Corporation.

Heat Transport System

RVACS

Air

Primary Na

Secondary Na

Water/Steam

IHX

EMP

Core

Steam Drum

EMP

EMF

ACS

Pump

Supply Steam

Feed Water

FWP

SG

Helical-coil type

double-wall steam generatorIntegrated assembly of IHX

and EM pumps

Passive cooling

by RVACS

IRACS

cooling system

Recirculating-type steam generator system to provide a stable steam supply

Page 12: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

12/22

Copyright 2009, Toshiba Corporation.

Reactor Building

Steam generator

Reactor assembly

Vertical view

Rubber

FlangeLead

plug

Horizontal seismic isolatorSeismic isolator

Page 13: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

13/22

Copyright 2009, Toshiba Corporation.

Design ParametersType Sodium cooled pool type fast neutron reactor

Thermal Output 135 MWt

Number of Loops 1

Plant / Fuel Life Time 30 / 10 years

Fuel / Clad Material U-10%Zr / HT-9

Sodium Core Inlet / Outlet Temperature 355 / 510 degrees C

Steam Supply Condition to SAGD plant 310 degrees C, 10.0 MPa

Steam Supply Flow Rate to SAGD plant 238 t/h

Decay Heat Removal System RVACS + IRACS

Reactivity Control System Reflector Controlled

Primary EM Pump Linear annular induction type

Intermediate Heat Exchanger (IHX) Vertical shell-and-tube type straight tube

Steam GeneratorDouble wall tube with wire mesh,

helical coil type

Reactor Vessel DimensionsInner diameter : 3.6 m

Total height : 25 m

Reactor Building Dimensions 31 m Long, 25 m Wide, 22 m High

Page 14: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

14/22

Copyright 2009, Toshiba Corporation.

1. Overview

2. Design Description

3. Advantages

Bitumen Production

Plant Availability

Greenhouse Gas (GHG) Emissions

Modular Concept & Construction

4. Concluding Remarks

Page 15: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

15/22

Copyright 2009, Toshiba Corporation.

Bitumen Production

4S-135 MWt Capability

One unit of 4S-135 MWt

supplies steam for a

relatively small SAGD plant

to produce approx. 12,000

bpd of bitumen (@ SOR=3)

The modular concept of 4S is

a fit for oil sands application.

8,000

10,000

12,000

14,000

16,000

18,000

20,000

2 2.5 3 3.5 4

Steam to Oil Ratio (SOR) [-]

Bit

um

en

Pro

du

cti

on

Ca

pa

bil

ity

[b

pd

]

Page 16: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

16/22

Copyright 2009, Toshiba Corporation.

Plant Availability

Core life time is 10 years

Low maintenance requirements

Outage for refueling and maintenance : less than 1 month

Plant availability

10 years / (10 years + 1 month) = 99%

Page 17: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

17/22

Copyright 2009, Toshiba Corporation.

Greenhouse Gas (GHG)

One unit of 4S-135 MWt plant supplies approx. 2 x 106 t/y of

steam to a SAGD plant corresponding to 9000 – 18,000 bpd

production of bitumen.

Reduces approx. 400,000 t of CO2 emissions per year

(compared with a natural gas plant )

Further,

4S can produce hydrogen more efficiently than conventional

nuclear reactors since coolant temperature is high.

If 4S is applied to supply hydrogen for upgrading bitumen,

GHG emissions can be reduced further.

Page 18: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

18/22

Copyright 2009, Toshiba Corporation.

Modular Concept

Low initial costs & risk

Cost reduction by plant standardization and shared facilities at multiple phase

1st unit

4S-135 MWt

Nth unit

4S-135 MWt

2nd unit

4S-135 MWt

SteamSAGD AInitial phase

Multiple phase

shared

auxiliary facilities

(e.g., S/F storage,

refueling)

SAGD B

Bitumen

upgrading

T/G

H2

production

···

Steam

Electricity

H2

···

Page 19: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

19/22

Copyright 2009, Toshiba Corporation.

Modular Construction

Plant construction of 4S does not heavily depend on:

– site location

– site weather conditions

Because,

– the heaviest component is less than 100 tons

– all components can be delivered to site by truck

– construction time is less than 2 years

4S is a fit for oil sands applications

Page 20: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

20/22

Copyright 2009, Toshiba Corporation.

1. Overview

2. Design Description

3. Advantages

4. Concluding Remarks

Page 21: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

21/22

Copyright 2009, Toshiba Corporation.

Concluding Remarks

A 4S-135 MWt plant concept supplying steam for a

SAGD plant has been developed.

The 4S application to oil sands recovery

significantly reduces GHG emissions and has

numerous advantages.

The burden for development and licensing will be

reduced in tie-ups with the program for 4S-30 MWt

which is now in process of pre-application review

by U.S. NRC.

Page 22: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

22/22

Copyright 2009, Toshiba Corporation.

AcronymsATWS : Anticipated Transient without Scram

CRIEPI : Central Research Institute of Electric Power Industry

DWSG : Double-Wall Steam Generator

EM pump : Electromagnetic pump

GNEP : Global Nuclear Energy Partnership

GHG : Greenhouse gas

IAEA : International Atomic Energy Agency

IHTS : Intermediate Heat Transport System

IHX : Intermediate Heat Exchanger

IRACS : Intermediate Reactor Auxiliary Cooling System

METI : Ministry of Economy, Trade and Industry

MEXT : Ministry of Education, Culture, Sports, Science and Technology

RVACS : Reactor Vessel Auxiliary Cooling System

SAGD : Steam Assisted Gravity Drainage

SMR : Small and Medium Reactor

SOR : Steam to Oil Ratio

US DOE : United States Department of Energy

US NRC : United States Nuclear Regulatory Commission

Page 23: Applicability of Small Fast Reactor “4S” for Oil Sands ... documents/Guests/Computare PDF Western Focu… · A 4S-135 MWt plant concept supplying steam for a SAGD plant has been

23/22

Copyright 2009, Toshiba Corporation.