april 08, 2004
DESCRIPTION
Welcome Shri Brajesh Mishra Principal Secretary to Hon’ble Prime Minister. April 08, 2004. POWERGRID started its commercial operation in 92-93 First ISO 9001 Company in Power Sector - PowerPoint PPT PresentationTRANSCRIPT
April 08, 2004
Welcome Shri Brajesh Mishra
Principal Secretary to Hon’ble Prime Minister
POWERGRID started its commercial operation in 92-93 First ISO 9001 Company in Power Sector It operates and maintains 50,000 ckms of EHV
transmission system along with 81 S/Stn at 99.25% system availability
Over 40% of the total generated power is wheeled by POWERGRID
Such a performance is feasible through Robust system design after detailed studies with
thrust on integrated development Deployment of Hot line Maintenance Techniques Use of Emergency Restoration System Trained and Dedicated Manpower with
decentralised administrative powers
POWERGRID, the central transmission utilityPOWERGRID, the central transmission utility
Commercial PerformanceCommercial Performance
2002-03(Actual)
2003-04
(Projection)
2006-07
(End of 10th Plan)
2011-12
(End of 11th Plan)
Gross Block 18943 19858 37800 64200
Net worth 7312 7865 12000 21000
Turn Over 2533 2733 4800 8500
Net Profit 643 672 1420 3100
Key Financial Indicators (Rs. In Crores)
National Grid of 30,000 MW capacity planned for execution by 2012 with an investment of Rs.71000 Crore.
Phase I : 5000 MW completed in 2002Phase II: Additional 18,000 MW Planned to
be completed by 2007. 3500 MW already commissioned
Phase III: Additional 7000 MW Planned from 2007-2012
POWERGRID to finance up to Rs 51,000 Crore through IR and loans
Balance Rs 20,000 Crore through Private Investment or GoI’s additional grant / equity with matching loan
Future PlanFuture Plan
The only company to adopt ESPP document with wide consultation at National and International level
POWERGRID: First to assist wherever disaster struck Gujarat Cyclone (1998) Orissa Cyclone (1999) Gujarat Earthquake (2001)
Establishment of Green Sub StationEstablishment of ultra modern office,
Group Housing Society, School and Township
Organise training on regular intervals for SEBs
LENDING TENDER HANDSLENDING TENDER HANDS
Inter Regional LinksInter Regional Links
WR
NR
ERNER
1000 MW
500 MW
500 MW
500 MW
Present IR Capacity : 8500 MW
To Go Upto 30,000 MW by 2012
2000
MW
1200 MW
SR
Functions of ULD&CFunctions of ULD&C
Apex body for integrated Grid Operation
Responsible for Optimum Scheduling and Dispatch of Electricity
Supervise and Control Inter-state Transmission System
Ensure Security and Economy in operation as per the Grid Standard and the Grid Code
Keep accounts of Electricity transmitted through the Grid
ULD&C PROJECTS : TYPICAL HIERARCHICAL CONTROL CENTRE SETUP
RTU RTU RTU
SUB LDC SUB LDC SUB LDC
SLDC SLDC SLDC
ERLDC WRLDC NRLDC SRLDC NERLDC5 Nos.
NLDC
32 Nos.
51 Nos.
1160 Nos.
National
Level
Region
State HQ
Group of Disticts
Plant / SS
ULD & C Projects : ObjectivesULD & C Projects : ObjectivesGreater and deeper visibility of the Power
System under ControlDedicated real time communication and co-
ordination between various control centres in the region
Effective management of grid parameters like frequency, voltage etc and better grid security through various SCADA / EMS features resulting in better Operations Scheduling Operations Monitoring and Control Power System Analysis
Real time dispatcher training
Establishment of Modern ULD&Cs has Establishment of Modern ULD&Cs has Resulted intoResulted into
Considerable betterment of System parameters viz. frequency and Voltage in spite of Minimal Generation addition
Merit Order Operation leading to overall economy
Introduction of ABT (Availability Based Tariff) linked to frequency variation
Transparency in Grid OperationQuantum leap in Intra and Inter Regional
power TradingEnhanced Grid Discipline
POWERGRID’s Diversification in POWERGRID’s Diversification in CommunicationCommunication
To utilise spare capacity of ULD&C Schemes through an incremental investment
To lay 20,000 kms telecom network spread over 60 cities including metros and major cities
12,000 kms, connecting 30 cities already commissioned . Rest by June’04.
Telecom Network on Transmission line is sturdy and secure, rodent menace free, Vandalism proof, 100% availability etc.
DWDM /SDH equipment deployedScalable to terra bit capacityObtained IP-II licence in Jan 2001 and ISP
category A licence in May 2003