aps progress under the 2011 17 plan: goals 1...

38
APS Progress Under the 201117 Strategic Plan: Goals 1 & 2 Presentation to the School Board Arlington Public Schools October 18, 2012

Upload: others

Post on 23-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

APS Progress Under the 2011‐17 Strategic Plan:  Goals 1 & 2

Presentation to the School BoardArlington Public Schools

October 18, 2012

Page 2: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

The Whole Child

Challenging & Engaging Education

Optimal Learning 

Environments

Eliminating Gaps

High Quality Staff

Strategic Plan Goal Areas 

2

Page 3: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Division Scorecard

3

Page 4: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

APS Dashboard: Sample Screen

4

Page 5: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

KPIs under Goals 1 and 2Key Performance Indicator Goal 1:  Challenge & Engage Goal 2:  Eliminate Gaps

Pre‐K Enrollment Proficiency

Gifted Services Identification Rigor

Elementary SOLs Proficiency Proficiency

Middle School SOLs Proficiency Proficiency

High School SOLs (EOC) Proficiency Proficiency

AP/IB Enrollment Rigor Rigor

AP/IB Performance Rigor Rigor

SAT/ACT Participation Rigor Rigor

SAT Performance Rigor Rigor

ACT Performance Rigor Rigor

Dual Enrollment Rigor Rigor

On‐time Graduation Proficiency Proficiency

Diploma Types Rigor Rigor

5

Page 6: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Calendar of Presentations

Meeting Date

Strategic Plan Goal

Focus

October 18 Goals 1 &2  Challenge & engage all students and eliminate gaps on proficiency measures

November 1 Goals 3 &4 High quality staff & optimal learning environments

November 13 Goals 1 &2 Challenge & engage all students and eliminate gaps on more rigorousmeasures

December 6 Goal 5 Meeting the needs of the whole child

6

Page 7: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Proficiency Measures from Pre‐K to Grade 16

7

Pre‐K Enrollment

Grade 3 ‐ 5 SOLs

Grade 6 ‐ 8 SOLs

End of Course SOLs

On‐time Graduation

Page 8: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

PRE‐K ENROLLMENT

8

Page 9: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Kindergarten Students Enrolled in Pre‐K 

87 8681

868784

0

20

40

60

80

100

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f K S

tude

nts

Source: 2011-12 Strategic Plan Report

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐9

Page 10: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Kindergarten Students Enrolled in Pre‐K 

87 8681

868784

0

20

40

60

80

100

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f K S

tude

nts

Asian Black Hispanic White APS

Source: 2011-12 Strategic Plan Report

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐10

KPI:  % of kindergarten students previously enrolled in pre‐K program by identified subgroups 

Page 11: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Kindergarten Students Enrolled in Pre‐K 

79

71

87

92

89 8890 89

797981

8585

70

75

80

85

90

95

100

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f K S

tude

nts

Asian Black Hispanic White APS

Source: 2011-12 Strategic Plan Report

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11

2016‐17 Target Range = 85‐90%

Page 12: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Kindergarten Students Enrolled in Pre‐K 

8487 86

818687

0

20

40

60

80

100

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f K S

tude

nts

Econ Dis LEP SWD APS

Source: 2011-12 Strategic Plan Report

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12

KPI:  % of kindergarten students previously enrolled in pre‐K program by identified subgroups 

Page 13: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Kindergarten Students Enrolled in Pre‐K 

75

8284

79

85

8175

9189 90 91

93

70

75

80

85

90

95

100

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f K S

tude

nts

Econ Dis LEP SWD APS

Source: 2011-12 Strategic Plan Report

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐13

2016‐17 Target Range = 85‐90%

Page 14: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOLs:  College and Career‐Ready Standards

Subject Area New Standards  (SOLs) Adopted

New SOL Assessments Introduced

History/Social Science 2008 2010‐11

Mathematics 2009 2011‐12

English (Reading/Writing) 2010 2012‐13

Science 2010 2012‐13

Page 15: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Key Performance Indicators

Subject Area Elementary Middle High

English/Reading Grades 3‐5 Grades 6‐8 EOC (Grade 11)  

Mathematics Grades 3‐5 Math 6‐8AlgebraGeometry

AlgebraGeometryAlgebra II

Science Grades 3 & 5 Grade 8 Earth ScienceBiology

Chemistry

History/Social Science

Grade 3VA Studies (Grade 4)

US History I (Gr 6)US History II (Gr 7)World Geography

World GeographyWorld History IWorld History IIVA/US History

English/Writing Combined Grade 5, Grade 8 and EOC (Grade 11) tests

15

Page 16: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Pass Rates:  All Subjects (All Grades Tested)

86

92 93939593

8784 7988

0

20

40

60

80

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Reading Writing History Math Science

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐16

KPI:  % of students at each school level scoring proficient or above in each subject 

Page 17: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Pass Rates:  All Subjects (All Grades Tested)

92

86

939395

93

87

84

79

88

70

75

80

85

90

95

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Reading Writing History Math Science

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐17

2016‐17 Target Range = 90‐95%

Page 18: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

READING SOL TESTSElementary KPIs

18

Page 19: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Pass Rates: Reading by Level 

95

85 88898888

96949695

0

20

40

60

80

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Elementary Middle High

Source: VDOE SOL Assessment Reports, 10/11/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐19

KPI:  % of students at each school level scoring proficient or above in reading 

Page 20: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Pass Rates:  Reading by Level

95

85

88898888

9694

9695

70

75

80

85

90

95

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Elementary Middle High

Source: VDOE SOL Assessment Reports, 10/11/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐20

2016‐17 Target Range = 90‐95%

Page 21: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Reading Pass Rates:  Elementary  

76

96

77817876

9696 9696

0

20

40

60

80

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Asian Black Hispanic White APS

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐21

KPI:  Percentage of students grades 3‐5 scoring proficient or above in reading 

Page 22: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Reading Pass Rates:  Elementary  

76

96

77

81

7876

9696 9696

70

75

80

85

90

95

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Asian Black Hispanic White APS

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐22

2016‐17 Target Range = 90‐95%

Page 23: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Reading Pass Rates:  Elementary  

6873 74

69 67

89 90 90 89 89

0

20

40

60

80

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Econ Dis LEP SWD APS

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐23

KPI:   Percentage of students grades 3‐5 scoring proficient or above in reading

Page 24: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Reading Pass Rates:  Elementary  

68

73 74

69

89 90 90 89 89

67

60

70

80

90

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Econ Dis LEP SWD APS

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐24

2016‐17 Target Range = 90‐95%

Page 25: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SCIENCE SOL TESTSHigh School KPIs

25

Page 26: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Pass Rates: Science by Level 

87

94929189

92898888

89

0

20

40

60

80

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Elementary Middle High

Source: VDOE SOL Assessment Reports, 10/11/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐26

KPI:  % of students at each school level scoring proficient or above in science

Page 27: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Pass Rates:  Science by Level

89 91 9294

87

9289

88 88 89

70

75

80

85

90

95

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Elementary Middle High

Source: VDOE SOL Assessment Reports, 10/11/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐27

2016‐17 Target Range = 90‐95%

Page 28: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Science Pass Rates:  High School  

78

98

85838079

9897 9898

0

20

40

60

80

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Asian Black Hispanic White APS

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐28

KPI:  % of students grades  9‐12 scoring proficient or above on EOC science tests

Page 29: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Science Pass Rates:  High School 

81

78 79 80

85

98 9897 9898

70

75

80

85

90

95

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Asian Black Hispanic White APS

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

2016‐17 Target Range = 90‐95%

29

Page 30: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Science Pass Rates:  High School  

7176 75 75

79

89 88 88 89 92

0

20

40

60

80

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Econ Dis LEP SWD APS

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐30

KPI:   % of students grades  9‐12 scoring proficient or above on EOC science tests

Page 31: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

SOL Science Pass Rates:  High School 

71

76 75 75

79

89 88 88 8992

60

65

70

75

80

85

90

95

100

2007-08 2008-09 2009-10 2010-11 2011-12

Perc

ent o

f Stu

dent

s Pa

ssin

g

Econ Dis LEP SWD APS

Source: VDOE SOL Assessment Reports, 9/28/12

(Year 1)‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Baseline‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐31

2016‐17 Target Range = 90‐95%

Page 32: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

ON‐TIME GRADUATION

32

Page 33: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

APS Cohort On‐time Graduation Rates

84.5 85.287.6

89.0

82.5

70

75

80

85

90

95

100

2008 2009 2010 2011 2012*

Perc

ent o

f Coh

ort S

tude

nts

Source: VDOE On-time Graduation Detail Report, 10/01/12 *VDOE will announce final rates on October 23, 2012. (N=1,190) (N=1,320) (N=1,355) (N=1,449) (N=1,431)Adjusted Cohort:

Class of 2017 Target = 95%

33

KPI:   % of students graduating on‐time with any diploma (as defined by state)

Page 34: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

On‐Time Graduation Rate by Race/Ethnicity

87.5

76.3

63.9

90.8

80.4

69.1

91.9

85.1

68.3

89.4

88.5

73.8

91.2

87.3

78.2

93.8

96.6

96.3

97.4

97.4

0

20

40

60

80

100

Asian Black Hispanic White

% o

f Stu

dent

s G

radu

atin

g O

n-tim

e

2008 2009 2010 2011 2012*

Source: Virginia On-time Graduation Rate Reports, 10/01/2012

Class of 2017 Target = 95%

*VDOE will announce final rates on October 23, 2012.

Page 35: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

On‐Time Graduation Rate by Special Services

72.6

50.8

86.1

78.4

54.8

82.6

77.9

58.3

88.6

80.7

62.7

90.5

83.2

65.6

90.5

0

20

40

60

80

100

Econ Dis LEP SWD

% o

f Stu

dent

s G

radu

atin

g O

n-tim

e

2008 2009 2010 2011 2012*

Source: Virginia On-time Graduation Rate Reports, 10/01/2012

Class of 2017 Target = 95%

*VDOE will announce final rates on October 23, 2012.

Page 36: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

Goals 1 and 2 (Proficiency):  Summary

Key Performance Indicator

Goal 1:  Challenge and Engage Students

Goal 2:  Eliminate Gaps

Pre‐K Enrollment All students within 6‐year target range (85‐90%)  

All subgroups except Asian, LEP, and economically disadvantaged already within 6‐year target range (85‐90%)

SOL Proficiency in Core Subjects

All students within in or approaching 6‐year target range (90‐95%) for reading, writing, math, science, and history

Pass rates increasing in some subjects for some subgroups; persistent gaps remain for some reporting groups:  Black, Hispanic, LEP, SWD, and economically disadvantaged

On‐time Graduation Projected to meet 6‐year target of 95% based on upward trend

Rates for all subgroups are increasing

36

Page 37: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

APS Dashboard: Sample Screen

37

Page 38: APS Progress Under the 2011 17 Plan: Goals 1 2mlkcommission.dls.virginia.gov/meetings/2012/E-2_Strat_Plan_Goals… · APS Progress Under the 2011‐17 Strategic Plan: Goals 1 & 2

APS Progress Under the 2011‐17 Strategic Plan:  Goals 1 & 2

Presentation to the School BoardArlington Public Schools

October 18, 2012