Page 1: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

Excavated Materials Options Assessment (EMOA)Annex C1 to C3Doc Ref: 9.10.03

Folder 88 September 2013DCO-DT-000-ZZZZZ-091003

Anne

x C1

to C

3

Thames Tideway Tunnel Thames Water Utilities Limited

Application for Development ConsentApplication Reference Number: WWO10001

Page 2: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003
Page 3: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

Key to worksheets:

Long list sites name & IDViability filter

This spreadsheet should be read in conjunction with the EMOA

This worksheet provides basic details relating to every option on the long listThis worksheet provides basic details relating to the performance of every site on the long list against evaluation indicators 11a)-e).

This assessment process necessarily relies to a large extent on responses to telephone surveys and internet searches, whilst every endeavour has been made to ensure the information used is

correct, the accuracy of the information is not guaranteed. The EMOA has been designed to allow for reassessment of options during the process if new data is obtained.

Page 4: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

This spreadsheet should be read in conjunction with the EMOA

Page 5: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID

Site

ID

Name Operator

Location Postcode/ Grid reference Type of operation

Long list Green on Viability filter (Options on

Viable List)

Green on Viability

Asessment (Options on Short List)

Preferred list (Options on

planning stage preferred list) Date added

AGR 50 Agricultural Lime VariousVarious (e.g.John Bourne & Co) TN18 5QG Use in Industry

1

AHN Calais Wood, Broxbourne A H Nicholls & Sons LtdEttridge Farm Depot, Pembridge Lane, Broxbourne, Hertfordshire, EN TL 327830 067860

Material Recycling (including

aggregates and soils)

1

AIR 54 Thames Estuary Airport None

Thames Estuary

51.460425, 1.062241

Development and

Infrastructure (including

Power) 1

AUB Mimbridge Nurseries, Chobham, Gu24 Aubrey Smith & Co ( Horsell) LtdMimbridge Nurseries, Station Road, Chobham, Woking, Surrey, GU24 8 SU 991390 606130

Material Recycling (including

aggregates and soils)

1

BAR Wapsey's Wood Bardon Aggregates

Gerrards Cross, Buckinghamshire Landfill and Quarry Restoration 1

BAR.1 Park Farm, Ardleigh Bardon Aggregates Slough Lane, Ardleigh, Essex TM 05271 27921

Landfill and Quarry

Restoration 1 25/01/2012

BAR.2 Slough farm, Ardleigh Bardon Aggregates Slough Lane, Ardleigh, Essex TM 04954 27728

Landfill and Quarry

Restoration 1 25/01/2012

BAR.3 Martells Quarry Bardon Aggregates Slough Lane, Ardleigh, Essex TM 05005 28319

Landfill and Quarry

Restoration 1 25/01/2012

BAT 34 Battersea Power Station & Nine Elms REO (Powerstation) Ltd

Wandsworth SW8 5BN Development and

Infrastructure (including

Power) 1

BIF.1 18 Biffa - Shakespeare Farm Landfill Biffa

Rochester, Kent ME3 8RN Landfill and Quarry Restoration 1

Page 6: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

BIF.2 19 Biffa - Redhill Landfill Biffa

Surrey RH1 4ER Landfill and Quarry Restoration 1

BIF.3 20 Biffa - Colnbrook Landfill Biffa

Surrey SL3 8AB Landfill and Quarry Restoration 1

BOR Borough Green Sand Pit Borough Green Sand Pits LtdLand / Premises At, Platt Industrial Estate, Borough Green, Sev TQ 6150 5750

Landfill and Quarry Restoration

1

BOU Bournewood Inert Landfill Site Bournewood Sand And Gravel Ltd Off A20 By Pass, Swanley, Kent, BR8 7DP, TQ 5020 6820

Landfill and Quarry Restoration

1 Y 1 1

BRE.1 Park Lodge Landfill Brett Aggregates LtdPark Lodge, Pinewood Road, Iver, Bucks, SL0 0NE, TQ 182800 8350

Landfill and Quarry Restoration

1

BRE.2 Home Farm Landfill Brett Aggregates Ltd; Tarmac LtdHome Farm Landfill, Littleton Lane, Shepperton, Middlesex, TW17 0NF TQ 0593 6738

Landfill and Quarry Restoration

1 Y 1

BRE.3 Ham Farm Landfill Brett Aggregates LtdHam Farm Landfill, Ham Road, Faversham, ME13 7TS, TR 020000 626000

Landfill and Quarry Restoration

1

Page 7: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

BRE.4 Hersham Pit, Hersham, Kt12 Brett Aggregates LtdHersham Pit, East of Molesey Road, Hersham, Surrey, KT12, TQ 128000 663000

Landfill and Quarry Restoration

1

BRE.5Fairlop Quarry (area C) Brett- Lafarge Joint Venture Brett Lafarge Ltd

Fairlop Quarry (C), Hainault Road, Little Heath, Romford, Essex, RM6 5SS, TQ 464000 907000

Landfill and Quarry Restoration 1 Y 1

BRE.6 Queen Mary Brett Aggregates; Reservoir Aggregates Ashford Road, Laleham, Middlesex TW18 1QF TQ 06249 70356

Landfill and Quarry Restoration 1 Y 1 28/07/2011

BRE.7 Church Farm, Alresford Brett AggregatesFord Lane Alresford, Colchester, Essex, CO7 8BB TM 06315 19991

Landfill and Quarry

Restoration 1 25/01/2012

BRE.8 Lodge Farm, Alresford Brett AggregatesFord Lane Alresford, Colchester, Essex, CO7 8BB TM 05851 20551

Landfill and Quarry

Restoration 1 25/01/2012

BRE.9 Sandon, Chelmsford Brett Aggregates Sandon Quarry, Mayes Lane, Chelmsford Essex TL 74747 04109

Landfill and Quarry

Restoration 1 25/01/2012

BRO Brocks Haulage Brocks Haulage LtdWatson Close, West Thurrock, Grays, Essex, RM20 3EF, TQ 58223 76835

Material Recycling (including

aggregates and soils)

1

BUL Bulmer Brickfields Bulmer Brick Cutting Services The Brickworks, Hedingham, Bulmer, Essex TL 83304 38221

Landfill and Quarry

Restoration 1 25/01/2012

BWR B W Rice Treatment B W Rice Plant & Skip Hire LtdRomainville Way, Charfleets Ind Est, Canvey Island, Essex, SS8 0RB, TQ 77045 83104

Material Recycling (including

aggregates and soils)

1

CAM Camden Plant, Lower Hall Lane Camden Plant Ltd Lower Hall Lane, Chingford, London, E4 8JG, TQ 362340 925830

Material Recycling (including

aggregates and soils)

1

CAN Units 1&2 Willesborough Industrial Estate Cannon Hygiene LtdUnits 1&2, Willesborough Industrial Estate, Kennington Road, Wille TR 033930 422630

Material Recycling (including

aggregates and soils)

1

Page 8: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

CAS Castcrete Ltd, Unit 3 Spindle Way Castcrete LtdCastcrete Ltd, Unit 3 Spindle Way, Crawley, West Sussex, RH10 1TG, TQ 27612 36467

Material Recycling (including

aggregates and soils)

1

CAT 45Catalysing agent in copper, iron and steel manufacture Various eg Buxton Lime

Derbyshire SK17 8TG Use in Industry1

CEM Cement Industry - Cemex Cemex U K Materials Ltd

Rugby Cement Works

CV21 2RY

Cement and Brick

Manufacture 1

CEM.1 Borough Green Quarry Cemex U K Materials LtdCemex Uk, Wrotham Road, Sevenoaks, Kent, TN15 8DN, TQ 6196 5769

Landfill and Quarry Restoration

1 Y 1 1

CEM.10 Martins Farm, Wellwick, St Osyth CEMEXMartins Farm, St Osyth, Clacton-on-Sea, CO16 8HN TM 11494 17438

Landfill and Quarry

Restoration 1 25/01/2012

CEM.2 Coldharbour Lane Landfill Cemex U K Materials LtdLand / Premises At, Norlands Lane, Thorpe, Egham, Surrey, TW20 TQ 027000 690000

Landfill and Quarry Restoration

1

CEM.3 Great Westwood Cemex U K Materials Ltd Fir Tree Hill, Staines, Hertfordshire, WD3 4LY, TQ 0750 9900

Landfill and Quarry Restoration

1

CEM.4 Stanwell Landfill Ii Cemex U K Materials Ltd Staines, Surrey, TW19 9XT, TQ 0500 7450

Landfill and Quarry Restoration

1

CEM.5 Eversley Quarry Cemex U K Materials LtdFox Lane, Off Reading Road, Eversley, Hampshire RG27 0NQ

Landfill and Quarry Restoration 1 23/08/2011

Page 9: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

CEM.6 Kingsmead Quarry Cemex U K Materials Ltd Stanwell Road, Horton, Berkshire SL3 9PG

Landfill and Quarry Restoration 1 Y 1 1 23/08/2011

CEM.7 Barrington Landfill Cemex U K Materials Ltd Haslingfield Road, Barrington Cambridgeshire CB22 7RQ

Landfill and Quarry Restoration 1 Y 1 1 23/08/2011

CEM.8 Westmill Quarry Cemex Materials Ltd.Westmill Quarry, Westmill Road, Ware, Hertfordshire SG12 0ES TL 34793 15874

Landfill and Quarry

Restoration 1 25/01/2012

CEM.9 Bradwell Quarry CEMEX Bradwell, Nr. Braintree, Essex. CM77 8EP

TL 82284 21026 Landfill and Quarry

Restoration 1 25/01/2012

CHA Chambers, Hollybush Lane, Aldershot Gu11 Chambers Waste Management PlcHollybush Lane, Aldershot, Hampshire, GU11 2PX, SU 882900 522900

Material Recycling (including

aggregates and soils)

1

CHE 38 Chelsea Barracks Project Blue (Guernsey) Ltd

Chelsea, West London SW1W 8 Development and

Infrastructure (including

Power) 1

CHK Chalk grassland restoration Salisbury PlainHabitat

restoration 1

CHR.1 Hythe End Farm Landfill Charles Morris Fertilizers LtdHythe End Farm, Hythe End Road, Wraysbury, Berkshire, TW19 5AW, TQ 0140 7260

Material Recycling (including

aggregates and soils)

1

CHR.2 Charles Morris, Horton Rd Charles Morris Fertilizers LtdHorton Road Site, Horton Road, Stanwell Moor, Staines, Middlesex, TQ 045890 744850

Material Recycling (including

aggregates and soils)

1

Page 10: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

CLC C L C C L C Construction Ltd25/26 Childerditch Industrial Park, Childerditch Park, Brentwood, E TQ 60716 89644

Material Recycling (including

aggregates and soils)

1

CLE Rainbow Shaw Treatment Clearserve LtdRainbow Shaw Quarry, Holford Road, Linford, Stanford Le Hope, Esse TQ 66748 80366

Landfill and Quarry

Restoration

1

COR.1 21 Cory - Mucking Landfill Cory

Stanford Le Hope, Essex SS17 0RN Landfill and Quarry

Restoration 1 Y 1

COR.2 22 Cory - Barling Marsh Landfill Cory

Essex SS3 0NR Landfill and Quarry

Restoration 1 Y

CPB Strawberry Farm, Normandy, Gu3 C P Backhurst & Co LtdStrawberry Farm, Glaziers Lane, Normandy, Guildford, Surrey, GU3 2 SU 934940 508600

Material Recycling (including

aggregates and soils)

1

CRE Crescent Shipyard Crescent Marine Services LtdCommissioners Road, Strood, Rochester, Kent, ME2 4HA, TQ 746000 694000

Landfill and Quarry

Restoration

1

CRO 39 Crown Estates Crown EstatesVarious Locations, Including Portland Quarries DT5 2DP (nearest) -

Portland QuarriesHabitat

restoration 1

DAV John Davies, Woolmongers Lane Davies JohnThe Elms, Woolmongers Lane, Epping Forest, Essex, CM4 0JX, TL 583000 017000

Material Recycling (including

aggregates and soils)

1

Page 11: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

DAY Woking Depot DAY Aggregates Woking Yard, Woking. GU22 7QE

Material Recycling (including

aggregates and soils) 1

DLR Docklands Light Railway DLR project team

(020) 7987 4244 Development and

Infrastructure (including

Power) 1

DPW 37 London Gateway Port DP World/ Laing O Rourke Infrastructure LtdThe Manorhouse, The Manorway, Stanford Le Hope, Essex, SS17 9PD, TQ 72970 81610

Development and

Infrastructure (including

Power)

1

DRA Drax Power Station DRAX Group Plc

Development and

Infrastructure (including

Power) 1

DRU Drum Disposal & Recycling Services Ltd Drum Disposal & Recycling ServicesUnit 7 Albright Industrial Estate, Ferry Lane, Rainham, Essex, RM13 TQ 516130 819160

Material Recycling (including

aggregates and soils)

1

EAR.1 Warren Farm Landfill Earthline Ltd Calfont St. Peter, Buckinghamshire, SL9 0QY, TQ 020000 915300

Landfill and Quarry

Restoration

1

EAR.2 Warren Farm, Chalfont St Peter Earthline LtdWarren Farm, Chalfont St Peter, Buckinghamshire, SL9 0QH, TQ 011750 909000

Landfill and Quarry

Restoration1

EAR.3 Shellingford Quarry Earthline LtdStanford Road, Stanford in the Vale, Faringdon, Berkshire, SN7 8HE SU 32880 93631

Landfill and Quarry

Restoration 1

Page 12: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

ECO Eco Aggregates Cole Green Eco Aggregates LtdHighfields, Birchall Lane, Cole Green, Welwyn Garden City, Hertford TL 270130 115920

Material Recycling (including

aggregates and soils)

1

EDL Rainham Generation Plant EDL Operations (Rainham) LtdRainham Generation Plant Compound, Coldharbour Lane, Rainham, Esse TQ 524500 792000

Development and

Infrastructure (including

Power)

1

EDW.1 Crumps Farm,Lt Canfield, Dunmow Edwards Waste Management Little Canfield, Dunmow Essex TL 58082 20792

Landfill and Quarry

Restoration 1 25/01/2012

EDW.2 Little Bullocks Farm, Great&Little Canfield Edwards Waste Management Little Canfield, Dunmow Essex TL 58065 20506

Landfill and Quarry

Restoration 1 25/01/2012

ENE Energyready Energyready Ltd39 High Street, Rowhedge, Colchester, Essex, CO5 7ET, TM 03169 21478

Development and

Infrastructure (including

Power)

1ENV Flood Defence Environment Agency Flood Defence 1

ENV.1 12 EA Flood Defences (river) Environment Agency

Mole Valley - RH10 7ZJ (nearest), � Mole Valley - RH10 7ZJ (nearest),

Flood Defence

1

ENV.2 13 EA Flood Defences (river) Environment Agency

Catford (River Quaggy) - SE9 5LW (nearest)

Catford (River Quaggy) - SE9 5LW (nearest)

Flood Defence

1

ENV.3 Flood Defences East Anglia Environment Agency Flood Defence

1

ENV.4 Flood Defences Thames Estuary Environment Agency, Kent Thames Gateway.

Flood Defence1

EON 41 Kingsnorth Power Station (Medway Estuary) E.ON

Medway ME3 9LD Development and

Infrastructure (including

Power) 1

ERI Crayford Marshes Landfill, Erith Da8 Erith Environmental Services LtdCrayford Marshes Landfill Site, off Thames Road, Crayford Marshes, Slade Green, Kent, TQ 532040 761250

Landfill and Quarry

Restoration1

Page 13: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

EVA Evans Thornwood John Evans, Timothy Evans, Terry EvMarlow, High Road, Thornwood Common, Epping, Essex, CM16 6LU, TL 469240 049630

Material Recycling (including

aggregates and soils)

1

FIL Filling of London Docks

Development and

Infrastructure (including

Power) 1

FLO Flowline Flowline LtdRawreth Industrial Estate, Rawreth, Rayleigh, Essex, SS6 9RL, TQ 79650 92360

Material Recycling (including

aggregates and soils)

1

FRE 46 Soil conditioner and topsoil manufacture Freeland

Various - e.g. Freeland in Kent BR8 7LT Material Recycling (including

aggregates and soils) 1

FRO 40 Frontiers/Storefield Aggregates Frontiers/Storefield Aggregates

Dartford, Kent DA9 9DU (nearest) Landfill and Quarry

Restoration 1 Y 1

GAL.1 28 Hermitage Quarry Inert Landfill Gallagher Aggregates LtdLand / Premises At, Hermitage Lane, Maidstone, Kent, ME16 9NT, TQ 7232 5602

Landfill and Quarry

Restoration

1 Y

GAL.2 28 Workhouse Quarry Inert Landfill Gallagher Aggregates LtdLand / Premises At, Workhouse Road, Ryarsh, West Malling, Kent, TQ 666500 598000

Landfill and Quarry

Restoration

1

Page 14: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

GBF Manor Farm Landfill Site G B Foot LtdManor Farm, Monk Sherborne, Tadley, Hants, RG26 5HW, SU 6085 5565

Landfill and Quarry

Restoration

1

GOO Bluelands Quarry Goodman Bluelands Quarry, Arterial Road, Purfleet TQ 57019 78669

Landfill and Quarry

Restoration 1 25/01/2012

GRU Various GrundonLakeside Industrial Estate, Colnbrook, Slough SL3 0EG

Landfill and Quarry

Restoration 1

GUI Kill Copse, Willinghurst Estate Guildford Tipper Hire LtdKill Copse, Willinghurst Estate, Shamley Green, Guildford, Surrey, TQ 04700 43700

Material Recycling (including

aggregates and soils)

1

GYP Oast House Farm Gypsum Recycling International A/sShed 3 & 4, Ridham Dock, Ridham, Sittingbourne, Kent, ME9 8SR, TQ 9210 6820

Material Recycling (including

aggregates and soils)

1

GYS Press House Shed Gypsum Recycling U K Ltd Rochester Works, Halling, Kent, ME2 1AWH, TQ 7010 6500

Material Recycling (including

aggregates and soils)

1

HAH Igtham Sandpit H & H Celcon The sandpit, Borough Green Road, Igtham, Kent TQ 60606 57931

Landfill and Quarry Restoration 1

HAN.1 Shipton-on-Cherwell Quarry. Hansteen Holdings Shipton-on-Cherwell, Oxfordshire OX5 3EL SP 47870 17417

Landfill and Quarry

Restoration 1 Y 1 1 20/09/2011

HAR.1 Aldermarston Wharf Harleyford Aggregates SU 59856 66872

Landfill and Quarry

Restoration 1

HAR.2 The Lea Harleyford Aggregates Denham,UB9 5PG TQ 04829 85929

Landfill and Quarry

Restoration 1

Page 15: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

HAR.3 Harefield Pit Harleyford Aggregates Morefield Road, UB9 6BD TQ 04851 88882

Landfill and Quarry

Restoration 1

HAR.4 Harleyford Marina Harleyford Aggregates Henley Road SU 83312 84960

Landfill and Quarry

Restoration 1

HAS Maldon Road, Birch Hanson AggregatesMaldon Road Layer, Marney Colchester Essex CO5 9XE TL 92814 19429

Landfill and Quarry

Restoration 1 25/01/2012

HAV South Hall Farm Havering Aggregates LtdSouth Hall Farm, New Road, Rainham, Essex, RM13 9EW, TQ 537470 819860

Material Recycling (including

aggregates and soils) 1

HAZ Harpwood Residential Hazeldene Mr And MrsHarpwood, Seven Mile Lane, Wrotham Heath, Kent, TN15 7RJ, TQ 636000 580000

Landfill and Quarry

Restoration

1

HEN.1 Harlington Pit Henry Streeter High Street, Harlington, Hayes, Middx.UB3 5DA TQ 08432 78266

Material Recycling (including

aggregates and soils) 1 Y 1 28/07/2011

HEN.2 Sipson Lane Henry Streeter Sipson Rd, Sipson Lane, Hayes Middx TQ 07585 78189

Material Recycling (including

aggregates and soils) 1 Y 1 28/07/2011

HEN.3 Land at Hengrove Farm Henry StreeterLand at Hengrove Farm, London Road, Staines, Middlesex, TW15 4AJ TQ 05345 72202

Material Recycling (including

aggregates and soils) 1 28/07/2011

HIG 30 M25 widening Highways Agency

Various (as well as other Highways Agency Developments)

RM19 1YN(nearest)

Development and

Infrastructure (including

Power) 1

HIL.1 Bowling Green Farm, Farringdon Hills Minerals & Waste LtdStanford Rd, Shellingford, Farringdon, Oxfordshire SN7 8EZ SU 31026 94866

Landfill and Quarry

Restoration 1

HIL.2 Chinham Farm Hills Minerals & Waste LtdStanford Rd, Shellingford, Farringdon, Oxfordshire SN7 8EZ SU 31026 94866

Landfill and Quarry

Restoration 1

HIL.3 Tubney Wood Quarry, Tubney Hills Minerals & Waste LtdOaksmere, Tubney, Abingdon, Oxfordshire OX13 5QU SP 44790 00680

Landfill and Quarry

Restoration 1

HOG Unit 75 Kingsnorth Industrial Estate Hogarth Tyre Shredders LtdHogarth Tyre Shredders Ltd, Unit 75 Jetty Road Kingsnorth Indu TQ 806000 732000

Material Recycling (including

aggregates and soils)

1

Page 16: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

HRO H Rockall, Kimber Lane, Maidenhead, Sl6 H Rockall & SonH Rockall, Kimber Lane, Maidenhead, Berkshire, SL6 2QP, SU 886100 790000

Material Recycling (including

aggregates and soils)

1

IBS 44 Ibstock Brick Manufacturers Ibstock Brick Manufacturers

Leicestershire LE67 6HS Cement and Brick

Manufacture 1

IME Quidhampton Quarry Imerys Former Imerys Quarry, Quidhampton,SP2 9AD SU 11360 31472

Landfill and Quarry

Restoration 1 25/01/2012

ING.1 Marks Warren Quarry Landfill Ingrebourne Valley LtdMarks Warren Quarry Landfill, Whalebone Lane North, Romford, Es TQ 4885 8971

Landfill and Quarry Restoration

1

ING.2 Spring Farm Landfill Ingrebourne Valley LtdSpring Farm Landfill, New Road, Rainham, Essex, RM13 9GF, TQ 5390 8215

Landfill and Quarry

Restoration

1

ING.3 Gosham Farm Ingrebourne Valley Ltd Goshams Farm, Station Road, Tilbury TQ 67433 76992

Landfill and Quarry

Restoration 1 Y25/01/2012

updated 20/06/13

ING.4 Hoddesdon Quarry Ingrebourne Valley LtdHoddesdon Quarry Landfill, Cock Lane, Hoddesdon TL 35452 07716

Landfill and Quarry

Restoration 1 25/01/2012

ING.5 Ingrebourne Links Ingrebourne Valley LtdIngrebourne Links Golf Complex, New Road, Wennington, Rainham, Essex. RM13 9FL TQ 52640 82792

Landfill and Quarry Restoration

1

JAC Unit 35, Hobbs Industrial Estate Jacques Plant Hire Ltd TQ 358 412

Material Recycling (including

aggregates and soils)

1

Page 17: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

JAY.1 Horton Brook Quarry Jayflex ( Aggregates ) LtdHorton Brook Quarry, Horton, Slough, Berks, SL3 0LP, TQ 015 765

Landfill and Quarry Restoration

1

JCL.1 Arnolds Lodge Landfill J Clubb LtdLand / Premises At, Hale Street, East Peckham, Tonbridge, Kent, TQ 6784 4877

Landfill and Quarry

Restoration

1

JCL.2 Perry's Farm J Clubb LtdPerrys Farm, Grain Road, Isle Of Grain, Rochester, Kent, ME3 0A TQ 8790 7649

Landfill and Quarry

Restoration

1

JJF Betchworth Sand Quarry Landfill J & J Franks LtdReigate Road Quarry, Reigate Road, Betchworth, Reigate, Surrey, TQ 2017 5041

Landfill and Quarry

Restoration

1

JKS J K S J K S Construction LtdRoach Valley Works, 59 Purdeys Way, Purdey's Ind Estate, Rochford, TQ 88095 89893

Material Recycling (including

aggregates and soils)

1

JLC.3 Nepicar sand Quarry J Clubb LtdMaidstone Road Wrotham Heath, Sevenoaks, Kent, TN15 7SR TQ 62459 57859

Landfill and Quarry

Restoration 1

JOH Reading Quarry John Mould Reading Quarry, Reading. RG30 3XA

Landfill and Quarry Restoration 1

Page 18: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

K2S K2 Supplies Ltd K2 Supplies LtdUnit 11, Trafalgar Way, Cuscam Trading Est, Camberley, Surrey, GU1 SU 85751 59930

Material Recycling (including

aggregates and soils)

1

KEE.1 Tile Kiln, Sible Hedingham P.W Keen Sible Hedingham, Essex CO9 3AN TL 78732 32125

Landfill and Quarry

Restoration 1 25/01/2012

KEL Europe including dykes / levees in Holland Keltbray AWS

Development and

Infrastructure (including

Power) 1

KEN Kent Thames Gateway regeneration area

Development and

Infrastructure (including

Power) 1

KIL.1 Botany Quarry, Purfleet Killoughery Waste Management LtdBotany Quarry, Botany Way, Beacon Hill Ind Estate, Purfleet, Essex TQ 55800 78400

Landfill and Quarry

Restoration

1

KIL.2 Littleton Lane Quarry Killoughery Waste Management LtdLittleton Lane, Shepperton, Middlesex, TW17 0NF, TQ 059000 677500

Landfill and Quarry

Restoration

1

KIL.3 Oxted sandpits Killoughery Waste Management Ltd Oxted Sandpit, Barrow Green Road, Oxted TQ 37251 52234

Landfill and Quarry

Restoration 1 25/01/2012

KLR Lower Twydall Chalk Pit Kent Land Reclamation Ltd Lower Rainham Road, Rainham, Kent, TQ 805000 677000

Landfill and Quarry

Restoration

1

LAF.1 23 Lafarge - Wivenhoe Landfill Lafarge Aggregates Ltd

Colchester, Essex CO7 9JU Landfill and Quarry

Restoration 1

Page 19: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

LAF.2 Little Marlow Landfill Site Lafarge Aggregates LtdLittle Marlow Landfill Site, Marlow Road, Little Marlow, Buckin SU 8710 8760

Cement and Brick

Manufacture

1

LAF.3 Tyttenhanger Landfill 2 Lafarge Aggregates Ltd Tyttenhanger Lfs, Coursers Road TL 201000 039000

Landfill and Quarry

Restoration

1

LAF.4 Tyttenhanger Quarry Lafarge Aggregates LtdCoursers Road, London Colney, St Albans, Hertfordshire, AL4 0RY, TL 193000 044000

Landfill and Quarry

Restoration1 Y 1 1

LAF.5Scratchwoood Depot, Mill Hill (North London) Lafarge. Noe QRS TQ 19860 94650

Landfill and Quarry

Restoration 1

LAF.6Scratchwoood Depot, Mill Hill (North London) Lafarge. Noe QRS TQ 19860 94650

Material Recycling (including

aggregates and soils) 1

LAN Ebbsfleet Development Land Securities Kent TQ 57947 73646

Landfill and Quarry

Restoration 1

LON 33 London Array London Array

North Sea (51.643889,1.553611) nearest

Development and

Infrastructure (including

Power) 1

LTG.1 35 Rainham Village LTGDC

Essex RM13 9TH(nearest)

Development and

Infrastructure (including

Power) 1

LTG.2 36 South Dagenham LTGDC

East London RM9 6QD(nearest)

Development and

Infrastructure (including

Power) 1

LYO.1 Pole Hole Farm, Gilston Lyons Landfill LtdPole Hole Farm, Eastwick Road, Pye Corner, Gilston, Harlow, Essex, CM20 2RP, TL 454000 127500

Landfill and Quarry Restoration 1

Page 20: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

LYO.2 Bunkers Hill Frank Lyons GroupWaterhall Quarry, Lower Hatfield Road Hertford Hertfordshire SG13 8LF TL 30037 09536

Landfill and Quarry Restoration

1 Y 1

LYO.3 Blackleys Quarry, Gt. Leighs Frank Lyons GroupBlackley Quarry, Great Leighs, Chelmsford, Essex CM3 1QP TL 73054 19206

Landfill and Quarry

Restoration 1 25/01/2012

MAR Midgeham Quarry, Bath Road Marley Tile Co. Newbury, RG7 5UX SU 56039 66507

Landfill and Quarry

Restoration 1

MDD.1 Shellow Cross, WillingaleSite included within Essex Minerals Development Document (Not Operational)

Land at Shellow Cross Farm, Elm Farm and Newland Hall Farm, Roxwell / Willingale, Ongar TL 62577 09101

Landfill and Quarry

Restoration1 25/01/2012

MDD.10 Alsteads Farm, Lt WalthamSite included within Essex Minerals Development Document (Not Operational) Alsteads Farm, Little Waltham, Chelmsford TL 72575 13841

Landfill and Quarry

Restoration 1 25/01/2012

MDD.11 Patch Farm, AbridgeSite included within Essex Minerals Development Document (Not Operational) Patch Park Farm, Abridge, Essex TQ 48338 97861

Landfill and Quarry

Restoration 1 25/01/2012

MDD.12 Appleford & Colemans farm, WithamSite included within Essex Minerals Development Document (Not Operational)

Applefords and Colemans Farm, Rivenhall, Essex TL 83638 16033

Landfill and Quarry

Restoration 1 25/01/2012

MDD.13 Olivers Nurseries, WithamSite included within Essex Minerals Development Document (Not Operational) Olivers Nurseries, Maldon Road, Witham TL 82307 12441

Landfill and Quarry

Restoration 1 25/01/2012

MDD.14 Gurnhams, Little BentleySite included within Essex Minerals Development Document (Not Operational) Gurnhams Farm, Little Bentley, Essex TM 12501 23367

Landfill and Quarry

Restoration 1 25/01/2012

MDD.15 Admirals Farm, Great BentleySite included within Essex Minerals Development Document (Not Operational) Admirals Farm, Great Bentley, Essex TM 11949 22827

Landfill and Quarry

Restoration 1 25/01/2012

MDD.16 Frogs Hall Farm, TakeleySite included within Essex Minerals Development Document (Not Operational) Frogs Hall farm, Takeley, Essex TL 58272 21816

Landfill and Quarry

Restoration 1 25/01/2012

MDD.17 Ardleigh Rail, ArdleighSite included within Essex Minerals Development Document (Not Operational) Ardleigh Rail Sidings, Ardleigh Essex TM 06894 28893

Landfill and Quarry

Restoration 1 25/01/2012

MDD.18 Park Gate Farm, Silver EndSite included within Essex Minerals Development Document (Not Operational) Park Gate Farm, Silver End, Essex TL 83757 19917

Landfill and Quarry

Restoration 1 25/01/2012

MDD.2 Easton Park, Gt DunmowSite included within Essex Minerals Development Document (Not Operational) Great Dunmow, Essex TL 63407 20869

Landfill and Quarry

Restoration 1 25/01/2012

MDD.3 Broadfield farm, RayneSite included within Essex Minerals Development Document (Not Operational) Broadfield farm, Rayne, Essex TL 70853 22739

Landfill and Quarry

Restoration 1 25/01/2012

MDD.4 Frating Hall Farm, FratingSite included within Essex Minerals Development Document (Not Operational) Frating Hall Farm, Frating, Essex TM 08909 22841

Landfill and Quarry

Restoration 1 25/01/2012

Page 21: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

MDD.5 Land at Ugley, UgleySite included within Essex Minerals Development Document (Not Operational) Ugley, Essex TL 51563 26803

Landfill and Quarry

Restoration 1 25/01/2012

MDD.6Sunnymead, Elmstead and Heath Farm, Alresford

Site included within Essex Minerals Development Document (Not Operational) Brightlingsea Road, Alresford TM 05722 22774

Landfill and Quarry

Restoration 1 25/01/2012

MDD.7 Tyndales Farm, DanburySite included within Essex Minerals Development Document (Not Operational)

Tynedales Farm, Danbury / Woodham Mortimer TL 80051 04861

Landfill and Quarry

Restoration 1 25/01/2012

MDD.8 Covenbrook Hall Farm, StistedSite included within Essex Minerals Development Document (Not Operational) Covenbrook Hall Farm, Stisted, Essex TL 78753 23563

Landfill and Quarry

Restoration 1 25/01/2012

MDD.9 Thorrington Hall FarmSite included within Essex Minerals Development Document (Not Operational) Thorrington Hall farm, Thorrington Essex TM 09136 19461

Landfill and Quarry

Restoration 1 25/01/2012

MER 14 Hailey Road, Erith Meridian Technical Services Ltd 14 Hailey Road, Erith, Kent, DA18 4AP, TQ 4950 7970

Material Recycling (including

aggregates and soils)

1

MET 31 Metrotidal Metrotidal

Thames Estuary SS8 7DN(nearest)

Development and

Infrastructure (including

Power) 1 Y

MIL Metcom International Ltd Metcom International LtdUnit 6 New Horizons Bus Centre, Barrows Road, Harlow, Essex, CM19 TL 4260 0950

Material Recycling (including

aggregates and soils)

1

MOD 32 MOD/Defence Estates MODVarious Salisbury Plain

(413356,139603) Habitat

restoration 1

MRJ Greenacre Farm, Canewdon Rochford Essex Mr John Frederick MorleyGreenacre Farm, Hyde Wood Lane, Canewdon, Rochford, Essex, SS4 3RR TQ 87515 93532

Material Recycling (including

aggregates and soils)

1

MWM 185 Manor Rd, Erith Metropolitan Waste Management ( W R 185 Manor Road, Erith, Kent, DA8 2AD, TQ 522660 777040

Material Recycling (including

aggregates and soils)

1

Page 22: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

NEE Needham Market Needham ChalksNeedham Market Chalk Quarry, Ipswich Road,Needham Market, Ipswich, IP6 8EL TM 09330 54169

Landfill and Quarry Restoration 1

NOR.1 Nordic Recycling Chatham Docks Nordic Recycling LtdBerth 6 Basin 3, Chatham Docks, Gillingham, Kent, ME4 4SR, TQ 7730 7020

Material Recycling (including

aggregates and soils)

1

NOR.2 Nordic Recycling Ltd Nordic Recycling Ltd34/34 A Tilbury Docks, Tilbury Freeport, Tilbury, Essex, RM18 7EH, TQ 62896 75271

Material Recycling (including

aggregates and soils)

1

NOT 53 North Sea Disposal

North Sea, Kent/Essex coast (51 35.000 N - 01 58.000 E )

Landfill and Quarry

Restoration 1

NPO 47 Tilbury Power Station NPower / RWEN

West Tilbury, Thurrock RM18 8UL Development and

Infrastructure (including

Power) 1

ODO O'Donovan, Markfield Rd O'Donovan (Waste Disposal) Ltd100a Markfield Road, Tottenham, London, N15 4QF, TQ 342790 888660

Material Recycling (including

aggregates and soils)

1

OHA O' Hara Edible Oils & Waste Mrs Beverley O' Hara, Mr Joseph Pat64 Durham House Farm, Hollybush Lane, Denham, Buckinghamshire, UB9 TQ 0355 8545

Material Recycling (including

aggregates and soils)

1

Page 23: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OIK Tallow Storage Oikos Storage LtdHole Haven Wharf, Haven Road, Canvey Island, Essex, SS8 0NR, TQ 7770 8216

Material Recycling (including

aggregates and soils)

1

OIL Use in oil fieldsUse in Industry

1

PAI 49 Paint manufacture ICI Paints PlcVarious, e.g. Slough SL2 5DS Use in Industry

1

PAN Ayletts Farm Quarry (Rainham) Panelmark Ltd

Landfill and Quarry

Restoration 1

PEA Addington Quarry Pearsons Ballast LtdAddington Quarry, Addington Lane, Trottiscliffe, West Malling, Kent, ME19 5DN, TQ 647000 599000

Landfill and Quarry

Restoration

1

PEE.1 2 Peel Ports - Hoo Island Peel Ports

Hoos Marshes, Medway Estuary TQ796720 Landfill and Quarry

Restoration 1 Y 1

PEE.2 3 Peel Ports - Rushenden Peel Ports

Isle of Sheppy, Kent TQ 900000 710000 Development and

Infrastructure (including

Power) 1

PEE.3 5 Peel Ports - Burntwick Island Peel PortsBurntwick Island, Thames Estuary TQ859721 Habitat

restoration 1

PEE.4 4Peel Ports - Sheerness Lappel Bank Foreshore Port of Sheerness Ltd

Lappel Bank Foreshore, Sheerness Docks, South Of Sheerness, Sheerness, Kent, TQ 907000 737000

Development and

Infrastructure (including

Power) 1

PJC Compounds P & Q P J Cars & Plant LtdTemplewood Estate, Stock Road, West Hanningfield, Chelmsford, Esse TL 70760 00720

Material Recycling (including

aggregates and soils)

1

PLA Plasterboard Recycling Edmonton Plasterboard Recycling UK LtdUnits 3a & 3b Stonehill Bus Park, Harbet Road, Edmonton, London, N TQ 359020 918780

Material Recycling (including

aggregates and soils)

1

Page 24: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

POL Polkacrest, Chase Farm Hospital Polkacrest LtdChase Farm Hospital, The Ridgeway, Enfield, Middlesex, EN2 8JL, TQ 314510 981480

Material Recycling (including

aggregates and soils)

1

POWCrossan House, Old Oak Sidings, Off Scrubs Lane, London NW10 6RJ Powerday

Crossan House, Old Oak Sidings, Off Scrubs Lane, London NW10 6RJ TQ 21920 82858

Material Recycling (including

aggregates and soils) 1

PRE Finmere Quarry Premier Aggregates Banbury Road, MK18 4AJ SP 62835 32501

Landfill and Quarry

Restoration 1 Y

PRI Fingringhoe Quarry Prior GroupBallast Quay, Fingringhoe, Colchester, Essex, CO5 7DB TM 03236 19989

Landfill and Quarry

Restoration 1 25/01/2012

RAR Little Belhus Landfill Rural ArisingsFormer Belhus Landfill Site, Arisdale Avenue, South Ockendon,RM15 5DP TQ 58634 82501

Landfill and Quarry

Restoration 1 Y 1 1

RAY Copyhold farm Quarry, Raymond Brown Minerals Curidge. RG18 9DR SU 49110 72787

Landfill and Quarry

Restoration 1

RER Chilton Railway Cutting Landfill R E Richardson (Chilton) Ltd Prospect Farm, Chilton, Oxfordshire, OX11 0ST, SU 7960 8550

Landfill and Quarry

Restoration

1

RES Reservoir Landfill Reservoir Aggregates Ltd Ashford Road, Laleham, Middlesex, TW18 1QF, TQ 0614 7064

Landfill and Quarry

Restoration

1

RIO 26 Riosoils - Dansand & Ardleigh Quarries Riosoils

Orsett, Essex RM16 3BX Landfill and Quarry

Restoration 1 Y 1

RMC Addlestone Quarry Landfill Rmc Materials LtdAddlestone Quarry, Byfleet Road, Weybridge, Surrey, KT15 3LA, TQ 0628 6295

Landfill and Quarry

Restoration

1

RON Armigers Farm, Thaxted Ronald B Haigh & Co. LtdArmigers Farm Stanbrook Thaxted, Dunmow, Essex CM6 2NN TL 59720 29775

Landfill and Quarry

Restoration 1 25/01/2012

Page 25: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

RSP 1RSPB - Wallasea Island (Wallasea Wetland Creation Project ) RSPB

Creeksea Ferry Road, Essex (Nearest) SS4 2HD Habitat restoration

1 Y 1 1

SAP Sapphire Sapphire Energy Recovery LtdTunnel Estate, Barclay Way, Off Central Avenue, West Thurrock, Ess TQ 5781 7816

Development and

Infrastructure (including

Power)

1

SCA Burham Pit S C A Packaging LtdLand/ Premises At, Eccles, Aylesford, Kent, ME1 3YA, TQ 719000 606000

Landfill and Quarry

Restoration

1

SHE Sheppy Ltd Sheppy LtdRushenden Road, Queensborough, Kent, ME11 5HH, TQ 90904 71966

Material Recycling (including

aggregates and soils)

1

SIT.1 Benedict Wharf Recovery Facility S I T A ( G B ) LtdBenedict Wharf, Benedict Road, Mitcham, Surrey, RH4 1AJ, TQ 27044 68450

Material Recycling (including

aggregates and soils)

1

SIT.2 Runfold South Quarry SitaGuildford Road, Runfold, Farnham, Surrey GU101PB SU 86397 47238

Landfill and Quarry

Restoration 1 Y 1

SIT.3 Albury Landfill SITA Albury Landfill, Shere Road, Guildford TQ 05319 48325

Landfill and Quarry

Restoration 1

SIT.4 Seale Landfill SITA Seale Lane, Seale, Surrey SU 89126 47669

Landfill and Quarry

Restoration 1

SIT.5 Epsom landfill SITA West Ewell, Epsom TQ 20113 61960

Landfill and Quarry

Restoration 1

SIT.6 Harmondsworth landfill SITAHarmondsworth, Holloway lane, Sipsworh, West Drayton. UB7 0AE TQ 06741 77640

Landfill and Quarry

Restoration 1

SMI.1 Duns Tew Quarry Smith & Sons Chipping Norton,OX7 7DQ SP 45649 27306

Landfill and Quarry

Restoration 1

SMI.2 Gill Mill Quarry Smith & Sons SP 37134 07343

Landfill and Quarry

Restoration 1

Page 26: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

SOU Oxted Quarry Landfill Southern Gravel LtdOxted Quarry, Chalk Pit Lane, Oxted, Surrey, RH8 0QW, TQ 3820 5440

Landfill and Quarry

Restoration

1

SPO Hurstridge, Hathersham Lane, Smallfield Sporting Surface Supplies LtdHathersham Lane, Smallfield, Horley, Surrey, RH6 9JG, TQ 309 442

Material Recycling (including

aggregates and soils)

1

SQE Waterhall Quarry SQ Environmental Lower hatfield Road, North. SG13 8LF TL 30100 10891

Landfill and Quarry

Restoration 1

SUM 27 Summerleaze - Denham Quarry

Buckinghamshire UB9 4HE Landfill and Quarry

Restoration 1 Y 1 1

SUM.1 Berry Hill Farm Summerleaze

Taplow SU 91125 81628 Landfill and Quarry

Restoration 1

SUM.2 East Burnham Quarry Summerleaze

Burnham SU 94990 83455 Landfill and Quarry

Restoration 1 Y 1 1

SUM.3 Sheephouse Farm Summerleaze

Berkshire SU 89265 82615 Landfill and Quarry

Restoration 1

SWAPrincess Margaret Road Landfill (East Tilbury, Essex)

S Walsh and Son Ltd : Tom Pugh Technical Manager

East Tilbury

RM18 8PA

Landfill and Quarry

Restoration 1

SWS.1 Ham Hill Wtw Southern Water Services LtdHam Hill Wtw, Off Snodland Bypass, Bull Lane, Ham Hill, Snodland, TQ 706360 608910

Material Recycling (including

aggregates and soils)

1

SWS.2Queenborough Waste Water Treatment Works Southern Water Services Ltd

Queenborough , Argent Road, Isle Of Sheppey, Kent, ME11 5LZ, TQ 910000 704000

Landfill and Quarry

Restoration

1

Page 27: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

SWS.3 Sittingbourne Sewage Treatment Works Southern Water Services Ltd Gas Road, Sittingbourne, Kent, ME10 2QD, TQ 913000 648000

Landfill and Quarry

Restoration

1

SWS.4 Aylesford Wastewater Treatment Works Southern Water Services Ltd Bull Lane, Aylesford, Maidstone, Kent, TQ 720000 596000

Landfill and Quarry

Restoration

1

TAR Orsett Quarry & Waltons Hall Farm Tarmac

Landfill and Quarry

Restoration 1

TAR.1 All Souls Farm Quarry Tarmac LtdLand / Premises At, Wexham Park Lane, Wexham, Bucks, SL3 6LX, SU 999 821

Landfill and Quarry

Restoration

1

TAR.2 Colchester Quarry Tarmac Warren Lane. Colchester. Essex. CO3 0NN TL 95399 22618

Landfill and Quarry

Restoration 1 25/01/2012

TAR.3 Bellhouse Farm, Colchester Quarry Tarmac Warren Lane. Colchester. Essex. CO3 0NN TL 94482 22842

Landfill and Quarry

Restoration 1 25/01/2012

TAU Europe including dykes / levees in Holland Tauw Group

Development and

Infrastructure (including

Power) 1

TGA 51 Tile and Grout Adhesive LoctiteVarious (Hertfordshire) HP2 4RQ � Use in Industry

1

THA Thames Water infrastructure developments Thames Water internal contacts

Development and

Infrastructure (including

Power) 1

THA.1 58 Reuse in Thames Tunnel Project Thames Water internal contacts

London (529041,177438) Development and

Infrastructure (including

Power) 1

Page 28: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

THA.2 29 Thames Water Reservoir Construction Thames Water internal contacts

Oxfordshire OX13 6BE (nearest) Development and

Infrastructure (including

Power) 1

TIL 52 Tripcock Point Waste Recycling Facility Tilfen Land LtdRecycling Facility, Tripcock Point, Thamesmead, London, SE28 0AB, TQ 447900 797270

Landfill and Quarry

Restoration

1

TOO 48 Toothpaste Manufacture GalaxoSmithKlineMaidenhead, Berkshire SL6 4BL Use in Industry

1

VAN Hunts Wharf Van Dalen U K LtdPerry Road, Chequers Lane, Dagenham Dock, Essex, TQ 490000 817500

Material Recycling (including

aggregates and soils)

1

VEO.1 11 Veolia Essex - Rainham Landfill Veolia E S Cleanaway ( U K ) Ltd

Essex RM13 9DA Landfill and Quarry

Restoration 1 Y 1 1

VEO.2 11 Veolia Inert Soils Coldharbour Lane Veolia E S Cleanaway ( U K ) LtdInert Soils Recovery, Coldharbour Lane, Off Ferry Lane, Rainham, E TQ 5191 8023

Material Recycling (including

aggregates and soils)

1

VEO.3 14 Veolia Bucks - Wapseys Wood Landfill Veolia E S Cleanaway ( U K ) Ltd

Gerrards Cross, Buckinghamshire SL9 8TE Landfill and Quarry

Restoration 1 Y 1

VEO.4 15 Veolia Bucks - Springfield Landfill Veolia E S Cleanaway ( U K ) Ltd

Beconsfield, Buckinghamshire HP9 1XD Landfill and Quarry

Restoration 1

VEO.5 16 Veolia Essex - Pitsea Landfill Veolia E S Cleanaway ( U K ) Ltd

Basildon, Essex SS16 4UW Landfill and Quarry

Restoration 1 Y 1

VEO.6 17 Veolia Essex - Ockendon Landfill Veolia E S Cleanaway ( U K ) Ltd

South Ockendon, Essex RM16 1TZ Landfill and Quarry

Restoration 1 Y

VIR 24 Viridor - Beddington Farmlands Landfill Viridor

Croydon CR0 4TD Landfill and Quarry

Restoration 1

Page 29: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

VIR.2 Elsenham Landfill Viridor Waste Management Hall Road, Elsenham, Nr Bishop's Stortford CM22 6DJ

Landfill and Quarry Restoration 1 Y 1 07/09/2011

WES 6 RSPB/Westminster Dredgings - Cliffe Pools Westminster DredgingsKent TQ722757 Habitat

restoration 1 Y 1 1 25/10/2012

WIG Wiggins, Poyle Manor Farm Wiggins Transport LtdPoyle Manor Farm, Poyle Road, Poyle, Berkshire, SL3 0BL, TQ 029000 762000

Landfill and Quarry

Restoration

1

WRG.1 WRG - D-shaped Field, Allington Landfill Waste Recycling Group ( Central ) LtdLand / Premises At, A20 London Road, Allington, Maidstone, Kent, ME16 0LE, TQ 734000 578000

Landfill and Quarry

Restoration

1

WRG.2 7 WRG - Aveley Landfill WRG

South Ockendon, Essex RM15 4HL Landfill and Quarry

Restoration 1

WRG.3 8 WRG - Calvert Landfill WRG

Buckinghamshire MK18 2HF Landfill and Quarry

Restoration 1 Y 1 1

WRG.4 9 WRG - Stewartby/Brogborough Landfills WRG

Bedfordshire MK43 9LZ Landfill and Quarry

Restoration 1 Y

WRG.5 10 WRG - Sutton Courtenay WRG

Oxfordshire OX14 4PW Landfill and Quarry

Restoration 1 Y 1 1

YEO Yeoman Aggregates Ltd Yeoman Aggregates LtdStone Terminal, Horn Lane, Acton, London, W3 9EH, TQ 203290 813260

Material Recycling (including aggregates and soils)

1

JJF.1 Mercers Farm J&J Franks LtdMercers Farm Nutfield Marsh Road Nutfield Redhill RH1 4EU TQ 30352 51826

Landfill and Quarry

Restoration

1 Y 04/06/2013

Page 30: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

CEM.11 Watersplash Farm Cemex U K Materials Ltd

Watersplash Farm, Gaston Bridge Road And Fordbridge Road, Sunbury On Thames, TW16 6AU TQ 09484 67442

Landfill and Quarry

Restoration

1 Y 10/06/2013

HAS.1 Milton Park Farm Hanson Aggregates Milton Park, Stroude Rd, Egham TW20 9UW TQ 01251 70076

Landfill and Quarry

Restoration 1 10/06/2013

DUN.1 Meadhams Farm Brickworks Dunton Brothers LtdMeadhams Farm Brickworks, Blackwell Hall Lane, Ley Hill, Chesham, HP5 1UN SP 98753 01226

Landfill and Quarry

Restoration 1 19/06/2013

HAR.5 Denham Park Farm Harleyford Aggregates Denham Park Farm,Denham Green,UB9 5DL TQ 02815 89140

Landfill and Quarry

Restoration 1 19/06/2013

HAR.6 Westhorpe Lakes Harleyford Aggregates Westhorpe Lake,Westhorpe House, Little Marlow, SU 86542 86870

Landfill and Quarry

Restoration 1 19/06/2013

HIG.1 A14 Project Highway Agency Huntingdon Road (A14), Cambridgeshire TL 32815 67674

Development and

Infrastructure (including

Power) 1 03/07/2013

HAC.1 Swanscombe Peninsula Homes and Communities AgencyNorthfleet Industrial Estate, Gravesend, Kent, DA11 9SN TQ 60501 76002

Development and

Infrastructure (including

Power) 1 05/07/2013

HAC.2 Isle Sheppy Homes and Communities AgencyQueenborough Rd, Minster on Sea, Sheerness, Kent ME12 3RJ   TQ 93121 72271

Flood Defence1 05/07/2013

HAC.3 Northfleet Industrial Estate Homes and Communities AgencyNorthfleet Industrial Estate, Gravesend, Kent, DA11 9SN TQ 61095 75918

Development and

Infrastructure (including

Power) 1 05/07/2013

BRE.10 Cliffe Works Brett Aggregates LtdBrett Aggregates, Salt Lane, Rochester, Kent. ME3 7ST TQ 71397 76455

Landfill and Quarry

Restoration 1 Y 1 1 08/07/2013

BRE.11 Lydd Quarry (Allen's Bank) Brett Aggregates LtdBrett Aggregates, Jury's Gap Rd, Lydd, Kent TN29 9LB TR 04595 21599

Landfill and Quarry

Restoration 1 Y 1 1 08/07/2013

Page 31: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

AGR

Agricultural Lime Various Various (e.g.John Bourne & Co)

TN18 5QG Recycling Use in Industry Association which represents the large quarries and producers of lime in the UK. This lime is used to be

spread on farmers fields for agricultural benefit.

Timescales have not been examined due to the receptor sites insufficient capacity.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics. Organisation representative suggested that chalk is likely to be required in a dry state rather than as a slurry.

3 The receptor site has insufficient capacity.

3 The receptor site would not be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The adequate level of permits and planning for the receptor site to receive Thames Tideway Tunnel material have not been examined due to the receptor sites insufficient capacity.

3 A representative of the lime producers association suggested that that the UK industry could not accept this quantity and characteristics of Thames Tideway Tunnel material as there are already established markets for lime.

3

AHN

Calais Wood, Broxbourne

A H Nicholls & Sons Ltd

Ettridge Farm Depot, Pembridge Lane,

Broxbourne, Hertfordshire, EN

TL 327830 067860 Recycling Material Recycling (including aggregates and soils)

Civil Engineering company, primarily for road construction.

The receptor site does not have the ability to meet the required Thames Tideway Tunnel project timescales.

3 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type and based on the receptor sites' demand requirements.

2 Site representative indicated that the receptor site has insufficient capacity to receive any Thames Tideway Tunnel material.

3 The receptor site has insufficient capacity and therefore unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The adequate level of permits and planning for receptor site to receive Thames Tideway Tunnel material have not been examined due to the receptor sites' insufficient capacity.

3 The receptor site is not a viable option to receive Thames Tideway Tunnel material due to no capacity being available.

3

AIR

Thames Estuary Airport None Thames Estuary 51.460425, 1.062241

Reclamation Development and Infrastructure (including Power)

Boris Johnson has revisited the concept of an airport in the Thames Estuary and appointed a Steering Group to

consider the idea.

The proposals are still very hypothetical and are unlikely to meet the required timescale, due to the lengthy planning procedure which may be required before the receptor site could begin accepting material.

3 No information made available on this receptor site.

3 No information made available on this receptor site.

3 No information made available on this receptor site.

3 No information made available on this receptor site.

3 This project is in the early development stages. The proposals are still very hypothetical and are unlikely to meet the required Thames Tideway Tunnel project timescale.

3

AUB

Mimbridge Nurseries, Chobham, Gu24

Aubrey Smith & Co ( Horsell) Ltd

Mimbridge Nurseries, Station Road, Chobham, Woking, Surrey, GU24 8

SU 991390 606130

Recycling Material Recycling (including aggregates and soils)

Nursery Timescales have not been examined due to the site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Insufficient capacity - 28000 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate permits to accept 28,000tpa of material , but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

BAR

Wapsey's Wood Bardon Aggregates Gerrards Cross, Buckinghamshire

0 Restoration & Recycling

Landfill and Quarry Restoration Co-Located with Veolia Wapsey's Wood - Extraction element of landfill. Assess as VEO.3

Assess as VEO.3 3 Assess as VEO.3 3 Assess as VEO.3 3 Assess as VEO.3 3 Assess as VEO.3 3 Assess as VEO.3 3

BAR.1

Park Farm, Ardleigh Bardon Aggregates Slough Lane, Ardleigh, Essex

TM 05271 27921 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that this receptor site is likely to have completed restoration prior to Thames Tideway Tunnel project commencement

3 Acceptability of material characteristics has not been examined due to the receptor site's limited timescales.

3 Limited timescales therefore this criterion has not been assessed.

3 Limited timescales therefore this criterion has not been assessed.

3 Limited timescales therefore this criterion has not been assessed.

3 Essex MDD suggests that this receptor site is likely to have completed restoration prior to Thames Tideway Tunnel project commencement, and so is not viable.

3

BAR.2

Slough farm, Ardleigh Bardon Aggregates Slough Lane, Ardleigh, Essex

TM 04954 27728 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3

BAR.3

Martells Quarry Bardon Aggregates Slough Lane, Ardleigh, Essex

TM 05005 28319 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project, and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials unlikely to be required.

3

BAT

Battersea Power Station & Nine Elms

REO (Powerstation) Ltd

Wandsworth SW8 5BN Restoration Development and Infrastructure (including Power)

This is a development which is still in the local planning stages (The Master plan).

The receptor site has potential to meet all or part of the required Thames Tideway Tunnel project timescale - subject to it receiving planning consent.

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics.

2 A development representative indicated that the receptor site has insufficient capacity for the development to receive Thames Tideway Tunnel material.

3 Due to the development being only able to receive a small level of material it is unlikely that it would be able to receive Thames Tideway Tunnel project throughput.

3 Consents for the receptor site to receive Thames Tideway Tunnel material has not been examined due to the receptor sites' insufficient capacity.

3 The receptor site has insufficient capacity based on discussions with a development representative and has not been investigated further.

3

Viability Filter

Page 32: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

BIF.1

Biffa - Shakespeare Farm Landfill

Biffa Rochester, Kent ME3 8RN Restoration Landfill and Quarry Restoration Landfill that is no longer accepting waste The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales. Organisation representative was not aware of any development demands for Thames Tideway Tunnel material.

3 The receptor site is not accepting material and therefore cannot accept material with Thames Tideway Tunnel characteristics

3 Site representative indicated that the receptor site cannot receive material as there is insufficient capacity.

3 The receptor site has insufficient capacity and therefore is unable to receive Thames Tideway Tunnel project throughput.

3 The receptor site does not have the appropriate operational consents as it closed to receiving material.

3 The receptor site is closed and it not receiving any material therefore it is not a viable option.

3

BIF.2

Biffa - Redhill Landfill Biffa Surrey RH1 4ER Restoration Landfill and Quarry Restoration Landfill that will be accepting waste material The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 Organisation representative indicated that the receptor site would only be interested in receiving clay and no other Thames Tideway Tunnel material.

2 Organisation representative indicated that the receptor site would have the ability to receive only a small amount of clay for restoration purposes and not the total amount of clay estimated to be produced by the Thames Tideway Tunnel project. This small amount of material is not considered to be of a useful quantity.

3 The receptor site is likely to be able to receive the required throughput for clay, however limitations may be present due to the sites capacity, footprint and/or permitted daily waste movements.

2 The receptor site has the relevant consents in place.

1 The receptor site will be accepting waste but unlikely to be able to meet useful capacity or throughput requirements for Thames Tideway Tunnel material.

3

BIF.3

Biffa - Colnbrook Landfill Biffa Surrey SL3 8AB Restoration Landfill and Quarry Restoration Landfill that is due for closure in 2011 and remediation will be completed by 2012.

The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales and is due to close in 2012.

3 The receptor site will not be accepting material during the Thames Tideway Tunnel project timescales and therefore would not be able to accept material with Thames Tideway Tunnel characteristics.

3 Site representative indicated that over the Thames Tideway Tunnel project timescales the receptor site cannot receive material, and therefore there is insufficient capacity for Thames Tideway Tunnel material.

3 The receptor site has insufficient capacity and therefore is unable to receive Thames Tideway Tunnel project throughput.

3 Consents to receive material for restoration may be present, but due to the insufficient capacity of the receptor site's operating timescales, this was not examined.

2 This receptor site will be unable to receive material and is due to close prior to the commencement of the Thames Tideway Tunnel project.

3

BOR

Borough Green Sand Pit Borough Green Sand Pits Ltd

Land / Premises At, Platt Industrial Estate, Borough

Green, Sev

TQ 6150 5750 Restoration Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 84,000 tonnes (source: EA)

3 The receptor site has insufficient capacity and therefore unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate consents to accept 84,000 tonnes of Thames Tideway Tunnel material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

BOU

Bournewood Inert Landfill Site

Bournewood Sand And Gravel Ltd

Off A20 By Pass, Swanley, Kent, BR8 7DP,

TQ 5020 6820 Restoration Landfill and Quarry Restoration Inert landfill The receptor site has potential to meet all or part of the required Thames Tideway Tunnel project timescale.

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to those meeting WAC requirements.

2 The receptor site has total capacity to receive 1.7million m3 for restoration.

1 The receptor site can take some of the required throughput however limitations may be present due to the site's capacity, footprint or permitted daily waste movements.

2 The receptor site has the appropriate consents in place.

1 The receptor site has the ability to accept some Thames Tideway Tunnel material.

1

BRE.1

Park Lodge Landfill Brett Aggregates Ltd Park Lodge, Pinewood Road, Iver, Bucks, SL0 0NE,

TQ 182800 8350 Recycling and Disposal

Landfill and Quarry Restoration Landfill and Quarry merchants Timescales have not been examined due to the site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that this receptor site cannot receive material and therefore there is insufficient capacity.

3 The receptor site has insufficient capacity and therefore is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 Consents for the receptor site have not been examined due to the receptor site's insufficient capacity.

2 The receptor site will not be able to receive any Thames Tideway Tunnel project material.

3

BRE.2

Home Farm Landfill Brett Aggregates Ltd; Tarmac Ltd

Home Farm Landfill, Littleton Lane,

Shepperton, Middlesex, TW17 0NF

TQ 0593 6738 Recycling and Disposal

Landfill and Quarry Restoration Landfill and Quarry merchants The receptor site has potential to meet all or part of the required Thames Tideway Tunnel project timescale.

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type, receptor site can only accept sands and gravels.

2 Organisation representative has indicated that capacity is available for a useful volume of Thames Tideway Tunnel sands and gravels, however figures are not indicated.

2 Receptor site is likely to have the ability to receive throughput however limitations may be present due to the receptor site's capacity, footprint or permitted daily waste movements.

2 This receptor site has the appropriate consents in place.

1 The receptor site will be able to accept some sands and gravels, however quantities have not been confirmed. �

1

BRE.3

Ham Farm Landfill Brett Aggregates Ltd Ham Farm Landfill, Ham Road, Faversham, ME13

7TS,

TR 020000 626000

Recycling and Disposal

Landfill and Quarry Restoration Landfill and Quarry merchants Timescales have not been examined due to the site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 150,000 tonnes (source: EA)

3 The receptor site has insufficient capacity and therefore is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate permit to accept 150,000 tonnes of material but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity and therefore is not considered viable.

3

BRE.4

Hersham Pit, Hersham, Kt12

Brett Aggregates Ltd Hersham Pit, East of Molesey Road, Hersham,

Surrey, KT12,

TQ 128000 663000

Recycling and Disposal

Landfill and Quarry Restoration Landfill and Quarry merchants Timescales have not been examined due to the site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that this receptor site cannot receive material and therefore there is insufficient capacity.

3 The receptor site has insufficient capacity and therefore is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 Consents for this receptor site have not been examined due to the receptor site's insufficient capacity.

2 The receptor site will not be able to receive any Thames Tideway Tunnel project material.

3

Page 33: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

BRE.5

Fairlop Quarry (area C) Brett- Lafarge Joint

Venture

Brett Lafarge Ltd Fairlop Quarry (C), Hainault Road, Little Heath, Romford, Essex, RM6 5SS,

TQ 464000 907000

Restoration Landfill and Quarry Restoration Landfill and Quarry merchants � The receptor site has potential to meet all or part of the required Thames Tideway Tunnel project timescale.

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, the receptor site would be able to accept sands and gravels only. �

2 Organisation representative suggested that capacity is available for a useful volume of Thames Tideway Tunnel material, however potential capacity quantities were not confirmed.

2 The receptor site is likely to have the ability to receive throughput however limitations may be present due to the sites capacity, footprint and/or permitted daily waste movements.

2 Consents have not been examined however It has been assumed that the receptor site may have appropriate permits to accept material with Thames Tideway Tunnel project quantities and characteristics as it is currently operating as a landfill.

1 The receptor site has the ability to receive sands and gravels, however the timescales on receiving material could potentially be an issue. �

1

BRE.6

Queen Mary Brett Aggregates; Reservoir Aggregates

Ashford Road, Laleham, Middlesex TW18 1QF

TQ 06249 70356 Recycling and Disposal

Landfill and Quarry Restoration Landfill and Quarry merchants � The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. �

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, the receptor site is able to accept sands and gravels only.

2 Organisation representative has anecdotally confirmed that there is capacity available for a useful volume of Thames Tideway Tunnel sands and gravels, however figures are not confirmed.

2 The receptor site is likely to have the ability to receive the throughput however limitations may be present due to the site's capacity, footprint and/or permitted daily waste movements.

2 This receptor site has the appropriate permits and planning consents to operate as an inert landfill.

1 The receptor site will be able to accept some sands and gravels, however quantities have not been confirmed. �

1

BRE.7

Church Farm, Alresford Brett Aggregates Ford Lane Alresford, Colchester, Essex, CO7 8BB

TM 06315 19991 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3

BRE.8

Lodge Farm, Alresford Brett Aggregates Ford Lane Alresford, Colchester, Essex, CO7 8BB

TM 05851 20551 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3

BRE.9

Sandon, Chelmsford Brett Aggregates Sandon Quarry, Mayes Lane, Chelmsford Essex

TL 74747 04109 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site has planning consent to complete restoration by 2017 so would not be available to receive Thames Tideway Tunnel material.

3 Acceptability of material characteristics has not been examined due to the receptor site's limited timescales.

3 This criterion is not assessed due to limited timescales.

3 This criterion is not assessed due to limited timescales.

3 This criterion is not assessed due to limited timescales.

3 The receptor sites planning consent requires restoration to be complete prior to the Thames Tideway Tunnel project commencing.

3

BRO

Brocks Haulage Brocks Haulage Ltd Watson Close, West Thurrock, Grays, Essex,

RM20 3EF,

TQ 58223 76835 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has limited capacity - 75,000 tpa (source: EA)

3 The receptor site has insufficient capacity and therefore is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate permits to accept 75,000 tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

BUL

Bulmer Brickfields Bulmer Brick Cutting Services

The Brickworks, Hedingham, Bulmer, Essex

TL 83304 38221 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3

BWR

B W Rice Treatment B W Rice Plant & Skip Hire Ltd

Romainville Way, Charfleets Ind Est, Canvey

Island, Essex, SS8 0RB,

TQ 77045 83104 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 5,000 tpa(source: EA)

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate permits to accept 5,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

CAM

Camden Plant, Lower Hall Lane

Camden Plant Ltd Lower Hall Lane, Chingford, London, E4 8JG,

TQ 362340 925830

Recycling Material Recycling (including aggregates and soils)

Processors of C&D aggregate materials Timescales have not been examined due to the receptor site's limited capacity.

3 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. The receptor site is able to accept sands and gravels only.

2 The receptor site has insufficient capacity - 109368 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate permits to accept 109,368tpa of material, but this has not been examined in detail due to the site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and indicated when contacted that although sands and gravels could be accepted the receptor site's physical capacity will limit its ability to manage the throughput.

3

CAN

Units 1&2 Willesborough Industrial Estate

Cannon Hygiene Ltd Units 1&2, Willesborough Industrial Estate,

Kennington Road, Wille

TR 033930 422630

Recycling Material Recycling (including aggregates and soils)

Processing facility - not for excavation materials Timescales have not been assessed as the receptor site is unable to receive Thames Tideway Tunnel material.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics and so capacity for Thames Tideway Tunnel material is not available.

3 The receptor site cannot accept Thames Tideway Tunnel material characteristics and therefore throughput cannot be achieved.

3 The receptor site does not have the appropriate permits to receive Thames Tideway Tunnel material.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics thus has not been investigated further.

3

CAS

Castcrete Ltd, Unit 3 Spindle Way

Castcrete Ltd Castcrete Ltd, Unit 3 Spindle Way, Crawley,

West Sussex, RH10 1TG,

TQ 27612 36467 Recycling Material Recycling (including aggregates and soils)

Processing facility. Timescales have not been examined due to the site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Insufficient capacity - 6000 tpa(source: EA)

3 The receptor site has insufficient capacity and therefore unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 Site has appropriate permits to accept 6000tpa of material, but this has not been examined in detail due to the site's insufficient capacity.

2 The site has insufficient capacity based on EA data and has not been investigated further.

3

CAT

Catalysing agent in copper, iron and steel

manufacture

Various eg Buxton Lime

Derbyshire SK17 8TG Restoration & Recycling

Use in Industry Buxton Lime is an industrial producer of chalk and lime, which could be used as catalysing agents in metals

manufacturer as well as other industrial or chemical processes.

The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity.

3 It is unlikely that the receptor site will be able to receive the material throughput produced by the Thames Tideway Tunnel project.

3 The receptor site does not have the appropriate operational permits or consents.

3 Chalk slurry is not required by this processor and they have their own sources of raw material and therefore will not require chalk. Therefore this is not an option that can be used as a receptor site for Thames Tideway Tunnel material

3

Page 34: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

CEM

Cement Industry - Cemex

Cemex U K Materials Ltd

Rugby Cement Works CV21 2RY Engineering Cement and Brick Manufacture Organisation contacted and answer awaited Updated - 23/08/2011

Updated 14/10/2011 - waiting for CEMEX to get back on analysis of chalk and clay

The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site confirmed that suitability of Thames Tideway Tunnel project material to be used in CEMEX processes cannot be confirmed as consistent quality cannot be guaranteed and they have their own sources of this material. Receptor site confirmed that the material would be best suited for restoration of CEMEX sites rather than being used in

3 The receptor site has a capacity of 1,000,000 tonnes a year for chalk and 40-45,000 tonnes of clay a month.

1 The receptor site has the ability to accept the anticipated throughput.

1 The receptor site has the required planning consent and permit in place.

1 Representative of organisation confirmed that unlikely would look to receive chalk material as unable to guarantee that it's quality would be suitable to be used in CEMEX concrete production.

3

CEM.1

Borough Green Quarry Cemex U K Materials Ltd

Cemex Uk, Wrotham Road, Sevenoaks, Kent,

TN15 8DN,

TQ 6196 5769 Disposal Landfill and Quarry Restoration Inert landfill Updated - 23/08/2011 The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 Initial discussions suggest that there are no constraints on taking material with Thames Tideway Tunnel characteristics.

1 The receptor site has capacity for 450,000 tonnes per annum, with an estimated requirement of 5million tonnes required to complete restoration.

1 The receptor site is permitted to receive 450,000tpa.

1 The receptor site has the required planning consent and permit.

1 The receptor site can potentially accept all Thames Tideway Tunnel materials. It has the necessary planning consent and permit in place.

1

CEM.10

Martins Farm, Wellwick, St Osyth

CEMEX Martins Farm, St Osyth, Clacton-on-Sea, CO16 8HN

TM 11494 17438 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material. Timescales have not been assessed.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3

CEM.2

Coldharbour Lane Landfill

Cemex U K Materials Ltd

Land / Premises At, Norlands Lane, Thorpe,

Egham, Surrey, TW20

TQ 027000 690000

Restoration & Recycling

Landfill and Quarry Restoration Organisation contacted and answer awaited Updated - 23/08/2011

No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3

CEM.3

Great Westwood Cemex U K Materials Ltd

Fir Tree Hill, Staines, Hertfordshire, WD3 4LY,

TQ 0750 9900 Restoration & Recycling

Landfill and Quarry Restoration Organisation contacted and answer awaited Updated - 23/08/2011 Updated

20/09/2011 with further information on the site

Updated 29/09/2011 Site only has planning consent until 2013

The receptor site has planning consent until 2013 thus the receptor site will be closed prior to the Thames Tideway Tunnel project commencing.

3 Initial discussions suggest that there are no constraints at the receptor site on taking material with Thames Tideway Tunnel characteristics.

1 The receptor site has capacity for 200,000 tpa.

1 The receptor site has the ability to accept the throughput.

1 The receptor site only has planning consent until 2013.

3 The receptor site can potentially accept all Thames Tideway Tunnel materials. It has the necessary planning consent and permit in place.

3

CEM.4

Stanwell Landfill Ii Cemex U K Materials Ltd

Staines, Surrey, TW19 9XT, TQ 0500 7450 Restoration & Recycling

Landfill and Quarry Restoration Organisation contacted and answer awaited Updated - 23/08/2011

No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3 No information has been made available on this receptor site. CEMEX did not propose this receptor site to receive Thames Tideway Tunnel material.

3

CEM.5

Eversley Quarry Cemex U K Materials Ltd

Fox Lane, Off Reading Road, Eversley, Hampshire

RG27 0NQ Restoration Landfill and Quarry Restoration Quarry requiring restoration Updated 27/09/2011 need to confirm date for the siteUpdated 07/11/2011 site only has planning consent

until 2015

The receptor site has planning consent until 2015 so will not be available to receive Thames Tideway Tunnel material.

3 Initial discussions suggest that there are no constraints with the receptor site accepting material with Thames Tideway Tunnel characteristics.

1 Initial discussions suggest that capacity is available at the receptor site. The receptor site has the capacity to accept 840,000 tonnes of material which would be a useful amount of material for the Thames Tideway Tunnel project.

1 The receptor site is likely to have the ability to receive the anticipated throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 The receptor site has the appropriate permit and planning consent for restoration.

1 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations. Updated 07/11/2011 receptor site only has planning consent until 2015 which is prior to the commencement of the Thames Tideway Tunnel project.

3

CEM.6

Kingsmead Quarry Cemex U K Materials Ltd

Stanwell Road, Horton, Berkshire

SL3 9PG Restoration Landfill and Quarry Restoration Quarry requiring restoration The receptor site has potential to meet part of the required Thames Tideway Tunnel project timescale.

2 Initial discussions suggest that there are no constraints on the receptor site taking material with Thames Tideway Tunnel characteristics.

1 Initial discussions suggest that capacity is available at the receptor site. The receptor site has void space for approx 5million tonnes of material.

1 There are no restrictions on permitted throughput. There are restrictions on operating hours at the receptor site.

1 The receptor site has planning consent and will be applying for an environmental permit to enable it to receive 5million tonnes of material.

2 The receptor site is an active quarry and the organisation representative indicated that material will be required for restoration from 2017.

1

CEM.7

Barrington Landfill Cemex U K Materials Ltd

Haslingfield Road, Barrington Cambridgeshire

CB22 7RQ Restoration Landfill and Quarry Restoration Quarry requiring restoration The receptor site has the potential to meet part of the required Thames Tideway Tunnel project timescale.

2 Initial discussions suggest that there are no constraints on the receptor site taking material with Thames Tideway Tunnel characteristics

1 Initial discussions suggest that capacity is available at the receptor site. The receptor site can accept 700,000tpa.

1 The receptor site can take some of the required throughput however there are limitations on train movements.

2 This receptor site has the appropriate permit and planning consent for restoration.

1 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations.

1

CEM.8

Westmill Quarry Cemex Materials Ltd.

Westmill Quarry, Westmill Road, Ware, Hertfordshire

SG12 0ES

TL 34793 15874 Restoration Landfill and Quarry Restoration The Old quarry is due to be restored, and through discussions with CEMEX, this site was not proposed.

Restoration at the receptor site is due to be completed by 2017.

3 The receptor site would be able to accept inert material.

1 Due to limited timescales, the capacity of the receptor site has not been assessed.

3 Due to limited timescales, the throughput of the receptor site has not been assessed.

3 Due to limited timescales, the planning consent and permit of the receptor site have not been assessed.

3 The receptor site has limited timescales and therefore has not be assessed further.

3

CEM.9

Bradwell Quarry CEMEX Bradwell, Nr. Braintree, Essex. CM77 8EP

TL 82284 21026 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that it is likely that the receptor site will have completed restoration prior to Thames Tideway Tunnel project commencement.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has limited timescales therefore this criterion has not assessed.

3 The receptor site has insufficient timescales therefore this criterion has not assessed.

3 The receptor site has limited timescales therefore this criterion has not assessed.

3 Essex MDD suggests that it is likely that the receptor site will have completed restoration prior to Thames Tideway Tunnel project commencement, and so is not a viable receptor site to accept Thames Tideway Tunnel material.

3

Page 35: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

CHA

Chambers, Hollybush Lane, Aldershot Gu11

Chambers Waste Management Plc

Hollybush Lane, Aldershot, Hampshire, GU11 2PX,

SU 882900 522900

Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 75,000 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely that it would be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 75,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

CHE

Chelsea Barracks Project Blue (Guernsey) Ltd

Chelsea, West London SW1W 8 Restoration Development and Infrastructure (including Power)

This is a development which is still in the local planning stages (The Master plan).

The receptor site is at the master planning stage. There is the potential that the receptor site would be able to meet the required Thames Tideway Tunnel project timescales.

2 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has no capacity available to receive Thames Tideway Tunnel material. It is likely that only a small amount of material will be required for remediation, and that is likely to be sourced from the development itself.

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site does not have the appropriate operational permit or planning consent in place.

3 Only a small amount of material may be required at the receptor site for landscaping purposes and likely to be sourced from the development itself and therefore is not a viable receptor site.

3

CHK

Chalk grassland restoration

0 Salisbury Plain 0 Restoration Habitat restoration Use of chalk to restore grassland areas Timescales have not been examined due to the receptor site's insufficient capacity.

3 Restoring chalk grasslands on chalk geology would not require any extra chalk.

3 The receptor site has insufficient capacity.

3 Not suitable for Thames Tideway Tunnel material therefore throughput capabilities have not been considered at the receptor site.

3 Permits and consents for the receptor site have not been considered due the receptor site's insufficient capacity.

3 Restoring chalk grasslands on chalk geology would not require any extra chalk. It is understood that chalk grassland management is about grazing regimes, scrub encroachment and nutrient enrichment.

3

CHR.1

Hythe End Farm Landfill Charles Morris Fertilizers Ltd

Hythe End Farm, Hythe End Road, Wraysbury, Berkshire, TW19 5AW,

TQ 0140 7260 Recycling & Disposal

Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 5,000m3 (source: EA).

3 The receptor site has insufficient capacity and therefore unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 5,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

CHR.2

Charles Morris, Horton Rd

Charles Morris Fertilizers Ltd

Horton Road Site, Horton Road, Stanwell Moor,

Staines, Middlesex,

TQ 045890 744850

Recycling & Disposal

Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 75,000tonnes(source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has appropriate permit to accept 75,000tpa of material, this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

CLC

C L C C L C Construction Ltd

25/26 Childerditch Industrial Park,

Childerditch Park, Brentwood, E

TQ 60716 89644 Restoration & Disposal

Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 75,000tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 75,000tpa of material and has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

CLE

Rainbow Shaw Treatment

Clearserve Ltd Rainbow Shaw Quarry, Holford Road, Linford, Stanford Le Hope, Esse

TQ 66748 80366 Restoration & Disposal

Landfill and Quarry Restoration Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 5,000 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 5,000tpa of material and has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

COR.1

Cory - Mucking Landfill Cory Stanford Le Hope, Essex SS17 0RN Restoration Landfill and Quarry Restoration Landfill site due to stop accepting waste in 2011 The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescales. The receptor site has indicated that by 2018 restoration will be largely complete therefore it will only be partly available.

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics. The receptor site can accept inert material suitable for restoration such as clays and sands/gravels.

2 The receptor site has capacity available for a useful volume of Thames Tideway Tunnel material. The receptor site will require less than 1million m3.

1 The receptor site can accept some of the required throughput of clay and sands/gravels, however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 It is assumed that the receptor site may have the appropriate permit and consent to accept material with Thames Tideway Tunnel characteristics as it is currently operating as a landfill.

1 The receptor site is likely to have largely completed restoration by 2018 and therefore unlikely to require a large quantity of material.

1

COR.2

Cory - Barling Marsh Landfill

Cory Essex SS3 0NR Restoration Landfill and Quarry Restoration A landfill which is due to stop receiving waste in 2014 The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. �

2 Initial discussions suggest that there are no constraints on taking material with Thames Tideway Tunnel characteristics at the receptor site.

1 Dependent on the stage of restoration, there would be capacity at the receptor site to accept a useful amount of Thames Tideway Tunnel material, although quantities could not be confirmed at this stage.

2 The receptor site can take some of the required throughput however limitations may be present - such as constraints on HGV movements.

2 The receptor site is currently operating as a landfill and has the necessary permit and planning consent in place for restoration.

1 The receptor site could be available to accept some of the Thames Tideway Tunnel material however there maybe limitation on throughput capabilities.

1

CPB

Strawberry Farm, Normandy, Gu3

C P Backhurst & Co Ltd

Strawberry Farm, Glaziers Lane, Normandy,

Guildford, Surrey, GU3 2

SU 934940 508600

Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 35,000tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 35,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

CRE

Crescent Shipyard Crescent Marine Services Ltd

Commissioners Road, Strood, Rochester, Kent,

ME2 4HA,

TQ 746000 694000

Restoration & Disposal

Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 150,000 tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 150,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

Page 36: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

CRO

Crown Estates Crown Estates Various Locations, Including Portland Quarries

DT5 2DP (nearest) -

Portland Quarries

Restoration Habitat restoration The Crown Estates are large land holders and there will be some remediation projects required on the crown

lands.

Small scale developments are likely to occur throughout Thames Tideway Tunnel project lifespan.

2 Acceptability of material characteristics has not been examined due to the receptor site's limited capacity.

3 Organisation representative indicated that receptor sites would be unlikely to be able to receive Thames Tideway Tunnel material in a useful quantity due to a limited demand.

3 Network of sites have insufficient capacity and therefore it is unlikely that they would be able to accept the anticipated throughput of the Thames Tideway Tunnel project.

3 Operational permits and planning consents have not been considered for the network of receptor sites due to there insufficient capacity.

3 Small scale remediation developments may require a small amount of material from the Thames Tideway Tunnel project. However at this stage it is not anticipated to be a useful amount.

3

DAV

John Davies, Woolmongers Lane

Davies John

The Elms, Woolmongers Lane, Epping Forest, Essex,

CM4 0JX,

TL 583000 017000 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 4,999tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has appropriate permit to accept 4,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

DAY

Woking Depot DAY Aggregates Woking Yard, Woking. GU22 7QE

0 Recycling Material Recycling (including aggregates and soils)

Aggregates Sales company Organisation does not operate mineral extraction sites, and therefore has no capacity to receive Thames Tideway Tunnel materials. Timescales have not been assessed.

3 Organisation does not operate mineral extraction sites, and therefore has no capacity to receive Thames Tideway Tunnel materials.

3 Organisation does not operate mineral extraction sites, and therefore has no capacity to receive Thames Tideway Tunnel materials

3 Organisation does not operate mineral extraction sites, and therefore has no capacity to receive Thames Tideway Tunnel materials

3 Organisation does not operate mineral extraction sites, and therefore has no capacity to receive Thames Tideway Tunnel materials

3 Organisation does not operate mineral extraction sites, and therefore has no capacity to receive Thames Tideway Tunnel materials

3

DLR

Docklands Light Railway DLR project team (020) 7987 4244 0 Engineering Development and Infrastructure (including Power)

Material to be used on DLR improvement schemes No information on this receptor site was made available.

3 No information on this receptor site was made available.

3 No information on this receptor site was made available.

3 No information on this receptor site was made available.

3 No information on this receptor site was made available.

3 Organisation was contacted on several occasions and details of the project were passed on to project managers with a request to contact if Thames Tideway Tunnel material could be utilised. Assumption made that Thames Tideway Tunnel material is not required for developments.

3

DPW

London Gateway Port DP World/ Laing O Rourke

Infrastructure Ltd

The Manorhouse, The Manorway, Stanford Le Hope, Essex, SS17 9PD,

TQ 72970 81610 Engineering Development and Infrastructure (including Power)

Construction of a deep water port in London Gateway, managed by Dubai Ports World

Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that there is no spare capacity available at the receptor site to receive Thames Tideway Tunnel material.

3 The receptor site is likely to be able to accept the required throughput but this has not been examined in detail due to the receptor site's limited spare capacity.

3 The receptor site's operational permit and planning consent were not reviewed due to the receptor site's having insufficient capacity.

3 Organisation representative indicated that the receptor site is not in a position to receive any material.

3

DRA

Drax Power Station DRAX Group Plc 0 0 Engineering Development and Infrastructure (including Power)

Power station could require material for process or development on site.

The receptor site is unable to accept Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has limited capacity. 3 The receptor site is unable to accept Thames Tideway Tunnel material therefore throughput capabilities have not been considered.

3 The receptor site does not have the appropriate operational permit or consent.

3 Organisation was contacted during the Lee Tunnel options assessment and indicated that they would not be interested in the Thames Tideway Tunnel material.

3

DRU

Drum Disposal & Recycling Services Ltd

Drum Disposal & Recycling Services

Unit 7 Albright Industrial Estate, Ferry Lane,

Rainham, Essex, RM13

TQ 516130 819160

Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 4,896 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 4,896tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

EAR.1

Warren Farm Landfill Earthline Ltd Calfont St. Peter, Buckinghamshire, SL9 0QY,

TQ 020000 915300

Restoration Landfill and Quarry Restoration Quarry and inert landfill operators, mainly outside southeast region

The receptor site is unable to accept Thames Tideway Tunnel material and therefore can not meet the required timescales

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that there is no capacity at this receptor site to receive Thames Tideway Tunnel material.

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site is unable to receive Thames Tideway Tunnel material thus permits and consents have not been considered.

3 Organisation representative indicated that the receptor site is unable to accept materials due to capacity limitations.

3

EAR.2

Warren Farm, Chalfont St Peter

Earthline Ltd Warren Farm, Chalfont St Peter, Buckinghamshire,

SL9 0QH,

TQ 011750 909000

Restoration Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 75,000tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 75,000 tonnes of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

EAR.3

Shellingford Quarry Earthline Ltd Stanford Road, Stanford in the Vale, Faringdon, Berkshire, SN7 8HE

SU 32880 93631 Restoration Landfill and Quarry Restoration Inert landfill The receptor site will be operational throughout the Thames Tideway Tunnel project. �

1 Initial discussions did not suggest that there would be constraints regarding the acceptability of Thames Tideway Tunnel material at the receptor site.

1 The site has capacity to receive approximately 1.5million tonnes of Thames Tideway Tunnel material.

1 The receptor site has limited throughput capacity (80,000tonnes p.a.)

3 The receptor site has the appropriate permit to accept 80,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

3 The receptor site has limited throughput capacity and has not been investigated further.

3

Page 37: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

ECO

Eco Aggregates Cole Green

Eco Aggregates Ltd Highfields, Birchall Lane, Cole Green, Welwyn Garden City, Hertford

TL 270130 115920 Recycling Material Recycling (including aggregates and soils)

Soil washing facility The receptor site is unable to accept Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 The receptor site can not accept material with Thames Tideway Tunnel characteristics.

3 Organisation representative indicated that there is no capacity at this receptor site to receive Thames Tideway Tunnel material.

3 The throughput capabilities have not been considered for this receptor site.

3 Receptor site is not a viable option to receive Thames Tideway Tunnel material thus permits and consents have not been considered.

3 The organisation representative indicated that the receptor site is not able to receive Thames Tideway Tunnel material due to its limited capacity and therefore has not been investigated further.

3

EDL

Rainham Generation Plant

EDL Operations (Rainham) Ltd

Rainham Generation Plant Compound, Coldharbour

Lane, Rainham, Esse

TQ 524500 792000

Recycling Development and Infrastructure (including Power)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 50,000 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 50,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

EDW.1

Crumps Farm,Lt Canfield, Dunmow

Edwards Waste Management

Little Canfield, Dunmow Essex

TL 58082 20792 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3

EDW.2

Little Bullocks Farm, Great&Little Canfield

Edwards Waste Management

Little Canfield, Dunmow Essex

TL 58065 20506 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3

ENE

Energyready Energyready Ltd 39 High Street, Rowhedge, Colchester, Essex, CO5 7ET,

TM 03169 21478 Recycling Development and Infrastructure (including Power)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 5,000tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 5,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

ENV

Flood Defence Environment Agency

0 0 Engineering Flood Defence Thames T2100 team The network of receptor sites has not been confirmed. It is uncertain whether they would be operational throughout Thames Tideway Tunnel project timescale.

2 Initial discussions did not suggest that there would be constraints regarding acceptability of material with Thames Tideway Tunnel characteristics.

1 Organisation representative indicated that capacity is available for a useful volume of Thames Tideway Tunnel material, by utilising a number of flood projects. However total capacity requirements are unknown . - updated 27/04/11 Organisation representative indicated that no project is in a position to confirm it has the capacity to receive Thames

2 Network of site can take some of the required throughput but limitations may be present, however across a network of sites this limitation will be mitigated.

2 The network of sites will require the appropriate permits and consents but these should be obtainable.

2 Subject to further information becoming available, it is likely that across the network of flood defences schemes some Thames Tideway Tunnel material maybe required. However capacity, characteristics or timescale information has not been provided.

3

ENV.1

EA Flood Defences (river)

Environment Agency

Mole Valley - RH10 7ZJ (nearest), �

Mole Valley - RH10 7ZJ (nearest),

Engineering Reclamation

Flood Defence Potential of use of aggregate material in EA flood defences Upper Mole Flood Alleviation Scheme. EA

were supplied with the dates and estimated tonnages and identified this scheme with potential to take

Thames Tideway Tunnel material.

The receptor site may be operational throughout the Thames Tideway Tunnel project, at this stage limited information was provided.

2 Initial discussions did not suggest that there would be constraints regarding acceptability of Thames Tideway Tunnel material.

1 Initial discussions suggest that capacity could be available to receive all or some of the Thames Tideway Tunnel material, but the organisation representative should be contacted closer to the time of material extraction to confirm capacity potential.- updated 27/04/11 Organisation representative indicated that currently no project is in a

2 Organisation representative indicated that currently no project is in a position to confirm it has the capacity to receive Thames Tideway Tunnel material and therefore requests that at this stage the schemes are not included in this assessment.

2 Organisation representative indicated that currently no project is in a position to confirm it has the capacity to receive Thames Tideway Tunnel material and therefore requests that at this stage the schemes are not included in this assessment.

2 Organisation representative indicated that currently no project is in a position to confirm it has the capacity to receive Thames Tideway Tunnel material and therefore requests that at this stage the schemes are not included in this assessment.

3

ENV.2

EA Flood Defences (river)

Environment Agency

Catford (River Quaggy) - SE9 5LW (nearest)

Catford (River Quaggy) - SE9

5LW (nearest)

Engineering Reclamation

Flood Defence Potential of use of aggregate material in EA flood defences: Lewisham and Catford Flood Alleviation

Scheme. EA were supplied with the dates and estimated tonnages and identified this scheme with potential to

take Thames Tideway Tunnel material.

The receptor site may be operational throughout the Thames Tideway Tunnel project, at this stage limited information was provided.

2 Initial discussions did not suggest that there would be constraints regarding acceptability of Thames Tideway Tunnel material.

1 Initial discussions suggest that capacity could be available to receive all or some of the Thames Tideway Tunnel material, but the organisation representative should be contacted closer to the time of material extraction to confirm capacity potential.- updated 27/04/11 Organisation representative indicated that currently no project is in a

2 Organisation representative indicated that currently no project is in a position to confirm it has the capacity to receive Thames Tideway Tunnel material and therefore requests that at this stage the schemes are not included in this assessment.

2 Organisation representative indicated that currently no project is in a position to confirm it has the capacity to receive Thames Tideway Tunnel material and therefore requests that at this stage the schemes are not included in this assessment.

2 Organisation representative indicated that currently no project is in a position to confirm it has the capacity to receive Thames Tideway Tunnel material and therefore requests that at this stage the schemes are not included in this assessment.

3

ENV.3

Flood Defences East Anglia

Environment Agency

0 0 Engineering Flood Defence Contact indicated that material unlikely to be required in the level anticipated to be produced by Thames and timescales for proposed developments are not yet

indicated

The receptor site cannot meet the required timescales of the Thames Tideway Tunnel project.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 Organisation representative indicated that the receptor site is unlikely to have the required capacity to receive Thames Tideway Tunnel materials.

3 It is unlikely that the receptor site is going to be able to receive the anticipated throughput of the Thames Tideway Tunnel project

3 The receptor sites permit and planning consent were not reviewed due to the receptor site's limited timescales.

2 Organisation representative indicated that it is unlikely that material will be required and timescales for proposed development are not yet confirmed.

3

ENV.4

Flood Defences Thames Estuary

Environment Agency,

Kent Thames Gateway.

0 0 Engineering Flood Defence Contact indicated that material unlikely to be required in the level anticipated to be produced by Thames and timescales for proposed developments are not yet

indicated

The network of sites cannot meet the required timescales for the Thames Tideway Tunnel project.

3 The network of sites cannot accept material with Thames Tideway Tunnel characteristics.

3 Organisation representative indicated that it is unlikely that the network of sites would have the required capacity to receive Thames Tideway Tunnel materials.

3 It is unlikely that the network of sites would be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 Planning consent and permit have not been assessed due to the network of site's limited timescales.

2 Organisation representative indicated that it is unlikely that the network of site's would require material and timescales for the proposed developments have not been indicated.

3

EON

Kingsnorth Power Station (Medway

Estuary)

E.ON Medway ME3 9LD Restoration Development and Infrastructure (including Power)

Contact was made regarding the demand for all types of material, produced by Thames Tideway Tunnel such as

clay for construction projects, as well as chalk to be used in the industrial process.

The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales. Organisation representative was not aware of any development demands for Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 Organisation representative indicated that there is no capacity at the receptor site to receive Thames Tideway Tunnel material.

3 The receptor site can not accept Thames Tideway Tunnel material therefore throughput capabilities have not been considered.

3 The receptor site permits and planning consents have not been considered due to the receptor site's insufficient capacity.

3 Organisation representative suggests that material is unlikely to be required at this receptor site. The receptor site is not considered to be an option for Thames Tideway Tunnel material.

3

ERI

Crayford Marshes Landfill, Erith Da8

Erith Environmental Services Ltd

Crayford Marshes Landfill Site, off Thames Road,

Crayford Marshes, Slade Green, Kent,

TQ 532040 761250

Restoration & Disposal

Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 74,999tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely that the receptor site would be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 74,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

Page 38: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

EVA

Evans Thornwood John Evans, Timothy Evans,

Terry Ev

Marlow, High Road, Thornwood Common,

Epping, Essex, CM16 6LU,

TL 469240 049630 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 74,999 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 74,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

FIL

Filling of London Docks 0 0 0 Disposal Development and Infrastructure (including Power)

Potential restoration of London docks. Development of the London Docks may occur prior to 2021 which could require Thames Tideway Tunnel material. However future development have not been confirmed, planning consent has not been obtained either. Timescales have not been assessed

3 Development of the London Docks may occur prior to 2021 which could require Thames Tideway Tunnel material. However future development have not been confirmed, planning consent has not been obtained either. Material characteristics have not be assessed.

3 Development of the London Docks may occur prior to 2021 which could require Thames Tideway Tunnel material. However future development have not been confirmed, planning consent has not been obtained either.

3 Development of the London Docks may occur prior to 2021 which could require Thames Tideway Tunnel material. However future development have not been confirmed, planning consent has not been obtained either.

3 Development of the London Docks may occur prior to 2021 which could require Thames Tideway Tunnel material. However future development have not been confirmed, planning consent has not been obtained either.

3 Development of the London Docks may occur prior to 2021 which could require Thames Tideway Tunnel material. However future development have not been confirmed, planning consent has not been obtained either.

3

FLO

Flowline Flowline Ltd Rawreth Industrial Estate, Rawreth, Rayleigh, Essex,

SS6 9RL,

TQ 79650 92360 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 24,999 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 24,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

FRE

Soil conditioner and topsoil manufacture

Freeland Various - e.g. Freeland in Kent

BR8 7LT Recycling Material Recycling (including aggregates and soils)

Topsoil manufacturers are likely to require sands as a raw material in producing topsoil

The network of sites would be operational throughout the Thames Tideway Tunnel project

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. The receptor sites are likely only to be able to accept sands and gravels.

2 It is considered unlikely that there would be sufficient capacity available at network of receptor sites.

3 The receptor sites can take some of the required throughput of sands and gravels however limitations may be present - such as HGV movements limiting throughput.

2 The receptor sites permit and planning consent were not reviewed due to the receptor site's limited capacity.

3 Due to the specific demands of manufacturers requiring high specification it is unlikely that they would be able to accept a useful amount of Thames Tideway Tunnel material.

3

FRO

Frontiers/Storefield Aggregates

Frontiers/Storefield Aggregates

Dartford, Kent DA9 9DU (nearest)

Restoration and Recycling

Landfill and Quarry Restoration Waste Management company which currently requires 7 million m3 of inert material for infilling a stone quarry, which will then be developed to a housing estate upon

completion.

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. �

2 Initial discussions suggest that there are no constraints on the receptor site accepting material with Thames Tideway Tunnel characteristics

1 Initial discussions suggest that there remains capacity for 2million m3 void of Thames Tideway Tunnel Project material at the receptor site.

1 The receptor site can accept some of the required throughput however limitations may be present - such as HGV movements limitations.

2 The receptor site has the required permit and planning consent to receive all of Thames Tideway Tunnel project material.

1 The receptor site has capacity to receive material from the Thames Tideway Tunnel project, however there may be some limitations on throughput capabilities. �

1

GAL.1

Hermitage Quarry Inert Landfill

Gallagher Aggregates Ltd

Land / Premises At, Hermitage Lane,

Maidstone, Kent, ME16 9NT,

TQ 7232 5602 Recycling & Disposal

Landfill and Quarry Restoration Inert landfill and Sands/gravels reprocessing facilities The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can accept material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. The receptor site would be able to accept sands/gravels.

2 Organisation representative indicated that capacity would be available for a useful volume of Thames Tideway Tunnel material at the receptor site.

1 The receptor site can accept some of the required throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 The receptor site currently operates as a landfill and has the necessary permit in place to receive Thames Tideway Tunnel materials, although the receptor site's permitted capacity was not provided.

1 The receptor site can accept the sands and gravels.

1

GAL.2

Workhouse Quarry Inert Landfill

Gallagher Aggregates Ltd

Land / Premises At, Workhouse Road, Ryarsh,

West Malling, Kent,

TQ 666500 598000

Recycling & Disposal

Landfill and Quarry Restoration Inert landfill and Sands/gravels reprocessing facilities The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can accept material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. The receptor site would be able to accept sands/gravels.

2 Organisation representative indicated that capacity would be available for a useful volume of Thames Tideway Tunnel material at this receptor site. - updated 27/04/11 organisation representative indicated this receptor site is no longer available to receive Thames Tideway Tunnel material.

2 The receptor site can accept some of the required throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 The receptor site currently operates as a landfill and has the necessary permit in place to receive Thames Tideway Tunnel materials, although the receptor site's permitted capacity was not provided.

2 The receptor site can accept the sands and gravels.- updated 27/04/11 organisation representative indicated that the receptor site will be unable to receive Thames Tideway Tunnel materials.

3

GBF

Manor Farm Landfill Site G B Foot Ltd Manor Farm, Monk Sherborne, Tadley, Hants,

RG26 5HW,

SU 6085 5565 Restoration & Disposal

Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 4,999 tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput of the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 4,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

GOO

Bluelands Quarry Goodman Bluelands Quarry, Arterial Road, Purfleet

TQ 57019 78669 Restoration Landfill and Quarry Restoration The Old chalk quarry is due to be restored in to a commercial park

The receptor site is due to be restored by 2013.

3 The receptor site would be able to accept inert material.

1 Due to limited timescales, capacity has not been assessed for this receptor site.

3 Due to limited timescales, throughput has not been assessed for this receptor site.

3 Due to limited timescales permits have not been assessed.

3 The receptor has limited timescales and therefore is not appropriate to be assessed.

3

GRU

Various Grundon Lakeside Industrial Estate, Colnbrook, Slough SL3 0EG

0 Disposal Landfill and Quarry Restoration Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that there would be insufficient capacity available at the receptor site.

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site's permit and consent have not been examined in detail due to the receptor site's insufficient capacity.

3 Organisation representative indicated that Thames Tideway Tunnel material would not be required due to insufficient capacity available at the receptor site.

3

GUI

Kill Copse, Willinghurst Estate

Guildford Tipper Hire Ltd

Kill Copse, Willinghurst Estate, Shamley Green,

Guildford, Surrey,

TQ 04700 43700 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 50,000 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 50,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

Page 39: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

GYP

Oast House Farm Gypsum Recycling International A/s

Shed 3 & 4, Ridham Dock, Ridham, Sittingbourne,

Kent, ME9 8SR,

TQ 9210 6820 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 2,654tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 2,654tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

GYS

Press House Shed Gypsum Recycling U K Ltd

Rochester Works, Halling, Kent, ME2 1AWH,

TQ 7010 6500 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 40,000 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 40,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

HAH

Igtham Sandpit H & H Celcon The sandpit, Borough Green Road, Igtham, Kent

TQ 60606 57931 Recycling Landfill and Quarry Restoration Old quarry requiring material for restoration. Organisation representative confirmed that the receptor site does not currently have planning consent to receive material for restoration. The former quarry is in an Area of Outstanding Natural Beauty and the organisation representative suggested that the receptor site is unlikely to receive planning consent for restoration. Timescales have not been assessed.

3 The receptor site does not receive excavated material and therefore would not receive Thames Tideway Tunnel material.

3 The capacity of the receptor site has not been assessed as it would not be able to receive Thames Tideway Tunnel material.

3 The throughput of the receptor site has not been assessed as it would be unable to receive Thames Tideway Tunnel material.

3 The receptor site's planning consent and permit have not been assessed as the receptor site is unable to receive Thames Tideway Tunnel material.

3 The receptor site will not be able to accept Thames Tideway Tunnel material.

3

HAN.1

Shipton-on-Cherwell Quarry.

Hansteen Holdings Shipton-on-Cherwell, Oxfordshire OX5 3EL

SP 47870 17417 Restoration Landfill and Quarry Restoration Aggregate Quarry The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 Initial discussions suggest that there are no constraints on the receptor site accepting material with Thames Tideway Tunnel characteristics

1 Receptor site has capacity to receive 2.2million m3 of Thames Tideway Tunnel material. However planning consent limits import by road of material to 750,000tonnes.

1 The receptor site has capacity to receive 250,000tonnes of material per annum.

1 The receptor site has the appropriate planning consent and permit for restoration

1 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations.

1

HAR.1

Aldermarston Wharf Harleyford Aggregates

0 SU 59856 66872 Restoration Landfill and Quarry Restoration Aggregate Quarry Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3

HAR.2

The Lea Harleyford Aggregates

Denham,UB9 5PG TQ 04829 85929 Restoration Landfill and Quarry Restoration Aggregate Quarry Organisation representative indicated that it is in the process of applying for consent to extract material. The receptor site is currently unable to receive Thames Tideway Tunnel material. Timescales have not been assessed

3 Organisation representative indicated that it is in process of applying for consent to extract material. The receptor site is currently unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that it is in process of applying for consent to extract material. The receptor site is currently unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that it is in process of applying for consent to extract material. The receptor site is currently unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that it is in process of applying for consent to extract material. The receptor site is currently unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that it is in process of applying for consent to extract material. The receptor site is currently unable to receive Thames Tideway Tunnel material.

3

HAR.3

Harefield Pit Harleyford Aggregates

Morefield Road, UB9 6BD TQ 04851 88882 Restoration Landfill and Quarry Restoration Aggregate Quarry The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site would only be able to receive sands and gravels for reprocessing.

2 The receptor site has insufficient capacity. The receptor site has capacity to accept 100-150,000tpa.

3 The receptor site has insufficient capacity to receive Thames Tideway Tunnel materials.

3 The receptor site has insufficient capacity to receive Thames Tideway Tunnel materials.

3 The receptor site has insufficient capacity to receive Thames Tideway Tunnel materials.

3

HAR.4

Harleyford Marina Harleyford Aggregates

Henley Road SU 83312 84960 Restoration Landfill and Quarry Restoration Aggregate Quarry Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would be unable to receive Thames Tideway Tunnel material.

3

HAS

Maldon Road, Birch Hanson Aggregates Maldon Road Layer, Marney Colchester Essex

CO5 9XE

TL 92814 19429 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required.

3

HAV

South Hall Farm Havering Aggregates Ltd

South Hall Farm, New Road, Rainham, Essex,

RM13 9EW,

TQ 537470 819860

Restoration & Disposal

Material Recycling (including aggregates and soils)

Part of Brett Aggregates No information has been made available on this receptor site.

3 No information has been made available on this receptor site.

3 No information has been made available on this receptor site.

3 No information has been made available on this receptor site.

3 No information has been made available on this receptor site.

3 No information has been made available on this receptor site.

3

HAZ

Harpwood Residential Hazeldene Mr And Mrs

Harpwood, Seven Mile Lane, Wrotham Heath,

Kent, TN15 7RJ,

TQ 636000 580000

Restoration & Disposal

Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 150,000 tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 150,000 tonnes of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

Page 40: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

HEN.1

Harlington Pit Henry Streeter High Street, Harlington, Hayes, Middx.UB3 5DA

TQ 08432 78266 Recycling Material Recycling (including aggregates and soils)

Aggregate suppliers The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to accepting sands and gravels and clay.

2 The receptor site has capacity available for a useful volume of Thames Tideway Tunnel sands, gravels and clay (250,000tpa)

1 The receptor site can take some of the required clay, sands and gravels anticipated throughput however limitations may be present due to the sites capacity, footprint and/or permitted daily waste movements.

2 The receptor site currently operates as a quarry/landfill and has the necessary permit and consent in place.

2 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations.

1

HEN.2

Sipson Lane Henry Streeter Sipson Rd, Sipson Lane, Hayes Middx

TQ 07585 78189 Recycling Material Recycling (including aggregates and soils)

Aggregate suppliers The receptor site will be operational throughout the Thames Tideway Tunnel project

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to accepting sands and gravels and clay.

2 The receptor site has capacity available for a useful volume of Thames Tideway Tunnel sands, gravels and clay (250,000tpa)

1 The receptor site can take some of the required clay, sands and gravels anticipated throughput however limitations may be present due to the sites capacity, footprint and/or permitted daily waste movements.

2 The receptor site currently operates as a quarry/landfill and has the necessary permit and consent in place.

2 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations.

1

HEN.3

Land at Hengrove Farm Henry Streeter Land at Hengrove Farm, London Road, Staines, Middlesex, TW15 4AJ

TQ 05345 72202 Recycling Material Recycling (including aggregates and soils)

Aggregate suppliers The receptor site currently has permitted operations until 2013. However it is looking to extend this beyond 2013 but the plans have yet to be confirmed. Until this has been achieved, the receptor site would not be available to receive Thames Tideway Tunnel material.

3 Acceptability of material characteristics has not been examined due to the receptor site's limited timescales.

3 The receptor site's capacity has not been assessed due to the receptor site's limited timescales.

3 The receptor site's throughput has not been assessed due to the receptor site's limited timescales.

3 The receptor site has limited timescales thus the throughput has not been assessed.

3 The receptor site has limited timescales and therefore would not be able to accept Thames Tideway Tunnel material.

3

HIG

M25 widening Highways Agency Various (as well as other Highways Agency

Developments)

RM19 1YN(nearest)

Engineering Reuse

Development and Infrastructure (including Power)

Development and widening of the M25 (as well as other Highways Agency developments), for example Junction

30 widening programme

Organisation representative confirmed that development and road widening of M25 is likely to occur throughout Thames Tideway Tunnel project lifespan but this is to be confirmed.

2 Organisation representative confirmed that development and road widening of M25 is likely to occur throughout Thames Tideway Tunnel project lifespan, but this is to be confirmed.

3 Organisation representative confirmed that development and road widening of M25 is likely to occur throughout Thames Tideway Tunnel project lifespan, but this is to be confirmed.

3 Organisation representative confirmed that development and road widening of M25 is likely to occur throughout Thames Tideway Tunnel project lifespan, but this is to be confirmed.

3 Organisation representative confirmed that development and road widening of M25 is likely to occur throughout Thames Tideway Tunnel project lifespan, but this is to be confirmed.

3 Organisation representative confirmed that development and road widening of M25 is likely to occur throughout Thames Tideway Tunnel project lifespan. However organisation did not request to be contacted again in the future.

3

HIL.1

Bowling Green Farm, Farringdon

Hills Minerals & Waste Ltd

Stanford Rd, Shellingford, Farringdon, Oxfordshire

SN7 8EZ

SU 31026 94866 Restoration Landfill and Quarry Restoration Aggregate Quarry Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's limited timescales.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3

HIL.2

Chinham Farm Hills Minerals & Waste Ltd

Stanford Rd, Shellingford, Farringdon, Oxfordshire

SN7 8EZ

SU 31026 94866 Restoration Landfill and Quarry Restoration Aggregate Quarry Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's limited timescales.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3

HIL.3

Tubney Wood Quarry, Tubney

Hills Minerals & Waste Ltd

Oaksmere, Tubney, Abingdon, Oxfordshire

OX13 5QU

SP 44790 00680 Restoration Landfill and Quarry Restoration Aggregate Quarry Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's limited timescales.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3 Organisation representative indicated that the receptor site would require a small amount of material however this is not anticipated to be of a sufficient volume. Thus the receptor site has not be considered to be viable to accepting Thames Tideway Tunnel material and has not been assessed further.

3

HOG

Unit 75 Kingsnorth Industrial Estate

Hogarth Tyre Shredders Ltd

Hogarth Tyre Shredders Ltd, Unit 75 Jetty Road

Kingsnorth Indu

TQ 806000 732000

Recycling Material Recycling (including aggregates and soils)

Materials recycling service - not suitable for Thames Tideway Tunnel material

Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's limited timescales.

3 The receptor site has insufficient capacity - 4,999 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 4,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

HRO

H Rockall, Kimber Lane, Maidenhead, Sl6

H Rockall & Son H Rockall, Kimber Lane, Maidenhead, Berkshire,

SL6 2QP,

SU 886100 790000

Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's limited timescales.

3 The receptor site has insufficient capacity - 4,800 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 4,800tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

IBS

Ibstock Brick Manufacturers

Ibstock Brick Manufacturers

Leicestershire LE67 6HS Restoration Cement and Brick Manufacture Ibstock is a large clay brick manufacturer with a factory in Dorking surrey. Clay is required for the production of

bricks.

It is likely that clay would be required in the future for manufacturing bricks there is the potential to meet the required Thames Tideway Tunnel project timescales.

2 It is likely that clay would be required in the future for manufacturing bricks however the clay produced by the Thames Tideway Tunnels might not meet the required standards.

2 The receptor site has insufficient capacity.

3 Throughput has not been examined due to the receptor site's insufficient capacity.

3 Permits and planning consent have not been examined due to the receptor site's insufficient capacity

3 Organisation representative confirmed that they have their own clay quarries and do not require more material.

3

IME

Quidhampton Quarry Imerys Former Imerys Quarry, Quidhampton,SP2 9AD

SU 11360 31472 Restoration Landfill and Quarry Restoration Former quarry looking to be restored. The current land is owned by a developer who is looking to sell it and not

manage the import of material/restoration at the site.

It is currently unknown if the receptor site would require Thames Tideway Tunnel material. Timescales have not been assessed.

3 Initial discussions suggest that there are no constraints on the receptor site accepting material with Thames Tideway Tunnel characteristics

1 The receptor site has capacity for approximately 2millionm3 of material.

1 The receptor site currently has no planning consent. The receptor site does also not have a secured owner. Thus throughput has not been examined due to the receptor site's limited information on timescales

3 The receptor site currently does not have planning consent.

3 The receptor site is currently for sale, and the current owners (Imerys) are looking to find an operator who would take control of the receptor site. The receptor site does not have planning consent.

3

Page 41: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

ING.1

Marks Warren Quarry Landfill

Ingrebourne Valley Ltd

Marks Warren Quarry Landfill, Whalebone Lane

North, Romford, Es

TQ 4885 8971 Restoration Landfill and Quarry Restoration Former quarry looking to be restored. The receptor site would be operational throughout the Thames Tideway Tunnel project.

1 Initial discussions suggest that there are no constraints on the receptor site accepting material with Thames Tideway Tunnel characteristics

1 The operator of the receptor site has confirmed that it requires roughly 350,000m3 to complete restoration. However it is anticipated that this tonnage would be reduced by the time Thames Tideway Tunnel Project material would be produced.

3 The receptor site has a limited throughput as a result of limited number of HGVs allowed daily access to the receptor site.

3 Permits and planning consent have not been examined due to the receptor site's limited capacity.

2 The receptor site has limited capacity and so would not be able to receive a useful amount of Thames Tideway Tunnel Project material.

3

ING.2

Spring Farm Landfill Ingrebourne Valley Ltd

Spring Farm Landfill, New Road, Rainham, Essex,

RM13 9GF,

TQ 5390 8215 Restoration & Disposal

Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 There is no capacity available at the receptor site to receive Thames Tideway Tunnel material.

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has no capacity to receive materials and it is likely that it does not have required permits to receive material.

3 The receptor site has no capacity to receive materials and it is likely that it does not have required permits to receive material.

3

ING.3

Gosham Farm Ingrebourne Valley Ltd

Goshams Farm, Station Road, Tilbury

TQ 67433 76992 Restoration Landfill and Quarry Restoration Ingrebourne Valley are managing the restoration of this former quarry

The receptor site has planning consent to 2015, however the operator has confirmed that this is likely to be required to be extended as void may not be filled by this time.

3 The receptor site can take material with some of the Thames Tideway Tunnel characteristics there might be some limits to accepting chalk materials.

2 The receptor site is permitted to receive 759,000m3 per annum of inert material to complete restoration. The operator confirmed that more void may become available should planning be successful.

1 The receptor site can take some of the required clay, sands and gravels anticipated throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 Permits and planning consent have not been examined due to the receptor site's limited timescales.

2 The receptor site is due to be restored prior to the Thames Tunnel project commencing. However the operator has confirmed that it is likely that time would likely be extended as void is unlikely to be full by that time. At the time of assessment, no further inforamtion is provided.

3

ING.4

Hoddesdon Quarry Ingrebourne Valley Ltd

Hoddesdon Quarry Landfill, Cock Lane,

Hoddesdon

TL 35452 07716 Restoration Landfill and Quarry Restoration The Old quarry is due to be restored The receptor site is not made available to receive Thames Tideway Tunnel material and will be restored by 2013.

3 Initial discussions suggest that there are no constraints on the receptor site accepting material with Thames Tideway Tunnel characteristics

1 Due to limited timescales of the receptor site, capacity has not been assessed.

3 Due to limited timescales of the receptor site, throughput has not been assessed.

3 Due to limited timescales of the receptor site, consents and permits have not been assessed.

3 The receptor site has limited timescales and therefore has not be assessed further.

3

ING.5

Ingrebourne Links Ingrebourne Valley Ltd

Ingrebourne Links Golf Complex, New Road,

Wennington, Rainham, Essex. RM13 9FL

TQ 52640 82792 Recycling Landfill and Quarry Restoration Old landfill requiring restoration in to a Golf course The receptor site is not made available to receive Thames Tideway Tunnel material and will be restored by 2015.

3 The receptor site can take material with some of the Thames Tideway Tunnel characteristics however there might be some limits to accepting chalk materials.

2 The capacity of the receptor site was not assessed as the receptor site would not be able to receive Thames Tideway Tunnel material.

3 The throughput for the receptor site was not assessed as the receptor site is unable to receive Thames Tideway Tunnel material.

3 The receptor site's planning consent and permit were not assessed as the receptor site is unable to receive Thames Tideway Tunnel material.

3 The receptor site will not be able to accept Thames Tideway Tunnel material.

3

JAC

Unit 35, Hobbs Industrial Estate

Jacques Plant Hire Ltd

TQ 358 412 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 24,990 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 24,990tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

JAY.1

Horton Brook Quarry Jayflex ( Aggregates ) Ltd

Horton Brook Quarry, Horton, Slough, Berks, SL3

0LP,

TQ 015 765 Restoration & Disposal

Landfill and Quarry Restoration Inert Landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated there is insufficient capacity at the receptor site.

3 The receptor site has insufficient capacity to accept Thames Tideway Tunnel material and therefore would be unable to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 Permit and planning consent details have not been assessed due to the receptor site's insufficient capacity.

3 Organisation representative indicated there is insufficient capacity at the receptor site to receive Thames Tideway Tunnel material.

3

JCL.1

Arnolds Lodge Landfill J Clubb Ltd Land / Premises At, Hale Street, East Peckham,

Tonbridge, Kent,

TQ 6784 4877 Restoration & Disposal

Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 75,000tonnes(source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 75,000tonnes of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

JCL.2

Perry's Farm J Clubb Ltd Perrys Farm, Grain Road, Isle Of Grain, Rochester,

Kent, ME3 0A

TQ 8790 7649 Restoration & Disposal

Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 24,999tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 24,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

JJF

Betchworth Sand Quarry Landfill

J & J Franks Ltd Reigate Road Quarry, Reigate Road, Betchworth,

Reigate, Surrey,

TQ 2017 5041 Restoration & Disposal

Landfill and Quarry Restoration Inert landfill Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has limited capacity - 120,000tonnes (source: EA).

3 The receptor site has limited capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 120,000tonnes of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

JKS

J K S J K S Construction Ltd

Roach Valley Works, 59 Purdeys Way, Purdey's Ind

Estate, Rochford,

TQ 88095 89893 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 68,850 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 68,850tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

Page 42: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

JLC.3

Nepicar sand Quarry J Clubb Ltd Maidstone Road Wrotham Heath, Sevenoaks, Kent,

TN15 7SR

TQ 62459 57859 Restoration Landfill and Quarry Restoration Aggregate Quarry Organisation representative indicated that the receptor site would not be able to accept Thames Tideway Tunnel material. Timescales have not been assessed.

3 Organisation representative indicated that the receptor site would not be able to accept Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3 Organisation representative indicated that the receptor site would not be able to accept Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3 Organisation representative indicated that the receptor site would not be able to accept Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3 Organisation representative indicated that the receptor site would not be able to accept Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3 Organisation representative indicated that the receptor site would not be able to accept Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3

JOH

Reading Quarry John Mould Reading Quarry, Reading. RG30 3XA

0 Restoration & Disposal

Landfill and Quarry Restoration Aggregate quarry Organisation representative indicated that the receptor site would not require Thames Tideway Tunnel material as it would be closed by 2014.

3 Organisation representative indicated that the receptor site does not require Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3 Organisation representative indicated that the receptor site does not require Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3 Organisation representative indicated that the receptor site does not require Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3 Organisation representative indicated that the receptor site does not require Thames Tideway Tunnel material. Thus the receptor site has not been assessed.

3 Organisation representative indicated that the receptor site does not require Thames Tideway Tunnel material as it will be closed by 2014 before the commencement of the Thames Tideway Tunnel project.

3

K2S

K2 Supplies Ltd K2 Supplies Ltd Unit 11, Trafalgar Way, Cuscam Trading Est,

Camberley, Surrey, GU1

SU 85751 59930 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 2,175tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 2,175tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

KEE.1

Tile Kiln, Sible Hedingham

P.W Keen Sible Hedingham, Essex CO9 3AN

TL 78732 32125 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore it is unlikely that restoration materials will be required.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project, and therefore it is unlikely that restoration materials will be required.

3

KEL

Europe including dykes / levees in Holland

Keltbray AWS 0 0 Restoration & Engineering

Development and Infrastructure (including Power)

Utilising a demand for material for restoration and engineering purposes in Europe by transporting the

material to these destinations by barge.

No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 Contact made with an organisation who suggested that shipping large quantities of clean soil to Europe would be uneconomical.

3

KEN

Kent Thames Gateway regeneration area

0 0 0 Restoration & Engineering

Development and Infrastructure (including Power)

Urban regeneration Partnership No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 Organisation was contacted on several occasions and have not confirmed that they would be able to receive Thames Tideway Tunnel material for any proposed developments.

3

KIL.1

Botany Quarry, Purfleet Killoughery Waste Management Ltd

Botany Quarry, Botany Way, Beacon Hill Ind Estate, Purfleet, Essex

TQ 55800 78400 Recycling Landfill and Quarry Restoration Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 75,000 tpa(source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 75,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

KIL.2

Littleton Lane Quarry Killoughery Waste Management Ltd

Littleton Lane, Shepperton, Middlesex,

TW17 0NF,

TQ 059000 677500

Recycling Landfill and Quarry Restoration Part of Tarmac No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3 No information made available to assess this receptor site.

3

KIL.3

Oxted sandpits Killoughery Waste Management Ltd

Oxted Sandpit, Barrow Green Road, Oxted

TQ 37251 52234 Restoration Landfill and Quarry Restoration Sandpit due for restoration Organisation representative stated that a proposed extension to the planning application has been applied for to continue operations until 2015. However this is still before the commencement of the Thames Tideway Tunnel project.

3 Initial discussions suggest that there are no constraints on the receptor site accepting material with Thames Tideway Tunnel characteristics

1 Due to the limited timescales of the receptor site, capacity has not been assessed.

3 Due to the limited timescales of the receptor site, throughput has not been assessed.

3 Due to the limited timescales of the receptor site, permit and consents have not been assessed.

3 Due to the limited timescales of the receptor site, the receptor site is not a viable option to receive Thames Tideway Tunnel material.

3

KLR

Lower Twydall Chalk Pit Kent Land Reclamation Ltd

Lower Rainham Road, Rainham, Kent,

TQ 805000 677000

Restoration Landfill and Quarry Restoration Hauliers and brokers of material for restoration projects Organisation representative indicated that they are primarily a haulage company and would broker Thames Tideway Tunnel material.

3 Organisation representative indicated that they are primarily a haulage company and would broker Thames Tideway Tunnel material.

3 Organisation representative indicated that they are primarily a haulage company and would broker Thames Tideway Tunnel material.

3 Organisation representative indicated that they are primarily a haulage company and would broker Thames Tideway Tunnel material.

3 Organisation representative indicated that they are primarily a haulage company and would broker Thames Tideway Tunnel material.

3 Organisation representative indicated that they are primarily a haulage company and would broker Thames Tideway Tunnel material.

3

Page 43: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

LAF.1

Lafarge - Wivenhoe Landfill

Lafarge Aggregates Ltd

Colchester, Essex CO7 9JU Restoration Landfill and Quarry Restoration A landfill which is due to close in the next few years, but is likely to require material for remediation. Additionally

the opening of new cells is also likely to occur

Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material. Timescales have not been assessed.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3

LAF.2

Little Marlow Landfill Site

Lafarge Aggregates Ltd

Little Marlow Landfill Site, Marlow Road, Little

Marlow, Buckin

SU 8710 8760 Recycling Cement and Brick Manufacture Landfill and sand/gravel recovery operations. When discussing this receptor site, operator confirmed that unlikely would look to receive chalk slurry for use in

cement manufacturing business as would not be able to guarantee its quality and therefore its suitability to be

used in their cement manufacturing process.

Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material. Timescales have not been assessed.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3

LAF.3

Tyttenhanger Landfill 2 Lafarge Aggregates Ltd

Tyttenhanger Lfs, Coursers Road

TL 201000 039000 Recycling Landfill and Quarry Restoration Landfill and sand/gravel recovery operations The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics. Chalk slurry is unlikely to be able to be accepted at the receptor site.

2 Organisation representative indicated that capacity may be available for a useful volume of Thames Tideway Tunnel material, if the project demanded material.

2 The receptor site can take some of the required throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements. More information is required before throughput capacity can be confirmed.

2 The receptor site has planning consent to receive 750,000tpa of material for restoration.

2 Site can be referred to as LAF.4 3

LAF.4

Tyttenhanger Quarry Lafarge Aggregates Ltd

Coursers Road, London Colney, St Albans,

Hertfordshire, AL4 0RY,

TL 193000 044000 Recycling Landfill and Quarry Restoration Landfill and sand/gravel recovery operations The receptor site would be operational throughout the Thames Tideway Tunnel project.

1 The receptor site would be able to receive all types of Thames Tideway Tunnel project material, subject to it meeting waste acceptance criteria.

1 Organisation representative suggested that capacity would be available for a useful volume of Thames Tideway Tunnel material.

1 The receptor site can take some of the required throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 The receptor site has the required permit and planning consent to receive all of Thames Tideway Tunnel project material.

1 The receptor site can receive a useful amount of Thames Tideway Tunnel material.

1

LAF.5

Scratchwoood Depot, Mill Hill (North London)

Lafarge. Noe QRS TQ 19860 94650 0 Recycling Landfill and Quarry Restoration Lafarge Contact did not offer the use of this site Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material. Timescales have not been assessed.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3 Organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3

LAF.6

Scratchwoood Depot, Mill Hill (North London)

Lafarge. Noe QRS TQ 19860 94650 0 Recycling Material Recycling (including aggregates and soils)

Transfer Station and aggregate depot Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that it cannot receive material, and therefore there is insufficient capacity.

3 The receptor site has no capacity and therefore is unable to receive the Thames Tideway Tunnel project throughput.

3 The receptor site consent and permit have not been assessed due to the receptor site's insufficient capacity.

3 The receptor site can not receive Thames Tideway Tunnel material and has insufficient capacity thus has not been investigated further.

3

LAN

Ebbsfleet Development Land Securities Kent TQ 57947 73646 Restoration Landfill and Quarry Restoration Housing Development Organisation representative confirmed that due to restoration management at the receptor site they will not require Thames Tideway Tunnel material for restoration purposes. Timescales have not been assessed.

3 Organisation representative confirmed that due to restoration management at the receptor site, they will not require Thames Tideway Tunnel material for restoration purposes.

3 Organisation representative confirmed that due to restoration management at the receptor site, they will not require Thames Tideway Tunnel material for restoration purposes.

3 Organisation representative confirmed that due to restoration management at the receptor site, they will not require Thames Tideway Tunnel material for restoration purposes.

3 Organisation representative confirmed that due to restoration management at the receptor site, they will not require Thames Tideway Tunnel material for restoration purposes.

3 Organisation representative confirmed that due to restoration management at the receptor site, they will not require Thames Tideway Tunnel material for restoration purposes.

3

LON

London Array London Array North Sea (51.643889,1.553611) nearest

Engineering Reclamation

Development and Infrastructure (including Power)

Off shore construction to finish in 2011. However there are other developments planned and that could lead on

to other projects which may require engineering material.

Organisation representative indicated that the receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescales.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics. Chalk slurry is unlikely to be able to be accepted at the receptor site, however clay, sands and gravels maybe accepted.

2 Organisation representative suggested that capacity may be available for a useful volume of Thames Tideway Tunnel material, if the project demanded material. - updated 03/03/11 organisation representative indicated that the receptor site would be unable to receive materials.

3 Organisation representative indicated that the receptor site would be unable to receive materials.

3 Organisation representative indicated that the receptor site would be unable to receive materials.

3 Organisation representative indicated that the receptor site would be unable to receive materials.

3

LTG.1

Rainham Village LTGDC Essex RM13 9TH(nearest)

Restoration Development and Infrastructure (including Power)

Develop an area of former industrialised land in the area. Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that there is insufficient capacity to receive a useful quantity of Thames Tideway Tunnel material at the receptor site.

3 The receptor site is unlikely to be able to accept the required throughput produced by the Thames Tideway Tunnel project.

3 The receptor site does not have the appropriate planning consent or permit.

3 Organisation representative indicated that the receptor site would not be in the position to receive any material.

3

LTG.2

South Dagenham LTGDC East London RM9 6QD(nearest)

Restoration Development and Infrastructure (including Power)

Develop an area of former industrialised land in the area. Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that there is insufficient capacity to receive a useful quantity of Thames Tideway Tunnel material.

3 The receptor site are unlikely to be able to accept the required throughput produced by the Thames Tideway Tunnel project.

3 The receptor site does not have the appropriate planning consent and permit.

3 Organisation representative indicated that there is insufficient capacity to receive a useful quantity of Thames Tideway Tunnel material.

3

LYO.1

Pole Hole Farm, Gilston Lyons Landfill Ltd Pole Hole Farm, Eastwick Road, Pye Corner, Gilston, Harlow, Essex, CM20 2RP,

TL 454000 127500 Restoration Landfill and Quarry Restoration Site indicated that unable to receive materials Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity and is unable to receive Thames Tideway Tunnel material.

3 Throughput of the receptor site have not been examined due to the receptor site's limited viability.

3 The receptor site's planning consent and permit have not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that the receptor site would be unable to receive materials.

3

Page 44: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

LYO.2

Bunkers Hill Frank Lyons Group Waterhall Quarry, Lower Hatfield Road Hertford Hertfordshire SG13 8LF

TL 30037 09536 Restoration Landfill and Quarry Restoration Quarry and landfill The receptor site would be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. The receptor site would accept sands and gravels.

2 Organisation representative has indicated that there is capacity available for a useful volume of Thames Tideway Tunnel material at the receptor site.

1 The receptor site can take some of the required throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 The receptor site has the required consents and permit to receive all of Thames Tideway Tunnel material.

1 The receptor site is likely to be able to receive a useful amount of Thames Tideway Tunnel material.

1

LYO.3

Blackleys Quarry, Gt. Leighs

Frank Lyons Group Blackley Quarry, Great Leighs, Chelmsford, Essex

CM3 1QP

TL 73054 19206 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required at the receptor site.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required at the receptor site.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required at the receptor site.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project, and therefore restoration materials are unlikely to be required at the receptor site.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project, and therefore restoration materials are unlikely to be required at the receptor site.

3 Essex MDD suggests that the receptor site has expected extraction lifespan beyond the Thames Tideway Tunnel project and therefore restoration materials are unlikely to be required at the receptor site.

3

MAR

Midgeham Quarry, Bath Road

Marley Tile Co. Newbury, RG7 5UX SU 56039 66507 Restoration Landfill and Quarry Restoration Aggregate Quarry Timescales have not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that the receptor site would not require restoration material, as the receptor site will be restored to lakes.

3 The receptor site has insufficient capacity and does require material for restoration.

3 Throughput of the receptor site have not been examined due to the receptor site's insufficient capacity.

3 The receptor site's planning consent and permit have not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that the receptor site would not require restoration material, as the receptor site will be restored to lakes.

3

MDD.1

Shellow Cross, Willingale Site included within Essex Minerals Development

Document (Not Operational)

Land at Shellow Cross Farm, Elm Farm and Newland Hall Farm,

Roxwell / Willingale, Ongar

TL 62577 09101 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational.

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.10

Alsteads Farm, Lt Waltham

Site included within Essex Minerals Development

Document (Not Operational)

Alsteads Farm, Little Waltham, Chelmsford

TL 72575 13841 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.11

Patch Farm, Abridge Site included within Essex Minerals Development

Document (Not Operational)

Patch Park Farm, Abridge, Essex

TQ 48338 97861 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.12

Appleford & Colemans farm, Witham

Site included within Essex Minerals Development

Document (Not Operational)

Applefords and Colemans Farm, Rivenhall, Essex

TL 83638 16033 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.13

Olivers Nurseries, Witham

Site included within Essex Minerals Development

Document (Not Operational)

Olivers Nurseries, Maldon Road, Witham

TL 82307 12441 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.14

Gurnhams, Little Bentley Site included within Essex Minerals Development

Document (Not Operational)

Gurnhams Farm, Little Bentley, Essex

TM 12501 23367 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.15

Admirals Farm, Great Bentley

Site included within Essex Minerals Development

Document (Not Operational)

Admirals Farm, Great Bentley, Essex

TM 11949 22827 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.16

Frogs Hall Farm, Takeley Site included within Essex Minerals Development

Document (Not Operational)

Frogs Hall farm, Takeley, Essex

TL 58272 21816 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

Page 45: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

MDD.17

Ardleigh Rail, Ardleigh Site included within Essex Minerals Development

Document (Not Operational)

Ardleigh Rail Sidings, Ardleigh Essex

TM 06894 28893 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.18

Park Gate Farm, Silver End

Site included within Essex Minerals Development

Document (Not Operational)

Park Gate Farm, Silver End, Essex

TL 83757 19917 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.2

Easton Park, Gt Dunmow

Site included within Essex Minerals Development

Document (Not Operational)

Great Dunmow, Essex TL 63407 20869 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.3

Broadfield farm, Rayne Site included within Essex Minerals Development

Document (Not Operational)

Broadfield farm, Rayne, Essex

TL 70853 22739 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.4

Frating Hall Farm, Frating

Site included within Essex Minerals Development

Document (Not Operational)

Frating Hall Farm, Frating, Essex

TM 08909 22841 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.5

Land at Ugley, Ugley Site included within Essex Minerals Development

Document (Not Operational)

Ugley, Essex TL 51563 26803 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.6

Sunnymead, Elmstead and Heath Farm,

Alresford

Site included within Essex Minerals Development

Document (Not Operational)

Brightlingsea Road, Alresford

TM 05722 22774 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 This criterion has not been assessed as the Essex MDD document suggests that the receptor site has an extraction lifespan beyond the Thames Tideway Tunnel project. Additionally when the organisation was contacted, this receptor site was not proposed therefore it has been assumed it would be unavailable to accept Thames Tideway Tunnel

3 This criterion has not been assessed as the Essex MDD document suggests that the receptor site has an extraction lifespan beyond the Thames Tideway Tunnel project. Additionally when the organisation was contacted, this receptor site was not proposed therefore it has been assumed it would be unavailable to accept Thames Tideway Tunnel

3 This criterion has not been assessed as the Essex MDD document suggests that the receptor site has an extraction lifespan beyond the Thames Tideway Tunnel project. Additionally when the organisation was contacted, this receptor site was not proposed therefore it has been assumed it would be unavailable to accept Thames Tideway Tunnel

3 This criterion has not been assessed as the Essex MDD document suggests that the receptor site has an extraction lifespan beyond the Thames Tideway Tunnel project. Additionally when the organisation was contacted, this receptor site was not proposed therefore it has been assumed it would be unavailable to accept Thames Tideway Tunnel

3

MDD.7

Tyndales Farm, Danbury Site included within Essex Minerals Development

Document (Not Operational)

Tynedales Farm, Danbury / Woodham Mortimer

TL 80051 04861 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.8

Covenbrook Hall Farm, Stisted

Site included within Essex Minerals Development

Document (Not Operational)

Covenbrook Hall Farm, Stisted, Essex

TL 78753 23563 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MDD.9

Thorrington Hall Farm Site included within Essex Minerals Development

Document (Not Operational)

Thorrington Hall farm, Thorrington Essex

TM 09136 19461 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The receptor site is proposed as a preferred site within the Essex MDD. However timescales have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However material characteristics have not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3 The receptor site is proposed as a preferred site within the Essex MDD. However this criterion has not been assessed as the receptor site is currently not operational .

3

MER

14 Hailey Road, Erith Meridian Technical Services Ltd

14 Hailey Road, Erith, Kent, DA18 4AP,

TQ 4950 7970 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 5,000tpa(source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate permit to accept 5,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

MET

Metrotidal Metrotidal Thames Estuary SS8 7DN(nearest)

Engineering Reclamation

Development and Infrastructure (including Power)

This project involves the construction of a bridge across the lower Thames from Hoo Peninsular to Canvey Island

in conjunction with a tidal power barge. The project is still in conceptual stage, and stakeholders are being

informed. The project has got a lot of high level support and if it is approved would begin construction the same

time as Thames Tideway Tunnel.

The receptor site could be operational throughout the Thames Tideway Tunnel project. Planned timescales for the receptor site are between 2014 to 2019 which is within the Thames Tideway Tunnel project timescales.

2 Organisation representative indicated that there are no constraints on taking material with Thames Tideway Tunnel characteristics.

1 Organisation representative indicated that capacity is available - 2million m3 of material would be required for engineering processes on the barrages required.

1 The receptor site has the ability to accept the anticipated Thames Tideway Tunnel throughput.

1 The receptor site does not have the appropriate consent or permits. The project is being discussed with stakeholders.

3 If this project were to be awarded planning consent and remain on schedule then this would be a potential viable option for Thames Tideway Tunnel material.

1

Page 46: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

MIL

Metcom International Ltd

Metcom International Ltd

Unit 6 New Horizons Bus Centre, Barrows Road,

Harlow, Essex, CM19

TL 4260 0950 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 4,999 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 4,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

MOD

MOD/Defence Estates MOD Various Salisbury Plain (413356,139603)

Restoration Habitat restoration Defence Estates Development Plan 2009. There are a number of rationalisation procedures occurring thereby reducing the number of MoD premises available in the

UK. If the sites were being developed, including those in London there may be some demand for landscaping

materials.

Network of receptor sites has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. A new Development Plan is being produced and the requirement of material will be dependant on the plans.

2 A new Development Plan is being produced and the requirement of material will be dependant on the plans. No additional information is available at present.

3 A new Development Plan is being produced and the requirement of material will be dependant on the plans. No additional information is available at present.

3 A new Development Plan is being produced and the requirement of material will be dependant on the plans. No additional information is available at present.

3 A new Development Plan is being produced and the requirement of material will be dependant on the plans. No additional information is available at present.

3 The MoD are currently producing a Development Plan which will then determine the level of material which maybe required in their developments. It is likely that some material will be required. The organisation has requested to be contacted closer to the time of Thames Tideway Tunnel material excavation.

3

MRJ

Greenacre Farm, Canewdon Rochford

Essex

Mr John Frederick Morley

Greenacre Farm, Hyde Wood Lane, Canewdon, Rochford, Essex, SS4 3RR

TQ 87515 93532 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 4,999 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 4,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

MWM

185 Manor Rd, Erith Metropolitan Waste Management ( W R

185 Manor Road, Erith, Kent, DA8 2AD,

TQ 522660 777040

Recycler Material Recycling (including aggregates and soils)

Wood recycler - not suitable for Thames Tideway Tunnel material

The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 The receptor site can not accept material and therefore cannot accept material with Thames Tideway Tunnel characteristics

3 Capacity of the receptor site have not been examined due to the receptor site's being unable to receive material.

3 Throughput of the receptor site have not been examined due to the receptor site's being unable to receive material.

3 The receptor site's planning consent and permit have not been examined due to the receptor site's being unable to receive material.

3 Organisation representative indicated that the receptor site would not require restoration material.

3

NEE

Needham Market Needham Chalks Needham Market Chalk Quarry, Ipswich

Road,Needham Market, Ipswich, IP6 8EL

TM 09330 54169 Recycling Landfill and Quarry Restoration Old Chalk Quarry, could require some chalk for reprocessing.

Organisation representative confirmed that new operators of the receptor site are expected to be appointed in September 2012. Currently there are no requirements for chalk at the receptor site. Timescales have not been assessed.

3 The receptor site does not receive excavated material and therefore would not receive Thames Tideway Tunnel material.

3 The capacity of the receptor site has not assessed as it would not be able to receive Thames Tideway Tunnel material.

3 The throughput of the receptor site has not assessed as it is unable to receive Thames Tideway Tunnel material.

3 The receptor site's planning consent and permit have not been assessed as the receptor site is unable to receive Thames Tideway Tunnel material.

3 The receptor site will not be able to accept Thames Tideway Tunnel material.

3

NOR.1

Nordic Recycling Chatham Docks

Nordic Recycling Ltd Berth 6 Basin 3, Chatham Docks, Gillingham, Kent,

ME4 4SR,

TQ 7730 7020 Recycling Material Recycling (including aggregates and soils)

Materials recycling service - not suitable for Thames Tideway Tunnel material

The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 Organisation representative indicated that the receptor site would not require restoration material.

3 Capacity of the receptor site have not been examined due to the receptor site's being unable to receive material.

3 Throughput of the receptor site have not been examined due to the receptor site's being unable to receive material.

3 The receptor site's planning consent and permit have not been examined due to the receptor site's being unable to receive material.

3 Organisation representative indicated that the receptor site would not require restoration material.

3

NOR.2

Nordic Recycling Ltd Nordic Recycling Ltd 34/34 A Tilbury Docks, Tilbury Freeport, Tilbury,

Essex, RM18 7EH,

TQ 62896 75271 Recycling Material Recycling (including aggregates and soils)

Materials recycling service - not suitable for Thames Tideway Tunnel material

The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 The receptor site can not accept material and therefore cannot accept material with Thames Tideway Tunnel characteristics

3 Capacity of the receptor site have not been examined due to the receptor site's being unable to receive material.

3 Throughput of the receptor site have not been examined due to the receptor site's being unable to receive material.

3 The receptor site's planning consent and permit have not been examined due to the receptor site's being unable to receive material.

3 Organisation representative indicated that the receptor site would not require restoration material.

3

NOT

North Sea Disposal 0 North Sea, Kent/Essex coast

(51 35.000 N - 01 58.000 E )

Disposal Landfill and Quarry Restoration For the Lee Tunnel, a study was conducted to investigate the opportunities for disposal of material to

sea.

The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 The receptor site can not accept material and therefore cannot accept material with Thames Tideway Tunnel characteristics

3 Capacity of the receptor site have not been examined due to the receptor site's being unable to receive material.

3 Throughput of the receptor site have not been examined due to the receptor site's being unable to receive material.

3 The receptor site's planning consent and permit have not been examined due to the receptor site's being unable to receive material.

3 Organisation representative indicated that the receptor site would not require restoration material.

3

NPO

Tilbury Power Station NPower / RWEN West Tilbury, Thurrock RM18 8UL Restoration Development and Infrastructure (including Power)

If construction works were to be required at the power plant, material could be reused here, to prevent virgin

material being used.

The development plans for the receptor site are unknown and so timescales cannot be assessed.

3 The development plans for the receptor site are unknown and so acceptability of Thames Tideway Tunnel material cannot be assessed.

3 The development plans for the receptor site are unknown and so capacity requirements cannot be assessed.

3 The development plans for the receptor site are unknown and so throughput requirements cannot be assessed.

3 The development plans for the receptor site are unknown and so consent and permits of the receptor site have not been assessed.

3 Tilbury was contacted during the Lee Tunnel options assessment and indicated that they would be not be interested in Thames Tideway Tunnel material.

3

ODO

O'Donovan, Markfield Rd

O'Donovan (Waste Disposal) Ltd

100a Markfield Road, Tottenham, London, N15

4QF,

TQ 342790 888660

Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 24,000 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 24,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

Page 47: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

OHA

O' Hara Edible Oils & Waste

Mrs Beverley O' Hara, Mr Joseph Pat

64 Durham House Farm, Hollybush Lane, Denham,

Buckinghamshire, UB9

TQ 0355 8545 Recycling Material Recycling (including aggregates and soils)

Materials recycling service - not suitable for Thames Tideway Tunnel material

Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics not examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 5,000tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 5,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

OIK

Tallow Storage Oikos Storage Ltd Hole Haven Wharf, Haven Road, Canvey Island,

Essex, SS8 0NR,

TQ 7770 8216 Recycling Material Recycling (including aggregates and soils)

Materials recycling service - not suitable for Thames Tideway Tunnel material

Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics has not been examined due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity - 74,999 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 74,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

OIL

Use in oil fields 0 0 0 Engineering Use in Industry Material could be used for engineering purposes to assist in the extraction of oil from North sea oil wells.

Organisation representative indicated that use of Thames Tideway Tunnel material in oil extraction is not feasible.

3 Organisation representative indicated that the receptor site would not require Thames Tideway Tunnel material.

3 Capacity of the receptor site have not been examined due to the receptor site being unable to receive material.

3 Throughput of the receptor site have not been examined due to the receptor site being unable to receive material.

3 The receptor site's planning consent and permit have not been examined due to the receptor site being unable to receive material.

3 Organisation representative indicated that use of Thames Tideway Tunnel material in oil extraction is not feasible.

3

PAI

Paint manufacture ICI Paints Plc Various, e.g. Slough SL2 5DS Recycling Use in Industry For the Lee Tunnel study, ICI paints were approached to discover the potential of using chalk in the production

of Auro chalk paint.

Timescales have not been examined due to the receptor site's insufficient capacity.

3 The receptor site can not accept material and therefore cannot accept material with Thames Tideway Tunnel characteristics

3 for Orsett Quarry see RIO, For Waltons Hall Farm see COR.1.

3 The receptor site will not be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site's planning consent and permit have not been examined due to the receptor site's insufficient capacity.

3 The receptor site can not accept material with Thames Tideway Tunnel characteristics as it would require good quality material.

3

PAN

Ayletts Farm Quarry (Rainham)

Panelmark Ltd 0 0 Restoration & Disposal

Landfill and Quarry Restoration Inert landfill The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 The receptor site can not accept material and therefore cannot accept material with Thames Tideway Tunnel characteristics

3 The receptor site no longer accepts material therefore has insufficient capacity.

3 The receptor site is not suitable for accepting Thames Tideway Tunnel material therefore throughput capabilities have not been considered.

3 The receptor site does not have the appropriate consent or permit.

3 The receptor site no longer accepts material and therefore does not require Thames Tideway Tunnel material.

3

PEA

Addington Quarry Pearsons Ballast Ltd Addington Quarry, Addington Lane,

Trottiscliffe, West Malling, Kent, ME19 5DN,

TQ 647000 599000

Restoration & Disposal

Landfill and Quarry Restoration Inert landfill The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site can not accept material and therefore cannot accept material with Thames Tideway Tunnel characteristics

3 The receptor site has limited capacity - 150,000tonnes (source: EA).

3 The receptor site has limited capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 150,000tonnes of material, but this has not been examined in detail due to the receptor site's limited capacity.

2 The receptor site has limited capacity based on EA data and has not been investigated further.

3

PEE.1

Peel Ports - Hoo Island Peel Ports Hoos Marshes, Medway Estuary

TQ796720 Reclamation Landfill and Quarry Restoration Currently the site is a dredging disposal site. The receptor site would be operational throughout the Thames Tideway Tunnel project.

1 Organisation representative suggested that there are no constraints on taking material with Thames Tideway Tunnel characteristics.

1 Organisation representative suggested that capacity is available to accept all of the clay and potentially all of the other Thames Tideway Tunnel material.

1 The receptor site has the ability to accept the anticipated throughput. The receptor site also has experience of handling similar excavation materials.

1 Organisation representative indicated that historically the receptor site has not required planning consent, however the receptor site is now in discussions to address this. The receptor site may need to modify its permit to accept chalk.

2 The receptor site currently accepts materials similar to those that will be produced by the Thames Tideway Tunnel project and will be operating throughout the Thames Tideway Tunnel project period. However permitting issue require addressing before material can be accepted.

1

PEE.2

Peel Ports - Rushenden Peel Ports Isle of Sheppy, Kent TQ 900000 710000

Reclamation Development and Infrastructure (including Power)

This is a major development planned to accept material for a wetlands creation in the Medway.

Organisation representative confirmed that there are no plans for developments which would require Thames Tideway Tunnel material. Timescales have not been assessed.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 Organisation representative confirmed that there is no capacity to receive Thames Tideway Tunnel material.

3 Throughput of the receptor site has not been examined due to the receptor site's insufficient capacity.

3 The receptor site's planning consent and permit have not been examined due to the receptor site not requiring restoration material.

3 Organisation representative indicated that the receptor site would not require material for restoration.

3

PEE.3

Peel Ports - Burntwick Island

Peel Ports Burntwick Island, Thames Estuary

TQ859721 Reclamation Habitat restoration A regeneration project of an old London tip, as a nesting area for birds.

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescales.

2 No information was made available on the types of material the receptor site could accept. Similar projects accept materials with Thames Tideway Tunnel characteristics.

2 Organisation representative suggested that capacity is available at the receptor site. It is estimated that the receptor site requires 3million m3 of material.

1 The throughput capabilities of the receptor site are not known at present.

3 The receptor site does not have the necessary consent or permit.

3 At this stage there is limited information on the receptor site for it to be a viable option for receiving Thames Tideway Tunnel material.

3

Page 48: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

PEE.4

Peel Ports - Sheerness Lappel Bank Foreshore

Port of Sheerness Ltd

Lappel Bank Foreshore, Sheerness Docks, South Of

Sheerness, Sheerness, Kent,

TQ 907000 737000

Reclamation Development and Infrastructure (including Power)

It is a major reclamation project which will involve reclaiming land from the river. Once reclaimed the land will be developed to produce a port land and also used

to regenerate Sheerness.

Organisation representative confirmed that there are no plans for developments which would require Thames Tideway Tunnel material.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 Organisation representative confirmed that there is no capacity to receive Thames Tideway Tunnel material.

3 Throughput of the receptor site has not been examined due to the receptor site's insufficient capacity.

3 The receptor site's planning consent and permit have not been examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that the receptor site would not require restoration material.

3

PJC

Compounds P & Q P J Cars & Plant Ltd Templewood Estate, Stock Road, West Hanningfield,

Chelmsford, Esse

TL 70760 00720 Recycling Material Recycling (including aggregates and soils)

Materials recycling service - not suitable for Thames Tideway Tunnel material

The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 75,000tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 75,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

PLA

Plasterboard Recycling Edmonton

Plasterboard Recycling UK Ltd

Units 3a & 3b Stonehill Bus Park, Harbet Road,

Edmonton, London, N

TQ 359020 918780

Recycling Material Recycling (including aggregates and soils)

Materials recycling service - not suitable for Thames Tideway Tunnel material

The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 24,999 tpa(source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 24,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

POL

Polkacrest, Chase Farm Hospital

Polkacrest Ltd Chase Farm Hospital, The Ridgeway, Enfield, Middlesex, EN2 8JL,

TQ 314510 981480

Recycling Material Recycling (including aggregates and soils)

Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 4,999 tpa(source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 4,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

POW

Crossan House, Old Oak Sidings, Off Scrubs

Lane, London NW10 6RJ

Powerday Crossan House, Old Oak Sidings, Off Scrubs Lane,

London NW10 6RJ

TQ 21920 82858 Recycling Material Recycling (including aggregates and soils)

Physical treatment Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics not examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that no capacity is available.

3 The receptor site has no capacity and therefore is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permits to accept material similar in nature to that produced by Thames, but this has not been examined in detail due to the receptor site's insufficient capacity.

3 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

PRE

Finmere Quarry Premier Aggregates Banbury Road, MK18 4AJ SP 62835 32501 Restoration Landfill and Quarry Restoration Aggregate Quarry Currently the receptor site is planning to extract material from 2013 to 2017. Thus the receptor site might be available during the Thames Tideway Tunnel timescales.

2 The receptor site would be able to receive all types of Thames Tideway Tunnel material .

1 The receptor site would be able to receive 0.5million tonnes in its lifespan.

1 There are no permit throughput restrictions currently for the receptor site. Limiting factor would be the speed in which the receptor site requires the material for restoration.

1 The receptor site has planning consent and permit for quarrying.

1 The receptor site has the ability to receive a useful amount of Thames Tideway Tunnel material for some Thames period.

1

PRI

Fingringhoe Quarry Prior Group Ballast Quay, Fingringhoe, Colchester, Essex, CO5

7DB

TM 03236 19989 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

The restoration of the receptor site does not meet the Thames Tideway Tunnel project timescales.

3 Acceptability of material characteristics not examined due to the receptor site's limited timescales.

3 Throughput requirements have not been examined due to the receptor site's limited timescales.

3 Capacity of the receptor site has not been examined due to the receptor site's limited timescales.

3 Planning consent and permits of the receptor site have not been examined due to the receptor site's limited timescales.

3 The timescales for the restoration of the receptor site does not meet the Thames Tideway Tunnel project timescales. Additionally when contacted the organisation representative did not propose this receptor site.

3

RAR

Little Belhus Landfill Rural Arisings Former Belhus Landfill Site, Arisdale Avenue,

South Ockendon,RM15 5DP

TQ 58634 82501 Restoration Landfill and Quarry Restoration Rural Arisings are managing the restoration of a former landfill and will be creating a Country Park.

The receptor site is expected to be restored by 2021.

1 Organisation representative indicated that there are no constraints on taking material with Thames Tideway Tunnel characteristics.

1 The restoration project requires approximately 1.67million m3.

1 The receptor site can take some of the required clay, sands and gravels throughput however limitations may be present due to the sites capacity, footprint and/or permitted daily waste movements.

2 The receptor site has planning consent and is currently operating under an exemption whilst applying for an environmental permit.

2 The receptor site would be able to receive material for some of the Thames Tideway Tunnel project period and would accept a useful quantity of it.

1

RAY

Copyhold farm Quarry, Raymond Brown Minerals

Curidge. RG18 9DR SU 49110 72787 Restoration Landfill and Quarry Restoration Aggregate Quarry The receptor site is likely to be available to receive materials throughout the Thames Tideway Tunnel project timescales.

2 Organisation representative indicated that the receptor site would be able to receive all inert Thames Tideway Tunnel material types.

1 The receptor site has insufficient capacity and is likely to be able to accept 100,000tonnes in total (over 7 years).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive anticipated throughput produced by the Thames Tideway Tunnel project.

3 Permit and planning details of the receptor site have not been assessed due to its insufficient capacity.

3 The receptor site has limited capacity and thus would only be able to accept 100,00 tonnes over 7 years of the project timescales.

3

RER

Chilton Railway Cutting Landfill

R E Richardson (Chilton) Ltd

Prospect Farm, Chilton, Oxfordshire, OX11 0ST,

SU 7960 8550 Restoration Disposal

Landfill and Quarry Restoration Inert landfill The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site can not accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 74,999 tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate the permit to accept 74,999tonnes of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

Page 49: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

RES

Reservoir Landfill Reservoir Aggregates Ltd

Ashford Road, Laleham, Middlesex, TW18 1QF,

TQ 0614 7064 Restoration & Engineering

Landfill and Quarry Restoration Mining of aggregates The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 The receptor site can not accept material with Thames Tideway Tunnel characteristics.

3 No information was made available on the receptor site's capacity.

3 The receptor site is not suitable to accept Thames Tunnel material therefore throughput capabilities not considered.

3 No information made available on the permit and consents of the receptor site.

3 The receptor site is not suitable for Thames Tideway Tunnel material and so has not been investigated further

3

RIO

Riosoils - Dansand & Ardleigh Quarries

Riosoils Orsett, Essex RM16 3BX Restoration and Recycling

Landfill and Quarry Restoration A quarry which requires material for restoration. Also the company confirm would look to process materials on site, such as the sands and gravels and recycle the

gravels to aggregate grade. As well as Dan sand Quarry, the site would act as a broker for some clay material for

other capping and restoration processes.

The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. Organisation representative indicated that the receptor site would prefer to accept chalk rather than clay.

2 The receptor site has capacity for 1 million m3 of Thames Tideway Tunnel material.

1 The receptor site can take some of the required chalk throughput however limitations may be present due to the sites capacity, footprint and/or permitted daily waste movements.

2 The receptor site has the required consent and permit to receive all of Thames Tideway Tunnel material.

1 The receptor site is likely to be able to receive a useful amount of Thames Tideway Tunnel material.

1

RMC

Addlestone Quarry Landfill

Rmc Materials Ltd Addlestone Quarry, Byfleet Road, Weybridge,

Surrey, KT15 3LA,

TQ 0628 6295 Restoration and Recycling

Landfill and Quarry Restoration Organisation is part of CEMEX group. Contact made with this organisation and Site was not offered to receive

Thames Tideway Tunnel material

Organisation is part of the CEMEX group. Organisation representative did not offer this receptor site to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 Organisation is part of the CEMEX group. Organisation representative did not offer this receptor site to receive Thames Tideway Tunnel material

3 Organisation is part of the CEMEX group. Organisation representative did not offer this receptor site to receive Thames Tideway Tunnel material

3 Organisation is part of the CEMEX group. Organisation representative did not offer this receptor site to receive Thames Tideway Tunnel material

3 Organisation is part of the CEMEX group. Organisation representative did not offer this receptor site to receive Thames Tideway Tunnel material

3 Organisation is part of the CEMEX group. Organisation representative did not offer this receptor site to receive Thames Tideway Tunnel material

3

RON

Armigers Farm, Thaxted Ronald B Haigh & Co. Ltd

Armigers Farm Stanbrook Thaxted, Dunmow, Essex

CM6 2NN

TL 59720 29775 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Timescales have not been examined due to the receptor site's insufficient capacity.

3 Acceptability of material characteristics not examined due to the receptor site's insufficient capacity.

3 The receptor site has limited capacity therefore this criterion is not assessed.

3 The receptor site has limited capacity therefore this criterion is not assessed.

3 The receptor site has limited capacity therefore this criterion is not assessed.

3 The Essex MDD suggests that the receptor site has limited capacity to accept a useful volume of Thames Tideway Tunnel material.

3

RSP

RSPB - Wallasea Island (Wallasea Wetland Creation Project )

RSPB Creeksea Ferry Road, Essex (Nearest)

SS4 2HD Reclamation Habitat restoration The Wallasea Island Wild Coast Project is a project to raise the land on a flood risk coastline and to generate a new coastal nature reserve. There is a planning consent

from Essex County Council, and the reserve will form mudflats and salt marsh. RSPB own 2/3 of the 736Ha

project area and are required to eventually acquire the entire project area. The consent is for the import of the

minimum amount of material to create the nature reserve, estimated at 7.5 million m3.

The receptor site should be operational throughout the Thames Tideway Tunnel project.

2 Organisation representative indicated that there are no constraints on taking material with Thames Tideway Tunnel characteristics. Organisation representative also indicated that space is available for processing the chalk slurry.

1 Organisation representative indicated that capacity is available. The receptor site is anticipated to require 7.3million m3 of material. 50% will be provided by Crossrail. Currently it is planned that other developers will also make use of this receptor site.

1 The receptor site has the ability to accept the throughput.

1 The receptor site has the required permit and planning consent to receive all of Thames Tideway Tunnel project material.

2 The receptor site would be able to receive a useful amount of Thames Tideway Tunnel material.

1

SAP

Sapphire Sapphire Energy Recovery Ltd

Tunnel Estate, Barclay Way, Off Central Avenue,

West Thurrock, Ess

TQ 5781 7816 Recycling Development and Infrastructure (including Power)

Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics

3 The receptor site has insufficient capacity - 5,000tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 5,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SCA

Burham Pit S C A Packaging Ltd Land/ Premises At, Eccles, Aylesford, Kent, ME1 3YA,

TQ 719000 606000

Restoration & Disposal

Landfill and Quarry Restoration Inert landfill The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 150,000 tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 150,000tonnes of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SHE

Sheppy Ltd Sheppy Ltd Rushenden Road, Queensborough, Kent,

ME11 5HH,

TQ 90904 71966 Recycling Material Recycling (including aggregates and soils)

Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 24,000tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the anticipated throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 24,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SIT.1

Benedict Wharf Recovery Facility

S I T A ( G B ) Ltd Benedict Wharf, Benedict Road, Mitcham, Surrey,

RH4 1AJ,

TQ 27044 68450 Recycling Material Recycling (including aggregates and soils)

Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 54,320 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 54,320tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SIT.2

Runfold South Quarry Sita Guildford Road, Runfold, Farnham, Surrey GU101PB

SU 86397 47238 Restoration Landfill and Quarry Restoration Inert Landfill The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 Organisation representative indicated that there are no constraints on taking material with Thames Tideway Tunnel characteristics.

1 Organisation representative indicated that capacity is available for a useful volume of Thames Tideway Tunnel material. However this would be dependent on void space at the time of the start of the Thames Tideway Tunnel project.

2 The receptor site can take some of the required anticipated throughput however limitations may be present due to the receptor sites capacity, footprint and/or permitted daily waste movements.

2 The receptor site operates as a landfill and has the necessary permit and consent.

1 The receptor site is currently operating as an inert landfill and has the ability to accept a useful amount of Thames Tideway Tunnel material.

1

Page 50: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

SIT.3

Albury Landfill SITA Albury Landfill, Shere Road, Guildford

TQ 05319 48325 Restoration Landfill and Quarry Restoration Landfill Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3

SIT.4

Seale Landfill SITA Seale Lane, Seale, Surrey SU 89126 47669 Restoration Landfill and Quarry Restoration Landfill Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3

SIT.5

Epsom landfill SITA West Ewell, Epsom TQ 20113 61960 Restoration Landfill and Quarry Restoration Landfill Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3

SIT.6

Harmondsworth landfill SITA Harmondsworth, Holloway lane, Sipsworh, West

Drayton. UB7 0AE

TQ 06741 77640 Restoration Landfill and Quarry Restoration Landfill Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3

SMI.1

Duns Tew Quarry Smith & Sons Chipping Norton,OX7 7DQ SP 45649 27306 Restoration Landfill and Quarry Restoration Aggregate Quarry Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material. Timescales have not been assessed.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3 Organisation representative indicated that the receptor site would not be suitable to receive Thames Tideway Tunnel material.

3

SMI.2

Gill Mill Quarry Smith & Sons 0 SP 37134 07343 Restoration Landfill and Quarry Restoration Aggregate Quarry The receptor site is likely to be operational throughout the Thames Tideway Tunnel project period.

2 Organisation representative confirmed the receptor site would only receive sands and gravels for reprocessing.

2 The receptor site has insufficient capacity and would only be able to receive approximately 100,000tonnes over the Thames Tideway Tunnel timescales.

3 The receptor site has insufficient capacity to receive Thames Tideway Tunnel materials.

3 The receptor site has insufficient capacity to receive Thames Tideway Tunnel materials.

3 The receptor site has insufficient capacity to receive Thames Tideway Tunnel materials.

3

SOU

Oxted Quarry Landfill Southern Gravel Ltd Oxted Quarry, Chalk Pit Lane, Oxted, Surrey, RH8

0QW,

TQ 3820 5440 Restoration & Disposal

Landfill and Quarry Restoration Inert landfill The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 100,000 tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate permit to accept 100,000tonnes of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SPO

Hurstridge, Hathersham Lane, Smallfield

Sporting Surface Supplies Ltd

Hathersham Lane, Smallfield, Horley, Surrey,

RH6 9JG,

TQ 309 442 Recycling Material Recycling (including aggregates and soils)

Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 50,000tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 50,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SQE

Waterhall Quarry SQ Environmental Lower hatfield Road, North. SG13 8LF

TL 30100 10891 Restoration Landfill and Quarry Restoration Aggregate Quarry Organisation representative indicated that the receptor site cannot meet Thames Tideway Tunnel project timescales as is no longer receiving material.

3 Organisation representative indicated that the receptor site cannot meet Thames Tideway Tunnel project timescales as is no longer receiving material.

3 Organisation representative indicated that the receptor site cannot meet Thames Tideway Tunnel project timescales as is no longer receiving material.

3 Organisation representative indicated that the receptor site cannot meet Thames Tideway Tunnel project timescales as is no longer receiving material.

3 Organisation representative indicated that the receptor site cannot meet Thames Tideway Tunnel project timescales as is no longer receiving material.

3 Organisation representative indicated that the receptor site cannot meet Thames Tideway Tunnel project timescales as is no longer receiving material.

3

SUM

Summerleaze - Denham Quarry

0 Buckinghamshire UB9 4HE Restoration Landfill and Quarry Restoration Gravel extraction quarry, where material is also required for restoration

The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics.

2 Organisation representative indicated that the receptor site would require 644,000m3 of Thames Tideway Tunnel material.

2 The receptor site can take some of the required throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 The receptor site has the required permit and planning consent to receive Thames Tideway Tunnel project material.

1 Thames Tideway Tunnel material could be accepted at the receptor site.

1

Page 51: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

SUM.1

Berry Hill Farm Summerleaze Taplow SU 91125 81628 Restoration Landfill and Quarry Restoration Possible inert landfilling The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 Acceptability of material characteristics not examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that there is insufficient capacity at the receptor site.

3 The receptor site has insufficient capacity therefore throughput capabilities of the receptor site have not been considered.

3 The permit and planning details of the receptor site have not been assessed due to the receptor site's insufficient capacity.

3 Organisation representative indicated that the receptor site does not require any Thames Tideway Tunnel material.

3

SUM.2

East Burnham Quarry Summerleaze Burnham SU 94990 83455 Restoration Landfill and Quarry Restoration Possible inert landfilling The receptor site would be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but would be subject to WAC.

2 There is capacity available for a useful volume of Thames Tideway Tunnel material at the receptor site.

2 The receptor site can take some of the required throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 The receptor site has the required permit and planning consent to receive Thames Tideway Tunnel project material.

1 Thames Tideway Tunnel material could be accepted at the receptor site.

1

SUM.3

Sheephouse Farm Summerleaze Berkshire SU 89265 82615 Restoration Landfill and Quarry Restoration Possible inert landfilling The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 Acceptability of material characteristics not examined due to the receptor site's insufficient capacity.

3 Organisation representative indicated that there is insufficient capacity at the receptor site.

3 The receptor site has insufficient capacity therefore throughput capabilities of the receptor site have not been considered.

3 The permit and planning details of the receptor site have not been assessed due to the receptor site's insufficient capacity.

3 Organisation representative indicated that the receptor site does not require any Thames Tideway Tunnel material.

3

SWA

Princess Margaret Road Landfill (East Tilbury,

Essex)

S Walsh and Son Ltd : Tom Pugh

Technical Manager

East Tilbury RM18 8PA Restoration Engineering

Landfill and Quarry Restoration Landfill operators and excavating waste brokers. The receptor site would be operational throughout the Thames Tideway Tunnel project.

1 Can take material with some of the Thames Tideway Tunnel characteristics, but would be subject to WAC

2 Capacity available for a useful volume of Thames Tideway Tunnel material - would seek to act as a broker for remaining material.

2 Receptor site can take some of the required throughput however limitations may be present due to the sites capacity, footprint or permitted waste movements per day.

2 The receptor site has the required permits and receptor sites would likely to have permits otherwise would not be able to distribute material.

1 Organisation would accept some Thames generated material and act as a broker for that material which is beyond capacity.

3

SWS.1

Ham Hill Wtw Southern Water Services Ltd

Ham Hill Wtw, Off Snodland Bypass, Bull

Lane, Ham Hill, Snodland,

TQ 706360 608910

Recycling Material Recycling (including aggregates and soils)

Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 15,600tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit and planning consent to accept 15,600tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SWS.2

Queenborough Waste Water Treatment Works

Southern Water Services Ltd

Queenborough , Argent Road, Isle Of Sheppey,

Kent, ME11 5LZ,

TQ 910000 704000

Recycling Landfill and Quarry Restoration Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 3,900tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 3,900tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SWS.3

Sittingbourne Sewage Treatment Works

Southern Water Services Ltd

Gas Road, Sittingbourne, Kent, ME10 2QD,

TQ 913000 648000

Recycling Landfill and Quarry Restoration Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 46,800tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 46,800tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

SWS.4

Aylesford Wastewater Treatment Works

Southern Water Services Ltd

Bull Lane, Aylesford, Maidstone, Kent,

TQ 720000 596000

Recycling Landfill and Quarry Restoration Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 28,500tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 28,500tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

TAR

Orsett Quarry & Waltons Hall Farm

Tarmac 0 0 Restoration, Engineering

Landfill and Quarry Restoration For Orsett Quarry see RIO, For Waltons Hall Farm see COR.1.

For Orsett Quarry see RIO, For Waltons Hall Farm see COR.1.

3 For Orsett Quarry see RIO, For Waltons Hall Farm see COR.1.

3 For Orsett Quarry see RIO, For Waltons Hall Farm see COR.1.

3 For Orsett Quarry see RIO, For Waltons Hall Farm see COR.1.

3 For Orsett Quarry see RIO, For Waltons Hall Farm see COR.1.

3 For Orsett Quarry see RIO, For Waltons Hall Farm see COR.1.

3

Page 52: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

TAR.1

All Souls Farm Quarry Tarmac Ltd Land / Premises At, Wexham Park Lane,

Wexham, Bucks, SL3 6LX,

SU 999 821 Restoration & Disposal

Landfill and Quarry Restoration Inert landfill The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 150,000 tonnes (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit and consent to accept 150,000tonnes of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

TAR.2

Colchester Quarry Tarmac Warren Lane. Colchester. Essex. CO3 0NN

TL 95399 22618 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3

TAR.3

Bellhouse Farm, Colchester Quarry

Tarmac Warren Lane. Colchester. Essex. CO3 0NN

TL 94482 22842 Restoration Landfill and Quarry Restoration Site taken from Essex CC Minerals Development Document and/ or Waste Development Document as a

nominated site for potential minerals extraction.

Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3 Organisation representative did not propose this receptor site therefore it has been assumed that the receptor site is unavailable to accept Thames Tideway Tunnel material.

3

TAU

Europe including dykes / levees in Holland

Tauw Group 0 0 Restoration Development and Infrastructure (including Power)

Use of soils in Europe No information made available on this receptor site.

3 No information made available on this receptor site.

3 No information made available on this receptor site.

3 No information made available on this receptor site.

3 No information made available on this receptor site.

3 Shipping large volumes of clean soil to Europe is not considered viable due the distances potentially required.

3

TGA

Tile and Grout Adhesive Loctite Various (Hertfordshire) HP2 4RQ � Recycling Use in Industry Companies  such  as  Henkel  –  Unibond  Require chalk in the production of their products such

as tile adhesive and grout. An investigation for the Lee Tunnel material arisings examined the potential for chalk to be used by this

industry.

The receptor site is unable to receive Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 Chalk is likely to be required in a dry state rather than as a slurry and this material is likely to be all that is required.

2 The receptor site has insufficient capacity.

3 It is unlikely that the receptor site would be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 No information was made available. 3 This Lee Tunnel team investigated the use of chalk in this process but found that it is likely that only a small tonnage would be required and this would have to be pre-treated before being delivered. Therefore this option has not been investigated further.

3

THA

Thames Water infrastructure developments

Thames Water internal contacts

0 0 Engineering Development and Infrastructure (including Power)

Use within other Thames Tideway Tunnel projects. There will be a demand for some material on other Thames Water projects throughout the Thames Tideway Tunnel project lifespan.

1 Thames Water projects would be able to take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. The London Clay and sands and gravels may be appropriate for use.

2 It is unlikely that sufficient capacity would be available.

3 Unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project

3 Planning and permitting would be required and have not been investigated.

3 Use within other Thames Tideway Tunnel projects may be appropriate for a small proportion of the Thames Tideway Tunnel material, but it would not be viable for the majority of materials produced.

3

THA.1

Reuse in Thames Tunnel Project

Thames Water internal contacts

London (529041,177438) Reuse Development and Infrastructure (including Power)

It is possible that the Thames Tideway Tunnel could make use of some of the excavated materials in creation

of the coffer dams and other on site engineering (e.g. access roads)

The receptor site would be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. The London Clay and sands and gravels may be appropriate for use at the receptor site.

2 It is unlikely that there would be sufficient capacity available at the receptor site.

3 It is unlikely that the receptor site would be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 Planning and permitting would be required and have not been investigated.

3 Use within other Thames Tideway Tunnel projects may be appropriate for a small proportion of the Thames Tideway Tunnel material, but it would not be viable for the majority of materials produced.

3

THA.2

Thames Water Reservoir Construction

Thames Water internal contacts

Oxfordshire OX13 6BE (nearest)

Engineering Reclamation

Development and Infrastructure (including Power)

This option was relating to using the excavated material in engineering purposes to develop a Thames Water Reservoir in Oxfordshire. Through discussions with

Thames Tideway Tunnel Staff this outlet is no longer feasible.

The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 It is unlikely that the receptor site would have sufficient capacity available.

3 It is unlikely that the receptor site would be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 Planning and permitting would be required and have not been investigated.

3 Through discussions with Thames Tideway Tunnel staff this receptor site is not feasible to accept Thames Tideway Tunnel material.

3

TIL

Tripcock Point Waste Recycling Facility

Tilfen Land Ltd Recycling Facility, Tripcock Point, Thamesmead,

London, SE28 0AB,

TQ 447900 797270

Recycling Landfill and Quarry Restoration Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 74,999 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has appropriate permit and planning consent to accept 74,999tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

Page 53: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

TOO

Toothpaste Manufacture

GalaxoSmithKline Maidenhead, Berkshire SL6 4BL Restoration Use in Industry Toothpaste requires calcium carbonate (natural chalk) as a key ingredient. The chalk is required in a dried

powder form.

The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales.

3 The receptor site is unable to accept material with Thames Tideway Tunnel project characteristics. Chalk would be the only material required and it would require drying and probably cleaning to remove bentonite.

2 The receptor site has insufficient capacity to accept Thames Tideway Tunnel material.

3 The receptor site has insufficient material to accept Thames Tideway Tunnel material and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site's permit and planning consent have not been assessed due to the receptor site's insufficient capacity.

3 The manufacturers do not need a new source of chalk and costs of pre-treatment would be prohibitive. Also the Thames Tideway Tunnel material is unlikely to be suitable given that it will require drying and cleaning to remove additives.

3

VAN

Hunts Wharf Van Dalen U K Ltd Perry Road, Chequers Lane, Dagenham Dock,

Essex,

TQ 490000 817500

Recycling Material Recycling (including aggregates and soils)

Recycling facility not suitable for Thames Tideway Tunnel materials

The receptor site does not require Thames Tideway Tunnel material. Timescales have not been assessed.

3 The receptor site does not require Thames Tideway Tunnel material.

3 The receptor site does not require Thames Tideway Tunnel material.

3 The receptor site does not require Thames Tideway Tunnel material.

3 The receptor site does not require Thames Tideway Tunnel material.

3 The receptor site does not require Thames Tideway Tunnel material.

3

VEO.1

Veolia Essex - Rainham Landfill

Veolia E S Cleanaway ( U K )

Ltd

Essex RM13 9DA Restoration Engineering

Landfill and Quarry Restoration The site at Rainham accepts around 1.5million tonnes of waste per annum. The landfill is 177 hectares in size. The entire landfill site is due to be fully restored and suitable

for public access by 2018.

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale.

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type, there would be some limits on the receptor site accepting chalk materials.

2 Organisation representative indicated that capacity is available to receive a useful quantity of Thames Tideway Tunnel project material.

2 The receptor site can take some of the required throughput however limitations may be present due to the receptor site's capacity, footprint and/or permitted daily waste movements.

2 The receptor site operates as a landfill and has the necessary permit and consent.

1 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations on material characteristics accepted and the dates that the receptor site is available.

1

VEO.2

Veolia Inert Soils Coldharbour Lane

Veolia E S Cleanaway ( U K )

Ltd

Inert Soils Recovery, Coldharbour Lane, Off Ferry Lane, Rainham, E

TQ 5191 8023 Recycling Material Recycling (including aggregates and soils)

Receptor site operates soil recovery as part of Veolia Rainham Landfill See VEO.1

The receptor site operates soil recovery as part of Veolia Rainham Landfill See VEO.1.

3 Receptor site operates soil recovery as part of Veolia Rainham Landfill See VEO.1.

3 Receptor site operates soil recovery as part of Veolia Rainham Landfill See VEO.1.

3 Receptor site operates soil recovery as part of Veolia Rainham Landfill See VEO.1.

3 Receptor site operates soil recovery as part of Veolia Rainham Landfill See VEO.1.

3 Receptor site operates soil recovery as part of Veolia Rainham Landfill See VEO.1.

3

VEO.3

Veolia Bucks - Wapseys Wood Landfill

Veolia E S Cleanaway ( U K )

Ltd

Gerrards Cross, Buckinghamshire

SL9 8TE Restoration Engineering

Landfill and Quarry Restoration Takes 600,000 m3 non-hazardous mixed waste. 160 Ha. Due to close in 2012 however application has been

produced for an extension to this. �

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. �

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. Further information is required on material types.

2 Capacity is available at the receptor site for a useful amount of Thames Tideway Tunnel material but this is dependant on how restoration is progressing.

2 The receptor site can take some of the required throughput however limitations may be present - such as HGV movements constraining the ability to accept the anticipated throughput.

2 The receptor site operates as a landfill and has the necessary permit and consent.

1 This receptor site is likely to be available to receive Thames Tideway Tunnel material, however it is likely that throughput and capacity will limit the receptor site's potential. �

1

VEO.4

Veolia Bucks - Springfield Landfill

Veolia E S Cleanaway ( U K )

Ltd

Beconsfield, Buckinghamshire

HP9 1XD Restoration Engineering

Landfill and Quarry Restoration As an alternative to the Wapseys Wood landfill, this site can accept 150,000 tonnes per annum. �

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. �

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. Chalk slurry is unlikely to be able to be received at the receptor site.

2 The receptor site has insufficient capacity and can only accept 50,000m3 in total.

3 The receptor site can take some of the required throughput however limitations may be present - such as HGV movements constraining the ability to accept the anticipated throughput.

2 The receptor site operates as a landfill and has the necessary permit and consent.

1 This receptor site has limited capacity and can only accept 50,000m3 in total.

3

VEO.5

Veolia Essex - Pitsea Landfill

Veolia E S Cleanaway ( U K )

Ltd

Basildon, Essex SS16 4UW Restoration Engineering

Landfill and Quarry Restoration Accepts around 800,000 tonnes per annum of waste and is due to close in 2015. This will then be restored to

grass land and nature conservation.

The receptor site has potential to meet all or part of the required Thames Tideway Tunnel project timescales.

2 Organisation representative indicated that there are no constraints on taking material with Thames Tideway Tunnel characteristics.

1 Organisation representative indicated that capacity is available at the receptor site for all of Thames Tideway Tunnel material, or at least all of one type of Thames Tideway Tunnel material.

1 The receptor site can take some of the required throughput however limitations may be present - such as HGV movements constraining the ability to accept throughput.

2 The receptor site operates as a landfill and has the necessary permit and consent.

1 This receptor site is likely to be available to receive Thames Tideway Tunnel material, however it is likely that throughput and capacity will limit the receptor site's potential. �

1

VEO.6

Veolia Essex - Ockendon Landfill

Veolia E S Cleanaway ( U K )

Ltd

South Ockendon, Essex RM16 1TZ Restoration Engineering

Landfill and Quarry Restoration 750,000 tonnes per annum of Non-Hazardous Industrial & 100,000 tonnes per annum of Inert Material

The receptor site is currently not operational. The receptor site could be operational throughout the Thames Tideway Tunnel project.

2 Organisation representative indicated that there are no constraints on taking material with Thames Tideway Tunnel characteristics.

1 Organisation representative indicated that capacity is available for all of Thames Tideway Tunnel material, or at least all of one type of Thames Tideway Tunnel material.

1 The receptor site can take some of the required throughput however limitations may be present - such as HGV movements constraining the ability to accept throughput.

2 The receptor site operates as a landfill and has the necessary permit and consent.

1 The receptor site is currently not operational. The receptor site could be operational throughout the Thames Tideway Tunnel project, however it is likely that throughput and capacity will limit the receptor site's potential. �

1

VIR

Viridor - Beddington Farmlands Landfill

Viridor Croydon CR0 4TD Restoration Landfill and Quarry Restoration Viridor operate a landfill which could accept this material throughout project timeframe. This material

may not all be used for restoration

The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. Chalk slurry is unlikely to be able to be received at the receptor site, however sand, gravels and clay can be received at the receptor site.

2 Capacity is available for a useful volume of Thames Tideway Tunnel material at the receptor site. However organisation would seek to act as a broker for remaining material. -updated 19/07/2011 Receptor site has no requirement for material

3 There may be some limitations constraining the ability to accept throughput, such as vehicle movements but organisation representative did not suggest that this would prevent the receptor site receiving some of the Thames Tideway Tunnel material throughput.

2 The receptor site operates as a landfill and would have the necessary permit and consents.

1 It is likely that the receptor site will accept some of the Thames Tideway Tunnel material but where capacity is exceeded the organisation would act as a broker to other parties. -updated 19/07/2011 Receptor site has no requirement for material.

3

Page 54: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

VIR.2

Elsenham Landfill Viridor Waste Management

Hall Road, Elsenham, Nr Bishop's Stortford

CM22 6DJ Restoration Landfill and Quarry Restoration Quarry requiring restoration The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type and based on the receptor sites' demand requirements.

2 Organisation representative indicated that capacity is available at the receptor site. The receptor site has capacity for 3.2million m3 of material.

1 The receptor site can take some of the required throughput however limitations may be present - such as HGV movements constraining the ability to accept throughput.

2 The receptor site operates as a quarry/landfill and has the necessary permit and consents.

2 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations.

1

WES

RSPB/Westminster Dredgings - Cliffe Pools

Westminster Dredgings

Kent TQ722757 Reclamation Habitat restoration RSPB wetlands project and land reuse in a similar nature to Wallasea.

The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type and based on the receptor sites' demand requirements.

2 Organisation representative indicated that capacity is available at the receptor site. The receptor site has capacity for 1.9million m3 of material.

2 The receptor site has the ability to accept the throughput.

1 The receptor site has planning consent to operate as a dredgings site. The receptor site operates under exemption to receive river dredgings material. The receptor site is included within local development plans to be developed and appropriate stakeholders have been engaged to obtain operating permits.

2 Thames Tideway Tunnel material could be accepted at the receptor site.

1

WIG

Wiggins, Poyle Manor Farm

Wiggins Transport Ltd

Poyle Manor Farm, Poyle Road, Poyle, Berkshire, SL3

0BL,

TQ 029000 762000

Recycling Landfill and Quarry Restoration Physical treatment The receptor site cannot receive any Thames Tideway Tunnel material throughout the required project timescale.

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site has insufficient capacity - 85,000 tpa (source: EA).

3 The receptor site has insufficient capacity and therefore it is unlikely to be able to receive the throughput produced by the Thames Tideway Tunnel project.

3 The receptor site has the appropriate permit to accept 85,000tpa of material, but this has not been examined in detail due to the receptor site's insufficient capacity.

2 The receptor site has insufficient capacity based on EA data and has not been investigated further.

3

WRG.1

WRG - D-shaped Field, Allington Landfill

Waste Recycling Group ( Central ) Ltd

Land / Premises At, A20 London Road, Allington, Maidstone, Kent, ME16

0LE,

TQ 734000 578000

Disposal Landfill and Quarry Restoration This site is not available, as it is an EfW The receptor site is unable to take Thames Tideway Tunnel material and therefore can not meet the required timescales

3 The receptor site cannot accept material with Thames Tideway Tunnel characteristics.

3 The receptor site does not have sufficient capacity to accept Thames Tideway Tunnel material.

3 The receptor site can not accept Thames Tideway Tunnel material therefore throughput capabilities have not been considered.

3 The receptor site does not require Thames Tideway Tunnel material.

3 The receptor site does not require Thames Tideway Tunnel material.

3

WRG.2

WRG - Aveley Landfill WRG South Ockendon, Essex RM15 4HL Restoration Landfill and Quarry Restoration This is a landfill which is currently under going closure proceedings. Restoration material has been secured.

The receptor site is unable to accept Thames Tideway Tunnel material as materials have already been secured. Timescales have not been assessed.

3 The receptor site is unable to accept Thames Tideway Tunnel material as materials have already been secured.

3 The receptor site is unable to accept Thames Tideway Tunnel material as materials have already been secured.

3 The receptor site is unable to accept Thames Tideway Tunnel material as materials have already been secured.

3 The receptor site is unable to accept Thames Tideway Tunnel material as materials have already been secured.

1 The receptor site is unable to accept Thames Tideway Tunnel material as materials have already been secured.

3

WRG.3

WRG - Calvert Landfill WRG Buckinghamshire MK18 2HF Restoration Landfill and Quarry Restoration Landfill the requires restoration over a number of years Organisation representative indicated that the receptor site will be operational beyond the period of the Thames Tideway Tunnel timescales.

1 Organisation representative indicated that the receptor site can accept all material with Thames Tideway Tunnel characteristics.

1 The receptor site is permitted to accept 1 million tonnes of inert material per annum and has a total capacity in excess of 20 million m3.

1 The receptor site has the ability to accept the anticipated throughput of Thames Tideway Tunnel material.

1 The receptor site operates as a landfill and has the necessary permit and planning consent in place.

1 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations.

1

WRG.4

WRG - Stewartby/Brogborough

Landfills

WRG Bedfordshire MK43 9LZ Restoration Landfill and Quarry Restoration Stewartby landfill is due to close in the next five years, and require materials. Brogborough will also require

some material for restoration.

The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type.

2 Dependent on the stage of restoration, capacity is available at the receptor site for a useful amount of Thames Tideway Tunnel material which is clay, sands and gravels.

2 The receptor site can take some of the required throughput however limitations may be present - such as HGV movements constraining the ability to accept the anticipated throughput.

2 The receptor site operates as a landfill and has the necessary permit and consent in place.

1 The receptor site has the ability to accept Thames Tideway Tunnel material, however there may be some limitations.

1

WRG.5

WRG - Sutton Courtenay WRG Oxfordshire OX14 4PW Restoration Engineering

Landfill and Quarry Restoration This landfill has operational capacity for the next 20 years. However some cells will require material for

engineering purposes.

The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type.

2 Dependent on the stage of restoration, capacity is available at the receptor site for a useful amount of Thames Tideway Tunnel material which is clay, sands and gravels.

2 The receptor site can take some of the required clay, sands and gravels anticipated throughput however limitations may be present due to the receptor sites capacity, footprint and/or permitted daily waste movements.

2 The receptor site operates as a landfill and has the necessary permit and consent in place.

1 The receptor site has the ability to accept some material for restoration purposes over the next 20 years.

1

YEO

Yeoman Aggregates Ltd Yeoman Aggregates Ltd

Stone Terminal, Horn Lane, Acton, London, W3

9EH,

TQ 203290 813260

Recycling Material Recycling (including aggregates and soils)

Aggregate suppliers Timescales have not been assessed as the receptor site is unable to receive Thames Tideway Tunnel material.

3 The receptor site does not receive excavated material and therefore would not be able to receive Thames Tideway Tunnel material.

3 Capacity of the receptor site has not been assessed as the receptor site would not be able to receive Thames Tideway Tunnel material.

3 Throughput of the receptor site has not been assessed as it is unable to receive Thames Tideway Tunnel material.

3 The receptor site's planning consent and permit have not been assessed as it is unable to receive Thames Tideway Tunnel material.

3 The receptor site is unable to accept Thames Tideway Tunnel material as materials.

3

Page 55: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

JJF.1

Mercers Farm J&J Franks Ltd Mercers Farm Nutfield Marsh Road Nutfield

Redhill RH1 4EU

TQ 30352 51826 Restoration Engineering

Landfill and Quarry Restoration Site is named in the Surrey Minerals Plan for potential development. Planning Application to extract minerals and the restoration of the site has been submitted to

the Local Planning Authority in 2013.

Timescales are not confirmed as the receptor site is not currently operational. Receptor site operator suggests that when operational, it is likely to operate for 15 years to extract material, which would make it operational during Thames Tideway Tunnel project lifespan if obtained prior to 2021.

2 Organisation representative indicated that the receptor site can accept all material with Thames Tideway Tunnel characteristics.

1 Dependent on the stage of restoration, capacity is available at the receptor site for a useful amount of Thames Tideway Tunnel material which is clay, sands and gravels.

2 The receptor site is likely to be able to accept some of the required throughput but this can not be confirmed until further information on the proposed planning consent is confirmed.

2 The receptor site does not have the necessary consent or permit.

3 The receptor site would likely have the ability to receive Thames Tideway Tunnel project material if it were to receive planning consent and environmental permit. However there may be conditions within these consents effecting the receptor site's viability.

1

CEM.11

Watersplash Farm Cemex U K Materials Ltd

Watersplash Farm, Gaston Bridge Road And

Fordbridge Road, Sunbury On Thames, TW16 6AU

TQ 09484 67442 Restoration Engineering

Landfill and Quarry Restoration Site is named in the Surrey Minerals Plan for potential development. Planning Application to extract minerals and the restoration of the site has been submitted to

the Local Planning Authority in 2013.

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. �

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type.

2 The capacity to receive Thames Tideway Tunnel project material at the receptor site is 680,000m3

2 The receptor site is likely to be able to accept some of the required throughput but this can not be confirmed until further information on the proposed planning consent is confirmed.

2 The receptor site does not have the necessary consent or permit.

3 The receptor site would likely have the ability to receive Thames Tideway Tunnel project material if it were to receive planning consent and environmental permit. However there may be conditions within these consents effecting the receptor site's viability.

3

HAS.1

Milton Park Farm Hanson Aggregates Milton Park, Stroude Rd, Egham TW20 9UW

TQ 01251 70076 Restoration Engineering

Landfill and Quarry Restoration Site is named in the Surrey Minerals Plan for potential development. Planning Application to extract minerals and the restoration of the site has been submitted to

the Local Planning Authority in 2013.

Timescales are currently unknown at the receptor site as it is currently not operational and without planning consent.

2 The receptor site does not have planning consent, and it is currently unknown if it would be able to receive material with Thames Tideway Tunnel material characteristics.

2 The capacity available at the receptor site is currently unknown. However Authority confirmed that likely to be in the region of 1.7million m3.

2 The receptor site currently has no planning consent. Thus throughput has not been examined due to the receptor site's limited information throughput restrictions.

3 The receptor site currently does not have planning consent.

3 The receptor site does not have planning consent and information relating to its operational timescale, capacity or throughput is unconfirmed at this stage. This site could become more viable once planning is secured and these details are confirmed.

3

DUN.1

Meadhams Farm Brickworks

Dunton Brothers Ltd Meadhams Farm Brickworks, Blackwell Hall Lane, Ley Hill, Chesham,

HP5 1UN

SP 98753 01226 Restoration Engineering

Landfill and Quarry Restoration The site is a former brickworks which has recently ceased operations.

Timescales are currently unknown at the receptor site as it is currently operational and decisions are yet to be made on its future.

3 The receptor site is currently operational and decisions are yet to be made by the operator on its future. It is currently unclear what materials, if any would be required by the receptor site for restoration.

3 The capacity available at the receptor site is currently unknown.

3 The receptor site is currently operational and decisions are yet to be made by the operator on its future. It is currently unclear if the receptor site would seek to amend it's environmental permit in order to receive material for restoration.

3 The receptor site's planning consent and permit have not been assessed as the operator is currently unclear on the receptor site's ability to receive Thames Tideway Tunnel material.

3 The future operations of the receptor site are currently yet to be determined. The ability of the receptor site to receive any Thames Tideway Tunnel project material cannot therefore be assessed at this stage until plans for the receptor site have been developed.

3

HAR.5

Denham Park Farm Harleyford Aggregates

Denham Park Farm,Denham Green,UB9

5DL

TQ 02815 89140 Restoration Engineering

Landfill and Quarry Restoration Gravel extraction quarry, where material is also required for restoration. Harleyford Aggregates operate the

material extraction and Ingrebourne Valley operate the restoration of the receptor site. Ingrebourne Valley

have indicated that they would seek to fill other sites in their portfolio with inert material prior to using this

receptor site.

The receptor site will likely to be operational throughout the Thames Tideway Tunnel project, however this is to be determined by other projects and the demand for void space.

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type.

2 The operator has indicated that the receptor site's capacity is likely to be in the region of 250,000m3 by 2016, and then 150,000m3 per year of the Thames Tideway Tunnel project. However the operator has indicated a preference to use other receptor sites within their portfolio.

2 The receptor site can take some of the required throughput however limitations may be present once planning consent is secured - such as HGV movements constraining the ability to accept the anticipated throughput.

2 The receptor site operates as a quarry/landfill and has the necessary permit and consents.

2 When contacted the organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3

HAR.6

Westhorpe Lakes Harleyford Aggregates

Westhorpe Lake,Westhorpe House,

Little Marlow,

SU 86542 86870 Restoration Engineering

Landfill and Quarry Restoration Former quarry where material is also required for restoration. Harleyford Aggregates operate the material

extraction and Ingrebourne Valley operate the restoration of the receptor site. Ingrebourne Valley

have indicated that they would seek to fill other sites in their portfolio with inert material prior to using this

receptor site.

Timescales are currently unknown at the receptor site as it is currently un-operational and decisions are yet to be made on its future.

3 The receptor site is currently un-operational and decisions are yet to be made by the operator on its future. It is currently unclear what materials, if any would be required by the receptor site for restoration.

3 The capacity available at the receptor site is currently unknown.

3 The receptor site is currently un-operational and decisions are yet to be made by the operator on its future.

3 The receptor site currently does not have an environmental permit.

3 When contacted the organisation representative did not propose this receptor site to receive Thames Tideway Tunnel project material.

3

HIG.1

A14 Project Highway Agency Huntingdon Road (A14), Cambridgeshire

TL 32815 67674 Engineering Reuse

Development and Infrastructure (including Power)

Proposed development of the A14 between Huntingon and Cambridge. Material may be required for

engineering works.

Timescales are currently unknown at the receptor site as the development is yet to apply for planning permission and decisions are yet to be made on its future.

3 The development is yet to receive planning permission and decisions are yet to be made by the operator on its future. It is currently unclear what materials, if any would be required by the development for engineering requirements.

3 The capacity available at the receptor site is currently unknown.

3 The development is yet to apply for planning permission and decisions are yet to be made by the operator on its future.

3 The development currently does not have an environmental permit.

3 The development is yet to apply for planning permission and details surrounding the demand for material to be used for engineering purposes are not yet confirmed.

3

HAC.1

Swanscombe Peninsula Homes and Communities

Agency

Northfleet Industrial Estate, Gravesend, Kent,

DA11 9SN

TQ 60501 76002 Engineering Reuse

Development and Infrastructure (including Power)

Proposed import of material for landraise required for flood defence as well as to produce a platform for

future development of the receptor site.

Timescales are currently unknown at the receptor site as the development is yet to apply for planning permission and decisions are yet to be made on its future.

3 The receptor site does not have planning consent, and it is currently unknown if it would be able to receive material with Thames Tideway Tunnel material characteristics.

3 The capacity available at the receptor site is currently yet to be confirmed. However operator confirmed that likely to be in the region of 4-7million tonnes.

3 The receptor site's throughput cannot be assessed as it does not have planning consent or environmental permit at the time of assessment.

3 The development currently does not have an environmental permit or planning consent.

3 The development is yet to apply for planning permission and details surrounding the demand for material to be used for engineering purposes are not yet confirmed.

3

HAC.2

Isle Sheppy Homes and Communities

Agency

Queenborough Rd, Minster on Sea, Sheerness,

Kent ME12 3RJ  

TQ 93121 72271 Engineering Reuse

Development and Infrastructure (including Power)

Proposed import of material for landraise required for flood defence as well as to produce a platform for

future development of the receptor site.

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. �

2 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type and based on the receptor sites' demand requirements.

2 The capacity available at the receptor site is likely to be less than 200,000tonnes from 2016

3 The receptor site has insufficient capacity to receive Thames Tideway Tunnel materials.

3 The receptor site has the appropriate permit and planning consent to accept material, but this has not been examined in detail due to the receptor site's insufficient capacity.

3 The receptor site has a limited capacity for material to be produced within the Thames Tideway Tunnel project timeframe and so has not been assessed further.

3

Page 56: Application Reference Number: WWO10001 …...2003/10/09  · Excavated Materials Options Assessment (EMOA) Annex C1 to C3 Doc Ref: 9.10.03 Folder 88 September 2013 DCO-DT-000-ZZZZZ-091003

OP ID Name Operator Location Postcode/ Grid Reference

Type of Operation

Operation type Summary a) Likelihood of implementation within the required timescale St

atus b) Acceptability of material with

Thames Tideway Tunnel material characteristics by the receptor sites St

atus

c) Capacity of the receptor site to accept the required volume of Thames Tideway Tunnel material (based on likely tonnage accepted)

Stat

us

d) Ability of the receptor sites to accept Thames Tideway Tunnel material at the anticipated rate (speed of material generation vs. acceptance rate)

Stat

us e) Site operations have appropriate planning/permitting consent St

atus

Overall Suitability

Stat

us

HAC.3

Northfleet Industrial Estate

Homes and Communities

Agency

Northfleet Industrial Estate, Gravesend, Kent,

DA11 9SN

TQ 61095 75918 Engineering Reuse

Development and Infrastructure (including Power)

Proposed import of material for landraise required for flood defence as well as to produce a platform for

future development of the receptor site.

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. �

3 The receptor site does not have planning consent, and it is currently unknown if it would be able to receive material with Thames Tideway Tunnel material characteristics.

3 The receptor site is unable to accept Thames Tideway Tunnel material as the majority of material has already been secured.

3 The receptor site is unable to accept Thames Tideway Tunnel material as the majority of material has already been secured.

3 The receptor site is currently receiving material similar in nature to that produced by the Thames Tideway Tunnel project and planning consents and environmental permit are in place.

1 The receptor site is currently receiving material similar in nature to that to be produced by the Thames Tideway Tunnel project and so is unlikely to require this material at the time of its production.

3

BRE.10

Cliffe Works Brett Aggregates Ltd Brett Aggregates, Salt Lane, Rochester, Kent.

ME3 7ST

TQ 71397 76455 Restoration Landfill and Quarry Restoration Proposed restoration of the receptor site in to pasture as well as a small area for development.

The receptor site has the potential to meet all or part of the required Thames Tideway Tunnel project timescale. The existing planning consent requires restoration to be complete by 2018.

2 The operator has confirmed that a permit would be sought to receive all Thames Tideway Tunnel project material types.

1 There is capacity available for a useful volume of Thames Tideway Tunnel material at the receptor site.

2 Receptor site can take the required throughput however limitations may be present due to the sites capacity.

1 The receptor site necessary has the planning consent and is in the process of applying for an environmental permit.

2 The receptor site will require material for restoration purposes. It has planning consent but yet to obtain an environmental permit. It has capacity for a useful amount of Thames Tideway Tunnel project material and is available until 2018.

1

BRE.11

Lydd Quarry (Allen's Bank)

Brett Aggregates Ltd Brett Aggregates, Jury's Gap Rd, Lydd, Kent TN29

9LB

TR 04595 21599 Restoration Landfill and Quarry Restoration Proposed restoration of quarry to return to agriculture. The receptor site will be operational throughout the Thames Tideway Tunnel project.

1 The receptor site can take material with some of the Thames Tideway Tunnel characteristics, but this is limited to material type. Chalk slurry is unlikely to be able to be received at the receptor site due to practical transport arrangements, however sand, gravels and clay can be received at the receptor site.

2 There is capacity available for a useful volume of Thames Tideway Tunnel material at the receptor site.

2 Receptor site can take some of the required throughput however limitations may be present due to the sites capacity.

2 The receptor site necessary planning consent and is in the process of applying for an environmental permit.

2 The receptor site will require material for restoration purposes. It has planning consent but yet to obtain an environmental permit. It has capacity for a useful amount of Thames Tideway Tunnel project material and is available throughout the Thames Tideway Tunnel project.

1

Number of sites proceeding to Viable List

37

Number of sites NOT proceeding to Viable List

222

Total Options on Long List 259