Process of registration of Boiler / Economiser Application along with fees and documents Fix date of inspection Prescribed fees as Per Indian Boiler Regulation, 1950 Within 7 days of owner intimating the Boiler been prepared as per Regulation Inspection of Boilers by Inspector Submit report to Deputy Chief Inspector of Boilers (DCIB) To be submitted by IB within 7 days of Inspection Submit report to Chief Inspector of Boilers(CIB) Not Satisfactorv Communicate to the Owner the reason Satisfactorv Registration i.e issue of Provisional order Provsional orders for six month pending Steam Test for certification Assign registry Number Communicate to owner for engraving/Marking Engrave/Mark Boiler Number on Boiler by Owner Owner intimates Inspector after Engraving/Marking on Boiler Page 1 of 6

Upload: others

Post on 14-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Application along with fees Prescribed fees as Per …...Process of registration of Boiler / Economiser Application along with fees and documents Fix date of inspection Prescribed

P r o c e s s of r e g i s t r a t i o n of B o i l e r / E c o n o m i s e r

Application along with fees

and documents

Fix date of inspection

Prescribed fees as Per Indian Boiler

Regulation, 1950

Within 7 days of owner intimating the Boiler

been prepared as per Regulation

Inspection of Boilers by

Inspector

Submit report to Deputy Chief

Inspector of Boilers (DCIB)

To be submitted by IB within 7 days of Inspection

Submit report to Chief

Inspector of Boilers(CIB)

Not Satisfactorv

Communicate to the

Owner the reason

Satisfactorv

Registration i.e issue of

Provisional order

Provsional orders for six month pending Steam Test for certification

Assign registry Number

Communicate to owner for engraving/Marking

Engrave/Mark Boiler Number on

Boiler by Owner

Owner intimates Inspector after

Engraving/Marking on Boiler

Page 1 of 6

Page 2: Application along with fees Prescribed fees as Per …...Process of registration of Boiler / Economiser Application along with fees and documents Fix date of inspection Prescribed

Checklist

• Application on Letter Head stating Makers number, type of boiler, capacity and heating surface

area

• Boiler/Economiser maker Folder ( e.g. Form II, Form III, Form IV, Form IV-A, Approved Drawings)

• IBR certificates of Mountings And Fittings

• Work Completion Report of steam pipe line, if applicable

• Fees for Registration and Inspection by way of challan

Time Line:

Maximum Number of Days to complete : 30 days

Page 2 of 6

Page 3: Application along with fees Prescribed fees as Per …...Process of registration of Boiler / Economiser Application along with fees and documents Fix date of inspection Prescribed

B. R e n e w a l of B o i l e r / E c o n o m l s e r C e r t i f i c a t e

Application with requisite fees

Fix date of inspection

Not Satisfartorv

Satisfactory

Submit certificate to DCIB

Within 7 days of owner intimating the Boiler has

been prepared as per Regulation

Communicate to the Owner the

reason

Obtain permission of CIS for

repairs

Issue repair order

Verification of repairs

y To be submitted by IB within 48 hours of

Inspection

Submit certificate to CIB for

Signature

Issue of Certificate for use of

Boiler

Checklist

• Application on Letter Head stating Boiler registration number

• Fees for Inspection by way of challan

Time Line:

Maximun Number of Days to complete : 15 days

Certificate for one year or Provisional

order for six months pending steam test