District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Bruce-Monroe School Improvement Team (SIT)

MeetingReunión del Equipo de

Mejoramiento

April 26, 2017 6PM

Presenter
Presentation Notes
Good evening. Welcome to the Bruce Monroe School Improvement Team Meeting. My name is Toussaint Webster for those of you who don’t remember me from before (the last time we were together was in November). We are here to share an exciting update to keep you in the loop. Let’s take a look at our brief agenda.

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Updated Project DetailsDetalles actualizados del proyecto Introduction of Project ManagerIntroducción de Project Manager Introduction of BuilderIntroducción de Contratista General Introduction of Project ArchitectIntroducción del Arquitecto del ProyectoPlan Moving ForwardPlan de Avanzar

Agenda

Presenter
Presentation Notes
We will give you an update of the project details. A lot has happened since November. Then we’ll introduce you to the official DGS Project Manager Then you will meet the project architect and hearing about the work they’ve done on other schools After that, you’ll hear from our builder seeing the projects they’ve completed in the past And we’ll close out the meeting with a soft timeline of out next steps. We know that you have no reason to trust us, but we’ll work on restoring that trust.

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Location/Ubicación: 3560 Warder St NW Ward/Sala: 1 Overall Project Budget/Presupuesto general del proyecto: $11.2M Project Status/Estado del proyecto: Pre-Design/Pre diseño Program Manager/Director del programa: Nikkia Martin Architect/Arquitecto: Shinberg Levinas General Contractor/Contratista general: Winmar Construction DCPS SIT Coordinator/Coordinador de DCPS SIT: Toussaint Webster Scope: Full kitchen, larger dining space (down to 3 lunch periods),

loading, and correct parking grade issues in the back

Project Details/detalles del proyecto

Presenter
Presentation Notes
First we talked about a possible additional $5.5M added to the project. When we last met on April 4, we were waiting on the City Council to vote in favor of that additional $5.5M. Fortunately, they did. So we now have a project budget almost double the size, at $11.2M. On the Architect’s Request for Proposal, the goal was to release one for expanding the cafeteria to include its own kitchen, to solve the loading/parkin

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Project Experience/Experiencia en proyectos

Anacostia SHS Brookland Middle School Truesdell EC Phase I Leckie ES Phase I Murch Elementary Swing Space

Nikkia Martin

Presenter
Presentation Notes
Say some things about yourself, so that the community knows that they’re in good hands.

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

A DC Registered CBE Firm

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

LISTEN + UNDERSTAND + EXPERIENCEPhilosophy

We are a firm that designs without boundaries. By constantly changing our approach to fit each client and project, our design work reads as clean, imaginative, responsive and

playful. Architect, client, contractors and consultants are teammates in the design process.

Somos una empresa que diseña sin fronteras. Al cambiar constantemente nuestro enfoque para adaptarse a cada cliente y proyecto, nuestro trabajo de diseño se lee como limpio, imaginativo,

sensible y juguetón. Arquitecto, cliente, contratistas y consultores son compañeros de equipo en el proceso de diseño.

Presenter
Presentation Notes
Introduce this community to Shinberg Levinas and get them excited about the project

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

45+ Years of Experience Designing PreK-12 SchoolsMás de 45 años de experiencia diseñando escuelas PreK-12

Presenter
Presentation Notes
Introduce this community to Shinberg Levinas and get them excited about the project

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Experience with DC Regulatory Agencies and Code OfficialsExperiencia con las agencias reguladoras de DC y funcionarios de código

Rocketship Rise AcademyCafeteria – LEED Platinum

Carlos Rosario Public SchoolCafeteria – LEED Gold

Presenter
Presentation Notes
Introduce this community to Shinberg Levinas and get them excited about the project

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Experience with Education Building ComponentsExperiencia con los Componentes del Edificio Educativo

Eagle AcademyGym – LEED Gold

Paul Public SchoolGym – LEED Gold Target

Presenter
Presentation Notes
Introduce this community to Shinberg Levinas and get them excited about the project

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

We Have Programmed and Designed over 2 million Square Feetof Institutional Space Hemos programado y diseñado más de 2 millones de pies cuadradosDel Espacio Institucional

Presenter
Presentation Notes
Introduce this community to Shinberg Levinas and get them excited about the project

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Extensive and Long Term Experience Working with the full range of DC Regulatory Agencies

Hyde-AddisonElementaryPublic School

Renovation + Addition to Historic Building

Presenter
Presentation Notes
Introduce this community to Shinberg Levinas and get them excited about the project

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

We approach every project with an uncompromising devotion to the highest design, engineering and construction standards in the industry and our team is committed to executing timely and budget conscious projects through creative problem solving and open lines of communication.Abordamos cada proyecto con una devoción intransigente a los más altos estándares de diseño, ingeniería y construcción en la industria y nuestro equipo está comprometido a ejecutar proyectos oportunos y con presupuesto limitado a través de soluciones creativas y líneas de comunicación abiertas.

Winmar is a DC registered ‘CBE’ whom has never performed school project with less than 50% participation of local, small or disadvantaged businesses. Winmar es un DC registrado 'CBE' que nunca ha realizado proyectos escolares con menos del 50% de participación de empresas locales, pequeñas o en desventaja.

Philosophy

Building Community

Presenter
Presentation Notes
For my folks from Winmar, I'm sure that you have done this more than I have seen it done; but I think that you should have someone speak for about 10 minutes about your company in general, its philosophy, your achievements building schools (especially DCPS), how you hire subcontractors, and next steps in the project. Also, please have a few graphics of school constructions, that you're proud of, to talk about.

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Janney Elementary42,000 SF addition and a 63 space underground parking garaje42,000 pies cuadrados y un garaje subterráneo de 63 plazas

kitchen, art room, music room, science lab, multipurpose room/gymnasiumCocina, sala de arte, sala de música, laboratorio de ciencias, sala multiusos / gimnasio

June 2010-Dec 2012Junio 2010-Diciembre 2012

LEED Gold/Oro LEED

Presenter
Presentation Notes
For my folks from Winmar, I'm sure that you have done this more than I have seen it done; but I think that you should have someone speak for about 10 minutes about your company in general, its philosophy, your achievements building schools (especially DCPS), how you hire subcontractors, and next steps in the project. Also, please have a few graphics of school constructions, that you're proud of, to talk about.

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Brent Elementary 12,000 SF Classroom

modernization and addition of Administration building

12.000 pies cuadrados Modernización de aulas y la adición de edificio de administración

State of the Art playground and Library

Parque infantil y biblioteca del estado del arte

May-August 2009 Mayo-Agosto 2009

Upgrade lighting & IT beyond specs

Mejorar la iluminación y la tecnología más allá de las especificaciones

Presenter
Presentation Notes
For my folks from Winmar, I'm sure that you have done this more than I have seen it done; but I think that you should have someone speak for about 10 minutes about your company in general, its philosophy, your achievements building schools (especially DCPS), how you hire subcontractors, and next steps in the project. Also, please have a few graphics of school constructions, that you're proud of, to talk about.

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Fort Stanton Recreational Center

28,000 SF Pool House and Recreation Center

Centro de recreación y piscina de 28.000 pies cuadrados

Playground, Fitness Center, Senior Center

Parque infantil, Gimnasio, Centro para personas mayores

April-July 2013Abril-Julio 2013

LEED SilverPlata LEED

Presenter
Presentation Notes
For my folks from Winmar, I'm sure that you have done this more than I have seen it done; but I think that you should have someone speak for about 10 minutes about your company in general, its philosophy, your achievements building schools (especially DCPS), how you hire subcontractors, and next steps in the project. Also, please have a few graphics of school constructions, that you're proud of, to talk about.

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Summer 2017 – Concept / Schematic & Design DevelopmentVerano 2017 - Concepto / Desarrollo de esquemas y diseños

Fall 2017 – New Heating/Cooling systems at corridorsFall 2017 - Nuevos sistemas de calefacción y refrigeración en los pasillos

Winter 2017/18 – Excavation, structural installationsInvierno 2017/18 - Excavación, instalaciones estructurales

Spring 2018 – New Cafeteria utilities (electrical, plumbing)Primavera 2018 - Nueva utilidades de la cafetería (electricidad, plomería)

Summer 2018 – Food Service Equipment, Cafeteria finishes, complete new parking area. Turnover full project 8/1/2018

Verano 2018 - Equipos de servicio de comidas, acabados de cafetería, nueva área de estacionamiento. Proyecto completo de Turnover 8/1/2018

Next Steps/Rough Timeline

Presenter
Presentation Notes
For my folks from Winmar, I'm sure that you have done this more than I have seen it done; but I think that you should have someone speak for about 10 minutes about your company in general, its philosophy, your achievements building schools (especially DCPS), how you hire subcontractors, and next steps in the project. Also, please have a few graphics of school constructions, that you're proud of, to talk about.

District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov

Questions/Concerns?Preguntas / inquietudes?

Contact: [email protected] and www.engagedcps.org

Don’t forget to sign-in (please print)No te olvides de registrarte (por favor, escribe)

Presenter
Presentation Notes
Are there any questions?