A member firm of Ernst & Young Global Limited
Ernst & Young LLP Suite 3200 401 Congress Avenue Austin, TX 78701
Tel: +1 512 478 9881 Fax: +1 512 473 3499 ey.com
Mr. Stanley Jessee
Superintendent
Rivercrest ISD4100 US Highway 271 SBogata, Texas 75417
, 2020
Application for Appraised Value Limitation on Qualified Property
Dear Mr. Jessee,
Please do not hesitate to contact me directly if you have any additional questions regarding this filing, or
need any further information.
Sincerely,
Adam Glatz
Senior Manager
Attachment
Copy to: Mr. Rick Lambert, Director, Powell Youngblood & Taylor, LLP Ms. Shelly Leung, Powell Youngblood & Taylor, LLP
Ms. Bristi Cure, Director, Invenergy LLC
Delilah Solar Energy LLC - Supplement No. 1, Amendment No. 2to Application 1385
June 26
Please see the attached Supplement #1 to Amendment #2 to the Application for Appraised Value Limitationfor Delilah Solar Energy LLC (Application # 1385 per the Comptroller of Public Accounts).
This amendment reflects updates to the number of construction jobs in Tab 4, relabeling of the map legend toread “Solar Farm Area/Total Site Solar Project Boundary” in the Proximity and Site Maps, the removal of the"Samson-Delilah Reinvestment Zone" line from both the map and legend in the Reinvestment Zone Map, removalof the "Project Summary Map", and updated wage amounts in Schedule C.
-
ATTACHMENT TO APPLICATION FOR CHAPTER 313 APPRAISED VALUE LIMITATION BY DELILAH SOLAR ENERGY LLC TO RIVERCREST ISD
Delilah Solar Energy LLC
Application for Appraised Value Limitation on Qualified Property
To
Rivercrest ISD
Tab #4
Detailed Description of Project
Delilah Solar Energy LLC proposes constructing an up to 51 MW solar electric generation facility on up to
The proposed qualified investment consists of solar photovoltaic modules, a single axis tracking system,
driven-pile foundations, DC wiring, DC/AC inverters, medium voltage step-up transformers, AC
cabling and a central substation with a high voltage step-up transformer. Upon completion the site will
include 36-52 inverters and 360,000 – 800,000 panels depending on the final size of the project built and
the associated electrical generating capacity of each panel.
Other improvements include an electrical substation or switchyard, collection cable, foundations and
racking, modules, trackers, inverters, transformers, DC & AC collections (above grade and buried),
transmission facilities, and roads associated with the solar facility.
The capital investment for this project is estimated to be $52 million. There will be 100 construction jobs
in the first year and 50 construction jobs in the second year as well as one (1) permanent local job once
fully operational. Delilah Solar Energy LLC anticipates the commencement of commercial operations for
this project by the second quarter of 2022. This project may be referred to as Delilah or Delilah Solar En-ergy in media reports.
Delilah Solar Energy LLC has applied to ERCOT on November 9, 2018 and has received the following
IGNR number: 21INR0221.
MJ786TPText Box1385 - Rivercrest ISD - Delilah Solar Energy LLC -Supplement 001 to Amendment 002 - 06.26.2020
MJ786TPStamp
-
!(
!(
!(
!(
!(
!(
!(!(
¬«37
¬«37
¬«96
¬«37
")1820
")1102
")1430")1470
")1312
")1100
")1335
")4105
")1905
")2007
")3547
")17350
")1285
")1135
")1490
")1371
")1465
")1410
")2163
")17360
")2127
")15300
")1122
")1204
")2278
")1277
")1417
")1442
")1915
")1270
")15070
")2143
")1276
")1125
")1345
")1165
")17300")1480
")1278
")1370
")2110
")1828
")1150
")2130
")2113
")16080
")1110
")1436
")1353
")2115")NW 1028
")1155
")NW1074
")16020")1271
")1267
")4130
")1200
")2162
")1272
")1347
")1282
")5015
")3545
")1825
")1355
")2123
")1118 ")1435
")4611
")1091
")1206
")1130
")2020
")NE 2110
")1426
")2124
")NE 2123
")15240
")1910
")3202
")2165
")1162
")4633
")2116
")NW1022
")1248
")3548
")5001
")1237
")15400
")15170
")1305
")1482
")17050
")1131
")3101
")1340
")2120
")2155
")1405
")1257
")1245
")2104
")3150
")1367
")1325
")15160
")1414
")1455
")15220
")1245
")NW1085
")1249
")1287
")1460
")4610
")15350
")1331")15200
")1413
")1420
")2110
")15190
")NW1070
")1242
")1113
")1247
")1250
")4110
")1322
")1275")1360
")NE 2120
")6045
")1425
")NW1060
")1357
")NW1081
")1240
")1467 ")1412
")1427
")16060
")3629
")4115
")16100 ")1160
")1286
")NW 1050
")1870
")1210
")2142
")1330
")NW 1080
")15140
")1290
")15120
")16130
")2161
")1416
")1365
")1112
")15180
")4605
")1255
")1350
")15100
")1216
")1215
")1280
")1300
Clarksville
Bogata
Deport
Detroit
Talco
Bagwell
Johntown
£¤271
£¤271D
£¤82
£¤82
£¤271
Franklin
County
Hopkins
County
Franklin
County
Titus C
ounty
Franklin CountyRed River
County
Hopkins CountyDelta C ounty
Titus CountyRed River County
Delta CountyLamar Coun ty
Lamar C
ounty
Red Riv
er Coun
ty
Proximity Map - Delilah Solar Energy I LLCDelilah Solar Energy Center I LLC | Lamar & Red River Counties, Texas
Date Saved: Tuesday, January 21, 2020 1:34:31 PM Prepared By: RMead Coordinate System: WGS 1984 Web Mercator Auxiliary Sphere Path: \\AZ-CGISARC1\gisdocs\_MXDs\US\TX\_Solar\Delilah\delilah_reinvestmentzone_lett.mxd
!(
County BoundaryPrairiland ISDRivercrest ISD
Road ClassificationUS/State RouteCounty Road
January 21, 2020Rev. 00
!(
ÛÛÛ
5,900 0 5,900Feet
Solar Farm Area/Total SiteSolar Project Boundary
City
Legend
MJ786TPText Box1385 - Rivercrest ISD - Delilah Solar Energy LLC -Supplement 001 to Amendment 002 - 06.26.2020
-
GGG
GGG
GGG
G G
GG
")1116
")16080
")17300
")1150
")1110
")1155
")1118
")16100
")1135
")16040
")17050
")1131
")1113
")16060
")1160
")16130
£¤271
Lamar C
ounty
Red Riv
er Coun
ty
Site Map - Delilah Solar Energy LLCDelilah Solar Energy Center LLC | Lamar and Red River Counties, Texas
Date Saved: Wednesday, February 5, 2020 3:35:38 PM Prepared By: CLevy Coordinate System: WGS 1984 Web Mercator Auxiliary Sphere Path: \\az-cgisarc1\GISDOCS\_MXDs\US\TX\_Solar\Delilah\delilah_reinvestmentzone_lett.mxd
LegendG Inverter
Project SubstationProject T-Line
Road ClassificationUS/State RouteCounty Road
April 14, 2020Rev. 00
!(
ÛÛÛ
1,400 0 1,400Feet
BlocksCounty Boundary
Solar Farm Area/Total SiteSolar Project Boundary
MJ786TPText Box1385 - Rivercrest ISD - Delilah Solar Energy LLC -Supplement 001 to Amendment 002 - 06.26.2020
-
GGG
GGG
GGG
G G
G G
¬«37
¬«37
")1102
")1307
")1100
")17350
")1465
")1122
")1204
")1116
")17360
")1125
")1150
")1309
")1110
")16080
")1155
")5015
")15460
")1118
")1206
")1130
")1135
")1162
")16040
")17050
")1131
")1210 ")1300
")1106
")NW1081
")1455
")NW 1080
")1113
")16100
")1467
")16060
")1160
")16130
")1112
")17300
Bogata£¤271D
£¤271
Franklin
County
Hopkins
Count
y
Franklin CountyRed River County
kins CountyDelta Co
unty
Delta County
Lamar County
Lamar C
ounty
Red Riv
er Coun
ty
Reinvestment Zone - Delilah Solar Energy LLCDelilah Solar Energy Center LLC | Lamar and Red River Counties, Texas
Date Saved: Friday, April 17, 2020 3:31:10 PM Prepared By: CLevy Coordinate System: WGS 1984 Web Mercator Auxiliary Sphere Path: \\az-cgisarc1\GISDOCS\_MXDs\US\TX\_Solar\Delilah\delilah_reinvestmentzone_lett.mxd
Legend!(G
County BoundaryDelilah Reinvestment ZoneRivercrest ISD
Project Layout
Road ClassificationUS/State RouteCounty Road
June 18, 2020Rev. 00
!(
ÛÛÛ
2,600 0 2,600Feet
Solar Farm Area/Total SiteSolar Project Boundary
CityInverter
Project Delilah within Rivercrest ISD
MJ786TPText Box1385 - Rivercrest ISD - Delilah Solar Energy LLC -Supplement 001 to Amendment 002 - 06.26.2020
-
Date
Applicant Name Form 50-296A
ISD Name Revised May 2014
Non-Qualifying Jobs
Column A Column B Column C Column D Column E
YearSchool Year (YYYY-YYYY)
Tax Year (Actual tax year)
YYYY
Number of Construction FTE's or man-hours
(specify)Average annual wage rates
for construction workers
Number of non-qualifying jobs applicant estimates it
will create (cumulative)
Number of new qualifying jobs applicant commits to
create meeting all criteria of Sec. 313.021(3)
(cumulative)Average annual wage of
new qualifying jobs
Each year prior to start of Value Limitation Period Insert as many rows as necessary
0 2020-2021 2020 75 FTE's 39,000.00$
QTP1 2021-2022 2021 100 FTE's 39,000.00$
QTP2 2022-2023 2022 50 FTE's 39,000.00$
1 2023-2024 2023 1 39,000.00$
2 2024-2025 2024 1 39,000.00$
3 2025-2026 2025 1 39,000.00$
4 2026-2027 2026 1 39,000.00$
5 2027-2028 2027 1 39,000.00$
6 2028-2029 2028 1 39,000.00$
7 2029-2030 2029 1 39,000.00$
8 2030-2031 2030 1 39,000.00$
9 2031-2032 2031 1 39,000.00$
10 2032-2033 2032 1 39,000.00$
Years Following Value Limitation Period
11 through
252033-2048 2033-2047 1 39,000.00$
Notes: See TAC 9.1051 for definition of non-qualifying jobs.Only include jobs on the project site in this school district.
C1. Yes No
C1a. Yes No
C1b. Yes No
If yes, answer the following two questions:
Are the cumulative number of qualifying jobs listed in Column D less than the number of qualifying jobs required by statute? (25 qualifying jobs in Subchapter B districts, 10 qualifying jobs in Subchapter C districts)
Will the applicant request a job waiver, as provided under 313.025(f-1)?
Will the applicant avail itself of the provision in 313.021(3)(F)?
23-Mar-20
Value Limitation Period The qualifying time period could overlap the
value limitation period.
Schedule C: Employment Information
Delilah Solar Energy LLC
Rivercrest ISD
Construction Qualifying Jobs
MJ786TPText Box1385 - Rivercrest ISD - Delilah Solar Energy LLC -Supplement 001 to Amendment 002 - 06.26.2020